The city's published records show little recorded distress here in the last three years. Less recorded distress than 100% of 1-5-unit residential buildings citywide. The citywide median for 1-5-unit residential buildings is 0 penalty
points per 10 units; this building carries 0. In ZIP 11211, 58% of residential buildings hold an A and
7% grade D or F.
How grades work
this building
A
C
Among 699,345 1-5-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
23 service requests in the last three years. Most common: Noise (13) · Illegal Parking (3) · Snow or Ice (3) · Dirty Condition (1) · Obstruction (1) · Blocked Driveway (1).
Filed construction activity
$32,000 in permitted construction work filed since
2016 (5 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974 (2019)
No
Six or more residential units (2)
No
421-a / J-51 tax benefit on the current tax roll
0 of 3 signals present. None of the common signals are present — stabilization is unlikely (though never impossible). The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
202 NORTH 10TH LLC
Head officer
THOMAS FINNICAN
Managing agent
PATOMA
Last registered
2025-09-13
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$3,131,000
$187,860
2026
$3,964,000
$237,840
2027
$5,213,000
$312,780
The city's market estimate has risen
66% between tax years 2025 and 2027.
Flood exposure
Inside the 2007 FEMA floodplain but outside the 2015
preliminary update — worth checking against current FEMA maps.
Hurricane evacuation zone 3 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Bedford Av — L · 650 ft straight-line (about a 3-minute walk) · station accessibility: full Lorimer St — G L · 0.3 mi straight-line (about a 9-minute walk) · station accessibility: full
Bus
Nearest boarding stop: Driggs Av / N 11 St — B62 · 300 ft
Citi Bike
Driggs Ave & N 9 St · 200 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
23 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $4,168,750 on
2018-07-23 (lender: Bcb Community Bank). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2018-07-23
AL&R $4,500,000 — from 202 NORTH 10TH LLC to BCB COMMUNITY BANK
$4,500,000
2018-07-23
Mortgage $331,250 — from 202 NORTH 10TH LLC to BCB COMMUNITY BANK
$331,250
2018-07-23
Mortgage $4,168,750 — from 202 NORTH 10TH LLC to BCB COMMUNITY BANK
$4,168,750
2014-09-19
MLEA $4,500,000 — from DORTO, JOSEPH A; DORTO, SHIRLEY to 202 AGENT LLC
$4,500,000
Ten-year activity
50250
2017
30
2018
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
11
9
2
2
0
24
2018
13
13
1
3
0
30
2019
11
5
7
0
0
23
2020
11
1
5
0
2
19
2021
0
2
4
0
1
7
2022
4
2
4
0
0
10
2023
0
0
0
0
0
0
2024
0
0
10
0
0
10
2025
0
0
12
0
0
12
2026
0
0
5
1
0
6
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2021-04-09Elevator permit: FURNISH AND INSTALL ONE (1) NEW AUTOMATIC PUSH BUTTON PASSENGER, OVERHEAD TRACTION GEARLESS ELEVATOR AS DETAILED IN THE ATTACHED D$159,000
2020-12-14Elevator permit: FURNISH AND INSTALL ONE (1) NEW AUTOMATIC PUSH BUTTON PASSENGER, OVERHEAD TRACTION GEARLESS ELEVATOR AS DETAILED IN THE ATTACHED D$159,000
2020-07-20Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED, PIPE SCAFFOLD, AND NEEDLE BEAM AS PER PLANS. SIDEWALK SHED LIVE LOAD 300 PSF SHALL COMPLY WITH CHAPTER #33 O$10,000
2020-07-16Permit EW — ISSUED
2020-07-16Permit EW — ISSUED
2020-06-23Elevator permit: FURNISH AND INSTALL ONE (1) NEW AUTOMATIC PUSH BUTTON PASSENGER, OVERHEAD TRACTION GEARLESS ELEVATOR AS DETAILED IN THE ATTACHED D$159,000
2020-03-24311: Noise — Noise: Construction Before/After Hours (NM1)
2020-01-25311: Noise — Noise: Construction Equipment (NC1)
2020-01-16Permit AL — ISSUED
2019
2019-10-11Permit Supported Scaffold — Signed-off
2019-10-11Permit Sidewalk Shed — Signed-off
2019-10-10Permit Supported Scaffold — Signed-off
2019-10-10Permit Sidewalk Shed — Signed-off
2019-09-25Permit PL — ISSUED
2019-08-22311: General Construction/Plumbing — Site Conditions Endangering Workers
2019-08-22DOB complaint, category ?
2019-06-12Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED, PIPE SCAFFOLD, AND NEEDLE BEAM AS PER PLANS. SIDEWALK SHED LIVE LOAD 300 PSF SHALL COMPLY WITH CHAPTER #33 O$10,000
2019-05-25311: Noise — Noise: Construction Before/After Hours (NM1)
2019-04-27311: Noise — Noise: Construction Before/After Hours (NM1)
2019-03-30311: Noise — Noise: Construction Before/After Hours (NM1)
2019-03-29Permit EQ — ISSUED
2019-02-28311: Sustainability Enforcement — Sustainability Enforcement Work Order
2019-01-28Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED, PIPE SCAFFOLD, AND NEEDLE BEAM AS PER PLANS. SIDEWALK SHED LIVE LOAD 300 PSF SHALL COMPLY WITH CHAPTER #33 O$10,000
2019-01-16ECB CLASS - 2 violation: PROJECT INFORMATION PANEL/SIDEWALK SHED PARAPET PANEL/CONSTRUCTION SIGN NOT PROVIDED OR NOT IN COMPLIANCE W/ SECTION. AT TIME OF I
2019-01-16Permit AL — ISSUED
2019-01-15311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2019-01-15DOB complaint, category ?
2018
2018-12-19Permit Sidewalk Shed — Signed-off
2018-12-19Permit Supported Scaffold — Signed-off
2018-11-14FDNY inspection (CONSTR)
2018-07-23AL&R $4,500,000 — from 202 NORTH 10TH LLC to BCB COMMUNITY BANK$4,500,000
2018-07-23Mortgage $331,250 — from 202 NORTH 10TH LLC to BCB COMMUNITY BANK$331,250
2018-07-23Mortgage $4,168,750 — from 202 NORTH 10TH LLC to BCB COMMUNITY BANK$4,168,750
2018-06-28FDNY inspection (ALT)
2018-06-27FDNY inspection (CONSTR)
2018-06-25FDNY inspection (CONSTR)
2018-06-05FDNY inspection (CONSTR)
2018-05-21311: Noise — Noise: Construction Before/After Hours (NM1)
2018-04-12Permit EQ — ISSUED
2018-04-04Permit AL — ISSUED
2018-03-26Permit Sidewalk Shed — Signed-off
2018-03-26Permit Supported Scaffold — Signed-off
2018-03-23Permit Sidewalk Shed — Signed-off
2018-03-23Permit Supported Scaffold — Signed-off
2018-03-22Permit EQ — ISSUED
2018-03-15Job filed: INSTALLATION OF ROOF PROTECTION AS PER PLANS.AND SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLI
2018-03-13Permit PL — ISSUED
2018-03-12FDNY inspection (ALT)
2018-03-09Permit Supported Scaffold — Signed-off
2018-03-09Permit Sidewalk Shed — Signed-off
2018-03-08FDNY inspection (CONSTR)
2018-03-06FDNY inspection (CONSTR)
2018-02-15FDNY inspection (CONSTR)
2018-02-06FDNY inspection (ALT)
2018-01-30FDNY inspection (ALT)
2018-01-23FDNY inspection (ALT)
2018-01-03FDNY inspection (ALT)
2017
2017-12-14311: Indoor Air Quality — Chemical Vapors/Gases/Odors
2017-11-15FDNY inspection (ALT)
2017-10-19FDNY inspection (ALT)
2017-10-19FDNY inspection (CONSTR)
2017-10-12Job filed: INSTALLATION OF ROOF PROTECTION AS PER PLANS.AND SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLI
2017-10-09Job filed: INSTALLATION OF ROOF PROTECTION AS PER PLANS.AND SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLI
2017-10-09Job filed: INSTALLATION OF PIPE SCAFFOLD & NEEDLE BEAMS AS PER PLANS. ALL WORK SHALL BE ACCORDING TO CHAPTER #33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN
2017-10-09Job filed: INSTALLATION OF ROOF PROTECTION AS PER PLANS.AND SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLI
2017-09-29Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED & PLYWOOD FENCE AS PER PLANS. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014
2017-09-29Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED & PLYWOOD FENCE AS PER PLANS. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014
2017-09-25FDNY inspection (CONSTR)
2017-09-22Permit AL — ISSUED
2017-09-18FDNY inspection (ALT)
2017-08-15FDNY inspection (CONSTR)
2017-07-25ZONE — from DORTO, JOSEPH A; DORTO, SHIRLEY
2017-07-25CERT — from SUCCESSFUL ABSTRACT LLC
2017-07-18FDNY inspection (CONSTR)
2017-06-26Job filed: FILING FOR SPRINKLER SYSTEM IN CONJUNCTION WITH JOB # 321126580.$1,000
2017-06-26Job filed: FILING FOR SPRINKLER SYSTEM IN CONJUNCTION WITH JOB # 321126580.$1,000
2017-06-13FDNY inspection (CONSTR)
2017-06-01311: Dead/Dying Tree — Planted More Than 2 Years Ago
2017-05-15FDNY inspection (CONSTR)
2017-05-10Permit EQ — ISSUED
2017-05-10Permit AL — ISSUED
2016
2016-03-11Job filed: FILING FOR DRY-PROOFING OF STRUCTURE