The city's published records show little recorded distress here in the last three years. Less recorded distress than 56% of 25-99-unit residential buildings citywide. The citywide median for 25-99-unit residential buildings is 23.6 penalty
points per 10 units; this building carries 17.2. In ZIP 10021, 81% of residential buildings hold an A and
3% grade D or F.
How grades work
this building
A
B
C
Among 17,252 25-99-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
Open HPD violations
19 total — 12 class C (immediately hazardous), 1 class B, 6 class A. Oldest open since 2006-08-28.
status snapshot refreshed weekly from HPD records
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
$55,625 in enforcement penalties imposed (ECB/OATH) in the last three years.
What 311 hears from this address
44 service requests in the last three years. Most common: Noise (12) · General Construction/Plumbing (11) · Emergency Response Team (ERT) (4) · Street Condition (3) · Homeless Person Assistance (3) · Illegal Dumping (2).
Filed construction activity
$670,658 in permitted construction work filed since
2016 (41 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974 (2025)
Yes
Six or more residential units (52)
No
421-a / J-51 tax benefit on the current tax roll
1 of 3 signals present. Only a partial profile — stabilization is possible but less likely. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
CF EAST 72 OWNER LLC
Head officer
MEYER CHETRIT
Managing agent
PLAZA MANAGEMENT
Last registered
2021-10-20
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$1,990,000
$895,500
2026
$2,587,000
$1,164,150
2027
$3,363,000
$1,513,350
The city's market estimate has risen
69% between tax years 2025 and 2027.
Building systems
Energy grade (LL33)
F — did not submit required benchmarking data, posted at the entrance by law (2022 disclosure cycle)
Heating fuel
NATURALGAS
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
72 St — Q · 150 ft straight-line (about a 1-minute walk) · station accessibility: full 68 St-Hunter College — 6 · 0.3 mi straight-line (about a 7-minute walk) · station accessibility: full
Bus
Nearest boarding stop: E 72 St / 2 Av — M72 · 150 ft
Citi Bike
2 Ave & E 72 St · 100 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
44 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $15,221,015 on
2025-03-19 (lender: G4 18222 LLC), covering 4 lots — the amount covers all of them. Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2025-03-19
AL&R $165,000,000 — from CF EAST 72 OWNER LLC; 259 EAST 72 OWNER LLC to G4 18222 LLC
$165,000,000
2025-03-19
Agreement $16,221,016 — from CF EAST 72 OWNER LLC; 259 EAST 72 OWNER LLC to G4 18222 LLC
$16,221,016
2025-03-19
Mortgage $15,221,016 — from CF EAST 72 OWNER LLC; 259 EAST 72 OWNER LLC to G4 18222 LLC
$15,221,016
2025-03-19
Agreement $65,391,452 — from CF EAST 72 OWNER LLC; 259 EAST 72 OWNER LLC to G4 18222 LLC
$65,391,452
2025-03-19
Mortgage $64,391,452 — from 259 EAST 72 OWNER LLC; CF EAST 72 OWNER LLC to G4 18222 LLC
$64,391,452
2025-03-19
Agreement $83,387,532 — from CF EAST 72 OWNER LLC; 259 EAST 72 OWNER LLC to G4 18222 LLC
$83,387,532
2025-03-19
Mortgage $24,212,642 — from CF EAST 72 OWNER LLC; 259 EAST 72 OWNER LLC to G4 18222 LLC
$24,212,642
2024-11-22
AL&R $61,174,890 — from 259 EAST 72 OWNER LLC; CF EAST 72 OWNER LLC to G4 18222 LLC
$61,174,890
2024-11-22
Mortgage $1,000,000 — from CF EAST 72 OWNER LLC; 259 EAST 72 OWNER LLC to G4 18222 LLC
$1,000,000
2024-11-22
Mortgage $1,000,000 — from CF EAST 72 OWNER LLC; 259 EAST 72 OWNER LLC to G4 18222 LLC
$1,000,000
2024-11-22
Mortgage $59,174,890 — from 259 EAST 72 OWNER LLC; CF EAST 72 OWNER LLC to G4 18222 LLC
$59,174,890
2023-11-29
Mortgage $1,000,000 — from CF EAST 72 OWNER LLC; 259 EAST 72 OWNER LLC to G4 18222, LLC
$1,000,000
2023-11-29
Mortgage $59,174,890 — from 259 EAST 72 OWNER LLC; CF EAST 72 OWNER LLC to G4 18222, LLC
$59,174,890
2023-11-29
Mortgage $5,500,000 — from 1200 FIFTH ASSOCIATES LLC; 259 EAST 72 OWNER LLC; 49-51 CHAMBERS LLC; CF EAST 72 OWNER LLC to G4 18222, LLC
$5,500,000
2023-11-29
Mortgage $4,000,000 — from 1200 FIFTH ASSOCIATES LLC; CF EAST 72 OWNER LLC; 49-51 CHAMBERS LLC; 259 EAST 72 OWNER LLC to G4 18222, LLC
$4,000,000
Ten-year activity
2001000
2017
2018
2019
2020
2021
2022
2023
2024
2025
110
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
0
1
9
0
7
17
2018
0
4
73
6
9
92
2019
5
12
30
0
3
50
2020
1
12
32
0
2
47
2021
0
3
23
0
8
34
2022
20
27
29
6
6
88
2023
3
29
34
14
10
90
2024
1
6
17
6
2
32
2025
21
4
11
7
1
44
2026
53
35
18
1
3
110
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Permit Protection and Mechanical Methods — Permit Issued
2026-09-18
Job filed: PROPOSED TWENTY (20) STORY MIXED USE DEVELOPMENT.
2026-09-16
311: Sewer Maintenance — Backup
2026-09-03
Permit General Construction — Permit Issued
2026-09-01
Job filed: Installation of a temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occ
2026-09-01
Job filed: Installation of a temporarily supported scaffold and heavy-duty sidewalk shed/overhead protection per plan submitted. Work shall comply with 2022 buil
2026-08-27
Job filed: PROPOSED NEW CURB CUT FILED IN CONJUNCTION WITH NB JOB NUMBER M00785688-I1.
2026-08-27
Job filed: Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occ
2026-08-27
Job filed: Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and
2026-08-27
Job filed: Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or o
2026-08-26
Job filed: Installation of temporary single personnel hoist as per plans submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egre
2026-08-04
Permit Plumbing — Permit Issued
2026-08-04
Permit Plumbing — Permit Issued
2026-08-03
DOB complaint, category ?
2026-08-03
ECB CLASS - 2 violation: OBS. NEEDLE BEAM INSTALLATIONS AT EXP. 3 & 4 DEVIATE FROM APPR. NEEDLEBEAM PLANS. FL. 14-(9) BEAMS; APPR. (6). FL. 6-(9); APPR. (8
2026-07-30
SMIS — from CF EAST 72ND OWNER LLC
2026-07-30
Permit Mechanical Systems — Permit Issued
2026-07-29
Job filed: Temporary use of the 1st floor of NB (M00785688-I1) at 260 East 72nd Street NY 10021 is hereby requested for the purpose of exhibiting a sales office(
2026-07-27
Permit Standpipe — Permit Issued
2026-07-27
Permit Sprinklers — Permit Issued
2026-07-27
Job filed: Installation of a temporarily supported scaffold and heavy-duty sidewalk shed/overhead protection per plan submitted. Work shall comply with 2022 buil
2026-07-17
Job filed: Installation of a temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occ
2026-07-16
Elevator permit: FURNISH AND INSTALL FOUR (4) NEW OVERHEAD GEARLESS TRACTION PASSENGER ELEVATOR. ALL WORK COMPLY WITH ASMEA17.1-2013, PART 2, SAFET
2026-07-02
Job filed: STRUCTURE FILED IN CONJUNCTION WITH NB JOB NUMBER M00785688-S3.
2026-06-25
DOB complaint, category ?
2026-06-25
ECB CLASS - 2 violation: ACTIVE 18STORY NB. NEEDLE BEAMS INSTALLED ON EXPO3&4 OF SITE WERE CONTRARY TO PLANS & MISSING REQUIRED SHORING POSTS ON FLOORS BEN
2026-06-20
311: Noise — Noise: Construction Before/After Hours (NM1)
2026-06-19
FDNY inspection (CONSTR)
2026-06-16
DOB complaint, category ?
2026-06-15
ECB CLASS - 2 violation: OBSERVED PLASTIC BARRIERS INSTALLED ON THE ROADWAY EXP1 72 ST NOT IN ACCORDANCE WITH MANUFACTURER SPECIFICATIONS. THE BARRIERS WER
2026-06-08
DOB complaint, category ?
2026-06-03
Permit Protection and Mechanical Methods — Permit Issued
2026-05-29
Job filed: Install foundation as per plans filed herewith.
2026-05-28
Permit Protection and Mechanical Methods — Permit Issued
2026-05-26
Permit Construction Fence — Permit Issued
2026-05-22
Permit Structural — Permit Issued
2026-05-21
Permit Foundation — Permit Issued
2026-05-21
Permit General Construction — Permit Issued
2026-05-20
311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2026-05-20
DOB complaint, category ?
2026-05-20
DOB complaint, category ?
2026-04-30
Job filed: Installation of Concrete pump as per plans filed herewith. No change in use, egress or occupancy.
2026-04-29
HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2026-04-28
311: Street Condition — Blocked - Construction
2026-04-24
Elevator permit: FURNISH AND INSTALL FOUR (4) NEW OVERHEAD GEARLESS TRACTION PASSENGER ELEVATOR. ALL WORK COMPLY WITH ASMEA17.1-2013, PART 2, SAFET
2026-04-21
Job filed: Installation of a temporary Site Specific Engineered Enclosure System per plan submitted. Work shall comply with 2022 building codes chapter 33. No ch
2026-04-20
DOB complaint, category ?
2026-04-20
DOB complaint, category ?
2026-04-20
Job filed: Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and
2026-04-17
311: General Construction/Plumbing — Debris - Excessive
2026-04-17
DOB complaint, category ?
2026-04-17
ECB CLASS - 1 violation: AT TIME OF INSPECTION OF AN 18 STORY BUILDING AT 10 FLOOR LEVEL. INSPECTION REVEAL AS PER ADJACENT PROPERTY TENANT THAT A WRENCH F
2026-04-17
ECB CLASS - 1 violation: AT THE TIME OF MY INSPECTION OF AN 18 STORY BUILDING AT 10 FLOOR LEVEL. I OBSERVED CONSTRUCTION DEBRIS AND TOOLS FALLING UNTO ADJA
2026-04-17
ECB CLASS - 1 violation: AT TIME OF INSPECTION OF AN 18 STORY BUILDING AT 10 FLOOR LEVEL. INSPECTION REVEAL AS PER ADJACENT PROPERTY TENANT THAT A WRENCH F
2026-04-17
ECB CLASS - 1 violation: AT TIME OF INSPECTION OF 18 STORY NEW BUILDING IN PROGRESS AT 10' FLOOR OBSERVED NO CONSTRUCTION SUPERINTENDENT ON SITE AS REQUIRE
2026-04-17
ECB CLASS - 2 violation: AT TIME OF INSPECTION OF 18 STORY BUILDING AT 10 FL LEVEL POURING CONCRETE WITH HORIZONTAL NETTING EXPOSURE 1, 2 &4 NOT AT REQUIRE
2026-04-17
ECB CLASS - 1 violation: AT TIME OF INSPECTION OF AN 18 STORY BUILDING AT 10 FLOOR LEVEL. INSPECTION REVEAL AS PER ADJACENT PROPERTY TENANT THAT A WRENCH F
2026-04-16
311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2026-04-16
DOB complaint, category ?
2026-04-13
Job filed: BPP HEREWITH FILED IN CONJUNCTION WITH NB JOB NUMBER M00785688-I1. A TOTAL OF 239.2 LINEAR FEET PROPOSED.
2026-04-13
Job filed: Installation of a temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occ
2026-04-07
Job filed: Installation of a temporarily supported scaffold and heavy-duty sidewalk shed/overhead protection per plan submitted. Work shall comply with 2022 buil
2026-04-06
DOB complaint, category ?
2026-03-31
311: Emergency Response Team (ERT) — After Hours Work - Illegal
2026-03-31
DOB complaint, category ?
2026-03-28
Job filed: PROPOSED TWENTY (20) STORY MIXED USE DEVELOPMENT.
2026-03-20
Permit Structural — Permit Issued
2026-03-18
Job filed: INSTALLATION AND USE OF TEMPORARY OUTRIGGER PLATFORM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
2026-03-17
311: Street Condition — Pothole
2026-03-17
Job filed: Installation of temporary window protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or
2026-03-16
ECB CLASS - 2 violation: CERTIFICATE OF CORRECTION HAS NOT BEEN OBTAINED FOR CLASS 1 VIOLATION#39094384L ISSUED 9/8/2023 CITING EXCESSIVE AMOUNT OF CONSTRU
2026-03-13
Permit Standpipe — Permit Issued
2026-03-11
311: Emergency Response Team (ERT) — After Hours Work - Illegal
2026-03-11
Job filed: Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and
2026-03-11
DOB complaint, category ?
2026-03-09
Permit Protection and Mechanical Methods — Permit Issued
2026-03-08
311: Dirty Condition — Trash
2026-03-08
311: Dirty Condition — Trash
2026-03-06
DOB complaint, category ?
2026-03-06
ECB CLASS - 2 violation: OBSERVED ENGINEERED ENCLOSURE SYSTEM AT WEST EXPOSURE BY ADJACENT BUILDING COURTYARD. NO PERMIT OF THE EQUIPMENT.28-105.1STOP CONT
showing the 80 most recent
The full timeline
2026
2026-10-09Permit Protection and Mechanical Methods — Permit Issued
2026-09-18Job filed: PROPOSED TWENTY (20) STORY MIXED USE DEVELOPMENT.$1,000
2026-09-16311: Sewer Maintenance — Backup
2026-09-03Permit General Construction — Permit Issued
2026-09-01Job filed: Installation of a temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occ$3,000
2026-09-01Job filed: Installation of a temporarily supported scaffold and heavy-duty sidewalk shed/overhead protection per plan submitted. Work shall comply with 2022 buil$8,000
2026-08-27Job filed: PROPOSED NEW CURB CUT FILED IN CONJUNCTION WITH NB JOB NUMBER M00785688-I1.$130
2026-08-27Job filed: Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occ
2026-08-27Job filed: Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and$5,000
2026-08-27Job filed: Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or o$5,000
2026-08-26Job filed: Installation of temporary single personnel hoist as per plans submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egre$10,000
2026-08-04Permit Plumbing — Permit Issued
2026-08-04Permit Plumbing — Permit Issued
2026-08-03DOB complaint, category ?
2026-08-03ECB CLASS - 2 violation: OBS. NEEDLE BEAM INSTALLATIONS AT EXP. 3 & 4 DEVIATE FROM APPR. NEEDLEBEAM PLANS. FL. 14-(9) BEAMS; APPR. (6). FL. 6-(9); APPR. (8$1,250
2026-07-30SMIS — from CF EAST 72ND OWNER LLC
2026-07-30Permit Mechanical Systems — Permit Issued
2026-07-29Job filed: Temporary use of the 1st floor of NB (M00785688-I1) at 260 East 72nd Street NY 10021 is hereby requested for the purpose of exhibiting a sales office($477,600
2026-07-27Permit Standpipe — Permit Issued
2026-07-27Permit Sprinklers — Permit Issued
2026-07-27Job filed: Installation of a temporarily supported scaffold and heavy-duty sidewalk shed/overhead protection per plan submitted. Work shall comply with 2022 buil$8,000
2026-07-17Job filed: Installation of a temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occ$3,000
2026-07-16Elevator permit: FURNISH AND INSTALL FOUR (4) NEW OVERHEAD GEARLESS TRACTION PASSENGER ELEVATOR. ALL WORK COMPLY WITH ASMEA17.1-2013, PART 2, SAFET$1,780,000
2026-07-02Job filed: STRUCTURE FILED IN CONJUNCTION WITH NB JOB NUMBER M00785688-S3.$1,000
2026-06-25DOB complaint, category ?
2026-06-25ECB CLASS - 2 violation: ACTIVE 18STORY NB. NEEDLE BEAMS INSTALLED ON EXPO3&4 OF SITE WERE CONTRARY TO PLANS & MISSING REQUIRED SHORING POSTS ON FLOORS BEN$625
2026-06-20311: Noise — Noise: Construction Before/After Hours (NM1)
2026-06-19FDNY inspection (CONSTR)
2026-06-16DOB complaint, category ?
2026-06-15ECB CLASS - 2 violation: OBSERVED PLASTIC BARRIERS INSTALLED ON THE ROADWAY EXP1 72 ST NOT IN ACCORDANCE WITH MANUFACTURER SPECIFICATIONS. THE BARRIERS WER
2026-06-08DOB complaint, category ?
2026-06-03Permit Protection and Mechanical Methods — Permit Issued
2026-05-29Job filed: Install foundation as per plans filed herewith.$1,000
2026-05-28Permit Protection and Mechanical Methods — Permit Issued
2026-05-26Permit Construction Fence — Permit Issued
2026-05-22Permit Structural — Permit Issued
2026-05-21Permit Foundation — Permit Issued
2026-05-21Permit General Construction — Permit Issued
2026-05-20311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2026-05-20DOB complaint, category ?
2026-05-20DOB complaint, category ?
