The city's published records show little recorded distress here in the last three years. Less recorded distress than 74% of 25-99-unit residential buildings citywide. The citywide median for 25-99-unit residential buildings is 23.6 penalty
points per 10 units; this building carries 4.7. In ZIP 11220, 69% of residential buildings hold an A and
6% grade D or F.
How grades work
this building
A
B
C
Among 17,252 25-99-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
4 heat or hot-water complaints in the last three years (winter 2023–24: 4).
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
78 service requests in the last three years. Most common: Illegal Parking (21) · Noise (15) · Illegal Dumping (8) · Vendor Enforcement (8) · Abandoned Bike (5) · HEAT/HOT WATER (2).
Filed construction activity
$6,448,806 in permitted construction work filed since
2016 (28 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974 (2019)
Yes
Six or more residential units (50)
No
421-a / J-51 tax benefit on the current tax roll
1 of 3 signals present. Only a partial profile — stabilization is possible but less likely. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
SUNSET PARK LP
Head officer
MICHELLE DE LA UZ
Managing agent
FIFTH AVE COMMITTEE INC
Last registered
2025-09-10
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$3,887,280
$1,749,276
2026
$6,053,524
$2,724,086
2027
$0
$0
The city's market estimate has fallen
100% between tax years 2025 and 2027.
Tax exemptions on the roll: 420C
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
1 street-flooding or sewer-backup complaints at this address since
2024 (1 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
53 St — R · 100 ft straight-line (about a 1-minute walk) · station accessibility: none
Bus
Nearest boarding stop: 52 St / 4 Av — B11 · 200 ft
Citi Bike
53 St & 4 Ave · 450 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
78 311 service requests from this address in the last three years — 2 of them about heat or hot water.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
311: Overgrown Tree/Branches — Dead Branches in Tree
2026-07-13
311: Illegal Parking — Blocked Bike Lane
2026-06-11
311: Vendor Enforcement — Food Vendor
2026-06-11
311: Noise - Commercial — Car/Truck Horn
2026-05-31
311: Sidewalk Condition — Broken Sidewalk
2026-05-31
311: Graffiti — Graffiti
2026-05-19
311: Noise - Residential — Loud Talking
2026-05-12
Bedbug filing: 0 infested units
2026-05-11
Job filed: facade inspections
2026-05-08
HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2026-05-06
FDNY inspection (RISK)
2026-03-04
311: Obstruction — Trash or Recycling
2026-02-17
311: Illegal Parking — Blocked Crosswalk
2026-02-10
311: Illegal Parking — Blocked Hydrant
2026-01-28
311: Snow or Ice — Sidewalk
2026-01-19
311: Noise - Residential — Banging/Pounding
2026-01-09
311: Vendor Enforcement — Food Vendor
2026-01-08
Eviction executed (7-B)
2026-01-06
311: Mobile Food Vendor — Insects / Pests
2025-12-28
311: General Construction/Plumbing — Egress - Doors Locked/Blocked/Improper/No Secondary Means
2025-12-28
311: Illegal Parking — Blocked Hydrant
2025-12-28
311: Noise - Vehicle — Engine Idling
2025-12-28
DOB complaint, category ?
2025-12-19
311: Noise — Noise: Manufacturing Noise (NK1)
2025-12-18
311: Vendor Enforcement — Food Vendor
2025-12-17
311: Illegal Parking — Blocked Bike Lane
2025-12-01
311: Illegal Parking — Blocked Crosswalk
2025-11-30
311: Noise - Residential — Banging/Pounding
2025-11-23
311: Illegal Parking — Blocked Crosswalk
2025-11-05
311: Illegal Dumping — Removal Request
2025-10-31
311: Construction Safety Enforcement — CSC - Monitoring Tracking
2026-05-08HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2025-06-27HPD class B: § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6J, 6th STORY, 1st APARTMENT FROM S
2025-06-27HPD class B: § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6J, 6th STORY,
2024-04-17HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2024-04-16311: Missed Collection — Trash
2024-03-12Certificate of occupancy Renewal With Change
2024-02-08Job filed: INSTALLATION OF HVAC SYSTEM ON THE CELLAR, FIRST, 2ND FLOOR. AS INDICATED ON THE DRAWINGS . NO CHANGE IN USE EGRESS OR OCCUPANCY.$1,000
2023-12-22HPD class C: § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO H
2023-12-20311: HEAT/HOT WATER — ENTIRE BUILDING
2023-12-20Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2023-12-19311: HEAT/HOT WATER — ENTIRE BUILDING
2023-12-19Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2023-10-25Certificate of occupancy Renewal Without Change
2023-07-26Certificate of occupancy Renewal Without Change
2023-06-15Mortgage assigned — from COMMUNITY PRESERVATION CORPORATION (THE) to PENY & CO., L.L.C.
2023-06-15AALR — from COMMUNITY PRESERVATION CORPORATION (THE) to PENY & CO., L.L.C.
2023-06-15Mortgage assigned — from COMMUNITY PRESERVATION CORPORATION (THE) to PENY & CO., L.L.C.
