The city's published records show little recorded distress here in the last three years. Less recorded distress than 75% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty
points per 10 units; this building carries 4.4. In ZIP 11222, 66% of residential buildings hold an A and
5% grade D or F.
How grades work
this building
A
B
C
Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
12 service requests in the last three years. Most common: Illegal Parking (7) · Water System (3) · Lead (2).
Filed construction activity
$5,649,800 in permitted construction work filed since
2016 (9 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1903)
Yes
Six or more residential units (9)
No
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
139 Huron Condominium
Head officer
Anthony DelSignore
Managing agent
ATLAS NYC PROPERTY MANAGEMENT
Last registered
2026-03-26
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$164,000
$73,800
2026
$236,160
$106,272
2027
$283,380
$127,521
The city's market estimate has risen
73% between tax years 2025 and 2027.
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 2 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Greenpoint Av — G · 450 ft straight-line (about a 2-minute walk) · station accessibility: full
Bus
Nearest boarding stop: Manhattan Av / India St — B43 B62 · 400 ft
Citi Bike
India St & Manhattan Ave · 350 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
12 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
2024-04-10HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2023
2023-12-11Mortgage assigned — from JPMORGAN CHASE BANK, N.A.; FIRST REPUBLIC BANK; FEDERAL DEPOSIT INSURANCE CORPORATION to JPMORGAN CHASE BANK NATIONAL ASSOCIATION
2023-11-21HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2023-11-09Mortgage assigned — from FIRST REPUBLIC BANK, SAN FRANCISCO, CA; FEDERAL DEPOSIT INSURANCE CORPORATION; JPMORGAN CH to JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO
2023-08-02311: Noise — Noise: air condition/ventilation equipment (NV1)
2023-05-04311: Noise — Noise: Jack Hammering (NC2)
2023-03-23HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2022
2022-12-04311: Residential Disposal Complaint — Waste Set Out Too Early or Too Late
2022-11-20311: Dead Animal — Bird
2022-08-11Agreement $1,674,655 — from MIDFIRST BANK to ALL BLUE HERON, LLC$1,674,655
2022-08-11Agreement $1,674,655 — from MIDFIRST BANK to ALL BLUE HERON, LLC$1,674,655
2022-08-11Agreement $1,674,655 — from MIDFIRST BANK to ALL BLUE HERON, LLC$1,674,655
2022-08-11Agreement $696,000 — from KOTKIN, DEBORAH to WELLS FARGO BANK, N.A.$696,000
2022-08-11Agreement $1,674,655 — from MIDFIRST BANK to ALL BLUE HERON, LLC$1,674,655
2022-08-11Mortgage $696,000 — from ALL BLUE HERON, LLC to MIDFIRST BANK$696,000
2022-08-11Mortgage assigned — from MIDFIRST BANK to WELLS FARGO BANK, N.A.