2026-04-30Job filed: Installation of Concrete pump as per plans filed herewith. No change in use, egress or occupancy.$1,000
2026-04-29HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2026-04-28311: Street Condition — Blocked - Construction
2026-04-24Elevator permit: FURNISH AND INSTALL FOUR (4) NEW OVERHEAD GEARLESS TRACTION PASSENGER ELEVATOR. ALL WORK COMPLY WITH ASMEA17.1-2013, PART 2, SAFET$1,780,000
2026-04-21Job filed: Installation of a temporary Site Specific Engineered Enclosure System per plan submitted. Work shall comply with 2022 building codes chapter 33. No ch$3,000
2026-04-20DOB complaint, category ?
2026-04-20DOB complaint, category ?
2026-04-20Job filed: Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and$5,000
2026-04-17311: General Construction/Plumbing — Debris - Excessive
2026-04-17DOB complaint, category ?
2026-04-17ECB CLASS - 1 violation: AT TIME OF INSPECTION OF AN 18 STORY BUILDING AT 10 FLOOR LEVEL. INSPECTION REVEAL AS PER ADJACENT PROPERTY TENANT THAT A WRENCH F$5,000
2026-04-17ECB CLASS - 1 violation: AT THE TIME OF MY INSPECTION OF AN 18 STORY BUILDING AT 10 FLOOR LEVEL. I OBSERVED CONSTRUCTION DEBRIS AND TOOLS FALLING UNTO ADJA$10,000
2026-04-17ECB CLASS - 1 violation: AT TIME OF INSPECTION OF AN 18 STORY BUILDING AT 10 FLOOR LEVEL. INSPECTION REVEAL AS PER ADJACENT PROPERTY TENANT THAT A WRENCH F$2,500
2026-04-17ECB CLASS - 1 violation: AT TIME OF INSPECTION OF 18 STORY NEW BUILDING IN PROGRESS AT 10' FLOOR OBSERVED NO CONSTRUCTION SUPERINTENDENT ON SITE AS REQUIRE$10,000
2026-04-17ECB CLASS - 2 violation: AT TIME OF INSPECTION OF 18 STORY BUILDING AT 10 FL LEVEL POURING CONCRETE WITH HORIZONTAL NETTING EXPOSURE 1, 2 &4 NOT AT REQUIRE$2,500
2026-04-17ECB CLASS - 1 violation: AT TIME OF INSPECTION OF AN 18 STORY BUILDING AT 10 FLOOR LEVEL. INSPECTION REVEAL AS PER ADJACENT PROPERTY TENANT THAT A WRENCH F$2,500
2026-04-16311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2026-04-16DOB complaint, category ?
2026-04-13Job filed: BPP HEREWITH FILED IN CONJUNCTION WITH NB JOB NUMBER M00785688-I1. A TOTAL OF 239.2 LINEAR FEET PROPOSED.
2026-04-13Job filed: Installation of a temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occ$3,000
2026-04-07Job filed: Installation of a temporarily supported scaffold and heavy-duty sidewalk shed/overhead protection per plan submitted. Work shall comply with 2022 buil$8,000
2026-04-06DOB complaint, category ?
2026-03-31311: Emergency Response Team (ERT) — After Hours Work - Illegal
2026-03-31DOB complaint, category ?
2026-03-28Job filed: PROPOSED TWENTY (20) STORY MIXED USE DEVELOPMENT.$1,000
2026-03-20Permit Structural — Permit Issued
2026-03-18Job filed: INSTALLATION AND USE OF TEMPORARY OUTRIGGER PLATFORM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$3,000
2026-03-17311: Street Condition — Pothole
2026-03-17Job filed: Installation of temporary window protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or$5,000
2026-03-16ECB CLASS - 2 violation: CERTIFICATE OF CORRECTION HAS NOT BEEN OBTAINED FOR CLASS 1 VIOLATION#39094384L ISSUED 9/8/2023 CITING EXCESSIVE AMOUNT OF CONSTRU
2026-03-13Permit Standpipe — Permit Issued
2026-03-11311: Emergency Response Team (ERT) — After Hours Work - Illegal
2026-03-11Job filed: Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and$5,000
2026-03-11DOB complaint, category ?
2026-03-09Permit Protection and Mechanical Methods — Permit Issued
2026-03-08311: Dirty Condition — Trash
2026-03-08311: Dirty Condition — Trash
2026-03-06DOB complaint, category ?
2026-03-06ECB CLASS - 2 violation: OBSERVED ENGINEERED ENCLOSURE SYSTEM AT WEST EXPOSURE BY ADJACENT BUILDING COURTYARD. NO PERMIT OF THE EQUIPMENT.28-105.1STOP CONT$1,250
2026-03-06ECB CLASS - 1 violation: NEW BUILDING CURRENTLY ON 3RD FRAMING LEVEL WERE MISSING OVERHEAD PROTECTION FOR ADJACENT BUILDING AT EXPOSURE 4 COURTYARD, CREATI$10,000
2026-03-05311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2026-03-05Permit Structural — Permit Issued
2026-03-05DOB complaint, category ?
2026-03-03DOB complaint, category ?
2026-03-02311: Industrial Waste — Concrete In Catch Basin (IEA)
2026-02-24311: Snow or Ice — Sidewalk
2026-02-20Permit General Construction — Permit Issued
2026-02-09Job filed: Install foundation as per plans filed herewith.$1,000
2026-02-06Elevator permit: Installation of 7000# capacity Dual Personnel Hoist during NB Application #M00785688-I1 filed separately. Installations and Tests $20,000
2026-02-05Job filed: Installation Of Temporary Dual Personnel Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egres$20,000
2026-01-23Permit Protection and Mechanical Methods — Permit Issued
2026-01-23Job filed: Filing for installation of engineered enclosure system per 3309.17$100
2026-01-22Job filed: Installation of Concrete pump as per plans filed herewith. No change in use, egress or occupancy.$1,000
2026-01-21Permit Protection and Mechanical Methods — Permit Issued
2026-01-21Permit Protection and Mechanical Methods — Permit Issued
2026-01-21Permit Protection and Mechanical Methods — Permit Issued
2026-01-20311: General Construction/Plumbing — Structural Stability Impacted - New Building Under Construction
2026-01-20DOB complaint, category ?
2026-01-20DOB complaint, category ?
2026-01-20Job filed: Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and$5,000
2026-01-20ECB CLASS - 2 violation: B C 3307 .2.1 AT INSPECTION OF A PROPOSED 21 STORIES BUILDING AT FIRST FLOOR I OBSERVED TIP OF SAND { DIRT } ON THE ROAD USED FOR $2,500
2026-01-20ECB CLASS - 2 violation: 3301.1.2 AT INSPECTION OF A PROPOSED 21 STORIES BUILDING I OBSERVED SEVERAL TEMPORARY HEATING EQUIPMENT IN THE CELLER USED FOR HE$2,500
2026-01-19Job filed: Installation of temporary window protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or$5,000
2026-01-19Job filed: Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or o$5,000
2026-01-14Job filed: TEMPORARY STANDPIPE SYSTEM FILED IN CONJUNCTION WITH NB JOB NUMBER M00785688-I1.$130
2026-01-13311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2026-01-13311: General Construction/Plumbing — Adjacent Buildings Not Protected
2026-01-13DOB complaint, category ?
2026-01-13DOB complaint, category ?
2025
2025-12-29DOB complaint, category ?
2025-12-15Job filed: Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occ
2025-12-05Permit Construction Fence — Permit Issued
2025-12-05Job filed: Installation of temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/o
2025-12-05Job filed: Filing for installation of engineered enclosure system per 3309.17$100
2025-12-03Job filed: Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occ
2025-11-20Job filed: Filing for installation of engineered enclosure system per 3309.17$100
2025-11-17HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2025-11-10Job filed: Installation of a temporarily supported scaffold and heavy-duty sidewalk shed/overhead protection per plan submitted. Work shall comply with 2022 buil$8,000
2025-11-10Job filed: UNDERGROUND PLUMBING FILED IN CONJUNCTION WITH NB JOB NUMBER M00785688-I1.$130
2025-11-06311: Noise — Noise: Construction Before/After Hours (NM1)
2025-10-31Elevator permit: Installation of 7000# capacity Dual Personnel Hoist during NB Application #M00785688-I1 filed separately. Installations and Tests $20,000
2025-10-30Permit Sidewalk Shed — Permit Issued
2025-10-30Job filed: Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occ
2025-10-26311: Emergency Response Team (ERT) — After Hours Work - Illegal
2025-10-26DOB complaint, category ?
2025-10-24Permit Protection and Mechanical Methods — Permit Issued
2025-10-24Job filed: Installation Of Temporary Dual Personnel Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egres$20,000
2025-10-16311: Noise — Noise: Construction Equipment (NC1)
2025-10-03311: Noise — Noise: Construction Equipment (NC1)
2025-09-16311: Noise — Noise: Jack Hammering (NC2)
2025-09-12311: Noise — Noise: Construction Equipment (NC1)
2025-08-20311: Homeless Person Assistance — Non-Chronic
2025-07-31311: Noise — Noise: Construction Equipment (NC1)
2025-07-24Job filed: Construction Fence$100
2025-06-27311: Homeless Person Assistance — Non-Chronic
2025-06-25Job filed: SUPPORT OF EXCAVATION FILED IN CONJUNCTION WITH NB JOB NUMBER M00785688-I1.$1,000
2025-06-04HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2025-05-14DOB complaint, category ?
