The city's published records show little recorded distress here in the last three years. Less recorded distress than 100% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty
points per 10 units; this building carries 0. In ZIP 10013, 70% of residential buildings hold an A and
5% grade D or F.
How grades work
this building
A
B
C
Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
12 service requests in the last three years. Most common: Missed Collection (3) · General Construction/Plumbing (2) · Air Quality (2) · Sewer (1) · Homeless Person Assistance (1) · Dirty Condition (1).
Filed construction activity
$909,550 in permitted construction work filed since
2016 (24 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1860)
Yes
Six or more residential units (16)
No
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
MAIN DUANE OWNERS CORP.
Head officer
PATRICIA JOYCE
Managing agent
J&C LAMB MANAGEMENT CORP.
Last registered
2025-09-13
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$9,131,000
$4,108,950
2026
$9,446,000
$4,250,700
2027
$10,205,000
$4,592,250
The city's market estimate has risen
12% between tax years 2025 and 2027.
For property tax, the Department of Finance values this co-op
as if it were a rental building. Its 2021 estimate: gross income $1,705,733 a year
($40.85 per sq ft), operating expenses $560,366
($13.42 per sq ft), net operating income $1,145,367. These are the
city's estimates from comparable rentals, not the building's actual budget, rents or maintenance
charges.
Building systems
Heating fuel
NATURALGAS
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 4 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
2 street-flooding or sewer-backup complaints at this address since
2011 (1 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Chambers St — 2 3 A C E R W · 350 ft straight-line (about a 2-minute walk) · station accessibility: partial Chambers St — 1 2 3 · 400 ft straight-line (about a 2-minute walk) · station accessibility: full
Bus
Nearest boarding stop: West Broadway / Duane St — M20 · 300 ft
Citi Bike
Hudson St & Reade St · 400 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
12 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $500,000 on
2021-11-10 (lender: National Consumer Cooperative Bank). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2025-10-01
RPTT&RET $1,950,000 — from PRIZANT, LESLIE; PRIZANT, MARK to HUGHES-HALLETT, CHARLES; TESLIK, ASHLEY
$1,950,000
2025-09-16
Sold for $1,950,000
$1,950,000
$121,875
2021-11-10
Mortgage $500,000 — from MAIN DUANE OWNERS CORP to NATIONAL CONSUMER COOPERATIVE BANK
$500,000
2021-11-10
AL&R $3,500,000 — from MAIN DUANE OWNERS CORP to NATIONAL CONSUMER COOPERATIVE BANK
$3,500,000
2021-11-10
Mortgage $3,500,000 — from MAIN DUANE OWNERS CORP to NATIONAL CONSUMER COOPERATIVE BANK
$3,500,000
2021-11-10
AL&R $500,000 — from MAIN DUANE OWNERS CORP to NATIONAL CONSUMER COOPERATIVE BANK
$500,000
2021-10-29
RPTT&RET $2,973,750 — from MILLS, BENJAMIN to PARK, SANGMI; HOLST-KNUDSEN, MARK
$2,973,750
2021-10-15
Sold for $2,973,750
$2,973,750
$185,859
2019-04-04
RPTT&RET $1,750,000 — from FRENCH, DEBORAH to BROOK, DEVIN
$1,750,000
2019-03-25
Sold for $1,750,000
$1,750,000
$109,375
2018-06-26
RPTT&RET $2,446,500 — from THEODORAKIS, MATTHEW to GARNETT, JAMES; BARTHOLOMEW, BRIAN
$2,446,500
2018-06-19
Sold for $2,446,500
$2,446,500
$152,906
2016-09-27
RPTT&RET $1,750,000 — from KENDRICK, MELVIN S; SALTER, MARY to PRIZANT, MARK; PRIZANT, LESLIE
$1,750,000
2016-09-22
Sold for $1,750,000
$1,750,000
$109,375
2015-08-21
RPTT&RET $2,935,000 — from MICHEL, JEROME P; CORTADELLAS, MARIE J to MILLS, BENJAMIN
$2,935,000
Ten-year activity
50250
2017
2018
2019
2020
32
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
7
4
6
0
4
21
2018
13
0
7
2
3
25
2019
6
0
7
4
3
20
2020
4
8
7
1
3
23
2021
5
2
11
12
2
32
2022
8
1
5
2
2
18
2023
3
4
3
2
2
14
2024
14
0
5
0
3
22
2025
11
2
3
2
2
20
2026
3
2
8
0
3
16
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2026-05-18311: Air Quality — Air: Odor/Fumes, Vehicle Idling (AD3)
2026-03-14311: Air Quality — Air: Odor/Fumes, Vehicle Idling (AD3)
2026-03-02Certificate of occupancy Renewal Without Change
2026-02-12311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2026-02-12DOB complaint, category ?
2026-02-11311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2026-02-11DOB complaint, category ?
