The city's published records show little recorded distress here in the last three years. Less recorded distress than 81% of 100+-unit residential buildings citywide. The citywide median for 100+-unit residential buildings is 3.7 penalty
points per 10 units; this building carries 0.7. In ZIP 11101, 70% of residential buildings hold an A and
5% grade D or F.
How grades work
this building
A
B
C
Among 4,677 100+-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
32 heat or hot-water complaints in the last three years (winter 2023–24: 10 · winter 2024–25: 2 · winter 2025–26: 6). Repeated winter clusters suggest a chronic heating problem.
10
’23–24
2
’24–25
6
’25–26
7 bedbug-infested unit(s) reported in filings over the last three years.
What 311 hears from this address
986 service requests in the last three years. Most common: Illegal Parking (535) · Noise (216) · Dirty Condition (22) · HEAT/HOT WATER (16) · Smoking or Vaping (15) · Street Sign (13).
Filed construction activity
$25,246,813 in permitted construction work filed since
2016 (74 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974 (2020)
Yes
Six or more residential units (1132)
No
421-a / J-51 tax benefit on the current tax roll
1 of 3 signals present. Only a partial profile — stabilization is possible but less likely. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
GO HPS LLC
Head officer
PHIL G LAVOIE
Managing agent
GOTHAM REAL ESTATE MANAGERS, LCC
Last registered
2025-09-10
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$93,941
$42,273
2026
$6,666,256
$2,999,815
2027
$0
$0
The city's market estimate has fallen
100% between tax years 2025 and 2027.
Tax exemptions on the roll: ARTICLE XI · NFP-CONTEMPLATED USE
For property tax, the Department of Finance values this condo
as if it were a rental building. Its 2023 estimate: gross income $39,528,550 a year
($38.00 per sq ft), operating expenses $15,031,251
($14.45 per sq ft), net operating income $24,497,299. These are the
city's estimates from comparable rentals, not the building's actual budget, rents or maintenance
charges.
Building systems
Heating fuel
NATURALGAS
Flood exposure
In the FEMA 1%-annual-chance floodplain (2015 preliminary flood
maps) — lenders typically require flood insurance here.
Hurricane evacuation zone 1 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Vernon Blvd-Jackson Av — 7 · 0.4 mi straight-line (about an 11-minute walk) · station accessibility: none Greenpoint Av — G · 0.6 mi straight-line (about a 15-minute walk) · station accessibility: full
Bus
Nearest boarding stop: 56 Av / 2 St — Q101 Q103 · 200 ft
Citi Bike
55 Ave & Center Blvd · 400 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
986 311 service requests from this address in the last three years — 16 of them about heat or hot water.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Agreement $242,398,663 — from SOUTH POINT HOUSING DVELOPMENT FUND CORP; GO HPS LLC; GO HPS LIHTC LLC to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D
$242,398,663
2024-05-02
Mortgage $33,170,000 — from GO HPS LIHTC LLC; SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$33,170,000
2024-05-02
Mortgage $18,959,304 — from SOUTH POINT HOUSING DVELOPMENT FUND CORP; GO HPS LLC; GO HPS LIHTC LLC to DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK
$18,959,304
2024-05-02
Mortgage $34,188,853 — from SOUTH POINT HOUSING DVELOPMENT FUND CORP; GO HPS LLC; GO HPS LIHTC LLC to DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK
$34,188,853
2024-05-02
Agreement $242,398,663 — from SOUTH POINT HOUSING DVELOPMENT FUND CORP; GO HPS LLC; GO HPS LIHTC LLC to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D
$242,398,663
2024-05-02
Agreement $242,398,663 — from SOUTH POINT HOUSING DVELOPMENT FUND CORP; GO HPS LLC; GO HPS LIHTC LLC to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D
$242,398,663
2024-05-02
Mortgage $5,221,924 — from GO HPS LLC; SOUTH POINT HOUSING DVELOPMENT FUND CORP; GO HPS LIHTC LLC to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D
$5,221,924
2024-05-02
Mortgage $33,170,000 — from GO HPS LIHTC LLC; SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$33,170,000
2024-05-02
Mortgage $33,170,000 — from GO HPS LIHTC LLC; SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$33,170,000
2024-05-02
Agreement $242,398,663 — from SOUTH POINT HOUSING DVELOPMENT FUND CORP; GO HPS LLC; GO HPS LIHTC LLC to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D
$242,398,663
2024-05-02
Mortgage $33,170,000 — from GO HPS LIHTC LLC; SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$33,170,000
2024-05-02
Agreement $242,398,663 — from SOUTH POINT HOUSING DVELOPMENT FUND CORP; GO HPS LLC; GO HPS LIHTC LLC to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D
$242,398,663
2024-05-02
Mortgage $4,564,585 — from SOUTH POINT HOUSING DVELOPMENT FUND CORP; GO HPS LIHTC LLC; GO HPS LLC to DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK
$4,564,585
2024-05-02
Mortgage $33,170,000 — from GO HPS LIHTC LLC; SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$33,170,000
2024-05-02
Agreement $242,398,663 — from SOUTH POINT HOUSING DVELOPMENT FUND CORP; GO HPS LLC; GO HPS LIHTC LLC to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D
$242,398,663
Ten-year activity
1,0005000
2017
2018
2019
2020
2021
2022
2023
501
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
0
0
0
0
0
0
2018
0
0
0
0
0
0
2019
25
0
0
0
0
25
2020
86
27
0
0
5
118
2021
91
45
0
0
9
145
2022
40
15
11
28
7
101
2023
24
15
123
14
12
188
2024
22
6
310
150
13
501
2025
20
12
387
0
16
435
2026
26
4
280
0
6
316
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2026-07-07HPD class C: § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CI
2026-04-29HPD class C: HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 221, 2nd STORY, 6th APARTMENT F
2026-04-15311: Abandoned Vehicle — With License Plate
2026-04-15Job filed: Provide and install new plumbing fixtures and equipment. Install new wet sprinkler heads with piping and relocate existing heads as required. Remove e$87,500
2026-04-14311: Street Condition — Line/Marking - After Repaving
2026-04-13311: Street Sign - Missing — No Parking, Standing, Stopping
2026-03-19311: Noise — Noise: Construction Equipment (NC1)
2026-03-19311: General Construction/Plumbing — Posted Notice Or Order Removed/Tampered With
2026-03-19DOB complaint, category ?
