The city's published records show little recorded distress here in the last three years. Less recorded distress than 88% of 100+-unit residential buildings citywide. The citywide median for 100+-unit residential buildings is 3.7 penalty
points per 10 units; this building carries 0.4. In ZIP 10001, 68% of residential buildings hold an A and
6% grade D or F.
How grades work
this building
A
B
C
Among 4,677 100+-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
4 heat or hot-water complaints in the last three years (winter 2024–25: 2 · winter 2025–26: 2). Repeated winter clusters suggest a chronic heating problem.
2
’24–25
2
’25–26
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
216 service requests in the last three years. Most common: Illegal Parking (57) · Noise (51) · For Hire Vehicle Complaint (21) · Encampment (18) · Homeless Person Assistance (15) · Vendor Enforcement (5).
Filed construction activity
$35,919,909 in permitted construction work filed since
2016 (31 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974 (2014)
Yes
Six or more residential units (382)
Yes
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. Buildings receiving 421-a or J-51 benefits are generally required to register their units as rent-stabilized for the duration of the benefit. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
855 SIXTH AVENUE CONDOMINIUM
Head officer
JOHNATHAN DURST
Managing agent
ROYAL REALTY CORP.
Last registered
2025-07-29
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$0
$0
2026
$100,560,107
$45,252,048
2027
$110,974,456
$49,938,505
Tax exemptions on the roll: 421A 35 YR
For property tax, the Department of Finance values this condo
as if it were a rental building. Its 2023 estimate: gross income $18,693,216 a year
($52.27 per sq ft), operating expenses $4,606,249
($12.88 per sq ft), net operating income $14,086,967. These are the
city's estimates from comparable rentals, not the building's actual budget, rents or maintenance
charges.
Building systems
Energy grade (LL33)
D — ENERGY STAR score 48/100, posted at the entrance by law (2022 disclosure cycle)
Heating fuel
NATURALGAS
Facade (Local Law 11)
SAFE (cycle 10)
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
34 St-Herald Sq — B D F M N Q R W · 450 ft straight-line (about a 2-minute walk) · station accessibility: full 34 St-Penn Station — 1 2 3 · 750 ft straight-line (about a 4-minute walk) · station accessibility: full
Bus
Nearest boarding stop: 6 Av / W 31 St — M5 M7 M55 · 250 ft
Citi Bike
6 Ave & W 33 St · 600 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
216 311 service requests from this address in the last three years — 2 of them about heat or hot water.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
311: Non-Emergency Police Matter — Other (complaint details)
2026-06-18
311: Non-Emergency Police Matter — Other (complaint details)
2026-06-18
311: Dirty Condition — Trash
2026-05-27
311: Noise — Noise: Construction Before/After Hours (NM1)
2026-05-26
311: Noise — Noise: Jack Hammering (NC2)
2026-05-26
311: Noise - Residential — Banging/Pounding
2026-05-06
311: Encampment — N/A
2026-05-06
311: Encampment — N/A
2026-05-01
311: Homeless Person Assistance — Non-Chronic
2026-05-01
311: Encampment — N/A
2026-04-18
311: Homeless Person Assistance — Chronic
2026-04-07
311: Encampment — N/A
2026-04-01
311: Homeless Person Assistance — Non-Chronic
2026-03-08
311: Animal-Abuse — Neglected
2026-02-27
311: Encampment — N/A
2026-02-27
311: Encampment — N/A
2026-02-25
311: HEAT/HOT WATER — APARTMENT ONLY
2026-02-25
Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-02-24
Cooling tower inspection
2026-02-06
Facade (LL11) filing, cycle 10: SAFE
2026-01-30
Certificate of occupancy Renewal Without Change
2026-01-25
311: Homeless Person Assistance — Chronic
2026-01-24
311: Noise - Residential — Loud Music/Party
2026-01-17
HPD class A: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 23K, 23rd STORY, 4
2026-01-17
HPD class A: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 23K, 2
2026-01-17HPD class A: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 23K, 23rd STORY, 4
2026-01-17HPD class A: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 23K, 2
2023-07-06311: Lead — Lead Kit Request (Residential) (L10)
2023-07-06311: General Construction/Plumbing — Vent/Exhaust - Illegal/Improper
2023-06-22Job filed: INSTALLATION OF AN ADT ACCESS SYSTEM ON THE ROOF AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD TO COMPLY WITH C
2023-06-22Job filed: INSTALLATION OF AN ADT ACCESS SYSTEM ON THE ROOF AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD TO COMPLY WITH C
2023-06-20311: Lost Property — Bag/Wallet
2023-06-19311: Illegal Parking — Paper License Plates
2023-06-19311: Illegal Parking — Paper License Plates
2023-06-19311: Illegal Parking — Paper License Plates
2023-06-15311: Homeless Person Assistance
2023-06-13311: Illegal Parking — Paper License Plates
2023-06-06311: Illegal Parking — Paper License Plates
2023-05-26311: Day Care — Day Care Facility
2023-05-18311: Homeless Person Assistance
2023-05-17311: Illegal Parking — Paper License Plates
2023-01-05HPD class A: § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE ENTIRE APARTMENT LOCAT
2022
2022-12-23311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-12-19311: Indoor Air Quality — Dust from Construction
2022-12-19311: Indoor Air Quality — Chemical Vapors/Gases/Odors
2022-07-15Certificate of occupancy Renewal Without Change
2022-06-24311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-06-24311: Illegal Parking — Blocked Bike Lane
2022-06-23311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-05-30311: Noise - Residential — Loud Talking
2022-05-25Permit Mechanical Systems — Signed-off
2022-05-23Permit General Construction — Signed-off
2022-05-20Job filed: SPRINKLERS WORK IN CONJUNCTION WITH INTERIOR RENOVATION ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$4,000
2022-05-20Job filed: MECHANICAL WORK IN CONJUNCTION WITH INTERIOR RENOVATION ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$10,000
2022-05-13Job filed: INTERIOR RENOVATION OF THE 1ST FLOOR MAIL/PACKAGE ROOM INVOLVING DEMOLITION OF NON-LOAD BEARING PARTITIONS AND MINOR CEILING MODIFICATIONS AS PER PLAN$80,000
2021-07-22Certificate of occupancy Renewal Without Change
2021-07-21City emergency repair (OMO): pursuant to a department of buildings reoccurring immediately hazardous elevator violation, the elevator at this locatio
2021-07-17311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-07-09ECB CLASS - 1 violation: CLASS 1 CAR CEASE USE CAR DOOR RESTRICTOR IS NOT WORKING MISSING PARTS REPAIR OR REPLACE.$1,250
2021-07-09ECB CLASS - 1 violation: CLASS 1 RESTORE TO SERVICE FOR PROPER INSPECTION BY DOB ,HOIST ROPE RUSTED REPLACE.$1,250
2021-07-09ECB CLASS - 1 violation: CLASS 1 CAR CEASE USE CAR DOOR RESTRICTOR IS NOT WORKING MISSING PARTS REPAIR OR REPLACE.$1,250
2021-05-05311: Noise — Noise: Construction Equipment (NC1)
2021-04-20HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2021-04-20HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021-04-09HPD class A: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT
2021-03-29311: Noise - Helicopter — Other
2021-03-13311: Noise — Noise: Construction Equipment (NC1)
2020-12-23311: Noise — Noise: Construction Before/After Hours (NM1)
2020-12-21311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2020-12-17Elevator permit: Direct Replacement of drive sheave,shaft and hoist cables. - All work in compliance with ASME A17.1 2000/03 as modified by appe$12,000
2020-11-04311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2020-11-04311: Sidewalk Condition — Blocked - Construction
2020-08-24Job filed: INSTALLATION OF AN ADT ACCESS SYSTEM ON THE ROOF AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD TO COMPLY WITH C
2020-08-24Job filed: INSTALLATION OF AN ADT ACCESS SYSTEM ON THE ROOF AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD TO COMPLY WITH C
2020-08-05ECB CLASS - 2 violation: HOIST MACHINE MAINTENANCE TAG EXPIRED PROVIDE.$310
2020-08-05Permit Sidewalk Shed — Signed-off
2020-08-04Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF$1,000
2020-07-30311: HEAT/HOT WATER — APARTMENT ONLY
2020-07-30Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2020-07-13311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-07-07311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-06-18311: NonCompliance with Phased Reopening — Business not in compliance
2020-04-29Elevator permit: Furnish and install components and software providing Door Monitor Circuitry to existing controller. All work to comply with ASME$61,250
2020-01-25Tenant complaint: ELECTRIC — OUTLET/SWITCH
2020-01-23311: Other Enforcement — E3B Sidewalk Obstruction
2020-01-18311: Elevator — Elevator - Multiple Devices On Property
2020-01-14Bedbug filing: 0 infested units
2020-01-13HPD class A: § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT EAST WALL IN THE 3rd KITCHEN FROM NORTH LOCATED
2020-01-13HPD class A: § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE WASHBASIN IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 21F, 21st STORY, 3rd APARTMENT FR
2020-01-13HPD class A: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BASE CABINET IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 21F, 21st STORY, 3rd A
2020-01-13HPD class A: § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE OUTLET COVER AT EAST WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 21F, 21st ST
2019-12-11Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2019-11-23311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-11-07Certificate of occupancy Temporary
2019-09-15311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-08-29FDNY inspection (RISK)
2019-08-29Permit EQ — ISSUED
2019-08-27Job filed: INSTALLATION OF AN ADT ACCESS SYSTEM ON THE ROOF AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD TO COMPLY WITH C
2019-08-24311: Non-Emergency Police Matter — Other (complaint details)
2019-08-14Certificate of occupancy Temporary
2019-07-09SMIS — from CITY OF NEW YORK (THE)
2019-07-09SMIS — from CITY OF NEW YORK (THE)
2019-07-09SMIS — from CITY OF NEW YORK (THE)
2019-07-09SMIS — from CITY OF NEW YORK (THE)
2019-06-10Job filed: Women's World Cup Soccer Viewing Party
2019-06-10Job filed: Women's World Cup Soccer Viewing Party
2019-06-03Tenant complaint: WATER LEAK — DAMP SPOT
2019-05-30Elevator permit: Furnish and install new machine drive sheave, shaft and hoist cables. -Installation and tests as per ASME A17.1/2000 with A17.1a-$8,000
2019-05-28311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2019-03-07Job filed: MINOR RENOVATIONS TO EXISTING SPRINKLER SYSTEMS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$89,563
2019-03-07Job filed: REMOVAL OF FIRE ALARM DEVICES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,482
2019-03-07Job filed: MINOR RENOVATIONS TO THE EXISTING MECHANICAL SYSTEMS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$76,162
2019-03-07Job filed: MODIFICATIONS TO EXISTING FIRE ALARM SYSTEMS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$10,482
2019-02-19311: Illegal Parking — Blocked Hydrant
2019-02-15Mortgage $120,000,000 — from 855 OFF LLC to CAPITAL ONE, NATIONAL ASSOCIATION$120,000,000
2019-02-08Certificate of occupancy Temporary
2019-01-30Bedbug filing: 1 infested units
2019-01-11Certificate of occupancy Temporary
2018
2018-12-23311: Urinating in Public — N/A
2018-12-05311: Lead — Lead Kit Request (Residential) (L10)
2018-10-26HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2018-10-23Agreement — from 855 LIRU LLC; 855 MRU LLC to CITY OF NEW YORK (THE)
2018-10-23Agreement — from 855 LIRU LLC; 855 MRU LLC to CITY OF NEW YORK (THE)
2018-10-23Certificate of occupancy Temporary
2018-10-06311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2018-10-05Elevator permit: Furnish and install new machine drive sheave, shaft and hoist cables.$8,000
2018-09-24Elevator permit: Furnish and install new machine drive sheave and new hoist cables.$8,000
2018-09-02311: Noise — Noise, Barking Dog (NR5)
2018-07-31311: Special Projects Inspection Team (SPIT) — Illegal Hotel Rooms In Residential Building
2018-04-13Job filed: INSTALLATION OF STEEL POSTS AND FRAME TO SUPPORT GLASS/WALL$15,000
