The city's published records show little recorded distress here in the last three years. Less recorded distress than 76% of 100+-unit residential buildings citywide. The citywide median for 100+-unit residential buildings is 3.7 penalty
points per 10 units; this building carries 1. In ZIP 10022, 72% of residential buildings hold an A and
6% grade D or F.
How grades work
this building
A
B
C
Among 4,677 100+-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
2 heat or hot-water complaints in the last three years (winter 2025–26: 2).
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
8 service requests in the last three years. Most common: Noise (6) · Homeless Person Assistance (1) · HEAT/HOT WATER (1).
Filed construction activity
$1,589,100 in permitted construction work filed since
2016 (47 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1959)
Yes
Six or more residential units (105)
No
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
210 EAST PROPERTY LLC
Head officer
CURTIS SACHS
Managing agent
J&M REALTY SERVICES CORP.
Last registered
2025-10-29
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$18,921,000
$8,514,450
2026
$20,803,000
$9,361,350
2027
$20,240,000
$9,108,000
The city's market estimate has risen
7% between tax years 2025 and 2027.
Building systems
Energy grade (LL33)
D — ENERGY STAR score 26/100, posted at the entrance by law (2022 disclosure cycle)
Heating fuel
NATURALGAS
Facade (Local Law 11)
SWARMP — "Safe With A Repair and Maintenance Program": known facade conditions that must be repaired (cycle 9)
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
59 St — 4 5 6 N R W · 600 ft straight-line (about a 3-minute walk) · station accessibility: none 51 St — 6 E F · 0.2 mi straight-line (about a 6-minute walk) · station accessibility: full
Bus
Nearest boarding stop: E 57 St / 3 Av — M31 M57 · 250 ft
Citi Bike
E 58 St & 3 Ave · 300 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
8 311 service requests from this address in the last three years — 1 of them about heat or hot water.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $48,599,234 on
2024-06-27 (lender: Pfp 2021-8 Ltd), covering 2 lots — the amount covers all of them. Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2024-07-17
AL&R $50,500,000 — from 210 EAST PROPERTY OWNER LLC; 155 EAST PROPERTY OWNER LLC to 3650 REAL ESTATE INVESTMENT TRUST 2 LLC
$50,500,000
2024-07-17
Agreement $50,500,000 — from 155 EAST PROPERTY OWNER LLC; 210 EAST PROPERTY OWNER LLC to 3650 REAL ESTATE INVESTMENT TRUST 2 LLC
$50,500,000
2024-06-27
Mortgage $48,599,234 — from 155 EAST PROPERTY LLC; 210 EAST PROPERTY LLC to PFP 2021-8 LTD
$48,599,234
2024-06-27
Agreement $71,776,314 — from 65 WEST PROPERTY LLC; 210 EAST PROPERTY LLC; 155 EAST PROPERTY LLC to PFP 2021-8 LTD
$71,776,314
2021-06-25
Deed $38,000,000 — from 58TH STREET CAPITAL LLC to 210 EAST PROPERTY LLC
$38,000,000
2021-06-25
Mortgage $41,641,656 — from 65 WEST PROPERTY LLC; 210 EAST PROPERTY LLC; 155 EAST PROPERTY LLC to PRIME FINANCE SHORT DURATION HOLDING COM
$41,641,656
2021-06-25
Agreement $71,776,314 — from 65 WEST PROPERTY LLC; 210 EAST PROPERTY LLC; 155 EAST PROPERTY LLC to PRIME FINANCE SHORT DURATION HOLDING COM
$71,776,314
2021-06-25
Mortgage $9,421,386 — from 210 EAST PROPERTY LLC; 155 EAST PROPERTY LLC; 65 WEST PROPERTY LLC to PRIME FINANCE SHORT DURATION HOLDING COM
$9,421,386
2021-06-25
AL&R $81,197,700 — from 65 WEST PROPERTY LLC; 210 EAST PROPERTY LLC; 155 EAST PROPERTY LLC to PRIME FINANCE SHORT DURATION HOLDING COM
$81,197,700
2021-06-15
RPTT&RET $65,067,329 — from DWORMAN, ALVIN to CAPITAL ENTERPRISES MIDTOWN LLC
$65,067,329
2021-06-07
Sold for $38,000,000
$38,000,000
$361,905
2016-04-12
Agreement $12,000,000 — from 58TH STREET CAPITAL LLC to JPMORGAN CHASE BANK, N.A.
$12,000,000
2011-06-21
Mortgage $4,500,000 — from 58TH STREET CAPITAL LLC to JPMORGAN CHASE BANK, N.A.
$4,500,000
2007-12-17
Mortgage $4,415,027 — from CAPITAL PROPERTIES COMPANY to WASHINGTON MUTUAL BANK
$4,415,027
2007-12-17
Agreement $7,500,000 — from CAPITAL PROPERTIES COMPANY to WASHINGTON MUTUAL BANK
$7,500,000
Ten-year activity
100500
2017
2018
2019
2020
70
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
4
5
12
1
16
38
2018
0
2
39
0
10
51
2019
0
0
31
0
4
35
2020
0
2
7
0
1
10
2021
51
2
5
11
1
70
2022
11
1
6
3
2
23
2023
9
10
3
0
1
23
2024
0
2
7
15
3
27
2025
0
0
5
0
6
11
2026
0
0
3
0
0
3
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2026-01-11
311: Noise - Residential — Banging/Pounding
The full timeline
2026
2026-05-04Bedbug filing: 0 infested units
2026-04-29HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2025-10-14Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-09-24311: Noise — Noise: Construction Before/After Hours (NM1)
2025-08-10Bedbug filing: 0 infested units
2025-07-15Boiler inspection
2025-07-15Boiler inspection
2025-06-04HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2024-07-17Mortgage assigned — from PFP 2021-8, LTD. to 3650 REAL ESTATE INVESTMENT TRUST 2 LLC
2024-07-17Mortgage assigned — from PFP 2021-8, LTD. to 3650 REAL ESTATE INVESTMENT TRUST 2 LLC
2024-07-17TL&R — from PFP 2021-8, LTD. to 65 WEST PROPERTY LLC; 155 EAST PROPERTY LLC; 210 EAST PROPERTY LLC
2024-07-17AALR — from 3650 REAL ESTATE INVESTMENT TRUST 2 LLC to 3650 REIT WAREHOUSE FACILITY ENTITY 2C L
2024-07-17Mortgage assigned — from 3650 REAL ESTATE INVESTMENT TRUST 2 LLC to 3650 REIT WAREHOUSE FACILITY ENTITY 2C L
2024-07-17AL&R $50,500,000 — from 210 EAST PROPERTY OWNER LLC; 155 EAST PROPERTY OWNER LLC to 3650 REAL ESTATE INVESTMENT TRUST 2 LLC$50,500,000
2024-07-17Agreement $50,500,000 — from 155 EAST PROPERTY OWNER LLC; 210 EAST PROPERTY OWNER LLC to 3650 REAL ESTATE INVESTMENT TRUST 2 LLC$50,500,000
2024-07-17Deed — from 210 EAST PROPERTY LLC to 210 EAST PROPERTY OWNER LLC
2024-07-10Deed transfer (nominal price)
2024-06-27Mortgage $48,599,234 — from 155 EAST PROPERTY LLC; 210 EAST PROPERTY LLC to PFP 2021-8 LTD$48,599,234
2024-06-27Agreement $71,776,314 — from 65 WEST PROPERTY LLC; 210 EAST PROPERTY LLC; 155 EAST PROPERTY LLC to PFP 2021-8 LTD$71,776,314
2024-05-20311: Homeless Person Assistance
2024-04-04Bedbug filing: 0 infested units
2024-04-01HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2023-08-03DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2023-07-27Job filed: FILE PLUMBING WORK IN CONJUNCTION TO DEPARTMENT OF BUILDINGS APPLICATION# M08035648. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$57,000
2023-07-21Job filed: REPLACEMENT OF EXISTING STOREFRONT WITH NEW GLASS DOOR, INTERIOR RENOVATION WITH PARTITION WORK FOR THE NEW MEDICAL OFFICES ON BASEMENT AND CELLAR. NO$121,600
2023-07-17Job filed: FILE MECHANICAL WORK TO INSTALL NEW HVAC SYSTEM IN CONJUNCTION WITH DOB APPLICATION# M08037663. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$40,000
2023-04-22DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022)
2023-04-04Permit Mechanical Systems — Signed-off
2023-03-31Job filed: FILE MECHANICAL WORK TO INSTALL NEW HVAC SYSTEM IN CONJUNCTION WITH DOB APPLICATION# M08037663. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$40,000
2023-03-31Job filed: FILE MECHANICAL WORK TO INSTALL NEW HVAC SYSTEM IN CONJUNCTION WITH DOB APPLICATION# M00780157. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$30,000
2023-01-24Permit General Construction — Signed-off
2022
2022-12-23Bedbug filing: 0 infested units
2022-12-09Job filed: FILE PLUMBING WORK IN CONJUNCTION TO DEPARTMENT OF BUILDINGS APPLICATION# M08035648. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$57,000
2022-12-02311: Lead — Lead Kit Request (Residential) (L10)
2022-11-23Job filed: REPLACEMENT OF EXISTING STOREFRONT WITH NEW GLASS DOOR, INTERIOR RENOVATION WITH PARTITION WORK FOR THE NEW MEDICAL OFFICES ON BASEMENT AND CELLAR. NO$121,600
2022-11-03Job filed: FILE MECHANICAL WORK TO INSTALL NEW HVAC SYSTEM IN CONJUNCTION WITH DOB APPLICATION# M00780157. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$30,000
2022-11-02Job filed: FILE PLUMBING WORK IN CONJUNCTION TO DEPARTMENT OF BUILDINGS APPLICATION# M00780157. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$21,000
2022-11-02Job filed: REPLACEMENT OF EXISTING STOREFRONT AND WINDOWS, INSTALL NEW GLASS RAILING FOR THE STAIRWAY, INTERIOR RENOVATION WITH PARTITION WORK FOR THE RETAIL STO$181,000
2022-10-31Permit Mechanical Systems — Signed-off
2022-10-21Job filed: FILE MECHANICAL WORK TO INSTALL NEW HVAC SYSTEM IN CONJUNCTION WITH DOB APPLICATION# M00780157. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$30,000
2022-10-18Permit Plumbing — Signed-off
2022-09-15Elevator permit: MODERNIZE (2) ELEVATORS PER DEVICE JOB DESCRIPTION. ALL WORK TO COMPLY WITH ASME A17.1-2000/03, CHAPTER 30, APPENDIX K and K3. PER$270,000
2022-09-12Permit General Construction — Signed-off
2022-09-09Job filed: FILE PLUMBING WORK IN CONJUNCTION TO DEPARTMENT OF BUILDINGS APPLICATION# M00780157. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$21,000
2022-08-21DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2021
2022-08-03Job filed: REPLACEMENT OF EXISTING STOREFRONT AND WINDOWS, INSTALL NEW GLASS RAILING FOR THE STAIRWAY, INTERIOR RENOVATION WITH PARTITION WORK FOR THE RETAIL STO$181,000
2022-05-25Cooling tower inspection
2022-04-02311: Noise — Noise: Construction Before/After Hours (NM1)
2022-03-16311: Noise — Noise: Jack Hammering (NC2)
2022-02-22Bedbug filing: 0 infested units
2022-02-15HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2022-02-10Mortgage assigned — from PFP VII SUB VIII, LLC to PFP 2021-8, LTD.
2022-02-10AALR — from PFP VII SUB VIII, LLC to PFP 2021-8, LTD.
2022-02-10Mortgage assigned — from PFP VII SUB VIII, LLC to PFP 2021-8, LTD.
2021
2021-12-07Permit Plumbing — Signed-off
2021-12-06Job filed: FILE PLUMBING WORK IN CONJUNCTION TO DEPARTMENT OF BUILDINGS APPLICATION# M00553130. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$10,000
2021-12-01DOB violation EGRADE: FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2021-11-30Job filed: INTERIOR RENOVATION, REPLACE WINDOWS AND INSTALL NEW SERVICE STAIRWAY TO COMBINE SECOND FLOOR APT. 2B AND THIRD FLOOR APT. 3B INTO ONE DUPLEX APARTMEN$42,000
2021-10-28Permit General Construction — Signed-off
2021-10-27Job filed: INTERIOR RENOVATION WITH PARTITION WORKS TO COMBINE TWO APARTMENTS ON FIFTH FLOOR APT. 5B AND APT. 5C INTO ONE APARTMENT. NO CHANGE OF USE, EGRESS OR $18,700
2021-10-26Job filed: INTERIOR RENOVATION WITH PARTITION WORKS TO COMBINE TWO APARTMENTS ON NINTH FLOOR APT. 9B AND APT. 9C INTO ONE APARTMENT. NO CHANGE OF USE, EGRESS OR $18,700
2021-10-25Permit Plumbing — Signed-off
2021-10-22Permit Plumbing — Signed-off
2021-10-19Permit Plumbing — Signed-off
2021-10-19Permit General Construction — Signed-off
2021-10-08Permit General Construction — Signed-off
2021-10-07Permit General Construction — Signed-off
2021-10-07Permit General Construction — Signed-off
2021-10-06Job filed: FILE PLUMBING WORK IN CONJUNCTION TO DEPARTMENT OF BUILDINGS APPLICATION# M00557637. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$8,000
2021-10-05Job filed: FILE PLUMBING WORK IN CONJUNCTION TO DEPARTMENT OF BUILDINGS APPLICATION# M00553130. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$10,000
2021-10-04Job filed: INTERIOR RENOVATION WITH PARTITION WORKS TO COMBINE TWO APARTMENTS ON FOURTH FLOOR APT. 4F AND APT. 4G INTO ONE APARTMENT. NO CHANGE OF USE, EGRESS OR$30,300
2021-10-03311: Noise - Vehicle — Car/Truck Music
2021-09-30Job filed: INTERIOR RENOVATION, REPLACE WINDOWS AND INSTALL NEW SERVICE STAIRWAY TO COMBINE SECOND FLOOR APT. 2B AND THIRD FLOOR APT. 3B INTO ONE DUPLEX APARTMEN$42,000
2021-09-29AALR — from PRIME FINANCE SHORT DURATION HOLDING COM to PFP VII SUB VIII, LLC
2021-09-29Mortgage assigned — from PRIME FINANCE SHORT DURATION HOLDING COM to PFP VII SUB VIII, LLC
2021-09-29Mortgage assigned — from PRIME FINANCE SHORT DURATION HOLDING COM to PFP VII SUB VIII, LLC
2021-09-29Permit Plumbing — Signed-off
2021-09-23Permit General Construction — Signed-off
2021-09-23Permit General Construction — Signed-off
2021-09-23Permit General Construction — Signed-off
2021-09-20Job filed: FILE PLUMBING WORK IN CONJUNCTION TO DEPARTMENT OF BUILDINGS APPLICATION# M00562408. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$19,000
2021-09-20Permit General Construction — Signed-off
2021-09-08Job filed: INTERIOR RENOVATION WITH PARTITION WORKS TO COMBINE TWO APARTMENTS ON NINTH FLOOR APT. 9B AND APT. 9C INTO ONE APARTMENT. NO CHANGE OF USE, EGRESS OR $18,700
2021-08-27Permit Plumbing — Signed-off
2021-08-25Job filed: FILE PLUMBING WORK IN CONJUNCTION TO DEPARTMENT OF BUILDINGSAPPLICATION# M00547229. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$7,000
2021-08-25Permit Plumbing — Signed-off
2021-08-23Permit General Construction — Signed-off
2021-08-17Job filed: FILE PLUMBING WORK IN CONJUNCTION TO DEPARTMENT OF BUILDINGS APPLICATION# M00575052. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$13,000
2021-08-17Job filed: INTERIOR RENOVATION WITH PARTITION WORKS FOR 11TH FLOOR APT.11C. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$32,000
2021-08-16Job filed: FILE PLUMBING WORK IN CONJUNCTION TO DEPARTMENT OF BUILDINGS APPLICATION# M00552853. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$10,000
2021-08-12Job filed: FILE PLUMBING WORK IN CONJUNCTION TO DEPARTMENT OF BUILDINGS APPLICATION# M00553220. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$25,000
2021-08-12Permit Plumbing — Signed-off
2021-08-10Permit General Construction — Signed-off
2021-08-09Job filed: INTERIOR RENOVATION WITH PARTITION WORKS TO COMBINE TWO APARTMENTS ON 12TH FLOOR APT.12C AND APT.12E INTO ONE APARTMENT. NO CHANGE OF USE, EGRESS OR O$50,000
2021-08-09Job filed: FILE PLUMBING WORK IN CONJUNCTION TO DEPARTMENT OF BUILDINGS APPLICATION# M00553727. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$7,000
2021-08-06Job filed: COMBINE TWO APARTMENTS ON SECOND FLOOR 2C AND 2D INTO ONEAPARTMENT WITH PARTITION WORKS. NO CHANGE OF USE, EGRESS OROCCUPANCY.$12,000
2021-08-06Permit Plumbing — Signed-off
2021-08-05Job filed: INTERIOR RENOVATION WITH PARTITION WORKS TO COMBINE TWO APARTMENTS ON FOURTH FLOOR APT. 4C AND APT. 4D INTO ONE APARTMENT. NO CHANGE OF USE, EGRESS OR$15,000
2021-08-04Asbestos abatement: Removal — PLI Group Corp
2021-08-04Job filed: COMBINE THREE APARTMENTS ON SECOND FLOOR 2H, 2J AND 2G INTO TWO APARTMENTS WITH PARTITION WORKS AND INSTALLATION OF NEW WINDOWS. NO CHANGE OF USE, EGR$35,800
2021-08-04Permit General Construction — Signed-off
2021-07-30Job filed: FILE PLUMBING WORK IN CONJUNCTION TO DEPARTMENT OF BUILDINGS APPLICATION# M00562408. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$19,000
2021-07-30Job filed: FILE PLUMBING WORK IN CONJUNCTION TO DEPARTMENT OF BUILDINGS APPLICATION# M00562313. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$14,000
2021-07-26Job filed: INTERIOR RENOVATION WITH PARTITION WORKS TO COMBINE TWO APARTMENTS ON FIFTH FLOOR APT. 5B AND APT. 5C INTO ONE APARTMENT. NO CHANGE OF USE, EGRESS OR $18,700
2021-07-23Job filed: INTERIOR RENOVATION WITH PARTITION WORKS TO COMBINE TWO APARTMENTS ON NINTH FLOOR APT. 9B AND APT. 9C INTO ONE APARTMENT. NO CHANGE OF USE, EGRESS OR $18,700
2021-07-23Job filed: FILE PLUMBING WORK IN CONJUNCTION TO DEPARTMENT OF BUILDINGSAPPLICATION# M00547229. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$7,000
2021-07-21Job filed: FILE PLUMBING WORK IN CONJUNCTION TO DEPARTMENT OF BUILDINGS APPLICATION# M00553727. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$7,000
2021-07-21Job filed: FILE PLUMBING WORK IN CONJUNCTION TO DEPARTMENT OF BUILDINGS APPLICATION# M00557637. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$8,000
2021-07-20Job filed: INTERIOR RENOVATION WITH PARTITION WORKS TO COMBINE TWO APARTMENTS ON FOURTH FLOOR APT. 4F AND APT. 4G INTO ONE APARTMENT. NO CHANGE OF USE, EGRESS OR$30,300
2021-07-19Job filed: INTERIOR RENOVATION WITH PARTITION WORKS TO COMBINE TWO APARTMENTS ON FOURTH FLOOR APT. 4C AND APT. 4D INTO ONE APARTMENT. NO CHANGE OF USE, EGRESS OR$15,000
2021-07-19Job filed: COMBINE TWO APARTMENTS ON SECOND FLOOR 2C AND 2D INTO ONEAPARTMENT WITH PARTITION WORKS. NO CHANGE OF USE, EGRESS OROCCUPANCY.$12,000
2021-06-25Deed $38,000,000 — from 58TH STREET CAPITAL LLC to 210 EAST PROPERTY LLC$38,000,000
2021-06-25Mortgage assigned — from JPMORGAN CHASE BANK, N.A. to PRIME FINANCE SHORT DURATION HOLDING COM
2021-06-25Mortgage $41,641,656 — from 65 WEST PROPERTY LLC; 210 EAST PROPERTY LLC; 155 EAST PROPERTY LLC to PRIME FINANCE SHORT DURATION HOLDING COM$41,641,656
2021-06-25Agreement $71,776,314 — from 65 WEST PROPERTY LLC; 210 EAST PROPERTY LLC; 155 EAST PROPERTY LLC to PRIME FINANCE SHORT DURATION HOLDING COM$71,776,314
2021-06-25Mortgage $9,421,386 — from 210 EAST PROPERTY LLC; 155 EAST PROPERTY LLC; 65 WEST PROPERTY LLC to PRIME FINANCE SHORT DURATION HOLDING COM$9,421,386
2021-06-25AL&R $81,197,700 — from 65 WEST PROPERTY LLC; 210 EAST PROPERTY LLC; 155 EAST PROPERTY LLC to PRIME FINANCE SHORT DURATION HOLDING COM$81,197,700
2021-06-15RPTT&RET $65,067,329 — from DWORMAN, ALVIN to CAPITAL ENTERPRISES MIDTOWN LLC$65,067,329
2021-06-07Sold for $38,000,000$38,000,000
2021-04-29DOB violation EGRADE: FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2020-06-18311: Non-Emergency Police Matter — Social Distancing
2020-06-18311: Non-Emergency Police Matter — Face Covering Violation
2020-06-14311: Homeless Person Assistance — N/A
2020-05-26311: Elevator — Elevator - Multiple Devices On Property
2020-05-26ECB CLASS - 1 violation: 42-M-07 , FILE APPLICATION , INSTALL DLM AND, PERFORM AND FILE TEST WITH NYCDOB. 29-J-1, DOOR OPERATOR MISALIGNED ADJUST, 56-Y-2 H$1,250
2020-05-26DOB complaint, category ?
2019
2019-12-26Bedbug filing: 1 infested units
2019-12-26Elevator permit: Alteration of Two (2) Passenger Elevators. All new work in compliance with ASME A17.1-2000/RS A17.1b-2003 with supplements Chapte$28,350
2019-05-03HPD class C: § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO H
2019-05-03HPD class A: § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX SIGN
2019-05-03HPD class A: § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPE
2019-05-03HPD class A: § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES
2019-01-06HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 4th ROOM FROM NORTH LOCATED AT PENTHOUSE
2019-01-06HPD class A: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT PENTHOUSE PHH
2019-01-06HPD class C: § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CI
2019-01-06HPD class A: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE 4th ROOM FROM NORTH LOCATED AT PENTHOUSE PHH
2019-01-06HPD class B: § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE FOYER LOCATED AT PENTHOUSE PHH
2019-01-02311: UNSANITARY CONDITION — PESTS
2019-01-02311: APPLIANCE — ELECTRIC/GAS RANGE
2019-01-02311: FLOORING/STAIRS — FLOOR
2019-01-02311: WATER LEAK — SLOW LEAK
2019-01-02311: PLUMBING — WATER SUPPLY
2019-01-02Tenant complaint: APPLIANCE — ELECTRIC/GAS RANGE
2019-01-02Tenant complaint: PLUMBING — WATER SUPPLY
2019-01-02Tenant complaint: WATER LEAK — SLOW LEAK
2018-11-08HPD class A: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 4th ROOM FROM NORTH LOC
2018-11-08HPD class A: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND EAST WALL IN THE 1st ROOM FROM NORTH A
2018-11-08HPD class A: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT
2018-11-08HPD class A: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE IN THE PRIVATE HALLWAY LOCATED AT APT PHH, 12th STORY, 1st
2018-11-08HPD class A: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT PHH, 12th STORY, 1
2018-11-08HPD class A: § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 4th ROOM FROM NORTH LOCATED AT A
2018-11-08HPD class B: § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE CABINET OFF THE CEILING IN THE KITCHEN LOCATED AT APT PHH, 12th STORY, 1st APARTMENT FROM SOUTH
2018-11-08HPD class B: § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE LOCATED AT APT PHH, 12th STORY, 1st APARTMENT FROM SOUTH AT WEST
2018-11-08HPD class A: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 4th ROOM FROM NORTH LOCATED AT APT PHH, 1
2018-11-08HPD class A: § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES AT SINK IN THE KITCHEN LOCATED AT APT PHH, 12th STORY, 1st APARTME
2018-11-08HPD class A: § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT
2018-11-08HPD class A: § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND EAST WALL IN THE 1st ROOM FROM NORT
2018-11-08HPD class A: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT PH
2018-11-02Tenant complaint: WATER LEAK — HEAVY FLOW
2018-11-02Tenant complaint: WATER LEAK — SLOW LEAK
2018-11-02Tenant complaint: PLUMBING — WATER SUPPLY
2018-10-31HPD litigation: Tenant Action
2018-10-16Rodent inspection: Passed
2018-10-12Boiler inspection
2018-10-12Boiler inspection
2018-09-07HPD class B: § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE LOCATED AT APT PHH, 12th STORY, 1st APARTMENT FROM NORTH AT EAST
2018-09-07HPD class B: § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE UPPER CABINETS TO CEILING TOTAL 2 AT SOUTH IN THE KITCHEN LOCATED AT APT PHH, 12th STORY, 1st A
2018-09-07HPD class A: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT PHH, 12th STORY, 1
2017-12-01ECB CLASS - 2 violation: FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AS PER 1 RCNY 103-04. NOTED: AT TIME OF INSPECTION NORTH ELEVATION EXPOSURE#1 BROKEN/
2017-11-29Facade (LL11) filing, cycle 8: SAFE
2017-10-28311: Noise — Noise: Construction Before/After Hours (NM1)
2017-10-03311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2017-10-03DOB complaint, category ?
2017-09-07Permit EQ — ISSUED
2017-07-10311: Noise - Vehicle — Car/Truck Horn
2017-06-23311: Air Quality — Air: Odor/Fumes, Vehicle Idling (AD3)
2017-06-20ECB CLASS - 2 violation: FAILURE TO FILE ANNUAL CERT. THAT COOLING TOWER 1000005323 HAS BEEN INSPECTED, TESTED, & DESINFECTED, & THAT A MAINTENANCE PLAN HA$1,000
2017-06-13Eviction executed (9F)
2017-05-21311: Noise — Noise: Construction Before/After Hours (NM1)
2017-05-17311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2016-05-13Job filed: CHANGE IN USE AND OCCUPANCY AT CELLAR. NO CHANGE IN EGRESS. ENCLOSE EXISTING BASEMENT AREA AT FRONT.$41,000
2016-05-13Job filed: CHANGE IN USE AND OCCUPANCY AT CELLAR. NO CHANGE IN EGRESS. ENCLOSE EXISTING BASEMENT AREA AT FRONT.$41,000
2016-04-12Agreement $12,000,000 — from 58TH STREET CAPITAL LLC to JPMORGAN CHASE BANK, N.A.$12,000,000
2016-03-28DOB violation E:
2016-03-28DOB violation E:
2016-03-14311: Noise — Noise: Jack Hammering (NC2)
2016-01-19311: Noise — Noise: Jack Hammering (NC2)
2016-01-14Permit EW — ISSUED
2016-01-11311: Miscellaneous Categories — Inspection Work Order (DOB)
2016-01-11DOB complaint, category ?
2016-01-06Permit EQ — ISSUED
2016-01-05Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCU
2016-01-05Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCU
2016-01-01ECB CLASS - 2 violation: BC03307.6.5 FAILURE TO MAINTAIN ADEQUATE ILLUMINATION BENEATH SIDEWALKSHED AS REQUIRED BY CODE.NOTE:SIDEWALK SHED ERECTED UNDER JO
2015
2015-12-22FDNY inspection (SPECIAL-OTH)
2015-11-18311: Noise — Noise: Construction Before/After Hours (NM1)
2015-10-31311: Street Condition — Plate Condition - Shifted
2015-09-28ECB CLASS - 2 violation: BC 3307.6.5 FAILURE TO MAINTAIN ADEQUATE ILLUMINATION BENEATH SIDEWALKSHED AS REQUIRED BY CODE.NOTE:SIDEWALK SHED ERECTED UNDER JO
2015-09-28Permit EQ — ISSUED
2015-09-21ECB CLASS - 2 violation: 28-317.3 FAILURE TO REGISTER COOLING TOWER.REM COMPLY W/ CODE.
2015-07-08Permit AL — ISSUED
2015-07-06Job filed: TO REVERSE THE SWING OF THE EXISTING DOUBLE-DOOR FRONT ENTRANCE TO THE LOBBY FROM INWARD TO OUTWARD. NO CHANGE IN USE EGRESS OR OCCUPANCY.$800
2015-07-06Job filed: TO REVERSE THE SWING OF THE EXISTING DOUBLE-DOOR FRONT ENTRANCE TO THE LOBBY FROM INWARD TO OUTWARD. NO CHANGE IN USE EGRESS OR OCCUPANCY.$800
2015-02-28311: Noise — Noise: Construction Before/After Hours (NM1)
2015-02-02Job filed: FACADE REPAIR INCLUDING WATER TOWER BULKHEAD,ROOF AND BRICK REPLACEMENT. BRICK REPLACEMENT AND PARAPET REPLACEMENT AS PER PLANS FILED. NO CHANGE IN $553,286
2015-02-02Job filed: FACADE REPAIR INCLUDING WATER TOWER BULKHEAD,ROOF AND BRICK REPLACEMENT. BRICK REPLACEMENT AND PARAPET REPLACEMENT AS PER PLANS FILED. NO CHANGE IN $553,286
2014
2014-12-22ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE CYCLE 7 TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS &$800
2014-09-27311: Noise — Noise: Construction Before/After Hours (NM1)
2014-09-27Permit EQ — ISSUED
2014-09-26311: Noise — Noise: Construction Before/After Hours (NM1)
2014-09-24311: Noise — Noise: Construction Before/After Hours (NM1)
2014-09-21311: Noise — Noise: Jack Hammering (NC2)
2014-09-12311: Noise — Noise: Construction Before/After Hours (NM1)
2014-08-29311: Street Condition — Plate Condition - Shifted
2014-08-27311: Street Condition — Plate Condition - Noisy
2014-08-27311: Noise — Noise: Construction Before/After Hours (NM1)
2014-08-22311: Street Condition — Plate Condition - Shifted
2014-08-22311: Street Condition — Plate Condition - Shifted
2014-08-19311: Street Condition — Plate Condition - Shifted
2014-06-25311: Street Condition — Plate Condition - Shifted
2014-06-23311: Noise — Noise: Construction Equipment (NC1)
2014-03-20DOB violation E:
2014-03-20DOB violation E:
2014-01-30311: Street Condition — Plate Condition - Noisy
2014-01-29311: Street Condition — Defective Hardware
2013
2013-12-31DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013
2013-12-23311: Street Condition — Plate Condition - Noisy
2013-12-02311: Street Condition — Plate Condition - Noisy
2013-11-19311: Noise — Noise: Construction Before/After Hours (NM1)
2013-11-08311: Air Quality — Air: Odor/Fumes, Restaurant (AD2)
2013-10-31311: Noise — Noise: Jack Hammering (NC2)
2013-10-09Permit EQ — ISSUED
2013-09-26311: Noise — Noise: Construction Before/After Hours (NM1)
2013-09-23311: Noise — Noise: Construction Before/After Hours (NM1)
2013-09-20311: Noise — Noise: Construction Before/After Hours (NM1)
2013-09-19311: Noise — Noise: Construction Before/After Hours (NM1)
2013-09-18311: Sidewalk Condition — Blocked - Construction
2013-08-23311: Noise — Noise: Jack Hammering (NC2)
2013-03-06Job filed: PA
2013-02-28311: PAINT - PLASTER — WALLS
2013-02-28311: PAINT - PLASTER — WALLS
2013-02-28311: PLUMBING — BASIN/SINK
2013-02-28311: GENERAL CONSTRUCTION — MOLD
2013-02-28Tenant complaint: GENERAL — MOLD
2013-02-28Tenant complaint: PAINT/PLASTER — WALL
2013-02-28Tenant complaint: PAINT/PLASTER — WALL
2013-02-28Tenant complaint: PLUMBING — BASIN/SINK
2013-02-20DOB violation E:
2013-02-20DOB violation E:
2013-02-14Permit EW — ISSUED
2013-01-25Job filed: REPLACE NEW CHILLER IN SAME PLACE AS PREVIOUSLY EXISTING. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.$165,000
2013-01-25Job filed: REPLACE NEW CHILLER IN SAME PLACE AS PREVIOUSLY EXISTING. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.$165,000
2012
2012-11-19Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2012-11-19Permit EQ — ISSUED
2012-11-09311: General Construction/Plumbing — Vent/Exhaust - Illegal/Improper
2012-11-09DOB complaint, category ?
2012-10-29311: General Construction/Plumbing — Site Conditions Endangering Workers
2012-10-29DOB complaint, category ?
2012-10-23311: Noise - Vehicle — Engine Idling
2012-10-09Rodent inspection: Passed
2012-06-05311: ELECTRIC — BELL-BUZZER/INTERCOM
2012-06-05Tenant complaint: ELECTRIC — BELL-BUZZER/INTERCOM
2012-05-29311: Elevator — Elevator - Defective/Not Working
2012-05-29311: ELECTRIC — BELL-BUZZER/INTERCOM
2012-05-29Tenant complaint: ELECTRIC — BELL-BUZZER/INTERCOM
2011-10-21311: Air Quality — Air: Odor/Fumes, Restaurant (AD2)
2011-09-24311: Air Quality — Air: Odor/Fumes, Restaurant (AD2)
2011-08-18311: Street Condition — Plate Condition - Shifted
2011-08-12Rodent inspection: Passed
2011-07-29ECB CLASS - 2 violation: FAILURE TO FILE AN AMENDED 6TH ROUND REPORT ACCEPTABLE TO THIS DEPT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIA$2,000
2011-07-18311: Street Condition — Plate Condition - Shifted
2011-07-15DOB violation E:
2011-07-15DOB violation E:
2011-07-05311: Street Condition — Plate Condition - Noisy
2011-06-21Deed — from CAPITAL PROPERTIES COMPANY to 58TH STREET CAPITAL LLC
2011-06-21Mortgage $4,500,000 — from 58TH STREET CAPITAL LLC to JPMORGAN CHASE BANK, N.A.$4,500,000
2011-06-21TL&R — from JPMORGAN CHASE BANK, N.A.; JPMORGAN CHASE BANK, N.A.
2011-06-13HPD class B: SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR NORTH AND EAST WALL IN THE 1st ROOM
2011-06-07Tenant complaint: GENERAL — MOLD
2011-06-07Tenant complaint: NONCONST — VERMIN
2011-06-07Tenant complaint: PLUMBING — BASIN/SINK
2011-06-06HPD litigation: Tenant Action
2011-05-23311: Street Condition — Plate Condition - Noisy
2011-03-27311: Street Condition — Defective Hardware
2011-02-03311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2011-02-03DOB violation C:
2011-02-03DOB complaint, category ?
2010
2010-09-14311: Street Condition — Plate Condition - Shifted
2010-09-13311: Noise — Noise: Jack Hammering (NC2)
2010-08-30DOB violation E:
2010-08-30DOB violation E:
2010-06-28311: Street Condition — Failed Street Repair
2010-04-08311: Noise — Noise: Jack Hammering (NC2)
2010-04-08311: Noise — Noise: Construction Before/After Hours (NM1)
2010-04-07311: Noise — Noise: Construction Before/After Hours (NM1)
2010-03-26311: Taxi Complaint — Driver Complaint
2010-03-26ECB CLASS - 2 violation: FAILURE TO FILE AN AMENDED 6TH ROUND REPORT ACCEPTABLE TO THIS DEPT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIA$2,000
2010-02-20311: Noise — Noise: Jack Hammering (NC2)
2010-02-14311: Noise — Noise: Jack Hammering (NC2)
2010-02-13311: Noise — Noise: Construction Equipment (NC1)
2008-01-15ECB Hazardous violation: SEC 27-129(D)(1)(A):LOCAL REPORT FILED AS "UNSAFE";UNSAFE CONDITION EXISTS AND NO MEASURES TAKEN TO SECURE SAFETY OF PUBLIC AS PER$800
2007
2007-12-17Mortgage $4,415,027 — from CAPITAL PROPERTIES COMPANY to WASHINGTON MUTUAL BANK$4,415,027
2007-12-17Agreement $7,500,000 — from CAPITAL PROPERTIES COMPANY to WASHINGTON MUTUAL BANK$7,500,000
2007-08-14Tenant complaint: GENERAL — VENTILATION SYSTEM
2007-08-14Tenant complaint: GENERAL — CERAMIC-TILE
2007-08-14Tenant complaint: GENERAL — DOORS
2007-08-14Tenant complaint: ELECTRIC — WIRING
2007-08-14Tenant complaint: PLUMBING — WATER SUPPLY
2007-08-14Tenant complaint: APPLIANCE — ELECTRIC/GAS RANGE
2007-08-14Tenant complaint: PAINT/PLASTER — WALL
2007-08-14Tenant complaint: GENERAL — CABINET
2007-08-09HPD litigation: Tenant Action
2007-07-16DOB violation E:
2007-07-16DOB violation E:
2007-06-25DOB violation L1198:
2007-05-29Permit EW — ISSUED
2007-05-21Job filed: Upgrade existing kitchen fire suppression system, as shown on plan. No change in use, occupancy, or egress.$3,000
2007-05-21Job filed: Upgrade existing kitchen fire suppression system, as shown on plan. No change in use, occupancy, or egress.$3,000
2007-02-21Facade (LL11) filing, cycle 6: SAFE
2006
2006-06-29DOB violation E:
2006-06-29DOB violation E:
2006-05-23DOB complaint, category ?
2005
2005-03-01Tenant complaint: NONCONST — VERMIN
2003
2003-10-07DOB violation E:
2003-10-07DOB violation E:
2000
2000-03-13ECB Non-Hazardous violation: 37L11,40M14,46O02,74O02,57I11,57O02.37L11)REPAIR FUSE NO.1 ON CONTROLLER-WINE WRAP AROUND BUTTON LEG OF FUSE HOLDER.40M14)MISSING
2000-03-13ECB Non-Hazardous violation: 74002,02D-,25Q12,57O02,57I11,04L11, 74)CLEAN CAR TOP 25)REPLACE DOOR OPERATOR CODE 57)REPAIR DAMAGED PIT WALL 04)REPAIR EMERGENCY
2000-03-09Permit EW — ISSUED
2000-01-20DOB violation E: 1P24480
2000-01-20DOB violation E: 1P24479
1999
1999-06-25Permit EW — ISSUED
1999-03-16DOB violation LL6291:
1998
1998-07-06Agreement — from CAPITAL PROPERTIES COMPANY to DIME SAVINGS BANK OFNEW YORK
1998-07-06Mortgage $113,753 — from CAPITAL PROPERTIES COMPANY to DIME SAVINGS BANK OFNEW YORK$113,753
1993-09-17Mortgage $90,000 — from CAPTIAL PROPERTIES CO to ANCHOR SAVINGS BANK,FSB$90,000
1993-09-17Agreement — from CAPITAL PROPERTIS CO to ANCHOR SAVINGS BANKFSB
1993-09-17Mortgage assigned — from CAPITAL PROPERTIES CO to ANCHOR SAVINGS BANKFSB
1993-09-17Mortgage assigned — from FIRST NATIONL BK/CHICAGO to ANCHOR SAVINGS BANKFSB
1993-08-11Permit EW — ISSUED
1993-06-28DOB violation LL1081: 2
1992
1992-10-22ECB Hazardous violation: FAILURE TO FILE AN AMENDED REPORT ACCEPTABLE TO THIS DEPARTMENT PURSUANT TO RULE RCNY 32-03B(5)INDICATING CORRECTION OF HAZA
1992-10-06Permit EW — ISSUED
1992-05-27ECB Hazardous violation: FAILURE TO FILE AN AMENDED REPORT ACCEPTABLE TO THIS DEPARTMENT PURSUANT TO RULE RCNY 32-03B (5) INDICATING CORRECTION OF HA$400
1992-02-19DOB complaint, category ?
1992-02-11DOB violation LL10/80:
1987
1987-12-24Mortgage $2,533,749 — from CAPITAL PROPERTIES CO to FIRST NTL BK/CHICAGO$2,533,749
1987-12-24Mortgage satisfied — from CAPITAL PROPERTIES CO; WICKAMSHIRE RLTY CORP; WICKHCMSHIRE RLTY CORP to LIFTON, MARTIN; CHEMICAL BANK
1987-12-24Mortgage assigned — from JAMAICA SVGS BK to FIRST NTL BK/CHICAGO
1983
1983-02-24Mortgage $213,150 — from CAPITAL PROPERTIES CO. to CHEMICAL BANK$213,150
1982
1982-08-10Mortgage assigned — from LIFTON, MARTIN INDIV. to CHEMICAL BANK
1982-08-10Agreement — from CAPITAL PROPERTIES CO. to CHEMICAL BANK
1982-08-10SAGE — from LIFTON, MARTIN
1980
1980-08-04Deed — from WICKHAMSHIRE REALTYCORP to CAPITAL PROPERTIES CO
1980-08-04Deed — from CAPITAL PROPERTIES CO to WICKHAMSHIRE REALTYCORP
1980-08-04Mortgage assigned — from WEINER, PHYLLIS; LIFTON, MARTIN; LIFTON, NAT to LIFTON, MARTIN
1980-08-04Mortgage — from WICKHAMSHIRE REALTYCORP to LIFTON, MARTIN
1980-08-04Agreement — from WICKHAMSHIRE REALTYCORP to LIFTON, MARTIN
1980-08-04Agreement — from CAPITAL PROPERTIES CO to LIFTON, MARTIN
1980-08-04Mortgage assigned — from WICKHAMSHIRE REALTYCORP to LIFTON, MARTIN
1978
1978-11-24Agreement — from CAPITAL PROPERTIES CO to WEIVER, PHYLLIS; TIFTON, MARTIN; TIFTON, NAT
1978-11-24Deed — from WICKHAMSHIRE REALTYCORP to CAPITAL PROPERTIES CO
1978-11-24Deed — from CAPITAL PROPERTIES CO to WICKHAMSHIRE REALTYCORP
1978-11-24Agreement — from WICKHAMSHIRE REALTYCORP to WEINER, PHYLLIS; TIFTON, MARTIN; TIFTON, NAT
1975
1975-05-29Deed — from WICKHAMSHIRE REALTYCORP to CAPITAL PROPERTIES CO
1975-05-29Mortgage assigned — from LIFTON, MARTIN to LIFTON, NAT
1975-05-29Mortgage assigned — from LIFTON, MARTIN to WEINER, PHYLLIS
1975-05-29Mortgage — from WICKHAMSHIRE REALTYCORP to LIFTON, MARTIN
1975-05-29LEAS — from CAPITAL PROPERTIES CO to LIFTON, MARTIN
1975-05-29Deed — from CAPITAL PROPERTIES CO to WICKHAMSHIRE REALTYCORP
1975-05-29Mortgage assigned — from WICKHAMSHIRE REALTYCORP to LIFTON, MARTIN
1972
1972-11-13Agreement — from CAPITAL PROPERTIES CO to JAMAICA SAVINGS BANK
1972-11-08Deed — from WICKHAMSHIRE REALTYCORP to CAPITAL PROPERTIES CO
1972-11-08Mortgage assigned — from PRUDENTIAL INS CO AMER to JAMAICA SAVINGS BANK
1972-11-08Mortgage — from WICKHAMSHIRE REALTYCORP to JAMAICA SAVINGS BANK
1972-11-08Mortgage assigned — from PROVIDERS BENEFIT CO to JAMAICA SAVINGS BANK
1971
1971-08-24Mortgage assigned — from SECURITY ALLIANCE CORP. to PROVIDERS BENEFIT CO.
1971-08-24Mortgage assigned — from LEEB HARRY A. to PROVIDERS BENEFIT CO.
1971-08-24Mortgage — from WICKHAMSHIRE RLTY CORP.
1971-06-28Mortgage — from WICKHAMSHIRE RLTY CORP. to SECURITY ALLIANCE CORP.
1971-06-28Deed — from CAPITAL PROPERTIES CO. to WICKHAMSHIRE RLTY CORP.
1971-04-28Mortgage assigned — from SECURITY ALLIANCE CORP. to PROVIDERS BENEFIT CO.
1970
1970-09-14Mortgage assigned — from AMERICAN BNK TRUST CO. to SECURITY ALLIANCE CORP.
1970-09-14Deed — from LEEB HARRY A. to WICKHAMSHIRE RLTY CORP.
1970-09-14PAT — from LEEB HARRY A. to MACKLER ALFRED
1970-09-14LEAS — from CAPITAL PROP. CO. ETAL
1970-09-14Mortgage — from SECURITY ALLIANCE CORP. to LEEB HARRY A.
1970-09-14Deed — from WICKHAMSHIRE RLTY CORP. to CAPITAL PROPERTIES CO
1970-09-14Mortgage — from WICKHAMSHIRE RLTY CORP. to LEEB HARRY A.
1970-09-08Mortgage — from SECURITY ALLIANCE CORP. to MARTIRS AMERICAN CO.
1970-04-27Mortgage — from LEEB HARRY A. to ECOLOG CORP.
1970-04-27Mortgage assigned — from LEEB HARRY A. to ECOLOG CORP.
1970-04-27Mortgage assigned — from ECOLOG CORP. to AMERICAN BANK + TRSTCO
1970-03-04Mortgage assigned — from AZIN EVELYN (IND) ETAL to LEEB HARRY A.
1967
1967-08-11Agreement — from CAPITAL PROPERTIES CO. to SECURITY ALLIANCE CORP.
1967-08-11Mortgage assigned — from SECURITY ALLIANCE CORP. to MARTINE AMERICA CO.
1967-08-08Mortgage assigned — from ATLANTIC CO. to MACK OLGA L.
1967-08-08Mortgage assigned — from BRISTOL OPERATING CORP. to CAPITAL PROPERTIES CO.
1967-08-08Mortgage — from CAPITAL PROPERTIES INC to SECURITY ALLIANCE CORP.
1967-08-08Mortgage assigned — from COLLATERAL FACTORS CORP. to BRISTOL OPERATING INC.
1966
1966-06-07Mortgage — from BRISTOL OPERATING INC. to ATLANTIC COMPANY ETAL
1966-06-07Mortgage — from BRISTOL OPERATING INC. to ATLANTIC CO. ETAL
1966-01-06Mortgage assigned — from ATLANTIC COMPANY to MACK OLGA L.
1900
1900-01-01Boiler inspection
1900-01-01Air permit (CERTIFICATE TO OPERATE), fuel: NO6FUEL