2026-03-16Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-16311: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-16HPD class A: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SILICONE SEALANT AT WEST 2 WINDOW UPPER PANE GLASS IN THE 2
2025-09-27311: Illegal Parking — Unauthorized Bus Layover
2025-09-26Job filed: INTERIOR FIT-OUT FOR NEW DENTAL OFFICE INCLUDING NEW PARTITIONS, FLOORING, CEILING, AND CARPENTRY WORK, AND LIGHTING WORK. NO CHANGE IN USE, EGRESS, O$73,650
2025-09-25Job filed: Installation of three (3) water-cooled indoor refrigeration condensers and a water-cooled HVAC system, in conjunction with renovation work filed under$90,835
2025-09-25Job filed: Provide and install new plumbing fixtures and equipment. Install new wet sprinkler heads with piping and relocate existing heads as required. Remove e$87,500
2025-05-08Job filed: INTERIOR ALTERATIONS TO PLUMBING IN GROUND FL UNIT, INCLUDING NEW TOILET, LAV, KITCHENETTE SINK, DISHWASHER, SERVICE SINK, DRINKING FOUNTAIN AND ASSOC$15,000
2025-05-08Job filed: INTERIOR ALTERATIONS MECHANICAL SYSTEMS IN GROUND FL UNIT, INCLUDING HEATING, AIR-CONDITIONING, AND VENTILATION SYSTEMS AND ASSOCIATED DUCTWORK, RELAT$60,000
2025-05-08Job filed: INTERIOR ALTERATIONS TO SPRINKLER SYSTEM IN GROUND FL UNIT, INCLUDING NEW SPRINKLER BRANCH LINES AND HEADS AND RELOCATIONS OF EXISTING SPRINKLER BRANC$20,000
2025-05-07311: Illegal Parking — Blocked Bike Lane
2025-05-02Job filed: MECHANICAL WORK FOR NEW CLASSROOMS, TOILETS AND ACCESSORY AREAS AT 1st AND 2nd FLOORS FOR BRILLIANCE DAY CARE AS PER PLANS FILED HEREWITH. NO CHANGE$465,000
2025-03-17Job filed: INTERIOR ALTERATIONS TO GROUND FL UNIT IN AN EXISTING BUILDING, INCLUDING NEW PARTITIONS, LIGHTING, AND ELECTRICAL WORK. ALTERATIONS TO MECHANICAL SYS$350,000
2025-01-14311: Smoking or Vaping — Allowed in Smoke Free Area
2025-01-14Job filed: TO PROVIDE INTERIOR ARCHITECTURAL PARTITIONS AND CEILINGS FOR NEW CLASSROOMS, TOILETS AND ACCESSORY AREAS AT 1st AND 2nd FLOORS OF PREMISES. THERE I$560,000
2024-10-01ECB CLASS - 1 violation: FAILURE TO SUBMIT THE REQUIRED PARKING STRUCTURE INITIAL OBSERVATION REPORT FOR AN EXISTING PARKING STRUCTURE DOCUMENTING THE COND
2024-05-31Job filed: TO PROVIDE INTERIOR ARCHITECTURAL PARTITIONS AND CEILINGS FOR NEW CLASSROOMS, TOILETS AND ACCESSORY AREAS AT 1st AND 2nd FLOORS OF PREMISES. THERE I$560,000
2024-05-30Job filed: sprinkler work for brilliance daycare as per plans filed herewith. no change to use, egress or occupancy.$187,500
2024-05-30Job filed: MECHANICAL WORK FOR NEW CLASSROOMS, TOILETS AND ACCESSORY AREAS AT 1st AND 2nd FLOORS FOR BRILLIANCE DAY CARE AS PER PLANS FILED HEREWITH. NO CHANGE$465,000
2024-05-30Job filed: PLUMBING WORK FOR BRILLIANCE DAY CARE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$164,500
2024-05-29311: Non-Emergency Police Matter — Other (complaint details)
2024-05-02Agreement $242,398,663 — from SOUTH POINT HOUSING DVELOPMENT FUND CORP; GO HPS LLC; GO HPS LIHTC LLC to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D$242,398,663
2024-05-02Mortgage $33,170,000 — from GO HPS LIHTC LLC; SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$33,170,000
2024-05-02Agreement — from SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LIHTC LLC; GO HPS LLC; NEW YORK CITY HOUS to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D
2024-05-02Agreement — from SOUTH POINT HOUSING DEVELOPMENT FUND COR to GO HPS LLC; GO HPS LIHTC LLC
2024-05-02TERL — from SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC to GO HPS LIHTC LLC
2024-05-02Agreement — from DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02SUBM — from DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02Mortgage $18,959,304 — from SOUTH POINT HOUSING DVELOPMENT FUND CORP; GO HPS LLC; GO HPS LIHTC LLC to DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK$18,959,304
2024-05-02SUBM — from NEW YORK CITY HOUSING DEVELOPMENT CORPOR to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02Agreement — from SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LIHTC LLC; GO HPS LLC; NEW YORK CITY HOUS to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D
2024-05-02Agreement — from SOUTH POINT HOUSING DEVELOPMENT FUND COR to GO HPS LLC; GO HPS LIHTC LLC
2024-05-02TERL — from SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC to GO HPS LIHTC LLC
2024-05-02Mortgage $34,188,853 — from SOUTH POINT HOUSING DVELOPMENT FUND CORP; GO HPS LLC; GO HPS LIHTC LLC to DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK$34,188,853
2024-05-02Agreement — from DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02Agreement $242,398,663 — from SOUTH POINT HOUSING DVELOPMENT FUND CORP; GO HPS LLC; GO HPS LIHTC LLC to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D$242,398,663
2024-05-02Agreement — from SOUTH POINT HOUSING DEVELOPMENT FUND COR to GO HPS LLC; GO HPS LIHTC LLC
2024-05-02Agreement $242,398,663 — from SOUTH POINT HOUSING DVELOPMENT FUND CORP; GO HPS LLC; GO HPS LIHTC LLC to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D$242,398,663
2024-05-02Agreement — from SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LIHTC LLC; GO HPS LLC; NEW YORK CITY HOUS to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D
2024-05-02Agreement — from DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02SUBM — from DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02Mortgage $5,221,924 — from GO HPS LLC; SOUTH POINT HOUSING DVELOPMENT FUND CORP; GO HPS LIHTC LLC to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D$5,221,924
2024-05-02Agreement — from SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LIHTC LLC; GO HPS LLC; NEW YORK CITY HOUS to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D
2024-05-02SUBM — from NEW YORK CITY HOUSING DEVELOPMENT CORPOR to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02Mortgage $33,170,000 — from GO HPS LIHTC LLC; SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$33,170,000
2024-05-02Agreement — from SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LIHTC LLC; GO HPS LLC; NEW YORK CITY HOUS to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D
2024-05-02Agreement — from SOUTH POINT HOUSING DEVELOPMENT FUND COR to GO HPS LLC; GO HPS LIHTC LLC
2024-05-02Mortgage $33,170,000 — from GO HPS LIHTC LLC; SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$33,170,000
2024-05-02SUBM — from NEW YORK CITY HOUSING DEVELOPMENT CORPOR to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02Agreement $242,398,663 — from SOUTH POINT HOUSING DVELOPMENT FUND CORP; GO HPS LLC; GO HPS LIHTC LLC to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D$242,398,663
2024-05-02Mortgage $33,170,000 — from GO HPS LIHTC LLC; SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$33,170,000
2024-05-02SUBM — from NEW YORK CITY HOUSING DEVELOPMENT CORPOR to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02Agreement — from DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02SUBM — from DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02Agreement $242,398,663 — from SOUTH POINT HOUSING DVELOPMENT FUND CORP; GO HPS LLC; GO HPS LIHTC LLC to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D$242,398,663
2024-05-02Mortgage $4,564,585 — from SOUTH POINT HOUSING DVELOPMENT FUND CORP; GO HPS LIHTC LLC; GO HPS LLC to DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK$4,564,585
2024-05-02SUBM — from NEW YORK CITY HOUSING DEVELOPMENT CORPOR to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02SUBM — from NEW YORK CITY HOUSING DEVELOPMENT CORPOR to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02Mortgage $33,170,000 — from GO HPS LIHTC LLC; SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$33,170,000
2024-05-02Agreement — from SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LIHTC LLC; GO HPS LLC; NEW YORK CITY HOUS to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D
2024-05-02Agreement — from SOUTH POINT HOUSING DEVELOPMENT FUND COR to GO HPS LLC; GO HPS LIHTC LLC
2024-05-02Agreement — from SOUTH POINT HOUSING DEVELOPMENT FUND COR to GO HPS LLC; GO HPS LIHTC LLC
2024-05-02SUBM — from DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02Agreement — from DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02SUBM — from DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02Mortgage — from GO HPS LIHTC LLC; GO HPS LLC; SOUTH POINT HOUSING DVELOPMENT FUND CORP to DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK
2024-05-02Agreement — from SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LIHTC LLC; GO HPS LLC; NEW YORK CITY HOUS to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D
2024-05-02Agreement — from SOUTH POINT HOUSING DEVELOPMENT FUND COR to GO HPS LLC; GO HPS LIHTC LLC
2024-05-02SUBM — from DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02Agreement $242,398,663 — from SOUTH POINT HOUSING DVELOPMENT FUND CORP; GO HPS LLC; GO HPS LIHTC LLC to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D$242,398,663