2023-06-15AALR — from COMMUNITY PRESERVATION CORPORATION (THE) to PENY & CO., L.L.C.
2023-06-12FDNY inspection (RISK)
2023-06-12FDNY inspection (COM_OCPCY)
2023-06-09SAGE — from COMMUNITY PRESERVATION CORPORATION (THE) to CITY OF NEW YORK (THE)
2023-06-09Mortgage $1,639,841 — from FAC SUNSET PARK HOUSING DEVELOPMENT FUND; FAC SUNSET PARK, L.P. to CITY OF NEW YORK (THE)$1,639,841
2023-06-09SAGE — from FAC SUNSET PARK, L.P.; FAC SUNSET PARK HOUSING DEVELOPMENT FUND to CITY OF NEW YORK (THE)
2023-06-09Agreement $6,008,013 — from FAC SUNSET PARK, L.P.; FAC SUNSET PARK HOUSING DEVELOPMENT FUND to CITY OF NEW YORK (THE)$6,008,013
2023-06-09AL&R $4,066,159 — from FAC SUNSET PARK HOUSING DEVELOPMENT FUND; FAC SUNSET PARK, L.P. to COMMUNITY PRESERVATION CORPORATION (THE)$4,066,159
2023-06-09Mortgage $4,066,159 — from FAC SUNSET PARK HOUSING DEVELOPMENT FUND; FAC SUNSET PARK, L.P. to COMMUNITY PRESERVATION CORPORATION (THE)$4,066,159
2023-06-09Mortgage assigned — from BANK OF NEW YORK MELLON (THE) to CITY OF NEW YORK (THE)
2023-06-09Mortgage assigned — from BANK OF NEW YORK MELLON (THE) to CITY OF NEW YORK (THE)
2023-06-09TL&R — from BANK OF NEW YORK MELLON (THE) to FAC SUNSET PARK HOUSING DEVELOPMENT FUND; FAC SUNSET PARK, L.P.
2023-06-09TL&R — from BANK OF NEW YORK MELLON (THE) to FAC SUNSET PARK HOUSING DEVELOPMENT FUND; FAC SUNSET PARK, L.P.
2023-06-09SAGE — from FAC SUNSET PARK, L.P.; FAC SUNSET PARK HOUSING DEVELOPMENT FUND to CITY OF NEW YORK (THE)
2023-06-09SAGE — from FAC SUNSET PARK HOUSING DEVELOPMENT FUND; FAC SUNSET PARK, L.P. to NEW YORK STATE DIVISI0N OF HOUSING AND C
2023-06-09SUBM — from CITY OF NEW YORK (THE) to COMMUNITY PRESERVATION CORPORATION (THE)
2023-06-09SAGE — from CITY OF NEW YORK (THE) to COMMUNITY PRESERVATION CORPORATION (THE)
2023-06-09SUBM — from CITY OF NEW YORK (THE) to COMMUNITY PRESERVATION CORPORATION (THE)
2023-06-09SAGE — from CITY OF NEW YORK (THE) to COMMUNITY PRESERVATION CORPORATION (THE)
2023-06-09SAGE — from COMMUNITY PRESERVATION CORPORATION (THE) to CITY OF NEW YORK (THE)
2023-06-09Mortgage $4,368,172 — from FAC SUNSET PARK, L.P.; FAC SUNSET PARK HOUSING DEVELOPMENT FUND to CITY OF NEW YORK (THE)$4,368,172
2023-06-09Agreement $6,008,013 — from FAC SUNSET PARK, L.P.; FAC SUNSET PARK HOUSING DEVELOPMENT FUND to CITY OF NEW YORK (THE)$6,008,013
2023-06-09Agreement $3,655,000 — from FAC SUNSET PARK, L.P.; FAC SUNSET PARK HOUSING DEVELOPMENT FUND to CITY OF NEW YORK (THE)$3,655,000
2023-06-09Agreement $8,750,000 — from FAC SUNSET PARK HOUSING DEVELOPMENT FUND; FAC SUNSET PARK, L.P. to CITY OF NEW YORK (THE)$8,750,000
2023-06-09AL&R $4,066,159 — from FAC SUNSET PARK HOUSING DEVELOPMENT FUND; FAC SUNSET PARK, L.P. to COMMUNITY PRESERVATION CORPORATION (THE)$4,066,159
2023-06-09Mortgage $4,066,159 — from FAC SUNSET PARK HOUSING DEVELOPMENT FUND; FAC SUNSET PARK, L.P. to COMMUNITY PRESERVATION CORPORATION (THE)$4,066,159
2023-06-09Mortgage assigned — from BANK OF NEW YORK MELLON (THE) to CITY OF NEW YORK (THE)
2023-06-09Mortgage assigned — from BANK OF NEW YORK MELLON (THE) to CITY OF NEW YORK (THE)
2023-06-09TL&R — from BANK OF NEW YORK MELLON (THE) to FAC SUNSET PARK HOUSING DEVELOPMENT FUND; FAC SUNSET PARK, L.P.
2023-06-09TL&R — from BANK OF NEW YORK MELLON (THE) to FAC SUNSET PARK HOUSING DEVELOPMENT FUND; FAC SUNSET PARK, L.P.
2023-06-09Mortgage satisfied — from FAC SUNSET PARK HOUSING DEVELOPMENT FUND; FAC SUNSET PARK, L.P. to BANK OF NEW YORK MELLON (THE)
2023-06-09Mortgage satisfied — from FAC SUNSET PARK, L.P.; FAC SUNSET PARK HOUSING DEVELOPMENT FUND to BANK OF NEW YORK MELLON (THE)
2023-06-09PREL — from BANK OF NEW YORK MELLON (THE) to FAC SUNSET PARK, L.P.; FAC SUNSET PARK HOUSING DEVELOPMENT FUND
2023-06-09PREL — from BANK OF NEW YORK MELLON (THE) to FAC SUNSET PARK, L.P.; FAC SUNSET PARK HOUSING DEVELOPMENT FUND
2023-06-09Mortgage satisfied — from FAC SUNSET PARK HOUSING DEVELOPMENT FUND; FAC SUNSET PARK, L.P. to BANK OF NEW YORK MELLON (THE)
2023-06-09Agreement $8,750,000 — from FAC SUNSET PARK HOUSING DEVELOPMENT FUND; FAC SUNSET PARK, L.P. to CITY OF NEW YORK (THE)$8,750,000
2023-06-09SAGE — from FAC SUNSET PARK, L.P.; FAC SUNSET PARK HOUSING DEVELOPMENT FUND to CITY OF NEW YORK (THE)
2023-06-09SAGE — from FAC SUNSET PARK, L.P.; FAC SUNSET PARK HOUSING DEVELOPMENT FUND to CITY OF NEW YORK (THE)
2023-06-09SAGE — from FAC SUNSET PARK HOUSING DEVELOPMENT FUND; FAC SUNSET PARK, L.P. to NEW YORK STATE DIVISI0N OF HOUSING AND C
2023-06-09SUBM — from CITY OF NEW YORK (THE) to COMMUNITY PRESERVATION CORPORATION (THE)
2023-06-09SAGE — from CITY OF NEW YORK (THE) to COMMUNITY PRESERVATION CORPORATION (THE)
2023-06-09SUBM — from CITY OF NEW YORK (THE) to COMMUNITY PRESERVATION CORPORATION (THE)
2023-06-09SAGE — from CITY OF NEW YORK (THE) to COMMUNITY PRESERVATION CORPORATION (THE)
2023-06-09Agreement $3,655,000 — from FAC SUNSET PARK, L.P.; FAC SUNSET PARK HOUSING DEVELOPMENT FUND to CITY OF NEW YORK (THE)$3,655,000
2023-06-09Mortgage satisfied — from FAC SUNSET PARK, L.P.; FAC SUNSET PARK HOUSING DEVELOPMENT FUND to BANK OF NEW YORK MELLON (THE)
2023-04-14311: Emergency Response Team (ERT) — After Hours Work - Illegal
2023-04-14DOB complaint, category ?
2023-03-31HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2023-03-21Certificate of occupancy Renewal Without Change
2022-12-16Certificate of occupancy Renewal Without Change
2022-12-14Agreement — from FAC SUNSET PARK, L.P.; FAC SUNSET PARK HOUSING DEV. FUND CORP. to CITY OF NEW YORK (THE)
2022-12-14REL — from NYS DIVISION OF HOUSING AND COMMUNITY RE to FAC SUNSET PARK HOUSING DEV. FUND CORP.; FAC SUNSET PARK, L.P.
2022-12-14REL — from BANK OF NEW YORK MELLON to FAC SUNSET PARK, L.P.; FAC SUNSET PARK HOUSING DEV. FUND CORP.
2022-12-14REL — from BANK OF NEW YORK MELLON to FAC SUNSET PARK, L.P.; FAC SUNSET PARK HOUSING DEV. FUND CORP.
2022-12-14PREL — from BANK OF NEW YORK MELLON to FAC SUNSET PARK HOUSING DEV. FUND CORP.; FAC SUNSET PARK, L.P.
2022-12-14PREL — from BANK OF NEW YORK MELLON to FAC SUNSET PARK HOUSING DEV. FUND CORP.; FAC SUNSET PARK, L.P.
2022-12-14REL — from CITY OF NEW YORK (THE) to FAC SUNSET PARK, L.P.; FAC SUNSET PARK HOUSING DEV. FUND CORP.
2022-12-14REL — from CITY OF NEW YORK (THE) to FAC SUNSET PARK HOUSING DEV. FUND CORP.; FAC SUNSET PARK, L.P.
2022-12-14PREL — from CITY OF NEW YORK (THE) to FAC SUNSET PARK HOUSING DEV. FUND CORP.; FAC SUNSET PARK, LP
2022-12-14Deed — from FAC SUNSET PARK HOUSING DEVELOPMENT FUND; FAC SUNSET PARK, L.P. to CITY OF NEW YORK (THE)
2022-12-14CERT — from CITY OF NEW YORK (THE)
2022-12-14Agreement — from FAC SUNSET PARK, L.P.; FAC SUNSET PARK HOUSING DEV. FUND CORP. to CITY OF NEW YORK (THE)
2022-12-14SMIS — from FAC SUNSET PARK, L.P.; FAC SUNSET PARK HOUSING DEV. FUND CORP.
2022-12-14CERT — from CITY OF NEW YORK (THE)
2022-12-14CERT — from CITY OF NEW YORK (THE)
2022-12-14SMIS — from FAC SUNSET PARK, L.P.; FAC SUNSET PARK HOUSING DEV. FUND CORP.
2022-11-23311: Dirty Condition — Dog Waste
2022-11-02311: Dirty Condition — Trash
2022-10-27Elevator permit: Furnish and install one hydraulic passenger elevator. Serving C, *1 and 2. All work to comply with ASME A17.1 b-2003 with Append$110,000
2022-10-27Permit EW — ISSUED
2022-10-27Permit Supported Scaffold — Signed-off
2022-10-27Job filed: INSTALLATION OF STEEL PIPE SCAFFOLD IN SHAFTWAY AS PER PLANS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.$1,000
2022-10-18Permit Structural — Signed-off
2022-10-13Permit Sprinklers — Signed-off
2022-10-13Permit Plumbing — Signed-off
2022-09-23Certificate of occupancy Renewal With Change
2022-09-19Certificate of occupancy Renewal With Change
2022-08-24Certificate of occupancy Initial
2022-08-16Permit NB — ISSUED
2022-07-26Permit EW — ISSUED
2022-07-14Permit EQ — ISSUED
2022-06-21DOB complaint, category ?
2022-05-27FDNY inspection (RISK)
2022-05-17Job filed: INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK.$117,959
2022-05-13Job filed: New boilers in conjunction with NB application # 321188031$1,000
2022-04-05Permit EW — ISSUED
2022-04-05Permit EW — ISSUED
2022-04-05Permit EW — ISSUED
2022-03-12Permit NB — ISSUED
2022-03-07Permit PL — ISSUED
2022-03-02DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2022-02-24Permit Boiler Equipment — Signed-off
2022-02-11Elevator permit: Furnish and install two (2) new MRL elevator as per attached drawings. All work to comply with ASME A17.1-2005S, as modified by A$429,007
2022-01-19DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2022-01-19DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2021
2021-12-10Permit EW — ISSUED
2021-12-07ECB CLASS - 2 violation: FAILURE TO SAFEGUARD ALL PERSONS AFFECTED BY CONSTRUCTION OPERATIONS. AT TIME OF INSPECTION OBSERVED ROOF PROTECTION INSTALLED BY
2021-12-07ECB CLASS - 1 violation: FAILURE TO PROMPTLY NOTIFY THE DEPT. OF AN ACCIDENT OR DAMAGE TO ADJOINING PROPERTY AT CONSTRUCTION/DEMOLITION SITE. AT TIME OF IN
2021-12-07DOB complaint, category ?
2021-12-01ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED DOCUMENTS/AMENDMENTS-SITE SAFETY PLAN. AT TIME OF INSPECTION ON AN 8 STY TOPPED OFF NB UNDER PER
2021-12-01DOB complaint, category ?
2021-11-15Permit Boiler Equipment — Signed-off
2021-10-29DOB complaint, category ?
2021-10-28ECB CLASS - 1 violation: FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 33. AT THE TIME OF INSPECTION,I SAW ACTIVE CONSTRUCTION SITE,$1,250
2021-10-28ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVEDAMENDMENTS-SUSPENDED SCAFFOLD AT EXP#2&3 AT REAR OF BLDG CON$2,500
2021-10-04Permit EW — ISSUED
2021-10-04Permit EW — ISSUED
2021-10-04Permit EW — ISSUED
2021-09-07Permit AL — ISSUED
2021-08-23FDNY inspection (RISK)
2021-08-18Elevator permit: Furnish and install two (2) new MRL elevator as per attached drawings. All work to comply with ASME A17.1-2005S, as modified by A$429,007
2021-08-18MAPS — from FAC/BPL SUNSET PARK CONDOMINIUM
2021-08-18CDEC — from FAC SUNSET PARK, L.P.; FAC SUNSET PARK HOUSING DEVELOPMENT FUND
2021-08-18CDEC — from FAC SUNSET PARK, L.P.; FAC SUNSET PARK HOUSING DEVELOPMENT FUND
2021-08-18MAPS — from FAC/BPL SUNSET PARK CONDOMINIUM
2021-08-18CDEC — from FAC SUNSET PARK, L.P.; FAC SUNSET PARK HOUSING DEVELOPMENT FUND
2021-08-18MAPS — from FAC/BPL SUNSET PARK CONDOMINIUM
2021-08-18Permit NB — ISSUED
2021-08-18Permit EQ — ISSUED
2021-08-18Permit Construction Fence — Signed-off
2021-08-16Job filed: INSTALLATION OF 2-POINT SUSENDED SCAFFOLDING TO COMPLY WITH CHATER 33 OF NYC BUILDING CODE.$5,000
2021-08-08311: Graffiti — Graffiti
2021-06-22ECB CLASS - 1 violation: FAILURE TO COMMUNICATE REQUIRED INFO DURING SITE SAFETY ORIENTATION ORREFRESHER NOTE:ATOI OF 8STYNB,ACTIVE JOBSITE W/INTERIOR&EXTE$5,000
2021-06-22ECB CLASS - 1 violation: BC3303.12 ELEVATORS&HOISTS DURING CONST NOTE:ATOI OF 8STYNB,ACTIVE JOBSITE W/INTERNAL&EXTERIOR FINISHES.I OBSERVED TEMP HOIST IN P$625
2021-06-22ECB CLASS - 2 violation: FAILURE TO INSTITUTE&MAINTAIN SAFETY MEASURES&TEMP CONST EQUIPMENT NOTE:ATOI OF 8STYNB,ACTIVE JOBSITE W/INTERIOR&EXTERIOR FINISHES$5,000
2021-06-22ECB CLASS - 1 violation: BC3314.1 UNSAFE PIPE SCF NOT COMPLY W/CODE SPECS NOTE:ATOI OF 8STYNB,ACTIVE JOBSITE W/BLDG INTERIOR&EXTERIOR FINISHES ACTIVITIES,I$2,500
2021-06-09Permit Boiler Equipment — Signed-off
2021-06-02DOB complaint, category ?
2021-05-26DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2021-05-26DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2021-05-07FDNY inspection (CONSTR)
2021-05-05Permit Supported Scaffold — Signed-off
2021-04-30Permit Supported Scaffold — Signed-off
2021-04-29Job filed: INSTALLATION OF PIPE SCAFFOLDING & NEEDLE B EAMS AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS O$5,000
2021-04-28Job filed: THIS IS A NO WORK APPLICATION TO SUBDIVIDE TAX LOT 34 INTO THREE (3) CONDO TAX LOTS, 1001-1003. NO WORK, AND NO CHANGE IN USE, ZONING, OR EGRESS UNDER
2021-04-28Job filed: THIS IS A NO WORK APPLICATION TO SUBDIVIDE TAX LOT 34 INTO THREE (3) CONDO TAX LOTS, 1001-1003. NO WORK, AND NO CHANGE IN USE, ZONING, OR EGRESS UNDER
2021-04-22ECB CLASS - 2 violation: FAILURE TO OBTAIN A TEMPORARY CONSTRUCTION PERMIT PRIOR TO INSTALLATION/USE OF TEMPORARY CONSTRUCTION EQUIPMENT.NOTE AT TIME OF IN
2021-04-22DOB complaint, category ?
2021-04-01Permit Sidewalk Shed — Signed-off
2021-03-10Permit Sidewalk Shed — Signed-off
2021-03-09DOB complaint, category ?
2021-03-06ECB CLASS - 1 violation: SEC. 3309.10 PROTECTION OF ROOFS. NOTE: AT THE TIME OF INSPECTION RESPONDING TO A COMPLAINT OF DEBRIIS FALLING ON ROOF AT 5114 4 A$625
2021-03-06ECB CLASS - 2 violation: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. NOTE: AT THE TIME OF INSPECTION I OBSERVED LOOSE CONSTRUCTION
2021-03-05DOB complaint, category ?
2021-03-03Permit PL — ISSUED
2021-03-03ECB CLASS - 1 violation: 3303.4.1 SLIPPING&TRIPPING HAZARDS NOTE:@TIME OF MY INSP OF 8STYBLDG TOPPED OFF@ROOF.CONST WORK IN PROGRESS I OBSERVED WATER&OIL O$625
2021-03-03ECB CLASS - 2 violation: EXPIRED SCAFFOLD PERMIT. NOTE: AT TIME OF INSPECTION OD A 8 STY BLDG TOPPED OFF AT ROOF CONSTRUCTION WORK IN PROGRESS RESEARCH CAR$625
2021-03-03ECB CLASS - 1 violation: PERMIT HOLDER FAILED TO ENSURE WORKERS ATTEND PRESHIFT SAFETY MEETING PRIOR TO COMMENCEMENT OF WORK. NOTE AT TIME OF MY INSPECTION$5,000
2021-03-02DOB complaint, category ?
2021-03-02DOB complaint, category ?
2021-02-22Job filed: INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH $10,000
2021-02-19Job filed: INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH $10,000
2021-02-08Permit NB — ISSUED
2021-02-08DOB complaint, category ?
2021-02-08DOB complaint, category ?
2021-02-05ECB CLASS - 2 violation: 28-110.2 () SITE SAFETY PLAN-AT THE TIME OF MY INSPECTION AT AN 8 STORY BUILDING UNDER CONSTRUCTION, I OBSERVED SUSPENDED SCAFFOLD
2021-02-05ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED PLANS/DRAWINGS.AT THE TIME OF INSPECTION AT AN 8 STORY BUILDING UNDER CONSTRUCTION I OBSERVED SU$2,500
2021-02-05ECB CLASS - 1 violation: SUPPORTED SCAFFOLD-MAINTENANCE,ADJUST, REPAIR-AT THE TIME OF MY INSPECTION AT AN 8 STORY BUILDING UNDER CONSTRUCTION I OBSERVED PI$2,500
2021-01-19Job filed: INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH $10,000
2020
2020-12-30Permit Supported Scaffold — Signed-off
2020-11-30Permit Supported Scaffold — Signed-off
2020-11-19Permit Construction Fence — Signed-off
2020-11-17DOB complaint, category ?
2020-11-12FDNY inspection (CONSTR)
2020-10-16Permit EW — ISSUED
2020-10-16Permit EW — ISSUED
2020-10-13Permit EW — ISSUED
2020-09-29DOB complaint, category ?
2020-09-25Job filed: No Work
2020-09-09Job filed: FILING HEREWITH STRUCTURAL WORK IN CONJUNCTION WITH NEW BUILDING AND ALTERATION TYPE 2 # 322085168 & 122241733 . NO CHANGE IN USE,EGRESS OR OCCUPA$1,000
2020-08-28Permit NB — ISSUED
2020-08-28Permit EQ — ISSUED
2020-08-27Permit NB — ISSUED
2020-08-24Permit NB — ISSUED
2020-08-13Elevator permit: INSTALLATION OF A TEMPORARY PERSONNEL MATERIAL HOIST CARS AS PER PLANS IN CONJUNCTION WITH INSTALLATION AND TESTS AS PER ANSI A10$10,000
2020-08-13Job filed: FILING HEREWITH INSTALLATION OF SPRINKLER HEADS WITH ASSOCIATES PIPING IN CONJUNCTION WITH NEW BUILDING AS INDICATED ON THE DRAWINGS. NO CHANGE IN U$233,000
2020-08-11Job filed: FILING HEREWITH INSTALLATION OF PLUMBING FIXTURES ON THE CELLAR , FIRST AND SECOND FLOOR AS INDICATED ON THE DRAWINGS.NO CHANGE IN USE EGRESS OR OCC$1,000
2020-08-10Job filed: FILING HEREWITH STRUCTURAL WORK IN CONJUNCTION WITH NEW BUILDING AND ALTERATION TYPE 2 # 322085168 & 122241733 . NO CHANGE IN USE,EGRESS OR OCCUPANCY.$1,000
2020-07-22Job filed: New boilers in conjunction with NB application # 321188031$1,000
2020-07-20Permit Supported Scaffold — Signed-off
2020-07-20Job filed: INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH $10,000
2020-07-02Permit EQ — ISSUED
2020-06-29Elevator permit: INSTALLATION OF A TEMPORARY PERSONNEL MATERIAL HOIST CARS AS PER PLANS IN CONJUNCTION WITH INSTALLATION AND TESTS AS PER ANSI A10$10,000
2020-06-24Job filed: INSTALLATION OF SINGLE TEMPORARY PERSONNEL/MATERIAL HOIST FOR WORKER ACCESS DURING CONSTRUCTION,SINGLE TEMPORARY PERSONAL/MATERIAL HOIST COMPLIES WITH
2020-06-24Job filed: INSTALLATION OF SINGLE TEMPORARY PERSONNEL/MATERIAL HOIST FOR WORKER ACCESS DURING CONSTRUCTION,SINGLE TEMPORARY PERSONAL/MATERIAL HOIST COMPLIES WITH
2020-06-24Job filed: INSTALLATION OF SINGLE TEMPORARY PERSONNEL/MATERIAL HOIST FOR WORKER ACCESS DURING CONSTRUCTION,SINGLE TEMPORARY PERSONAL/MATERIAL HOIST COMPLIES WITH
2020-06-14DOB complaint, category ?
2020-06-11Rodent inspection: Passed
2020-05-11Job filed: INSTALLATION OF HVAC SYSTEM ON THE CELLAR, FIRST, 2ND FLOOR. AS INDICATED ON THE DRAWINGS . NO CHANGE IN USE EGRESS OR OCCUPANCY.$1,000
2020-05-06Job filed: FILING HEREWITH INTERIOR RENOVATION ON THE CELLAR,FIRST AND SECOND IN CONJUNCTION WITH NEW BUILDING # 122241733 AS INDICATED.NO CHANGE IN USE, EGRESS $1,000
2020-05-06Job filed: FILING HEREWITH INTERIOR RENOVATION ON THE CELLAR,FIRST AND SECOND IN CONJUNCTION WITH NEW BUILDING #321188031AS INDICATED. NO CHANGE IN USE, OR EGR E$1,000
2020-04-30Permit Construction Fence — Signed-off
2020-04-09DOB complaint, category ?