2022-08-11Agreement $1,674,655 — from MIDFIRST BANK to ALL BLUE HERON, LLC$1,674,655
2022-08-11Agreement $1,674,655 — from MIDFIRST BANK to ALL BLUE HERON, LLC$1,674,655
2022-06-28Certificate of occupancy Final
2022-06-28Certificate of occupancy Final
2022-04-13PAT — from PARRIN, DAVID JR to THE HURON CONDOMINIUM
2022-04-13Mortgage $559,200 — from PARRIN, DAVID JR to US BANK NATIONAL ASSOCIATION$559,200
2022-04-13Deed $705,378 — from ALL BLUE HURON, LLC to PARRIN, DAVID JR$705,378
2022-03-24Sold for $705,378$705,378
2022-03-10Certificate of occupancy Renewal Without Change
2022-02-17Deed $953,330 — from ALL BLUE HURON, LLC to CONSTANCE CASEY, TRUSTEE; THE JACOB VARMUS 2021 TRUST$953,330
2022-02-17PAT — from THE JACOB VARMUS 2021 TRUST; CONSTANCE CASEY, TRUSTEE to THE BOARD OF MANAGERS OF 139 HURON CONDO; ALL BLUE HURON, LLC
2022-02-15Mortgage $489,300 — from SUNSHINE ON HURON, LLC to FIRST REPUBLIC BANK, A STATE BANK$489,300
2022-02-15PAT — from SUNSHINE ON HURON, LLC to THE BOARD OF MANAGERS OF THE 139 HURON C; ALL BLUE HURON, LLC
2022-02-15Deed $699,000 — from ALL BLUE HURON, LLC to SUNSHINE ON HURON, LLC$699,000
2022-02-07Sold for $953,330$953,330
2022-02-04Sold for $699,000$699,000
2022-01-28Mortgage $2,712,500 — from FITZGERALD, CONOR B; MASNIK, JULIA A to FIRST REPUBLIC BANK, A STATE BANK$2,712,500
2022-01-28PAT — from FITZGERALD, CONOR B; MASNIK, JULIA A to ALL BLUE HURON, LLC; THE BOARD OF MANAGERS OF 139 HURON CONDO
2022-01-28Deed $3,875,000 — from ALL BLUE HURON, LLC to MASNIK, JULIA A; FITZGERALD, CONOR B$3,875,000
2022-01-20Sold for $3,875,000$3,875,000
2021
2021-12-14Certificate of occupancy Renewal Without Change
2021-11-22Agreement $719,200 — from MATTAR, MICHELLE to GUARANTEED RATE AFFINITY, LLC; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; GR AFFINITY, LLC$719,200
2021-11-10Agreement $719,200 — from MIDFIRST BANK to ALL BLUE HURON, LLC$719,200
2021-11-10PAT — from MATTAR, MICHELLE to THE BOARD OF MANAGERS OF 139 HURON CONDO
2021-11-10Mortgage satisfied — from ALL BLUE HURON, LLC to MIDFIRST BANK
2021-11-10Agreement $719,200 — from MIDFIRST BANK to ALL BLUE HURON, LLC$719,200
2021-11-10Mortgage satisfied — from ALL BLUE HURON, LLC to MIDFIRST BANK
2021-11-10Agreement $719,200 — from MIDFIRST BANK to ALL BLUE HURON, LLC$719,200
2021-11-10Agreement $719,200 — from MIDFIRST BANK to ALL BLUE HURON, LLC$719,200
2021-11-10Mortgage satisfied — from ALL BLUE HURON, LLC to MIDFIRST BANK
2021-11-10Agreement $719,200 — from MIDFIRST BANK to ALL BLUE HURON, LLC$719,200
2021-11-10Mortgage assigned — from MIDFIRST PLAZA to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; GR AFFINITY, LLC; GUARANTEED RATE AFFINITY, LLC
2021-11-10Agreement $719,200 — from ALL BLUE HURON, LLC to MIDFIRST PLAZA$719,200
2021-11-10Deed $907,203 — from ALL BLUE HURON, LLC to MATTAR, MICHELLE$907,203
