Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

64 East 11 Street · Manhattan · BBL 1005627503 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

Where the penalty points come from

ComponentWhat it coversPoints
Housing codeHPD violations by class, complaints, emergency repairs, litigation, vacate orders, AEP0
Structural & safetyDOB violations, ECB/OATH violations by class0
PestsBedbug filings, failed rodent inspections, rodent 311s0
DisplacementMarshal evictions executed0
GRADE A

The city's published records show little recorded distress here in the last three years. Less recorded distress than 100% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty points per 10 units; this building carries 0. In ZIP 10003, 67% of residential buildings hold an A and 4% grade D or F. How grades work

this building
A
B
C

Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more

Open with the city right now

No current HPD flags in the latest weekly snapshot: no open violations, no pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.

Patterns

No heat or hot-water complaints in the last three years.

No bedbug-infested units reported in the last three years of filings.

What 311 hears from this address

14 service requests in the last three years. Most common: Noise (5) · Blocked Driveway (4) · Illegal Parking (3) · Derelict Vehicles (1) · Homeless Person Assistance (1).

Filed construction activity

$3,250,296 in permitted construction work filed since 2016 (17 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

Rent-stabilization signals

YesBuilt before 1974 (1929)
YesSix or more residential units (6)
No421-a / J-51 tax benefit on the current tax roll

2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit: request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).

Registered with HPD — the names behind the building

Registered owner(s)66 EAST 11TH STREET CONDOMINIUM
Head officerDAVID BIEBER
Managing agentJ&C LAMB MANAGEMENT CORP.
Last registered2025-11-14

as filed by the owner in the building's HPD registration

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$2,716,702 $1,222,516
2026$2,892,436 $1,301,597
2027$120,000 $54,000

The city's market estimate has fallen 96% between tax years 2025 and 2027.

Building systems

Facade (Local Law 11)SAFE (cycle 9)

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Not in a hurricane evacuation zone.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

No street-flooding or sewer-backup complaints on record at this address.

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

Subway8 St-NYU — R W · 700 ft straight-line (about a 3-minute walk) · station accessibility: none
14 St-Union Sq — 4 5 6 L N Q R W · 850 ft straight-line (about a 4-minute walk) · station accessibility: partial
BusNearest boarding stop: E 9 St / Broadway — M8 · 450 ft
Citi BikeE 11 St & Broadway · 200 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: P.S. 041 Greenwich Village
Middle: M.S. 297. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

64 East 11 Street

Heat or hot waterHeat or hot water
Apartment maintenanceApartment maintenance
Bed bugsBed bugs
Residential pestsResidential pests
Rats or miceRats or mice
Anything elseAnything else

14 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

The landlord's report card

Managed by J&C LAMB MANAGEMENT CORP. — 18 buildings, 1,062 units. Grades across the portfolio: A16 · B2. See the whole portfolio

BuildingBoroughUnitsGrade
330 East 75 Street MN197 A
773 Lexington Avenue MN131 A
333 East 55 Street MN114 A
1009 Madison Avenue MN111 A
1420 York Avenue MN95 A
60 West 13 Street MN70 A
179 East 79 Street MN59 A
111 East 88 Street MN58 A
140 West 22 Street MN51 A
425 East 78 Street MN35 B
27 West 55 Street MN34 A
224 West 18 Street MN31 A
23 Park Avenue MN22 A
24 Gramercy Park South MN19 A
134 Duane Street MN16 A
11 East 79 Street MN7 A
64 East 11 Street MN6 A
128 East 7 Street MN6 B

Sales, deeds & mortgages

DateRecordAmountPer res. unit
2026-02-13Agreement $4,000,000 — from BIEBER, DAVID to MERS $4,000,000
2024-08-29Mortgage $1,000,000 — from RA 66TH LLC to BLUE HORIZON FUNDING LLC $1,000,000
2024-08-29AL&R $1,000,000 — from RA 66TH LLC to BLUE HORIZON FUNDING LLC $1,000,000
2024-08-29Mortgage $1,000,000 — from RA 66TH LLC to BLUE HORIZON FUNDING LLC $1,000,000
2024-08-29AL&R $1,000,000 — from RA 66TH LLC to BLUE HORIZON FUNDING LLC $1,000,000
2022-08-25Agreement $5,000,000 — from RA 66TH LLC to FIRST REPUBLIC BANK $5,000,000
2022-08-25Agreement $5,000,000 — from RA 66TH LLC to FIRST REPUBLIC BANK $5,000,000
2021-01-12Mortgage $9,800,000 — from NIERENBERG, ELIN; NIERENBERG, MICHAEL to JPMORGAN CHASE BANK, N.A. $9,800,000
2021-01-12Deed $14,000,000 — from GRENVILLE PROPERTIES LLC to NIERENBERG, MICHAEL; NIERENBERG, ELIN $14,000,000
2020-12-30Sold for $14,000,000 $14,000,000 $2,333,333
2019-11-12Mortgage $5,000,000 — from RA 66TH LLC to VETRINA NEW YORK LLC $5,000,000
2019-11-12Mortgage $5,000,000 — from RA 66TH LLC to VETRINA NEW YORK LLC $5,000,000
2018-01-11Deed $9,000,000 — from VETRINA NEW YORK LLC to RA 66TH LLC $9,000,000
2018-01-11Deed $9,000,000 — from VETRINA NEW YORK LLC to RA 66TH LLC $9,000,000
2017-12-18Sold for $9,000,000 $9,000,000 $1,500,000

Ten-year activity

50250
2017
2018
2019
2020
2021
2022
2023
30
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
20173109114
20188044117
201990010221
2020401117
202160158029
202270164128
20230082212
202417084130
202516060123
202662211021
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 23 records

DateRecord
2026-09-11Mortgage satisfied — from VETRINA NEW YORK LLC to FEDERAL DEPOSIT INSURANCE CORPORATION; FIRST REPUBLIC BANK, SAN FRANCISCO, CA
2026-09-11TL&R — from FIRST REPUBLIC BANK, SAN FRANCISCO, CA; FEDERAL DEPOSIT INSURANCE CORPORATION to VETRINA NEW YORK LLC
2026-09-11TL&R — from FIRST REPUBLIC BANK, SAN FRANCISCO, CA; FEDERAL DEPOSIT INSURANCE CORPORATION to VETRINA NEW YORK LLC
2026-09-11Mortgage satisfied — from VETRINA NEW YORK LLC to FEDERAL DEPOSIT INSURANCE CORPORATION; FIRST REPUBLIC BANK, SAN FRANCISCO, CA
2026-09-11TL&R — from FIRST REPUBLIC BANK, SAN FRANCISCO, CA; FEDERAL DEPOSIT INSURANCE CORPORATION to VETRINA NEW YORK LLC
2026-09-11Mortgage satisfied — from VETRINA NEW YORK LLC to FEDERAL DEPOSIT INSURANCE CORPORATION; FIRST REPUBLIC BANK, SAN FRANCISCO, CA
2026-08-19Job filed: FILED FOR INT AND EX RENOVATIONS OF MULTISTORY PH LOCATED AT THE 7TH,8TH & PH FLOORS REM/REP INT COMMUNICATING NON-EGRESS STAIRS, NONBEARING PART, F
2026-07-14DOB complaint, category ?
2026-06-24LOCC — from RA 66TH LLC to BRD OF MANAGERS OF 66 EAST 11TH STREET C
2026-06-24LOCC — from RA 66TH LLC to BRD OF MANAGERS OF 66 EAST 11TH STREET C
2026-06-22311: Blocked Driveway — No Access
2026-06-22Permit Protection and Mechanical Methods — Signed-off
2026-06-21311: Blocked Driveway — No Access
2026-06-02Permit Plumbing — Permit Issued
2026-06-02Permit Plumbing — Permit Issued
2026-06-02Permit Sprinklers — Permit Issued
2026-06-02Permit Sprinklers — Permit Issued
2026-03-23FDNY inspection (RISK)
2026-02-13Agreement $4,000,000 — from BIEBER, DAVID to MERS
2026-02-13Mortgage assigned — from CITIZENS BANK, N.A. to MORGAN STANLEY PRIVATE BANK, NATIONAL AS
2026-02-13Mortgage assigned — from MORGAN STANLEY PRIVATE BANK, NATIONAL AS to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2025-12-30Rodent inspection: Passed
2025-12-17Bedbug filing: 0 infested units

