The city's published records show little recorded distress here in the last three years. More recorded distress than 54% of 25-99-unit residential buildings citywide. The citywide median for 25-99-unit residential buildings is 23.6 penalty
points per 10 units; this building carries 30.2. In ZIP 11209, 84% of residential buildings hold an A and
3% grade D or F.
How grades work
this building
A
B
C
Among 17,252 25-99-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
96 heat or hot-water complaints in the last three years (winter 2023–24: 6 · winter 2024–25: 28 · winter 2025–26: 62). Repeated winter clusters suggest a chronic heating problem.
6
’23–24
28
’24–25
62
’25–26
No bedbug-infested units reported in the last three years of filings.
$3,437 in enforcement penalties imposed (ECB/OATH) in the last three years.
What 311 hears from this address
120 service requests in the last three years. Most common: HEAT/HOT WATER (48) · Noise (19) · Indoor Air Quality (10) · UNSANITARY CONDITION (7) · Abandoned Vehicle (5) · PAINT/PLASTER (5).
Filed construction activity
$2,040,650 in permitted construction work filed since
2016 (16 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1926)
Yes
Six or more residential units (84)
No
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
NAISOPH HOLDING LLC
Head officer
KENNETH L NAGIN
Managing agent
NY SUPERIOR MANAGEMENT LLC
Last registered
2025-08-26
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$6,345,000
$2,855,250
2026
$7,114,000
$3,201,300
2027
$7,365,000
$3,314,250
The city's market estimate has risen
16% between tax years 2025 and 2027.
Building systems
Energy grade (LL33)
B — ENERGY STAR score 82/100 (2022 disclosure cycle)
Heating fuel
NO2FUEL
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Bay Ridge-95 St — R · 0.4 mi straight-line (about a 10-minute walk) · station accessibility: full
Bus
Nearest boarding stop: Shore Rd / Oliver St — B16 X27 X37 · 600 ft
Citi Bike
Shore Rd & Oliver St · 700 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
120 311 service requests from this address in the last three years — 48 of them about heat or hot water.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $231,534 on
2019-12-11 (lender: Apple Bank For Savings). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2019-12-11
Mortgage $231,535 — from NAISOPH HOLDING LLC to APPLE BANK FOR SAVINGS
$231,535
2019-12-11
Agreement $2,100,000 — from NAISOPH HOLDING LLC to APPLE BANK FOR SAVINGS
$2,100,000
2019-12-11
AL&R $2,100,000 — from NAISOPH HOLDING LLC to APPLE BANK FOR SAVINGS
$2,100,000
2013-01-10
Mortgage $132,077 — from NAISOPH HOLDING LLC; NAISOPH HOLDING COMPANY to THE DIME SAVINGS BANK OF WILLIAMSBURGH
$132,077
2013-01-10
Agreement $2,200,000 — from NAISOPH HOLDING LLC; NAISOPH HOLDING COMPANY to THE DIME SAVINGS BANK OF WILLIAMSBURGH
$2,200,000
2013-01-10
AL&R $2,200,000 — from NAISOPH HOLDING COMPANY; NAISOPH HOLDING LLC to THE DIME SAVINGS BANK OF WILLIAMSBURGH
$2,200,000
2003-09-09
Mortgage $139,549 — from NAISOPH HOLDING LLC to INDEPENDENCE COMMUNITY BANK
$139,549
1998-12-04
Mortgage $754,598 — from NAISOPH HOLDING LLC to INDEPENDENCE COMMUNITY BANK
$754,598
1995-11-29
Mortgage $673,416 — from NAISOPH HOLDING LLC to INDEPENDENCE SAVINGSBANK
$673,416
1986-10-30
Mortgage $521,034 — from NAISOPH HLDG CO to LINCOLN SAVS BANK
$521,034
1984-04-19
Mortgage $327,736 — from NAISOPH HOLDING CO. to LINCOLN SAVINGS BANKFSB
$327,736
Ten-year activity
2001000
2017
2018
2019
2020
2021
2022
2023
2024
105
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
3
3
41
0
0
47
2018
0
2
5
0
1
8
2019
4
0
8
5
1
18
2020
5
3
6
0
4
18
2021
3
2
21
0
2
28
2022
3
1
4
0
2
10
2023
0
3
19
0
1
23
2024
7
10
79
0
1
97
2025
8
5
91
0
1
105
2026
4
4
47
0
1
56
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
311: Real Time Enforcement — Work Without A Permit - Occupied Multiple Dwelling
2026-08-06
ECB CLASS - 1 violation: FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. NOTED: AT A 6-STORY MULTI DWELLING OBSERVED WINDOW MOUNTED A/C UNITS INSTALLED FI
2026-08-06
DOB complaint, category ?