2018-04-13Job filed: ADDITION OF SEMI-ENCLOSED SHOWROOM TO EXISTING 4TH FLOOR SPACE. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$200,000
2018-03-29311: Taxi Complaint — Driver Complaint
2018-03-23311: For Hire Vehicle Complaint — Driver Complaint
2018-03-12Job filed: MINOR PLUMBING WORK ASSOCIATED WITH NEW LAYOUT FOR NORDSTROM RACK. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$15,000
2018-03-12Job filed: MINOR MECHANICAL WORK ASSOCIATED WITH NEW LAYOUT TO EXISTING RETAIL SPACE OCCUPIED BY NORDSTROM RACK. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$6,500
2018-03-12Job filed: MINOR INTERIOR RENOVATION TO EXISTING RETAIL SPACE OCCUPIED BY "NORDSTROM RACK". REMOVE/INSTALL NON LOAD BEARING PARTITIONS, FLOORING, CEILINGS FINISH$5,000
2018-01-17ECB CLASS - 1 violation: UNAPPROVED, UNSAFE, UNSUITABLE ELECTRICAL EQUIPMENT, APPARATUS, MATERIALS, DEVICES, APPLIANCES OR WIRING IN USE. BASEMENT SERVICE
2018-01-03SAGE — from NEW YORK STATE HOUSING FINANCE AGENCY to NORDSTROM INC
2018-01-03Mortgage $73,000,000 — from 855 RET LLC; 855 MRU LLC; 855 ORU LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION$73,000,000
2018-01-03Mortgage assigned — from NEW YORK STATE HOUSING FINANCE AGENCY to WELLS FARGO BANK, NATIONAL ASSOCIATION
2018-01-03Mortgage $73,000 — from 855 MRU LLC; 855 LIRU LLC; 855 RET LLC; 855 ORU LLC to NEW YORK STATE HOUSING FINANCE AGENCY$73,000
2018-01-03Mortgage $187,000 — from 855 MRU LLC; 855 RET LLC; 855 ORU LLC to NEW YORK STATE HOUSING FINANCE AGENCY$187,000
2018-01-03Agreement $260,000 — from 855 RET LLC; 855 LIRU LLC; 855 MRU LLC; 855 ORU LLC to NEW YORK STATE HOUSING FINANCE AEANCY$260,000
2018-01-03TERA — from WELLS FARGO NATIONAL ASSOCIATION to NEW YORK STATE HOUSING FINANCE AGENCY
2018-01-03Mortgage $187,000 — from 855 MRU LLC; 855 RET LLC; 855 ORU LLC to NEW YORK STATE HOUSING FINANCE AGENCY$187,000
2018-01-03Mortgage $73,000 — from 855 MRU LLC; 855 LIRU LLC; 855 RET LLC; 855 ORU LLC to NEW YORK STATE HOUSING FINANCE AGENCY$73,000
2018-01-03Mortgage assigned — from NEW YORK STATE HOUSING FINANCE AGENCY to WELLS FARGO BANK, NATIONAL ASSOCIATION
2018-01-03Mortgage $73,000,000 — from 855 RET LLC; 855 MRU LLC; 855 ORU LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION$73,000,000
2018-01-03Agreement — from NEW YORK STATE HOUSING FINANCE AGENCY to WELLS FARGO BANK, NATIONAL ASSOCIATION
2018-01-03SAGE — from U.S. BANK NATIONAL ASSOCIATION; NEW YORK STATE HOUSING FINANCE AGENCY; WELLS FARGO BANK, N to CITY OF NEW YORK
2018-01-03SAGE — from WELLS FARGO BANK, NATIONAL ASSOCIATION to CITY OF NEW YORK
2018-01-03TERA — from WELLS FARGO NATIONAL ASSOCIATION to NEW YORK STATE HOUSING FINANCE AGENCY
2018-01-03SAGE — from WELLS FARGO BANK, NATIONAL ASSOCIATION to NORDSTROM INC
2018-01-03REL — from CITY OF NEW YORK to 855 MRU LLC
2018-01-03TERA — from 855 ORU LLC to CITY OF NEW YORK
2018-01-03SAGE — from WELLS FARGO BANK, NATIONAL ASSOCIATION to CITY OF NEW YORK
2018-01-03SAGE — from U.S. BANK NATIONAL ASSOCIATION; NEW YORK STATE HOUSING FINANCE AGENCY; WELLS FARGO BANK, N to CITY OF NEW YORK
2018-01-03Agreement — from NEW YORK STATE HOUSING FINANCE AGENCY to WELLS FARGO BANK, NATIONAL ASSOCIATION
2018-01-03Mortgage $73,000,000 — from 855 RET LLC; 855 MRU LLC; 855 ORU LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION$73,000,000
2018-01-03Mortgage assigned — from NEW YORK STATE HOUSING FINANCE AGENCY to WELLS FARGO BANK, NATIONAL ASSOCIATION
2018-01-03Mortgage $73,000 — from 855 MRU LLC; 855 LIRU LLC; 855 RET LLC; 855 ORU LLC to NEW YORK STATE HOUSING FINANCE AGENCY$73,000
2018-01-03Agreement $260,000 — from 855 RET LLC; 855 LIRU LLC; 855 MRU LLC; 855 ORU LLC to NEW YORK STATE HOUSING FINANCE AEANCY$260,000
2018-01-03SAGE — from 855 MRU LLC; 855 LIRU LLC to CITY OF NEW YORK
2018-01-03SAGE — from 855 LIRU LLC; 855 MRU LLC to NEW YORK STATE HOUSING FINANCE AGENCY
2018-01-03TERA — from WELLS FARGO NATIONAL ASSOCIATION to NEW YORK STATE HOUSING FINANCE AGENCY
2018-01-03Agreement $260,000 — from 855 RET LLC; 855 LIRU LLC; 855 MRU LLC; 855 ORU LLC to NEW YORK STATE HOUSING FINANCE AEANCY$260,000
2018-01-03SAGE — from 855 MRU LLC; 855 LIRU LLC to CITY OF NEW YORK
2018-01-03SAGE — from 855 LIRU LLC; 855 MRU LLC to NEW YORK STATE HOUSING FINANCE AGENCY
2018-01-03Agreement — from NEW YORK STATE HOUSING FINANCE AGENCY to WELLS FARGO BANK, NATIONAL ASSOCIATION
2018-01-03Mortgage $187,000 — from 855 MRU LLC; 855 RET LLC; 855 ORU LLC to NEW YORK STATE HOUSING FINANCE AGENCY$187,000
2018-01-03Certificate of occupancy Temporary
2017
2017-12-17311: HEAT/HOT WATER — ENTIRE BUILDING
2017-12-17Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2017-12-12Deed — from 855 ORU LLC; 855 RET LLC to 855 OFF LLC
2017-12-08Deed transfer (nominal price)
2017-11-21SAGE — from 855 MRU LLC to CITY OF NEW YORK
2017-11-21SAGE — from 855 ORU LLC to THE CITY OF NEW YORK
2017-11-17311: Other Enforcement — E3B Sidewalk Obstruction
2017-11-15SMIS — from 855 LIRU LLC; 855 ORU LLC; 855 MRU LLC
2017-11-15SMIS — from 855 LIRU LLC; 855 ORU LLC; 855 MRU LLC
2017-11-15SMIS — from 855 LIRU LLC; 855 ORU LLC; 855 MRU LLC
2017-11-15SMIS — from 855 LIRU LLC; 855 ORU LLC; 855 MRU LLC
2017-11-15311: HEAT/HOT WATER — ENTIRE BUILDING
2017-11-15Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2017-11-15Permit Sign — Signed-off
2017-11-15Permit Sign — Signed-off
2017-11-15Permit Sign — Signed-off
2017-11-14Agreement — from 855 ORU LLC; NORDSTROM, INC. to NEW YORK STATE HOUSING FINANCE AGENCY
2017-11-12311: HEAT/HOT WATER — APARTMENT ONLY
2017-11-12Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2017-11-08HPD class C: § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CI
2017-09-29ECB CLASS - 2 violation: 42B10)ESCALATOR FAILS TO COMPLY WITH ASME A17.1/CSA OR LOCAL CODE WHEN NOT CONVEYING PASSENGERS. REM: COMPLY WITH CODE.
2017-09-29ECB CLASS - 2 violation: 42B10)ESCALATOR FAILS TO HAVE A VARIABLE FREQUENCY DRIVE AS PER SECTION REQUIREMENTS. REM: COMPLY WITH CODE.
2017-09-29ECB CLASS - 2 violation: 42B10)ESCALATOR FAILS TO HAVE A VARIABLE FREQUENCY REGENERATIVE DRIVE AS PER SECTION REQUIREMENTS. REM: COMPLY WITH CODE.
