The city's published records show little recorded distress here in the last three years. Less recorded distress than 100% of 1-5-unit residential buildings citywide. The citywide median for 1-5-unit residential buildings is 0 penalty
points per 10 units; this building carries 0. In ZIP 11211, 58% of residential buildings hold an A and
7% grade D or F.
How grades work
this building
A
C
Among 699,345 1-5-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
89 service requests in the last three years. Most common: Water System (35) · Illegal Parking (24) · Water Maintenance (9) · Missed Collection (8) · Dirty Condition (4) · Noise (3).
Filed construction activity
$68,000 in permitted construction work filed since
2016 (24 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974 (2023)
No
Six or more residential units (5)
No
421-a / J-51 tax benefit on the current tax roll
0 of 3 signals present. None of the common signals are present — stabilization is unlikely (though never impossible). The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
128 Woodpoint condominium
Head officer
Sam Wurtzberger
Managing agent
MRE Property Management
Last registered
2026-01-05
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2026
$280,840
$126,378
2027
$318,010
$143,105
The city's market estimate has risen
13% between tax years 2026 and 2027.
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 6 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
1 street-flooding or sewer-backup complaints at this address since
2026 (1 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Graham Av — L · 0.3 mi straight-line (about a 7-minute walk) · station accessibility: none
Bus
Nearest boarding stop: Kingsland Av / Withers St — B24 · 250 ft
Citi Bike
Withers St & Kingsland Ave · 250 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
89 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
2024-09-23311: Street Sign - Damaged — Other/Unknown
2024-06-13CDEC — from 128 WOODPOINT LLC
2024-06-13MAPS — from THE 128 WOODPOINT ROAD CONDOMINIUM
2024-06-13CDEC — from 128 WOODPOINT LLC
2024-06-13MAPS — from THE 128 WOODPOINT ROAD CONDOMINIUM
2024-06-13CDEC — from 128 WOODPOINT LLC
2024-06-13MAPS — from THE 128 WOODPOINT ROAD CONDOMINIUM
2024-06-13CDEC — from 128 WOODPOINT LLC
2024-06-13CDEC — from 128 WOODPOINT LLC
2024-06-13MAPS — from THE 128 WOODPOINT ROAD CONDOMINIUM
2024-06-13MAPS — from THE 128 WOODPOINT ROAD CONDOMINIUM
2024-05-24Permit Support of Excavation — Signed-off
2024-05-22Permit General Construction — Signed-off
2024-05-22Permit Foundation — Signed-off
2024-04-16Job filed: PROPOSE FOUNDATION FOR NEW RETAINING WALL AT REAR YARD FILED IN CONJUNCTION WITH GC # B01025810-I1.$20,000
2024-04-16Job filed: PROPOSE RETAINING WALL ABOVE ADJOINING GRADE LEVEL AT REAR YARD FILED IN CONJUNCTION TO NB #B00748466-I1. RELATED FO AND SOE WORKS FILED SUBSEQUENTLY.$10,000
2024-04-16Job filed: PROPOSE SOE SCOPE FOR RETAINING WALL AT REAR YARD FILED IN CONJUNCTION WITH GC # B01025810-I1.$15,000
2024-04-04Permit Construction Fence — Signed-off
2024-03-20Job filed: Installation of construction fence at sidewalk as per plan in conjunction with NB-GC # B00748466-I1. No change in use, egress or bulk under this appli$1,000
2024-03-11Permit Sprinklers — Signed-off
2024-02-05Permit Curb Cut — Signed-off
2024-01-10Job filed: SUBDIVISION CONDOMINIUM HEREWITH FILED LOT NO. 50 TENTATIVE LOT NOS. 1501-1505. SEE COMMENTS FOR DETAILS. RELATED DOB NOW BUILD NB APPLICATION NO. B00
2023
2023-10-27Permit Foundation — Signed-off
2023-10-27Permit Structural — Signed-off
2023-10-27Permit Construction Fence — Signed-off
2023-10-27Permit Mechanical Systems — Signed-off