2026-08-05
311: Real Time Enforcement — Work Without A Permit - Occupied Multiple Dwelling
2026-08-05
DOB complaint, category ?
2026-08-04
Permit Sidewalk Shed — Permit Issued
2026-08-04
Permit Sidewalk Shed — Permit Issued
2026-07-21
Permit Suspended Scaffold — Permit Issued
2026-06-29
311: Sanitation Worker or Vehicle Complaint — Inappropriate Behavior
311: Smoking or Vaping — Allowed in Smoke Free Area
2025-11-10
311: HEAT/HOT WATER — ENTIRE BUILDING
showing the 80 most recent
The full timeline
2026
2026-09-28311: Indoor Air Quality — Dust from Construction
2026-09-26311: Indoor Air Quality — Ventilation
2026-09-24Boiler inspection
2026-09-23311: Indoor Air Quality — Dust from Construction
2026-09-23311: Indoor Air Quality — Dust from Construction
2026-09-17311: Noise — Dog
2026-08-06311: Real Time Enforcement — Work Without A Permit - Occupied Multiple Dwelling
2026-08-06ECB CLASS - 1 violation: FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. NOTED: AT A 6-STORY MULTI DWELLING OBSERVED WINDOW MOUNTED A/C UNITS INSTALLED FI$2,500
2026-08-06DOB complaint, category ?
2026-08-05311: Real Time Enforcement — Work Without A Permit - Occupied Multiple Dwelling
2025-11-23311: Indoor Air Quality — Other (Explain Below)
2025-11-18FDNY inspection (RISK)
2025-11-18FDNY inspection (COMPLAINT)
2025-11-17311: Smoking or Vaping — Allowed in Smoke Free Area
2025-11-10311: HEAT/HOT WATER — ENTIRE BUILDING
2025-11-10Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-11-09311: HEAT/HOT WATER — ENTIRE BUILDING
2025-11-09Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-10-29HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2025-10-28311: HEAT/HOT WATER — ENTIRE BUILDING
2025-10-28Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-10-26HPD class B: § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES AIRCONDITIONING UNIT P
2025-10-26HPD class B: § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES AIRCONDITIONING UNIT P
2025-10-26HPD class A: § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING SAFETY COVER AT ELECTRICAL OUTLET AT SOUTH WALL AT PUBLIC HALL, 1st STORY
2025-10-26HPD class B: § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES AIRCONDITIONING UNIT P
2025-10-26HPD class A: § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING SAFETY COVERS FOR ELECTRICAL OUTLETS ON TOP OF FIREPLACE AT PUBLIC HALL, 1st STORY
2025-10-26HPD class B: § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES AIRCONDITIONING UNIT P
2025-10-26HPD class B: § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES METAL SCAFFOLDING AT N
2025-10-26HPD class B: § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES AIRCONDITIONING UNIT P
2025-10-26HPD class B: § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF CONSTRUCTION MATERIAL, PLYWOOD AND METAL LADDER AT BULKHEAD LANDING
2025-10-25311: HEAT/HOT WATER — ENTIRE BUILDING
2025-10-25Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-10-23311: HEAT/HOT WATER — ENTIRE BUILDING
2025-10-23311: HEAT/HOT WATER — ENTIRE BUILDING
2025-10-23Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-10-23Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-10-21HPD class C: § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING CONSISTING OF PERMANENTLY INSTALLED MAGNETIC STOPPER AT DOOR
2025-10-21HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2025-10-21HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 6K, 6th STORY, 2nd APARTMENT FROM SOUT
2025-10-21HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2025-10-21HPD class B: § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN AC
2025-10-20311: HEAT/HOT WATER — ENTIRE BUILDING
2025-10-20311: HEAT/HOT WATER — ENTIRE BUILDING
2025-10-20Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-10-20Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-10-19HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2025-10-19HPD class C: HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES AT COMPACTOR CLOSET, 5th STORY
2025-10-17311: HEAT/HOT WATER — ENTIRE BUILDING
2025-10-17Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-10-01311: Illegal Parking — Blocked Hydrant
2025-09-17311: GENERAL — SIGNAGE MISSING
2025-09-17Tenant complaint: GENERAL — SIGNAGE MISSING
2025-08-18ECB CLASS - 1 violation: AT TIME OF INSPECTION I OBSERVED SUSPENDED SCAFFOLD IN THE PROCESS OF BEING INSTALLED WITH WORKERS ON THE ROOF INSTALLING OUTRIGGE
2025-08-15311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2025-08-15DOB complaint, category ?