2017-09-29ECB CLASS - 2 violation: 42B10)ESCALATOR FAILS TO COMPLY WITH ASME A17.1/CSA OR LOCAL CODE WHEN NOT CONVEYING PASSENGERS. REM: COMPLY WITH CODE.
2017-09-28ECB CLASS - 2 violation: 42B10)ESCALATOR FAILS TO COMPLY WITH ASMEA17.11CSA OR LOCAL CODE WHEN NOT CONVEYING PASSENGERS. REM: COMPLY WITH CODE.
2017-09-28ECB CLASS - 2 violation: 42B10)ESCALATOR FAILS TO HAVE A VARIABLE FREQUENCY REGENERATIVE DRIVE AS PER SECTION REQUIREMENTS. REM: COMPLY WITH CODE.
2017-09-28ECB CLASS - 2 violation: 42B10)ESCALATOR FAILS TO COMPLY WITH ASME A 17.1/CSA OR LOCAL CODE WHEN NOT CONVEYING PASSENGERS. REMEDY: COMPLY WITH CODE.
2017-09-28ECB CLASS - 2 violation: 42B10)ESCALATOR FAILS TO HAVE A VARIABLE FREQUENCY REGENERATIVE DRIVE AS PER SECTION REQUIREMENTS. REM: COMPLY WITH CODE.
2017-08-23HPD class A: § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND
2017-08-23HPD class A: § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISS
2017-08-23HPD class A: § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES
2017-08-23HPD class A: § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL IN THE KITCHEN LOCATED AT APT 21F, 21
2017-08-23HPD class A: § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON
2017-08-23HPD class A: § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGE
2017-08-23HPD class A: § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM
2017-08-23HPD class C: § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO H
2017-08-23HPD class A: § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPE
2017-08-23Job filed: MODIFICATION TO EXISTING STANDPIPE TO ACCOMMODATE NEW TENANT LAYOUT FOR NORDSTROM. INSTALL NEW FIRE HOSE CABINETS NO CHANGE IN EGRESS, USE OR OCCUPAN$20,000
2017-05-05Agreement — from 855 ORU LLC; NORDSTROM INC. to NEW YORK STATE HOUSING FINANCE AGENCY
2017-05-05Agreement — from 855 ORU LLC; NORDSTROM INC. to NEW YORK STATE HOUSING FINANCE AGENCY
2017-05-05Agreement — from 855 ORU LLC; NORDSTROM INC. to NEW YORK STATE HOUSING FINANCE AGENCY
2017-05-02311: Drug Activity — Use Indoor
2017-05-01Job filed: INSTALLATION OF NEW MANUAL AND AUTOMATIC SMOKE DETECTION AND SPRINKLER FIRE ALARM SYSTEM AND PURGE SYSTEM.$65,000
2017-05-01Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEM TO ACCOMMODATE NEW TENANT LAYOUT FOR NORDSTROM. NO CHANGE IN EGRESS, USE OR OCCUPANCY$309,900
2017-03-13311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2017-02-28311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2017-02-24Certificate of occupancy Temporary
2017-02-18311: Building/Use — Illegal Conversion Of Residential Building/Space
2017-02-16DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2016
2017-02-15Job filed: PLUMBING WORK ASSOCIATED WITH NEW TENANT BUILD OUT FOR "NORDSTROM RACK" AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$50,000
2017-02-15Job filed: MECHANICAL WORKS ASSOCIATED WITH NEW TENANT BUILD OUT FOR "NORDSTROM RACK" AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$750,000
2017-02-15Job filed: RENOVATION TO EXISTING RETAIL SPACE FOR TENANT BUILD OUT FOR "NORDSTROM RACK" INSTALL NON LOAD BEARING PARTITIONS, FLOORING, CEILINGS, FINISHES, FIXTU$1,000,000
2017-02-15Job filed: STRUCTURAL WORK ASSOCIATED FOR TENANT BUILD OUT FOR "NORDSTROM RACK" PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY$375,000
2017-02-09311: Building/Use — Illegal Conversion Of Residential Building/Space
2017-02-09311: Building/Use — Illegal Conversion Of Residential Building/Space
2016
2016-12-14Certificate of occupancy Temporary
2016-12-06311: Noise — Noise: Construction Before/After Hours (NM1)
2016-11-21SMIS — from 855 LIRU LLC
2016-10-14Certificate of occupancy Temporary
2016-09-24311: Blocked Driveway — No Access
2016-09-15Job filed: SPRINKLER RENOVATIONS FOR INTERIOR OFFICE BUILD OUT AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.$825,000
2016-09-15Job filed: MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.$450,000
2016-09-15Job filed: STRUCTURAL RENOVATIONS FOR INTERIOR OFFICE BUILD OUT AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.$926,120
2016-09-15Job filed: INTERIOR OFFICE BUILD OUT OF NON LOAD BEARING PARTITIONS AND RELATED FINISHES AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE, OR OCCUPANCY$25,000,000
2016-09-15Job filed: MECHANICAL AND PLUMBING RENOVATIONS FOR INTERIOR OFFICE BUILD OUT AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.$5,617,300
2016-08-18SMIS — from 855 MRU LLC
2016-08-18SMIS — from 855 MRU LLC
2016-08-18SMIS — from 855 MRU LLC
2016-08-18SMIS — from 855 MRU LLC
2016-08-08Certificate of occupancy Temporary
2016-06-30Certificate of occupancy Temporary
2016-06-14Job filed: INSTALLATION OF SUSPENDED SCAFFOLD, SUSPENDED FROM EXISTING DAVIT SYSTEM AS PER PLANS FILED HEREWITH.
2016-04-28ECB CLASS - 2 violation: SEC. 3303.2 DOT PERMIT. AT TIME OF INSPECTION I OBSERVED THAT CONTRACTOR FAIL TO POST DOT PERMIT FOR STREET/SIDEWALK CLOSING. REME
2016-04-28ECB CLASS - 1 violation: WORK W/O A PERMIT. AT TIME OF INSPECTION I OBSERVED AT W 30TH SIDE(EXP#2)A CHAIN LINK FENCE & BARRICADES IN STREET. NO DOT PERMIT
2016-04-28ECB CLASS - 1 violation: FAILURE TO SAFEGUARD. AT TIME OF INSPECTION I OBSERVED A WALKWAY ALONG30TH,W/BARRICADE & CHAIN LINK FENCE. CONCRETE TRUCK W/PUMP.
