A modest record — below the level that usually signals systemic problems. More recorded distress than 76% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty
points per 10 units; this building carries 65. In ZIP 11215, 70% of residential buildings hold an A and
4% grade D or F.
How grades work
this building
A
B
C
Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
Open HPD violations
7 total — 3 class C (immediately hazardous), 4 class B, 0 class A. Oldest open since 2023-03-29.
status snapshot refreshed weekly from HPD records
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
$21,250 in enforcement penalties imposed (ECB/OATH) in the last three years.
What 311 hears from this address
35 service requests in the last three years. Most common: Snow or Ice (15) · General Construction/Plumbing (8) · Noise (6) · Dirty Condition (2) · Illegal Dumping (1) · Street Condition (1).
Filed construction activity
$3,162,007 in permitted construction work filed since
2016 (24 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1906)
Yes
Six or more residential units (8)
No
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
444 15th Owner LLC
Head officer
MARK LEVINE
Managing agent
APEX MANAGEMENT GROUP
Last registered
2025-09-12
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$2,428,000
$1,092,600
2026
$2,588,000
$1,164,600
2027
$2,930,000
$1,318,500
The city's market estimate has risen
21% between tax years 2025 and 2027.
Building systems
Heating fuel
NATURALGAS
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
15 St-Prospect Park — F G · 500 ft straight-line (about a 2-minute walk) · station accessibility: none
Bus
Nearest boarding stop: 15 St / 8 Av — B61 · 250 ft
Citi Bike
Windsor Pl & 8 Ave · 500 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
35 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $7,523 on
2025-04-02 (lender: Fcr Dc JV Holdings LLC). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2025-04-02
Agreement $2,400,000 — from 444 15TH OWNER LLC to FCR DC JV HOLDINGS LLC
$2,400,000
2025-04-02
AL&R $735,273 — from 444 15TH OWNER LLC to FCR DC JV HOLDINGS LLC
$735,273
2025-04-02
Agreement $735,273 — from 444 15TH OWNER LLC to FCR DC JV HOLDINGS LLC
$735,273
2025-04-02
Mortgage $7,523 — from 444 15TH OWNER LLC to FCR DC JV HOLDINGS LLC
$7,523
2025-04-02
AL&R $1,464,727 — from 444 15TH OWNER LLC to FCR DC JV HOLDINGS LLC
$1,464,727
2025-04-02
Agreement $1,464,727 — from 444 15TH OWNER LLC to FCR DC JV HOLDINGS LLC
$1,464,727
2025-04-02
Mortgage $67,477 — from 444 15TH OWNER LLC to FCR DC JV HOLDINGS LLC
$67,477
2025-04-02
AL&R $2,400,000 — from 444 15TH OWNER LLC to FCR DC JV HOLDINGS LLC
$2,400,000
2025-04-02
Mortgage $875,000 — from 444 15TH OWNER LLC to FCR DC JV HOLDINGS LLC
$875,000
2024-01-09
AL&R $3,650,000 — from 444 15TH OWNER LLC to CROSS RIVER BANK
$3,650,000
2024-01-09
Mortgage $727,750 — from 444 15TH OWNER LLC to CROSS RIVER BANK
$727,750
2024-01-09
Mortgage $1,397,250 — from 444 15TH OWNER LLC to CROSS RIVER BANK
$1,397,250
2024-01-09
Mortgage $1,525,000 — from 444 15TH OWNER LLC to CROSS RIVER BANK
$1,525,000
2024-01-09
Deed $3,050,000 — from 3X4 SLOPE BK LLC to 444 15TH OWNER LLC
$3,050,000
2023-12-29
Sold for $3,050,000
$3,050,000
$381,250
Ten-year activity
100500
2017
2018
2019
2020
2021
2022
2023
2024
74
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
0
1
1
0
0
2
2018
0
0
0
0
1
1
2019
0
0
1
0
1
2
2020
0
0
0
1
1
2
2021
0
0
2
0
3
5
2022
0
0
5
0
1
6
2023
8
16
20
3
2
49
2024
22
9
2
5
0
38
2025
10
17
30
17
0
74
2026
12
4
6
0
0
22
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
ECB CLASS - 2 violation: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR SUMMONS #
2026-09-09
DOB complaint, category ?
