The city's published records show little recorded distress here in the last three years. Less recorded distress than 70% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty
points per 10 units; this building carries 6. In ZIP 11216, 38% of residential buildings hold an A and
19% grade D or F.
How grades work
this building
A
B
C
Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
2 service requests in the last three years. Most common: Non (1) · Illegal Parking (1).
Filed construction activity
$15,000 in permitted construction work filed since
2016 (1 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974 (2017)
Yes
Six or more residential units (10)
No
421-a / J-51 tax benefit on the current tax roll
1 of 3 signals present. Only a partial profile — stabilization is possible but less likely. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
204 MONROE STREET CONDOMINIUM
Head officer
KATHERINE INGRAVALLO
Managing agent
COE PROPERTY MANAGEMENT SERVICES
Last registered
2025-06-25
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$132,383
$59,573
2026
$336,834
$151,575
2027
$186,788
$84,054
The city's market estimate has risen
41% between tax years 2025 and 2027.
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
1 street-flooding or sewer-backup complaints at this address since
2023 (0 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Bedford-Nostrand Avs — G · 0.3 mi straight-line (about an 8-minute walk) · station accessibility: none Nostrand Av — A C · 0.3 mi straight-line (about an 8-minute walk) · station accessibility: none
Bus
Nearest boarding stop: Nostrand Av / Monroe St — B44 · 200 ft
Citi Bike
Putnam Ave & Nostrand Ave · 550 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
2 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
311: Illegal Parking — Parking Permit Improper Use
The full timeline
2026
2026-09-02Rodent inspection: Passed
2026-03-20Rodent inspection: Passed
2025
2025-12-04Bedbug filing: 0 infested units
2025-11-12311: Illegal Parking — Parking Permit Improper Use
2025-09-08Rodent inspection: Passed
2025-09-02311: Non-Emergency Police Matter — Other (complaint details)
2025-03-03Rodent inspection: Passed
2024
2024-12-03Bedbug filing: 0 infested units
2024-11-06Mortgage $500,000 — from DANIELS, CLARENCE; SPARKMAN, FELICIA to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; ROCKET MORTGAGE LLC$500,000
2024-09-06Rodent inspection: Passed
2024-03-06Rodent inspection: Failed for Rat Activity
2024-01-19Bedbug filing: 0 infested units
2023
2023-11-20HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2022-11-09HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2022-09-02Rodent inspection: Passed
2022-04-20Bedbug filing: 0 infested units
2022-03-17Rodent inspection: Passed
2022-03-10HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021
2021-11-10Mortgage satisfied — from HUANG, CAROLYN to CITIZENS BANK N A
2021-10-21Mortgage $457,417 — from HUANG, CAROLYN to BETTER MORTGAGE CORPORATION; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$457,417
2021-08-09Bedbug filing: 0 infested units
2021-07-13311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-07-12311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-04-20HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021-03-12Rodent inspection: Passed
2020