2023-10-27Permit General Construction — Permit Issued
2023-10-12Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2023-09-07Permit Construction Fence — Signed-off
2023-08-24Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2023-07-13Job filed: INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2023-05-16Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2023-05-16Permit Sidewalk Shed — Signed-off
2023-05-16Permit Supported Scaffold — Signed-off
2023-05-15Job filed: INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2023-03-31Job filed: Propose plumbing work filed in conjunction with NB-GC # B00748466-I1.$1,000
2023-03-17Permit Plumbing — Signed-off
2023-03-16Job filed: PROPOSE NEW 4-STORY PLUS CELLAR RESIDENTIAL BUILDING AS PER PLAN. OBTAIN NEW C OF O.$1,000
2023-03-07Job filed: Propose plumbing work filed in conjunction with NB-GC # B00748466-I1.$1,000
2023-03-07Job filed: PROPOSE MECHANICAL SCOPE OF WORKS FILED IN CONJUNCTION WITH NEW BUILDING # B00748466-I1 AS PER PLAN. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS $1,000
2023-03-07Job filed: Propose Sprinkler scope of work filed in conjunction with NB-GC # B00748466-I1$1,000
2023-02-21Job filed: PROPOSE SUPPORT OF EXCAVATION IN CONJUNCTION WITH NEW BUILDING AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. PROPOSE STEEL DRILLED SOLDIER BEAM$1,000
2023-02-21Job filed: PROPOSE FOUNDATION SCOPE OF WORKS IN CONJUNCTION WITH NEW BUILDING AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2023-02-21Job filed: PROPOSE STRUCTURAL WORK FOR NEW 4-STORY CAST-IN-PLACE CONCRETE BUILDING IN CONJUNCTION WITH NB# B00748466-I1.$1,000
2023-01-09Job filed: PROPOSE NEW 4-STORY PLUS CELLAR RESIDENTIAL BUILDING AS PER PLAN. OBTAIN NEW C OF O.$1,000
2022
2022-12-19Permit Mechanical Systems — Signed-off
2022-12-16Permit Structural — Signed-off
2022-12-16Permit General Construction — Permit Issued
2022-12-16Permit Foundation — Signed-off
2022-12-16Permit Support of Excavation — Signed-off
2022-12-14Permit General Construction — Permit Issued
2022-10-13Job filed: PROPOSE NEW 4-STORY PLUS CELLAR RESIDENTIAL BUILDING AS PER PLAN. OBTAIN NEW C OF O.$1,000
2022-10-04Permit Construction Fence — Signed-off
2022-09-30Job filed: Propose Sprinkler scope of work filed in conjunction with NB-GC # B00748466-I1$1,000
2022-07-15Job filed: Propose Sprinkler scope of work filed in conjunction with NB-GC # B00748466-I1$1,000
2022-07-15Job filed: PROPOSE MECHANICAL SCOPE OF WORKS FILED IN CONJUNCTION WITH NEW BUILDING # B00748466-I1 AS PER PLAN. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS $1,000
2022-07-15Job filed: Propose plumbing work filed in conjunction with NB-GC # B00748466-I1.$1,000
2022-07-09311: Water System — Hydrant Running (WC3)
2022-06-30Job filed: PROPOSE BUILDER'S PAVEMENT PLAN FOR A TOTAL STREET FRONTAGE OF 103.89 LF FILED IN CONJUNCTION WITH NB # B00748466-I1
2022-06-30Job filed: Installation of construction fence at sidewalk as per plan in conjunction with NB-GC # B00748466-I1. No change in use, egress or bulk under this appli$1,000
2022-06-29Job filed: CONSTRUCT ONE 10'-0" CURB CUT ON WOODPOINT ROAD.$3,000
2022-06-16Job filed: PROPOSE STRUCTURAL WORK FOR NEW 4-STORY CAST-IN-PLACE CONCRETE BUILDING IN CONJUNCTION WITH NB# B00748466-I1.$1,000
2022-06-16Job filed: PROPOSE SUPPORT OF EXCAVATION IN CONJUNCTION WITH NEW BUILDING AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. PROPOSE STEEL DRILLED SOLDIER BEAM$1,000
2022-06-16Job filed: PROPOSE FOUNDATION SCOPE OF WORKS IN CONJUNCTION WITH NEW BUILDING AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2022-06-10Job filed: PROPOSE NEW 4-STORY PLUS CELLAR RESIDENTIAL BUILDING AS PER PLAN. OBTAIN NEW C OF O.$1,000