2024-05-02Agreement — from SOUTH POINT HOUSING DEVELOPMENT FUND COR to GO HPS LLC; GO HPS LIHTC LLC
2024-05-02Agreement — from SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LIHTC LLC; GO HPS LLC; NEW YORK CITY HOUS to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D
2024-05-02Agreement $242,398,663 — from SOUTH POINT HOUSING DVELOPMENT FUND CORP; GO HPS LLC; GO HPS LIHTC LLC to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D$242,398,663
2024-05-02Agreement — from DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02SUBM — from DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02Mortgage $67,984,211 — from GO HPS LIHTC LLC; SOUTH POINT HOUSING DVELOPMENT FUND CORP; GO HPS LLC to DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK$67,984,211
2024-05-02Agreement $242,398,663 — from SOUTH POINT HOUSING DVELOPMENT FUND CORP; GO HPS LLC; GO HPS LIHTC LLC to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D$242,398,663
2024-05-02SUBM — from NEW YORK CITY HOUSING DEVELOPMENT CORPOR to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02Mortgage $33,170,000 — from GO HPS LIHTC LLC; SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$33,170,000
2024-05-02Agreement — from SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LIHTC LLC; GO HPS LLC; NEW YORK CITY HOUS to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D
2024-05-02Agreement — from SOUTH POINT HOUSING DEVELOPMENT FUND COR to GO HPS LLC; GO HPS LIHTC LLC
2024-05-02Agreement — from SOUTH POINT HOUSING DEVELOPMENT FUND COR to GO HPS LLC; GO HPS LIHTC LLC
2024-05-02Mortgage $33,170,000 — from GO HPS LIHTC LLC; SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$33,170,000
2024-05-02SUBM — from NEW YORK CITY HOUSING DEVELOPMENT CORPOR to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02Mortgage $39,695,567 — from GO HPS LLC; GO HPS LIHTC LLC; SOUTH POINT HOUSING DVELOPMENT FUND CORP to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D$39,695,567
2024-05-02Agreement $242,398,663 — from SOUTH POINT HOUSING DVELOPMENT FUND CORP; GO HPS LLC; GO HPS LIHTC LLC to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D$242,398,663
2024-05-02Agreement — from DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02SUBM — from DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02Mortgage $7,756,511 — from GO HPS LIHTC LLC; GO HPS LLC; SOUTH POINT HOUSING DVELOPMENT FUND CORP to DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK$7,756,511
2024-05-02Agreement $242,398,663 — from SOUTH POINT HOUSING DVELOPMENT FUND CORP; GO HPS LLC; GO HPS LIHTC LLC to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D$242,398,663
2024-05-02SUBM — from NEW YORK CITY HOUSING DEVELOPMENT CORPOR to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02Mortgage $33,170,000 — from GO HPS LIHTC LLC; SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$33,170,000
2024-05-02Agreement — from SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LIHTC LLC; GO HPS LLC; NEW YORK CITY HOUS to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D
2024-05-02Agreement — from SOUTH POINT HOUSING DEVELOPMENT FUND COR to GO HPS LLC; GO HPS LIHTC LLC
2024-05-02TERL — from SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC to GO HPS LIHTC LLC
2024-05-02Mortgage $20,901,814 — from SOUTH POINT HOUSING DVELOPMENT FUND CORP; GO HPS LLC; GO HPS LIHTC LLC to DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK$20,901,814
2024-05-02SUBM — from DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02Agreement — from DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02Mortgage $33,170,000 — from GO HPS LIHTC LLC; SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$33,170,000
2024-05-02Agreement $242,398,663 — from SOUTH POINT HOUSING DVELOPMENT FUND CORP; GO HPS LLC; GO HPS LIHTC LLC to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D$242,398,663
2024-05-02Agreement — from DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02SUBM — from DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02Mortgage $36,653,596 — from GO HPS LIHTC LLC; GO HPS LLC; SOUTH POINT HOUSING DVELOPMENT FUND CORP to DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK$36,653,596
2024-05-02Agreement $242,398,663 — from SOUTH POINT HOUSING DVELOPMENT FUND CORP; GO HPS LLC; GO HPS LIHTC LLC to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D$242,398,663
2024-05-02SUBM — from NEW YORK CITY HOUSING DEVELOPMENT CORPOR to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02Mortgage $33,170,000 — from GO HPS LIHTC LLC; SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$33,170,000
2024-05-02Agreement — from SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LIHTC LLC; GO HPS LLC; NEW YORK CITY HOUS to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D
2024-05-02Agreement — from SOUTH POINT HOUSING DEVELOPMENT FUND COR to GO HPS LLC; GO HPS LIHTC LLC
2024-05-02TERL — from SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC to GO HPS LIHTC LLC
2024-05-02SUBM — from NEW YORK CITY HOUSING DEVELOPMENT CORPOR to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02SUBM — from NEW YORK CITY HOUSING DEVELOPMENT CORPOR to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02Agreement — from SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LIHTC LLC; GO HPS LLC; NEW YORK CITY HOUS to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D
2024-05-02Agreement — from DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02SUBM — from DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02Mortgage $696,784 — from GO HPS LLC; GO HPS LIHTC LLC; SOUTH POINT HOUSING DVELOPMENT FUND CORP to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D$696,784
2024-05-02Agreement — from DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02Agreement — from DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02SUBM — from DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02Mortgage $2,123,604 — from SOUTH POINT HOUSING DVELOPMENT FUND CORP; GO HPS LLC; GO HPS LIHTC LLC to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D$2,123,604
2024-05-02Agreement $242,398,663 — from SOUTH POINT HOUSING DVELOPMENT FUND CORP; GO HPS LLC; GO HPS LIHTC LLC to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D$242,398,663
2024-05-02Mortgage $33,170,000 — from GO HPS LIHTC LLC; SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$33,170,000
2024-05-02Agreement — from SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LIHTC LLC; GO HPS LLC; NEW YORK CITY HOUS to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D
2024-05-02Agreement — from SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LIHTC LLC; GO HPS LLC; NEW YORK CITY HOUS to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D
2024-05-02Agreement — from SOUTH POINT HOUSING DEVELOPMENT FUND COR to GO HPS LLC; GO HPS LIHTC LLC
2024-05-02Agreement — from DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02Mortgage $3,651,910 — from GO HPS LLC; GO HPS LIHTC LLC; SOUTH POINT HOUSING DVELOPMENT FUND CORP to DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK$3,651,910
2024-05-02SUBM — from DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02Mortgage $33,170,000 — from GO HPS LIHTC LLC; SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$33,170,000
2024-05-02SUBM — from NEW YORK CITY HOUSING DEVELOPMENT CORPOR to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2024-05-02Mortgage $33,170,000 — from GO HPS LIHTC LLC; SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$33,170,000
2024-04-30Job filed: TO PROVIDE INTERIOR ARCHITECTURAL PARTITIONS AND CEILINGS FOR NEW CLASSROOMS, TOILETS AND ACCESSORY AREAS AT 1st AND 2nd FLOORS OF PREMISES. THERE I$560,000
2024-04-25Job filed: INTERIOR RENOVATION IN EXISTING 1ST FLOOR COMMERCIAL SPACE. NEW STORAGE & WALK IN BOX. WATERPROOFING & FLOOR FINISHING. NEW MECHANICAL EQUIPMENT.NEW C$97,704
2024-04-23311: Abandoned Vehicle — With License Plate
2024-04-23Job filed: FILING FOR NEW INLINE EXHAUST FAN FOR NEW COMMERCIAL HOOD IN EXISTING 1ST FLOOR COMMERCIAL SPACE. INSTALLING (7) WATER COOLED INDOOR REFRIGERATION CON$40,000
2024-02-27Mortgage $242,398,663 — from SOUTH POINT HOUSING DEVELOPMENT CORPORAT; GO HPS LLC; GO HPS LIHTC LLC to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D$242,398,663
2024-02-27ASPM $601,334 — from GO HPS LIHTC LLC; SOUTH POINT HOUSING DEVELOPMENT CORPORAT; GO HPS LLC to THE FLUX FACTORY, INC.$601,334
2024-02-27Mortgage $242,398,663 — from SOUTH POINT HOUSING DEVELOPMENT CORPORAT; GO HPS LLC; GO HPS LIHTC LLC to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D$242,398,663
2024-02-27Mortgage $242,398,663 — from SOUTH POINT HOUSING DEVELOPMENT CORPORAT; GO HPS LLC; GO HPS LIHTC LLC to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D$242,398,663
2024-02-27Mortgage $200,000 — from THE FLUX FACTORY, INC. to GO HPS LLC$200,000
2024-02-27Mortgage $778,000 — from THE FLUX FACTORY, INC. to GO HPS LLC$778,000
2024-02-27Deed $1,004,000 — from SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC to THE FLUX FACTORY, INC.$1,004,000