2016-04-28ECB CLASS - 1 violation: CONTRARY TO SSP APPROVED DOCUMENT. AT TIME OF INSPECTION I OBSERVED A MOVEABLE CHAINLINK FENCE ON EXP#2(W 30TH ST). FENCE IS CONTR$250
2016-04-28ECB CLASS - 1 violation: SEC. 3303.15 CONCRETE WASHOUT. AT TIME OF INSPECTION I OBSERVED A CONCRETE OPERATION OF W 30TH STREET. CONCRETE TRUCK & CONCRETE P$1,200
2016-04-06311: Homeless Person Assistance — N/A
2016-03-29Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2016-02-21311: Homeless Person Assistance — No Status Call
2016-01-28311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2015
2015-12-22Job filed: TENANT PROTECTION PLAN. THIS APPLICATION IS FILED IN CONJUNCTION WITH NB-121331102.$1,000
2015-12-21311: General Construction/Plumbing — Site Conditions Endangering Workers
2015-11-24311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2015-11-19311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2015-10-16Job filed: THIS APPLICATION IS FILED FOR A TEMPORARY USE PERMIT FOR A SALES OFFICE PURSUANT TO SECTION AC 28-111 AND BUILDINGS BULLETIN 2010-02. DIRECTIVE 2 REVI$3,000
2015-08-20MLEA — from 855 ORU LLC to NIKE USA, INC
2015-08-20MLEA — from 855 ORU LLC to NIKE USA, INC
2015-08-04ECB CLASS - 2 violation: SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS. NOTE: 41 STY BLDG UNDER CONSTRUCTION. THE SIDEWALK SHED LIGHTING AT CORNER OF 6TH$400
2015-08-04ECB CLASS - 2 violation: POSTING OF UNLAWFUL SIGNS,INFORMATION,(PICTORIAL)REPRESENTATION,BUSINESS OR ADVERTISING MESSAGE ON PROTECTION STRUCTURES. NOTE:(41
2015-08-04ECB CLASS - 1 violation: SEC. 3307.4 VEHICULAR BARRICADES-NOT FILLED W/WATER/(SAND)NOTE: 41 STYBLDG UNDER CONSTRUCTION. AT EXP#2 ALONG 30TH STREET OBSERVED$400
2015-07-08Job filed: PA
2015-06-13311: General Construction/Plumbing — Site Conditions Endangering Workers
2015-05-29Job filed: INSTALL NEW GAS FIRED BOILERS PER PLANS.$125,000
2015-05-12311: Water System — Hydrant Leaking (WC1)
2015-04-12311: Noise — Noise: Construction Before/After Hours (NM1)
2015-04-09311: General Construction/Plumbing — Site Conditions Endangering Workers
2015-03-31Deed $45,274,491 — from 855 MRU LLC to 855 ORU LLC$45,274,491
2015-03-31Deed $37,782,025 — from 855 MRU LLC to 855 LIRU LLC$37,782,025
2015-03-31Deed $31,769,874 — from 855 MRU LLC to 855 ORU LLC$31,769,874
2015-03-30311: General Construction/Plumbing — Site Conditions Endangering Workers
2015-03-30ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS.NOTE:@ TIME OF MY INSP.OF A 41 STORY BLDG UP TO RO$2,400
2015-03-22311: Noise — Noise: Construction Before/After Hours (NM1)
2015-03-17311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2015-03-06311: General Construction/Plumbing — Site Conditions Endangering Workers
2015-03-05ECB CLASS - 1 violation: NO TOE BOARDS/INADEQUATE ZERO CABLE.NOTED:INADEQUATE ZERO CABLE (FEW INCHES OFF THE DECK)ON FLOORS:34,28,24-18,16-10,4.REM:PROVIDE$1,000
2015-03-05ECB CLASS - 1 violation: FAILURE TO MAINTAIN ADEQUATE HOUSE KEEPING PER SECTION REQUIREMENTS.NOTED:LOOSE DEBRI ON LEADING EDJC (EYEBROW) ON FLOORS:31,29,28$2,400
2015-03-05ECB CLASS - 1 violation: 3304.4.5.1MATERIAL @EDGE OFBLDG WHEN NOT BEING USED W/IN 10FT FROM THEPERIMETER OF THE BLDG.NOTED:WINDOWS ON DOLLY STORED NEXT TO $1,600
2015-03-05ECB CLASS - 1 violation: 3301.2HOLES/OPENINGS NOT COVERED.HOLES/OPENINGS RANGING FROM 6"IN DIAMETER & BIGGER ON FLOORS 39,38,35-32,30,28,25,19,18,15.HOLES $1,600
2014
2014-12-08311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2014-12-08ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCS - SITE SAFETY PLAN. NOTED: MOVABLE 6 FEET TALL CHAIN LINK FENCE INSTALLED AT E
2014-12-03Job filed: INSTALLATION OF AN ADT ACCESS SYSTEM ON THE ROOF AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD TO COMPLY WITH C
2014-11-24311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2014-11-24311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2014-11-23311: Noise — Noise: Construction Before/After Hours (NM1)
2014-11-21ECB CLASS - 1 violation: FAIL TO INSTITUTE/MAINTAIN SAFETY EQUP MEASURES AFFECTED BY TEMP CONST - NO GUARDRAILS.NOTE:PROPOSED 41-STRY NB UNDER CONST OBS NO$1,200
2014-11-21ECB CLASS - 2 violation: 3301.7 DESIGN REQ BY CHAPTS OF 22.NOTE:OBS PROPOSED 41-STRY BLDG CONCRETE (BLLY)IN PROCESS W/GUARDRAILS SYSTEM WHICH HAS I-BOLT IN
2014-11-21ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONST DOCS AND/OR APPR AMENDMENTS.NOTE:41-STRY PROPOSED NB HAS INSTALLED CABLE GUARDRAILS SYSTEM$250
2014-10-29ECB CLASS - 1 violation: 3301.5 CN 85/14 CD 3597.FAILURE TO MAINTAIN CONSTRUCTION EQUIPMENT HMO:MICHAEL GRAY LIC:5996 EXP.11-30-14 CLASS B.INSPECTED MACHIN$1,600
2014-10-11311: Noise — Noise: Construction Before/After Hours (NM1)
2014-10-11311: Noise — Noise: Construction Before/After Hours (NM1)
2014-10-02Job filed: INSTALLATION OF A TEMPORARY RIGGING @ ROOF LEVEL AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.TEMPORARY RIGGING TO COMPL
2014-09-18ECB CLASS - 1 violation: AILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS NOTED: AT TIME OF INSPECTION,WHILE RESPONDING TO $2,400
2014-08-01311: Noise — Noise: Construction Before/After Hours (NM1)
2014-07-18MAPS — from 855 SIXTH AVENUE CONDOMINIUM
2014-07-18MAPS — from 855 SIXTH AVENUE CONDOMINIUM
2014-07-18CDEC — from 855 SIXTH AVENUE CONDOMINIUM
2014-07-18CDEC — from 855 SIXTH AVENUE CONDOMINIUM
2014-07-18MAPS — from 855 SIXTH AVENUE CONDOMINIUM
2014-07-18CDEC — from 855 SIXTH AVENUE CONDOMINIUM
2014-07-18CDEC — from 855 SIXTH AVENUE CONDOMINIUM
2014-07-11Job filed: INSTALLATION OF ADJACENT PROPERTY ROOF PROTECTION AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ROOF PROTECTION TO COMPL
2014-06-30311: Noise — Noise: Construction Before/After Hours (NM1)
2014-06-17Job filed: TO INSTALL PERIMETER COCOON NETTING SYSTEM. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
2014-05-17311: Emergency Response Team (ERT) — After Hours Work - Illegal
2014-05-17311: Noise — Noise: Construction Before/After Hours (NM1)
2014-05-06Job filed: INSTALLATION OF STROS 7000D (MODEL NOV 3242 UFC-11) DUAL CAR PERSONNEL/MATERIAL HOIST DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. H
2014-04-25Job filed: INSTALLATION OF A CONSTRUCTION FENCE AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.FENCE SHALL COMPLY WITH CHAPTER 33 OF
2014-04-25Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED APPROXIMATELY 545'LONG AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK
2014-04-10Job filed: FILING HEREWITH FOR TAX LOT CONDO SUBDVISION - LOT 1101 TO 1104 IN CONJUNCTION WITH NB 121331102
2014-04-09Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED APPROXIMATELY 285'LONG AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK
2014-02-26Job filed: FILING HEREWITH FOR INSTALLATION OF TEMPORARY STANDPIPE SYSTEMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.$1,000
2014-02-07311: Construction Safety Enforcement — Excavation Tracking Complaint
2014-01-29311: Noise — Noise: Construction Before/After Hours (NM1)
2014-01-10Job filed: INSTALLATION OF MANUAL & AUTOMATIC SMOKE/HEAT DETECTION & SPRINKLER FIRE ALARM SYSTEM WITH VOICE COMMUNICATION SYSTEM AND PURGE SYSTEM AND STA$100
2014-01-10Job filed: INSTALLATION OF MANUAL & AUTOMATIC SMOKE/HEAT/CO DETECTION & SPRINKLER ALARM SYSTEM AND POST FIRE SMOKE PURGE FOR THE FITNESS CENTER IN CONJUC$100
2014-01-10Job filed: INSTALLATION OF (RESIDENTIAL) SMOKE/HEAT/CO DETECTION & SPRINKLER ALARM SYSTEM WITH VOICE COMMUNICTION AND PURGE SYSTEM IN CONJUNCTION WITH NEW BU$100
2013
2013-12-18311: Noise — Noise: Construction Before/After Hours (NM1)
2013-12-09311: Noise — Noise: Construction Equipment (NC1)
2013-12-06311: Emergency Response Team (ERT) — After Hours Work - Illegal
2013-12-05311: Noise — Noise: Construction Before/After Hours (NM1)
2013-12-04311: Noise — Noise: Construction Equipment (NC1)
2013-11-08311: Noise — Noise: Jack Hammering (NC2)
2013-11-08311: Noise — Noise: Jack Hammering (NC2)
2013-11-07311: Construction Safety Enforcement — Excavation Tracking Complaint
2013-09-30Job filed: FILING HEREWITH FOR INSTALLATION OF EMERGENCY GENERATOR ASSOCIATED TO NB 121331102.$1,000
2013-09-30Job filed: FILING HEREWITH FOR FUEL OIL STORAGE TANK.$1,000
2013-09-09Job filed: BUILDER'S PAVEMENT PLAN APPLICATION FILED IN CONJUNCTION WITH NB # 121331102.
2013-09-09Job filed: CURB CUT APPLICATION FILED IN CONJUNCTION WITH NB # 121331102.
2013-09-09Job filed: CURB CUT APPLICATION FILED IN CONJUNCTION WITH NB # 121331102.
2013-08-19Job filed: FIRE PROTECTION PLAN FILED IN ASSOCIATION WITH NB # 121331102$1,000
2013-07-30Job filed: FILING HEREWITH FOR UNDERGROUND PLUMBING WOPRK IN CONJUNCTION WITH NEW BUILDING.$1,000
2013-07-22311: Graffiti — Graffiti
2013-06-06311: Emergency Response Team (ERT) — After Hours Work - Illegal
2013-05-07Job filed: FILING HEREWITH FOR EXCAVATION WORK$1,000
2013-05-07Job filed: FILING HEREWITH FOR INSTALLATION OF SPRINKLER STANDPIPE SYSTEM IN CONJUNCTION WITH NEW MIXED BUILDING.$2,000
2013-05-04Job filed: FILING HEREWITH FOR INSTALLATION OF HVAC SYSTEM AND PLUMBING FIXTURES ASSOCIATED WITH THE CONSTRUCTION OF A MIXED BUILDING
2013-05-04Job filed: FILING HEREWITH FOR STRUCTURAL WORK ASSOCIATED WITH THE CONSTRUCTION OF A MIXED BUILDING
2013-05-04Job filed: FILINF HEREWITH FOR FOUNDATION WORK.
2013-04-02Job filed: NB
2012
2012-12-28Rodent inspection: Passed
2012-12-13Rodent inspection: Passed
2012-12-13Rodent inspection: Passed
2012-12-13Rodent inspection: Failed for Rat Activity
2012-12-12Rodent inspection: Passed
2012-12-12Rodent inspection: Passed
2012-12-12Rodent inspection: Passed
2012-05-15311: BEST/Site Safety — Demolition Notification Received
2012-05-01311: BEST/Site Safety — Demolition Notification Received
2012-03-26Job filed: FULL DEMOLITION OF FOUR STORY STRUCTURE, USING MECHANICAL MEANS.
2012-03-20311: General Construction/Plumbing — Building Permit - None
2012-02-17311: Asbestos — Asbestos Complaint (B1)
2011
2011-06-28Rodent inspection: Passed
2011-06-28Rodent inspection: Passed
2011-06-28Rodent inspection: Passed
2011-06-28Rodent inspection: Passed
2011-06-28Rodent inspection: Passed
2011-06-28Rodent inspection: Passed
2011-05-24Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33.
2011-05-24Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33.
2011-05-24Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33.
2011-05-24Job filed: INSTALLATION OF FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33.
2011-05-24Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33.
2011-04-19Job filed: FULL DEMOLITION OF FIVE STORY BUILDING, USING MECHANICAL MEANS
2011-04-11ECB CLASS - 2 violation: WORK W/O PERMIT. EXPIRED PERMIT. NOTED: UPON INSPECTION FENCE PERMIT EXPIRED PERMIT #120379768FN 09/08/10. REM:RENEW PERMIT.$4,000
2011-01-25ECB CLASS - 2 violation: WORK W/O PERMIT. EXPIRED PERMIT. NOTED: UPON INSPECTION FENCE PERMIT EXPIRED PERMIT #120379768FN 9.8.10. REMEDY: RENEW PERMIT.$4,000
2010
2010-11-05ECB CLASS - 1 violation: FAILURE TO MAINTAIN UPON INSP CONSTRUCTION FENCE WEAK AND FALLING AT ALL 3EXPOSURES FENCE OPEN AT EXP#3 SITE ACCESSIBLE TO PUBLIC $5,000
2010-10-13311: Noise — Noise: Jack Hammering (NC2)
2010-09-30Rodent inspection: Failed for Other Reason
2010-09-30Rodent inspection: Passed
2010-09-30Rodent inspection: Failed for Other Reason
2010-07-23Rodent inspection: Passed
2010-07-23Rodent inspection: Passed
2010-07-23Rodent inspection: Failed for Rat Activity
2010-07-23Rodent inspection: Failed for Rat Activity and Other Reason
2010-07-23Rodent inspection: Failed for Rat Activity
2010-07-23Rodent inspection: Passed
2010-06-10Job filed: PLYWOOD FENCE.
2010-05-20City emergency repair (OMO): 1) remove 20 linear feet of tbf at exposure # 1 (the front of the lot) 2) install new tbf - 20lf by 8ft high at exposure$1,690
2010-05-08ECB CLASS - 2 violation: JOB SITE FENCE DEFECTIVE. NOTED & OBSERVED: AT TIME OF INSPECTION, A 20' SECTION OF CONSTRUCTION FENCE ON THE #1 EXPOSURE IS DOWN$4,000
2010-05-08ECB CLASS - 2 violation: WORK W/O A PERMIT - EXPIRED PERMIT (FENCE) NOTED: VACANT DEMO SITE, DEMO PERMIT HAS BEEN SIGNED OFF. OBSERVED: ENTIRE SITE IS SURR$4,000
2010-03-19ECB CLASS - 2 violation: FAILURE TO MAINTAIN. EXCAVATION NOT ADEQUATELY DRAINED OF RAINWATER AND/OR SUB-SURFACE WATER NOTED: UPON INSPECTION WATER NOT DRAI$250
2010-03-19ECB CLASS - 2 violation: FAILURE TO MAINTAIN. CONSTRUCTION MATERIAL & DEBRIS NOT PROPERLY STORED OR REMOVED FROM SITE. NOTED: UPON INSPECTION CONSTRUCTION $2,500
2010-03-19ECB CLASS - 2 violation: WORK W/O PERMIT. EXPIRED PERMIT. NOTED: UPON INSPECTION EXPIRED FENCE PERMIT EXPIRED 3/14/09. REMEDY: RENEW PERMIT POST.$4,000
2010-03-16ECB CLASS - 1 violation: FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES. NOTED: UPON INSPECTION MISSING PANELS ON FENCE APPROX 20' AT EXCAVATION SITE AT W$1,000
2010-03-11311: Water System — Defective Street Cut (WZZ1)
2010-01-27311: Graffiti — Graffiti
2008
2008-11-24ECB CLASS - 2 violation: JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION FENCE ERECTED UNDER APP#104796972,DEFECT NOTED:AT 30ST ENTRANCE GATE NO SECU$4,000
2008-08-19ECB CLASS - 2 violation: SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS. ON INSP NO LIGHTS ON UNDERSIDE OF SIDEWALK SHED IN PLACE AS PER CODE. REMEDY: PRO$2,400
2008-08-19ECB CLASS - 1 violation: FAIL TO MAINTAIN EXTERIOR. ON INSPECTION VERTICAL & DIAGONAL CRACKS ARE ON EAST WALL OR NORTH SIDE OF BARRING WALL. MORTAR JOIST$1,000
2008-08-19ECB CLASS - 2 violation: SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS. NOTED: VIOLATION WAS ISSUED 3.5.08 FOR NO LIGHTS IN PLACE. SHED LIGHT STILL HAS N$2,400
2008-08-19ECB CLASS - 3 violation: FAILURE TO MAINTAIN INTERIOR ON INSPECTION STAIR WELL TO ROOF ON EAST WALL APPROX 50 SQ FT HAS SPALLING DUE TO MOISTURE. PLASTER I$100
2008-08-19ECB CLASS - 2 violation: SIDEWALK SHED DOES NOT MEET CODE SPECIFICATION NO LIGHTS UNDERNEATH SIDEWALK SHED IN PLACE AS PER CODE. REMEDY: PROVIDE LIGHTS UND$2,400
2008-05-27Job filed: INSTALLATION OF EMERGENCY GENERATOR AND FUEL STORAGE TANK AS PER PLANS$2,000
2008-05-16Job filed: FILING HEREWITH FOR INSTALLATION OF PLUMBING PIPING AND FIXTURES RELATED FOR N EW BUILDING.
2008-05-14Job filed: INSTALLATION OF CLASS J SYSTEM AS PPER PLANS IN CONJUNCTION WITH NB 104859164$1,000
2008-05-14Job filed: INSTALLING INDIVIDUALLY CODED IF A FOR RETAIL STORE -BASEMENT 1ST & 2ND FLRS AS PER PLANS FILED IN CONJUNCTION WITH N.B.104859164$1,000
2008-04-28ECB Non-Hazardous violation: FAILURE TO POST REQUIRED CONTRACTORS SIGN. CURRENTLY AT NORTH EAST SOUTH EXPOSURES 1,2,4 A WOOD CONST FENCE APPRX 8' BOUNDARIES SI$200
2008-01-10ECB Hazardous violation: FAIILURE TO COMPLY TO COMMISSIONER PARTIAL STOP WORK ORDER. NOTED: UPON TIME OF INSPECTION CONTRACTOR FAILURE TO COMPLY W/VIOLATIO$5,000
2008-01-10ECB Hazardous violation: MECH DEMO W/O PERMIT. AT THE TIME OF INSPECTION DEMO IN PROGRESS USINGTRACK EXCAVATOR TO DEMOLISH BLDG AT THIS TIME 2 & 3 FLOORS I$5,000
2008-01-10Job filed: Filing herewith for removal of non load bearing partitions and related finishes as per plans. No change in use, egress or occupancy,$25,000
2008-01-07Job filed: Filing herewith for installation of standpipe system as per plans in conjuction with new building application 104859164.$1,000
2007
2007-12-21Job filed: Erect pipe scaffold, 16 ft long by 60 ft high erected on needle beam platform as per plan at 855 6th Avenue. During remediall repairs. Work shall com
2007-12-06Job filed: FILING HEREWITH FOR PARTIAL EXCAVATIONWORK RELATED TO NB 104859164. IN STALLATION OF TEMPORARY FENCE.$1,000
2007-11-29Job filed: Filing herewith for Fire Protection Plan. Filed in conjuction with NB application # 104859164.$3,000
2007-10-31Job filed: Filing herewith Builders Pavement Plan. Application filed in conjuction with NB # 104859164. No change in use egress or occupancy under this applica
2007-10-31Job filed: Filing herewith Curb Cut Plan. Application filed in conjunction with NB # 104859164. No change in use egress or occupancy under this application.
2007-09-19Job filed: DM
2007-09-19Job filed: DM
2007-09-12Job filed: DM
2007-08-21ECB Hazardous violation: SEC. 27-1039(2F). FAILURE TO PROVIDE DUST CONTROL DURING DEMOLITION OPERATION. NOTE: ON INSPECTION DEMOLITION CREW DUMPING SHEET R$2,500
2007-08-06Job filed: FILING HEREWITH FOR STRUCTURAL WORK FOENEW BUILDING
2007-08-06Job filed: FILING HEREWITH FOR INSTALLATION OF HVAC SYSTEM FOR NEW BUILDING
2007-08-03Job filed: FILING HEREWITH FOR INSTALLATION OF NEWFIRE ALARM SYSTEMS FOR MIXED USE D BLDG IN CONJUNCTION WITH NB 104859164.$1,000
2007-08-03Job filed: NB
2007-08-03Job filed: Filing herewith for Installation of Sprinkler system as per plans in conjunction with NB 104859164.$1,000
2007-06-22Job filed: MECHANICAL MEANS PERMIT FOR THE USE OF BOBCAT SKIDSTEER LOADERS AND MINE EXCAVATORS ON THE ELEVATED FLOORS OF THE BUILDING DURING DEMOLITION OPERATION
2007-06-19Job filed: INSTALL PIPE SCAFFOLD 65' LONG BY 40' LONG HIGH, AT 865 6TH AVENUE. DURING REMEDIAL REPAIRS . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2007-06-19Job filed: INSTALL PIPE SCAFFOLD 65' LONG BY 40' LONG HIGH, AT 861 6TH AVENUE. DURING REMEDIAL REPAIRS . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2007-06-19Job filed: INSTALL PIPE SCAFFOLD 60' LONG BY 50' LONG HIGH, AT 112 WEST 31 STREET. DURING REMEDIAL REPAIRS . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2007-06-19Job filed: INSTALL PIPE SCAFFOLD 20' LONG BY 40' LONG HIGH, AT 110 WEST 31 STREET. DURING REMEDIAL REPAIRS . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2007-06-19Job filed: INSTALL PIPE SCAFFOLD 65' LONG BY 40' LONG HIGH, AT 859 6TH AVENUE. DURING REMEDIAL REPAIRS . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2007-06-18Job filed: INSTALL PIPE SCAFFOLD 235' LONG BY 60' LONG HIGH, AT 855 6TH AVENUE. DURING REMEDIAL REPAIRS . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2007-06-11Job filed: Erect a temporary plywood wall fence 34 ft long by 8 lf high at 861 6TH AVENUE, - during remedial repairs. Work shall comply with LL33/91. No change i
2007-06-11Job filed: Erect a temporary plywood wall fence 17 ft long by 8 lf high at 865 6TH AVENUE, - during remedial repairs. Work shall comply with LL33/91. No change i
2007-06-11Job filed: Erect a temporary plywood wall fence 17 ft long by 8 lf high at 859 6TH AVENUE, - during remedial repairs. Work shall comply with LL33/91. No change i
2007-06-08Job filed: Erect a temporary plywood wall fence 270 ft long by 8 lf high at 855 6th Avenue, - during remedial repairs. Work shall comply with LL33/91. No change
2007-06-01Job filed: Filing herewith for Interior demolition of non load bearing partitions, reflected ceiling work as per plans. No change to use, egress or occupancy.$35,000
2007-04-18Job filed: DM
2007-04-10Job filed: INSTALL HEAVY DUTY SIDEWALK SHED A TOTAL OF 17 LF AT 865 6 AVENUE. WORK TO COMPLY WITH LL33/91. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2007-04-10Job filed: INSTALL HEAVY DUTY SIDEWALK SHED A TOTAL OF 20 FT LONG AT 110 WEST 31 STREET. DURING REPAIRS. WORK TO COMPLY WITH LL33/91. NO CHANGE IN USE, EGRESS O
2007-04-10Job filed: INSTALL HEAVY DUTY SIDEWALK SHED A TOTAL OF 34 FT LONG AT 861 6 AVENUE. DURING REMEDIAL REPAIRS. WORK TO COMPLY WITH LL33/91. NO CHANGE IN USE, EGRES
2007-04-10Job filed: INSTALL HEAVY DUTY SIDEWALK SHED A TOTAL OF 270 LF AT 855 6 AVENUE, WITH 229 FL AT WEST 30 STREET AND 41 FL AT 6 AVENUE. WORK TO COMPLY WITH LL33/91.
2007-04-10Job filed: INSTALL HEAVY DUTY SIDEWALK SHED A TOTAL OF 41 FT LONG AT 112 WEST 31 STREET. DURING REPAIRS. WORK TO COMPLY WITH LL33/91. NO CHANGE IN USE, EGRESS O
2007-04-10Job filed: INSTALL HEAVY DUTY SIDEWALK SHED A TOTAL OF 17 LF AT 859 6 AVENUE. WORK TO COMPLY WITH LL33/91. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2005
2005-08-09Job filed: Modifications to existin mechanical and plumbing systems on teh 4th floor as per plans submitted herewith. No change to use, occupancy group, or egre$54,000
2005-08-09Job filed: Interior partitions and general construction as per plans submitted herewith. No change to use, occupancy group or egress.$70,000
2005-03-03Job filed: REPLACE AUTOMATIC FIRE SUPPRESSION SYSTEM IN EXISTING KITCHEN RANGEHOOD. NO CHANGE IN USE, EGRESS AND OCCUPANCY. COOKING EQUIPMENTS WERE FILED IN 1010$3,000
2004
2004-10-25Job filed: Interior alterations to business space on the 3rd and 5th floor as per plans submitted herewith. No change to use, occupancy group or egress.$90,000
2004-10-25Job filed: Modifications to mechanical systems on the 3rd and 5th floors as per plans submitted herewith. No change to use occupancy group or egress.$75,000
2002
2002-09-25Air permit (CERTIFICATE TO OPERATE), fuel: NO6FUEL
2002-09-10Job filed: REPLACE TWO (2) BOILERS AND TWO (2) OIL BURNERS (NYC BOILER NOS. 42984- 01,-02). NO CHANGE IN EGRESS, OCCUPANCY OR USE UNDER THIS APPLICATION.
2002-08-27Job filed: Replacement of existing store front. No change in use, occupancy and an egress is involved under this application.$5,000
2001
2001-08-10Job filed: Alter existing mechanical system, relocate sink, no change in occupancy, use or egress$65,000
2001-08-10Job filed: Remodel existing offices, relocate partitions, no change in occupancy, use or eg ress$100,000
2001-08-10Job filed: ALTER EXISTING FIRE ALARM SYSTEM, NO CHANGE IN OCCUPANCY, USE OR EGRESS.$8,000
2001-02-13Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 35'DURING FACADE REPAIR NO CHANGE IN USE EGRESSOR OCCUPANCY SHED TO COMPLY WITH LL33/91
2000
2000-11-15Job filed: INSTALL FIRE SUPPRESSION SYSTEM. NO CHAN GE IN USE, EGRESS OR OCCUPANCY.$2,000
2000-04-27Job filed: Minor partition mechanical and plumbing changes on part of the basement, 1st mezzanine as indicated on drawings.No change in use egress or occupancy. $75,000
1998
1998-10-23ECB Hazardous violation: 37R,15R,74M. REMOVE WIRE JUMPERS FROM FUSE, REMOVE GATE FROM TOP FLOOR SHAFT WAY DOOR, PROVIDE FIRE MANS SERVICE., CEASE USE UNTIL$500