2021-11-10Mortgage satisfied — from ALL BLUE HURON, LLC to MIDFIRST BANK
2021-10-29Agreement $3,200,000 — from SIGNORE, CLAIRE SCHWEGEL DEL SIGNORE; SIGNORE, ANTHONY DEL to ''MERS'' MORTGAGE ELECTRONIC REGISTRATIO; TD BANK, N.A.$3,200,000
2021-10-22Sold for $907,203$907,203
2021-10-18Mortgage satisfied — from ALL BLUE HURON, LLC to MIDFIRST BANK
2021-10-18Mortgage satisfied — from ALL BLUE HURON, LLC to MIDFIRST BANK
2021-10-18PAT — from KOTKIN, DEBORAH to THE BOARD OF MANAGERS OF 139 HURON CONDO; ALL BLUE HURON, LLC
2021-10-18Mortgage satisfied — from ALL BLUE HURON, LLC to MIDFIRST BANK
2021-10-18Deed $870,000 — from ALL BLUE HURON, LLC to KOTKIN, DEBORAH$870,000
2021-10-18Mortgage satisfied — from ALL BLUE HURON, LLC to MIDFIRST BANK
2021-10-18Mortgage satisfied — from ALL BLUE HURON, LLC to MIDFIRST BANK
2021-10-18Mortgage satisfied — from ALL BLUE HURON, LLC to MIDFIRST BANK
2021-10-15Mortgage assigned — from MIDFIRST BANK to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; TD BANK, NA
2021-10-15PREL — from MIDFIRST BANK to ALL BLUE HURON, LLC
2021-10-15Agreement $2,439,000 — from ALL BLUE HURON, LLC to MIDFIRST BANK$2,439,000
2021-10-15Agreement $2,439,000 — from ALL BLUE HURON, LLC to MIDFIRST BANK$2,439,000
2021-10-14PAT — from DEL SIGNORE, ANTHONY; DEL SIGNORE, CLAIRE SCHWEGEL to ALL BLUE HURON, LLC
2021-10-14Deed $3,200,000 — from ALL BLUE HURON, LLC to DEL SIGNORE, CLAIRE SCHWEGEL; DEL SIGNORE, ANTHONY$3,200,000
2021-10-14Mortgage $121,000 — from DEL SIGNORE, ANTHONY; DEL SIGNORE, CLAIRE SCHWEGEL to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; TD BANK, N.A.$121,000
2021-10-07PREL — from ALL BLUE HURON, LLC to MIDFIRST BANK
2021-10-05Agreement $3,305,813 — from MIDFIRST BANK to ALL BLUE HURON, LLC$3,305,813
2021-10-05Agreement $3,305,813 — from MIDFIRST BANK to ALL BLUE HURON, LLC$3,305,813
2021-10-05Agreement $3,305,813 — from MIDFIRST BANK to ALL BLUE HURON, LLC$3,305,813
2021-10-05Agreement $3,305,813 — from MIDFIRST BANK to ALL BLUE HURON, LLC$3,305,813
2021-10-05PAT — from MAO, YI-SHAN to ALL BLUE HURON, LLC; THE BOARD OF MANAGERS OF 139 HURON CONDO
2021-10-05Agreement $475,000 — from MAO, YI-SHAN to MERS$475,000
2021-10-05Deed $950,000 — from ALL BLUE HURON, LLC to MAO, YI-SHAN$950,000
2021-10-05Mortgage assigned — from MIDFIRST BANK to MERS
2021-10-05Mortgage $475,000 — from ALL BLUE HURON, LLC to MIDFIRST BANK$475,000
2021-10-05Agreement $3,305,813 — from MIDFIRST BANK to ALL BLUE HURON, LLC$3,305,813
2021-10-05Agreement $3,305,813 — from MIDFIRST BANK to ALL BLUE HURON, LLC$3,305,813
2021-10-05Agreement $3,305,813 — from MIDFIRST BANK to ALL BLUE HURON, LLC$3,305,813
2021-10-05Agreement $3,305,813 — from MIDFIRST BANK to ALL BLUE HURON, LLC$3,305,813
2021-10-05PREL — from MIDFIRST BANK to ALL BLUE HURON, LLC
2021-09-30Sold for $870,000$870,000
2021-09-27Sold for $3,200,000$3,200,000
2021-09-21Certificate of occupancy Renewal Without Change
2021-09-10SUBM — from ALL BLUE HURON, LLC to MIDFIRST BANK
2021-09-10SUBM — from ALL BLUE HURON, LLC to MIDFIRST BANK
2021-09-10PAT — from PW BATH HAUS LLC to THE BOARD OF MANAGERS OF 139 HURON CONDO
2021-09-10SUBM — from ALL BLUE HURON, LLC to MIDFIRST BANK
2021-09-10SUBM — from ALL BLUE HURON, LLC to MIDFIRST BANK
2021-09-10SUBM — from ALL BLUE HURON, LLC to MIDFIRST BANK
2021-09-10SUBM — from ALL BLUE HURON, LLC to MIDFIRST BANK
2021-09-10Deed $3,275,000 — from ALL BLUE HURON, LLC to PW BATH HAUS LLC$3,275,000
2021-09-10SUBM — from ALL BLUE HURON, LLC to MIDFIRST BANK
2021-09-10SUBM — from ALL BLUE HURON, LLC to MIDFIRST BANK
2021-09-10SUBM — from ALL BLUE HURON, LLC to MIDFIRST BANK
2021-09-01Sold for $950,000$950,000
2021-08-31Sold for $3,275,000$3,275,000
2021-08-17MAPS — from 139 HURON CONDOMINIUM
2021-08-17MAPS — from 139 HURON CONDOMINIUM
2021-08-17CDEC — from ALL BLUE HURON, LLC
2021-08-17CDEC — from ALL BLUE HURON, LLC
2021-08-17MAPS — from 139 HURON CONDOMINIUM
2021-08-17CDEC — from ALL BLUE HURON, LLC
2021-08-17MAPS — from 139 HURON CONDOMINIUM
2021-08-17MAPS — from 139 HURON CONDOMINIUM
2021-08-17CDEC — from ALL BLUE HURON, LLC
2021-08-17MAPS — from 139 HURON CONDOMINIUM
2021-08-17CDEC — from ALL BLUE HURON, LLC
2021-08-17MAPS — from 139 HURON CONDOMINIUM
2021-08-17MAPS — from 139 HURON CONDOMINIUM
2021-08-17CDEC — from ALL BLUE HURON, LLC
2021-08-17CDEC — from ALL BLUE HURON, LLC
2021-08-17MAPS — from 139 HURON CONDOMINIUM
2021-08-17CDEC — from ALL BLUE HURON, LLC
2021-08-17CDEC — from ALL BLUE HURON, LLC
2021-06-18Certificate of occupancy Renewal Without Change
2021-05-24FDNY inspection (ALT)
2021-05-17Job filed: APPLICATION FILED FOR CONDOMINIUM SUBDIVISION. TAX LOT 56 TO BE SUBDIVIDED INTO 9 NEW CONDO TAX LOTS: LOTS 1101-1109. NO CHANGE TO ZONING.NO CHANGE TO
2021-05-17Job filed: APPLICATION FILED FOR CONDOMINIUM SUBDIVISION. TAX LOT 56 TO BE SUBDIVIDED INTO 9 NEW CONDO TAX LOTS: LOTS 1101-1109. NO CHANGE TO ZONING.NO CHANGE TO
2021-05-07Certificate of occupancy Initial
2020
2020-12-29Permit PL — ISSUED
2020-10-21Permit AL — ISSUED
2020-10-19Permit EW — ISSUED
2020-10-19Permit EQ — ISSUED
2020-09-02Permit EW — ISSUED
2020-08-20Job filed: THIS APPLICATION IS FILED FOR A TEMPORARY USE PERMIT FOR A SALES OFFICE INCLUDING MODEL APARTMENTS PURSUANT TO SECTION AC-28-111 AND BUILDING BULLETIN$1,000
2020-05-28Permit EQ — ISSUED
2020-05-13Permit Supported Scaffold — Signed-off
2020-04-14DOB complaint, category ?
2020-04-10FDNY inspection (ALT)
2020-04-01Permit Sidewalk Shed — Signed-off
2020-03-04DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2020-01-09Permit EW — ISSUED
2019
2019-12-09ECB CLASS - 1 violation: FAILURE TO PROVIDE SAFETY TRAINING AT JOB SITE.AT THE TIME OF INSPECTION ON AN ACTIVE JOBSITE OF A 4 STORY BUILDING UNDER ALTERATI$6,250
2019-12-05DOB complaint, category ?
2019-12-02ECB CLASS - 1 violation: 3309 PROTECTION OF ADJOINING PROPERTIES @THE TIME OF INSPECTION @4 STYALT BUILDING I OBSERVED UNFINISHED BRICK WORK @EXP1 &EXP2 CO$2,530
2019-11-21DOB complaint, category ?
2019-11-21ECB CLASS - 2 violation: BC3307.6.5.10.1=FAILURE TO PROVIDE DAILY INSPECTION LOG REPORT FOR SIDEWLAK SHED AT TIME OF INSPECTION ACTIEV JOBSIET AT ROOF LEVE$1,280
2019-10-28FDNY inspection (ALT)
2019-10-21Permit EW — RE-ISSUED
2019-10-21Permit EW — RE-ISSUED
2019-10-18Permit FO — ISSUED
2019-10-18Permit EQ — ISSUED
2019-10-18Permit FO — RE-ISSUED
2019-10-18Permit AL — RE-ISSUED
2019-10-18Permit PL — ISSUED
2019-09-14DOB complaint, category ?
2019-09-10Rodent inspection: Passed
2019-09-09FDNY inspection (ALT)
2019-08-26FDNY inspection (ALT)
2019-07-25DOB complaint, category ?
2019-07-25ECB CLASS - 1 violation: GUARD RAILS . AT THE TIME OF INSPECTION OBSERVED MISSING GUARDRAILS ON TOP WORKING DECK (ROOF OF 4TH)GUARDRAILS ALSO MISSING FOR$2,500
2019-07-25ECB CLASS - 1 violation: NO PERMIT FOR SCAFFOLD AT THE TIME OF MY INSPECTION OBSERVED SUPPORTEDSCAFFOLD IN ELEVTOR SHAFT.SCAFFOLD STARTING FROM BASEMENT TO$5,000
2019-07-25ECB CLASS - 1 violation: 3314.3.3 DRAWINGS FOR SCAFFOLD OVER 40 FT AT THE TIME OF INSPECTION OBSERVED SUPPORTED SCAFFOLD FROM BASEMENT TO BULKHEAD ASSEMB$625
2019-07-09DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019-07-09DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019-07-09DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019-07-06DOB complaint, category ?
2019-06-24Permit AL — ISSUED
2019-06-15DOB complaint, category ?
2019-06-03ECB CLASS - 1 violation: SEC. 3307.4.7 WORK OR STORAGE ZONES. AT TIME OF INSPECTION I OBSERVED AN ACTIVE CONSTRUCTION SITE W/EXTERIOR WORK OR PROGRESS,DURI$2,500
2019-05-30DOB complaint, category ?
2019-05-10Permit EQ — ISSUED
2019-04-30Permit Supported Scaffold — Signed-off
2019-04-29Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2019-04-29Job filed: INSTALLATION OF DEBRIS CHUTE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2019-04-18ECB CLASS - 2 violation: SEC. 3301.6 FAILURE TO PROVIDE DESIGN DRAWING. AT TIME OF INSPECTION I OBSERVED AN ACTIVE CONSTRUCTION SITE W/DEMOLITION & STEEL W$620
2019-04-18ECB CLASS - 2 violation: SEC. 3303.4 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. AT TIME OF INSPECTION I OBSERVED AN ACTIVE CONSTRU$620
2019-04-18ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVEDAMENDMENTS. AT THE TIME OF INSPECTION I OBSERVED AN ACTIVE C$620
2019-04-18ECB CLASS - 1 violation: SEC. 3301.2 GAPS/HOLES/OPENINGS. AT TIME OF INSPECTION I OBSERVED AN ACTIVE CONSTRUCTION SITE W/DEMOLITION & STEEL WORK ON PROGRES$2,500
2019-04-18ECB CLASS - 1 violation: BC3301.2/INADEQUATE GUARD RAILS.AT TIME OF INSPECTION I OBSERVED AN ACTIVE CONSTRUCTION SITE WITH DEMOLITION AND STEEL WORK ON PRO$2,500
2019-04-18ECB CLASS - 2 violation: INADEQUATE OVERHEAD PROTECTION. AT TIME OF INSPECTION I OBSERVED AN ACTIVE CONSTRUCTION SITE WITH DEMOLITION CMU WALLS AND STEEL$620
2019-04-18ECB CLASS - 1 violation: SEC. 3307.4.7 WORK OR STORAGE ZONES. AT TIME OF INSPECTION I OBSERVED AN ACTIBVE CONSTRUCTION SITE W/DEMOLITION & STEEL WORK ON PR$2,500
2019-04-18ECB CLASS - 2 violation: SEC. 3314.1 SCAFFOLD HAS NOT BEEN ERECTED & MAINTAINED IN A SAFE MANNER SO AS NOT TO ENDANGER PUBLIC & PROPERTY FROM FALLING MATER$620
2019-04-18ECB CLASS - 2 violation: CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM DUTIES PER CODE. AT TIMEOF INSPECTION I OBSERVED AN ACTIVE CONSTRUCTION SITE W/DEMOL$2,500
2019-04-16DOB complaint, category ?
2019-04-06ECB CLASS - 1 violation: WORK AFTER HOURS W/O VARIANCE PERMIT CONTRARY TO 28-105.12.5. AT THE TIME OF INSPECTION IT WAS OBSERVED THAT 3 WORKERS WAS AT JOB $1,250
2019-03-30DOB complaint, category ?
2019-03-29Permit Sidewalk Shed — Signed-off
2019-03-20DOB complaint, category ?
2019-03-08DOB complaint, category ?
2019-03-05Rodent inspection: Passed
2019-02-22Elevator permit: All work to comply with Chapter 30 of the NYC Building Code and AMSE A17.1 2005S, part 2,8,9 as modified by Appendix K of the NYC$156,000
2019-02-21Permit Sidewalk Shed — Signed-off
2019-02-20Job filed: INSTALLATION OF HEAVY-DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2019-01-08ECB CLASS - 2 violation: FAILURE TO PROVIDE APPROVED CONSTRUCTION DOCUMENTS. AL#321186499 IN ANENERGY COMPLIANCE INSPECTION,I OBSERVED CONSTRUCTION WORK W/
2019-01-07DOB complaint, category ?
2018
2018-10-24Permit PL — ISSUED
2018-10-18Permit FO — ISSUED
2018-10-18Permit EQ — ISSUED
2018-10-18Permit AL — RE-ISSUED
2018-10-18Permit FO — RE-ISSUED
2018-10-18Permit EW — ISSUED
2018-09-10Rodent inspection: Passed
2018-07-18DOB complaint, category ?
2018-07-11DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2018-06-26Permit AL — ISSUED
2018-05-30DOB complaint, category ?
2018-05-18Permit EW — ISSUED
2018-05-11Job filed: FILING MEANS AND METHODS APPLICATION FOR CELLAR WORK REMOVAL OF 1ST FLOOR ROOF, UPPER ROOF AND EXCAVATION IN CONJUNCTION WITH ALTERATION TYPE 1 APPLIC$1,000
2018-05-10Job filed: ERECT, MAINTAIN & DISMANTLE OVERHEAD PROTECTION NETTING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$5,000
2018-05-10Permit AL — ISSUED
2018-04-20DOB complaint, category ?