2025-08-08Job filed: Suspended Scaffold for Facade Restoration as shown on plans
2025-08-06Boiler inspection
2025-08-05Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION, ALL WORK TO COMPLY WITH CHAPTER 33 OF NYCBC.$30,000
2025-08-05Permit Sidewalk Shed — Permit Issued
2025-08-01311: Harboring Bees/Wasps — Bees/Wasps - Not a beekeper
2025-06-23311: Abandoned Vehicle — With License Plate
2025-06-17FDNY inspection (RISK)
2025-05-18311: Obstruction — Trash or Recycling
2025-04-19311: Noise — Noise: Alarms (NR3)
2025-03-26Job filed: Exterior Restoration include brick replacement, Lintel and sill replacement & parapet replacement as per plans filed herewith. No change to use, egres$1,521,500
2025-02-27311: Noise — Noise: Alarms (NR3)
2025-02-20Permit Sidewalk Shed — Signed-off
2025-02-07HPD class B: 28 RCNY § 25-171; & 67 (7)(B) MDL; NYC FIRE CODE § 703.1.3; NYC FIRE CODE § 703.2: ADJUST DOOR TO PREVENT GAPS BETWEEN THE TOP AND SIDE EDGE
2025-02-06311: HEAT/HOT WATER — ENTIRE BUILDING
2025-02-06311: HEAT/HOT WATER — ENTIRE BUILDING
2025-02-06Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-02-06Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-01-30311: Noise — Noise: Alarms (NR3)
2025-01-30311: HEAT/HOT WATER — ENTIRE BUILDING
2025-01-30Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2024-12-08311: Construction Lead Dust — In Common Areas
2024-11-20311: Lead — Lead Kit Request (Residential) (L10)
2024-11-09311: HEAT/HOT WATER — ENTIRE BUILDING
2024-11-09Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2024-10-30311: Noise — Noise: Alarms (NR3)
2024-10-29City emergency repair (OMO): at apt 6b entrance door to comply with nyc self closing code replace broken/defective door and jamb with new properly fi$2,000
2024-10-28311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2024-10-28DOB complaint, category ?
2024-10-17311: HEAT/HOT WATER — ENTIRE BUILDING
2024-10-17Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2024-10-16311: HEAT/HOT WATER — ENTIRE BUILDING
2024-10-16Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2024-10-15311: HEAT/HOT WATER — ENTIRE BUILDING
2024-10-15311: HEAT/HOT WATER — ENTIRE BUILDING
2024-10-15Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2024-10-15Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2024-08-27311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2024-08-27DOB complaint, category ?
2024-07-16311: Harboring Bees/Wasps — Bees/Wasps - Not a beekeper
2024-07-10311: Street Sign - Missing — Other/Unknown
2024-06-17311: Noise — Noise: Alarms (NR3)
2024-06-15311: Noise — Noise: Alarms (NR3)
2024-06-14Permit General Construction — Signed-off
2024-06-12HPD class A: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR AT WEST IN THE PRIVATE HALLWAY LOCATED AT APT 6B
2024-06-12HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2024-06-12HPD class A: § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION RADIATOR IN THE 3rd ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 2nd APA
2024-06-12HPD class A: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR AT WEST IN THE 3rd ROOM FROM NORTH LOCATED AT AP
2024-06-12HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE FOYER LOCATED AT APT
2024-06-12HPD class A: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR AT WEST WALL IN THE 1st ROOM FROM NORTH LOCATED
2024-06-12HPD class A: § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION RADIATOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 2nd APA
2024-06-12HPD class A: § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION RISER PIPE IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FR
2024-06-12HPD class B: § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ESCUTCHEON PLATE AT TOP OF RISER IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT
2024-06-11Permit Plumbing — Signed-off
2024-06-10311: Noise — Noise: Alarms (NR3)
2024-06-08HPD class B: § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF TABLE AND BOXES LEADING TO BULKHEAD AT PUBLIC HALL STAIRS, 6th STORY, SECTION
2024-05-08311: Lead — Lead Kit Request (Residential) (L10)
2024-05-08Job filed: HEREBY FILING FOR INTERIOR RENOVATION OF EXISTING APARTMENT 6F LOCATED ON THE SIXTH FLOOR. NO CHANGE TO USE OCCUPANCY OR EGRESS.$40,000
2024-05-08Job filed: HEREBY FILING FOR THE REMOVAL, REPLACEMENT, RELOCATION AND INSTALLATION OF PLUMBING FIXTURES IN CONJUNTION WITH THE INTERIOR RENOVATION OF APARTMENT 6$25,000
2024-04-09311: Indoor Air Quality — Dust from Construction
2024-04-09311: Indoor Air Quality — Dust from Construction
2024-04-04311: Indoor Air Quality — Dust from Construction
2024-04-03FDNY inspection (RISK)
2024-04-01Job filed: INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHAGE IN USE, EGRESS OR OCCUPANCY.$1,000
2024-03-29311: Water Quality — Cloudy Or Milky Water (QB1)
2024-03-27Boiler inspection
2024-03-06HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2024-02-20Job filed: INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHAGE IN USE, EGRESS OR OCCUPANCY.$1,000
2024-02-20DOB complaint, category ?
2024-02-20Permit Sidewalk Shed — Signed-off
2024-02-16DOB violation IMEGNCY: INSTALL APPROXIMATELY 150 FEET SIDEWALK SHED/OVERHEAD PROTECTION AT EXPOSURE #1 OF PREMISES TO SAFEGUARD THE PUBLIC
2024-02-14311: Real Time Enforcement — Work Without A Permit - Occupied Multiple Dwelling
2024-02-14ECB CLASS - 2 violation: FAILURE TO MAINTAIN BUILDING CODE IN COMPLIANT MANNER OBSERVED AT TIME OF INSPECTION FRONT ENTRANCE IN A SATE OF DISREPAIR. VISIBL$625
2024-02-14DOB complaint, category ?
2024-02-14DOB violation C: OBSERVED MASONRY FACADE WALL CRACKS VERTICAL & HORIZONTAL THROUGHOUT A LL EXPOSURES. ALSO THE PARAPET WALL @ EXPO #1 CRACKS & PARTI
2024-01-10HPD class B: § 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW A
2024-01-10HPD class C: § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO H
2024-01-10HPD class C: § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING PERMANENT DOOR STOPPER AT 1ST AND 2ND FIRE DOORS FROM NORTH A
2024-01-10HPD class C: § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING PERMANENT DOOR STOPPER AT 1ST AND 2ND FIRE DOORS FROM NORTH A
2024-01-10HPD class C: § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING PERMANENT DOOR STOPPER AT 1ST AND 2ND FIRE DOORS FROM NORTH A
2023
2023-12-24311: Abandoned Vehicle — With License Plate
2023-12-21HPD class C: § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING METAL CHAIN AT PUBLIC HALL, 5th STORY
2023-12-21HPD class C: § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING METAL CHAIN AT PUBLIC HALL, 6th STORY
2023-12-21HPD class C: § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO H
2023-12-19311: HEAT/HOT WATER — ENTIRE BUILDING
2023-12-19Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2023-12-15ECB CLASS - 2 violation: F. M. B IN CODE COMPLAINT MANNER: AT TIME OF INSPECTION OF A 6-STORY BUILDING FACADE OBSERVED AT EXPO. #1, AT 4- 5-6TH FL. LEVEL W$312
2023-12-12311: HEAT/HOT WATER — ENTIRE BUILDING
2023-12-12Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2023-12-11311: Abandoned Vehicle — With License Plate
2023-12-01Bedbug filing: 0 infested units
2023-11-20311: Abandoned Vehicle — With License Plate
2023-11-10311: HEAT/HOT WATER — ENTIRE BUILDING
2023-11-10Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2023-11-06DOB complaint, category ?
2023-11-03FDNY inspection (RISK)
2023-11-02311: Abandoned Vehicle — With License Plate
2023-10-03311: Construction Lead Dust — Coming into Apartment
2023-09-02311: Noise — Noise: Construction Equipment (NC1)
2023-07-27311: Harboring Bees/Wasps — Bees/Wasps - Not a beekeper
2023-06-15311: Noise — Noise, Barking Dog (NR5)
2023-05-03311: Lead — Lead Kit Request (Residential) (L10)
2023-04-11Boiler inspection
2022
2022-12-01Bedbug filing: 0 infested units
2022-08-12311: Water System — Hydrant Running (WC3)
2022-06-27Asbestos abatement: Removal — The Asbestos Contractor, Inc.
