Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

1588 Sterling Place · Brooklyn · BBL 3013800031 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

Where the penalty points come from

ComponentWhat it coversPoints
Housing codeHPD violations by class, complaints, emergency repairs, litigation, vacate orders, AEP231
Structural & safetyDOB violations, ECB/OATH violations by class4
PestsBedbug filings, failed rodent inspections, rodent 311s0
DisplacementMarshal evictions executed0
GRADE B

A modest record — below the level that usually signals systemic problems. More recorded distress than 73% of 25-99-unit residential buildings citywide. The citywide median for 25-99-unit residential buildings is 23.6 penalty points per 10 units; this building carries 75.8. In ZIP 11213, 61% of residential buildings hold an A and 11% grade D or F. How grades work

this building
A
B
C

Among 17,252 25-99-unit residential buildings citywide · left is less recorded distress, right is more

Open with the city right now

Open HPD violations2 total — 0 class C (immediately hazardous), 2 class B, 0 class A. Oldest open since 2024-02-16.

status snapshot refreshed weekly from HPD records

Patterns

45 heat or hot-water complaints in the last three years (winter 2023–24: 17 · winter 2024–25: 4 · winter 2025–26: 24). Repeated winter clusters suggest a chronic heating problem.

17
’23–24
4
’24–25
24
’25–26

No bedbug-infested units reported in the last three years of filings.

What 311 hears from this address

60 service requests in the last three years. Most common: Noise (26) · HEAT/HOT WATER (18) · WATER LEAK (4) · DOOR/WINDOW (2) · Non (2) · Dirty Condition (2).

Filed construction activity

$3,140,940 in permitted construction work filed since 2016 (15 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

Rent-stabilization signals

YesBuilt before 1974 (1922)
YesSix or more residential units (31)
No421-a / J-51 tax benefit on the current tax roll

2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit: request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).

Registered with HPD — the names behind the building

Registered owner(s)NYC PACT PRESERVATION PARTNERS LLC
Head officerKERRY KRAMER
Managing agentFAIRSTEAD MANAGEMENT
Last registered2025-08-25

as filed by the owner in the building's HPD registration

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$2,511,000 $1,129,950
2026$2,602,000 $1,170,900
2027$2,798,000 $1,259,100

The city's market estimate has risen 11% between tax years 2025 and 2027.

Tax exemptions on the roll: NYC HOUSING AUTH

Building systems

Heating fuelNATURALGAS

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Not in a hurricane evacuation zone.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

1 street-flooding or sewer-backup complaints at this address since 2015 (0 in the last three years).

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

SubwayCrown Hts-Utica Av — 3 4 · 0.3 mi straight-line (about an 8-minute walk) · station accessibility: full
BusNearest boarding stop: Saint Johns Pl / Buffalo Av — B45 · 200 ft
Citi BikeBuffalo Ave & St John's Pl · 350 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: Dr. Jacqueline Peek-Davis School
Middle: The School of Integrated Learning. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

1588 Sterling Place

Heat or hot waterHeat or hot water
Apartment maintenanceApartment maintenance
Bed bugsBed bugs
Residential pestsResidential pests
Rats or miceRats or mice
Anything elseAnything else

60 311 service requests from this address in the last three years — 18 of them about heat or hot water.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

The landlord's report card

Managed by FAIRSTEAD MANAGEMENT — 207 buildings, 6,649 units. Grades across the portfolio: A51 · B80 · C51 · D16 · F6. See the whole portfolio

BuildingBoroughUnitsGrade
2300 5 Avenue MN771 C
975 Simpson St BX376 C
45 West 139 Street MN326 C
620 Lenox Avenue MN259 C
630 Lenox Avenue MN259 C
60 West 142 Street MN257 C
710 East New York Avenue BK230 B
680 St Nicholas Avenue MN111 B
50 West 139 Street MN108 C
560 Lenox Avenue MN105 B
1710 Andrews Avenue South BX82 B
321 Columbus Avenue MN76 A
1685 Hoe Avenue BX75 A
1551 Shakespeare Avenue BX72 A
1730 Andrews Avenue South BX64 B
955 Rutland Road BK60 B
414 West 48 Street MN54 A
2019 Monterey Avenue BX54 C
1240 Westchester Avenue BX54 B
1601 Macombs Road BX53 B
25 Tapscott Street BK48 B
619 Howard Avenue BK48 A
2041 Pacific Street BK48 B
940 Tiffany Street BX48 B
1075 Longfellow Avenue BX46 B
2058 Union Street BK46 B
3621 Broadway MN46 D
1083 Longfellow Avenue BX45 C
5314 6 Avenue BK45 B
551 East 178 Street BX45 B
1715 Vyse Avenue BX44 B
923 Simpson Street BX43 C
328 West 53 Street MN41 A
2027 Monterey Avenue BX40 B
900 Fox Street BX40 B
1665 Vyse Avenue BX38 B
1717 Bryant Avenue BX38 B
5301 6 Avenue BK38 A
1698 Vyse Avenue BX37 A
1690 Vyse Avenue BX37 B
1668 Vyse Avenue BX37 A
1662 Vyse Avenue BX37 B
1680 Vyse Avenue BX37 B
212 Crown Street BK35 B
725 Howard Avenue BK35 B
1693 Vyse Avenue BX34 B
1491 St Johns Place BK32 A
1506 Sterling Place BK32 B
1463 St Johns Place BK32 C
438 49 Street BK32 B
104 Tapscott Street BK32 B
187 Tapscott Street BK32 A
1578 Sterling Place BK31 B
1568 Sterling Place BK31 A
1640 Sterling Place BK31 C
1598 Sterling Place BK31 D
1588 Sterling Place BK31 B
1521 Sterling Place BK31 B
891 Fox Street BX30 A
207 Central Park North MN30 B