2026-09-03
Job filed: INTERIOR RENOVATION WORK TO UNITS #2L AND 2R AT 2ND FLOOR & RENOVATE COMMON HALLWAY FROM CELLAR TO 002, INCLUDE REMOVING AND INSTALLING NEW INTERIOR N
2026-08-31
DOB violation LANDMK:
2026-07-25
311: Noise - Residential — Banging/Pounding
2026-06-04
Job filed: REPLACEMENT OF WINDOWS & EXTERIOR REPAIR WORK AT FRONT DOOR AND FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY
2026-03-21
311: Noise - Residential — Banging/Pounding
2026-03-21
311: Noise — Noise: Construction Before/After Hours (NM1)
2026-03-21
311: Noise - Residential — Banging/Pounding
2026-03-05
DOB complaint, category ?
2026-03-02
Permit General Construction — Permit Issued
2026-02-20
Permit Plumbing — Permit Issued
2026-02-20
Permit Plumbing — Permit Issued
2026-02-20
Permit Plumbing — Permit Issued
2026-02-20
Permit Plumbing — Permit Issued
2026-02-20
Permit Plumbing — Permit Issued
2026-02-20
Permit Plumbing — Signed-off
2026-02-17
Permit Mechanical Systems — Permit Issued
2026-02-13
Permit General Construction — Permit Issued
2026-02-13
Permit General Construction — Permit Issued
2026-01-20
311: Snow or Ice — Sidewalk
2026-01-19
311: Snow or Ice — Sidewalk
2025-12-18
ECB CLASS - 2 violation: ALTERATION OF 4 STORY BUILDING. OBSERVED ACCUMULATED SNOW FROM 3 DAYS AGO AND ICE @ PUBLIC AREA/SIDEWALK WHICH PUBLIC ACTIVELY USE
2025-12-18
DOB complaint, category ?
2025-12-16
Bedbug filing: 0 infested units
2025-12-16
311: Snow or Ice — Sidewalk
2025-12-16
311: Snow or Ice — Sidewalk
2025-12-16
311: Snow or Ice — Sidewalk
2025-12-15
311: Snow or Ice — Sidewalk
2025-12-07
311: Noise - Street/Sidewalk — Loud Talking
2025-11-14
DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
2025-11-12
Permit General Construction — Permit Issued
2025-10-24
311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2025-10-24
DOB complaint, category ?
The full timeline
2026
2026-09-24ECB CLASS - 2 violation: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR SUMMONS #$1,250
2026-09-09DOB complaint, category ?
2026-09-03Job filed: INTERIOR RENOVATION WORK TO UNITS #2L AND 2R AT 2ND FLOOR & RENOVATE COMMON HALLWAY FROM CELLAR TO 002, INCLUDE REMOVING AND INSTALLING NEW INTERIOR N$153,900
2026-03-02Permit General Construction — Permit Issued
2026-02-20Permit Plumbing — Permit Issued
2026-02-20Permit Plumbing — Permit Issued
2026-02-20Permit Plumbing — Permit Issued
2026-02-20Permit Plumbing — Permit Issued
2026-02-20Permit Plumbing — Permit Issued
2026-02-20Permit Plumbing — Signed-off
2026-02-17Permit Mechanical Systems — Permit Issued
2026-02-13Permit General Construction — Permit Issued
2026-02-13Permit General Construction — Permit Issued
2026-01-20311: Snow or Ice — Sidewalk
2026-01-19311: Snow or Ice — Sidewalk
2025
2025-12-18ECB CLASS - 2 violation: ALTERATION OF 4 STORY BUILDING. OBSERVED ACCUMULATED SNOW FROM 3 DAYS AGO AND ICE @ PUBLIC AREA/SIDEWALK WHICH PUBLIC ACTIVELY USE$5,000
2025-11-12Permit General Construction — Permit Issued
2025-10-24311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2025-10-24DOB complaint, category ?
2025-10-16311: General Construction/Plumbing — Failure To Maintain
2025-10-16DOB complaint, category ?
2025-10-14DOB complaint, category ?
2025-10-12311: General Construction/Plumbing — Debris - Excessive
2025-10-12DOB complaint, category ?
2025-10-01311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2025-10-01DOB complaint, category ?