The full timeline

2026
2026-09-11Mortgage satisfied — from VETRINA NEW YORK LLC to FEDERAL DEPOSIT INSURANCE CORPORATION; FIRST REPUBLIC BANK, SAN FRANCISCO, CA
2026-09-11TL&R — from FIRST REPUBLIC BANK, SAN FRANCISCO, CA; FEDERAL DEPOSIT INSURANCE CORPORATION to VETRINA NEW YORK LLC
2026-09-11TL&R — from FIRST REPUBLIC BANK, SAN FRANCISCO, CA; FEDERAL DEPOSIT INSURANCE CORPORATION to VETRINA NEW YORK LLC
2026-09-11Mortgage satisfied — from VETRINA NEW YORK LLC to FEDERAL DEPOSIT INSURANCE CORPORATION; FIRST REPUBLIC BANK, SAN FRANCISCO, CA
2026-09-11TL&R — from FIRST REPUBLIC BANK, SAN FRANCISCO, CA; FEDERAL DEPOSIT INSURANCE CORPORATION to VETRINA NEW YORK LLC
2026-09-11Mortgage satisfied — from VETRINA NEW YORK LLC to FEDERAL DEPOSIT INSURANCE CORPORATION; FIRST REPUBLIC BANK, SAN FRANCISCO, CA
2026-08-19Job filed: FILED FOR INT AND EX RENOVATIONS OF MULTISTORY PH LOCATED AT THE 7TH,8TH & PH FLOORS REM/REP INT COMMUNICATING NON-EGRESS STAIRS, NONBEARING PART, F$1,061,000
2026-07-14DOB complaint, category ?
2026-06-24LOCC — from RA 66TH LLC to BRD OF MANAGERS OF 66 EAST 11TH STREET C
2026-06-24LOCC — from RA 66TH LLC to BRD OF MANAGERS OF 66 EAST 11TH STREET C
2026-06-22311: Blocked Driveway — No Access
2026-06-22Permit Protection and Mechanical Methods — Signed-off
2026-06-21311: Blocked Driveway — No Access
2026-06-02Permit Plumbing — Permit Issued
2026-06-02Permit Plumbing — Permit Issued
2026-06-02Permit Sprinklers — Permit Issued
2026-06-02Permit Sprinklers — Permit Issued
2026-03-23FDNY inspection (RISK)
2026-02-13Agreement $4,000,000 — from BIEBER, DAVID to MERS$4,000,000
2026-02-13Mortgage assigned — from CITIZENS BANK, N.A. to MORGAN STANLEY PRIVATE BANK, NATIONAL AS
2026-02-13Mortgage assigned — from MORGAN STANLEY PRIVATE BANK, NATIONAL AS to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2025
2025-12-30Rodent inspection: Passed
2025-12-17Bedbug filing: 0 infested units
2025-09-30Permit General Construction — Permit Issued
2025-09-30Permit Mechanical Systems — Permit Issued
2025-09-30Permit Structural — Permit Issued
2025-09-17311: Illegal Parking — Blocked Sidewalk
2025-07-18311: Homeless Person Assistance — Non-Chronic
2025-06-20Permit Protection and Mechanical Methods — Signed-off
2025-06-20Permit Sidewalk Shed — Signed-off
2025-05-25311: Blocked Driveway — Partial Access
2025-05-03311: Noise - Residential — Loud Music/Party
2025-05-01Job filed: FILING HEREWITH PLUMBING WORK FOR THE RENOVATION OF THE 7TH FLOOR, 8TH FLOOR AND OF AT THE ADDRESS NOTED.$162,000
2025-04-23Permit Sprinklers — Permit Issued
2025-04-23Permit Plumbing — Permit Issued
2025-04-19311: Noise - Residential — Loud Music/Party
2025-03-21Permit Sprinklers — Permit Issued
2025-03-21Permit Plumbing — Permit Issued
2025-02-28Permit Suspended Scaffold — Signed-off
2025-01-07Permit Structural — Permit Issued
2025-01-07Permit General Construction — Permit Issued
2025-01-07Permit Mechanical Systems — Permit Issued
2025-01-03Permit Suspended Scaffold — Signed-off
2025-01-03Job filed: Application for installation and use of suspended scaffold as per plans filed herein. No changes in egress, use or occupancy.
2024
2024-12-10Bedbug filing: 0 infested units
2024-11-07Permit Construction Fence — Signed-off
2024-11-01311: Illegal Parking — License Plate Obscured
2024-11-01311: Illegal Parking — License Plate Obscured
2024-11-01311: Derelict Vehicles — Derelict Vehicles
2024-11-01Job filed: INSTALLATION OF TEMPORARY PLYWOOD ENCLOSURE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE PLYWOOD FENCE/ DOGHOUSE AT THE ROOF CONSISTS OF A $1,000
2024-10-28Permit Supported Scaffold — Signed-off
2024-10-23Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2024-09-03Rodent inspection: Passed
2024-08-29Mortgage $1,000,000 — from RA 66TH LLC to BLUE HORIZON FUNDING LLC$1,000,000
2024-08-29AL&R $1,000,000 — from RA 66TH LLC to BLUE HORIZON FUNDING LLC$1,000,000
2024-08-29Mortgage $1,000,000 — from RA 66TH LLC to BLUE HORIZON FUNDING LLC$1,000,000
2024-08-29AL&R $1,000,000 — from RA 66TH LLC to BLUE HORIZON FUNDING LLC$1,000,000
2024-06-21Permit Protection and Mechanical Methods — Signed-off
2024-06-20Permit Sidewalk Shed — Signed-off
2024-06-20Job filed: INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2024-06-19Job filed: INSTALALTION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2024-05-03311: Noise - Residential — Loud Music/Party
2024-05-03311: Noise - Residential — Banging/Pounding
2024-04-21311: Blocked Driveway — No Access
2024-03-28Permit Plumbing — Permit Issued
2024-03-28Permit Sprinklers — Permit Issued
2024-01-23Permit Sprinklers — Permit Issued
2024-01-23Permit Plumbing — Permit Issued
2024-01-23Permit Sprinklers — Permit Issued
2024-01-23Permit Plumbing — Permit Issued
2024-01-11Permit Structural — Permit Issued
2024-01-11Permit Mechanical Systems — Permit Issued
2024-01-11Permit General Construction — Permit Issued
2024-01-03Bedbug filing: 0 infested units
2023
2023-11-20Mortgage assigned — from FIRST REPUBLIC BANK SAN FRANCISCO CA; FEDERAL DEPOSIT INSURANCE CORPORATION; JPMORGAN CHAS to JPMORGAN CHASE BANK NATIONAL ASSOCIATION
2023-11-20Mortgage assigned — from FIRST REPUBLIC BANK SAN FRANCISCO CA; FEDERAL DEPOSIT INSURANCE CORPORATION; JPMORGAN CHAS to JPMORGAN CHASE BANK NATIONAL ASSOCIATION
2023-11-15Bedbug filing: 0 infested units
2023-11-05311: Noise - Residential — Loud Music/Party