showing 60 of 207 buildings

Sales, deeds & mortgages

Most recent mortgage recorded against this lot: $34,000,000 on 2023-12-14 (lender: New York City Housing Authority), covering 154 lots — the amount covers all of them. Face amount at recording — it may have since been paid down, refinanced or satisfied. View the recorded document.

DateRecordAmountPer res. unit
2023-12-14Mortgage $249,509,952 — from REID PARK ROCK HOUSING DEVELOPMENT FUNDC; NYC PACT PRESERVATION PARTNERS LLC to NEW YORK CITY HOUSING DEVELOPMENT FUND C $249,509,952
2023-12-14Mortgage $34,000,000 — from NYC PACT PRESERVATION PARTNERS LLC; REID PARK ROCK HOUSING DEVELOPMENT FUNDC to NEW YORK CITY HOUSING AUTHORITY $34,000,000
2023-12-14Mortgage $181,723,673 — from NYC PACT PRESERVATION PARTNERS LLC; REID PARK ROCK HOUSING DEVELOPMENT FUNDC to MERCHANTS CAPITAL CORP $181,723,673
2023-12-14Mortgage $166,276,327 — from REID PARK ROCK HOUSING DEVELOPMENT FUNDC; NYC PACT PRESERVATION PARTNERS LLC to MERCHANTS CAPITAL CORP $166,276,327
2023-12-14MLEA $23,258,391 — from NEW YORK CITY HOUSING AUTHORITY to REID PARK ROCK HOUSING DEVELOPMENT FUND; NYC PACT PRESERVATION PARTNERS LLC $23,258,391
1989-10-02Mortgage $14,093,860 — from COLUMBUS AV HSNG SYSTEMS to CITICORP COMMUNITY DVLPT $14,093,860
1989-10-02Mortgage $736,723 — from COLUMBUS AV HSNG SYSTEMS to CITICORP COMMUNITY DVLP $736,723

Ten-year activity

100500
2017
2018
2019
2020
2021
2022
2023
2024
83
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
20170070310
2018002024
2019002024
2020004026
2021004037
2022003025
202310117524
2024141600277
20251565201083
2026100310041
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 79 records

