The city's published records show little recorded distress here in the last three years. Less recorded distress than 77% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty
points per 10 units; this building carries 4. In ZIP 11238, 51% of residential buildings hold an A and
10% grade D or F.
How grades work
this building
A
B
C
Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
6 service requests in the last three years. Most common: Noise (2) · Lead (2) · Encampment (1) · Homeless Person Assistance (1).
Filed construction activity
$11,663,311 in permitted construction work filed since
2016 (19 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1940)
Yes
Six or more residential units (10)
No
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
283 GREENE LLC
Head officer
FREDERICK WILSON
Managing agent
ERPM COMPANY
Last registered
2025-09-08
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$1,250,000
$562,500
2026
$1,500,000
$675,000
2027
$1,698,000
$764,100
The city's market estimate has risen
36% between tax years 2025 and 2027.
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Classon Av — G · 450 ft straight-line (about a 2-minute walk) · station accessibility: none
Bus
Nearest boarding stop: Greene Av / Classon Av — B52 · 100 ft
Citi Bike
Lexington Ave & Classon Ave · 400 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
6 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
2026-01-28311: Homeless Person Assistance — Non-Chronic
2025
2025-12-29Bedbug filing: 0 infested units
2025-09-10Bedbug filing: 0 infested units
2025-08-08FDNY inspection (RISK)
2025-06-09HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2024
2024-11-29HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2024-11-28311: Lead — Lead Kit Request (Residential) (L10)
2024-09-30311: Lead — Lead Kit Request (Residential) (L10)
2021-06-23311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-06-03311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-06-03Certificate of occupancy Renewal Without Change
2021-05-28311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-05-26311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-05-19311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-04-22311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-04-20FDNY inspection (ALT)
2021-04-19311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-04-18311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-04-12Permit PL — ISSUED
2021-04-09HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021-04-08Certificate of occupancy Renewal Without Change
2021-03-30311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-02-15311: Lead — Lead Kit Request (Residential) (L10)
2021-02-03Certificate of occupancy Temporary
2020
2020-12-22Certificate of occupancy Temporary
2020-11-05FDNY inspection (ALT)
2020-10-02Elevator permit: Furnish and install two (2) new "MachineRoomLess" passenger elevators to comply with A17.1s -2005 and as modified by NYC BC 2014 $215,000
2020-08-26311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2020-08-26DOB complaint, category ?
2020-06-02Permit Construction Fence — Signed-off
2020-06-02Permit Sidewalk Shed — Signed-off
2020-06-01Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING$8,000
2020-06-01Job filed: INSTALLATION OF PLYWOOD FENCE AS PER DRAWINGS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EG$5,000
2020-05-01Elevator permit: Furnish and install two (2) new "MachineRoomLess" passenger elevators to comply with A17.1s -2005 and as modified by NYC BC 2014 $215,000
2020-03-19Permit FO — ISSUED
2020-03-19Permit FO — ISSUED
2020-03-18Permit AL — ISSUED
2020-03-11Permit EW — ISSUED
2020-03-11Permit EW — ISSUED
2020-02-13FDNY inspection (ALT)
2020-02-07Permit PL — ISSUED
2019
2019-12-06Job filed: INSTALLATION OF ROOF MOUNTED SOLAR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$152,437
2019-12-06Job filed: INSTALLATION OF ROOF MOUNTED SOLAR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$152,437
2019-12-06Job filed: INSTALLATION OF ROOF MOUNTED SOLAR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$152,437
2019-12-05DOB complaint, category ?
2019-12-05Permit EQ — ISSUED
2019-10-31FDNY inspection (ALT)
2019-10-19311: Noise — Noise: Construction Before/After Hours (NM1)
2019-10-07311: Sewer — Other Sewer Problem (Use Comments) (SZZ)
2019-08-19Permit FO — ISSUED
2019-08-19Permit FO — ISSUED
2019-08-19Permit AL — ISSUED
2019-07-24DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019-06-11Permit EQ — ISSUED
2019-06-10Permit EQ — ISSUED
2019-05-13311: Construction Safety Enforcement — CSE - Sweep
2019-05-13DOB complaint, category ?
