127 East 61 Street · Manhattan · BBL 1013960111 · generated 2026-10-20 · FREE
| Component | What it covers | Points |
|---|---|---|
| Housing code | HPD violations by class, complaints, emergency repairs, litigation, vacate orders, AEP | 4.4 |
| Structural & safety | DOB violations, ECB/OATH violations by class | 0 |
| Pests | Bedbug filings, failed rodent inspections, rodent 311s | 0 |
| Displacement | Marshal evictions executed | 0 |
The city's published records show little recorded distress here in the last three years. Less recorded distress than 72% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty points per 10 units; this building carries 5.5. In ZIP 10065, 78% of residential buildings hold an A and 3% grade D or F. How grades work
Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more
| Open HPD violations | 5 total — 1 class C (immediately hazardous), 3 class B, 1 class A. Oldest open since 1987-10-06. |
status snapshot refreshed weekly from HPD records
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
9 service requests in the last three years. Most common: Street Condition (5) · Noise (2) · Sidewalk Condition (1) · WATER LEAK (1).
$2,892,133 in permitted construction work filed since 2016 (11 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.
| Yes | Built before 1974 (1910) |
| Yes | Six or more residential units (8) |
| No | 421-a / J-51 tax benefit on the current tax roll |
2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit: request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
| Registered owner(s) | WISLAN REALTY COMPANY, LLC |
| Head officer | RUTH WISSNER |
| Managing agent | WALLACK MANAGEMENT COMPANY, INC. |
| Last registered | 2024-09-17 |
as filed by the owner in the building's HPD registration
| Tax year | City market value | Assessed value |
|---|---|---|
| 2025 | $3,580,000 | $1,611,000 |
| 2026 | $4,016,000 | $1,807,200 |
| 2027 | $4,118,000 | $1,853,100 |
The city's market estimate has risen 15% between tax years 2025 and 2027.
| Heating fuel | NATURALGAS |
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
| Subway | 59 St — 4 5 6 N R W · 350 ft straight-line (about a 2-minute walk) · station accessibility: none Lexington Av/63 St — M Q · 450 ft straight-line (about a 2-minute walk) · station accessibility: full |
| Bus | Nearest boarding stop: Lexington Av / E 62 St — M101 M102 M103 · 200 ft |
| Citi Bike | E 59 St & Lexington Ave · 600 ft · station location as of 2026-09-23; live availability |
| School zones (2024–25 map) | Elementary: East Side Elementary School, PS 267 Middle: J.H.S. 167 Robert F. Wagner. Confirm with the DOE's school search. |
Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
127 East 61 Street
| Heat or hot water | Heat or hot water |
| Apartment maintenance | Apartment maintenance |
| Bed bugs | Bed bugs |
| Residential pests | Residential pests |
| Rats or mice | Rats or mice |
| Anything else | Anything else |
9 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.
Managed by WALLACK MANAGEMENT COMPANY, INC. — 61 buildings, 4,120 units. Grades across the portfolio: A59 · B1. See the whole portfolio
showing 60 of 61 buildings
Most recent mortgage recorded against this lot: $2,150,000 on 2025-08-19 (lender: Stormfield Capital Funding I, LLC). Face amount at recording — it may have since been paid down, refinanced or satisfied. View the recorded document.