DateRecord
2026-09-14311: Dirty Condition — Trash
2026-08-04Permit General Construction — Permit Issued
2026-07-20311: Indoor Air Quality — Sewage Odor
2026-07-13Job filed: INSTALLATION OF NEW RAILING OVER EXISTING PARAPET WALLS AT ROOF AREA. NO CHANGE IN USE, EGRESS OR OCCUPANCY
2026-07-07311: Noise - Residential — Banging/Pounding
2026-07-01Permit Structural — Signed-off
2026-05-12Tenant complaint: PLUMBING — BATHTUB/SHOWER
2026-05-12Tenant complaint: PLUMBING — BATHTUB/SHOWER
2026-05-12311: PLUMBING — BATHTUB/SHOWER
2026-05-12311: PLUMBING — BATHTUB/SHOWER
2026-04-30Job filed: Scope of work includes the repair and/or replacement of ventilation components and heating elements in bathroom/kitchen of existing apartments, as nee
2026-04-11311: Noise - Residential — Banging/Pounding
2026-04-09311: Noise - Residential — Banging/Pounding
2026-03-25Tenant complaint: ELECTRIC — OUTLET/SWITCH
2026-03-25Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-03-25Tenant complaint: APPLIANCE — ELECTRIC/GAS RANGE
2026-03-25Tenant complaint: DOOR/WINDOW — DOOR
2026-03-25311: ELECTRIC — OUTLET/SWITCH
2026-03-25311: HEAT/HOT WATER — APARTMENT ONLY
2026-03-25311: DOOR/WINDOW — DOOR
2026-03-25311: APPLIANCE — ELECTRIC/GAS RANGE
2026-03-18Permit General Construction — Permit Issued
2026-03-18Permit General Construction — Signed-off
2026-03-11Permit General Construction — Permit Issued
2026-03-11Permit General Construction — Signed-off
2026-02-27HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT CELLAR AT BOILER ROOM
2026-02-27HPD class C: § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1D, 1st STORY, 1st APARTMENT
2026-02-24Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-02-24Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-02-24311: HEAT/HOT WATER — APARTMENT ONLY
2026-02-24311: HEAT/HOT WATER — APARTMENT ONLY
2026-02-23311: Noise - Residential — Banging/Pounding
2026-02-18311: Noise - Residential — Loud Music/Party
2026-02-13311: Noise - Residential — Loud Talking
2026-02-10Permit Suspended Scaffold — Permit Issued
2026-01-27311: Noise - Residential — Loud Talking
2026-01-24Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-24Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-01-24311: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-24311: HEAT/HOT WATER — APARTMENT ONLY
2026-01-05Job filed: SCOPE OF WORK INCLUDES THE REPLACEMENT OF GAS BOILERS AND ASSOCIATED PIPING AND DUCTWORK.
2025-12-29Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-12-29311: HEAT/HOT WATER — APARTMENT ONLY
2025-12-26311: Noise - Residential — Loud Talking
2025-12-12311: Noise — Noise: Construction Equipment (NC1)
2025-12-08Bedbug filing: 0 infested units
2025-12-06HPD class C: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCA
2025-12-06HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST AT SO
2025-12-06HPD class C: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK ACTIVE WATER DROPPING AT CEILING IN THE 2nd ROOM FROM
2025-12-05Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-12-05Tenant complaint: WATER LEAK — HEAVY FLOW
2025-12-05311: WATER LEAK — HEAVY FLOW
2025-12-05311: HEAT/HOT WATER — APARTMENT ONLY
2025-12-04Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-12-04311: HEAT/HOT WATER — APARTMENT ONLY
2025-12-03Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-12-03Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-12-03Tenant complaint: WATER LEAK — HEAVY FLOW
2025-12-03311: HEAT/HOT WATER — APARTMENT ONLY
2025-12-03311: WATER LEAK — HEAVY FLOW
2025-12-03311: HEAT/HOT WATER — APARTMENT ONLY
2025-11-28Tenant complaint: WATER LEAK — HEAVY FLOW
2025-11-28Tenant complaint: PAINT/PLASTER — CEILING
2025-11-28311: WATER LEAK — HEAVY FLOW
2025-11-28311: PAINT/PLASTER — CEILING
2025-11-23311: Noise - Residential — Banging/Pounding
2025-11-21Permit General Construction — Signed-off
2025-11-21Permit General Construction — Permit Issued
2025-11-17Job filed: Installation of plumbing fixtures along with related piping.
2025-11-14DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
2025-11-14DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
2025-11-08311: Noise - Residential — Banging/Pounding
2025-11-02Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-11-02311: HEAT/HOT WATER — APARTMENT ONLY
2025-11-01311: Noise - Residential — Banging/Pounding
2025-10-30Tenant complaint: WATER LEAK — HEAVY FLOW
2025-10-30311: WATER LEAK — HEAVY FLOW
2025-10-27Permit Suspended Scaffold — Permit Issued
2025-10-21Job filed: Suspended Scaffold for Facade Restoration as Shown on Plans