2024-02-27PREL — from NEW YORK CITY HOUSING DEVELOPMENT CORPOR to SOUTH POINT HOUSING DEVELOPMENT FUND; GO HPS LIHTC LLC; GO HPS LLC
2024-02-27PREL — from NEW YORK CITY HOUSING DEVELOPMENT CORPOR to SOUTH POINT HOUSING DEVELOPMENT FUND; GO HPS LLC; GO HPS LIHTC LLC
2024-02-27PREL — from NEW YORK CITY HOUSING DEVELOPMENT CORPOR to SOUTH POINT HOUSING DEVELOPMENT FUND; GO HPS LIHTC LLC; GO HPS LLC
2024-02-27PREL — from NEW YORK CITY HOUSING DEVELOPMENT CORPOR to GO HPS LIHTC LLC; SOUTH POINT HOUSING DEVELOPMENT FUND; GO HPS LLC
2024-02-27PREL — from NEW YORK CITY HOUSING DEVELOPMENT CORPOR to SOUTH POINT HOUSING DEVELOPMENT FUND; GO HPS LIHTC LLC; GO HPS LLC
2024-02-27Agreement $242,999,997 — from GO HPS LIHTC LLC; GO HPS LLC; SOUTH POINT HOUSING DEVELOPMENT CORPORAT to DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK$242,999,997
2024-02-27Mortgage $242,398,663 — from SOUTH POINT HOUSING DEVELOPMENT CORPORAT; GO HPS LLC; GO HPS LIHTC LLC to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D$242,398,663
2024-02-27Agreement $242,999,997 — from GO HPS LIHTC LLC; GO HPS LLC; SOUTH POINT HOUSING DEVELOPMENT CORPORAT to DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK$242,999,997
2024-02-27Mortgage $601,334 — from SOUTH POINT HOUSING DEVELOPMENT CORPORAT; GO HPS LIHTC LLC; GO HPS LLC to DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK$601,334
2024-02-27Agreement $242,999,997 — from GO HPS LIHTC LLC; GO HPS LLC; SOUTH POINT HOUSING DEVELOPMENT CORPORAT to DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK$242,999,997
2024-02-27Mortgage $242,398,663 — from SOUTH POINT HOUSING DEVELOPMENT CORPORAT; GO HPS LLC; GO HPS LIHTC LLC to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D$242,398,663
2024-02-27Agreement $242,999,997 — from GO HPS LIHTC LLC; GO HPS LLC; SOUTH POINT HOUSING DEVELOPMENT CORPORAT to DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK$242,999,997
2024-02-27Agreement $242,999,997 — from GO HPS LIHTC LLC; GO HPS LLC; SOUTH POINT HOUSING DEVELOPMENT CORPORAT to DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK$242,999,997
2024-02-27Agreement $242,999,997 — from GO HPS LIHTC LLC; GO HPS LLC; SOUTH POINT HOUSING DEVELOPMENT CORPORAT to DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK$242,999,997
2024-02-27Mortgage $242,398,663 — from SOUTH POINT HOUSING DEVELOPMENT CORPORAT; GO HPS LLC; GO HPS LIHTC LLC to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D$242,398,663
2024-02-27Agreement $242,999,997 — from GO HPS LIHTC LLC; GO HPS LLC; SOUTH POINT HOUSING DEVELOPMENT CORPORAT to DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK$242,999,997
2024-02-27Mortgage $242,398,663 — from SOUTH POINT HOUSING DEVELOPMENT CORPORAT; GO HPS LLC; GO HPS LIHTC LLC to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D$242,398,663
2024-02-27Mortgage $242,398,663 — from SOUTH POINT HOUSING DEVELOPMENT CORPORAT; GO HPS LLC; GO HPS LIHTC LLC to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D$242,398,663
2024-02-27Agreement $242,999,997 — from GO HPS LIHTC LLC; GO HPS LLC; SOUTH POINT HOUSING DEVELOPMENT CORPORAT to DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK$242,999,997
2024-02-27Mortgage $242,398,663 — from SOUTH POINT HOUSING DEVELOPMENT CORPORAT; GO HPS LLC; GO HPS LIHTC LLC to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D$242,398,663
2024-02-27Mortgage $242,398,663 — from SOUTH POINT HOUSING DEVELOPMENT CORPORAT; GO HPS LLC; GO HPS LIHTC LLC to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D$242,398,663
2024-02-27Agreement $242,999,997 — from GO HPS LIHTC LLC; GO HPS LLC; SOUTH POINT HOUSING DEVELOPMENT CORPORAT to DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK$242,999,997
2024-02-27Agreement $242,999,997 — from GO HPS LIHTC LLC; GO HPS LLC; SOUTH POINT HOUSING DEVELOPMENT CORPORAT to DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK$242,999,997
2024-02-27Mortgage $242,398,663 — from SOUTH POINT HOUSING DEVELOPMENT CORPORAT; GO HPS LLC; GO HPS LIHTC LLC to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D$242,398,663
2024-02-27Mortgage $242,398,663 — from SOUTH POINT HOUSING DEVELOPMENT CORPORAT; GO HPS LLC; GO HPS LIHTC LLC to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D$242,398,663
2024-02-27Agreement $242,999,997 — from GO HPS LIHTC LLC; GO HPS LLC; SOUTH POINT HOUSING DEVELOPMENT CORPORAT to DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK$242,999,997
2024-02-27PREL — from NEW YORK CITY HOUSING DEVELOPMENT CORPOR to GO HPS LLC; SOUTH POINT HOUSING DEVELOPMENT FUND; GO HPS LIHTC LLC
2024-02-27Agreement $242,999,997 — from GO HPS LIHTC LLC; GO HPS LLC; SOUTH POINT HOUSING DEVELOPMENT CORPORAT to DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK$242,999,997
2024-02-27Agreement $242,999,997 — from GO HPS LIHTC LLC; GO HPS LLC; SOUTH POINT HOUSING DEVELOPMENT CORPORAT to DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK$242,999,997
2024-02-27PAT — from THE FLUX FACTORY, INC. to BOARD OF MGRS OF GOTHAM POINT CONDOMINIU
2024-02-27SUBM — from THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D to GO HPS LLC
2024-02-27Mortgage $242,398,663 — from SOUTH POINT HOUSING DEVELOPMENT CORPORAT; GO HPS LLC; GO HPS LIHTC LLC to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D$242,398,663
2024-02-27Agreement $242,999,997 — from GO HPS LIHTC LLC; GO HPS LLC; SOUTH POINT HOUSING DEVELOPMENT CORPORAT to DEPARTMENT OF HOUSING PRESERVATION AND D; THE CITY OF NEW YORK$242,999,997
2024-02-26311: Street Condition — Line/Marking - After Repaving
2023-12-04Job filed: NEW PLUMBING FIXTURES & COOKING EQUIPMENT FOR NEW COMMERCIAL KITCHEN IN 1ST FLOOR COMMERCIAL SPACE. IN CONJUNCTION WITH RENOVATIONS FILED UNDER APPLIC$45,000
2023-11-30311: Smoking — Smoking Violation
2023-11-29Certificate of occupancy Renewal Without Change
2023-11-28Bedbug filing: 0 infested units
2023-11-28Bedbug filing: 0 infested units
2023-11-27311: Illegal Parking — Blocked Hydrant
2023-11-25311: Smoking — Smoking Violation
2023-11-24311: Lead — Lead Kit Request (Residential) (L10)
2023-11-18Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2023-11-18Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2023-11-18311: HEAT/HOT WATER — ENTIRE BUILDING
2023-11-18311: HEAT/HOT WATER — ENTIRE BUILDING
2023-11-16311: Animal-Abuse — Other (complaint details)
2023-11-16Job filed: INTERIOR RENOVATION IN EXISTING 1ST FLOOR COMMERCIAL SPACE. NEW STORAGE & WALK IN BOX. WATERPROOFING & FLOOR FINISHING. NEW MECHANICAL EQUIPMENT.NEW C$97,704
2023-09-14311: Noise - Residential — Loud Television
2023-09-13311: Illegal Parking — Blocked Sidewalk
2023-09-11Cooling tower inspection
2023-09-05311: Blocked Driveway — No Access
2023-09-04311: Blocked Driveway — No Access
2023-09-04311: Blocked Driveway — No Access
2023-09-04311: Sewer — Catch Basin Search (SC2)
2023-09-03311: Illegal Parking — Blocked Hydrant
2023-09-02311: Illegal Parking — Blocked Hydrant
2023-09-01Job filed: Proposed installation of 27' curb cut including splays as per plans filed herewith. to access loading berths. No change to use, egress or occupancy. $10,000
2023-08-14HPD class C: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE METAL RAILING AT WEST CORNER IN THE TERRACE LOCATED AT APT
2023-05-27311: Illegal Parking — Blocked Bike Lane
2023-05-03Certificate of occupancy Renewal Without Change
2023-04-24Bedbug filing: 0 infested units
2023-04-19Job filed: INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CO$2,000
2023-04-11Elevator permit: Furnish and install six (6) new Gearless Traction Elevators as per attached drawings. All work to comply with ASME A17.1-2000 wit$8,409,811
2023-03-31HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2023-02-25311: Illegal Parking — Blocked Bike Lane
2023-02-24Elevator permit: Furnish and install six (6) new Gearless Traction Elevators as per attached drawings. All work to comply with ASME A17.1-2000 wit$8,409,811
2023-02-22Certificate of occupancy Renewal With Change
2023-01-09Job filed: INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CO$2,000
2022-12-02Certificate of occupancy Renewal With Change
2022-11-29Permit Plumbing — Signed-off
2022-11-29Permit Sprinklers — Signed-off
2022-11-15HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2022-11-03Cooling tower inspection
2022-10-27FDNY inspection (CONSTR)
2022-10-26311: Special Projects Inspection Team (SPIT) — Sign/Awning/Marquee - Illegal/No Permit
2022-10-26DOB complaint, category ?
2022-10-21Job filed: INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CO$2,000
2022-07-27Certificate of occupancy Renewal Without Change
2022-07-14Job filed: INSTALLATION OF PLUMBING FIXTURES, SPRINKLER SYSTEM AND STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS$3,000
2022-07-09FDNY inspection (CONSTR)
2022-06-30Permit NB — ISSUED
2022-06-30Certificate of occupancy Renewal With Change
2022-06-29ECB CLASS - 1 violation: AT TIME OF MY INSPECTION ON ACTIVE 57 STORY NB,UNDER CONSTRUCTION,OBSERVED INADEQUATE GUARDRAILS/NETTINGS/CABLE SUSTEM THROUGHOUT
2022-06-29DOB complaint, category ?