2019-05-13ECB CLASS - 1 violation: FAILURE TO DESIGNATE OR HAVE CONSTRUCTION SUPERINTENDENT PRESENT DURING OPERATION. AT TIME OF INSPECTION OF AN ACTIVE WORK SITE OB$1,250
2019-05-05311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2019-05-05DOB complaint, category ?
2019-05-03311: Construction Safety Enforcement — Construction Safety Compliance Action
2019-05-03DOB complaint, category ?
2019-05-03ECB CLASS - 1 violation: BC3303.7.2/FIRE ESTINGUISHER NOT MAINTAINED.NOTED:AT TIME OF MY INSPCTION OF A 5 STORY ALERATION CONSTRUCTION OPERATIONS IN PROGRE
2019-05-03ECB CLASS - 1 violation: BC3303.16/CONTRACTORS SHED/SHANTY CONSTRUCTED WITHOUT PERMIT.NOTED:AT TIME OF MY INSPECTION OF AN ALTERATION 5 STORIE BUILDING,I O
2019-05-02311: Construction Safety Enforcement — CSC - Monitoring Tracking
2019-04-30311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2019-04-29Permit EQ — ISSUED
2019-04-29Permit EQ — ISSUED
2019-04-05311: Blocked Driveway — No Access
2019-03-28Job filed: INSTALLATION OF FIRE SUPPRESSION SYSTEM$10,000
2019-03-22Permit EW — ISSUED
2019-03-14Permit PL — ISSUED
2019-02-23311: Noise — Noise: Construction Equipment (NC1)
2019-02-16311: Noise — Noise: Construction Equipment (NC1)
2019-02-12Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER$23,000
2019-02-12Permit Supported Scaffold — Signed-off
2019-01-28Job filed: INSTALLATION OF FIRE SUPPRESSION SYSTEM$10,000
2019-01-28Job filed: INSTALLATION OF FIRE SUPPRESSION SYSTEM$10,000
2019-01-09Job filed: AUTOMATIC LINEAR HEAT DETECTION FOR CLEAN AGENT NOVEC 1230 FIRE SUPPRESSION SYSTEM FOR ESS.$10,000
2019-01-07311: General Construction/Plumbing — Working Contrary To Stop Work Order
2019-01-07DOB complaint, category ?
2019-01-04Job filed: INSTALLATION OF NEW BATTERY ENERGY STORAGE SYSTEM IN CONJUNCTION WITH ALT-1 # 321192534.$50,000
2019-01-04Job filed: INSTALLATION OF NEW BATTERY ENERGY STORAGE SYSTEM IN CONJUNCTION WITH ALT-1 # 321192534.$50,000
2019-01-04Permit EQ — ISSUED
2019-01-04Permit EW — ISSUED
2018
2018-12-12311: Borough Office — Construction Enforcement Work Order (DOB)
2018-12-12DOB complaint, category ?
2018-12-12DOB violation C: BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER PERMIT #321546029 ON 12/12/18 DUE TO THE CONTRACTOR WITHDRAW FROM T
2018-07-20311: Construction Safety Enforcement — Best - Low-Rise Tracking Complaint
2018-07-20DOB complaint, category ?
2018-07-19ECB CLASS - 2 violation: NO CONCRETE WASHOUT PROCEDURES OBSERVED CONCRETE PUMP OPEATIONS AT EXP#1 W/NO CONCRETE WASH OUT CONTAINER IN PLACE,CONCRETE WASHOU
2018-06-21Permit EQ — ISSUED
2018-06-13Permit EQ — ISSUED
2018-05-05311: Noise — Noise: Construction Before/After Hours (NM1)
2018-05-05311: Noise — Noise: Construction Before/After Hours (NM1)
2018-05-05311: Emergency Response Team (ERT) — After Hours Work - Illegal
2018-05-05DOB complaint, category ?
2018-05-03311: Noise — Noise: Construction Equipment (NC1)
2018-04-14311: Noise — Noise: Construction Before/After Hours (NM1)
2018-04-14311: Emergency Response Team (ERT) — After Hours Work - Illegal
2018-04-14DOB complaint, category ?
2018-04-10Permit FO — ISSUED
2018-04-09Permit EQ — ISSUED
2018-04-09Permit FO — ISSUED
2018-04-09Permit EQ — ISSUED
2018-04-09Permit EW — ISSUED
2018-04-09Permit AL — ISSUED
2018-04-07311: Emergency Response Team (ERT) — After Hours Work - Illegal
2018-04-07DOB complaint, category ?