2020-10-28311: New Tree Request — For One Address
2020-10-15Mortgage assigned — from WELLS FARGO BANK NA to QUICKEN LOANS LLC; MERS
2020-10-15Agreement $437,000 — from BUKA, OLTA to MERS$437,000
2019-11-19Deed $499,000 — from 204 MONROE LLC to DANIELS, CLARENCE$499,000
2019-11-19PAT — from DANIELS, CLARENCE to BOARD OF MANAGERS OF THE
2019-11-14311: New Tree Request — For One Address
2019-11-12Sold for $499,000$499,000
2019-09-27PAT — from ICART-PIERRE, JEAN PATRICK; ICART-PIERRE, SERENA to BOARD OF MANAGERS
2019-09-27Mortgage $559,200 — from ICART-PIERRE, SERENA; ICART-PIERRE, JEAN PATRICK to MERS$559,200
2019-09-27Deed $699,000 — from 204 MONROE LLC to ICART-PIERRE, JEAN PATRICK; ICART-PIERRE, SERENA$699,000
2019-09-11Sold for $699,000$699,000
2019-09-06Rodent inspection: Passed
2019-08-08Deed $999,000 — from 204 MONROE LLC to ROFE, TAMY; DONNELLY, FELIPE I$999,000
2019-08-08PAT — from DONNELLY, FELIPE IGNACIO to DEBBAS, PIERRE E; GERSHBURG, DANIEL; MELNICK, MATTHEW G; WEISMAN, ALISON; KLEIN, RICHARD;
2019-08-08PAT — from ROFE GRINBERG, TAMY; ROFE, TAMY to GERSHBURG, DANIEL; AVRUCHEVSKY, ANNA; KRINSKY, SCOTT; GRECO, DANIELLE; DEBBAS, PIERRE E; F
2019-08-08Mortgage $799,200 — from ROFE, TAMY; DONNELLY, FELIPE I to JP MORGAN CHASE BANK, N.A.$799,200
2019-08-08PAT — from ROFE, TAMY; DONNELLY, FELIPE I to BOARD OF MANAGERS 204 MONROE STREET COND
2019-07-25Sold for $999,000$999,000
2019-07-19Deed $1,068,144 — from 204 MONROE LLC to CHE, YIWEN; LI, NAN$1,068,144
2019-07-19PAT — from LI, NAN; CHE, YIWEN to 204 MONROE STREET CONDOMINIUM
2019-07-19Mortgage $734,300 — from CHE, YIWEN; LI, NAN to CITIZENS BANK, N.A.$734,300
2019-07-16TL&R — from WHITE OAK PROJECTS LLC to 204 MONROE LLC; 204 MONROE LLC
2019-07-16Mortgage satisfied — from 204 MONROE LLC to WHITE OAK PROJECTS LLC
2019-07-16TL&R — from WHITE OAK PROJECTS LLC to 204 MONROE LLC; 204 MONROE LLC
2019-07-16TL&R — from WHITE OAK PROJECTS LLC to 204 MONROE LLC; 204 MONROE LLC
2019-07-16Mortgage satisfied — from 204 MONROE LLC to WHITE OAK PROJECTS LLC
2019-07-16Mortgage satisfied — from 204 MONROE LLC to WHITE OAK PROJECTS LLC
2019-07-16Mortgage satisfied — from 204 MONROE LLC to WHITE OAK PROJECTS LLC
2019-07-16TL&R — from WHITE OAK PROJECTS LLC to 204 MONROE LLC; 204 MONROE LLC
2019-07-16Mortgage satisfied — from 204 MONROE LLC to WHITE OAK PROJECTS LLC
2019-07-16Mortgage satisfied — from 204 MONROE LLC to WHITE OAK PROJECTS LLC
2019-07-16TL&R — from WHITE OAK PROJECTS LLC to 204 MONROE LLC; 204 MONROE LLC
2019-07-16TL&R — from WHITE OAK PROJECTS LLC to 204 MONROE LLC; 204 MONROE LLC
2019-07-16Mortgage satisfied — from 204 MONROE LLC to WHITE OAK PROJECTS LLC
2019-07-16TL&R — from WHITE OAK PROJECTS LLC to 204 MONROE LLC; 204 MONROE LLC
2019-07-16Mortgage satisfied — from 204 MONROE LLC to WHITE OAK PROJECTS LLC
2019-07-16TL&R — from WHITE OAK PROJECTS LLC to 204 MONROE LLC; 204 MONROE LLC
2019-07-16Mortgage satisfied — from 204 MONROE LLC to WHITE OAK PROJECTS LLC
2019-07-16TL&R — from WHITE OAK PROJECTS LLC to 204 MONROE LLC; 204 MONROE LLC
2019-07-12Sold for $1,068,144$1,068,144
2019-07-10Deed $593,640 — from 204 MONROE LLC to HUANG, CAROLYN$593,640
2019-07-10PREL — from WHITE OAK PROJECTS LLC to 204 MONROE LLC
2019-07-10PAT — from HUANG, CAROLYN to THE 204 MONROE STREET CONDOMINIUM
2019-07-10TL&R — from WHITE OAK PROJECTS LLC to 204 MONROE LLC