2022-05-09Job filed: PLUMBING FIXTURES IN CONJUNCTION WITH APARTMENT #6H RENOVATION. CAP AND REMOVAL OF GAS PIPING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$12,500
2022-05-03FDNY inspection (RISK)
2022-04-28Permit Plumbing — Signed-off
2022-03-14Permit General Construction — Signed-off
2022-02-14311: HEAT/HOT WATER — ENTIRE BUILDING
2022-02-14Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2022-01-26Boiler inspection
2021
2021-12-28Bedbug filing: 1 infested units
2021-12-10311: HEAT/HOT WATER — ENTIRE BUILDING
2021-12-10Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2021-06-29HPD class C: § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS AT ENTRANCE TO BUILDING 1ST AT WEST AT CELLAR
2021-06-29HPD class C: § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS ENTRANCE DOOR TO BUILDING 1ST AT WEST AT PUBLIC HALL, 1st STORY
2021-06-29HPD class A: § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES
2021-06-29HPD class B: § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF KEY OPERATED LOCK INSTALLED ON ENTRANCE DOOR AT ROOM LEADING TO FIRE ESCAP
2021-06-29HPD class B: § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING LOCATED AT APT 6G, 6th STORY, 3rd APARTMENT FROM NORTH A
2021-06-29HPD class C: § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS AT APARTMENT IN THE ENTRANCE LOCATED AT APT 6G, 6th STORY, 3rd APARTMENT FR
2021-06-29HPD class B: § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES GAS RANGE IN THE KITCHENETTE LOCATED AT APT 6G, 6th STORY, 3rd APARTMEN
2021-06-29HPD class A: § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGE
2021-06-25311: GENERAL — COOKING GAS
2021-06-25Tenant complaint: GENERAL — COOKING GAS
2021-06-23Job filed: PLUMBING FIXTURES IN CONJUNCTION WITH APARTMENT #6H RENOVATION. CAP AND REMOVAL OF GAS PIPING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$12,500
2021-06-15Job filed: RENOVATE APARTMENT #6H ON THE 6TH FLOOR. WORK INCLUDES NEW PARTITIONS, NEW FINISHES, NEW KITCHEN CABINETS & APPLIANCE & NEW PLUMBING FIXTURES. NO CH$39,950
2021-04-16311: Water Quality — Taste/Odor, Bitter/Metallic (QA3)
2021-02-17Air permit (CERTIFICATE TO OPERATE), fuel: NO2FUEL
2021-02-13311: HEAT/HOT WATER — ENTIRE BUILDING
2021-02-13Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2021-02-04Permit EW — ISSUED
2021-01-30311: HEAT/HOT WATER — ENTIRE BUILDING
2021-01-30Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2021-01-23311: HEAT/HOT WATER — ENTIRE BUILDING
2021-01-23Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2021-01-14Boiler inspection
2020
2020-12-23ECB CLASS - 2 violation: MAIN LINE BOXES CAN BE OPENED WITH POWER ON. ADJUST BRAKE MONITOR. SEAL HOIST MACHINE LEAKS. REPAIR PHONE. HOIST ROPES DEVELOPING $312
2020-12-17Bedbug filing: 1 infested units
2020-12-17DOB complaint, category ?
2020-12-08Air permit (CERTIFICATE TO OPERATE), fuel: NO6FUEL
2020-11-25Permit Plumbing — Signed-off
2020-11-25Permit EW — ISSUED
2020-11-23Job filed: PLUMBING FIXTURES IN CONJUNCTION WITH APARTMENT #2E RENOVATION. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$10,000
2020-11-20Job filed: RENOVATE APARTMENT #2E ON THE 2ND FLOOR. WORK INCLUDES NEW PARTITIONS, NEW FINISHES, NEW KITCHEN CABINETS & APPLIANCE, NEW PLUMBING FIXTURES, NEW$63,000
2020-11-20Job filed: RENOVATE APARTMENT #2E ON THE 2ND FLOOR. WORK INCLUDES NEW PARTITIONS, NEW FINISHES, NEW KITCHEN CABINETS & APPLIANCE, NEW PLUMBING FIXTURES, NE$63,000
2020-11-09Asbestos abatement: Removal — Jabco Contracting, Inc.