2025-09-24Job filed: interior renovation work to apts 1R&1L at the 1st fl and apts 3L& 3R at the 3rd fl of existing 4-story multiple dwelling units, alterations to include$303,030
2025-09-03ECB CLASS - 2 violation: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. AT TIME OF INSPECTION OBSERVED INTERIOR 1ST AND 2ND FLOORS CON
2025-09-03ECB CLASS - 1 violation: FAILURE TO DESIGNATE AND/OR HAVE A CONSTRUCTION SUPERINTENDENT PRESENT AT SITE AS REQUIRED. AT TIME OF INSPECTION 4 STORY MULTI FA$10,000
2025-09-03ECB CLASS - 1 violation: FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 33. AT TIME OF INSPECTION OF ACTIVE ALTERATION SITE UPON REQU$2,500
2025-09-02FDNY inspection (RISK)
2025-09-02311: General Construction/Plumbing — Adjacent Buildings Not Protected
2025-09-02DOB complaint, category ?
2025-08-18Permit General Construction — Permit Issued
2025-08-18Permit General Construction — Permit Issued
2025-08-18Permit General Construction — Permit Issued
2025-08-15311: General Construction/Plumbing — Adjacent Buildings Not Protected
2025-08-15DOB complaint, category ?
2025-07-25Permit Mechanical Systems — Permit Issued
2025-07-24311: Noise — Noise: Construction Equipment (NC1)
2025-07-24311: Dumpster Complaint — Small uncovered dumpster
2025-05-29Job filed: MECHANICAL WORK TO RENOVATE UNITS #1R, 1L, 2R, 2L, 3R, 3L, 4R, 4L &ROOF. NO CHANGE TO USE, EGRESS OR OCCUPANCY$189,387
2025-05-14311: Illegal Parking — Blocked Sidewalk
2025-05-09DOB complaint, category ?
2025-04-10Job filed: SUBDIVIDE EXISTING TAX LOT INTO EIGHT CONDO TAX LOTS. NO CAHNGE TO ZONING UNDER THIS APPLICATION.
2025-04-04Permit Structural — Signed-off
2025-04-02TL&R — from PSG CR LENDING 2, LLC to 444 15TH OWNER LLC
2025-04-02Mortgage assigned — from PSG CR LENDING 2, LLC to FCR DC JV HOLDINGS LLC
2025-04-02Mortgage assigned — from PSG CR LENDING 2, LLC to FCR DC JV HOLDINGS LLC
2025-04-02Mortgage assigned — from PSG CR LENDING 2, LLC to FCR DC JV HOLDINGS LLC
2025-04-02Bedbug filing: 0 infested units
2025-04-02Agreement $2,400,000 — from 444 15TH OWNER LLC to FCR DC JV HOLDINGS LLC$2,400,000
2025-04-02AL&R $735,273 — from 444 15TH OWNER LLC to FCR DC JV HOLDINGS LLC$735,273
2025-04-02Agreement $735,273 — from 444 15TH OWNER LLC to FCR DC JV HOLDINGS LLC$735,273
2025-04-02Mortgage $7,523 — from 444 15TH OWNER LLC to FCR DC JV HOLDINGS LLC$7,523
2025-04-02AL&R $1,464,727 — from 444 15TH OWNER LLC to FCR DC JV HOLDINGS LLC$1,464,727
2025-04-02Agreement $1,464,727 — from 444 15TH OWNER LLC to FCR DC JV HOLDINGS LLC$1,464,727
2025-04-02Mortgage $67,477 — from 444 15TH OWNER LLC to FCR DC JV HOLDINGS LLC$67,477
2025-04-02AL&R $2,400,000 — from 444 15TH OWNER LLC to FCR DC JV HOLDINGS LLC$2,400,000
2025-04-02Mortgage $875,000 — from 444 15TH OWNER LLC to FCR DC JV HOLDINGS LLC$875,000
2025-03-25Job filed: PROPOSE INTERIOR STRUCTURAL MODIFICATION TO REINFORCE THE EXISTING FLOOR JOISTS FROM THE 1ST FLOOR TO THE 4TH FLOOR. STRUCTURAL WORK ONLY.$16,000
2025-03-21311: Street Condition — Blocked - Construction
2025-03-05311: General Construction/Plumbing — Debris - Excessive
2025-03-05DOB complaint, category ?
2025-02-26311: Dirty Condition — Trash
2025-02-22311: Dirty Condition — Trash
2025-02-11311: Snow or Ice — Sidewalk
2025-02-11311: Snow or Ice — Sidewalk
2025-02-10311: Snow or Ice — Sidewalk
2025-02-10311: Snow or Ice — Sidewalk
2025-02-09311: Snow or Ice — Sidewalk
2025-01-25311: Illegal Dumping — Chronic Dumping
2025-01-25311: Snow or Ice — Sidewalk
2025-01-24311: Snow or Ice — Sidewalk
2025-01-23311: Snow or Ice — Sidewalk
2025-01-17Mortgage assigned — from CROSS RIVER BANK to PSG CR LENDING 2, LLC
2025-01-17Mortgage assigned — from CROSS RIVER BANK to PSG CR LENDING 2, LLC
2025-01-17AALR — from CROSS RIVER BANK to PSG CR LENDING 2, LLC
2025-01-17Mortgage assigned — from CROSS RIVER BANK to PSG CR LENDING 2, LLC
2025-01-06311: General Construction/Plumbing — Debris - Excessive
2025-01-06DOB complaint, category ?
2024
2024-12-23311: Snow or Ice — Sidewalk
2024-12-19Permit Plumbing — Permit Issued
2024-12-19Permit Plumbing — Permit Issued
2024-12-19Permit Plumbing — Signed-off
2024-12-19Permit Plumbing — Permit Issued
2024-12-10Job filed: PLUMBING WORK TO RENOVATE UNIT #2R and 2L & CELLAR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$50,000
2024-12-10Job filed: PLUMBING WORK TO RENOVATE UNIT #4L& 4R . CELLAR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$50,000
2024-12-03Job filed: PLUMBING WORK TO RENOVATE UNITS #1L and 1R @ 1ST FLOOR, 3L and 3R @ 3RDFLOOR & CELLAR .NO CHANGE TO USE, EGRESS OR OCCUPANR$90,000
2024-11-26HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2024-11-19Job filed: INTERIOR RENOVATION WORK TO UNITS #2L AND 2R AT 2ND FLOOR & RENOVATE COMMON HALLWAY FROM CELLAR TO 002, INCLUDE REMOVING AND INSTALLING NEW INTERIOR N$153,900
2024-11-19Job filed: INTERIOR RENOVATION WORK TO UNITS #4L AND 4R AT 4TH FLOOR, INCLUDE REMOVING AND INSTALLING NEW INTERIOR NON-LOAD BEARING PARTITIONS, LIGHTING AND FINI$153,900
2024-11-11Job filed: interior renovation work to apts , 1R&1L at the 1st fl and apts, 3L& 3R at the 3rd fL of existing 4-story multiple dwelling units, alterations to incl$303,030
2024-08-28Job filed: PLUMBING WORK TO RENOVATE UNIT #4L& 4R . CELLAR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$50,000
2024-08-26Permit General Construction — Permit Issued
2024-08-22Permit General Construction — Permit Issued
2024-08-16Job filed: PLUMBING WORK TO RENOVATE UNIT #2R and 2L & CELLAR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$50,000
2024-08-15Permit General Construction — Permit Issued
2024-07-26Job filed: INTERIOR RENOVATION WORK TO UNITS #4L AND 4R AT 4TH FLOOR, INCLUDE REMOVING AND INSTALLING NEW INTERIOR NON-LOAD BEARING PARTITIONS, LIGHTING AND FINI$153,900
2024-07-01Job filed: PLUMBING WORK TO RENOVATE UNITS #1L and 1R @ 1ST FLOOR, 3L and 3R @ 3RDFLOOR & CELLAR .NO CHANGE TO USE, EGRESS OR OCCUPANR$90,000
2024-06-17Permit General Construction — Permit Issued
2024-06-11DOB complaint, category ?
2024-06-05Job filed: RENOVATION WORK TO COMB. APTS. 1L & 1R AT THE 1st FL & APTS. 3L & 3R AT THE 3RD FL OF AN EXIStT. G 4-STORY MULTIPLE DWELLING BUILDING, ALT. TO INCLU$303,030
2024-03-28Job filed: WORK TO APT. 1R AT 1ST FLOOR AND APTS 3L & 3R AT 3RD FLOOR OF AN EXISTING 4-STORY MULTIPLE DWELLING BUILDING. ALTERATIONS TO INCLUDE RELOCATED INTERIO$227,250
2024-03-28Job filed: MECHANICAL WORK TO APT. 1R AT 1ST FLOOR AND APT 3L AT 3RD FLOOR OF AN EXISTING 4-STORY MULTIPLE DWELLING BUILDING. ALTERATIONS TO INCLUDE THE INSTALLA$23,000
2024-03-25Job filed: INTERIOR RENOVATION WORK TO UNITS #2L AND 2R AT 2ND FLOOR & RENOVATE COMMON HALLWAY FROM CELLAR TO 002, INCLUDE REMOVING AND INSTALLING NEW INTERIOR N$153,900
2024-01-19ECB CLASS - 1 violation: UNLAWFUL ACTS: FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION# 35666750H ISSUED ON 04/05/23 AND TO
2024-01-19ECB CLASS - 1 violation: UNLAWFUL ACTS: FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION# 35657499M ISSUED ON 04/05/23 AND TO $2,500
2024-01-19ECB CLASS - 1 violation: UNLAWFUL ACTS: FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION# 35666751J ISSUED ON 04/05/23 AND TO
2024-01-19ECB CLASS - 1 violation: UNLAWFUL ACTS: FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION# 35657497Z ISSUED ON 04/05/23 AND TO
2024-01-19DOB complaint, category ?
2024-01-19DOB complaint, category ?
2024-01-19DOB complaint, category ?
2024-01-19DOB complaint, category ?
2024-01-09AL&R $3,650,000 — from 444 15TH OWNER LLC to CROSS RIVER BANK$3,650,000
2024-01-09Mortgage $727,750 — from 444 15TH OWNER LLC to CROSS RIVER BANK$727,750
2024-01-09Mortgage $1,397,250 — from 444 15TH OWNER LLC to CROSS RIVER BANK$1,397,250
2024-01-09Mortgage $1,525,000 — from 444 15TH OWNER LLC to CROSS RIVER BANK$1,525,000
2024-01-09Deed $3,050,000 — from 3X4 SLOPE BK LLC to 444 15TH OWNER LLC$3,050,000
2023-10-04DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2023-10-04DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2023-10-04DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2023-10-04DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2023-06-20DOB complaint, category ?
2023-06-01Job filed: WORK TO THE CELLAR, APT. 1R AT THE 1ST FLOOR, AND APTS. 3L & 3R AT THE 3RD FLOOR OF AN EXISTING 4-STORY MULTIPLE DWELLING BUILDING. ALTERATIONS TO INC$29,750
2023-05-26Job filed: WORK TO APT. 1R AT 1ST FLOOR AND APTS 3L & 3R AT 3RD FLOOR OF AN EXISTING 4-STORY MULTIPLE DWELLING BUILDING. ALTERATIONS TO INCLUDE RELOCATED INTERIO$227,250
2023-05-12311: General Construction/Plumbing — Site Conditions Endangering Workers
2023-05-12DOB complaint, category ?
2023-04-11311: Indoor Air Quality — Dust from Construction
2023-04-06Permit Mechanical Systems — Permit Issued
2023-04-06HPD class C: § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING FIRE RETARDED MATERIAL AT CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 1R, 1st STORY, 1st
2023-04-06HPD class C: § 27-2005 HMC: IMMEDIATELY PROVIDE A FIRE GUARD AS DIRECTED BY THE NYC DEPT. OF HOUSING PRESERVATION & DEVELOPMENT (HPD) AND/OR THE NYC DEPT
2023-04-06DOB complaint, category ?