2018-04-20ECB CLASS - 1 violation: SEC. 3307.3.2 FAILURE TO PROVIDE REQUIRED LOT LINE CONSTRUCTION FENCE.AT THE TIME OF MY INSPECTION IT WAS OBSERVED AN ACTIVE CONST$2,500
2018-04-20ECB CLASS - 1 violation: MECHANICAL DEMOLITION W/O PLANS ON SITE. AT THE TIME OF MY INSPECTION IT WAS OBSERVED AN ACTIVE CONSTRUCTION SITE W/MECHANICAL DEM$625
2018-04-20ECB CLASS - 1 violation: TEMPORARY ELECTRICAL WORK W/O PERMIT. AT THE TIME OF MY INSPECTION IT WAS OBSERVED AN ACTIVE CONSTRUCTION SITE W/TEMPORARY ELECTRI$400
2018-04-20ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. AT THE TIME OF MY INSPECTION IT WAS OBSERVED AN$5,000
2018-04-20ECB CLASS - 1 violation: SEC. 3309.14 FAILURE TO PROTECT OR ADEQUATELY PROTECT ADJOINING PROPERTIES DURING CONSTRUCTION OR DEMOPLITION OPERATION.(WINDOWA P$625
2018-04-20ECB CLASS - 1 violation: SEC. 3301.7 DESIGN DRAWING REQUIRED BY THE PROVISION OF CHAPTER 33 OF NYC BC. AT THE TIME OF MY INSPECTION IT WAS OBSERVED AN ACTI$625
2018-04-20ECB CLASS - 1 violation: FAILURE TO PROVIDE REQUIRED NOTIFICATION PRIOR TO THE COMMENCEMENT OF DEMOLITION. AT THE TIME OF MY INSPECTION IT WAS OBSERVED THA
2018-04-20ECB CLASS - 1 violation: SEC. 3309.12 FAILURE TO PROTECT OR ADEQUATELY PROTECT ADJOINING PROPERTIES DURING CONSTRUCTION OR DEMOLITION OPERATION.(YARDS,DECK$1,250
2018-04-20ECB CLASS - 1 violation: CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM OUTLETS AS PER CODE. AT THE TIME OF MY INSPECTION IT WAS OBSERVED AN ACTIVE CONSTRUC$10,000
2018-04-20ECB CLASS - 1 violation: FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY CHAPTER 33. AT THE TIME OF MY INSPECTION IT WAS OBSERVED THAT ON A 4 STY$625
2018-04-19DOB complaint, category ?
2018-04-19DOB complaint, category ?
2018-04-19DOB complaint, category ?
2018-04-12Permit PL — ISSUED
2018-03-05Rodent inspection: Passed
2017
2017-12-12FDNY inspection (STRUC_INT_3)
2017-11-28Permit AL — ISSUED
2017-11-28Permit FO — ISSUED
2017-11-28Permit FO — ISSUED
2017-11-21Permit EQ — ISSUED
2017-10-10Job filed: FILING FOR A BUILDERS PAVEMENT PLAN IN CONJUNCTION WITH ALTERATION TYPE 1
2017-06-20DOB complaint, category ?
2017-05-16Job filed: INSTALLATION OF AUTOMATIC SMOKE/CO DETECTION & SPRINKLER FIRE ALARM SYSTEM.$17,000
2017-05-16Job filed: INSTALLATION OF AUTOMATIC SMOKE/CO DETECTION & SPRINKLER FIRE ALARM SYSTEM.$17,000
2017-05-02Job filed: FILING HEREWITH INSTALLATION OF NEW SPRINKLER SYSTEM$180,000
2017-05-02Job filed: FILING HEREWITH INSTALLATION OF NEW SPRINKLER SYSTEM$180,000
2017-04-07Job filed: MECHANICAL AND PLUMBING WORK ASSOCIATED WITH BUILDING CONVERSION.
2017-04-07Job filed: MECHANICAL AND PLUMBING WORK ASSOCIATED WITH BUILDING CONVERSION.
2017-04-07Job filed: MECHANICAL AND PLUMBING WORK ASSOCIATED WITH BUILDING CONVERSION.
2017-04-07Job filed: STRUCTURAL WORK ASSOCIATED WITH BUILDING CONVERSION.
2017-03-30Job filed: CONVERT BUILDING TO RESIDENTIAL AS PER PLANS.$5,242,300
2017-03-21Permit EW — ISSUED
2017-03-21Job filed: INTERIOR DEMOLITION INCLUDING REMOVAL OF EXISTING SLAB. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$6,500