2020-04-09ECB CLASS - 2 violation: 3307.2.1 FAILURE TO COMPLY WITH DOT REGULATION-STORAGE ZONE.UPON INSPECTION OF A 8 STORY NB IN 2ND FLOOR PHASE I OBSERVED EXTERIOR
2020-04-09ECB CLASS - 2 violation: 3307.4.3 WARNING SIGNS,PERSONNEL AND BARRIERS FOR VEHICULAR TRAFFIC UPON INSPECTION OF A 8 STORY NB IN 2ND FLOOR PHASE I OBSERVED
2020-04-09ECB CLASS - 1 violation: 3307.4.7 WORK OR STORAGE ZONES.UPON INSPECTION OF A 8 STORY NB IN 2ND FLOOR PHASE I OBSERVED EXTERIOR OF SITE.OBSERVED FORKLIFT AN
2020-04-03Permit NB — ISSUED
2020-04-02Job filed: FILING HEREWITH INTERIOR RENOVATION ON THE CELLAR,FIRST AND SECOND FLOOR AS INDICATED.NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,875,000
2020-04-02Job filed: FILING HEREWITH INTERIOR RENOVATION ON THE CELLAR,FIRST AND SECOND FLOOR AS INDICATED.NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,875,000
2020-04-01Permit Sidewalk Shed — Signed-off
2020-03-27DOB complaint, category ?
2020-03-23Permit PL — ISSUED
2020-03-13Permit Sidewalk Shed — Signed-off
2020-03-13Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2020-03-06FDNY inspection (CONSTR)
2020-02-14Elevator permit: Furnish and install two (2) new MRL elevator as per attached drawings. All work to comply with ASME A17.1-2005S, as modified by A$429,007
2019
2019-12-23Permit Construction Fence — Signed-off
2019-12-18FDNY inspection (CONSTR)
2019-11-13Permit EQ — ISSUED
2019-10-25Permit EW — ISSUED
2019-10-11Permit Sidewalk Shed — Signed-off
2019-10-08Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2019-10-03DOB complaint, category ?
2019-09-25FDNY inspection (CONSTR)
2019-08-14Permit Construction Fence — Signed-off
2019-07-12FDNY inspection (CONSTR)
2019-05-13Permit NB — ISSUED
2019-04-19FDNY inspection (CONSTR)
2019-04-08Permit PL — ISSUED
2019-03-06DOB complaint, category ?
2019-03-06ECB CLASS - 1 violation: 28.407.1 WELDER'S LICENSE FAILURE TO HAVE WELDER'S LICENSE FOR MANUAL STRUCTURAL WELDING.AT THE TIME OF INSPECTION ON AN AC
2019-03-06ECB CLASS - 2 violation: FAILURE TO PROVIDE APPROVED/ACCEPTED CONSTRUCTION DOCUMENTS AT JOB SITE AT TIME OF INSPECTION.AT TIME OF INSPECTION REQUESTED S
2019-03-06ECB CLASS - 1 violation: UNSAFE STORAGE OF COMBUSTIBLE MATERIAL AND EQUIPMENT. AT TIME OF INSPECTION ON AN ACTIVE 8 STORY BUILDING UNDER CONSTRUCTION
2019-02-08FDNY inspection (CONSTR)
2019-01-08Permit Construction Fence — Signed-off
2019-01-04FDNY inspection (CONSTR)
2018
2018-12-24FDNY inspection (CONSTR)
2018-12-14FDNY inspection (CONSTR)
2018-12-10Permit Construction Fence — Signed-off
2018-12-10Job filed: INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH NB # 321188031.$1,000
2018-12-04ECB CLASS - 2 violation: FAILURE TO PROVIDE APPROVED/ACCEPTED CONSTRUCTION DOCUMENTS AT JOB SITE AT TIME OF INSPECTION.NOTE: AT THE TIME OF MY INSPECTIO$312
2018-12-04ECB CLASS - 1 violation: 3307.7.5 DESIGN OF FENCES. NOTE: AT THE TIME OF MY INSPECTION OF A 8 STORY BUILDING AT EXCAVATION PHASE. I OBSERVED APPROXIMATELY$400
2018-12-04DOB complaint, category ?
2018-12-03FDNY inspection (CONSTR)
2018-11-16Permit EQ — ISSUED
2018-11-16Permit NB — ISSUED
2018-10-30Permit EW — ISSUED
2018-08-29DOB complaint, category ?
2018-08-23Permit DM — ISSUED
2018-08-10Permit Sidewalk Shed — Signed-off
2018-08-09Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2018-08-08Permit EQ — ISSUED
2018-07-24Permit Construction Fence — Signed-off
2018-07-23Job filed: INSTALLATION OF FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2018-07-11Asbestos abatement: Removal — New York Insulation Inc.
2018-07-11Asbestos abatement: Removal — New York Insulation Inc.
2018-07-11Asbestos abatement: Removal — New York Insulation Inc.
2018-06-29Deed transfer (nominal price)
2018-04-12Job filed: INSTALLATION OF REPEATER RADIO COMMUNICATION SYSTEM WITH A PASSIVE DISTRIBUTED ANTENNA SYSTEM$1,000
2018-04-12Job filed: INSTALLATION OF AUTOMATIC SMOKE/HEAT/CO DETECTION & SPRINKLER FIRE ALARM SYSTEM WITH PURGE. ARCS FILED UNDER SEPARATE APPLICATION.$1,000
2018-04-10Job filed: INSTALL SOLAR PV SYSTEM ON THE EXISTING ROOFTOP. NO CHANGES TO USE, EGRESS OR OCCUPANCY.$263,847
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-25Boiler inspection
2018-01-17Job filed: SOE WORK FOR NB# 321188031
2017
2017-11-29Job filed: INSTALLATION OF TEMPORARY AIR PRESSURIZED ALARM SYSTEM FOR DRY STANDPIPE SYSTEM DURING CONSTRUCTION. FILED IN CONJUNCTION WITH NEW BUILDING 321188031$1,000
2017-11-29Job filed: A2$2,000
2017-09-13Job filed: FULL DEMOLITION OF ONE STORY STRUCTURE, USING HAND HELD EQUIPMENT, AND PARTIAL MECHANICAL MEANS.
2017-09-13Job filed: FULL DEMOLITION OF ONE STORY STRUCTURE, USING HAND HELD EQUIPMENT, AND PARTIAL MECHANICAL MEANS.
2017-08-09Job filed: FOUNDATION WORK FOR NB AS SHOWN ON PLANS FILED HEREWITH.
2017-08-09Job filed: STRUCTURAL SUPERSTRUCTURE WORK FOR NB AS SHOWN ON PLANS FILED HEREWITH.
2017-08-09Job filed: MECHANICAL AND PLUMBING WORK FOR 8 STORY NEW BUILDING.
2017-08-09Job filed: FOUNDATION WORK FOR NB AS SHOWN ON PLANS FILED HEREWITH.
2017-08-09Job filed: MECHANICAL AND PLUMBING WORK FOR 8 STORY NEW BUILDING.
2016-11-16Job filed: PROPOSED INSTALLATION OF 100% POINTING AND ALL LINTELS REPLACE.AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,000
2016-11-16Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2016-11-16Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2016-11-14DOB violation E:
2016-06-15Job filed: FILING FOR UPGRADE OF EXISTING IFA TO MANUAL & AUTOMATIC SMOKE/HEAT/CO DECECTION & SPRINKLER FIRE ALARM SYSTEM. NO CHABE TO USE, EGRESS OR OC$15,000
2014
2014-07-21DOB violation E: NY BROOKLYN PUBLIC LIBRARY
2013
2013-05-15DOB violation E:
2012
2012-12-20DOB violation E:
2012-08-30DOB complaint, category ?
2012-02-15Job filed: INSTALLATION OF NEW ROOF TOP UNITS AND BOILER AS WELL AS MINOR PLUMBING WORK.$244,229
2012-02-15Job filed: RENOVATION OF EXISTING LIBRARY$1,707,006
2012-02-15Job filed: ROOF TOP DUNNAGE FOR NEW HVAC UNITS.$80,000
2012-02-15Job filed: ADDITION/MODIFICATION TO AN EXISTING SYSTEM.$34,024
2012-02-15Job filed: ADDITION/MODIFICATION TO AN EXISTING SYSTEM.$34,024
2012-02-15Job filed: ROOF TOP DUNNAGE FOR NEW HVAC UNITS.$80,000
2011
2011-09-16DOB violation E:
2010
2010-11-02DOB violation E:
2010-10-08DOB violation VCAT1:
2008
2008-09-23DOB violation E:
2006
2006-09-08Permit AL — ISSUED
2006-04-03Permit EW — ISSUED
2006-04-03Permit EW — ISSUED
2006-03-31Permit PL — ISSUED
2006-03-31Permit EW — ISSUED
2006-02-02Permit EW — ISSUED
2006-02-02Permit EW — ISSUED
2006-02-02Permit EW — ISSUED
2005
2005-11-01Job filed: INTERIOR CELLAR EXPANSION AS USABLE SPACE-TECH.CENTER-COMPUTER ROOM.NO W ORK TO BE PERFORMED UNDER THIS APP.ALL WORK TO BE PERFORMED UNDER SEPARATE DI$2,000
2005-10-31Job filed: STRUCTURAL WORK FOR INTERIOR CELLAR EXPANSION SD USABLE SPACE.$145,000
2005-10-31Job filed: STRUCTURAL WORK FOR INTERIOR CELLAR EXPANSION SD USABLE SPACE.$145,000
2005-10-31Job filed: INTERIOR CELLAR EXPANSION AS USABLE SPACE; IN CONJUNCTION WITH ALT.1 APP LICATION.$133,000
2005-10-31Job filed: MODIFICATION OF EXISTING MECHANICAL & SPRINKLER SYSTEM.$39,300
2005-10-28Job filed: MODIFICATION OF EXISTING FA SYS$8,000
2005-10-28Job filed: MODIFICATION OF EXISTING FA SYS$8,000