2023-04-05ECB CLASS - 1 violation: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING.NOTE AT TIME OF INSPECTION,OBSERVED WORK BEING PERFORMED UNDER THE AFOREMENTIONED JOB NU$2,500
2023-04-05ECB CLASS - 1 violation: 3303.10 FAILURE TO COMPLY WITH TENANT PROTECTION PLAN.NOTE AT TIME OF INSPECTION,OBSERVED WORK BEING PERFORMED UNDER THE AFOREMENT
2023-04-05ECB CLASS - 1 violation: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NO FIRE STOPPINGPER BC712-3;27-345.NOTE AT TIME OF INSPECTION,OBSERVED IN AN
2023-04-05ECB CLASS - 1 violation: 28-201.1 TENANT PROTECTION PLAN INADEQUATE FOR SCOPE OF WORK.NOTE AT TIME OF INSPECTION,OBSERVED WORK BEING PERFORMED UNDER THE AF$10,000
2023-04-05ECB CLASS - 1 violation: FAILURE TO PROVIDE OSHA TRAINING.NOTE AT THE TIME OF MY INSPECTION ON AN ACTIVE JOBSITE,PERMIT HOLDER FAILED TO ENSURE EACH WORKER
2023-04-03Permit Plumbing — Signed-off
2023-03-29HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST LOCAT
2023-03-29HPD class C: HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4R, 4th STORY, 2nd APARTMENT FR
2023-03-29HPD class B: § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 4R, 4th STORY, 2nd APARTMENT
2023-03-29HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 4
2023-03-29HPD class B: § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 4R, 4th STORY, 2nd APARTMENT FROM SOUTH
2023-03-29HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ... IN THE ENTRANCE LOCATED AT APT
2023-03-23Permit General Construction — Permit Issued
2023-03-22Job filed: MECHANICAL WORK TO APT. 1R AT 1ST FLOOR AND APT 3L AT 3RD FLOOR OF AN EXISTING 4-STORY MULTIPLE DWELLING BUILDING. ALTERATIONS TO INCLUDE THE INSTALLA$22,000
2023-03-22Job filed: WORK TO THE CELLAR, APT. 1R AT THE 1ST FLOOR, AND APTS. 3L & 3R AT THE 3RD FLOOR OF AN EXISTING 4-STORY MULTIPLE DWELLING BUILDING. ALTERATIONS TO INC$29,750
2023-03-20HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2023-03-06311: WATER LEAK — SLOW LEAK
2023-03-06311: UNSANITARY CONDITION — PESTS
2023-03-06311: FLOORING/STAIRS — FLOOR
2023-03-06Tenant complaint: WATER LEAK — SLOW LEAK
2023-03-03Job filed: interior renovation work to apts 1R&1L at the 1st fl and apts 3L& 3R at the 3rd fl of existing 4-story multiple dwelling units, alterations to include$303,030
2023-02-28Deed $2,300,000 — from ASKINAZY, DECEASED, FRANK; ASKINAZY, MARK; ASKINAZY, STEVE to 3X4 SLOPE BK LLC$2,300,000
2023-02-15Sold for $2,300,000$2,300,000
2023-01-24311: Lead — Lead Kit Request (Residential) (L10)
2022
2022-11-09HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2022-07-17311: Dirty Condition — Dirt or Gravel
2022-02-25Boiler inspection
2022-02-18HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2022-02-18HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2022-01-09311: Illegal Parking — Blocked Hydrant
2021
2021-04-06HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2021-04-06HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021-04-02Rodent inspection: Passed
2021-01-26Boiler inspection
2021-01-20Rodent inspection: Failed for Rat Activity and Other Reason
2020
2020-12-14LDMK — from NYC LANDMARKS PRESERVATION COMMISSION
2020-02-14Boiler inspection
2019
2019-10-28HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2019-03-05Boiler inspection
2018
2018-04-27Boiler inspection
2017
2017-11-15HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2017-05-12FDNY inspection (RISK)
2016
2016-11-01HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2015
2015-10-06HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2015-02-06HPD class I: SECTION27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE ?27-2097 AND IS THER
2015-01-16DOB complaint, category ?
2013
2013-11-15FDNY inspection (COMPLAINT)
2012
2012-05-03311: New Tree Request — For One Address
2011
2011-10-29311: Damaged Tree — Branch or Limb Has Fallen Down
2007
2007-05-16ECB Hazardous violation: B4B-4B,10B,16,24B,32A,35,38,39,40,44,45,48A,50ABCDEFG.50A-FLUE PIPE SUPPORTED BY WOOD BAKE,50B-RELIEF VALVE NOT PIPED DOWN 50C-BUR$800
1993
1993-09-29DOB complaint, category ?
1976
1976-11-23Deed — from PODBER MARTHA; PODBER IRVING to ASKINAZY FRANKY; ASKINAZY MARK; ASKINAZY STEVE