2019-07-10Mortgage $466,400 — from HUANG, CAROLYN to CITIZENS BANK, N.A.$466,400
2019-07-09311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-07-04311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-07-03Deed $1,275,000 — from 204 MONROE LLC to HASTINGS, MICHAEL$1,275,000
2019-07-03Mortgage $1,020,000 — from HASTINGS, MICHAEL to CITIZENS BANK, N.A.$1,020,000
2019-07-03PAT — from HASTINGS, MICHAEL to 204 MONROE LLC; BOARD OF MANAGERS OF THE 204 MONROE STRE
2019-07-01Deed $559,019 — from 204 MONROE LLC to BUKA, OLTA$559,019
2019-07-01PAT — from BUKA, OLTA to 204 MONROE STREET CONDOMINIUM
2019-07-01REL — from WHITE OAKS PROJECTS LLC to 204 MONROE ST LLC
2019-07-01PREL — from WHITE OAKS PROJECTS LLC to 204 MONROE ST LLC
2019-07-01Mortgage $494,100 — from BUKA, OLTA to WELLS FARGO BANK,NA$494,100
2019-06-26REL — from WHITE OAK PROJECTS LLC to 204 MONROE LLC
2019-06-26Deed $579,384 — from 204 MONROE LLC to PRAYUTH PANICHPAKDEE AND DOUNGPORN PANIC; PRAYUTH PANICHPAKDEE, AS TRUSTEE; PANICHPAKDEE, $579,384
2019-06-26PAT — from PANICHPAKDEE, ROBERT; PRAYUTH PANICHPAKDEE AND DOUNGPORN PANIC; PRAYUTH PANICHPAKDEE, AS T to 204 MONROE STREET CONDOMINIUM
2019-06-26PREL — from WHITE OAK PROJECTS LLC to 204 MONROE LLC
2019-06-25Sold for $1,275,000$1,275,000
2019-06-19Sold for $593,640$593,640
2019-06-19Sold for $579,384$579,384
2019-06-18Sold for $559,019$559,019
2019-06-17Deed $566,656 — from 204 MONROE LLC to HODES, ELIZABETH A.$566,656
2019-06-17Mortgage $278,250 — from HODES, ELIZABETH A. to CITIZENS BANK N.A.$278,250
2019-06-17PAT — from HODES, ELIZABETH A. to 204 MONROE CONDOMINIUM
2019-06-17PREL — from WHITE OAK PROJECTS LLC to 204 MONROE LLC
2019-06-17REL — from WHITE OAK PROJECTS LLC to 204 MONROE LLC
2019-06-12Sold for $566,656$566,656
2019-06-07PAT — from ESMET, JOHN to 204 MONROE LLC; BOARD OF MANAGERS 204 MONROE STREET COND
2019-06-07Mortgage $522,000 — from ESMET, JOHN to CITIZENS BANK, N.A.$522,000
2019-06-07Deed $609,932 — from 204 MONROE LLC to ESMET, JOHN$609,932
2019-05-31Sold for $609,932$609,932
2019-05-21Certificate of occupancy Final
2019-03-29Rodent inspection: Passed
2019-01-03MAPS — from THE 204 MONROE STREET CONDOMINIUM
2019-01-03MAPS — from THE 204 MONROE STREET CONDOMINIUM
2019-01-03CDEC — from 204 MONROE LLC
2019-01-03CDEC — from 204 MONROE LLC
2019-01-03MAPS — from THE 204 MONROE STREET CONDOMINIUM
2019-01-03CDEC — from 204 MONROE LLC
2019-01-03MAPS — from THE 204 MONROE STREET CONDOMINIUM
2019-01-03CDEC — from 204 MONROE LLC
2019-01-03CDEC — from 204 MONROE LLC
2019-01-03MAPS — from THE 204 MONROE STREET CONDOMINIUM
2019-01-03CDEC — from 204 MONROE LLC
2019-01-03CDEC — from 204 MONROE LLC
2019-01-03CDEC — from 204 MONROE LLC
2019-01-03CDEC — from 204 MONROE LLC
2019-01-03MAPS — from THE 204 MONROE STREET CONDOMINIUM
2019-01-03MAPS — from THE 204 MONROE STREET CONDOMINIUM
2019-01-03CDEC — from 204 MONROE LLC
2019-01-03MAPS — from THE 204 MONROE STREET CONDOMINIUM
2019-01-03MAPS — from THE 204 MONROE STREET CONDOMINIUM
2019-01-03MAPS — from THE 204 MONROE STREET CONDOMINIUM
2018
2018-11-13FDNY inspection (CONSTR)
2018-10-10FDNY inspection (SPECIAL-OTH)
2018-10-02FDNY inspection (CONSTR)
2018-09-24Rodent inspection: Passed
2018-08-15FDNY inspection (CONSTR)
2018-08-08Job filed: LOT NO. 46 TENTATIVE LOT NOS. 1401-1410. SEE COMMENTS FOR DETAILS.
2018-08-08Job filed: LOT NO. 46 TENTATIVE LOT NOS. 1401-1410. SEE COMMENTS FOR DETAILS.
2018-07-18FDNY inspection (CONSTR)
2018-07-17Permit PL — ISSUED
2018-06-11FDNY inspection (CONSTR)
2018-05-09FDNY inspection (CONSTR)
2018-04-09FDNY inspection (CONSTR)
2018-03-20Rodent inspection: Passed
2018-03-20Permit NB — ISSUED
2018-03-06FDNY inspection (CONSTR)
2018-03-06FDNY inspection (STRUC_INT_6)
2018-02-06FDNY inspection (CONSTR)
2018-01-29FDNY inspection (STRUC_INT_3)
2018-01-24ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVEDAMENDMENTS. NB JOB#321185800 AT TIME OF AN ENERGY COMPLIANCE$250
2018-01-23DOB complaint, category ?
2018-01-09FDNY inspection (CONSTR)
2017
2017-11-29FDNY inspection (CONSTR)
2017-10-31FDNY inspection (CONSTR)
2017-10-19Permit NB — ISSUED
2017-10-19Permit EQ — ISSUED
2017-10-17Rodent inspection: Passed
2017-10-03FDNY inspection (CONSTR)
2017-09-05FDNY inspection (CONSTR)
2017-09-05Permit NB — ISSUED
2017-08-18DOB complaint, category ?
2017-08-17Rodent inspection: Passed
2017-08-17ECB CLASS - 2 violation: CONSTRUCTION SUPERINTENDENT FAILS TO MAINTAIN OR MAKE JOB SITE LOGS AVAILABLE (INADEQUATE) AT THE TIME OF INSPECTION OF A 4STORY$400
2017-08-09FDNY inspection (CONSTR)
2017-07-12Permit EQ — ISSUED
2017-07-10FDNY inspection (CONSTR)
2017-07-10Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
2017-07-10Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
2017-06-12FDNY inspection (CONSTR)
2017-05-31FDNY inspection (STRUC_INT)
2017-05-24Rodent inspection: Passed
2017-05-23Rodent inspection: Passed
2017-05-16FDNY inspection (CONSTR)
2017-04-28Rodent inspection: Failed for Rat Activity
2017-04-27Permit PL — ISSUED
2017-04-20Permit EQ — ISSUED
2017-04-18Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE
2017-04-18Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE
2017-04-17FDNY inspection (CONSTR)
2017-03-21FDNY inspection (CONSTR)
2017-02-21FDNY inspection (CONSTR)
2017-01-13FDNY inspection (CONSTR)
2016
2016-12-21Permit NB — ISSUED
2016-12-20Permit EQ — ISSUED
2016-12-19FDNY inspection (CONSTR)
2016-11-16DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2016-11-16DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2016-11-16DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2016-11-16DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2016-11-16DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2016-11-16DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2016-10-31FDNY inspection (SPECIAL-OTH)
2016-08-17DOB complaint, category ?
2016-08-17DOB complaint, category ?
2016-08-17ECB CLASS - 1 violation: SEC. 3306.9.8 HAZARDS TO BE REMOVED. NOTED: DEMOLITION IN PROGRESS HALF OF THE ROOF CONCRETE SLAB HAS BEEN REMOVED. WINDOWS AT MEZ$1,600
2016-08-17ECB CLASS - 1 violation: SEC. 3301.2 ADEQUATE MEANS OF EGRESS. NOTED: DEMOLITION IN PROGRESS ONTHE ROOF OF THE BLDG. INADEQUATE MEANS OF EGRESS/INGRESS TO $1,600
2016-08-17ECB CLASS - 1 violation: SEC. 3303.7.2 IN ADEQUATE FIRE EXTINGUISHER/NO FIRE EXTINGUISHER. NOTED: AT TIME OF INSPECTION DEMOLITION IN PROGRESS NO FIRE EXTI$1,600
2016-08-17ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS-DEMOLITION PLAN. NOTED: DEMOLITION WORK IN ORIGRESS OUT OF SEQUINCE-HALF
2016-08-17ECB CLASS - 1 violation: SEC. 3301.6.1 DESIGN DRAWINGS REQUIRED. NOTED: SIDEWALK SHED ERECTED AT EXP#1 PIPE SCAFFOLD ERECTED ON TOP OF SIDEWALK SHED,NO DES$1,600
2016-08-17ECB CLASS - 1 violation: SEC. 3307.7 FENCES. NOTED: DEMOLITION IN ORIGRESS-NO SITE FENCE ERECTED IN REAR YARD. SWO FENCE ERECTED IN REAR YARD. SWO ISSUED P
2016-07-22Permit EQ — ISSUED
2016-07-18Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS SHOWN ON DRAWING. THERE WILL BE NO CHANGE IN USE, EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF
2016-07-18Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS SHOWN ON DRAWING. THERE WILL BE NO CHANGE IN USE, EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF
2016-07-18Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS SHOWN ON DRAWING. THERE WILL BE NO CHANGE IN USE, EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF
2016-07-18Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS SHOWN ON DRAWING. THERE WILL BE NO CHANGE IN USE, EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF
2016-07-18Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS SHOWN ON DRAWING. THERE WILL BE NO CHANGE IN USE, EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF
2016-07-18Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS SHOWN ON DRAWING. THERE WILL BE NO CHANGE IN USE, EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF
2016-07-11DOB complaint, category ?
2016-07-08Permit DM — ISSUED
2016-07-06Rodent inspection: Passed
2016-07-01Permit EQ — ISSUED
2016-06-29Job filed: INSTALLATION OF AUTOMATIC SMOKE DETECTION AND SPRINKLER FIRE ALARM SYSTEM$15,000
2016-05-25Job filed: BUILDERS PAVEMENT PLAN IN CONJUNCTION WITH NEW BUILDING #321185800
2016-04-29Job filed: SPRINKLER WORK TYPE IN CONJUNCTION WITH NEW BUILDING
2016-04-29Job filed: PLUMBING AND MECHANICAL WORK TYPE IN CONJUNCTION WITH NEW BUILDING
2016-04-29Job filed: SOE PLANS IN CONJUNCTION WITH NEW BUILDING
2016-04-29Job filed: STRUCTURAL WORK TYPE IN CONJUNCTION WITH NEW BUILDING
2016-04-29Job filed: SPRINKLER WORK TYPE IN CONJUNCTION WITH NEW BUILDING
2016-04-29Job filed: PLUMBING AND MECHANICAL WORK TYPE IN CONJUNCTION WITH NEW BUILDING
2016-04-20Job filed: NB
2016-03-29Rodent inspection: Failed for Rat Activity
2016-01-15Job filed: PROP. 4 STORY 8 FAMILY NEW BUILDING. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
2015
2015-12-24Job filed: THIS JOB IS FILED FOR DEMOLITION OF A 1 STORY BUILDING.
2015-05-15Rodent inspection: Passed
2013
2013-11-19Rodent inspection: Failed for Rat Activity
2013-10-29Rodent inspection: Bait applied
2013-10-22Rodent inspection: Bait applied
2013-10-15Rodent inspection: Bait applied
2013-10-08Rodent inspection: Bait applied
2013-10-01Rodent inspection: Bait applied
2013-09-24Rodent inspection: Bait applied
2013-09-10Rodent inspection: Failed for Rat Activity
2013-08-21Rodent inspection: Failed for Rat Activity
2008
2008-06-03Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER DRAWINGS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
2008-06-03Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER DRAWINGS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
2008-06-03Permit EQ — ISSUED
2008-05-05Permit EQ — ISSUED
2008-05-01Job filed: INSTALLATION OF 20 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION AT 206 MONROE STREET. SIDEWALK SHED SHALL COMPLY WITH LL33/91 AND TP