2022-06-29ECB CLASS - 2 violation: AT TIME OF MY INSPECTION OF A 57 STORY NB,I OBSERVED NUMEROUS AREAS WITH DEBRIS PILES(CONSTRUCTION MATERIAL,GARBAGE) THROUGHOUT BU
2022-06-28Job filed: SHOWING CHANGES WITH SUSPENDED SCAFFOLD EQUIPMENT AS SHOWN ON PLANS$10,000
2022-06-24Elevator permit: Furnish and install six (6) new Gearless Traction Elevators as per attached drawings. All work to comply with ASME A17.1-2000 wit$8,409,811
2022-06-23FDNY inspection (CDA-90-DRILL)
2022-06-23FDNY inspection (OTHER)
2022-06-22FDNY inspection (10-35)
2022-06-16Elevator permit: Furnish and install two (2) new MRL elevators as per attached drawings, Plan# N1E889 and N1E890. All work to comply with ASME A17$678,630
2022-06-16Permit Supported Scaffold — Signed-off
2022-06-09Job filed: HEREWITH FILING TENANT PROTECTION PLAN IN CONJUNCTION WITH NB APPLICATION 420665346.$1,000
2022-05-24Job filed: FILING HEREWITH FOR NEW (5) NEW GAS BOILERS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUN$1,000
2022-05-13Certificate of occupancy Renewal With Change
2022-05-11ECB CLASS - 1 violation: BC3301.2 SAFETY MEASURES & STANDARDS-GAPS HOLES & OPENINGS UNCOVERED.AT TIME OF INSPECTION OF ACTIVE JOB SITE OBSERVED PERMIT HOLD$625
2022-05-11ECB CLASS - 2 violation: POSTING OF UNLAWFUL SIGNS INFORMATION PICTORAL REPRESENTATION BUSINESS OR ADVERTISING MESSAGES ON PROTECTIVE STRUCTURES.AT TIME OF$2,500
2022-05-11ECB CLASS - 2 violation: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS.AT TIME OF INSPECTION OF ACTIVE JOBSITE OBSERVED PERMIT HOLDER $625
2022-04-27Job filed: SUSPENDED SCAFFOLDING AS SHOWN ON PLANS$10,000
2022-04-22Permit Protection and Mechanical Methods — Signed-off
2022-04-21Elevator permit: Furnish and install six (6) new Gearless Traction Elevators as per attached drawings. All work to comply with ASME A17.1-2000 wit$8,409,811
2022-04-06Elevator permit: Furnish and install two (2) new MRL elevators as per attached drawings, Plan# N1E889 and N1E890. All work to comply with ASME A17$678,630
2022-04-06Job filed: SUSPENDED SCAFFOLDING AS SHOWN ON PLANS$10,000
2022-04-06Permit Protection and Mechanical Methods — Signed-off
2022-04-05Permit EQ — ISSUED
2022-04-05Permit EQ — ISSUED
2022-04-01Elevator permit: Furnish and install Four (4) new Gearless Traction elevator, Class of C3 Loading as per attached drawings. All work to comply wi$3,558,561
2022-03-29Certificate of occupancy Initial
2022-03-29Job filed: SUSPENDED SCAFFOLDING AS SHOWN ON PLANS$10,000
2022-03-29Permit Supported Scaffold — Signed-off
2022-03-23Permit Protection and Mechanical Methods — Signed-off
2022-03-18MAPS — from GOTHAM POINT CONDOMINIUM
2022-03-18CDEC — from SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC
2022-03-18MAPS — from GOTHAM POINT CONDOMINIUM
2022-03-18MAPS — from GOTHAM POINT CONDOMINIUM
2022-03-18CDEC — from SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC
2022-03-18CDEC — from SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC
2022-03-18CDEC — from SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC
2022-03-18MAPS — from GOTHAM POINT CONDOMINIUM
2022-03-18MAPS — from GOTHAM POINT CONDOMINIUM
2022-03-18MAPS — from GOTHAM POINT CONDOMINIUM
2022-03-18CDEC — from SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC
2022-03-18CDEC — from SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC
2022-03-18MAPS — from GOTHAM POINT CONDOMINIUM
2022-03-18CDEC — from SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC
2022-03-18MAPS — from GOTHAM POINT CONDOMINIUM
2022-03-18MAPS — from GOTHAM POINT CONDOMINIUM
2022-03-18CDEC — from SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC
2022-03-18MAPS — from GOTHAM POINT CONDOMINIUM
2022-03-18CDEC — from SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC
2022-03-18CDEC — from SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC
2022-03-18MAPS — from GOTHAM POINT CONDOMINIUM
2022-03-18CDEC — from SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC
2022-03-18CDEC — from SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC
2022-03-18MAPS — from GOTHAM POINT CONDOMINIUM
2022-03-18CDEC — from SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC
2022-03-18MAPS — from GOTHAM POINT CONDOMINIUM
2022-03-18CDEC — from SOUTH POINT HOUSING DEVELOPMENT FUND COR; GO HPS LLC
2022-03-18MAPS — from GOTHAM POINT CONDOMINIUM
2022-03-14Job filed: SUSPENDED SCAFFOLDING AS SHOWN ON PLANS$10,000
2022-03-10DOB complaint, category ?
2022-03-08Permit EQ — ISSUED
2022-03-02DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2022-02-16Permit Protection and Mechanical Methods — Signed-off
2022-02-16Job filed: SHOWING CHANGES WITH SUSPENDED SCAFFOLD EQUIPMENT AS SHOWN ON PLANS$10,000
2022-02-01Job filed: INSTALLATION OF PLUMBING FIXTURES, SPRINKLER SYSTEM AND STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS$3,000
2022-01-13Elevator permit: FURNISH AND INSTALL ONE NEW VERTICAL WHEELCHAIR LIFT. TOTAL TRAVEL 8' 3 1/4"$29,800
2022-01-05DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2021
2021-12-29Permit Standpipe — Signed-off
2021-12-29Permit Standpipe — Signed-off
2021-12-29Permit Sprinklers — Signed-off
2021-11-30DOB complaint, category ?
2021-11-29ECB CLASS - 1 violation: BUILT CONTRARY TO APPROVED PLAN.ALL EQUIPMENT MUST BE INSTALLED AS PERAPPROVED PLAN.AT TIME OF INSPECTION ON ACTIVE JOBSITE OBSERV$2,530
2021-11-16DOB complaint, category ?
2021-11-16DOB complaint, category ?
2021-11-15DOB violation C:
2021-11-15DOB violation C:
2021-11-15DOB violation C:
2021-11-15DOB violation C:
2021-11-05Permit Protection and Mechanical Methods — Signed-off
2021-11-04Job filed: INSTALLATION OF TEMPORARY CANTILEVERED PLATFORM AS PER DRAWINGS. CANTILEVERED PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUP$10,000
2021-11-03Permit Sprinklers — Signed-off
2021-11-03Permit Standpipe — Signed-off
2021-10-21Permit PL — ISSUED
2021-10-18Permit Standpipe — Signed-off
2021-10-18Permit Sprinklers — Signed-off
2021-10-06Permit EQ — ISSUED
2021-10-04Permit Boiler Equipment — Signed-off
2021-10-04Permit Boiler Equipment — Signed-off
2021-10-02FDNY inspection (CDA-90-DRILL)
2021-10-02FDNY inspection (CDA-90-DRILL)
2021-09-28Job filed: FILING HEREWITH FOR CONDOMINIUM LOT SUBDIVISION FOR (7) LOTS.
2021-09-28Job filed: FILING HEREWITH FOR CONDOMINIUM LOT SUBDIVISION FOR (7) LOTS.
2021-09-28Job filed: FILING HEREWITH FOR CONDOMINIUM LOT SUBDIVISION FOR (7) LOTS.
2021-09-28Job filed: FILING HEREWITH FOR CONDOMINIUM LOT SUBDIVISION FOR (7) LOTS.
2021-09-22Job filed: FILING HEREWITH FOR (1) NEW GAS-FIRED BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH NB#$1,000
2021-09-22Job filed: FILING HEREWITH FOR (2) NEW GAS-FIRED BOILERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH NB$1,000
2021-09-21Permit Sidewalk Shed — Signed-off
2021-09-21Permit Construction Fence — Signed-off
2021-09-21Permit Construction Fence — Signed-off
2021-09-21Permit Sidewalk Shed — Signed-off
2021-09-17Elevator permit: Furnish and install two (2) new MRL elevators as per attached drawings, Plan# N1E889 and N1E890. All work to comply with ASME A17$678,630
2021-09-17Elevator permit: Furnish and install one (1) new MRL elevators as per attached drawings, Plan# N1E891. All work to comply with ASME A17.1-2005S, $338,934
2021-09-14ECB CLASS - 1 violation: FAILURE TO NOTIFY THE DEPARTMENT OF AN ACCIDENT/INCIDENT THAT RESULTEDIN A FATALITY OR AN INJURY.NOTE:A WORKER USING STILTS SLIPPE$1,250
2021-09-01DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2021-08-27Permit Sprinklers — Signed-off
2021-08-27Permit Standpipe — Signed-off
2021-08-27Permit Plumbing — Signed-off
2021-08-23DOB complaint, category ?
2021-08-23ECB CLASS - 1 violation: FAILURE TO INSTITUTE AND MAINTAIN SAFETY MEASURES.NOTE AT THE TIME OF THE INSPECTION OF AN ACTIVE JOBSITE RESPONDING TO COMPLAINT#
2021-08-23ECB CLASS - 1 violation: 3301.8.1 EVIDENCE TAMPERING.NOTE AT THE TIME OF MY INSPECTION OF AN ACTIVE JOBSITE RESPONDING TO COMPLIANT#4856092 WHERE THE SITE
2021-08-18Job filed: HEREWITH FILING TENANT PROTECTION PLAN IN CONJUCTION WITH NEW BUIDING APPLICATION 420665355$1,000
2021-08-18Job filed: HEREWITH FILING TENANT PROTECTION PLAN IN CONJUCTION WITH NEW BUIDING APPLICATION 420665355$1,000
2021-08-13Permit Boiler Equipment — Signed-off
2021-08-10Elevator permit: Furnish and install Four (4) new Gearless Traction elevator, Class of C3 Loading as per attached drawings. All work to comply wi$3,558,561
2021-08-09Job filed: INSTALLATION OF HVAC SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH NB# 4$1,000
2021-08-06Job filed: INSTALLATION OF PLUMBING FIXTURES, SPRINKLER SYSTEM AND STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS$3,000
2021-07-27Permit Sprinklers — Signed-off
2021-07-27Permit Plumbing — Signed-off
2021-07-21Permit Sprinklers — Signed-off
2021-07-21Permit General Construction — Signed-off
2021-07-21Permit Plumbing — Signed-off
2021-07-09Permit Supported Scaffold — Signed-off
2021-07-06Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BU$2,500
2021-07-05Job filed: SUSPENDED SCAFFOLD AS SHOWN ON PLANS$1,000
2021-07-01Job filed: FILING HEREWITH FOR NEW (5) NEW GAS BOILERS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUN$1,000
2021-06-30Permit Plumbing — Signed-off
2021-06-30Permit Sprinklers — Signed-off
2021-06-30Permit EQ — ISSUED
2021-06-30Permit Standpipe — Signed-off
2021-06-24Permit Mechanical Systems — Signed-off
2021-06-22Permit NB — ISSUED
2021-06-21Permit NB — ISSUED
2021-06-16ECB CLASS - 1 violation: FAILURE TO NOTIFY THE DEPT. OF AN ACCIDENT/INCIDENT THAT RESULTED IN AFATALITY OR AN INJURY.NOTE:A WORKER SUFFERED A KNEE INJURY W$625
2021-06-15Job filed: INSTALLATION OF TEMPORARY WORK PLATFORM AS PER DRAWINGS. TEMPORARY WORK PLATFORM SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN $2,375
2021-06-12FDNY inspection (CDA-90-DRILL)
2021-06-08DOB complaint, category ?
2021-06-07ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR AMENDMENTS (TEMPORARY WORK PLATFORM ON ROOF LEVEL)AT TIME OF INSPE$625
2021-06-07ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR AMENDMENTS-SUSPENDED SCAFFOLD (C-HOOKS/PARAPET CLAMPS)AT TIME OF I$2,500
2021-06-02Permit Protection and Mechanical Methods — Signed-off
2021-06-01Elevator permit: Furnish and install Four (4) new Gearless Traction elevator, Class of C3 Loading as per attached drawings. All work to comply wi$3,558,561
2021-05-28ECB CLASS - 1 violation: BC 3301.2 HOLES NOT COVERED AS REQUIRED NOTE:AT TIME OF MY INSPECTION OBSERVED ACTIVE JOBSITE OPEN HOES MORE THAN 2'HAS BEEN FOUND
2021-05-28ECB CLASS - 1 violation: BC 3301.2 FAILURE TO INSTITUTE SAFETY EQUIPMENT MEASURE-NO MEANS OF EGRESS MAINTAIN AS REQUIRED.NOTE:AT TIME OF MY INSPECTION RESP$625
2021-05-28DOB complaint, category ?
2021-05-28ECB CLASS - 1 violation: ILLEGALLY ENGAGING IN ANY BUSINESS OR OCCUPATION WITHOUT A REQUIRED LICENSE OR OTHER AUTHORIZATION.NOTE:AT TIME OF MY INSPECTION O$625
2021-05-28ECB CLASS - 1 violation: FAILURE TO INSITUTE SAFETY EQUIPMENT MEASURE.GUARDRAILS NO MAINTAIN AS REQUIRED.NOTE:AT TIME OF MY INSPECTION OF A 57 STORY NEW BU$625
2021-05-28ECB CLASS - 1 violation: BC 3301.2 UNCAPS REBAR FAILURE TO MAINTAIN AS REQUIRED NOTE:AT TIME OFMY INSPECTION OBSERVED ACTIVE JOBSITE.UNCAPS REBARS HAS BEEN
2021-05-19Permit Supported Scaffold — Signed-off
2021-05-19DOB complaint, category ?
2021-05-18ECB CLASS - 1 violation: 3308.5.3,3308.5.4 CABLE NETTING(GUARDRAILS)AT TIME OF INSPECTION OF A 57 STORY NEW BUILDING CURRENTLY AT 3RD FLOOR OBSERVED THROUG$2,500
2021-05-06Elevator permit: Furnish and install Four (4) new Gearless Traction elevator, Class of C3 Loading as per attached drawings. All work to comply wi$3,558,561
2021-05-06Permit Protection and Mechanical Methods — Signed-off
2021-05-06Permit Standpipe — Signed-off
2021-05-04Permit Mechanical Systems — Signed-off
2021-05-03Permit Plumbing — Signed-off
2021-05-03Permit Sprinklers — Signed-off
2021-05-03Permit Standpipe — Signed-off
2021-04-28Permit EQ — ISSUED
2021-04-28Permit EQ — ISSUED
2021-04-27Permit Standpipe — Signed-off
2021-04-27Permit Sprinklers — Signed-off
2021-04-26FDNY inspection (CDA-90-DRILL)
2021-04-25Permit Supported Scaffold — Signed-off
2021-04-23Permit Standpipe — Signed-off
2021-04-23Job filed: INSTALLATION OF BAKERS SCAFFOLD AS PER DRAWINGS. BAKERS SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER $1,200
2021-04-23Permit Sprinklers — Signed-off
2021-04-13Permit Standpipe — Signed-off
2021-04-13Permit Plumbing — Signed-off
2021-04-13Permit Sprinklers — Signed-off
2021-04-13Permit Supported Scaffold — Signed-off
2021-04-13Permit Supported Scaffold — Signed-off
2021-04-09Job filed: INSTALLATION OF PLUMBING AND SPRINKLER SYSTEMS ASSOCIATED WITH TEMPORARY LEASING OFFICE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUP$2,000
2021-04-08Job filed: This application is filed for a Temporary Use Permit for a sales office pursuant to section AC 28-111 and Buildings Bulletin 2010-002. Filed in conjun$1,000
2021-04-05Permit EQ — ISSUED
2021-04-01Permit Protection and Mechanical Methods — Signed-off
2021-03-30Job filed: SUSPENDED SCAFFOLD AS SHOWN ON PLANS$1,000
2021-03-26DOB complaint, category ?
2021-03-26ECB CLASS - 1 violation: FAILURE TO ENSURE EACH WORKER IS IN COMPLIANCE W/BC3321.1 NOTE:@TIME OF MY INSP OF ACTIVE JOBSITE,INSP REVEALS WORKER JOHN MANZO D$10,000
2021-03-26ECB CLASS - 1 violation: PERMIT HOLDER FAILED WORKERS ATTEND PRESHIFT SAFETY MEETING PRIOR TO COMMENCEMENT OF WORK.NOTE:@TIME OF MY INSP OF ACTIVE JOBSITE,$5,000
2021-03-26ECB CLASS - 1 violation: FAILURE TO COMPLY W/MANUFACTURER SPECS.NOTE:@TIME OF MY INSP OF ACTIVEJOBSITE,I OBSERVED 3WORKERS PERFORMING CONST OPERATIONS&OPER
2021-03-26ECB CLASS - 1 violation: FAILURE TO COMMUNICATE REQUIRED INFO DURING PRESHIFT MEETING AS SAFETYMEASURE INSTITUTED&MAINTAINED FOR CONST OPERATIONS.NOTE:@TIM$10,000
2021-03-26ECB CLASS - 1 violation: WORK DOESNT CONFORM TO APPROVED CONST DOCS &/OR APPROVED AMENDMENTS.NOTE:@TIME OF MY INSP OF ACTIVE JOBSITE,I OBSERVED SUSPENDED S$2,500
2021-03-24Job filed: FILING HEREWITH FOR (2) NEW GAS-FIRED BOILERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH NB$1,000
2021-03-22Permit PL — ISSUED
2021-03-18Permit Protection and Mechanical Methods — Signed-off
2021-03-18Permit EQ — ISSUED
2021-03-18Job filed: INSTALLATION OF TEMPORARY WORK PLATFORM AS PER DRAWINGS. TEMPORARY WORK PLATFORM SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN $2,375
2021-02-22Elevator permit: Furnish and install two (2) new MRL elevators as per attached drawings, Plan# N1E889 and N1E890. All work to comply with ASME A17$678,630
2021-02-22Elevator permit: Furnish and install six (6) new Gearless Traction Elevators as per attached drawings. All work to comply with ASME A17.1-2000 wit$8,409,811
2021-02-22Elevator permit: Furnish and install one (1) new MRL elevators as per attached drawings, Plan# N1E891. All work to comply with ASME A17.1-2005S, $338,934
2021-02-22Elevator permit: Furnish and install two (2) new MRL elevators as per attached drawings, Plan# N1E892 and N1E893 (D1 and D2). All work to comply w$512,626
2021-02-12Permit Supported Scaffold — Signed-off
2021-02-11Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. TEMPORARY PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN $12,000,000
2021-02-09Permit EQ — ISSUED
2021-02-08Permit NB — ISSUED
2021-02-08Permit NB — ISSUED
2021-01-29Job filed: INSTALLATION OF TEMPORARY HANGING SCAFFOLD AS PER DRAWINGS. TEMPORARY HANGING SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHAN
2021-01-29Job filed: INSTALLATION OF TEMPORARY HANGING SCAFFOLD AS PER DRAWINGS. TEMPORARY HANGING SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHAN
2021-01-27Permit EQ — ISSUED
2021-01-26Permit Plumbing — Signed-off
2021-01-22DOB complaint, category ?