2020-07-21311: Illegal Parking — Blocked Sidewalk
2020-06-28311: Illegal Parking — Blocked Sidewalk
2020-06-09Elevator permit: New Door Lock Monitoring System.$14,916
2020-06-03Boiler inspection
2020-05-08311: Non-Emergency Police Matter — Social Distancing
2020-05-08311: Non-Emergency Police Matter — Social Distancing
2019-12-11Mortgage $231,535 — from NAISOPH HOLDING LLC to APPLE BANK FOR SAVINGS$231,535
2019-12-11Mortgage assigned — from THE DIME SAVINGS BANK OF WILLIAMSBURGH; THE DIME COMMUNITY BANK to APPLE BANK FOR SAVINGS
2019-12-11TL&R — from THE DIME SAVINGS BANK OF WILLIAMSBURGH; THE DIME COMMUNITY BANK to NAISOPH HOLDING COMPANY; NAISOPH HOLDING LLC
2019-12-11Agreement $2,100,000 — from NAISOPH HOLDING LLC to APPLE BANK FOR SAVINGS$2,100,000
2019-12-11AL&R $2,100,000 — from NAISOPH HOLDING LLC to APPLE BANK FOR SAVINGS$2,100,000
2019-07-15311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-07-10311: Broken Parking Meter — Coin or Card Did Not Register
2019-04-11Permit PL — ISSUED
2019-04-09311: HEAT/HOT WATER — ENTIRE BUILDING
2019-04-09Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019-04-09Job filed: RENOVATE APARTMENT #4G ON THE 4TH FLOOR. WORK INCLUDES NEW PARTITIONS, NEW FINISHES, NEW KITCHEN CABINETS & APPLIANCES, NEW PLUMBING FIXTURES, NEW$45,950
2019-04-09Job filed: RENOVATE APARTMENT #4G ON THE 4TH FLOOR. WORK INCLUDES NEW PARTITIONS, NEW FINISHES, NEW KITCHEN CABINETS & APPLIANCES, NEW PLUMBING FIXTURES, NEW$45,950
2019-04-09Permit EW — ISSUED
2019-01-22HPD class C: § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF FREE STANDING STEAM RADIATOR AT BUILDING WEST YARD
2019-01-20311: HEAT/HOT WATER — ENTIRE BUILDING
2019-01-20Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019-01-04Boiler inspection
2018
2018-08-20311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2018-08-08FDNY inspection (RISK)
2018-05-30ECB CLASS - 2 violation: 01L10,02L10,14J01,17H11,17D04,42G11,52K11,59J01,59E01,56Y13,13L10,61R11,60Q03,68B07,37R11,37B11,76Q03,97X10,61J01. 01,02L-MUTED/IN$625
2018-01-18311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2018-01-12Boiler inspection
2018-01-08311: Lead — Lead Kit Request (Residential) (L10)
2018-01-08311: Water System — Dirty Water (WE)
2018-01-08311: Water System — Dirty Water (WE)
2017
2017-12-28311: HEAT/HOT WATER — ENTIRE BUILDING
2017-12-28Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2017-12-26DOB complaint, category ?
2017-12-14311: HEAT/HOT WATER — ENTIRE BUILDING
2017-12-14311: HEAT/HOT WATER — ENTIRE BUILDING
2017-12-14311: HEAT/HOT WATER — ENTIRE BUILDING
2017-12-14Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2017-12-14Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2017-12-14Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2017-05-08311: Noise — Noise: Construction Equipment (NC1)
2017-03-11Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2017-03-03Job filed: RENOVATE APT. #1C ON THE 1ST FLOOR & APT. #3D ON THE 3RD FLOOR. WORK INCLUDES NEW PARTITIONS, NEW FINISHES, KITCHEN CABINETS, COUNTERS & APPL$104,500
2016-11-01Job filed: INSTALL HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH THE 2014 N
2016-11-01Job filed: INSTALL HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH THE 2014 N
2016-11-01Job filed: REMOVAL OF TWO STORAGE ROOM ON THE ROOF AND REPAIR PARAPET WALL AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SH$24,800
2016-11-01Permit AL — ISSUED
2016-11-01Permit EQ — ISSUED
2016-03-12311: Illegal Parking — Blocked Hydrant
2016-03-06311: HEAT/HOT WATER — APARTMENT ONLY
2016-03-06Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2016-02-12311: HEAT/HOT WATER — ENTIRE BUILDING
2016-02-12Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2016-01-19311: HEAT/HOT WATER — ENTIRE BUILDING
2016-01-19Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2016-01-13311: HEAT/HOT WATER — ENTIRE BUILDING
2016-01-13Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2016-01-11HPD class A: SECTION 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF T
2016-01-05311: HEAT/HOT WATER — ENTIRE BUILDING
2016-01-05311: HEAT/HOT WATER — ENTIRE BUILDING
2016-01-05Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2016-01-05Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2015
2015-12-29311: HEAT/HOT WATER — ENTIRE BUILDING
2015-12-29311: HEAT/HOT WATER — ENTIRE BUILDING
2015-12-15Job filed: EXISTING 30" DIAMETER CLAY CHIMNEY REQUIRES A STEANLESS STEEL LINING SYSTEM TO BE CUSTOM FABRICATED IN INSTALLED UNNING ON THE INTERIOR OF THIS APPROX$20,000
2015-12-15Job filed: EXISTING 30' DIAMETER CLAY CHIMNEY REQUIRES A STEANLESS STEEL LINING SYSTEM TO BE CUSTOM FABRICATED IN INSTALLED UNNING ON THE INTERIOR OF THIS APPROX$20,000
2015-12-15Permit EW — ISSUED
2015-10-17311: HEAT/HOT WATER — ENTIRE BUILDING
2015-10-17Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2015-01-08Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2015-01-08Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2014
2014-10-29Job filed: RENOVATE APT. #5C ON THE 5TH FLOOR. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK INCLUDES NEW PARTITIONS, NEW FINISHES, KITCHEN CABINETS & APPLIANC$46,400
2014-10-29Job filed: RENOVATE APT. #5C ON THE 5TH FLOOR. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK INCLUDES NEW PARTITIONS, NEW FINISHES, KITCHEN CABINETS & APPLIANC$46,400
2014-10-29Permit EW — ISSUED
2014-10-22Permit PL — ISSUED
2014-10-20311: Lead — Lead Kit Request (Residential) (L10)
2014-10-20311: HEAT/HOT WATER — APARTMENT ONLY
2014-10-20Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2014-10-17Permit PL — ISSUED
2014-09-24Job filed: RENOVATE APARTMENT #3E ON THE 3RD FLOOR. WORK INCLUDES NEW PARTITIONS, NEW FINISHES, NEW KITCHEN CABINETS, APPLIANCES, PLUMBING FIXTURES. NO CHANGE IN$65,000
2014-09-24Permit EW — ISSUED
2014-08-18Permit EW — ISSUED
2014-08-12Job filed: RENOVATE APARTMENT #3C ON THE 3RD FLOOR. WORK INCLUDES PARTITIONS, DOORS, FLOORS, FINISHES, PLUMBING FIXTURES. NO CHANGE IN USE, OCCUPANCY. OR EGRESS$46,400
2014-08-12Job filed: RENOVATE APARTMENT #3C ON THE 3RD FLOOR. WORK INCLUDES PARTITIONS, DOORS, FLOORS, FINISHES, PLUMBING FIXTURES. NO CHANGE IN USE, OCCUPANCY. OR EGRESS$46,400
2014-08-12Permit EW — ISSUED
2014-05-15DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
2014-01-06311: HEATING — HEAT
2014-01-06Tenant complaint: HEATING — HEAT RELATED
2013
2013-12-09DOB complaint, category ?
2013-11-13311: HEATING — HEAT
2013-11-13Tenant complaint: HEATING — HEAT RELATED
2013-11-10311: HEATING — HEAT
2013-11-10Tenant complaint: HEATING — HEAT RELATED
2013-11-07Permit PL — ISSUED
2013-10-29311: HEATING — HEAT
2013-10-29Tenant complaint: HEATING — HEAT RELATED
2013-09-17DOB complaint, category ?
2013-08-21DOB complaint, category ?
2013-07-19Job filed: RENOVATE APARTMENT #5F ON THE 5TH FLOOR. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$47,200
2013-07-19Job filed: RENOVATE APARTMENT #5F ON THE 5TH FLOOR. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$47,200
2013-07-19Permit EW — ISSUED
2013-06-12311: Noise — Noise, Barking Dog (NR5)
2013-06-06311: Street Sign - Damaged — Street Cleaning - ASP
2013-05-27311: Noise — Noise, Barking Dog (NR5)
2013-04-09Permit PL — ISSUED
2013-01-23Permit EW — ISSUED
2013-01-17Permit EW — ISSUED
2013-01-10Mortgage assigned — from SOVEREIGN BANK, N.A. to THE DIME SAVINGS BANK OF WILLIAMSBURGH
2013-01-10TL&R — from NAISOPH HOLDING LLC to FANNIE MAE
2013-01-10Mortgage assigned — from FANNIE MAE to SOVEREIGN BANK, N.A.