2026-01-14311: Missed Collection — Compost
2025
2025-12-23Certificate of occupancy Renewal Without Change
2025-12-17Bedbug filing: 0 infested units
2025-10-03Certificate of occupancy Renewal Without Change
2025-10-01RPTT&RET $1,950,000 — from PRIZANT, LESLIE; PRIZANT, MARK to HUGHES-HALLETT, CHARLES; TESLIK, ASHLEY$1,950,000
2025-09-16Sold for $1,950,000$1,950,000
2025-09-05Boiler inspection
2025-09-05Boiler inspection
2025-07-25Job filed: INTERIOR RENOVATIONS PER PLANS. RELOCATION AND INSTALLATION OF PLUMBING FIXTURES AND SPRINKLER. NO CHANGE IN EGRESS, USE, OR BULK. THIS BUILDING WAS C$20,000
2025-07-03Certificate of occupancy Renewal Without Change
2025-06-11Job filed: INTERIOR RENOVATIONS PER PLANS. RELOCATION AND INSTALLATION OF PLUMBING FIXTURES AND SPRINKLER. NO CHANGE IN EGRESS, USE, OR BULK. THIS BUILDING WAS C$20,000
2025-06-05311: Missed Collection — Compost
2025-05-12Permit Sidewalk Shed — Signed-off
2025-05-12Permit Sidewalk Shed — Signed-off
2025-05-09Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF$1,000
2025-05-09Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF$1,000
2025-05-08FDNY inspection (RISK)
2025-05-08FDNY inspection (COM_OCPCY)
2025-04-22311: Missed Collection — Compost
2025-04-10Certificate of occupancy Renewal Without Change
2025-01-13Certificate of occupancy Renewal Without Change
2024
2024-12-30Job filed: INTERIOR RENOVATIONS WITH PARTITIONS PER PLANS, REPLACEMENT OF EXISTING SKYLIGHTS. MECHANICAL, AND PLUMBING WORK UNDER SEPARATE APPLICATIONS. NO CHANG$75,000
2024-12-10Bedbug filing: 0 infested units
2024-10-29Certificate of occupancy Renewal With Change
2024-10-26311: Dirty Condition — Trash
2024-10-25Boiler inspection
2024-10-25Boiler inspection
2024-09-26Job filed: INTERIOR RENOVATIONS PER PLANS. RELOCATION AND INSTALLATION OF PLUMBING FIXTURES AND SPRINKLER. NO CHANGE IN EGRESS, USE, OR BULK. THIS BUILDING WAS C$20,000
2024-07-15Permit Sprinklers — Signed-off
2024-07-15Permit Plumbing — Signed-off
2024-07-10Elevator permit: Furnish and install new traction sheave and hoist ropes to replace existing. All work to comply with ASME A17.1-2013, Part 2, Sa$10,000
2024-07-09Permit Plumbing — Signed-off
2024-07-09Permit Sprinklers — Signed-off
2024-06-14311: Homeless Person Assistance
2024-06-13Permit General Construction — Signed-off
2024-05-28Job filed: MECHANICAL SCOPE PER PLANS. NO CHANGE IN EGRESS, USE, OR BULK. THIS BUILDING WAS CONVERTED TO RESIDENTIAL UNDER ARTICLE 78 OF MDL ALT 1486/8$20,000
2024-05-28Job filed: INTERIOR RENOVATIONS PER PLANS. RELOCATION AND INSTALLATION OF PLUMBING FIXTURES AND SPRINKLER. NO CHANGE IN EGRESS, USE, OR BULK. THIS BUILDING WAS C$20,000
2024-04-30Certificate of occupancy Renewal Without Change
2024-04-25Job filed: INTERIOR RENOVATIONS WITH PARTITIONS PER PLANS, REPLACEMENT OF EXISTING SKYLIGHTS. MECHANICAL, AND PLUMBING WORK UNDER SEPARATE APPLICATIONS. NO CHANG$75,000
2024-02-07Certificate of occupancy Renewal Without Change
2024-01-03Bedbug filing: 0 infested units
2023
2023-11-07Boiler inspection
2023-11-07Boiler inspection
2023-10-10Certificate of occupancy Renewal Without Change
2023-09-19FDNY inspection (COM_OCPCY)
2023-09-19FDNY inspection (COM_OCPCY)
2023-09-19FDNY inspection (RISK)
2023-07-28311: Special Projects Inspection Team (SPIT) — Illegal Hotel Rooms In Residential Building
2023-07-28DOB complaint, category ?
2023-07-18Certificate of occupancy Renewal Without Change
2023-05-14311: Homeless Person Assistance
2023-04-04Certificate of occupancy Renewal Without Change
2023-01-29311: Homeless Person Assistance
2023-01-27Mortgage satisfied — from MAE, FANNIE to NATIONAL COOPERATIVE BANK, N.A.
2023-01-27TL&R — from FANNIE MAE to NCB, FSB
2022
2022-12-27Certificate of occupancy Renewal With Change
2022-12-17311: Dirty Condition — Trash
2022-12-16Bedbug filing: 0 infested units
2022-12-14Certificate of occupancy Renewal Without Change
2022-11-02HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2022-09-29Boiler inspection
2022-09-29Boiler inspection
2022-09-28Job filed: Restoration of bullet glass cast iron panels at sidewalk vault, the removal of the concrete flags above sidewalk vault to install new waterproof membr$314,050
2022-09-08Certificate of occupancy Renewal Without Change
2022-08-11FDNY inspection (RISK)
2022-07-28Permit Structural — Signed-off
2022-07-14Job filed: Replacement of existing skylight on the roof in the back of the building. No change of use or egress.$25,000
2022-06-27Certificate of occupancy Renewal Without Change
2022-03-14Certificate of occupancy Renewal Without Change
2022-02-18Mortgage assigned — from NATIONAL COOPERATIVE BANK, N.A. to WILMINGTON TRUST, N.A., AS TRUSTEE FOR T
2022-02-18AALR — from NATIONAL COOPERATIVE BANK, N.A. to WILMINGTON TRUST, N.A., AS TRUSTEE FOR T
2022-01-26311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021
2021-12-15Bedbug filing: 0 infested units
2021-11-10Mortgage assigned — from NATIONAL CONSUMER COOPERATIVE BANK to NATIONAL COOPERATIVE BANK, N.A.
2021-11-10Mortgage satisfied — from NATIONAL COOPERATIVE BANK, N.A.; NCB, FSB to MAIN DUANE OWNERS CORP
2021-11-10TL&R — from NATIONAL CONSUMER COOPERATIVE BANK to MAIN DUANE OWNERS CORP
2021-11-10AALR — from NATIONAL CONSUMER COOPERATIVE BANK to NATIONAL COOPERATIVE BANK, N.A.
2021-11-10Mortgage $500,000 — from MAIN DUANE OWNERS CORP to NATIONAL CONSUMER COOPERATIVE BANK$500,000
2021-11-10AALR — from NATIONAL CONSUMER COOPERATIVE BANK to NATIONAL COOPERATIVE BANK, N.A.,
2021-11-10Mortgage assigned — from NATIONAL CONSUMER COOPERATIVE BANK to NATIONAL COOPERATIVE BANK, N.A.,
2021-11-10AL&R $3,500,000 — from MAIN DUANE OWNERS CORP to NATIONAL CONSUMER COOPERATIVE BANK$3,500,000
2021-11-10Mortgage $3,500,000 — from MAIN DUANE OWNERS CORP to NATIONAL CONSUMER COOPERATIVE BANK$3,500,000
2021-11-10AL&R $500,000 — from MAIN DUANE OWNERS CORP to NATIONAL CONSUMER COOPERATIVE BANK$500,000
2021-11-04DOB violation P: LAA DIVISION HAS ORDERED TO STOP ALL PLUMBING WORK IMMEDIATELY UNDER PERMIT# M00538387 DUE TO UNRESPONSIVE AUDIT OBJECTIONS.
2021-11-01311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-10-29RPTT&RET $2,973,750 — from MILLS, BENJAMIN to PARK, SANGMI; HOLST-KNUDSEN, MARK$2,973,750
2021-10-22DOB complaint, category ?
2021-10-15Sold for $2,973,750$2,973,750
2021-09-10Certificate of occupancy Renewal Without Change
2021-08-05Job filed: One new air conditioning system and associated fan coils. Replace two roof top condensing units. No change to use, egress or occupancy under this appl$20,000
2021-06-28311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-06-24Boiler inspection
2021-06-24Boiler inspection
2021-06-19Job filed: One new air conditioning system and associated fan coils. Replace two roof top condensing units. No change to use, egress or occupancy under this appl$20,000
2021-06-07311: Broken Parking Meter — Out of Order
2021-05-27311: Broken Parking Meter — Out of Order
2021-05-24311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-05-18Certificate of occupancy Renewal Without Change
2021-05-15311: Homeless Person Assistance
2021-05-08311: Broken Parking Meter — Timer Defect - Fast/Fail
2021-05-07311: Broken Parking Meter — Out of Order
2021-03-23311: Broken Parking Meter — Out of Order
2020-10-31311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2020-10-05Certificate of occupancy Temporary
2020-10-01LDMK — from NYC LANDMARKS PRESERVATION COMMISSION
2020-09-29Boiler inspection
2020-09-29Boiler inspection
2020-09-02DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2020-07-12311: Homeless Person Assistance — N/A
2020-07-07Certificate of occupancy Temporary
2020-06-29Elevator permit: To comply with ASME A17.1 - 2000, Part 8.7, with up to 2003 Addendum and NYC Appendix K. Test/Inspection in the presence of an el$236,000
2020-04-01Permit Sidewalk Shed — Signed-off
2020-03-24DOB complaint, category ?
2020-03-24ECB CLASS - 1 violation: NO DOOR LOCK MONITORING INSTALLED IN THIS CONTROLLER AS MANDATED BY 3.10.12 OF APPENDIX K3 OF THE 2014 NYCBC. THIS IS A CONTROLLER$1,280
2020-03-12DOB violation E:
2020-03-02DOB violation E:
2020-03-02DOB violation E:
2020-03-02DOB violation E:
2020-02-27311: Broken Parking Meter — Coin or Card Did Not Register
2020-01-25311: Broken Parking Meter — No Receipt
2020-01-16311: Broken Parking Meter — No Receipt
2019
2019-12-17Certificate of occupancy Temporary
2019-12-12311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-12-11311: Noise — Noise: Jack Hammering (NC2)
2019-12-03311: Street Condition — Defective Hardware
2019-09-26Certificate of occupancy Temporary
2019-08-22Elevator permit: Modification to the existing controller to install Door Position Monitoring System (DPM) as per requirements of ASME A17.3 of 2002$16,000
2019-07-22311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-07-10Permit Sidewalk Shed — Signed-off
2019-06-28Certificate of occupancy Temporary
2019-06-25311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-05-02311: Illegal Parking — Blocked Sidewalk
2019-04-04RPTT&RET $1,750,000 — from FRENCH, DEBORAH to BROOK, DEVIN$1,750,000
2019-03-29Certificate of occupancy Temporary
2019-03-28Boiler inspection
2019-03-28Boiler inspection
2019-03-25Sold for $1,750,000$1,750,000
2019-03-21CERT — from FIRST AMERICAN TITLE INSURANCE COMPANY
2018-10-17Job filed: BRICK POINTING AT REAR OF BUILDING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$4,500
2018-10-17Job filed: BRICK POINTING AT REAR OF BUILDING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$4,500
2018-10-17Job filed: BRICK POINTING AT REAR OF BUILDING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$4,500
2018-10-17Permit AL — ISSUED
2018-10-15Certificate of occupancy Temporary
2018-10-05HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2018-09-17Job filed: INSTALLATION OF NEW REAR DECK AT FLOOR 02$45,000
2018-08-30Boiler inspection
2018-08-30Boiler inspection
2018-08-10311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2018-07-26Permit Sidewalk Shed — Signed-off
2018-07-06Rodent inspection: Passed
2018-07-05311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2018-06-26RPTT&RET $2,446,500 — from THEODORAKIS, MATTHEW to GARNETT, JAMES; BARTHOLOMEW, BRIAN$2,446,500
2018-06-19Sold for $2,446,500$2,446,500
2018-05-24Job filed: INSTALLATION OF NEW REAR DECK AT FLOOR 02$45,000
2018-05-24Job filed: INSTALLATION OF NEW REAR DECK AT FLOOR 02$45,000
2018-05-11Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2018-03-31311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2018-03-26311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2018-03-01Job filed: FIRE ALARM MODIFICATIONS AS INDICATED ON PLANS FILED HEREWITH.$5,000
2018-03-01Job filed: FIRE ALARM MODIFICATIONS AS INDICATED ON PLANS FILED HEREWITH.$5,000
2017
2017-12-12Permit AL — ISSUED
2017-11-20Boiler inspection
2017-11-20Boiler inspection
2017-11-06HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2017-10-31311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2017-10-30Job filed: A1$40,000
2017-10-30Job filed: SPRINKLER MODIFICATION AS INDICATED ON PLANS FILED HEREWITH.
2017-10-30Job filed: A1$40,000
2017-10-30Job filed: SPRINKLER MODIFICATION AS INDICATED ON PLANS FILED HEREWITH.
2017-10-30Job filed: A1$40,000
2017-09-28311: Broken Muni Meter — No Receipt
2017-07-11Rodent inspection: Passed
2017-06-27Rodent inspection: Passed
2017-04-15311: Bike/Roller/Skate Chronic — N/A
2017-03-08Permit PL — ISSUED
2017-03-02DOB violation E:
2017-02-28DOB complaint, category ?
2017-02-21311: Cranes and Derricks — Crane/Suspension Scaffold - No Permit/License/Cert./Unsafe/Illegal
2017-02-21DOB complaint, category ?
2017-02-18ECB CLASS - 1 violation: SWO 021817DKM02 OPERATION AN ARTICULATION BOOM CRANE W/O A C OF O AT TIME OF INSPECTION EQUIPMENT BEING USED OUTSIDE THE EXEMPTION$1,000
2017-02-17311: Water Quality — Taste/Odor, Musty/Stale (QA4)
2016
2016-12-01Permit AL — ISSUED
2016-11-21FDNY inspection (ALT)
2016-11-09Rodent inspection: Passed
2016-10-24HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2016-10-05311: Broken Muni Meter — Out of Order
2016-09-27RPTT&RET $1,750,000 — from KENDRICK, MELVIN S; SALTER, MARY to PRIZANT, MARK; PRIZANT, LESLIE$1,750,000
2015-12-07Job filed: SPRINKLER WORK AT NEW PENTHOUSE AND REVISIONS AT 5TH FLOOR AS PER PLANS FILED HEREWITH.
2015-12-04Job filed: CREATE NEW PH APARTMENT AT ROOF, PLUMBING WORK AS PER PLANS FILED HEREWITH. TH IS BUILDING WAS CONVERTED TO RESIDENTIAL UNDER ARTICLE 78 OF MDL ALT 14$300,000
2015-12-04Job filed: NEW OPENING IN ROOF FOR STAIR TO NEW PH AND NEW PH STRUCTURE AS PER PLANS FILED HEREWITH.
2015-10-30Certificate of occupancy Final
2015-10-01HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2015-08-21RPTT&RET $2,935,000 — from MICHEL, JEROME P; CORTADELLAS, MARIE J to MILLS, BENJAMIN$2,935,000
2015-08-18FDNY inspection (OTHER)
2015-05-05Certificate of occupancy Temporary
2015-03-30ECB CLASS - 2 violation: FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES.NOTE:@ FRONT FACADE ABOVE 3RD FL WINDOWS,MINOR CRACKS OBSERVED.REM:COMPLY W/ NOTIC
2015-02-19DOB violation E:
2015-02-19DOB violation E:
2015-02-19DOB violation E:
2015-02-02HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2015-01-28FDNY inspection (RISK)
2015-01-09311: Hazardous Materials — Oil Spill On Street, Small (HQS)
2014-08-08RPTT&RET $28,392 — from MAIN DUANE OWNERS CORP. to SALTER, MARY; KENDRICK, MELVIN S$28,392
2014-08-06Permit EW — ISSUED
2014-08-06Permit EW — ISSUED
2014-08-06Permit PL — ISSUED
2014-08-04Job filed: REPLACE (1) BOILER AND (1) OIL BURNER WITH (1) BOILER AND (1) GAS/OIL BURNER. ACTIVATE GAS PORTION OF (1) EXISTING GAS/OIL BURNER ON (1) EXISTING LOW $10,000
2014-02-25RPTT&RET $2,400,000 — from JUUL-HANSEN, THOMAS; LEE, JUDY W to DAY, LINDA E$2,400,000
2014-02-19DOB violation E:
2014-02-19DOB violation E:
2014-02-19DOB violation E:
2014-02-19DOB violation E:
2014-01-17Certificate of occupancy Temporary
2014-01-09311: Street Condition — Cave-in
2013
2013-12-24Permit PL — ISSUED
2013-12-06FDNY inspection (DAY-CARE)
2013-11-13311: Street Condition — Cave-in
2013-10-16311: Street Condition — Cave-in
2013-10-09311: Street Condition — Cave-in
2013-10-09311: Street Condition — Pothole
2013-10-09311: Street Condition — Pothole
2013-09-27Certificate of occupancy Temporary
2013-09-10311: Street Condition — Rough, Pitted or Cracked Roads
2013-09-09Permit EW — ISSUED
2013-08-24RPTT&RET $2,400,000 — from COURTNEY, ANTONY A to BIZZARO, SANDRINE; GUILLEMAIN, ERIC$2,400,000
2013-08-02Permit EW — ISSUED
2013-07-31311: Illegal Parking — Blocked Sidewalk
2013-06-14Job filed: NEW WOOD AND CONCRETE PAVER DECK AT ROOF WITH STRUCTURAL STEEL FRAMING.$38,620
2013-06-14Job filed: NEW WOOD AND CONCRETE PAVER DECK AT ROOF WITH STRUCTURAL STEEL FRAMING.$38,620
2013-05-21RPTT&RET $91,260 — from MAIN DUANE OWNERS CORP. to MICHEL, JEROME P; CORTADELLAS, MARIE J$91,260
2013-05-20Job filed: REPOINT APPROX. 250 SF OF BRICK AS PER PLANS. NO CHANGE IN USE,BULK, OR EGRESS$10,000
2013-05-20Job filed: REPOINT APPROX. 250 SF OF BRICK AS PER PLANS. NO CHANGE IN USE,BULK, OR EGRESS$10,000
2013-05-20Permit AL — ISSUED
2013-04-22FDNY inspection (DAY-CARE)
2013-02-13DOB violation E:
2013-02-05Rodent inspection: Passed
2012
2012-10-23Job filed: REPLACE BOILER AND OIL BURNER (NYC BOILER NO. MD820563-01) FILED IN CONJUNCTION WITH LAA 140027717.
2012-10-23Job filed: REPLACE BOILER AND OIL BURNER (NYC BOILER NO. MD820563-01) FILED IN CONJUNCTION WITH LAA 140027717.
2012-10-23Permit EW — ISSUED
2012-10-23Permit EW — ISSUED
2012-08-30311: Construction Safety Enforcement — SST Tracking Complaint
2012-08-30ECB CLASS - 1 violation: FAILURE TO PROVIDE FALL PROTECTION FOR WORKERS PERFORMING FACADE REPAIRS AT 2ND FL LEVEL. NO LIFE LINE NO SAFETY HARNESESS. PICTUR$1,600
2012-08-30DOB complaint, category ?
2012-08-07RPTT&RET $91,260 — from MAIN DUANE OWNERS CORP. to THEODORAKIS, MATTHEW$91,260
2012-04-23Job filed: INTERIOR RENOVATION OF AN EXISTING APT, INCLUDING PARTITION CHANGES. MINOR MECHANICAL AND PLUMBING WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCU$47,900
2012-04-16AALR — from NCB, FSB to FANNIE MAE
2012-04-16Mortgage assigned — from NCB, FSB to FANNIE MAE
2012-04-11311: Construction Safety Enforcement — SST Tracking Complaint
2012-04-11ECB CLASS - 2 violation: SIDEWALK SHED DOES NOT MEET DOB CODE SPECIFICATIONS. SIDEWALK SHED ERECTED AT EXPOSURE #1 MISSING HORIZONTAL & CROSS BRACES AT ENT
2012-04-11DOB complaint, category ?
2012-04-11ECB CLASS - 2 violation: SIDEWALK SHED DOES NOT MEET DOB CODE SPECIFICATIONS. SIDEWALK SHED AT EXPOSURE #1 MISSING SOUND FOOTING & ANCHORAGE INSTALLED ABOV
2012-04-04311: Street Condition — Pothole
2012-03-30DOB violation E:
2012-03-21Job filed: INSTALLATION OF 58 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WI
2012-03-21Job filed: INSTALLATION OF 58 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WI
2012-03-21Permit EQ — ISSUED
2012-03-09Rodent inspection: Passed
2012-02-22311: Water System — Dirty Water (WE)
2012-02-21311: Water System — Dirty Water (WE)
2012-01-17DOB violation E:
2012-01-10311: Water System — Dirty Water (WE)
2012-01-09311: Water System — Dirty Water (WE)
2011
2011-12-27Mortgage satisfied — from MAIN DUANE OWNERS CORP to NCB, FSB
2011-12-27Mortgage assigned — from NATIONAL CONSUMER COOPERATIVE BANK (NCB) to NCB, FSB.
2011-12-27TL&R — from NCB, FSB to MAIN DUANE OWNERS CORP.
2011-12-27AL&R $500,000 — from MAIN DUANE OWNERS CORP to NATIONAL CONSUMER COOPERATIVE BANK (NCB)$500,000
2011-12-27Mortgage satisfied — from MAIN DUANE OWNERS CORP to NCB, FSB
2011-12-27AALR — from NATIONAL CONSUMER COOPERATIVE BANK (NCB) to NCB, FSB
2011-12-27Mortgage $500,000 — from MAIN DUANE OWNERS CORP to NATIONAL CONSUMER COOPERATIVE BANK (NCB)$500,000
2011-12-27AALR — from NATIONAL CONSUMER COOPERATIVE BANK (NCB) to NCB, FSB
2011-12-27Mortgage assigned — from NATIONAL CONSUMER COOPERATIVE BANK (NCB) to NCB, FSB
2011-12-27AL&R $3,000,000 — from MAIN DUANE OWNERS CORP to NATIONAL CONSUMER COOPERATIVE BANK (NCB)$3,000,000
2011-12-27Mortgage $3,000,000 — from MAIN DUANE OWNERS CORP to NATIONAL CONSUMER COOPERATIVE BANK (NCB)$3,000,000
2011-12-27TL&R — from NCB, FSB to MAIN DUANE OWNERS CORP
2011-12-27TL&R — from NCB,FSB to MAIN DUANE OWNERS CORP.
2011-12-27Mortgage satisfied — from MAIN DUANE OWNERS CORP. to NCB, FSB
2011-11-22RPTT&RET $1,825,000 — from HENTY, GEORGIA PAGE; BROWN, GRANTLY W to COURTNEY, ANTONY$1,825,000
2011-11-02311: Street Condition — Cave-in
2011-10-31311: Street Condition — Cave-in
2011-10-28Permit PL — ISSUED
2011-10-25Permit EW — ISSUED
2011-10-25Permit EW — ISSUED
2011-10-20Job filed: APT. # 2S, REMOVE AND ERECT MINOR INTERIOR PARTITIONS WITH NEW. MODIFY EXISTING MEZZANINE AND RELOCATE EXISTING STAIR, NEW FINISHES. NO CHANGE IN EGRE$79,625
2011-10-04311: Street Condition — Failed Street Repair
2011-09-29Permit PL — ISSUED
2011-09-21RPTT&RET $1,250,000 — from BROCKMAN, RICHARD to LEE, JUDY WENFEI; JUUL-HANSEN, THOMAS$1,250,000
2011-09-21311: City Vehicle Placard Complaint — N/A
2011-09-21311: City Vehicle Placard Complaint — N/A
2010-06-09311: Air Quality — Air: Smoke, Residential (AA1)
2010-06-07311: Noise — Noise: Air Condition/Ventilation Equip, Commercial (NJ2)
2010-05-18311: Building/Use — Illegal Conversion Of Residential Building/Space
2010-05-18DOB complaint, category ?
2010-05-18ECB CLASS - 3 violation: OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O OR BLDG DEPT RECORDS.IN THAT AS PER BLDG DEPT RECORDS THE CELLAR IS TO BE STORAGE
2010-04-29Permit PL — ISSUED
2010-04-27Permit AL — ISSUED
2010-04-26Job filed: HEREWITH FILING FOR THE MODIFIACTION OF INTERIOR FIRE ALARM SYSTEMON MEZZ AND 1ST FLOOR.NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$10,000
2010-03-16311: Missed Collection (All Materials) — 1RG Missed Recycling Paper
2010-03-01Permit EW — ISSUED
2010-02-25Job filed: A1$340,000
2010-02-25Job filed: PLUMBING, MECHANICAL, AND SPRINKLER INSTALLATION TO ACCOMMODATE ALTERTIONS TO THE SCHOOL ON 1ST FLOOR AND 1ST FLOOR MEZZANINE AS INDICATED ON PLANS FI
2010-02-25Job filed: STRUCTURAL WORK INCLUDING NEW OPENIGNS IN MASONRY WALL AND INSTALLATION OF NEW STRUCTURAL STEEL TO ACCOMMODATE RECONSTRUCTIO OF MEZZANINE LEVEL AND ST
2010-02-25Job filed: A1$340,000
2010-02-16DOB violation E:
2010-02-16DOB violation E:
2010-01-27Permit EW — ISSUED
2010-01-22Permit PL — ISSUED
2010-01-21Job filed: INTERIOR DEMOLITION INLCUDING REMOVAL OF INTERIOR PARTITIONS AND FINISHES ON PARTIAL 1ST FLOOR IN THE EXISTING STORE AND DEMOLITION OF ENTIRE MEZZANIN$20,000
2010-01-20Permit EW — ISSUED
2010-01-20Permit EW — ISSUED
2010-01-19Rodent inspection: Passed
2010-01-06Permit PL — ISSUED
2010-01-04Permit EW — ISSUED
2009
2009-11-10Permit EW — ISSUED
2009-11-09Job filed: RENOVATION OS EXISTING APARTMENT 3S ON THE 3RD FLOOR. ARCHITECTURAL WORK. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$18,000
2009-11-09Job filed: RENOVATION OS EXISTING APARTMENT 3S ON THE 3RD FLOOR. ARCHITECTURAL WORK. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$18,000
2009-11-09Job filed: MECHANICAL, PLUMBING, AND SPRINKLER WORK ASSOCIATES WITH THE RENOVATION OF APARTMENT 3S. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$43,000
2009-11-09Job filed: RENOVATION OS EXISTING APARTMENT 3S ON THE 3RD FLOOR. ARCHITECTURAL WORK. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$18,000
2009-11-09Job filed: MECHANICAL, PLUMBING, AND SPRINKLER WORK ASSOCIATES WITH THE RENOVATION OF APARTMENT 3S. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$43,000
2009-10-01Job filed: HEREWITH FILE PLANS TO RENOVATE APT. 3SE. WORK TO INCLUDE MINOR INTERIOR PARTITION DEMOLITION, NEW PARTITIONS AND FINISHES AND PLUMBING. NO CHANGE T$26,400
2009-10-01Job filed: HEREWITH FILE PLANS TO RENOVATE APT. 3SE. WORK TO INCLUDE MINOR INTERIOR PARTITION DEMOLITION, NEW PARTITIONS AND FINISHES AND PLUMBING. NO CHANGE T$26,400
2009-09-21Job filed: INTERIOR RENOVATION AND EXTERIOR ADDITION FOR INSTALLATION OF NEW 3-STOP ELEVA TOR OF 5TH FLOOR,MEZZANINE AND ROOF CONSTRUCTION OF NEW ROOFTOP ENCLOSU$19,000
2009-08-24RPTT&RET $1,050,000 — from MAIN DUANE OWNERS CORP. to JOYCE, TRICIA$1,050,000
2009-08-11RPTT&RET $900,000 — from POOLE, DAVID; POOLE, DENISE to HOFFMAN, MICHAEL$900,000
2009-02-20AALR — from NATIONAL CONSUMER COOPERATIVE BANK D/B/A to NCB, FSB
2009-02-20Mortgage assigned — from NATIONAL CONSUMER COOPERATIVE BANK D/B/A to NCB, FSB
2009-02-20AL&R $300,000 — from MAIN DUANE OWNERS CORP. to NATIONAL CONSUMER COOPERATIVE BANK D/B/A$300,000
2009-02-20Mortgage $300,000 — from MAIN DUANE OWNERS CORP. to NATIONAL CONSUMER COOPERATIVE BANK D/B/A$300,000
2009-01-06Permit EQ — ISSUED
2008
2008-10-31RPTT&RET $1,600,000 — from GORDON, COCO RUTH to CORTADELLAS, MARIE J; MICHEL, JEROME P$1,600,000
2008-10-22DOB violation E:
2008-08-15ECB CLASS - 2 violation: 59B10.61T7.26D6.15D6.59B10 REMOVE BINDA WIRE FROM BRKE PIN
2008-08-06ECB CLASS - 2 violation: 52BB12. 12 EXPIRES RESHACKLE TAG 4/04.
2008-07-28DOB complaint, category ?
2008-07-18ECB CLASS - 1 violation: THE MEMBERS OF THE SIDEWALK SHED SHALL BE ADEQUATELY BRACED AN CONNECTED TO PREVENT DISPLACEMENT OR DISTORTING OF THE FRAMEWORK.-N$1,600
2008-07-17DOB complaint, category ?
2008-06-23Mortgage assigned — from NATIONAL CONSUMER COOPERATIVE BANK DBA; NCB to NCB,FSB
2008-06-23AALR — from NATIONAL CONSUMER COOPERATIVE BANK DBA; NCB to NCB,FSB
2008-06-23AL&R $1,300,000 — from MAIN DUANE OWNERS CORP. to NCB; NATIONAL CONSUMER COOPERATIVE BANK DBA$1,300,000
2008-06-23Mortgage $1,300,000 — from MAIN DUANE OWNERS CORP. to NATIONAL CONSUMER COOPERATIVE BANK DBA; NCB$1,300,000
2008-06-23Mortgage assigned — from NATIONAL CONSUMER COOPERATIVE BANK DBA; NCB to NCB,FSB
2008-06-23AALR — from NATIONAL CONSUMER COOPERATIVE BANK DBA; NCB to NCB,FSB
2008-06-23Mortgage $2,300,000 — from MAIN DUANE OWNERS CORP. to NCB; NATIONAL CONSUMER COOPERATIVE BANK DBA$2,300,000
2008-06-23AL&R $2,300,000 — from MAIN DUANE OWNERS CORP. to NCB; NATIONAL CONSUMER COOPERATIVE BANK DBA$2,300,000
2008-04-22DOB complaint, category ?
2008-04-21Permit PL — ISSUED
2008-04-16DOB violation E:
2008-04-16DOB violation E:
2008-04-10Permit EW — ISSUED
2008-04-10Permit EW — ISSUED
2008-01-29Permit PL — ISSUED
2008-01-29Permit PL — ISSUED
2008-01-10Permit EQ — ISSUED
2008-01-07Job filed: Install sidewalk shed a total of 75 LF at 134 Duane Street. Work shall comply with LL 33/91. No change in use, egress or occupancy.
2007
2007-12-04Permit EW —
2007-12-03Permit EW — ISSUED
2007-11-29Job filed: Filing for plumbing modifications as shown on drawings filed herewith. No change in use, egress or occupancy.$20,000
2007-11-29Job filed: A2$80,000
2007-11-28Job filed: A2$50,000
2007-10-25DOB violation E:
2007-07-31Permit EW — ISSUED
2007-07-31Permit EW — ISSUED
2007-07-31Permit EW — ISSUED
2007-07-31Permit EW — ISSUED
2007-07-31Permit EW — ISSUED
2007-07-31Permit EW — ISSUED
2007-07-31Permit EW — ISSUED
2007-07-31Permit EW — ISSUED
2007-06-07DOB violation E:
2007-06-07DOB violation E:
2007-05-25Permit PL — ISSUED
2007-05-19DOB complaint, category ?
2007-03-29Permit EW — ISSUED
2007-03-29Permit EW — ISSUED
2007-02-26Permit EQ — ISSUED
2007-02-21DOB violation E:
2006
2006-11-09Permit EW — ISSUED
2006-11-07DOB complaint, category ?
2006-10-18Permit PL — ISSUED
2006-10-04Permit PL — ISSUED
2006-10-02Job filed: Modification to existing sprinkler system as per plans filed herewith. No change in use, egress or occupancy.$30,000
2006-10-02Job filed: Modification to existing sprinkler system as per plans filed herewith. No change in use, egress or occupancy.$30,000
2006-08-31Permit EW — ISSUED
2006-08-31Permit EW — ISSUED
2006-08-31Permit EW — ISSUED
2006-08-28DOB violation E:
2006-08-28DOB violation E:
2006-08-28Job filed: Filing for the interior renovation of apartments on the 3rd, 4th and 5th floor of 134 Duane Street as per drawings. This work is filed in conjunction$400,000
2006-08-28Job filed: Filing for mechanical and plumbing work related to the interior renovation of apartments on the 3rd, 4th and 5th floor of 134 Duane Street. This work$170,000
2006-08-28Job filed: Filing for the interior renovation of apartments on the 3rd, 4th and 5th floor of 134 Duane Street as per drawings. This work is filed in conjunction$400,000
2006-08-28Job filed: Filing for structural work related to the interior renovation of apartments on the 3rd, 4th and 5th floor of 134 Duane Street as per drawings. This w$50,000
2006-08-09Permit EW — ISSUED
2006-08-09Permit EW — ISSUED
2006-08-09Permit EW — ISSUED
2006-08-09Permit EW — ISSUED
2006-08-09Permit EW — ISSUED
2006-08-09Permit EW — ISSUED
2006-08-01Permit EW — ISSUED
2006-08-01Permit EW — RE-ISSUED
2006-08-01Permit EW — ISSUED
2006-07-26Job filed: Filing for mechanical work related to the interior renovation of apartments on the 3rd, 4th and 5th floor of 138 Duane Street as per drawings. This w$170,000
2006-07-26Job filed: Filing for structural work related to the interior renovation of apartments on the 3rd, 4th and 5th floor of 138 Duane Street as per drawings. This w$50,000
2006-07-26Job filed: Filing for mechanical work related to the interior renovation of apartments on the 3rd, 4th and 5th floor of 138 Duane Street as per drawings. This w$170,000
2006-07-25Job filed: Filing for the interior renovation of apartments on the 3rd, 4th and 5th floors of 138 duane Street as per drawings. This work is filed in conjuncti$400,000
2006-07-25Job filed: Filing for the interior renovation of apartments on the 3rd, 4th and 5th floors of 138 duane Street as per drawings. This work is filed in conjuncti$400,000
2006-06-26DOB complaint, category ?
2006-06-26ECB Non-Hazardous violation: FAILURE TO SAFEGUARD PUBLIC AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. NOTED: APPLICATION #104379673 EXP.8-9-06 IN THAT REM
2006-06-19Permit EW — ISSUED
2006-06-16Job filed: Installation of Air Conditioning Equipment. No change to use, egress or occupancy associated with this application.$30,000
2006-05-03RPTT&RET $1,221,900 — from FAZIO, JEFFREY R; FAZIO, CYNTHIA L to MAIN DUANE OWNERS CORP.$1,221,900
2006-05-02DOB violation E:
2006-03-23ECB Non-Hazardous violation: FAILURE TO PROVIDE CONTRACTOR'S SIGN ON SHED. REMEDY: PROVIDE CONTRACTOR SIGN ON SHED
2006-03-22Permit EW — ISSUED
2006-03-16Job filed: Filing to remove the existing roof and replace it with a new roofing membrane, remove and replace seven (7) skylights and reclad parapet and bulkhead$100,000
2006-03-06Permit EW — ISSUED
2006-03-02Permit EQ — ISSUED
2006-03-01Job filed: INSTALL HEAVY DUTY SIDEWALK SHED 75 FT LONG AT 134-138 DUANE STREET. DURING REMEDIAL REPAIRS. WORK TO COMPLY WITH LL33/91. NO CHANGE IN USE, EGRESS O
2006-02-28Job filed: Filing for the complete interior demolition on the third (3rd), fourth (4th), and fifth (5th) floors as shown on drawings filed herewith. No change in$300,000
2006-01-06DOB violation LL6291:
2005
2005-12-12Permit EW — ISSUED
2005-11-30Job filed: MINOR APARTMENT INTERIOR RENOVATIONMINOR PARTITION WORK AND PLUMBIN G. NO CHANGE TO USE, OCCUPANCY OR EGRESS$12,000
2005-11-18DOB violation E:
2005-11-18DOB violation E:
2005-08-17Mortgage $1,950,000 — from MAIN DUANE OWNERS CORP to NATIONAL CONSUMER COOPERATIVE BANK$1,950,000
2005-08-17Mortgage assigned — from NATIONAL CONSUMER COOPERATIVE BANK to NCB
2005-08-17AL&R $1,950,000 — from NATIONAL CONSUMER COOPERATIVE BANK to MAIN DUANE OWNERS CORP$1,950,000
2005-08-17AALR — from NATIONAL CONSUMER COOPERATIVE BANK to NCB
2005-02-09DOB violation E:
2005-02-09DOB violation E:
2005-02-09DOB violation E:
2005-01-31DOB violation LL6291:
2004
2004-09-10DOB complaint, category ?
2004-09-01RPTT — from THE ESTATE OF SUZANNE BROCKMAN to BROCKMAN, RICHARD
2004-07-14ECB Hazardous violation: USE OF A CRANE IN AN UNSAFE MANNER.(TIED BACK SAFETY LATCH ON HOOK).REMEDY:SAFETY LATCH ON HOOK MUST BE OPERATING PROPERLY.$5,000
2004-04-27DOB violation E:
2004-02-13DOB violation LL6291:
2003
2003-03-19DOB violation LL6291:
2002
2002-08-20Mortgage assigned — from NATIONAL CONSUMER COOPERATIVE BANK to WELLS FARGO BANK MINNESOTA, N.A. AS TRUS
2002-08-20Mortgage assigned — from NATIONAL CONSUMER COOPERATIVE BANK to WELLS FARGO BANK MINNESOTA, N.A. AS TRUS
2002-05-06DOB violation E: 1P35355
2002-03-26DOB violation LL6291:
2002-02-11Job filed: INSTALLATION OF FIRE ALARM SYSTEM, AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$13,000
2001
2001-12-03Permit EW — ISSUED
2001-07-16Mortgage assigned — from MAIN DUANE OWNERS CORP. to NATIONAL CONSUMER COOPERATIVE BANK
2001-07-16Mortgage $224,000 — from MAIN DUANE OWNERS CORP. to NATIONAL CONSUMER COOPERATIVE BANK$224,000
2001-07-16SAGE — from NATIONAL CONSUMER COOPERATIVE BANK
2001-06-27Permit PL — ISSUED
2001-06-13Permit EW — ISSUED
2001-06-13Permit EW — ISSUED
2001-06-05Job filed: RELOCATION OF INTERIOR PARTITIONS IN EXISTING DAY CARE WORK LIMITED TO FIRST FLOOR ONLY, PLUMBING RELOCATION OF FIXTURES SPRINKLER HEADS NEW, RELOCATI$50,000
2000
2000-01-10ECB Non-Hazardous violation: 75U,36D. FIVE YEAR TEST TAG. SECURE MOTOR ROOM DOOR.$2,500
1999
1999-12-08DOB violation E: 1P35355
1998
1998-11-06Permit PL — ISSUED
1998-08-10Permit EW — ISSUED
1998-02-13Permit EW — ISSUED
1998-01-06DOB complaint, category ?
1997
1997-10-11ECB Non-Hazardous violation: 39H50M57O30O 39-REGROOVE TRACTION SHEIVE. #50-INSTALL ROPE GUARDS. #57-CLEAN PIT (30) CLEAN TOP OF CAR.
1997-07-01DOB violation LL1080:
1997-07-01DOB violation LL1080:
1996
1996-01-03Permit EW — ISSUED
1996-01-03Permit EW — ISSUED
1994
1994-10-18ECB Non-Hazardous violation: 75U,46T,50Y, 75PERFORM 5YR SAFETY TEST:LPROPERLY DATE AND TAG DEVICE FOR SANME AND FILE ELEV#3FORM
1994-10-18ECB Non-Hazardous violation: 75U 75PERFORM 5YR SAFETY TEST, PEROPERLY DATE AND TAG DEVICE FOR SAME AND FILE ELEV #3FORM
1993
1993-04-12LDMK — from LANDMARKS PRSRVTN COMMSN to TRIBECA SO HISTORICETC
1992
1992-02-18ECB Non-Hazardous violation: 35P,33P, PROVIDE ACCESS TO MACHINE ROOM AND OVERHEAD SO A COMPLETE INSPECTION CAN BE MADE.
1983
1983-03-11Mortgage assigned — from WEINER, SIMON, EST OF; GUTMAN, ROBERT; THALHEIM, HANNAH to SASOPCO, INC.
1969
1969-09-15Mortgage assigned — from THALWEIN REALTY CORP to WEINER, SIMON; THALHEIM, HANNAH; GUTMAN, ROBERT
1969-05-26Deed — from REALOPCO INC to DUANE REALTY CO
1969-05-26Deed — from THALWEIN REALTY CORP to REALOPCO INC
1969-05-26Mortgage — from REALOPCO INC to THALWEIN REALTY CORP