2025-03-19AL&R $165,000,000 — from CF EAST 72 OWNER LLC; 259 EAST 72 OWNER LLC to G4 18222 LLC$165,000,000
2025-03-19Agreement $16,221,016 — from CF EAST 72 OWNER LLC; 259 EAST 72 OWNER LLC to G4 18222 LLC$16,221,016
2025-03-19Mortgage $15,221,016 — from CF EAST 72 OWNER LLC; 259 EAST 72 OWNER LLC to G4 18222 LLC$15,221,016
2025-03-19Agreement $65,391,452 — from CF EAST 72 OWNER LLC; 259 EAST 72 OWNER LLC to G4 18222 LLC$65,391,452
2025-03-19Mortgage $64,391,452 — from 259 EAST 72 OWNER LLC; CF EAST 72 OWNER LLC to G4 18222 LLC$64,391,452
2025-03-19Agreement $83,387,532 — from CF EAST 72 OWNER LLC; 259 EAST 72 OWNER LLC to G4 18222 LLC$83,387,532
2025-03-19Mortgage $24,212,642 — from CF EAST 72 OWNER LLC; 259 EAST 72 OWNER LLC to G4 18222 LLC$24,212,642
2025-03-17Job filed: BPP FILED IN CONJUNCTION WITH NEW BUILDING JOB NUMBERS M00785688-I1 & M00786020-I1. A TOTAL OF 239 LINEAR FEET PROPOSED.
2025-03-05Permit Construction Fence — Permit Issued
2025-03-04Job filed: Construction Fence$100
2024
2024-12-06311: General Construction/Plumbing — Debris - Excessive
2024-11-22AL&R $61,174,890 — from 259 EAST 72 OWNER LLC; CF EAST 72 OWNER LLC to G4 18222 LLC$61,174,890
2024-11-22Mortgage $1,000,000 — from CF EAST 72 OWNER LLC; 259 EAST 72 OWNER LLC to G4 18222 LLC$1,000,000
2024-11-22Mortgage $1,000,000 — from CF EAST 72 OWNER LLC; 259 EAST 72 OWNER LLC to G4 18222 LLC$1,000,000
2024-11-22Mortgage $59,174,890 — from 259 EAST 72 OWNER LLC; CF EAST 72 OWNER LLC to G4 18222 LLC$59,174,890
2024-11-22HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2024-06-02311: Noise — Noise: Construction Before/After Hours (NM1)
2024-06-02311: Noise — Noise: Construction Before/After Hours (NM1)
2024-05-21311: Encampment — N/A
2024-04-29311: General Construction/Plumbing — Adjacent Buildings Not Protected
2024-04-03DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2024-04-01HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2024-03-21ZONE — from CF EAST 72 OWNER LLC
2024-03-21CERT — from CONTINENTAL ABSTRACT LLC to 259 EAST 72 OWNER LLC; G4 18222, LLC; CF EAST 72 OWNER LLC
2024-03-18Job filed: PROVIDE BUILDERS PAVEMENT PLAN (BPP) FOR A TOTAL FRONTAGE OF 37 FT. AS PER PLANS FILED. FILED IN CONJUNCTION WITH NB #M00786020
2024-02-16311: Street Condition — Blocked - Construction
2024-02-16311: Illegal Dumping — Removal Request
2024-02-15Rodent inspection: Failed for Other Reason
2024-02-02ECB CLASS - 1 violation: AN INACTIVE DEMO SITE, OBSERVED ADJOINING BUILDING AT EXP2 WAS INADEQUATELY WATERPROOFED BC3309.9. OBSERVED CRACKS AT EXP4 OF 1355$5,000
2023-11-23311: Emergency Response Team (ERT) — After Hours Work - Illegal
2023-11-23DOB complaint, category ?
2023-11-22Rodent inspection: Bait applied
2023-11-15HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2023-10-27Rodent inspection: Failed for Rat Activity and Other Reason
2023-10-02Rodent inspection: Failed for Other Reason
2023-09-30311: Street Condition — Cave-in
2023-09-19311: Blocked Driveway — No Access
2023-09-15ECB CLASS - 2 violation: AT TIME OF INSPECTION I OBSERVED CONSTRUCTION FENCE INSTALLED ON EXPOSURE #1 AND 2 WITH VIEWING PANEL ON THE FENCE NOT COVERED WIT$1,000
2023-09-15ECB CLASS - 1 violation: AT TIME OF INSPECTION I OBSERVED SIDEWALK SHED INSTALLED ON EXPOSURE #1 AND 2 WITH INOPERABLE LIGHT BULBS AT UNDERSIDE THE SHED T$2,500
2023-09-14311: Vendor Enforcement — Food Vendor
2023-09-13311: Noise — Noise: Construction Equipment (NC1)
2023-09-13311: General Construction/Plumbing — Site Conditions Endangering Workers
2023-09-13311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2023-09-13DOB complaint, category ?
2023-09-13DOB complaint, category ?
2023-09-12311: General Construction/Plumbing — Debris - Excessive
2023-09-12DOB complaint, category ?
2023-09-08ECB CLASS - 1 violation: NO WORK IN PROGRESS - 50 CUBIC YARDS OF COMBUSTIBLE CONSTRUCTION DEBRIS OBSERVED ACCUMULATED INSIDE OF SITE, POSING A FIRE AND VER$2,500
2023-09-08ECB CLASS - 2 violation: AT TIME OF INSPECTION, FAILURE TO FILE CERTIFICATE OF CORRECTION FOR OATH SUMMONS #39518463X - SUMMONS SERVED 06-09-2023 - FIRST H$1,250
2023-09-07Permit DM — ISSUED
2023-08-29311: General Construction/Plumbing — Debris - Excessive
2023-08-29DOB complaint, category ?
2023-08-28ECB CLASS - 2 violation: IN RESPONDS TO COMPLAINT, I OBSERVED EXISTING 5 STORY BUILDING UNDER FULL DEMOLITION WITH INSTALLED SIDEWALK SHED IN ALL PLACES O
2023-08-24311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2023-08-24DOB complaint, category ?
2023-08-11311: Lot Condition — Construction Debris
2023-08-09311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-06-30DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2023-06-29ECB CLASS - 2 violation: AT TIME OF INSPECTION OBSERVED CONSTRUCTION FENCE IN PLACE WITH PERMIT M00231763 EXPIRED 1-10-2020.$5,000
2023-06-29ECB CLASS - 2 violation: AT TIME OF INSPECTION OBSERVED SIDEWALK SHED IN PLACE WITH LIGHTING NOT IN OPERATING CONDITION AS PER3307.6.4.8 CAUSING A HAZARD T$6,000
2023-06-29ECB CLASS - 1 violation: AT TIME OF INSPECTION OBSERVED ADJOINING PROPERTY WALL NOT PROTECTED AS PER CODE, MASONRY/BEAM POCKETS NOT FILLED/WATERPROOFED.MAI$6,250
2023-06-29ECB CLASS - 2 violation: AT TIME OF INSPECTION OBSERVED CONSTRUCTION FENCE IN PLACE NOT MAINTAINED. NONE CONSTRUCTION RELATED ADVERTISEMENTS, PANELS NOT SE$1,000
2023-06-29ECB CLASS - 2 violation: AT TIME OF INSPECTION OBSERVED CONSTRUCTION FENCE IN PLACE NOT MAINTAINED. NON-CONSTRUCTION RELATED ADVERTISEMENTS, VIEWING PANELS$5,000
2023-06-28311: General Construction/Plumbing — Fence - None/Inadequate
2023-06-28DOB complaint, category ?
2023-06-27311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2023-04-17311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2023-04-17DOB complaint, category ?
2023-04-14Rodent inspection: Passed
2023-04-12Rodent inspection: Failed for Rat Activity
2023-04-10Rodent inspection: Passed
2023-04-10311: Unsanitary Animal Pvt Property — Dog
2023-04-10311: Dirty Condition — Trash
2023-04-06ECB CLASS - 2 violation: AT TIME OF INSPECTION OBSERVED SIDEWALK SHED .OBSERVED AT 6:00AM NO LIGHT UNDER THE SIDEWALK SHED COMPLY WITH CODE$5,000
2023-04-04311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2023-04-04DOB complaint, category ?
2023-03-31Mortgage assigned — from G4 18222, LLC to AXOS BANK
2023-03-29Rodent inspection: Failed for Rat Activity
2023-03-29ECB CLASS - 1 violation: AT TIME OF RESPONDING COMPLAINT OBSERVED: ACTIVE JOB SITE, UPON REVIEWING ON DEPARTMENT RECORD IT APPEAR PERMIT # 123914309-01-DM
2023-03-15HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2023-03-10DOB complaint, category ?
2023-03-10ECB CLASS - 2 violation: AT TIME OF INSPECTION, OBSERVED CONSTRUCTION FENCE (#M00743499-I1-FN) AT EXPOSURE 1 AND 4 WAS FOUND TO HAVE EXCESSIVE, NON-CONSTRU$2,500
2023-03-09311: Rodent — Rat Sighting
2023-03-09311: Rodent — Rat Sighting
2023-01-06Rodent inspection: Failed for Rat Activity
2022
2022-12-31ECB CLASS - 2 violation: AT THE TIME OF MY INSPECTION I OBSERVED A CONSTRUCTION FENCE IN PLACE AT EXPOSURE 1. THIS FENCE IS NOT MAINTAINED. I OBSERVED SPLI$1,000
2022-12-31ECB CLASS - 2 violation: AT THE TIME OF MY INSPECTION I OBSERVED A CONSTRUCTION FENCE IN PLACE AT EXPOSURE 1. WITH REVIEW OF PERMIT STATUS I OBSERVED THAT $1,250
2022-12-21311: Real Time Enforcement — Work Without A Permit - Occupied Multiple Dwelling
2022-12-21DOB complaint, category ?
2022-12-14DOB complaint, category ?
2022-11-18Job filed: SPRINKLER AND STANDPIPE SYSTEM FILED IN CONJUNCTION WITH NB JOB NUMBER M00785688-I1.$260
2022-11-18Job filed: PLUMBING SYSTEM FILED IN CONJUNCTION WITH NB JOB NUMBER M00785688-I1.$1,000
2022-11-18Job filed: MECHANICAL SYSTEM FILED IN CONJUNCTION WITH NB JOB NUMBER M00785688-I1.$1,000
2022-11-16311: Encampment — N/A
2022-11-15Rodent inspection: Failed for Rat Activity
2022-11-15Permit DM — ISSUED
2022-11-14Permit Protection and Mechanical Methods — Permit Issued
2022-11-04Job filed: SUPPORT OF EXCAVATION FILED IN CONJUNCTION WITH NB JOB NUMBER M00785688-I1.$1,000
2022-11-02HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2022-11-02Job filed: PROPOSED TWENTY (20) STORY MIXED USE DEVELOPMENT.$1,000
2022-11-02Job filed: STRUCTURE FILED IN CONJUNCTION WITH NB JOB NUMBER M00785688-S3.$1,000
2022-11-02Job filed: Install foundation as per plans filed herewith.$1,000
2022-10-17ECB CLASS - 2 violation: JOB SITE FENCE PERMIT EXPIRED ON 01/31/2021.$1,250
2022-10-16311: Noise — Noise: air condition/ventilation equipment (NV1)
2022-10-11Job filed: Alteration
2022-10-04FDNY inspection (DEMO)
2022-09-19311: General Construction/Plumbing — Working Contrary To Stop Work Order
2022-09-19DOB complaint, category ?
2022-09-16ECB CLASS - 1 violation: OBSERVED ACTIVE MECHANICAL DEMO WORK IN PROGRESS UPON RESEARCH IN D.O.B. NOW AND BIS BOTH SHOWED NO MECHANICAL DEMO PERMIT WAS ISS
2022-09-15311: General Construction/Plumbing — Site Conditions Endangering Workers
2022-09-15DOB complaint, category ?
2022-09-14DOB complaint, category ?
2022-09-12311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2022-09-12DOB complaint, category ?
2022-08-30311: Special Projects Inspection Team (SPIT) — Illegal Hotel Rooms In Residential Building
2022-08-30DOB complaint, category ?
2022-08-27ECB CLASS - 2 violation: TEMP CONST EQUIPMENT (FENCE) ONSITE-EXPIRED PERMIT UPON INSP&REV OF BLDG INFO SYSTEM&DOBNOW BUILD SYSTEM,NO RECORD OF ACTIVE FENCE$3,125
2022-08-27ECB CLASS - 2 violation: CONST FENCE NOT MAINTAINED PURSUANT TO SUBSEC UPON INSP FOLLOWING VIO CONDITIONS PERTAINING TO FENCE WERE NOTED:(1)SECS OF FENCE P$2,500
2022-08-10Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2022-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2022-08-01FDNY inspection (DEMO)
2022-07-25DOB complaint, category ?
2022-07-22Permit DM — ISSUED
2022-07-19311: General Construction/Plumbing — Working Contrary To Stop Work Order
2022-07-19DOB complaint, category ?
2022-07-08ECB CLASS - 1 violation: CONSTRUCTION DEBRIS FALLING INTO ADJOINING PROPERTY. CONSTRUCTION FENCE AT 242 E 72 ST NOT 8' IN HEIGHT. CONSTRUCTION DEBRIS BEING
2022-07-08DOB complaint, category ?
2022-06-16FDNY inspection (RISK)
2022-06-16FDNY inspection (COM_OCPCY)
2022-05-25Permit General Construction — Permit Issued
2022-05-19Job filed: Interior soft demolition to a five story building$36,408
2022-05-09FDNY inspection (COM_OCPCY)
2022-05-03Permit Sidewalk Shed — Signed-off
2022-05-03Permit Supported Scaffold — Signed-off
2022-05-03Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2022-05-03Job filed: INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2022-04-09311: Noise — Noise: Construction Equipment (NC1)
2022-04-07311: Noise — Noise: Jack Hammering (NC2)
2022-04-06Rodent inspection: Passed
2022-03-29Rodent inspection: Failed for Rat Activity and Other Reason
2022-03-24Job filed: FULL DEMOLITION TO A FIVE STORY BUILDING
2022-03-24Job filed: FULL DEMOLITION TO A FIVE STORY BUILDING
2022-01-23311: HEAT/HOT WATER — ENTIRE BUILDING
2022-01-23Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2022-01-17311: HEAT/HOT WATER — ENTIRE BUILDING
2022-01-17HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM NORT
2022-01-17HPD class C: § 27-2028, 2032 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FROM AN APPROVED CENTRAL HEATING SYSTEM, OR AN APPROVED SYSTEM OF GAS OR ELECTRI
2022-01-17Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2022-01-16311: HEAT/HOT WATER — ENTIRE BUILDING
2022-01-16Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2022-01-15311: HEAT/HOT WATER — ENTIRE BUILDING
2022-01-15311: HEAT/HOT WATER — APARTMENT ONLY
2022-01-15311: HEAT/HOT WATER — ENTIRE BUILDING
2022-01-15Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2022-01-15Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2022-01-15Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2022-01-14311: HEAT/HOT WATER — ENTIRE BUILDING
2022-01-14Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2022-01-11311: HEAT/HOT WATER — ENTIRE BUILDING
2022-01-11Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2022-01-06Agreement $65,000,000 — from CF EAST 72 OWNER LLC; 259 EAST 72 OWNER LLC; 1231 THIRD FEE OWNER LLC to G4 18222, LLC$65,000,000
2022-01-06Mortgage assigned — from 1231 SELLER FUNDING LLC; E72 SELLER FUNDING LLC to G4 18222, LLC
2021-06-17Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2021-06-16311: HEAT/HOT WATER — ENTIRE BUILDING
2021-06-16Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2021-06-13311: Encampment — N/A
2021-06-03Boiler inspection
2021-05-12311: Encampment — N/A
2021-05-11Rodent inspection: Failed for Rat Activity
2021-04-29DOB violation EGRADE: FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2021-04-27311: Encampment — N/A
2021-04-27311: Encampment — N/A
2021-04-07Bedbug filing: 0 infested units
2021-04-01HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021-03-25Rodent inspection: Failed for Rat Activity
2021-03-05Rodent inspection: Failed for Rat Activity
2021-02-19ECB CLASS - 2 violation: JOBSITE FENCE NOT CONSTRUCTED OR MAINTAINED PURSUANT TO SUBSECTION.AT TIME OF INSPECTION ON NON ACTIVE DEMO MONITORING JOB,I OBSER$2,500
2021-02-19ECB CLASS - 2 violation: TEMPORARY CONSTRUCTION EQUIPMENT ONSITE.EXPIRED PERMIT.AT TIME OF INSPECTION ON NON ACTIVE DEMO MONITORING JOB,I OBSERVED A CONSTR$3,125
2020-12-15311: Water Quality — Taste/Odor, Bitter/Metallic (QA3)
2020-12-14Rodent inspection: Failed for Rat Activity
2020-09-15Boiler inspection
2020-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2020-07-25311: HEAT/HOT WATER — ENTIRE BUILDING
2020-07-25Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2020-05-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2020-03-24311: Consumer Complaint — Retail Store
2020-02-19311: Graffiti — Graffiti
2020-02-16311: HEAT/HOT WATER — ENTIRE BUILDING
2020-02-16Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2020-02-15311: HEAT/HOT WATER — ENTIRE BUILDING
2020-02-15311: HEAT/HOT WATER — APARTMENT ONLY
2020-02-15311: HEAT/HOT WATER — ENTIRE BUILDING
2020-02-15311: HEAT/HOT WATER — ENTIRE BUILDING
2020-02-15311: HEAT/HOT WATER — ENTIRE BUILDING
2020-02-15Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2020-02-15Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2020-02-15Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2020-02-15Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2020-02-15Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2020-02-14311: HEAT/HOT WATER — ENTIRE BUILDING
2020-02-14311: HEAT/HOT WATER — APARTMENT ONLY
2020-02-14Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2020-02-14Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2020-02-06ECB CLASS - 2 violation: INADEQUATE SUPERINTEDENT LOGBOOKS/FAILED TO DEFORM DUTIES.NOTE:AT TIMEOF INSPECTION ON A 2 STORIES DEMOLITIONS BUILDING DEMOLITION$625
2020-02-06ECB CLASS - 1 violation: PERMIT HOLDER FAILED TO ENSURE WORKERS ATTEND PRE SHIFT SAFETY MEETINGNOTE:AT TIME OF MY INSPECTION ON A 2 STOREY DEMOLITION,DEMOL$5,000
2020-02-06ECB CLASS - 2 violation: FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENT REQUIRED BY BC CHAPTER 33:SITE SAFETY PLAN. NOTE-AT THE TIME OF INSPECTION ON A 2 STO$625
2020-02-06ECB CLASS - 1 violation: PERMIT HOLDER FAIL TO ENSURE WORKERS RECEIVE SITE SAFETY ORIENTATION. NOTE-AT TIME OF MY INSPECTION OF A 3 STORIES DEMOLITION,DEMO$2,500
2020-02-06ECB CLASS - 1 violation: FAILURE TO MAINTAIN DOCUMENTS ON SITE.NOTE:AT TIME OF MY INSPECTION ONA 2 STORIES DEMOLITION BUILDING,DEMOLITION IN PROGRESS I OBS$2,500
2020-02-06ECB CLASS - 1 violation: FAILURE TO PROVIDE SITE SAFETY TRAINING CARD FOR COMPETENT PERSON.NOTEAT TIME OF MY INSPECTION OF OF A 2 STORY DEMOLITION BUILDING$2,500
2020-02-06ECB CLASS - 2 violation: CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM DUTIES PER RULE.NOTE:AT THE TIM EO FO MY INSPECTION OF A 2 STORIES BULDING UNDER DEM$5,000
2020-02-06ECB CLASS - 1 violation: PERMIT HOLDER FAILED TO ENSURE WORKERS ATTEND PRE SHIFT SAFETY MEETING. NOTE-AT TIME OF MY INSPECTION ON A 3 STORIES DEMOLITION,DE$2,500
2020-02-06ECB CLASS - 2 violation: FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENT REQUIRED BY BC CHAPTER 33:SITE SAFETY PLAN. NOTE-AT TIME OF MY INSPECTION ON 3 STORIE$625
2020-02-06ECB CLASS - 1 violation: PERMIT HOLDER FAIL TO ENSURE WORKERS RECEIVE SITE SAFETY ORIENTATION. NOTE-AT TIME OF MY INSPECTION OF A 2 STORIES DEMOLITION,DEMO$5,000
2020-02-05311: Noise — Noise: Construction Before/After Hours (NM1)
2020-01-18Permit Construction Fence — Signed-off
2020-01-08311: HEAT/HOT WATER — ENTIRE BUILDING
2020-01-08311: HEAT/HOT WATER — APARTMENT ONLY
2020-01-08311: HEAT/HOT WATER — ENTIRE BUILDING
2020-01-08Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2020-01-08Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2020-01-08Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2020-01-07311: HEAT/HOT WATER — ENTIRE BUILDING
2020-01-07311: HEAT/HOT WATER — ENTIRE BUILDING
2020-01-07Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2020-01-07Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019
2019-12-22311: HEAT/HOT WATER — APARTMENT ONLY
2019-12-22Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2019-12-20311: HEAT/HOT WATER — APARTMENT ONLY
2019-12-20Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2019-12-19Rodent inspection: Passed
2019-12-19Rodent inspection: Passed
2019-12-19Rodent inspection: Passed
2019-12-06311: HEAT/HOT WATER — ENTIRE BUILDING
2019-12-06Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019-11-19Permit Sidewalk Shed — Signed-off
2019-11-15Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2019-10-23Permit Construction Fence — Signed-off
2019-10-21Job filed: INSTALL 8' HIGH PLYWOOD CONSTRUCTION FENCE$5,000
2019-10-19311: HEAT/HOT WATER — ENTIRE BUILDING
2019-10-19Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019-10-15311: Illegal Parking — Blocked Bike Lane
2019-06-17Job filed: FULL DEMOLITION OF CHURCH.
2019-06-14311: HEAT/HOT WATER — ENTIRE BUILDING
2019-06-14311: HEAT/HOT WATER — ENTIRE BUILDING
2019-06-14311: HEAT/HOT WATER — ENTIRE BUILDING
2019-06-14311: HEAT/HOT WATER — ENTIRE BUILDING
2019-06-14Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019-06-14Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019-06-14Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019-06-14Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019-06-13311: HEAT/HOT WATER — ENTIRE BUILDING
2019-06-13311: HEAT/HOT WATER — ENTIRE BUILDING
2019-06-13Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019-06-13Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019-06-04311: HEAT/HOT WATER — ENTIRE BUILDING
2019-06-04Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019-04-17DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019-03-19ECB CLASS - 1 violation: LICENSED OIL BURNER INSTALLER LIC #1509 HAS FAILED TO COMPLY TO FILE AN LAA PERMIT WITHIN THE 2BUSINESS DAYS AFTER RECEIVING AN EW
2019-03-15ECB CLASS - 1 violation: LICENSED OIL BOILER INSTALLER HAS FAILED TO COMPLY TO FILE AN LAA PERMIT WITHIN THE 2 BUSINESS DAYS AFTER RECEIVING AN EWN # M-000
2019-03-15ECB CLASS - 1 violation: LICENSED OIL BOILER INSTALLER HAS FAILED TO COMPLY TO FILE AN LAA PERMIT WITHIN THE 2 BUSINESS DAYS AFTER RECEIVING AN EWN # M-000
2019-03-15ECB CLASS - 1 violation: LICENSED OIL BOILER INSTALLER HAS FAILED TO COMPLY TO FILE AN LAA PERMIT WITHIN THE 2 BUSINESS DAYS AFTER RECEIVING AN EWN # M-000
2019-03-15DOB complaint, category ?
2019-03-06311: Homeless Encampment — N/A
2019-03-01ECB CLASS - 1 violation: UNLAWFUL ACTS-FAILURE TO COMPLY W/AN ORDER OF THE COMMISSIONER.I OBSERVED THAT EWN WAS FILED W/THE BLDG DEPT BUT DID NOT FILE A PL
2019-01-17ECB CLASS - 1 violation: 1L10,2X10,5M7,71L10. 1L10-EMERGENCY STOP SWITCH BELL DOES NOT RING WHEN ACTIVATED DEFECTIVE REPAIR; 2X10-OUTSIDE COMM INOPERATIVE$1,250
2019-01-05311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2018
2018-12-31HPD litigation: Heat and Hot Water
2018-12-29311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2018-12-22311: HEAT/HOT WATER — ENTIRE BUILDING
2018-12-22311: HEAT/HOT WATER — ENTIRE BUILDING
2018-12-22311: HEAT/HOT WATER — ENTIRE BUILDING
2018-12-22311: HEAT/HOT WATER — ENTIRE BUILDING
2018-12-22311: HEAT/HOT WATER — ENTIRE BUILDING
2018-12-22Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-12-22Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-12-22Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-12-22Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-12-22Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-12-20Rodent inspection: Passed
2018-12-19Rodent inspection: Passed
2018-12-19Rodent inspection: Passed
2018-12-06311: Elevator — Elevator - Single Device On Property/No Alternate Service
2018-12-06DOB complaint, category ?
2018-11-20311: HEAT/HOT WATER — ENTIRE BUILDING
2018-11-20311: HEAT/HOT WATER — ENTIRE BUILDING
2018-11-20Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-11-20Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-11-13City emergency repair (OMO): provide single fuel drop with prime and start #2b-5 fuel fill tank. please report any problems immediately to esb fuel u$120
2018-11-13HPD class C: § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO H
2018-11-13HPD class B: § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE LOCATED AT APT 4F, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
2018-11-13HPD class B: § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE LOCATED AT APT 4F, 4th STORY, 1st APARTMENT FROM WEST
2018-11-13HPD class C: § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO H
2018-11-13HPD class B: § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM WINDOW TO FIRE ESCAPE OR PROVIDE APPROVED TYP
2018-11-12311: HEAT/HOT WATER — ENTIRE BUILDING
2018-11-12HPD class C: § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTRANCE LOCATED AT APT 5E, 5th STORY, 3rd APARTMENT FROM SOU
2018-11-12HPD class C: § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 4F, 4th STORY, 2nd APARTMENT
2018-11-12Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-11-11311: HEAT/HOT WATER — ENTIRE BUILDING
2018-11-11311: HEAT/HOT WATER — ENTIRE BUILDING
2018-11-11311: HEAT/HOT WATER — ENTIRE BUILDING
2018-11-11311: HEAT/HOT WATER — APARTMENT ONLY
2018-11-11311: HEAT/HOT WATER — ENTIRE BUILDING
2018-11-11311: HEAT/HOT WATER — APARTMENT ONLY
2018-11-11HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM SOUT
2018-11-11HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM WEST
2018-11-11HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT THE BASEMENT LEADING TO THE BOILER ROOM.
2018-11-11HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT THE BASEMENT LEADING TO THE BOILER ROOM.
2018-11-11HPD class C: § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 4D, 4th STORY, 1st APARTMENT
2018-11-11HPD class C: § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT
2018-11-11Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-11-11Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-11-11Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-11-11Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2018-11-11Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-11-11Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-11-11Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-11-11Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2018-11-10311: HEAT/HOT WATER — ENTIRE BUILDING
2018-11-10Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-11-09HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM NORT
2018-11-08311: HEAT/HOT WATER — APARTMENT ONLY
2018-11-08311: HEAT/HOT WATER — ENTIRE BUILDING
2018-11-08311: HEAT/HOT WATER — ENTIRE BUILDING
2018-11-08Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-11-08Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-11-08Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2018-11-07AL&R $30,000,000 — from CF EAST 72 OWNER LLC; 259 EAST 72 OWNER LLC; 1231 THIRD FEE OWNER LLC to 1231 SELLER FUNDING LLC; E72 SELLER FUNDING LLC$30,000,000
2018-11-07Deed $47,262,700 — from EAST 72ND LLC to CF EAST 72 OWNER LLC$47,262,700
2018-11-07Mortgage assigned — from WELLS FARGO BANK, NATIONAL ASSOCIATION to E72 SELLER FUNDING LLC; 1231 SELLER FUNDING LLC
2018-11-07Mortgage assigned — from WELLS FARGO BANK, NATIONAL ASSOCIATION to 1231 SELLER FUNDING LLC; E72 SELLER FUNDING LLC
2018-11-07Agreement $30,000,000 — from CF EAST 72 OWNER LLC; 1231 THIRD FEE OWNER LLC; 259 EAST 72 OWNER LLC to 1231 SELLER FUNDING LLC; E72 SELLER FUNDING LLC$30,000,000
2018-11-07311: HEAT/HOT WATER — APARTMENT ONLY
2018-11-07311: HEAT/HOT WATER — APARTMENT ONLY
2018-11-07311: HEAT/HOT WATER — ENTIRE BUILDING
2018-11-07Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2018-11-07Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2018-11-07Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-10-31311: Air Quality — Air: Smoke, Vehicular (AA4)
2018-10-31311: Noise — Noise: Construction Before/After Hours (NM1)
2018-10-31311: General Construction/Plumbing — Building Permit - None
2018-10-31311: Hazardous Materials — Chemical Odor (HD1)
2018-10-31311: Noise — Noise: Construction Equipment (NC1)
2018-10-31DOB complaint, category ?
2018-10-30Sold for $47,262,700$47,262,700
2018-10-30311: Hazardous Materials — Chemical Odor (HD1)
2018-10-24HPD class C: § 27-2028, 2032 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FROM AN APPROVED CENTRAL HEATING SYSTEM, OR AN APPROVED SYSTEM OF GAS OR ELECTRI
2018-10-24HPD class C: § 27-2028, 2032 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FROM AN APPROVED CENTRAL HEATING SYSTEM, OR AN APPROVED SYSTEM OF GAS OR ELECTRI
2018-10-21311: HEAT/HOT WATER — APARTMENT ONLY
2018-10-21Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2018-10-12Rodent inspection: Bait applied
2018-09-27Rodent inspection: Bait applied
2018-09-11DOB violation E:
2018-06-15Boiler inspection — defects found
2018-04-30Rodent inspection: Passed
2018-04-26Rodent inspection: Passed
2018-04-26Rodent inspection: Passed
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-09311: For Hire Vehicle Complaint — Driver Complaint
2017
2017-11-14311: HEAT/HOT WATER — APARTMENT ONLY
2017-11-14Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2017-10-31311: Street Condition — Pothole
2017-10-26311: Rodent — Rat Sighting
2017-09-14Rodent inspection: Passed
2017-09-14Rodent inspection: Passed
2017-09-14Rodent inspection: Passed
2017-07-31311: Street Condition — Failed Street Repair
2017-06-01311: Graffiti — Graffiti
2017-04-11Rodent inspection: Passed
2017-04-11Rodent inspection: Passed
2017-04-11Rodent inspection: Passed
2017-03-20Boiler inspection
2017-03-17311: Bus Stop Shelter Complaint — Snow Removal Requested
2017-03-01311: Bus Stop Shelter Placement — New Bus Stop Shelter Placement
2017-02-22DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2014-03-11Job filed: DIVIDED ONE COMERCIAL SPACES INTO TWO. PLUMBING WORK AS PER DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$20,000
2013
2013-12-31Mortgage $2,000,000 — from WALSAM EAST 72ND LLC to BANK OF AMERICA, N.A.$2,000,000
2013-09-23Permit EW — ISSUED
2013-09-23Permit EQ — RE-ISSUED
2013-09-23Job filed: INSTALLATION OF NEW GLASS AT STOREFRONT AND DEMO OF METAL ROLLING GATE. INSTALL WOOD FENCE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$9,360
2013-07-03Permit EW — ISSUED
2013-03-03311: Street Condition — Pothole
2013-03-01DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
2013-01-23311: Noise — Noise: Construction Equipment (NC1)
2013-01-23DOB complaint, category ?
2012
2012-09-12Mortgage $2,135,743 — from WALSAM EAST 72ND LLC to BANK OF AMERICA, N.A.$2,135,743
2012-09-12Agreement $18,000,000 — from WALSAM EAST 72ND LLC to BANK OF AMERICA, N.A.$18,000,000
2012-09-12Mortgage assigned — from WELLS FARGO BANK to BANK OF AMERICA, N.A.
2012-09-07Permit EW — ISSUED
2012-08-22311: General Construction/Plumbing — Failure To Maintain
2012-08-22DOB complaint, category ?
2012-08-21311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2012-08-21DOB violation C:
2012-08-21DOB complaint, category ?
2012-06-29Permit EQ — ISSUED
2012-06-27Rodent inspection: Passed
2012-06-27Rodent inspection: Passed
2012-06-27Rodent inspection: Passed
2012-06-27Job filed: RENOVATION OF NAIL STORE, INCLUDING REMOVAL AND INSTALLATION OF PARTITION. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPL$11,927
2012-06-27Job filed: RENOVATION OF NAIL STORE, INCLUDING REMOVAL AND INSTALLATION OF PARTITION. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPL$11,927
2011-11-30Job filed: INSTALLATION OF ROOF PROTECTION AS PER DRAWINGS DURING BLDG ALTERATION AT 250 EAST 72 STREET. ROOF PROTECTION SHALL COMPLY WITH CHAPTER #33 OF THE 200
2011-11-05311: Noise Survey — People Created Noise
2011-10-07HPD class A: SECTION 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE
2011-10-07HPD class B: SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF EXCESSIVE OFFENSIVE ODOR AT ELEVATOR SHAFT THROUGHOUT
2011-10-07HPD class A: SECTION 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A C
2011-09-20311: CONSTRUCTION — ELEVATOR
2011-09-20311: PLUMBING — SEWER
2011-09-20Tenant complaint: PLUMBING — SEWER
2011-09-20Tenant complaint: CONSTRUCTION — ELEVATOR
2011-09-16311: Indoor Sewage — Sewage Odor
2011-09-16311: Indoor Sewage — Sewage Odor
2011-07-22311: Water System — Possible Water Main Break (Use Comments) (WA1)
2011-07-14311: Food Establishment — Bare Hands in Contact w/ Food
2011-06-10Permit EW — ISSUED
2011-06-08Job filed: GENERAL FACADE REPAIR AND WATERPROOFING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$20,000
2011-06-02Permit EQ — ISSUED
2011-06-02Job filed: INSTALLATION OF 60 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WI
2011-05-22311: Noise — Noise: Construction Before/After Hours (NM1)
2011-05-22311: Noise - Vehicle — Engine Idling
2011-05-20Permit EW — ISSUED
2011-05-13Job filed: RENOVATION OF STORE. NEW FINISHINGS, WALLS AND NEW DROP CEILINGS. NO CHANGE IN EGRESS OCCUPANCY OR USE.$47,500
2011-05-13Job filed: RENOVATION OF STORE. NEW FINISHINGS, WALLS AND NEW DROP CEILINGS. NO CHANGE IN EGRESS OCCUPANCY OR USE.$47,500
2011-05-11Job filed: INSTALLATION OF SIDWALK SHED; REPAIR OF MANSONRY FOUNDATION WALL; INSTALLATION OF ANCHOR BOLTS AT BASES OF EXISTING STEEL COLUMNS IN CELLAR; AND INSTA$24,340
2011-03-30Job filed: FILING TO GROUT INJECTION AND REPOINTING OF RUBBLE WALLS, REPAIRING SPLIT FLOOR JOIST, PROVIDING ENCASEMENT AROUND PIPE COLUMNS, REPLACE EXISTING TIMB$190,343
2011-03-30Job filed: REPOINTING OF CELLAR RUBBLE STONE MASONRY AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$12,842
2010-10-29Rodent inspection: Failed for Rat Activity
2010-10-29Rodent inspection: Passed
2010-10-29Rodent inspection: Passed
2010-08-12DOB violation C:
2010-07-29311: Street Condition — Plate Condition - Noisy
2010-07-14Job filed: INSTALLATION OF A 45 FT SIDEWALK SHED. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2008 CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
2010-05-04Permit EW — ISSUED
2010-04-28311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2010-04-28DOB complaint, category ?
2010-03-30Agreement $16,480,000 — from WELLS FARGO NATIONAL BANK, NATIONAL ASSO to WALSAM EAST 72ND LLC$16,480,000
2010-03-11DOB violation E:
2010-03-10Job filed: PROPOSE TO RENOVATE APARTMENT NUMBER 4G AS PER PLANS FOLED HEREWITH, REFINISH WOOD FLOORS, NEW CLOSET, SKIM COAT WALLS, PAINT, REPLACE CABINETS AND FI$20,000
2010-03-10Job filed: PROPOSE TO RENOVATE APARTMENT NUMBER 4G AS PER PLANS FOLED HEREWITH, REFINISH WOOD FLOORS, NEW CLOSET, SKIM COAT WALLS, PAINT, REPLACE CABINETS AND FI$20,000
2010-03-10Job filed: PROPOSE TO RENOVATE APARTMENT NUMBER 4G AS PER PLANS FOLED HEREWITH, REFINISH WOOD FLOORS, NEW CLOSET, SKIM COAT WALLS, PAINT, REPLACE CABINETS AND FI$20,000
2010-02-23Permit EQ — ISSUED
2010-02-22Job filed: INSTALLATION OF A HEAVY DUTY SHED APPROXIMATELY 60 FEET LONG BY 10 FEET HIGH AS PER PLANS DURING FACADE RESTORATION. SIDEWALK SHED TO COMPLY WITH NEW
2010-02-22Job filed: INSTALLATION OF A HEAVY DUTY SHED APPROXIMATELY 60 FEET LONG BY 10 FEET HIGH AS PER PLANS DURING FACADE RESTORATION. SIDEWALK SHED TO COMPLY WITH NEW
2009
2009-10-29Job filed: RECONSTRUCTION OF THE PARAPET WALL AT THE EAST ELEVATION OF THE CHURCH AND THE REPLACEMENT OF THE FLAT BUILT-UP ROOF AT THE NORTHEAST CORNER OF THE CH$62,122
2009-05-05Permit EW — ISSUED
2009-03-20Job filed: PROPOSE TO RENOVATE EXISTING APT. #5B, FIFTH FLOOR, REFINISH EXISTING WOOD FLO ORS, REPAIR AS REQUIRED, REGROUT EXISTING BATHROOM CERAMIC FLOOR AND WA$33,000
2009-03-20Job filed: PROPOSE TO RENOVATE EXISTING APT. #5B, FIFTH FLOOR, REFINISH EXISTING WOOD FLO ORS, REPAIR AS REQUIRED, REGROUT EXISTING BATHROOM CERAMIC FLOOR AND WA$33,000
2009-03-12ECB CLASS - 1 violation: ERECTED OR INSTALL SUPPORTED SCAFFOLD 40FT OR HIGHER W/O A PERMIT. NOTED: INSTALLED 5 FRAMES VP (APPROX 32.5) ON 16'HIGH SIDEWA$1,200
2009-03-12ECB CLASS - 1 violation: SEC BC 3314.9 MISC VIOL: SUPPORTED SCAFFOLD DOES NOT MEET DOB CODE SPECS. NOTED: SUPPORTED SCAFFOLD WRAPPED UP IN PLASTIC, NO G$1,600
2009-03-12ECB CLASS - 1 violation: NO RECORD OF DAILY INSPECTION OF SUSPENDED SCAFFOLD PERFORMED AT SITE.NOTED: NO DAILY MAINTENANCE LOG BOOK AT SITE. REMEDY: MAINTA$2,400
2009-03-05Permit EW — ISSUED
2009-03-05Permit EW — ISSUED
2009-01-08Job filed: INSTALLATION OF 24 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR FACADE REPAIRS FILED UNDER SEPARATE APPLICATION. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL
2008
2008-12-30DOB violation E:
2008-12-01Job filed: RENOVATION OF EXISTING APRTMNT (2C)REFINISHING EXISTING WOOD FLOORS,REPAIR AS REQUIRED REGROUT BATHROOM TILES REPLACE KITCHEN CABINETS AND FIXTURES WI$22,000
2008-11-26Job filed: FACADE RESTORATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION.$43,000
2008-09-30Permit EW — ISSUED
2008-09-30Permit EW — ISSUED
2008-09-30Job filed: PROPOSE TO RENOVATE EXISTING APT #3G, THIRD FLOOR, REFINISH WOOD FLOORS, NEW K ITCHEN CABINETS, REPLACE CERAMIC TILE FLOORS AND WALLS IN BATHROOM, REP$26,000
2008-07-24Job filed: PROPOSE TO RENOVATE EXISTING APTS 5A & 5G, FIFTH FLOOR, REPLACE EXISTING KITCH EN CABINETS WITH NEW KITCHEN FIXTURES. INSTALL NEW CERAMIC TILE FLO$15,000
2008-07-24Job filed: PROPOSE TO RENOVATE EXISTING APTS 5A & 5G, FIFTH FLOOR, REPLACE EXISTING KITCH EN CABINETS WITH NEW KITCHEN FIXTURES. INSTALL NEW CERAMIC TILE FLO$15,000
2008-07-07Agreement $16,480,000 — from WELLS FARGO BANK, NATIONAL ASSOCIATION to WALSAM EAST 72ND LLC$16,480,000
2008-06-12Permit EW — ISSUED
2008-04-04Job filed: PROPOSE TO RENOVATE APTS. 3E AND 3F ON THE THIRD FLOOR, RE-FINISH WOOD FLOORS NEW KITCHEN CABINETS, REGROUT TILE IN BATHROOM AND NEW CERAMIC TILE IN $15,000
2008-04-03DOB complaint, category ?
2008-03-12ECB Non-Hazardous violation: 50A SWING CHECK ON BOILER MAKE UP WATER INSTALLED WRONG
2008-03-10DOB complaint, category ?
2008-02-07Agreement $16,480,000 — from WALSAM EAST 72ND LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION$16,480,000
2008-02-07TL&R — from GOTHAM BANK OF NEW YORK
2008-02-07Mortgage $15,701,727 — from WALSAM EAST 72ND LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION$15,701,727
2008-02-07TL&R — from GOTHAM BANK OF NEW YORK
2008-02-07Mortgage assigned — from GOTHAM BANK OF NEW YORK to WELLS FARGO BANK, NATIONAL ASSOCIATION
2008-02-07Deed $20,000,000 — from VANMARC REALTY CORP. to WALSAM EAST 72ND LLC$20,000,000
2007
2007-04-02DOB violation LL1081:
2007-01-19DOB violation LL6291:
2006
2006-12-27Job filed: INSTALLATION OF HEAVY DUTY SIDEWALKSHED20 LINEAR FEET DURING FACADE REPAIR. SHED TO COMPLY WITHLL33/91 AND TPPN 9/99. NO CHANGE IN USE , EGRESS OR OCC
2006-10-12City emergency repair (OMO): as per rc # 2006001274404 (enviro-probe inc), perform total lead analysis of 04 dust wipe sample(s) via environmental pr$14
2006-08-28HPD class C: § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIO
2006-08-25Tenant complaint: GENERAL — MOLD
2006-08-21HPD litigation: Tenant Action
2006-08-07DOB violation E:
2006-03-06Job filed: INSTALLATION OF A HEAVY DUTY SHED 20' DURING FACADE REPAIR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHED TO COMPLY WITH 33/91 AND TPPN 9/99.
2005
2005-05-23Permit EQ — ISSUED
2005-05-18Job filed: PROPOSED INSTALLATION OF 177 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. SIDEWALK SHED SHALL COMPLY WITH LL 33/91. NO CHANGE IN USE,
2005-04-19Mortgage $500,000 — from VANMARC REALTY CORP. to GOTHAM BANK OF NEW YORK$500,000
2005-04-19Agreement $3,200,000 — from VANMARC REALTY CORP. to GOTHAM BANK OF NEW YORK$3,200,000
2005-04-19AL&R $3,200,000 — from VANMARC REALTY CORP. to GOTHAM BANK OF NEW YORK$3,200,000
2005-01-27Tenant complaint: ELECTRIC — BELL-BUZZER/INTERCOM