2021-01-21Job filed: FILING HEREWITH FOR (1) NEW GAS-FIRED BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH NB#$1,000
2021-01-20DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2021-01-13Permit NB — ISSUED
2021-01-12ECB CLASS - 1 violation: BC3301.2.UNCAPPED REBAR FAILURE TO MAINTAIN.NOTE:@TIME OF MY INSPECTION @57STY NEW BLDG @5THFL LEVEL WORKING IN PROGRESS,I OBSERVE
2021-01-12ECB CLASS - 1 violation: PRESHIFT SAFETY MEETING CONTENT.NOTE:@TIME OF MY INSPECTION OF 57STY NEW BLDG @5THFL LEVEL UNDER CONSTRUCTION W/ MULTIPLE TRADES.U
2021-01-12ECB CLASS - 1 violation: BC3316.9.2.FAILURE TO PROVIDE CERTIFICATION OR TRAINING.NOTE:@TIME OF MY INSPECTION RESPONDING TO COMPLAINT THERE WORKER UNLOADING
2021-01-12ECB CLASS - 1 violation: FAILURE TO INSTITUTE&MAINTAIN SAFETY EQUIPMENT MEASURE.NOTE:@TIME OF MY INSPECTION RESPONDING TO COMPLAINT WHERE A WORKER UNLOADIN
2021-01-12DOB complaint, category ?
2021-01-12ECB CLASS - 1 violation: FAILURE TO ONSTITUTE&MAINTAIN SAFETY EQUIPMENT MEASURE.NOTE:@TIME OF MY INSPECTION RESPONDING TO COMPLAINT WHERE WORKER UNLOADING
2021-01-12ECB CLASS - 1 violation: BC3308.5.VERTICAL SAFETY NETTING.NOTE:@TIME OF MY INSPECTION OF 57STY NEW BLDG @5THFL LEVEL WORKING IN PROGRESS,I OBSERVED VERTICA
2021-01-12ECB CLASS - 1 violation: FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION-INADEQUATE GUARDRAILS.NOTE:@TIME OF MY INSPECTIO$2,500
2021-01-04Permit Plumbing — Signed-off
2020
2020-12-18Permit Mechanical Systems — Signed-off
2020-12-17Job filed: INSTALLATION AND USE OF ALTERNATE PROTECTION SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2020-12-15Permit Standpipe — Signed-off
2020-12-14Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS.TEMPORARY PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THENYC BUILDING CODE. NO CHANGE IN US$6,400,000
2020-12-14Permit Supported Scaffold — Signed-off
2020-12-11Permit EQ — ISSUED
2020-12-10Job filed: INSTALLATION AND USE OF EXTERIOR CLIMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2020-12-10Job filed: INSTALLATION AND USE OF TEMPORARY WORKING PLATFORM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2020-12-10Job filed: INSTALLATION AND USE OF TEMPORARY WORKING PLATFORM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2020-12-09DOB complaint, category ?
2020-12-09ECB CLASS - 1 violation: BC3301.2,UNEAPPED REBAR HAS NOT BEEN MAINTAIN AS REQUIRED.NOTE:AT TIME OF MY INSPECTION OF A 57 STORY NEW BUILDING AT 3RD FLOOR LE
2020-12-08Permit Construction Fence — Signed-off
2020-12-07Permit Sidewalk Shed — Signed-off
2020-12-07Permit Construction Fence — Signed-off
2020-12-05Permit Sidewalk Shed — Signed-off
2020-11-17Job filed: INSTALLATION AND USE OF EXTERIOR CLIMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2020-11-17Job filed: INSTALLATION AND USE OF EXTERIOR CLIMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2020-11-16Permit Standpipe — Signed-off
2020-10-27Permit FO — ISSUED
2020-10-26DOB complaint, category ?
2020-10-21DOB complaint, category ?
2020-10-21DOB complaint, category ?
2020-10-20ECB CLASS - 1 violation: FAILURE TO INSITUTE AND MAINTAIN SAFETY EQUIPMENT MEASURES AND TEMPORARY CONDITION.NOTE:AT THE TIME OF MY INSPECTION RESPONDING TO$10,000
2020-10-20ECB CLASS - 1 violation: FAILURE TO NOTIFY THE DEPT OF AN ACCIDENT/INCIDENT THAT RESULTED IN A FATALITY OR AN INJURY. A WORKER CUT HIS LEFT LEG WHILE CUTTI
2020-10-20ECB CLASS - 1 violation: FAILURE TO COMMUNICATE REQUIRED INFORMATION TO WORKER DURING PRE-SHIFTSAFETY MEETING NOTE:AT THE TIME OF MY INSPECTION OF A 57 STO
2020-10-20ECB CLASS - 1 violation: FAILURE TO INSTITUTE AND MAINTAIN SAFETY EQUIPMENT MEASURES AND TEMPORARY CONDITION. NOTE:AT THE TIME OF MY INSPECTION RESPONDING $10,000
2020-10-20DOB complaint, category ?
2020-10-08Permit EQ — ISSUED
2020-09-30Permit NB — RE-ISSUED
2020-09-23Elevator permit: Furnish and install Four (4) new Gearless Traction elevator, Class of C3 Loading as per attached drawings. All work to comply wi$3,558,561
2020-09-22Permit Construction Fence — Signed-off
2020-09-21Permit Sidewalk Shed — Signed-off
2020-09-21Permit Sidewalk Shed — Signed-off
2020-09-21Job filed: INSTALLATION OF PLYWOOD FENCE AS PER DRAWINGS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EG$2,500
2020-09-17DOB complaint, category ?
2020-09-17Permit Construction Fence — Signed-off
2020-09-16ECB CLASS - 2 violation: FAILURE TO MAINTAIN SAFETY MEASURES. @THE TIME OF MY INSPECTION OF A PROPOSED 33 STY NEW BLDG I OBSERVED UNCAPPED REBAR ON WORKING
2020-09-16ECB CLASS - 2 violation: JOBSITE FENCE NOT CONSTRUCTED OR MAINTAINED PURSUANT TO SUBSECTION AT THE TIME OF MY INSPECTION OF A PROPOSED 33 STORY NEW BUILDI
2020-09-16ECB CLASS - 2 violation: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. @THE TIME OF MY INSPECTION OF APPROVED 33 STY NEW BLDG I OBSER
2020-09-16ECB CLASS - 1 violation: FAILURE TO INSTALL OR MAINTAIN VERTICAL SAFETY NETTING SYSTEM AS REQUIRED. @THE TIME OF MY INSPECTION OF A PROPOSED 33 STY NEW BLD
2020-09-15ECB CLASS - 1 violation: FAILURE TO NOTIFY THE DEPT OF AN ACCIDENT/INCIDENT THAT RESULTED IN A FATALITY OR AN INJURY. DURING INSTALLATION OF A DRAIN PAN ON$1,250
2020-09-02Permit FO — ISSUED
2020-08-25Permit FO — ISSUED
2020-08-14DOB complaint, category ?