2023-09-19311: Noise — Noise: Construction Before/After Hours (NM1)
2023-08-31311: Illegal Parking — License Plate Obscured
2023-06-29311: Obstruction — Cone
2023-06-20Rodent inspection: Passed
2023-06-10311: Noise - Street/Sidewalk — Loud Music/Party
2023-03-25311: Noise - Residential — Loud Music/Party
2023-03-16311: Noise - Residential — Loud Music/Party
2023-02-20Facade (LL11) filing, cycle 9: SAFE
2022
2022-12-16Bedbug filing: 0 infested units
2022-10-30311: Noise - Residential — Loud Music/Party
2022-10-29311: Noise - Residential — Loud Music/Party
2022-08-25Mortgage assigned — from VETRINA NEW YORK LLC to FIRST REPUBLIC BANK
2022-08-25Agreement $5,000,000 — from RA 66TH LLC to FIRST REPUBLIC BANK$5,000,000
2022-08-25Mortgage assigned — from VETRINA NEW YORK LLC to FIRST REPUBLIC BANK
2022-08-25Agreement $5,000,000 — from RA 66TH LLC to FIRST REPUBLIC BANK$5,000,000
2022-06-30311: Noise - Residential — Loud Music/Party
2022-06-30311: Noise - Residential — Loud Music/Party
2022-05-16Job filed: Roof terrace renovation for a penthouse unit, including on-structure gathering space, seating, outdoor kitchens, paving, built-in raised planters, fur$100,000
2022-05-12Job filed: Mechanical work to include new VRF systems and kitchen, toilet & Laundry exhaust systems.$63,000
2022-05-12Job filed: FILING HEREWITH PLUMBING WORK FOR THE RENOVATION OF THE 7TH FLOOR, 8TH FLOOR AND OF AT THE ADDRESS NOTED.$162,000
2022-05-12Job filed: Structural work filed in conjunction of the renovation of the 7&8 floors and roof structures$50,000
2022-04-27Job filed: FILED FOR INT AND EX RENOVATIONS OF MULTISTORY PH LOCATED AT THE 7TH,8TH & PH FLOORS REM/REP INT COMMUNICATING NON-EGRESS STAIRS, NONBEARING PART, F$1,061,000
2022-04-10311: Noise - Residential — Loud Talking
2022-04-10311: Noise - Residential — Loud Music/Party
2022-04-02311: Noise - Residential — Loud Music/Party
2022-03-29311: Noise - Commercial — Loud Music/Party
2022-03-25Rodent inspection: Passed
2022-03-25311: Noise - Residential — Loud Music/Party
2022-03-23311: Noise - Street/Sidewalk — Loud Talking
2022-03-19311: Noise - Residential — Loud Talking
2022-02-23Bedbug filing: 0 infested units
2022-02-17Bedbug filing: 0 infested units
2022-02-15HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2022-02-11311: Noise - Residential — Loud Talking
2022-01-26Permit Supported Scaffold — Permit Issued
2022-01-04Permit Sidewalk Shed — Permit Issued
2021
2021-11-27311: Noise - Residential — Banging/Pounding
2021-11-27311: Noise — Noise: Construction Before/After Hours (NM1)
2021-11-27311: Noise - Residential — Banging/Pounding
2021-09-23311: Noise - Residential — Loud Music/Party
2021-09-19311: Noise - Residential — Loud Music/Party
2021-09-19311: Noise - Commercial — Loud Music/Party
2021-09-19311: Noise - Residential — Loud Music/Party
2021-05-27311: Noise - Residential — Loud Music/Party
2021-05-27311: Noise - Residential — Loud Music/Party
2021-05-27311: Noise - Residential — Loud Music/Party
2021-05-27311: Noise - Residential — Loud Music/Party
2021-05-27311: Noise - Residential — Loud Music/Party
2021-05-27311: Noise - Street/Sidewalk — Loud Music/Party
2021-04-01HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021-04-01HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2021-03-24Permit EW — ISSUED
2021-01-28Mortgage satisfied — from GRENVILLE PROPERTIES LLC to TITAN CAPITAL ID, LLC
2021-01-28TL&R — from GRENVILLE PROPERTIES LLC to TITAN CAPITAL ID, LLC
2021-01-22Mortgage satisfied — from GRENVILLE PROPERTIES LLC to EMIGRANT BANK
2021-01-20Permit Supported Scaffold — Permit Issued
2021-01-19Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2021-01-13Permit EW — ISSUED
2021-01-12PAT — from NIERENBERG, ELIN; NIERENBERG, MICHAEL to 66 EAST 11TH STREET CONDOMINIUM
2021-01-12Mortgage $9,800,000 — from NIERENBERG, ELIN; NIERENBERG, MICHAEL to JPMORGAN CHASE BANK, N.A.$9,800,000
2021-01-12PAT — from NIERENBERG, MICHAEL to HOCHBERG, STEVEN R
2021-01-12PAT — from NIERENBERG, ELIN to HOCHBERG, STEVEN R; CHASE, JACOB L
2021-01-12Deed $14,000,000 — from GRENVILLE PROPERTIES LLC to NIERENBERG, MICHAEL; NIERENBERG, ELIN$14,000,000
2021-01-08Permit Sidewalk Shed — Permit Issued
2021-01-07Job filed: INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2020
2020-12-30Sold for $14,000,000$14,000,000
2020-12-28Permit EW — ISSUED
2020-12-28Permit EW — ISSUED
2020-06-22Permit EW — ISSUED
2020-06-22Permit EW — ISSUED
2020-06-20311: Illegal Fireworks — N/A
2020-03-09Elevator permit: Modernization of elevator 1P47202 per PPN 26-90.$4,080
2019
2019-12-24Permit EW — ISSUED
2019-12-24Permit EW — ISSUED
2019-12-24Permit EW — ISSUED
2019-11-12Mortgage $5,000,000 — from RA 66TH LLC to VETRINA NEW YORK LLC$5,000,000
2019-11-12Mortgage $5,000,000 — from RA 66TH LLC to VETRINA NEW YORK LLC$5,000,000
2019-10-30TLS — from CITY OF NEW YORK to BANK OF NEW YORK
2019-05-31Job filed: PROPOSED FACADE REPAIRS AS INDICATED ON PLANS AND APPLICATIONS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE EGRESS OR OCCUPANCY.$60,000
2019-05-06Permit EW — ISSUED
2019-05-06Permit EW — ISSUED
2019-03-07Rodent inspection: Passed
2019-02-22Permit EW — ISSUED
2019-02-15ADEC — from 66 EAST 11TH STREET CONDOMINIUM
2019-02-15ADEC — from 66 EAST 11TH STREET CONDOMINIUM
2019-02-15ADEC — from 66 EAST 11TH STREET CONDOMINIUM
2019-02-15ADEC — from 66 EAST 11TH STREET CONDOMINIUM
2019-02-15ADEC — from 66 EAST 11TH STREET CONDOMINIUM