The full timeline

2026
2026-09-14311: Dirty Condition — Trash
2026-08-04Permit General Construction — Permit Issued
2026-07-20311: Indoor Air Quality — Sewage Odor
2026-07-13Job filed: INSTALLATION OF NEW RAILING OVER EXISTING PARAPET WALLS AT ROOF AREA. NO CHANGE IN USE, EGRESS OR OCCUPANCY$32,000
2026-07-07311: Noise - Residential — Banging/Pounding
2026-07-01Permit Structural — Signed-off
2026-05-12Tenant complaint: PLUMBING — BATHTUB/SHOWER
2026-05-12Tenant complaint: PLUMBING — BATHTUB/SHOWER
2026-05-12311: PLUMBING — BATHTUB/SHOWER
2026-05-12311: PLUMBING — BATHTUB/SHOWER
2026-04-30Job filed: Scope of work includes the repair and/or replacement of ventilation components and heating elements in bathroom/kitchen of existing apartments, as nee$21,800
2026-04-11311: Noise - Residential — Banging/Pounding
2026-04-09311: Noise - Residential — Banging/Pounding
2026-03-25Tenant complaint: ELECTRIC — OUTLET/SWITCH
2026-03-25Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-03-25Tenant complaint: APPLIANCE — ELECTRIC/GAS RANGE
2026-03-25Tenant complaint: DOOR/WINDOW — DOOR
2026-03-25311: ELECTRIC — OUTLET/SWITCH
2026-03-25311: HEAT/HOT WATER — APARTMENT ONLY
2026-03-25311: DOOR/WINDOW — DOOR
2026-03-25311: APPLIANCE — ELECTRIC/GAS RANGE
2026-03-18Permit General Construction — Permit Issued
2026-03-18Permit General Construction — Signed-off
2026-03-11Permit General Construction — Permit Issued
2026-03-11Permit General Construction — Signed-off
2026-02-27HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT CELLAR AT BOILER ROOM
2026-02-27HPD class C: § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1D, 1st STORY, 1st APARTMENT
2026-02-24Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-02-24Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-02-24311: HEAT/HOT WATER — APARTMENT ONLY
2026-02-24311: HEAT/HOT WATER — APARTMENT ONLY
2026-02-23311: Noise - Residential — Banging/Pounding
2026-02-18311: Noise - Residential — Loud Music/Party
2026-02-13311: Noise - Residential — Loud Talking
2026-02-10Permit Suspended Scaffold — Permit Issued
2026-01-27311: Noise - Residential — Loud Talking
2026-01-24Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-24Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-01-24311: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-24311: HEAT/HOT WATER — APARTMENT ONLY
2026-01-05Job filed: SCOPE OF WORK INCLUDES THE REPLACEMENT OF GAS BOILERS AND ASSOCIATED PIPING AND DUCTWORK.$42,500
2025
2025-12-29Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-12-29311: HEAT/HOT WATER — APARTMENT ONLY
2025-12-26311: Noise - Residential — Loud Talking
2025-12-12311: Noise — Noise: Construction Equipment (NC1)
2025-12-08Bedbug filing: 0 infested units
2025-12-06HPD class C: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCA
2025-12-06HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST AT SO
2025-12-06HPD class C: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK ACTIVE WATER DROPPING AT CEILING IN THE 2nd ROOM FROM
2025-12-05Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-12-05Tenant complaint: WATER LEAK — HEAVY FLOW
2025-12-05311: WATER LEAK — HEAVY FLOW
2025-12-05311: HEAT/HOT WATER — APARTMENT ONLY
2025-12-04Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-12-04311: HEAT/HOT WATER — APARTMENT ONLY
2025-12-03Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-12-03Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-12-03Tenant complaint: WATER LEAK — HEAVY FLOW
2025-12-03311: HEAT/HOT WATER — APARTMENT ONLY
2025-12-03311: WATER LEAK — HEAVY FLOW
2025-12-03311: HEAT/HOT WATER — APARTMENT ONLY
2025-11-28Tenant complaint: WATER LEAK — HEAVY FLOW
2025-11-28Tenant complaint: PAINT/PLASTER — CEILING
2025-11-28311: WATER LEAK — HEAVY FLOW
2025-11-28311: PAINT/PLASTER — CEILING
2025-11-23311: Noise - Residential — Banging/Pounding
2025-11-21Permit General Construction — Signed-off
2025-11-21Permit General Construction — Permit Issued
2025-11-17Job filed: Installation of plumbing fixtures along with related piping.$20,000
2025-11-14DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
2025-11-14DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
2025-11-08311: Noise - Residential — Banging/Pounding
2025-11-02Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-11-02311: HEAT/HOT WATER — APARTMENT ONLY
2025-11-01311: Noise - Residential — Banging/Pounding
2025-10-30Tenant complaint: WATER LEAK — HEAVY FLOW
2025-10-30311: WATER LEAK — HEAVY FLOW
2025-10-27Permit Suspended Scaffold — Permit Issued
2025-10-21Job filed: Suspended Scaffold for Facade Restoration as Shown on Plans
2025-10-15Permit General Construction — Permit Issued
2025-10-15Permit General Construction — Signed-off
2025-10-07311: Noise - Street/Sidewalk — Loud Music/Party
2025-09-27311: Noise - Street/Sidewalk — Loud Music/Party
2025-09-24311: Noise - Street/Sidewalk — Loud Music/Party
2025-09-24311: Noise - Street/Sidewalk — Loud Music/Party
2025-09-22311: Noise - Street/Sidewalk — Loud Music/Party
2025-09-20311: Noise - Street/Sidewalk — Loud Music/Party
2025-09-19311: Noise - Street/Sidewalk — Loud Music/Party
2025-09-10Job filed: Facade repairs and roof replacement. No change in egress, use or occupancy.$853,450
2025-08-26Job filed: PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCC$1,000
2025-08-26Permit Supported Scaffold — