The city's published records show little recorded distress here in the last three years. More recorded distress than 56% of 100+-unit residential buildings citywide. The citywide median for 100+-unit residential buildings is 3.7 penalty
points per 10 units; this building carries 5. In ZIP 11222, 66% of residential buildings hold an A and
5% grade D or F.
How grades work
this building
A
B
C
Among 4,677 100+-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
116 heat or hot-water complaints in the last three years (winter 2023–24: 10 · winter 2024–25: 31 · winter 2025–26: 71). Repeated winter clusters suggest a chronic heating problem.
10
’23–24
31
’24–25
71
’25–26
2 bedbug-infested unit(s) reported in filings over the last three years.
$1,250 in enforcement penalties imposed (ECB/OATH) in the last three years.
What 311 hears from this address
185 service requests in the last three years. Most common: Noise (77) · HEAT/HOT WATER (33) · Illegal Parking (17) · Residential Disposal Complaint (8) · UNSANITARY CONDITION (6) · Drinking Water (4).
Filed construction activity
$641,050 in permitted construction work filed since
2016 (13 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974 (2020)
Yes
Six or more residential units (554)
Yes
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. Buildings receiving 421-a or J-51 benefits are generally required to register their units as rent-stabilized for the duration of the benefit. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
WEST DEVELOPMENT B, LLC
Head officer
LIPA FRIEDMAN
Managing agent
HALCYON MANAGEMENT
Last registered
2026-07-10
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$154,397,000
$69,478,650
2026
$154,443,000
$69,499,350
2027
$162,457,000
$73,105,650
The city's market estimate has risen
5% between tax years 2025 and 2027.
Tax exemptions on the roll: 421A 25 YR NO CAP
Flood exposure
In the FEMA 1%-annual-chance floodplain (2015 preliminary flood
maps) — lenders typically require flood insurance here.
Hurricane evacuation zone 1 of 6 — zone 1 evacuates first.
In the city's stormwater flood map only under the extreme-storm
scenario (3.66 in/hr cloudburst with 2080 sea levels) — an Ida-scale event.
1 street-flooding or sewer-backup complaints at this address since
2025 (1 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Greenpoint Av — G · 0.4 mi straight-line (about a 10-minute walk) · station accessibility: full
Bus
Nearest boarding stop: Franklin St / Calyer St — B32 · 900 ft
Citi Bike
Calyer St & West St · 550 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
185 311 service requests from this address in the last three years — 33 of them about heat or hot water.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $88,623,000 on
2026-04-17 (lender: Wells Fargo Bank, National Association), covering 2 lots — the amount covers all of them. Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2026-04-17
Mortgage $88,623,000 — from WEST DEVELOPMENT B LLC; WEST DEVELOPMENT C LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
$88,623,000
2026-04-17
Agreement $333,873,000 — from WEST DEVELOPMENT B LLC; WEST DEVELOPMENT C LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
$333,873,000
2024-04-09
Mortgage $25,000,000 — from WEST DEVELOPMENT C LLC; WEST DEVELOPMENT B LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
$25,000,000
2020-01-13
Mortgage $32,697,282 — from WEST DEVELOPMENT C LLC; WEST DEVELOPMENT B LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
$32,697,282
2020-01-13
Mortgage $192,302,718 — from WEST DEVELOPMENT B LLC; WEST DEVELOPMENT C LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
$192,302,718
Ten-year activity
2001000
2017
2018
2019
2020
2021
2022
2023
2024
155
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
6
0
0
0
0
6
2018
13
8
0
0
0
21
2019
11
4
0
2
0
17
2020
17
3
0
21
0
41
2021
49
23
0
2
5
79
2022
25
15
0
2
7
49
2023
25
24
5
2
3
59
2024
9
11
98
7
1
126
2025
2
6
145
2
0
155
2026
14
0
101
19
3
137
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Mortgage assigned — from WELLS FARGO BANK, NATIONAL ASSOCIATION to FANNIE MAE
2026-04-17
Mortgage $88,623,000 — from WEST DEVELOPMENT B LLC; WEST DEVELOPMENT C LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2026-04-17
Agreement — from WELLS FARGO BANK, NATIONAL ASSOCIATION to DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK
2026-04-17
Agreement $333,873,000 — from WEST DEVELOPMENT B LLC; WEST DEVELOPMENT C LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2026-04-16
SMIS — from WEST DEVELOPMENT C LLC; WEST DEVELOPMENT C1 LLC; WEST DEVELOPMENT B LLC; M&H REALTY LLC
2026-04-16
SMIS — from M&H REALTY LLC; WEST DEVELOPMENT B LLC; WEST DEVELOPMENT C 1 LLC; WEST DEVELOPMENT A LLC;
2026-04-16
SMIS — from 27-41 WEST STREET HOMEOWNERS ASSOCIATION; NEW YORK CITY DEPTARTMENT OF PARKS & REC; CITY O
2026-04-16
SMIS — from WEST DEVELOPMENT C1 LLC; WEST DEVELOPMENT B LLC; M & H REALTY LLC; WEST DEVELOPMENT C LLC
2026-04-16
DECL — from WEST DEVELOPMENT B LLC; WEST DEVELOPMENT C to M&H REALTY LLC
2026-04-16
Mortgage assigned — from WELLS FARGO BANK, NATIONAL ASSOCIATION to WELLS FARGO BANK, NATIONAL ASSOCIATION
2026-04-16
Mortgage assigned — from WELLS FARGO BANK, NATIONAL ASSOCIATION to WELLS FARGO BANK, NATIONAL ASSOCIATION
2026-04-16
Mortgage assigned — from WELLS FARGO BANK, NATIONAL ASSOCIATION to WELLS FARGO BANK, NATIONAL ASSOCIATION
2026-04-16
SAGE — from M&H REALTY LLC to WEST DEVELOPMENT B LLC
2026-04-15
311: ELECTRIC — LIGHTING
2026-04-15
311: APPLIANCE — ELECTRIC/GAS RANGE
2026-04-15
311: GENERAL — CABINET
2026-04-15
311: PAINT/PLASTER — WALL
2026-04-15
Tenant complaint: GENERAL — CABINET
2026-04-15
Tenant complaint: PAINT/PLASTER — WALL
2026-04-15
Tenant complaint: ELECTRIC — LIGHTING
2026-04-15
Tenant complaint: APPLIANCE — ELECTRIC/GAS RANGE
2026-04-12
311: Noise — Noise: Boat(Engine,Music,Etc) (NR10)
2026-04-09
311: Residential Disposal Complaint — Waste Not Separated
2026-04-07
Deed — from M & H REALTY LLC to WEST DEVELOPMENT B LLC
2026-04-07
Deed — from WEST DEVELOPMENT B LLC to WEST DEVELOPMENT B LLC
2026-04-07
Deed — from WEST DEVELOPMENT B LLC to M & H REALTY LLC
2026-04-06
311: Noise - Residential — Banging/Pounding
2026-04-05
311: Noise - Residential — Banging/Pounding
2026-04-01
Job filed: MECHANICAL WORK TYPE FILED SUBSEQUENTLY IN CONJUNCTION WITH GENERAL CONSTRUCTION FILING #B01369258-I1
2026-04-01
Job filed: ALTERATION FOR PHYSICAL WORK IN CONJUNCTION WITH NB APPLICATION #320909996 INCLUDING INSTALLATION OF NON-BEARING PARTITIONS, FIXTURES, FINISHES & CASE
2026-04-01
Job filed: PLUMBING, SPRINKLER AND STANDPIPE WORK TYPES FILED SUBSEQUENTLY IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK FILED UNDER FILING B01369258-I1 FOR PROP
HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM
2026-02-25
HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 911, 9th STORY, 2nd APARTMENT FROM EAS
2026-04-01Job filed: MECHANICAL WORK TYPE FILED SUBSEQUENTLY IN CONJUNCTION WITH GENERAL CONSTRUCTION FILING #B01369258-I1$81,000
2026-04-01Job filed: ALTERATION FOR PHYSICAL WORK IN CONJUNCTION WITH NB APPLICATION #320909996 INCLUDING INSTALLATION OF NON-BEARING PARTITIONS, FIXTURES, FINISHES & CASE$378,150
2026-04-01Job filed: PLUMBING, SPRINKLER AND STANDPIPE WORK TYPES FILED SUBSEQUENTLY IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK FILED UNDER FILING B01369258-I1 FOR PROP$172,500
2026-02-28311: Illegal Parking — Blocked Bike Lane
2026-02-28311: Illegal Parking — Blocked Bike Lane
2026-02-25HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM
2026-02-25HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 911, 9th STORY, 2nd APARTMENT FROM EAS
2026-02-03Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-02-02311: DOOR/WINDOW — DOOR
2026-02-02311: HEAT/HOT WATER — APARTMENT ONLY
2026-02-02Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-02-02Tenant complaint: DOOR/WINDOW — DOOR
2026-02-01311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-01Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-31311: Residential Disposal Complaint — Waste Not Separated
2026-01-30311: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-30311: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-30Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-30Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-30HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM
2026-01-30HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE 2nd ROOM FROM NORTH LOCATED AT APT 326, 3rd STORY, 2nd APARTMENT FROM
2026-01-30HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM
2026-01-30HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE 1st ROOM FROM EAST LOCATED AT APT 2409, 24th STORY, 1st APARTMENT FROM
2026-01-30HPD class C: § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE 1st ROOM FROM EAST LOCATED AT APT 2409, 24th STORY, 1st APART
2026-01-30HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT
2026-01-28311: HEAT/HOT WATER — APARTMENT ONLY
2026-01-28311: HEAT/HOT WATER — APARTMENT ONLY
2026-01-28Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-01-28Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-01-27311: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-27311: HEAT/HOT WATER — APARTMENT ONLY
2026-01-27311: HEAT/HOT WATER — APARTMENT ONLY
2026-01-27311: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-27Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-27Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-01-27Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-01-27Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-26311: UNSANITARY CONDITION — MOLD
2026-01-26311: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-26Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-12-13Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-12-10311: HEAT/HOT WATER — APARTMENT ONLY
2025-12-10Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-12-07311: HEAT/HOT WATER — APARTMENT ONLY
2025-12-07Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-12-06HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR AT BOILER ROOM
2025-12-06HPD class C: § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 830, 8th STORY, 4th APARTMENT
2025-12-03Bedbug filing: 1 infested units
2025-12-03311: HEAT/HOT WATER — APARTMENT ONLY
2025-12-03Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-11-19Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-11-15HPD class C: § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1405, 14th STORY, 3rd APARTME
2025-11-15HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1405, 14th STORY, 3rd APARTMENT FROM E
2025-11-13311: HEAT/HOT WATER — APARTMENT ONLY
2025-11-13Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-11-10311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2025-11-07311: Residential Disposal Complaint — Waste Not Separated
2025-11-05311: Residential Disposal Complaint — Waste Not Separated
2025-10-31311: Water System — Dirty Water (WE)
2025-10-24311: HEAT/HOT WATER — ENTIRE BUILDING
2025-10-24Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-08-05HPD class B: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE FOYER LOCATED AT APT 2011, 20th
2025-08-05HPD class A: § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE MILDEW OFF THE GROUT, AT THE TILE JOINTS AND AROUND THE BATHTUB, IN TH
2025-08-05HPD class C: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE FOYER LOCATED AT APT 20
2025-08-03311: Smoking or Vaping — Allowed in Smoke Free Area
2025-05-20311: Smoking or Vaping — Allowed in Smoke Free Area
2025-04-05ECB CLASS - 1 violation: SUMMONS ISSUED FOR FAILURE TO PROVIDE UNOBSTRUCTED PASSAGEWAY DUE TO THE EXIT DOORS ON THE 7TH,8TH AND 9TH FLOORS OF STAIRWELL F L$1,250
2025-04-04HPD litigation: Heat and Hot Water
2025-04-04311: General Construction/Plumbing — Egress - Doors Locked/Blocked/Improper/No Secondary Means
2025-04-04DOB complaint, category ?
2025-03-17311: General Construction/Plumbing — Egress - Doors Locked/Blocked/Improper/No Secondary Means
2025-03-17DOB complaint, category ?
2025-03-12Job filed: SUBDIVISION APPLICATION FILED TO REAPPORTION LOTS 1,5,10,20,30,40,45,50. NO CHANGE TO USE, BULK, OCCUPANCY, AND EGRESS UNDER THIS APPLICATION.
2025-03-12Job filed: A1$100
2025-03-10DOB complaint, category ?
2025-03-07DOB complaint, category ?
2025-02-18DOB complaint, category ?
2025-02-16311: ELECTRIC — OUTLET/SWITCH
2025-02-16Tenant complaint: ELECTRIC — OUTLET/SWITCH
2025-02-02HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 315, 3rd STORY, 2nd APARTMENT FROM NOR
2025-02-02HPD class C: § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 315, 3rd STORY, 2nd APARTMENT
2025-01-30Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-01-30Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-01-26Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-01-25HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT CELLAR AT BOILER ROOM
2025-01-25HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3809, 38th STORY, 1st APARTMENT FROM E
2025-01-24Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-01-23Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-01-23Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-01-23Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-01-22Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-01-22Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-01-22Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-01-22Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-01-22Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-01-22HPD class C: § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE 2nd ROOM FROM NORTH LOCATED AT APT 315, 3rd STORY, 2nd APARTM
2025-01-22HPD class C: § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 615, 6th STORY, 2nd APARTMENT
2025-01-21Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-01-20Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-01-20Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-01-17Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-01-14Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-01-09Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-01-09Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-01-09Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-01-08Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-01-08Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-01-08Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-01-08Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-01-08Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-01-06Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2024
2024-12-08Tenant complaint: ELEVATOR — MAINTENANCE
2024-12-07Tenant complaint: SAFETY — FIRE ESCAPE
2024-12-05Tenant complaint: DOOR/WINDOW — DOOR
2024-12-05Tenant complaint: OUTSIDE BUILDING — SKYLIGHT
2024-12-05Tenant complaint: DOOR/WINDOW — DOOR
2024-12-05Tenant complaint: DOOR/WINDOW — DOOR
2024-12-05Tenant complaint: DOOR/WINDOW — DOOR
2024-12-05DOB complaint, category ?
2024-12-04DOB complaint, category ?
2024-12-02Bedbug filing: 1 infested units
2024-11-30311: Encampment — N/A
2024-11-30311: Encampment — N/A
2024-11-30311: Homeless Person Assistance
2024-11-25ECB CLASS - 1 violation: FAILURE TO MAINTAIN BUILDING: THE AWNING ABOVE THE FRONT ENTRANCE IS DEFECTIVE MISSING FASTENERS IN VARIOUS LOCATIONS AT 1ST FLOOR
2024-11-24DOB complaint, category ?
2024-11-23Tenant complaint: ELECTRIC — NO LIGHTING
2024-08-12HPD class B: § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING AT PUBLIC HALL, 9th STORY
2024-08-12HPD class A: § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT AT CEILING AT PUBLIC HALL, 9th STORY
2024-08-12HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT PLASTER AT CEILING AT PUBLIC HALL, 9th STORY
2024-08-12HPD class A: § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 9th STORY
2024-08-09Certificate of occupancy Renewal With Change
2024-05-13Certificate of occupancy Renewal With Change
2024-05-10311: New Tree Request — For One Address
2024-05-08PREL — from WEST DEVELOPMENT B LLC; WEST DEVELOPMENT C LLC to WELLS FARGO BANK NATIONAL ASOCIATION
2024-05-08PREL — from WEST DEVELOPMENT B LLC; WEST DEVELOPMENT C LLC to WELLS FARGO BANK NATIONAL ASSOCIATION
2024-04-28HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2024-04-27Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2024-04-08HPD class A: § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM
2024-04-08HPD class A: § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND
2024-04-08HPD class A: § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISS
2024-04-08HPD class A: § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON
2024-04-08HPD class A: § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES
2024-04-08HPD class A: § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPE
2024-04-08HPD class A: § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGE
2024-04-04Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2024-04-03Job filed: No Work
2024-04-02311: Street Condition — Blocked - Construction
2024-04-01Tenant complaint: PLUMBING — WATER SUPPLY
2024-04-01Tenant complaint: PLUMBING — WATER SUPPLY
2024-03-23Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2024-03-22Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2024-03-21Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2024-03-21Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2024-03-21HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 325, 3rd STORY, 2nd APARTMENT FROM SOU
2024-03-20Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2024-03-20Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2024-03-11Tenant complaint: PLUMBING — WATER SUPPLY
2024-03-07Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2024-02-27FDNY inspection (RISK)
2024-02-25Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2024-02-23Certificate of occupancy Renewal With Change
2024-02-02ZONE — from M&H REALTY DEVELOPERS; WEST DEVELOPMENT B LLC; WEST DEVELOPMENT C LLC; M & H REALTY LLC; W
2024-01-31Certificate of occupancy Renewal Without Change
2024-01-29SMIS — from M&H REALTY LLC; WEST DEVELOPMENT B LLC; WEST DEVELOPMENT C LLC; 27-41 WEST STREET HOMEOWNE
2024-01-17Elevator permit: Install 5 new Overhead Gearless Traction Passenger Elevators per ASME A17.1-2000/03, Part 2, Chapter 30, Appendix K. All inspectio$2,000,000
2023
2023-12-18Elevator permit: Install 5 new Overhead Gearless Traction Passenger Elevators per ASME A17.1-2000/03, Part 2, Chapter 30, Appendix K. All inspectio$2,000,000
2023-12-18311: Drinking Water — Illness Caused by Drinking Water
2023-12-16311: Drinking Water — Illness Caused by Drinking Water
2023-12-16311: Drinking Water — Illness Caused by Drinking Water
2023-12-16Tenant complaint: PLUMBING — WATER SUPPLY
2023-12-11Job filed: No Work
2023-12-05Bedbug filing: 0 infested units
2023-11-29Permit NB — ISSUED
2023-11-22Permit AL — ISSUED
2023-11-01Permit AL — ISSUED
2023-10-31Certificate of occupancy Renewal With Change
2023-10-10Certificate of occupancy Renewal With Change
2023-09-13Certificate of occupancy Renewal With Change
2023-09-07DOB complaint, category ?
2023-08-24Permit Construction Fence — Signed-off
2023-08-23Permit FO — ISSUED
2023-08-23Permit NB — ISSUED
2023-08-23Permit FO — ISSUED
2023-08-21Permit NB — ISSUED
2023-08-14FDNY inspection (STRUC_INT_3)
2023-08-14FDNY inspection (STRUC_INT_6)
2023-07-19Job filed: No Work
2023-07-12DOB complaint, category ?
2023-07-12ECB CLASS - 1 violation: AT THE TIME OF INSPECTION DUE TO AN INCIDENT REPORTED, I MET WITH MR. JASON FALQUCEE, ONSITE WHO HAS BEEN AT 60 WHARF DRIVE SINCE $625
2023-07-12Permit NB — ISSUED
2023-07-12Permit FO — ISSUED
2023-07-12Permit FO — ISSUED
2023-07-07Certificate of occupancy Initial
2023-06-27DOB complaint, category ?
2023-06-27Job filed: No Work
2023-06-27Job filed: No Work
2023-06-27Job filed: No Work
2023-06-16Elevator permit: Install new Dual Jack Cantilevered Holeless Hydraulic Passenger Elevators per ASME A17.1-2000/03, Part 3, Chapter 30 of 2014 BC, A$120,000
2023-06-14Elevator permit: Install 2 new Overhead Gearless Traction Passenger Elevators per ASME A17.1-2000/03, Part 2, Chapter 30, Appendix K. All inspectio$500,000
2023-06-13Agreement — from WEST DEVELOPMENT B LLC; WEST DEVELOPMENT C LLC to M&H REALTY LLC
2023-06-13Agreement — from WEST DEVELOPMENT C LLC; WEST DEVELOPMENT B LLC to THE CITY OF NEW YORK DEPARTMENT OF HOUSI
2023-06-13DOB complaint, category ?
2023-06-13ECB CLASS - 1 violation: AT THE TIME OF MY INSPECTION OF A PROPOSED 40 STORY NEW BUILDING RESPONDING TO COMPLAINT OBSERVED SUPPORTED SCAFFOLDS IN DIFFERENT$625
2023-05-22DOB complaint, category ?
2023-05-19DOB complaint, category ?
2023-05-17DOB complaint, category ?
2023-05-16DOB complaint, category ?
2023-05-16ECB CLASS - 2 violation: AT THE TIME OF MY INSPECTION JOB SITE , I OBSERVED A SUPPORTED SCAFFOLD 12 FEET HIGH AT EXPOSURE 1 NOT MAINTAINED AS REQUIRED, MIS
2023-05-16ECB CLASS - 1 violation: AT THE TIME OF MY INSPECTION OF A 40 STORY NEW BUILDING , CURRENTLY AT BULK HEAD LEVEL AND FULLY ENCLOSED, WHILE RESPONDING TO A I$2,500
2023-05-16ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. OBSERVED ONE 2X10 PLANK FOOTING WHEN APPROVED$2,500
2023-04-18Job filed: SPRINKLER AND STANDPIPE FILED IN CONJUNCTION WITH NB JOB #320909996$200
2023-03-15Job filed: Installation of boilers in conjunction with nb job number 3209099996$100
2023-02-28DOB complaint, category ?
2023-02-24ECB CLASS - 1 violation: FAILURE TO NOTIFY THE DEPT OF AN ACCIDENT OR INCIDENT THAT RESULTED INA FATALITY OR INJURY.NOT A WORKER WAS HURT HIS FINGER WHEN I
2023-02-03DOB complaint, category ?
2023-02-01Permit Boiler Equipment — Signed-off
2023-01-31Permit Standpipe — Signed-off
2023-01-27ECB CLASS - 1 violation: FAILED TO SUBMIT REPORT OF DEPT OF AN INCIDENT THAT RESULTED IN A FATALITY OR INJURY.NOTE WORKER SLIPPED/FELL INJURED.TAKEN TO OFF$2,500
2023-01-24DOB complaint, category ?
2023-01-24ECB CLASS - 2 violation: BC 3314.1 MISCELLANEOUS VIOLATIONS. FAILURE TO MAINTAIN TEMPORARY CONSTRUCTION EQUIPMENT. AT TIME OF INSPECTION ON AN ACTIVE JOBSI
2023-01-24ECB CLASS - 1 violation: FAILURE TO COMMUNICATE REQUIRED INFORMATION TO WORKERS DURING PRE-SHIFT SAFETY MEETING RESPONDING TO INCIDENT WHERE WORKER INJURED
2023-01-19ECB CLASS - 2 violation: FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS. RESPONDING A COMPLAINT OBSERVED:SWINGING GATE NO$500
2023-01-18DOB complaint, category ?
2023-01-10Permit PL — ISSUED
2022
2022-12-29Permit Construction Fence — Signed-off
2022-12-28Job filed: INSTALLATION OF OVERHEAD PROTECTION FOR WORKER ACCESS DURING CONSTRUCTION,OVERHEAD PROTECTION SHALL COMPLIES WITH CHAPTER 33 OF THE 2014 NYC BUILDING $1,000
2022-12-28Permit Construction Fence — Permit Issued
2022-12-23DOB complaint, category ?
2022-12-23ECB CLASS - 1 violation: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. ATTIME OF INSPECTION DUE TO AN INCIDENT OF A WORKER SLIP AND F$625
2022-12-15Permit General Construction — Signed-off
2022-12-14Job filed: Alteration filed for partial demo & construction of a leasing office as per plans. No change of bulk, use, egress, or occupancy. Sign off to indicate $100
2022-12-12Job filed: No Work
2022-12-12Job filed: No Work
2022-12-12Job filed: No Work
2022-12-12Job filed: No Work
2022-12-08DOB complaint, category ?
2022-12-08ECB CLASS - 1 violation: FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION-NO GUARD RAILS.AT TIME OF INSPECTION AT 40 STORY
2022-12-01DOB complaint, category ?
2022-12-01ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. OBSERVED SUSPENDED SCAFFOLDING AT EXPOSURE 1
2022-11-15Permit Structural — Signed-off
2022-11-08Job filed: TENANT PROTECTION PLANS (TPP) FILED IN CONJUCTION WITH NEW BUILDING APPLICATION NUMBER 320909996$1,000
2022-10-28Permit Boiler Equipment — Signed-off
2022-09-22Permit Protection and Mechanical Methods — Signed-off
2022-09-22Permit Protection and Mechanical Methods — Signed-off
2022-09-22Permit Protection and Mechanical Methods — Signed-off
2022-09-15Permit NB — ISSUED
2022-09-15Permit FO — ISSUED
2022-09-15Permit FO — ISSUED
2022-09-08Elevator permit: Install 2 new Overhead Gearless Traction Passenger Elevators per ASME A17.1-2000/03, Part 2, Chapter 30, Appendix K. All inspectio$500,000
2022-09-08Elevator permit: Install 5 new Overhead Gearless Traction Passenger Elevators per ASME A17.1-2000/03, Part 2, Chapter 30, Appendix K. All inspectio$2,000,000
2022-08-24Permit Sprinklers — Signed-off
2022-08-24Permit Standpipe — Signed-off
2022-07-19Elevator permit: INSTALL NEW DUAL JACK HOLELESS PASSENGER ELEVATOR PER ASME A.17.1-2000/03, PART 3, CHAPTER 30, APPENDIX K. PERFORM NECESSARY TESTS$175,000
2022-07-19Elevator permit: INSTALL NEW DUAL JACK HOLELESS PASSENGER ELEVATOR PER ASME A.17.1-2000/03, PART 3, CHAPTER 30, APPENDIX K. PERFORM NECESSARY TESTS$120,000
2022-07-19Elevator permit: Install new Dual Jack Cantilevered Holeless Hydraulic Passenger Elevators per ASME A17.1-2000/03, Part 3, Chapter 30 of 2014 BC, A$120,000
2022-06-16Permit Supported Scaffold — Signed-off
2022-04-19CERT — from RIVERSIDE ABSTRACT LLC
2022-04-19SMIS — from WEST DEVELOPMENT B LLC; M&H REALTY DEVELOPERS; WEST DEVELOPMENT A LLC; M&H REALTY LLC; WES
2022-03-11DOB complaint, category ?
2022-03-04Permit EQ — ISSUED
2022-03-04Permit EQ — ISSUED
2022-02-16Elevator permit: INSTALLATION OF A TEMPORARY PERSONNEL MATERIAL DUAL HOIST CARS (PM2) AS PER PLANS IN CONJUNCTION WITH INSTALLATION AND TESTS AS PE$20,000
2022-02-08DOB complaint, category ?
2022-02-08ECB CLASS - 2 violation: WORKING NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENT.AT THE TIME OF INSPECTION PROPOSED 40 STORIES I OBSERVED STRUCTURAL DD APPR$625
2022-02-04Permit Standpipe — Signed-off
2022-02-01DOB complaint, category ?
2022-02-01ECB CLASS - 1 violation: BC3308.6 ALTERNATE SYSTEM NOT MAINTAINED AS REQUIRED.AT TIME OF INSPECTION OF 40 STORY NB CURRENTLY AT ROOF LEVEL ACTIVE JOBSITE O
2022-01-31DOB complaint, category ?
2022-01-24DOB complaint, category ?
2022-01-24ECB CLASS - 1 violation: BC3303.6 ESCAPE HATCH.NOTE:AT TIME OF INSPECTION OF 40 STORY NEW BUILDING CONSTRUCTION WORK IN PROGRESS OBSERVED 40 FLOOR BEING PO$625
2022-01-24ECB CLASS - 1 violation: FAILURE TO MAINTAIN AND INSTITUTE SAFETY MEASURES.NOTE:RESPONDING TO INCIDENT REPORTED BY SITE SAFETY MANAGER MR ISUF SHEHY WAS OF
2022-01-14Permit PL — ISSUED
2022-01-06Elevator permit: INSTALLATION OF A TEMPORARY PERSONNEL MATERIAL DUAL HOIST CARS (PM1) AS PER PLANS IN CONJUNCTION WITH INSTALLATION AND TESTS AS PE$20,000
2021
2021-12-23Permit Construction Fence — Signed-off
2021-12-21Job filed: Moveable floor system to be installed at the 10th floor level.$100
2021-12-20Permit Construction Fence — Permit Issued
2021-12-14Permit EQ — ISSUED
2021-12-01Job filed: Installation of boilers in conjunction with nb job number 3209099996$100
2021-11-23Permit EQ — ISSUED
2021-11-10DOB complaint, category ?
2021-11-10ECB CLASS - 1 violation: PRESHIFT SAFETY MEETING CONTENT NOTE:AT THE TIME OF MY INSPECTION OF A40 STORY BUILDING AT 26TH FLOOR LEVEL UNDER CONSTRUCTION.I O
2021-10-20DOB complaint, category ?
2021-10-12Permit FO — ISSUED
2021-10-12Permit FO — ISSUED
2021-10-12Permit NB — ISSUED
2021-10-04DOB complaint, category ?
2021-09-23Permit Protection and Mechanical Methods — Signed-off
2021-09-23Permit Protection and Mechanical Methods — Signed-off
2021-09-23Permit Protection and Mechanical Methods — Signed-off
2021-09-17Job filed: INSTALLATION OF OVERHEAD PROTECTION FOR EXISTING CONTAINER PROTECTION ON SITE DURING CONSTRUCTION,OVERHEAD PROTECTION SHALL COMPLIES WITH CHAPTER 33 O$1,000
2021-09-17Job filed: INSTALLATION OF LOADING DOCK/RAMP FOR WORKER ACCESS DURING NEW BUILDING CONSTRUCTION, LOADING DOCK/RAMP SHALL COMPLIES WITH CHAPTER 33 OF THE 2014 NYC$1,000
2021-09-17Job filed: INSTALLATION OF OVERHEAD PROTECTION FOR WORKER ACCESS DURING CONSTRUCTION,OVERHEAD PROTECTION SHALL COMPLIES WITH CHAPTER 33 OF THE 2014 NYC BUILDING $1,000
2021-09-13Permit NB — ISSUED
2021-09-02DOB complaint, category ?
2021-08-30Permit NB — RE-ISSUED
2021-08-27Permit Sprinklers — Signed-off
2021-08-27Permit Standpipe — Signed-off
2021-08-26ECB CLASS - 1 violation: FAILURE TO INSTITUTE&MAINTAIN SAFETY MEASURES&TEMP CONST EQUIPMENT NOTE:ATOI OF PROPOSED 40STYNB,ACTIVE JOBSITE W/REBARS OPERATION
2021-08-26ECB CLASS - 1 violation: FAILURE TO COMMUNICATE REQUIRED INFO DURING SITESAFETY ORIENTATION OR REFRESHER NOTE:ATOI OF PROPOSED 40STYNB@19FL LEVEL IN RESPON
2021-08-26ECB CLASS - 1 violation: 3310-02G CONCRETE SAFETY MANAGER NOTE:ATOI OF PROPOSED 40STYNB@19FL LEVEL,CONST WORK IN PROGRESS.I OBSERVED CONCRETE SAFETY MANAGE$2,500
2021-08-26ECB CLASS - 1 violation: WORK DOESNT CONFORM TO APPROVED CONST DOCS &/OR APPROVED AMENDMENTS NOTE ATOI OF PROPOSED 40STYNB@19FL LEVEL,I OBSERVED SCREEN TYP$625
2021-08-26ECB CLASS - 1 violation: FAILURE TO INSTITUTE&MAINTAIN SAFETY MEASURES&TEMP CONST EQUIPMENT NOTE:ATOI OF PROPOSED 40STYNB,ACTIVE JOBSITE W/FORM WORK&REBARS
2021-08-26ECB CLASS - 1 violation: BC3308.9.3 INSPS NOTE:ATOI OF PROPOSED 40STYNB@19FL LEVEL,I OBSERVED COCOON SYSTEM IN PLACE ENCLOSING LEVEL 15-19,UPON REQUEST FOR$625
2021-08-25DOB complaint, category ?
2021-08-11ECB CLASS - 1 violation: FAILURE TO NOTIFY THE DEPARTMENT OF AN ACCIDENT/INCIDENT THAT RESULTEDIN A FATALITY OR AN INJURY.NOTE A WORKER SLIPPED AND HIT A P
2021-07-29Elevator permit: Install 2 new Overhead Gearless Traction Passenger Elevators per ASME A17.1-2000/03, Part 2, Chapter 30, Appendix K. All inspectio$500,000
2021-07-29Elevator permit: Install 2 new Overhead Gearless Traction Passenger Elevators per ASME A17.1-2000/03, Part 2, Chapter 30, Appendix K. All inspectio$500,000
2021-07-28Elevator permit: Install 5 new Overhead Gearless Traction Passenger Elevators per ASME A17.1-2000/03, Part 2, Chapter 30, Appendix K. All inspectio$2,000,000
2021-07-16DOB complaint, category ?
2021-07-16ECB CLASS - 1 violation: BC3320.7 POWER BUGGIES RESPONSIBILITIES OF EMPLOYERS&WORKERS EMPLOYERS&WORKERS SHALL HAVE FOLLOWING RESPONSIBILITIES REGARDING POW$625
2021-07-15DOB complaint, category ?
2021-07-15ECB CLASS - 1 violation: FAILURE TO NOTIFY THE DEPARTMENT OF BUILDING OF AN ACCCIDENT/INCIDENT THAT RESULTED IN A FATALITY OR AN INJURY.NOTE:A WORKER HIT H
2021-07-12Permit Supported Scaffold — Signed-off
2021-07-09Job filed: INSTALLATION OF TEMPORARY BAKERS SCAFFOLD AS PER DRAWINGS. BAKERS SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRE$2,000
2021-06-25DOB complaint, category ?
2021-06-25ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS.NOTE AT TIME OF MY INSPECTION OF A 40 STORY NE$625
2021-06-02DOB complaint, category ?
2021-06-02DOB complaint, category ?
2021-06-01ECB CLASS - 1 violation: FAILURE TO MAINTAIN A RECORD OF ORIENTRATION PREFORMED AT JOB SITE ADEQUATELY-LOGS MISSING EMERGENCY CONTACT INFORMATIONS.NOTE:AT
2021-05-13Job filed: INSTALLATION AND USE OF TEMPORARY LOADING PLATFORM AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2021-05-12Permit EQ — ISSUED
2021-05-12Permit EQ — ISSUED
2021-05-12Permit EQ — ISSUED
2021-05-06Job filed: INSTALLATION OF OVERHEAD PROTECTION FOR WORKER ACCESS AND EXISTING CONTAINER PROTECTION ON SITE DURING CONSTRUCTION,OVERHEAD PROTECTION SHALL COMPLIES
2021-05-06Job filed: INSTALLATION OF LOADING DOCK/RAMP FOR WORKER ACCESS DURING NEW BUILDING CONSTRUCTION, LOADING DOCK/RAMP SHALL COMPLIES WITH CHAPTER 33 OF THE 2014 NYC
2021-05-06Job filed: INSTALLATION OF OVERHEAD PROTECTION FOR WORKER ACCESS DURING CONSTRUCTION,OVERHEAD PROTECTION SHALL COMPLIES WITH CHAPTER 33 OF THE 2014 NYC BUILDING
2021-05-06Job filed: INSTALLATION OF OVERHEAD PROTECTION FOR WORKER ACCESS DURING CONSTRUCTION,OVERHEAD PROTECTION SHALL COMPLIES WITH CHAPTER 33 OF THE 2014 NYC BUILDING
2021-05-06Job filed: INSTALLATION OF LOADING DOCK/RAMP FOR WORKER ACCESS DURING NEW BUILDING CONSTRUCTION, LOADING DOCK/RAMP SHALL COMPLIES WITH CHAPTER 33 OF THE 2014 NYC
2021-04-22Elevator permit: INSTALLATION OF A TEMPORARY PERSONNEL MATERIAL DUAL HOIST CARS (PM2) AS PER PLANS IN CONJUNCTION WITH INSTALLATION AND TESTS AS PE$20,000
2021-04-21Permit EQ — ISSUED
2021-03-12Permit EQ — ISSUED
2021-03-11Job filed: INSTALLATION OF DUAL TEMPORARY PERSONAL/MATERIAL HOIST (PM2) FOR WORKER ACCESS DURING CONSTRUCTION,DUAL TEMPORARY PERSONAL/MATERIAL HOIST COMPLIES WIT
2021-03-11Job filed: INSTALLATION OF DUAL TEMPORARY PERSONAL/MATERIAL HOIST (PM2) FOR WORKER ACCESS DURING CONSTRUCTION,DUAL TEMPORARY PERSONAL/MATERIAL HOIST COMPLIES WIT
2021-03-11Permit NB — RE-ISSUED
2021-03-11Permit FO — ISSUED
2021-03-11Permit FO — ISSUED
2021-03-09DOB complaint, category ?
2021-03-09Permit EQ — ISSUED
2021-03-08Elevator permit: INSTALLATION OF A TEMPORARY PERSONNEL MATERIAL DUAL HOIST CARS (PM1) AS PER PLANS IN CONJUNCTION WITH INSTALLATION AND TESTS AS PE$20,000
2021-03-08Job filed: INSTALLATION OF DUAL TEMPORARY PERSONAL/MATERIAL HOIST (PM1) FOR WORKER ACCESS DURING CONSTRUCTION,DUAL TEMPORARY PERSONAL/MATERIAL HOIST COMPLIES WIT
2021-03-08Job filed: INSTALLATION OF DUAL TEMPORARY PERSONAL/MATERIAL HOIST (PM1) FOR WORKER ACCESS DURING CONSTRUCTION,DUAL TEMPORARY PERSONAL/MATERIAL HOIST COMPLIES WIT
2021-02-08Permit Standpipe — Signed-off
2021-01-25Permit NB — ISSUED
2021-01-25Permit PL — ISSUED
2021-01-13SAGE — from WEST DEVELOPMENT B LLC; WEST DEVELOPMENT C LLC to THE CITY OF NEW YORK
2021-01-13Agreement — from WELLS FARGO BANK, N.A. to THE CITY OF NEW YORK
2021-01-08Permit EQ — ISSUED
2021-01-07Job filed: INSTALLATION AND USE OF INTERIOR PLATFORM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2021-01-07Job filed: INSTALLATION AND USE OF INTERIOR PLATFORM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2021-01-07Job filed: INSTALLATION AND USE OF INTERIOR PLATFORM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2021-01-06Job filed: INSTALLATION AND USE OF ALTERNATE PROTECTION SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2021-01-06Job filed: INSTALLATION AND USE OF ALTERNATE PROTECTION SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2020
2020-12-21Permit Construction Fence — Signed-off
2020-12-21Permit Construction Fence — Permit Issued
2020-12-09Permit EQ — ISSUED
2020-11-04Permit Construction Fence — Signed-off
2020-11-04Permit Construction Fence — Permit Issued
2020-09-21Job filed: CONCRETE PLACING BOOM$1,000
2020-09-11Permit Construction Fence — Permit Issued
2020-09-10Permit Construction Fence — Signed-off
2020-09-08Permit FO — ISSUED
2020-09-08Permit FO — ISSUED
2020-08-04CERT — from RIVERSIDE ABSTRACT LLC
2020-08-04ZONE — from WEST DEVELOPMENT B LLC
2020-07-30SMIS — from WEST DEVELOPMENT B LLC; M & H REALTY LLC; WEST DEVELOPMENT C LLC
2020-07-30SMIS — from WEST DEVELOPMENT B LLC; NEW YORK CITY DEPARTMENT OF PARKS & RECR; WEST DEVELOPMENT C LLC;
2020-07-07SMIS — from WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-07SMIS — from STEWART TITLE INSURANCE COMPANY
2020-07-07SMIS — from WEST DEVELOPMENT B LLC; M & H REALTY LLC; NEW YORK CITY DEPARTMENT OF PARKS & RECR; WEST D
2020-07-07SMIS — from WEST DEVELOPMENT C LLC; WEST DEVELOPMENT B LLC; M & H REALTY LLC
2020-07-07EASE — from M&H REALTY LLC to WEST DEVELOPMENT C LLC; WEST DEVELOPMENT B LLC
2020-06-30Permit FO — ISSUED
2020-06-30Permit FO — ISSUED
2020-06-26Permit PL — ISSUED
2020-06-09CORRD — from M&H REALTY LLC to WEST DEVELOPMENT B LLC
2020-06-02Job filed: Application Herewith filed for Temporary Standpipe in conjunction with NB job number 320909996$100
2020-05-11DOB complaint, category ?
2020-04-22SMIS — from WEST DEVELOPMENT C, LLC; WEST DEVELOPMENT B, LLC; M&H REALTY LLC
2020-03-12FDNY inspection (CONSTR)
2020-02-12Job filed: SPRINKLER AND STANDPIPE FILED IN CONJUNCTION WITH NB JOB #320909996$200
2020-01-29Permit FO — ISSUED
2020-01-29Permit FO — ISSUED
2020-01-13SMIS — from WEST DEVELOPMENT B LLC; WEST DEVELOPMENT C LLC; M&H REALTY LLC
2020-01-13ZONE — from M&H REALTY LLC
2020-01-13CERT — from RIVERSIDE ABSTRACT LLC
2020-01-13Mortgage $32,697,282 — from WEST DEVELOPMENT C LLC; WEST DEVELOPMENT B LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION$32,697,282
2020-01-13Mortgage $192,302,718 — from WEST DEVELOPMENT B LLC; WEST DEVELOPMENT C LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION$192,302,718
2020-01-13EASE — from M&H REALTY LLC to WEST DEVELOPMENT C LLC; WEST DEVELOPMENT B LLC
2020-01-13EASE — from M&H REALTY LLC to WEST DEVELOPMENT C LLC; WEST DEVELOPMENT B LLC
2020-01-13Deed — from M&H REALTY LLC to WEST DEVELOPMENT B LLC
2020-01-13Agreement — from M&H REALTY LLC to WEST DEVELOPMENT B LLC; WEST DEVELOPMENT C LLC
2020-01-08FDNY inspection (CONSTR)
2020-01-06SMIS — from M & H REALTY LLC; M &H REALTY DEVELOPERS
2019
2019-12-26Deed transfer (nominal price)
2019-12-12Permit Construction Fence — Signed-off
2019-10-15EASE — from M & H REALTY LLC to NYS DEPARTMENT OF ENVIRONMENTAL CONSERVA
2019-09-18Permit FO — ISSUED
2019-09-18Permit FO — ISSUED
2019-09-17Permit Construction Fence — Permit Issued
2019-09-10Permit Construction Fence — Signed-off
2019-08-19FDNY inspection (CONSTR)
2019-08-14Job filed: INSTALLATION OF FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2019-07-23FDNY inspection (RISK)
2019-07-23Permit FO — ISSUED
2019-07-23Permit FO — ISSUED
2019-07-10Permit Construction Fence — Permit Issued
2019-07-03Permit FO — ISSUED
2019-07-03Permit FO — ISSUED
2019-04-01FDNY inspection (CONSTR)
2019-01-07FDNY inspection (CONSTR)
2018
2018-12-18Job filed: UNDERGROUND PLUMBING FILED IN CONJUNCTION WITH NB JOB NUMBER 320909996$100
2018-11-14Permit FO — ISSUED
2018-11-14Permit FO — ISSUED
2018-10-22FDNY inspection (CONSTR)
2018-09-12Permit Construction Fence — Permit Issued
2018-09-05Permit Construction Fence — Permit Issued
2018-08-27FDNY inspection (STRUC_INT_6)
2018-08-27FDNY inspection (STRUC_INT_3)
2018-07-25FDNY inspection (CONSTR)
2018-07-25FDNY inspection (STRUC_INT_3)
2018-07-25FDNY inspection (SPECIAL-OTH)
2018-07-25FDNY inspection (STRUC_INT_6)
2018-07-13Permit FO — RE-ISSUED
2018-07-13Permit FO — ISSUED
2018-07-09Permit Construction Fence — Permit Issued
2018-06-20FDNY inspection (CONSTR)
2018-06-14Permit FO — ISSUED
2018-06-14Permit FO — ISSUED
2018-03-30Job filed: Installation of temporary construction fence and fence on barricades per plan submitted. Work shall comply with 2014 building codes chapter 33. No cha
2018-03-30Permit Construction Fence — Permit Issued
2018-03-07Job filed: SUPPORT OF EXCAVATION HEREWITH FILED IN CONJUNCTION WITH NB JOB # 320909996
2017
2017-12-14Job filed: STRUCTURE HEREWITH FILED IN CONJUNCTION WITH 65 PRIVATE DRIVE, BLOCK 2570 AND LOT 40.
2017-12-14Job filed: MECHANICAL AND PLUMBING FILED IN CONJUNCTION WITH NB JOB NUMBER 320909996
2017-12-14Job filed: STRUCTURE HEREWITH FILED IN CONJUNCTION WITH 65 PRIVATE DRIVE, BLOCK 2570 AND LOT 40.
2017-12-13Job filed: FOUNDATION AND EARTHWORK HEREWITH FILED IN CONJUNCTION WITH 65 PRIVATE DRIVE, BLOCK 2570 AND LOT 40.
2017-12-13Job filed: FOUNDATION AND EARTHWORK HEREWITH FILED IN CONJUNCTION WITH 65 PRIVATE DRIVE, BLOCK 2570 AND LOT 40.