2018-03-17311: Emergency Response Team (ERT) — After Hours Work - Illegal
2018-03-17DOB complaint, category ?
2018-03-10311: Emergency Response Team (ERT) — After Hours Work - Illegal
2018-03-10DOB complaint, category ?
2018-03-06311: Emergency Response Team (ERT) — After Hours Work - Illegal
2018-03-06DOB complaint, category ?
2018-02-24311: Noise — Noise: Construction Before/After Hours (NM1)
2018-02-17311: Noise — Noise: Construction Before/After Hours (NM1)
2017
2017-09-15FDNY inspection (STRUC_INT_6)
2017-09-15FDNY inspection (STRUC_INT_4)
2017-09-15FDNY inspection (STRUC_INT_5)
2017-09-15FDNY inspection (STRUC_INT_2)
2017-09-15FDNY inspection (STRUC_INT_1)
2017-09-01Permit EQ — ISSUED
2017-08-29Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
2017-08-24311: Construction Safety Enforcement — Best - Low-Rise Tracking Complaint
2017-08-24DOB complaint, category ?
2017-08-15ECB CLASS - 2 violation: FAILURE TO SAFEGUARD PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. AT TIME OF MY INSPECTION OF A 5STORY ALTERATION.$400
2017-08-01311: Blocked Driveway — Partial Access
2017-06-13Permit AL — ISSUED
2017-06-13Permit FO — ISSUED
2017-06-13Permit FO — ISSUED
2017-06-13Permit EQ — ISSUED
2017-06-05Permit EQ — ISSUED
2017-06-02Job filed: INSTALLATION OF PLYWOOD FENCE AS PER PLAN. NO CHANGE IN USE,OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
2017-06-01Permit EQ — ISSUED
2017-05-31Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE
2017-05-31Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE
2017-05-26Permit EQ — ISSUED
2017-05-26Permit EW — ISSUED
2017-03-22Job filed: NONE$300,000
2017-03-22Job filed: NONE$300,000
2016
2016-11-03CERT — from STEWART TITLE INSURANCE COMPANY
2016-11-03ZONE — from 283 GREENE LLC
2016-09-28Job filed: BUILDERS PAVING PLAN IN CONJUNCTION WITH ALT 1 # 321192534
2016-09-28Job filed: BUILDERS PAVING PLAN IN CONJUNCTION WITH ALT 1 # 321192534
2016-09-28Job filed: BUILDERS PAVING PLAN IN CONJUNCTION WITH ALT 1 # 321192534
2016-08-05Job filed: STRUCTURAL & FOUNDATION WORK AS SHOWN ON PLANS
2016-08-05Job filed: MECHANICAL AND PLUMBING WORK AS SHOWN ON PLANS
2016-08-05Job filed: MECHANICAL AND PLUMBING WORK AS SHOWN ON PLANS
2016-08-05Job filed: STRUCTURAL & FOUNDATION WORK AS SHOWN ON PLANS
2016-08-05Job filed: MECHANICAL AND PLUMBING WORK AS SHOWN ON PLANS
2016-08-04Job filed: INSTALLATION OF AUTOMATIC SMOKE/HEAT/CO DETECTION AND SPRINKLER FIRE ALARM SYS TEM.$430,000
2016-08-04Job filed: INSTALLATION OF AUTOMATIC SMOKE/HEAT/DETECTION AND SPRINKLER FIRE ALARM SYSTEM$430,000
2016-08-03Job filed: SPRINKLER WORK AS SHOWN ON PLANS FILED HEREWITH IN CONJUNCTION WITH ALT 1 #321192534$300,000
2016-07-26Job filed: ALT-1 FILED TO CONVERT MANUFACTURING BUILDING TO RESIDENTIAL WITH OFFICES AT 1ST FLOOR. WORK TO INCLUDE VERTICAL AND HORIZONTAL ENLARGEMENT.$4,635,000
2016-07-26Job filed: ALT-1 FILED TO CONVERT MANUFACTURING BUILDING TO RESIDENTIAL WITH OFFICES AT 1ST FLOOR. WORK TO INCLUDE VERTICAL AND HORIZONTAL ENLARGEMENT.$4,635,000