2019-02-15ADEC — from 66 EAST 11TH STREET CONDOMINIUM
2019-02-15ADEC — from 66 EAST 11TH STREET CONDOMINIUM
2019-02-13Facade (LL11) filing, cycle 8: SWARMP
2019-01-10Permit PL — ISSUED
2019-01-10Permit EW — ISSUED
2018
2018-11-30Permit PL — ISSUED
2018-11-14Permit EW — ISSUED
2018-11-13Permit EW — ISSUED
2018-11-12311: Homeless Encampment — N/A
2018-10-03Job filed: RENOVATION OF AN EXISTING APARTMENT UNIT TH AT CELLAR, 1ST AND 2ND FLOOR. INSTALL NEW PLUMBING FIXTURES. RELOCATE SPRINKLER HEADS. NO CHANGE IN USE, E$187,200
2018-10-03Job filed: RENOVATION OF AN EXISTING APARTMENT UNIT TH AT CELLAR, 1ST AND 2ND FLOOR. INSTALL NEW PLUMBING FIXTURES. RELOCATE SPRINKLER HEADS. NO CHANGE IN USE, E$187,200
2018-08-01311: Noise — Noise: Construction Equipment (NC1)
2018-07-01311: Sanitation Condition — 12 Dead Animals
2018-06-21Permit PL — ISSUED
2018-06-11Rodent inspection: Passed
2018-06-05Permit EW — ISSUED
2018-05-31Job filed: INTERIOR REMOVALS OF NON-LOAD BEARING PARTITIONS AND FINISHES AT CELLAR, 1ST AND 2ND FLOOR. REMOVE AND CAP PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS$32,000
2018-05-12311: Homeless Encampment — N/A
2018-01-11Deed $9,000,000 — from VETRINA NEW YORK LLC to RA 66TH LLC$9,000,000
2018-01-11Deed $9,000,000 — from VETRINA NEW YORK LLC to RA 66TH LLC$9,000,000
2018-01-11PAT — from RA 66TH LLC to THE BOARD OF MANAGERS OF 66 EAST 11TH ST
2018-01-11PAT — from RA 66TH LLC to THE BOARD OF MANAGERS OF 66 EAST 11TH ST
2017
2017-12-19Mortgage satisfied — from VETRINA NEW YORK LLC to FIRST REPUBLIC BANK
2017-12-19Mortgage satisfied — from VETRINA NEW YORK LLC to FIRST REPUBLIC BANK
2017-12-19Mortgage satisfied — from VETRINA NEW YORK LLC to FIRST REPUBLIC BANK
2017-12-18Deed transfer (nominal price)
2017-12-18Sold for $9,000,000$9,000,000
2017-09-18Permit EW — ISSUED
2017-08-11Rodent inspection: Passed
2017-07-14AL&R $3,750,000 — from GRENVILLE PROPERTIES LLC to TITAN CAPITAL ID, LLC$3,750,000
2017-07-14Mortgage $3,750,000 — from GRENVILLE PROPERTIES LLC to TITAN CAPITAL ID, LLC$3,750,000
2017-05-16DOB complaint, category ?
2017-05-05PREL — from FIRST REPUBLIC BANK to VETRINA NEW YORK LLC
2017-05-05TL&R — from FIRST REPUBLIC BANK
2017-04-19Permit PL — ISSUED
2017-03-27Permit EW — ISSUED
2016
2016-12-13Rodent inspection: Passed
2016-12-02PAT — from 66 E11 LLC to 66 EAST 11TH STREET CONDOMINIUM
2016-12-02Deed $8,000,000 — from MALIBU COLONY PCH PROPERTY, LLC to 66 E11 LLC$8,000,000
2016-12-02Job filed: INTERIOR RENOVATION OF APARTMENT AT 7TH AND 8TH FLOOR, WORK AT ROOF TERRACE, MINOR PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS$60,448
2016-12-02Job filed: INTERIOR RENOVATION OF APARTMENT AT 7TH AND 8TH FLOOR, WORK AT ROOF TERRACE, MINOR PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS$60,448
2016-11-29Sold for $8,000,000$8,000,000
2016-09-29Permit EW — ISSUED
2016-09-29Permit EW — ISSUED
2016-09-28Permit EW — ISSUED
2016-08-25Mortgage $4,000,000 — from BIEBER, DAVID to CITIZEN BANK, N.A.$4,000,000
2016-08-25PAT — from BIEBER, DAVID to THE BOARD OF MANAGERS OF
2016-08-25Deed $8,000,000 — from VETRINA NEW YORK LLC to BIEBER, DAVID$8,000,000
2016-08-08Sold for $8,000,000$8,000,000
2016-04-06TL&R — from FIRST REPUBLIC BANK
2016-04-06PREL — from FIRST REPUBLIC BANK
2016-04-06Deed $26,122,156 — from VETRINA NEW YORK LLC to GRENVILLE PROPERTIES LLC$26,122,156
2016-04-06Mortgage $11,000,000 — from GRENVILLE PROPERTYIES LLC to EMIGRANT MORTGAGE COMPANY, INC.$11,000,000
2016-04-06Mortgage assigned — from EMIGRANT MORTGAGE COMPANY, INC. to EMIGRANT BANK
2016-04-06PAT — from GRENVILLE PROPERTIES LLC to BOARD OF MANAGERS OF 66 EAST 11TH STREET
2016-03-24Sold for $26,122,156$26,122,156
2016-03-01FDNY inspection (SPECIAL-OTH)
2015
2015-11-09FDNY inspection (RISK)
2015-10-09Job filed: GENERAL CONSTRUCTION ASSOCIATED WITH APARTMENT RENOVATION AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$245,000
2015-10-09Job filed: GENERAL CONSTRUCTION ASSOCIATED WITH APARTMENT RENOVATION AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$245,000
2015-10-09Job filed: SPRINKLER MODIFICATION ASSOCIATED WITH APARTMENT RENOVATION AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$52,000
2015-10-09Job filed: INSTALLATION OF PLUMBING FIXTURES AND PIPING ASSOCIATED WITH THE APARTMENT RENOVATION AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR E$73,000
2015-10-09Job filed: MODIFICATION TO THE MECHANICAL SYSTEM ASSOCIATED WITH APARTMENT RENOVATION AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$115,000
2015-07-02Permit EW — ISSUED
2015-06-15TL&R — from VETRINA NEW YORK LLC to SILO 66 EAST 11TH, LLC
2015-04-30Permit PL — ISSUED
2015-04-15Mortgage assigned — from SILO 66 EAST 11TH, LLC to FIRST REPUBLIC BANK
2015-04-15Mortgage assigned — from SILO 66 EAST 11TH, LLC to FIRST REPUBLIC BANK
2015-04-15Mortgage assigned — from SILO 66 EAST 11TH, LLC to FIRST REPUBLIC BANK
2015-04-15Mortgage $7,497,512 — from VETRINA NEW YORK LLC to FIRST REPUBLIC BANK$7,497,512
2015-04-15Mortgage assigned — from SILO 66 EAST 11TH, LLC to FIRST REPUBLIC BANK
2015-04-15Mortgage $7,497,512 — from VETRINA NEW YORK LLC to FIRST REPUBLIC BANK$7,497,512
2015-04-15Mortgage assigned — from SILO 66 EAST 11TH, LLC to FIRST REPUBLIC BANK
2015-04-15Mortgage assigned — from SILO 66 EAST 11TH, LLC to FIRST REPUBLIC BANK
2015-04-15Mortgage assigned — from SILO 66 EAST 11TH, LLC to FIRST REPUBLIC BANK
2015-04-15AL&R $21,500,000 — from VETRINA NEW YORK LLC to FIRST REPUBLIC BANK$21,500,000
2015-04-15Agreement $21,500,000 — from VETRINA NEW YORK LLC to FIRST REPUBLIC BANK$21,500,000
2015-04-15Mortgage assigned — from SILO 66 EAST 11TH, LLC to FIRST REPUBLIC BANK
2015-04-15Mortgage assigned — from SILO 66 EAST 11TH, LLC to FIRST REPUBLIC BANK
2015-04-15Mortgage assigned — from SILO 66 EAST 11TH, LLC to FIRST REPUBLIC BANK
2015-04-15Mortgage $7,497,512 — from VETRINA NEW YORK LLC to FIRST REPUBLIC BANK$7,497,512
2015-04-15Mortgage assigned — from SILO 66 EAST 11TH, LLC to FIRST REPUBLIC BANK
2015-04-15Agreement $21,500,000 — from VETRINA NEW YORK LLC to FIRST REPUBLIC BANK$21,500,000
2015-04-15AL&R $21,500,000 — from VETRINA NEW YORK LLC to FIRST REPUBLIC BANK$21,500,000
2015-04-15Agreement $21,500,000 — from VETRINA NEW YORK LLC to FIRST REPUBLIC BANK$21,500,000
2015-04-15Mortgage assigned — from SILO 66 EAST 11TH, LLC to FIRST REPUBLIC BANK
2015-04-15AL&R $21,500,000 — from VETRINA NEW YORK LLC to FIRST REPUBLIC BANK$21,500,000
2015-04-13DOB violation E:
2015-03-23Permit EW — ISSUED
2015-03-23Permit EW — ISSUED
2015-03-05Job filed: GENERAL CONSTRUCTION ASSOCIATED WITH APARTMENT RENOVATION AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$175,000
2015-03-05Job filed: REMOVE AND INSTALL PLUMBING FIXTURES AND ASSOCIATED PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$50,000
2015-03-05Job filed: MODIFICATION TO MECHANICAL SYSTEM AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$70,000
2015-03-05Job filed: GENERAL CONSTRUCTION ASSOCIATED WITH APARTMENT RENOVATION AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$175,000
2015-03-05Job filed: MODIFICATION TO THE SPRINKLER SYSTEM AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$35,000
2015-03-05Job filed: MODIFICATION TO MECHANICAL SYSTEM AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$70,000
2014
2014-12-08Deed — from DEEPAK K. CHOPRA & RITA CHOPRA FAMILY TR; RITA CHOPRA, TRUSTEE; DEEPAK K. CHOPRA, TRUSTEE to CHOPRA, DEEPAK K; CHOPRA, RITA
2014-12-08Deed — from CHOPRA, DEEPAK K to DEEPAK K. CHOPRA AS CO TRUSTEE; DEEPAK K CHOPRA QUALIFIED PERSONAL RESID; RITA CHOPRA AS C
2014-12-08Deed — from CHOPRA, RITA to RITA CHOPRA AS CO TRUSTEE; DEEPAK K. CHOPRA AS CO TRUSTEE; RITA CHOPRA QUALIFIED PERSONAL
2014-11-26Certificate of occupancy Final
2014-11-14Facade (LL11) filing, cycle 7: SAFE
2014-11-03Certificate of occupancy Temporary
2014-09-03PREL — from SILO FUNDING I LLC; SILO 66 EAST 11TH , LLC to VETRINA NEW YORK LLC
2014-09-03PAT — from THE WESTCOM CHICAGO TRUST, MICHAEL HIRTE to THE CONDOMINIUM BOARD
2014-09-03Deed $1,320,000 — from VETRINA NEW YORK LLC to MICHAEL HIRTENSTEIN AS TRUSTEE; THE WESTCOM CHICAGO TRUST$1,320,000
2014-08-25FDNY inspection (ALT)
2014-08-06FDNY inspection (ALT)
2014-07-31Certificate of occupancy Temporary
2014-07-22PAT — from CHOPRA, RITA to THE CONDOMINIUM BOARD
2014-07-22REL — from SILO 66 EAST 11TH, LLC; SILO FUNDING I LLC to VETRINA NEW YORK LLC
2014-07-22Deed $5,854,938 — from VETRINA NEW YORK LLC to RITA CHOPRA , TRUSTEE; DEEPAK K CHOPRA AND RITA CHOPRA FAMILY T; DEEPAK CHOPRA, TRUSTEE$5,854,938
2014-07-21FDNY inspection (ALT)
2014-07-11FDNY inspection (ALT)
2014-06-04SMIS — from 66 EAST 11TH STREET LLC to VETRINA NEW YORK LLC
2014-06-04SMIS — from 66 EAST 11TH STREET LLC to VETRINA NEW YORK LLC
2014-06-04SMIS — from 66 EAST 11TH STREET LLC to VETRINA NEW YORK LLC
2014-06-04SMIS — from 66 EAST 11TH STREET LLC to VETRINA NEW YORK LLC
2014-06-04SMIS — from 66 EAST 11TH STREET LLC to VETRINA NEW YORK LLC
2014-06-04SMIS — from 66 EAST 11TH STREET LLC to VETRINA NEW YORK LLC
2014-06-04SMIS — from 66 EAST 11TH STREET LLC to VETRINA NEW YORK LLC
2014-05-12SUBM — from SILO FUNDING I LLC; SILO 66 EAST 11TH, LLC to 66 EAST 11TH STREET CONDOMINIUM
2014-05-12SUBM — from SILO FUNDING I LLC; SILO 66 EAST 11TH, LLC to 66 EAST 11TH STREET CONDOMINIUM
2014-05-12SUBM — from SILO FUNDING I LLC; SILO 66 EAST 11TH, LLC to 66 EAST 11TH STREET CONDOMINIUM
2014-05-12SUBM — from SILO FUNDING I LLC; SILO 66 EAST 11TH, LLC to 66 EAST 11TH STREET CONDOMINIUM
2014-05-12PAT — from MALIBU COLONY PCH PROPERTY, LLC to BOARD OF MANAGERS OF 66 EAST 11TH STREET
2014-05-12Deed $10,000,000 — from VETRINA NEW YORK LLC to MALIBU COLONY PCH PROPERTY, LLC$10,000,000
2014-05-12SUBM — from SILO FUNDING I LLC; SILO 66 EAST 11TH, LLC to 66 EAST 11TH STREET CONDOMINIUM
2014-05-12PREL — from SILO FUNDING I LLC; SILO 66 EAST 11TH, LLC to VETRINA NEW YORK, LLC
2014-05-12SUBM — from SILO FUNDING I LLC; SILO 66 EAST 11TH, LLC to 66 EAST 11TH STREET CONDOMINIUM
2014-05-12SUBM — from SILO FUNDING I LLC; SILO 66 EAST 11TH, LLC to 66 EAST 11TH STREET CONDOMINIUM
2014-05-08Certificate of occupancy Temporary
2014-04-28FDNY inspection (CDA-90-DRILL)
2014-04-22MAPS — from 66 EAST 11TH STREET CONDOMINIUM
2014-04-22CDEC — from 66 EAST 11TH STREET CONDOMINIUM
2014-04-22MAPS — from 66 EAST 11TH STREET CONDOMINIUM
2014-04-22CDEC — from 66 EAST 11TH STREET CONDOMINIUM
2014-04-22MAPS — from 66 EAST 11TH STREET CONDOMINIUM
2014-04-22MAPS — from 66 EAST 11TH STREET CONDOMINIUM
2014-04-22CDEC — from 66 EAST 11TH STREET CONDOMINIUM
2014-04-22MAPS — from 66 EAST 11TH STREET CONDOMINIUM
2014-04-22MAPS — from 66 EAST 11TH STREET CONDOMINIUM
2014-04-22CDEC — from 66 EAST 11TH STREET CONDOMINIUM
2014-04-22CDEC — from 66 EAST 11TH STREET CONDOMINIUM
2014-04-22MAPS — from 66 EAST 11TH STREET CONDOMINIUM
2014-04-22CDEC — from 66 EAST 11TH STREET CONDOMINIUM
2014-04-22CDEC — from 66 EAST 11TH STREET CONDOMINIUM
2014-04-09DOB violation E:
2014-03-28Job filed: TAX LOT SUBDIVISION FOR CONDOMINIUM PURPOSES ONLY. F/K/A LOT 16, N/K/A LOT 1201 THRU 1207. NO CHANGES TO METES & BOUNDS.
2014-03-08311: Noise — Noise: Construction Before/After Hours (NM1)
2014-03-06Rodent inspection: Passed
2014-02-27Permit EQ — ISSUED
2014-02-27Permit AL — ISSUED
2014-02-27Permit EW — ISSUED
2014-02-27Permit EW — ISSUED
2014-02-27Permit EW — ISSUED
2014-02-14Facade (LL11) filing, cycle 6: SWARMP
2014-02-14Facade (LL11) filing, cycle 7: SAFE
2014-02-07Certificate of occupancy Temporary
2014-01-30Job filed: PROVIDE BUILDER'S PAVING PLAN FOR TOTAL FRONTAGE OF 43'
2014-01-30Job filed: PROVIDE BUILDER'S PAVING PLAN FOR TOTAL FRONTAGE OF 43'
2014-01-17FDNY inspection (CDA-90-DRILL)
2013
2013-12-31DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013
2013-10-02Permit EW — ISSUED
2013-09-23FDNY inspection (CDA-90-DRILL)
2013-08-15Permit EQ — ISSUED
2013-08-15Job filed: PROVIDE FIRE PROTECTION PLAN FOR ALT-1 # 120737408 AS PER PLANS FILED NO CHANGE IN USE, EGRESS, OR OCCCUPANCY$1,000
2013-08-15Job filed: PROVIDE FIRE PROTECTION PLAN FOR ALT-1 # 120737408 AS PER PLANS FILED NO CHANGE IN USE, EGRESS, OR OCCCUPANCY$1,000
2013-06-24FDNY inspection (CDA-90-DRILL)
2013-05-24311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2013-04-10Permit EW — ISSUED
2013-04-10Permit EQ — ISSUED
2013-04-01Job filed: AUTOMATIC SMOKE / HEAT DETECTION & SPRINKLER FA SYSTEM. THERE IS NO CHANGE TO USE, EGRESS OR OCCUPANCY.$50,000
2013-03-23311: Emergency Response Team (ERT) — After Hours Work - Illegal
2013-03-23DOB complaint, category ?
2013-03-06Permit EW — ISSUED
2013-02-28Permit PL — ISSUED
2013-02-28Permit EW — ISSUED
2013-02-21Permit EQ — ISSUED
2013-02-21Permit EW — ISSUED
2013-02-21Permit EW — ISSUED
2013-02-21Permit AL — ISSUED
2013-02-21Permit EW — ISSUED
2013-01-05311: Noise — Noise: Construction Before/After Hours (NM1)
2013-01-05311: Noise — Noise: Construction Before/After Hours (NM1)
2012
2012-11-30DOB complaint, category ?
2012-10-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2011 INSPECTION/TEST
2012-09-05Permit EQ — ISSUED
2012-09-05Permit EQ — ISSUED
2012-06-12ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE SIXTH ROUND TECHNICAL REPORT IN COMPLIANCE WITH THE CODE PROVISIONS. PERIODIC INSPECTION OF EXTERIOR$800
2012-06-06311: Asbestos — Asbestos Complaint (B1)
2012-04-09Permit EQ — ISSUED
2012-03-19Rodent inspection: Passed
2012-03-07311: Construction Safety Enforcement — SST Tracking Complaint
2012-03-07DOB complaint, category ?
2012-02-27Permit EW — ISSUED
2012-02-27Permit PL — ISSUED
2012-02-24ECB CLASS - 1 violation: NOTED SUPPORTED SCAFFOLDS AT EXP#1 BUILT NOT ACCORDING TO APPROVED PLANS JOB#120960308 CALLED FOR 5SECTION OF SCAFFOLDS INCLUDING $1,000
2012-02-22Permit EW — ISSUED
2012-02-22Permit EW — ISSUED
2012-02-22Permit EW — ISSUED
2012-02-22Permit AL — ISSUED
2012-02-22Permit EQ — ISSUED
2012-02-07Permit EQ — ISSUED
2012-02-06Job filed: INSTALLATION OF A STROS 3000 NOV 1420 UPF7 SINGLE CAGE PERSONNEL/MATERIAL HOIST IN CONJUNCTION WITH ALT 1 AS PER PLANS. NO CHANGE IN USE, EGRESS OR OC
2012-01-26Permit EQ — ISSUED
2012-01-26Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2012-01-25Permit EQ — ISSUED
2012-01-25Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
2012-01-25Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
2012-01-09Permit EW — ISSUED
2012-01-09Permit EW — ISSUED
2011
2011-12-15ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE SIXTH ROUND TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS:PERIODIC INSPECTION OF EXTERIOR WALL$800
2011-12-13Permit EW — ISSUED
2011-12-13DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2010 INSPECTION/TEST
2011-12-09Job filed: APPLICATION FILED HEREWITH FOR THE INSTALLATION OF A TEMPORARY AIR PRESSURERIZED STANDPIPE ALARM SYSTEM IN CONJUNCTION WITH ALTERATION 1 FILED UNDER D$15,000
2011-12-09Job filed: APPLICATION FILED HEREWITH FOR THE INSTALLATION OF A TEMPORARY AIR PRESSURERIZED STANDPIPE ALARM SYSTEM IN CONJUNCTION WITH ALTERATION 1 FILED UNDER D$15,000
2011-12-06Permit EW — ISSUED
2011-12-06Permit EW — ISSUED
2011-11-29DOB complaint, category ?
2011-11-29ECB CLASS - 1 violation: LL63/09 64/09 UPON PHYSICAL INSP FOUND STANDPIPE SYSTEM W/O A SOURCE AT WATER DRY/ NOT EQUIPPED W/ ALARM SYSTEM AS PER LOCAL LAWS $2,400
2011-10-13Permit AL — ISSUED
2011-10-13Permit EW — ISSUED
2011-10-13Permit EQ — ISSUED
2011-10-13Permit EQ — ISSUED
2011-09-22Permit AL — ISSUED
2011-09-22Permit EQ — ISSUED
2011-09-21DOB complaint, category ?
2011-09-16DOB complaint, category ?
2011-08-29Permit EW — ISSUED
2011-07-08Job filed: FILING HEREWITH FOR MECHANICAL, PLUMBING AND BOILER WORK AS PER DRAWINGS FILED HEREWITH, NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION$2,641,515
2011-07-08Job filed: FILING HEREWITH FOR STRUCTURAL WORK TO INCLUDE SUPERSTRUCTURE AND STRUCTURAL DEMOLITION AS PER DRAWINGS FILED HEREWITH IN CONJUNCTION WITH ALTERATION $230,000
2011-07-08Job filed: FILING HEREWITH FOR INSTALLATION OF NEW SPRINKLER & STANDPIPE SYSTEM IN CONJUNCTION WITH ALT 1 TP CONVERT FROM PARKING GARAGE TO RESIDENTIAL BLDG $444,665
2011-07-05Job filed: ALT-1 APPLICATION FILED FOR THE CONVERSION OF AN EXISITNG PARKING GARAGE STRUCTURE TO RESIDENTIAL BUILDING AND RELATED CONSTRUCTION AS PER DRAWINGS FI$3,564,240
2011-06-14Job filed: FILING HEREWITH ATLERATION TYPE 2 FOR PARTIAL STRUCTURAL DEMOLITION AND RELATED WORK AS PER DRAWINGS FILED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUP$169,500
2011-06-03ECB CLASS - 2 violation: FAILURE TO MAINTAIN BLDG IN A CODE-COMPLIANT MANNER. NOTED: AT REAR/SOUTH EXP ARE LOOSE AND IN SOME LOCATIONS ONLY HELD IN PLACE B
2011-06-03DOB complaint, category ?
2011-03-11ECB CLASS - 2 violation: FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLAINT MANNER. NOTED: AT REAR/SOUTH EXPOSURE FROM 8TH FL DOWN TO 2ND FL,THE METAL SHUTTE$2,500
2011-02-24DOB complaint, category ?
2011-02-17Rodent inspection: Passed
2011-01-25ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE 6 ROUND TECH REPORT IN COMPLIANCE W/ CODE PROVISIONS:PERIODIC INSPEC OF EXTERIOR WALLS & APPURTENANC$8,000
2010
2010-10-08DOB violation VCAT1:
2010-03-29ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE 6TH ROUND TECHNICAL REPORT IN COMPLIANCEWITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS $8,000
2010-02-09Rodent inspection: Passed
2009
2009-10-31ECB CLASS - 3 violation: FAILURE TO MAINTAIN: NOTES: EMERGENCY EXIT LIGHTS FLOORS 2,4,5 FRONT (REAR F.E. EXITS) WORKING. REM: MAINTAIN & REPAIR DEFECT.
2009-02-27DOB violation LL1081:
2008
2008-11-28ECB CLASS - 2 violation: FAILURE TO SUBMIT AN ACCEPTABLE SIXTH ROUND TECHNICAL REPORT IN COMPLIANCE W/CODE PROVISIONS:PERIODIC INSPECTION OF EXTERIOR WALLS$800
2008-05-05DOB violation E:
2008-03-21DOB violation LL1081:
2007
2007-11-30DOB violation LL1198:
2007-04-02DOB violation LL1081:
2005
2005-02-28DOB violation E:
2004
2004-04-16DOB violation E:
2004-02-26ECB Hazardous violation: FAILURE TO MAINTAIN BLDG.NOTE:(1)FIRE DOORS TO REAR FIRE ESCAPE AND FRONT STAIRS ARE IN DISREPAIR AND NOT SELF CLOSING AS REQUIRED$800
2004-02-26ECB Hazardous violation: REQUIRED MEANS OF EGRESS OBSTRUCTED:NOTE:PARKED CARS AND HYDRAULIC LIFTS PLACED IN FRONT OF REAR EXIT DOORS TO REAR FIRE ESCAPE AR
2003
2003-12-23DOB violation E:
2003-06-24Permit EW — ISSUED
2003-06-24Permit EW — ISSUED
2003-04-30Job filed: CONCRETE, STEEL AND MASNORY REPAIRS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$10,000
2003-04-30Job filed: CONCRETE, STEEL AND MASNORY REPAIRS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$10,000
2002
2002-12-12DOB complaint, category ?
2002-12-06ECB Non-Hazardous violation: FAILURE TO MAINTIAN BUILDING - NOTED THERE ARE CRACK ACROSS CEILINGS IN FRONT OF BUILDING ON FLOORS 1-8, THREE ARE CHUNCHS OF PLAS$350
2002-12-03DOB complaint, category ?
2002-12-03DOB complaint, category ?
2002-08-21ECB Hazardous violation: FAILURE TO SAFEGUARD PUBLIC & PROPERTY AFFECTED B Y CONSTRUCTION OPERATIONS NOTED DURING WORK ON REAR F.E ESCIPE PAINTING SCRAPING
2002-08-20DOB complaint, category ?
2000
2000-12-15ECB Hazardous violation: FAILURE TO FILE AN AMENDED ROUND FIVE REPORT ACCEPTABLE TO THIS DEPARTMENT PURSUANT TO RULE R.C.N.Y. 32-03B(5),INDICATING CORRECTI$400
2000-07-10Permit EW — ISSUED
2000-06-14Job filed: Exterior facade repairs, as per atttached drawings. No change to egress, use or occupancy.$50,000
2000-05-02DOB violation LL10/80:
2000-04-03Permit EQ — ISSUED
2000-04-03Permit EQ — ISSUED
2000-03-27Job filed: INSTALL HEAVY DUTY SIDEWALK SHED:70' LONG. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. WORK SHALL COMPLY WITH LL33/91.
2000-03-27Job filed: INSTALL HEAVY DUTY SIDEWALK SHED:70' LONG. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. WORK SHALL COMPLY WITH LL33/91.
2000-03-02ECB Hazardous violation: 73A0/18N11/54G07/18L11 CEASE USE UNTIL BY PASSED INTERLOCKS ARE REPAIRED 18 PROVIDE FOR ALL MUSCHINE DOOR LOCKS TO LATCH AFTER CLO$2,500
1998
1998-07-21ECB Non-Hazardous violation: 350,50Y,37G,46Q,74K,36I,50U,37U,36D,74M, 35O-CLEAN UP MOTOR ROOM. 50Y-SEAL MACHINE. 37G-PROPERLY FUSE CONTROLLER. 46Q-INSTALL
1997
1997-09-22ECB Non-Hazardous violation: 75M,39H,73O, 75-FIVE YEAR TEST 39-TRACTION SHEAVE WORN RENEW 73-CLEAN M. ROOM PIT & CAR.
1997-07-01DOB violation LL1080:
1996
1996-09-03Permit AL — ISSUED
1996-08-12ECB Non-Hazardous violation: 46K,36O. 46 HOIST ROPES DEFECTIVE. 35 MOTOR ROOM CLEAN.$1,000
1996-08-12DOB complaint, category ?
1996-03-28ECB Non-Hazardous violation: WORK WITHOUT A PERMIT WORK NOTED: INSTALL STEEL HIGH BEAMS AT FIRST FLOOR UNDER SIDE LONG AT FRONT AND ONE 40FT AT REAR (NOTE WORK
1996-03-15ECB Non-Hazardous violation: WORK WITHOUT A PERMIT WORK NOTED INSTALLATION OF APPROX 30' OF STEEL I BEAM AT 1ST FLR REAR CEILING. REMEDY: STOP ALL WORK MAKE SI$1,000
1996-03-15DOB complaint, category ?
1994
1994-12-27DOB violation E:
1994-11-02Permit EW — ISSUED
1994-08-23Permit EW — ISSUED
1994-08-02ECB Non-Hazardous violation: 75U,37G,37R,(75)PERFORM 5 YR, SAFETY TEST, PROPERLY DATE & TAG DEVICE FORSAME & FILE ELEV #3 FORM WITH THIS DEPT.(37)PROPERLY FUSE$200
1993
1993-08-18ECB Hazardous violation: 15L,18L,74#, (15) & (18) CEASE USE OF 1F UNTIL ALL HOISTWAY DOORS & INTERLOCKS ARE IN WORKING ORDER (RUNNING WITH DPPRS OPEN) (74)$1,250
1993-07-02ECB Hazardous violation: 15L,17M,18L,37L,74M. 15,17,18 CEASE USE OF IF UNTILL ALL HOISTWAY DOORAND INTERLOCKS ARE WORKING PROPERLY AND ISION PANELS ARE PRO$500
1992
1992-10-02ECB Non-Hazardous violation: 73#,74#, (73) PERFORM 5 YEAR TEST, PROPERLY TAG DEVICE AND FILE ELV3 FORM (74) HAVE ELEV. CO. TAG PROPER ELEVATOR # ON EQUIPT.$200

Support this site Back to the building page