2020-08-10Permit FO — ISSUED
2020-08-06Permit NB — ISSUED
2020-07-30Permit EQ — ISSUED
2020-07-28Job filed: INSTALLATION OF TEMPORARY CANTILEVERED OVERHEAD PROTECTION AS PER DRAWINGS. TEMPORARY CANTILEVERED OVERHEAD PROTECTION SHALL COMPLY WITH CHAPTER #33 O
2020-07-28Job filed: INSTALLATION OF TEMPORARY CANTILEVERED OVERHEAD PROTECTION AS PER DRAWINGS. TEMPORARY CANTILEVERED OVERHEAD PROTECTION SHALL COMPLY WITH CHAPTER #33 O
2020-07-20Permit EQ — ISSUED
2020-07-09Permit FO — ISSUED
2020-07-09Permit NB — ISSUED
2020-07-09Permit NB — ISSUED
2020-07-08Permit NB — ISSUED
2020-07-08Permit FO — ISSUED
2020-07-08Permit NB — ISSUED
2020-07-08Permit FO — ISSUED
2020-07-08Permit FO — ISSUED
2020-06-29DOB complaint, category ?
2020-06-23Permit Construction Fence — Signed-off
2020-05-21Permit Standpipe — Signed-off
2020-05-21Permit Sprinklers — Signed-off
2020-05-15Elevator permit: South Hoist Car # 3: Installation of a Single 7000 LB Capacity Personnel/Material Hoist during NB Construction, filed separately. $10,000
2020-05-15Elevator permit: North Hoists (cars 1and2): Installation of a Dual 7000 LB Capacity Personnel/Material Hoist during NB Construction, filed separate$20,000
2020-05-15Elevator permit: South Hoists (cars 3and4): Installation of a Dual 7000 LB Capacity Personnel/Material Hoist during NB Construction, filed separate$20,000
2020-05-15Elevator permit: Installation of a Dual 7000 LB Capacity Personnel/Material Hoist during NB Construction, filed separately. Installations and Tests$20,000
2020-05-14Permit EQ — ISSUED
2020-05-14Permit EQ — ISSUED
2020-05-13Permit Mechanical Systems — Signed-off
2020-05-13Permit Plumbing — Signed-off
2020-05-13Permit Standpipe — Signed-off
2020-05-13Permit Sprinklers — Signed-off
2020-05-12Permit Sprinklers — Signed-off
2020-05-12Permit Standpipe — Signed-off
2020-05-12Permit Plumbing — Signed-off
2020-05-07Permit EQ — ISSUED
2020-04-30Job filed: INSTALLATION OF SINGLE 7000 LBS CAPACITY PERSONNEL/MATERIAL HOIST DURING NEW BLDG CONSTRUCTION, FILED SEPARATELY. HOIST SHALL COMPLY WITH CHAPTER #33
2020-04-30Job filed: INSTALLATION OF DUAL 7000 LBS CAPACITY PERSONNEL/MATERIAL HOISTS DURING NEW BLDG CONSTRUCTION, FILED SEPARATELY. HOISTS SHALL COMPLY WITH CHAPTER #33
2020-04-30Job filed: INSTALLATION OF SINGLE 7000 LBS CAPACITY PERSONNEL/MATERIAL HOIST DURING NEW BLDG CONSTRUCTION, FILED SEPARATELY. HOIST SHALL COMPLY WITH CHAPTER #33
2020-04-29Job filed: INSTALLATION OF TEMPORARY HANGING SCAFFOLD AS PER DRAWINGS. TEMPORARY HANGING SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHAN
2020-04-27Permit EQ — ISSUED
2020-04-24DOB complaint, category ?
2020-04-22Permit Construction Fence — Signed-off
2020-04-21Job filed: INSTALLATION OF PLYWOOD FENCE DURING NB CONSTRUCTION, FILED SEP. FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUP$2,500
2020-04-15Permit Standpipe — Signed-off
2020-04-14Job filed: INSTALLATION OF ALTERNATIVE NETTING AS PER PLANS FILED HEREWITH. THIS APPLICATION IS FILED IN CONJUNCTION WITH NB-420665355.
2020-04-14Job filed: INSTALLATION OF ALTERNATIVE NETTING AS PER PLANS FILED HEREWITH. THIS APPLICATION IS FILED IN CONJUNCTION WITH NB-420665355.
2020-04-10Job filed: SOUTH HOISTS (CARS 3&4): INSTALLATION OF DUAL 7000 LBS CAPACITY PERSONNEL/MATERIAL HOISTS DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. DUAL
2020-04-10Job filed: NORTH HOISTS (CARS 1&2): INSTALLATION OF DUAL 7000 LBS CAPACITY PERSONNEL/MATERIAL HOISTS DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. DUAL
2020-04-10Job filed: SOUTH HOISTS (CARS 3&4): INSTALLATION OF DUAL 7000 LBS CAPACITY PERSONNEL/MATERIAL HOISTS DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. DUAL
2020-04-06Permit Construction Fence — Signed-off
2020-04-06DOB complaint, category ?
2020-04-06Job filed: INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CO$2,000
2020-03-19Job filed: FILING HEREWITH FOR UNDERGROUND SANITARY AND STORM PIPING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNC$1,000
2020-03-06Permit PL — ISSUED
2020-03-02Permit Plumbing — Signed-off
2020-02-28Job filed: FILING HEREWITH FOR UNDERGROUND SANITARY AND STORM PIPING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNC$1,000
2020-02-26FDNY inspection (SPECIAL-OTH)
2020-02-26Job filed: INSTALLATION OF PLUMBING FIXTURES, SPRINKLER SYSTEM AND STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS$3,000
2020-02-25FDNY inspection (CONSTR)
2020-02-21Job filed: INSTALLATION OF HVAC SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH NB# 4$1,000
2020-02-19DOB complaint, category ?
2020-02-19DOB complaint, category ?
2020-02-10FDNY inspection (CONSTR)
2020-01-22FDNY inspection (CONSTR)
2020-01-21FDNY inspection (CONSTR)
2020-01-16Permit NB — ISSUED
2020-01-16Permit FO — ISSUED
2020-01-16Permit FO — ISSUED
2020-01-14Permit FO — ISSUED
2020-01-14Permit NB — ISSUED
2020-01-14Permit Standpipe — Signed-off
2020-01-14Permit FO — RE-ISSUED
2020-01-13Job filed: INSTALLATION OF TEMPORARY FENCE AS PER DRAWINGS. FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS U$75,000
2020-01-13Permit Construction Fence — Signed-off
2020-01-07Job filed: INSTALLATION OF NEW TEMPORARY AIR MONITORED STANDPIPE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED$1,000
2020-01-07Permit Standpipe — Signed-off
2020-01-07Job filed: INSTALLATION OF NEW TEMPORARY MANUAL DRY STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. F$1,000
2019
2019-12-26Permit Sidewalk Shed — Signed-off
2019-12-24Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BU$2,500
2019-12-24Permit Sidewalk Shed — Signed-off
2019-12-23Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BU$2,500
2019-12-16Permit Construction Fence — Signed-off
2019-12-13Job filed: INSTALLATION AND USE OF CONSTRUCTION FENCE AS PER PLANS SUBMITTED. CONSTRUCTION FENCE SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICA$30,000
2019-12-13Permit Construction Fence — Signed-off
2019-12-12Job filed: INSTALLATION OF TEMPORARY FENCE AS PER DRAWINGS. FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS U$75,000
2019-10-04Job filed: FILING HEREWITH FOR SUPPORT OF EXCAVATION AS PER PLANS.
2019-10-04Job filed: FILING HEREWITH FOR SUPPORT OF EXCAVATION AS PER PLANS.
2019-10-04Job filed: FILING HEREWITH FOR SUPPORT OF EXCAVATION AS PER PLANS.
2019-08-08Job filed: FILING HEREWITH FOR 306 LF BUILDERS PAVEMENT PLAN AS PER PLANS. FILED IN CONJUNCTION WITH NB# 420665355.
2019-08-08Job filed: FILING HEREWITH FOR 306 LF BUILDERS PAVEMENT PLAN AS PER PLANS. FILED IN CONJUNCTION WITH NB# 420665355.
2019-08-08Job filed: FILING HEREWITH FOR 306 LF BUILDERS PAVEMENT PLAN AS PER PLANS. FILED IN CONJUNCTION WITH NB# 420665355.
2019-08-08Job filed: FILING HEREWITH FOR 504 LF BUILDERS PAVEMENT PLAN AS PER PLANS. FILED IN CONJUNCTION WITH NB# 420665346.
2019-07-12Job filed: FILING HEREWITH FOR FOUNDATION AS PER PLANS.
2019-07-01Job filed: FILING HEREWITH FOR HVAC SYSTEM AND INSTALLATION OF PLUMBING FIXTURES AS PER PLANS.
2019-07-01Job filed: FILING HEREWITH FOR LANDSCAPE WORK AS PER PLANS.
2019-07-01Job filed: FILING HEREWITH FOR SUPERSTRUCTURE AS PER PLANS.
2019-07-01Job filed: FILING HEREWITH FOR FOUNDATION AS PER PLANS.
2019-07-01Job filed: FILING HEREWITH FOR LANDSCAPE WORK AS PER PLANS.
2019-07-01Job filed: FILING HEREWITH FOR SUPERSTRUCTURE AS PER PLANS.