2013-01-10Mortgage $132,077 — from NAISOPH HOLDING LLC; NAISOPH HOLDING COMPANY to THE DIME SAVINGS BANK OF WILLIAMSBURGH$132,077
2013-01-10Agreement $2,200,000 — from NAISOPH HOLDING LLC; NAISOPH HOLDING COMPANY to THE DIME SAVINGS BANK OF WILLIAMSBURGH$2,200,000
2013-01-10AL&R $2,200,000 — from NAISOPH HOLDING COMPANY; NAISOPH HOLDING LLC to THE DIME SAVINGS BANK OF WILLIAMSBURGH$2,200,000
2013-01-07Job filed: A2$42,800
2012
2012-12-06Permit PL — ISSUED
2012-10-23Permit EW — ISSUED
2012-09-24Job filed: RENOVATE APARTMENT 1I IN THE 1ST FLOOR. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$74,468
2012-09-24Job filed: RENOVATE APARTMENT 1I IN THE 1ST FLOOR. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$74,468
2012-09-24Job filed: RENOVATE APARTMENT 1I IN THE 1ST FLOOR. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$74,468
2012-07-03ECB CLASS - 1 violation: 76X10,40M07,61J01,67L10,37L10,05X10,33E01,39Q03,37X10.CEASE USE ITEM.(76X)INOPERATIVE PLANK SWITCH.(40M)VENTILATION PER K3.(61J)MA$1,000
2012-05-03DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2011
2011-12-22DOB violation E:
2011-04-03311: Emergency Response Team (ERT) — After Hours Work - Illegal
2011-04-03DOB complaint, category ?
2011-03-03311: Noise - Vehicle — Engine Idling
2011-03-02311: Noise - Vehicle — Engine Idling
2011-03-01311: Noise - Vehicle — Engine Idling
2010
2010-11-18311: Lead — Lead Kit Request (Non-Residential) (L11)
2005-05-17ECB Non-Hazardous violation: 10H11/25D06/57H10/36P16/84#07/44P16. 57-H EXCESSIVE LOST MOTION.36-P CYLINDER TYPE LOCK ON WHEELHOUSE DOOR.84# PROVIDE PLATFORM AT$350
2005-05-10DOB complaint, category ?
2005-05-04DOB complaint, category ?
2005-04-29DOB complaint, category ?
2005-04-15DOB complaint, category ?
2005-04-14DOB complaint, category ?
2005-01-31DOB violation LL6291:
2005-01-21DOB violation E:
2004
2004-02-13DOB violation LL6291:
2003
2003-09-09Mortgage $139,549 — from NAISOPH HOLDING LLC to INDEPENDENCE COMMUNITY BANK$139,549
2003-09-09Agreement — from NAISOPH HOLDING LLC to INDEPENDENCE COMMUNITY BANK
2003-09-09Mortgage assigned — from INDEPENDENCE COMMUNITY BANK to FANNIE MAE
2003-09-09AL&R — from INDEPENDENCE COMMUNITY BANK to NAISOPH HOLDING LLC
2003-09-09AALR — from INDEPENDENCE COMMUNITY BANK to FANNIE MAE
2003-03-19DOB violation LL6291:
2003-02-23Tenant complaint: HEATING — HEAT RELATED
2002
2002-08-27DOB violation E: 3P1144
2002-03-26DOB violation LL6291:
2002-02-19DOB violation LL1081:
2001
2001-09-14DOB violation E: 3P1144
2001-02-27DOB violation LL6291:
2000
2000-06-05ECB Non-Hazardous violation: 73X11. 73- RESTORE TO SERVICE SO AN INSPECTION CAN BE MADE,
1998
1998-12-09PAT — from TELLER, WILBUR W to CONNORS, MICHAEL N
1998-12-04Mortgage $754,598 — from NAISOPH HOLDING LLC to INDEPENDENCE COMMUNITY BANK$754,598
1998-12-04Agreement — from INDEPENDENCE COMMUNITY BANK; INDEPENDENCE SAVINGSBANK to NAISOPH HOLDING LLC
1998-09-29ECB Non-Hazardous violation: 50F,73U,75U,15T,33O,21X. CITY ID TAGS, 5 YEAR TEST.
1995
1995-11-29Mortgage $673,416 — from NAISOPH HOLDING LLC to INDEPENDENCE SAVINGSBANK$673,416
1995-11-29Mortgage assigned — from THE DIME SAVINGS BANK OF NEW YORK FSB to INDEPENDENCE SAVINGSBANK
1995-11-29Agreement — from NAISOPH HOLDING to INDEPENDENCE SAVINGSBANK
1994
1994-05-31DOB violation LL1081:
1993
1993-05-01ECB Non-Hazardous violation: 37G, (37) REMOVE JUMPED OUT GLASS FUSES