| Date | Record | Amount | Per res. unit |
|---|---|---|---|
| 2026-09-03 | Agreement $2,150,000 — from E61 PARTNERS LLC to THK 61 LLC | $2,150,000 | |
| 2026-09-03 | Deed $5,125,000 — from 127 EAST 61ST PROPERTY OWNER LLC to E61 PARTNERS LLC | $5,125,000 | |
| 2026-08-20 | Sold for $5,125,000 | $5,125,000 | $640,625 |
| 2025-08-19 | AL&R $2,150,000 — from 127 EAST 61ST PROPERTY OWNER LLC to STORMFIELD CAPITAL FUNDING I, LLC | $2,150,000 | |
| 2025-08-19 | Mortgage $2,150,000 — from 127 EAST 61ST PROPERTY OWNER LLC to STORMFIELD CAPITAL FUNDING I, LLC | $2,150,000 | |
| 2025-08-18 | Deed $3,600,000 — from WISLAN REALTY CO. to 127 EAST 61ST PROPERTY OWNER LLC | $3,600,000 | |
| 2025-08-14 | Sold for $3,600,000 | $3,600,000 | $450,000 |
| Year | Construction | Enforcement | Housing & tenants | Ownership & money | Health & systems | Total |
|---|---|---|---|---|---|---|
| 2017 | 0 | 0 | 0 | 0 | 1 | 1 |
| 2018 | 0 | 0 | 0 | 0 | 3 | 3 |
| 2019 | 0 | 1 | 3 | 0 | 2 | 6 |
| 2020 | 0 | 0 | 2 | 0 | 1 | 3 |
| 2021 | 0 | 0 | 1 | 0 | 1 | 2 |
| 2022 | 0 | 0 | 1 | 0 | 1 | 2 |
| 2023 | 0 | 0 | 3 | 0 | 3 | 6 |
| 2024 | 0 | 0 | 7 | 0 | 1 | 8 |
| 2025 | 0 | 0 | 3 | 4 | 1 | 8 |
| 2026 | 13 | 0 | 1 | 7 | 8 | 29 |
| Date | Record | |
|---|---|---|
| 2026-09-17 | CERT — from OMNI TITLE AGENCY | |
| 2026-09-17 | ZONE — from E61 PARTNERS LLC | |
| 2026-09-14 | Job filed: Plumbing work for in conjunction with ALT-CO as New Building with existing Elements to Remain, complete renovation into single family dwelling. | |
| 2026-09-14 | Job filed: Foundation and Structural work for horizontal enlargement, mild vertical enlargement and work though in conjunction with ALT-CO as New Building with e | |
| 2026-09-14 | Job filed: Support of Excavation work at rear yard to accommodate foundation for horizontal enlargement, in conjunction with ALT-CO as New Building with existing | |
| 2026-09-14 | Job filed: Sprinkler work for in conjunction with ALT-CO as New Building with existing Elements to Remain, complete renovation into single family dwelling. | |
| 2026-09-14 | Job filed: Mechanical Systems work for installation of central HVAC with Air Handling & Condensing units in conjunction with ALT-CO as New Building with existing | |
| 2026-09-11 | Job filed: ALT-CO as New Building with existing Elements to Remain, Complete renovation with horizontal and vertical enlargement, converting mixed use five stori | |
| 2026-09-03 | Agreement $2,150,000 — from E61 PARTNERS LLC to THK 61 LLC | |
| 2026-09-03 | Deed $5,125,000 — from 127 EAST 61ST PROPERTY OWNER LLC to E61 PARTNERS LLC | |
| 2026-09-03 | Mortgage assigned — from STORMFIELD CAPITAL FUNDING I, LLC to THK 61 LLC | |
| 2026-09-03 | TL&R — from STORMFIELD CAPITAL FUNDING I, LLC to 127 EAST 61ST PROPERTY OWNER LLC | |
| 2026-08-20 | Sold for $5,125,000 | |
| 2026-08-17 | Permit General Construction — Permit Issued | |
| 2026-08-17 | Permit General Construction — Permit Issued | |
| 2026-08-12 | Asbestos abatement: Removal — MC Builders 1 LLC | |
| 2026-08-12 | Asbestos abatement: Removal — MC Builders 1 LLC | |
| 2026-08-12 | Asbestos abatement: Removal — MC Builders 1 LLC | |
| 2026-08-12 | Asbestos abatement: Removal — MC Builders 1 LLC | |
| 2026-08-05 | Asbestos abatement: Removal — MC Builders 1 LLC | |
| 2026-08-05 | Asbestos abatement: Removal — MC Builders 1 LLC | |
| 2026-08-05 | Asbestos abatement: Removal — MC Builders 1 LLC | |
| 2026-08-05 | Asbestos abatement: Removal — MC Builders 1 LLC | |
| 2026-08-04 | Job filed: Removal and reinstallation of interior non-load bearing partitions and wall, floor and ceiling finishes in cellar, basement, 001-004, for cosmetic ren | |
| 2026-07-13 | Job filed: Removal of interior non-load bearing partitions and wall, floor and ceiling finishes in cellar, basement, 001-004. No change in occupancy use or egres | |
| 2026-04-29 | HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD | |
| 2026-03-30 | Job filed: New plumbing fixtures and appliances along with new sprinkler system for converted new one family dwelling on cellar and first through fifth floors. | |
| 2026-03-30 | Job filed: Installation of new mechanical equipment and units on cellar, first through fifth floors as well as roof and roof bulkhead for new one family dwelling | |
| 2026-03-25 | Job filed: Removal of existing and addition of new floor area, front and rear facade restoration and alteration, interior full renovation with raising of floor l | |
| 2025-12-24 | 311: WATER LEAK — SLOW LEAK | |
| 2025-12-24 | Tenant complaint: WATER LEAK — SLOW LEAK | |
| 2025-12-10 | Boiler inspection | |
| 2025-11-17 | HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE |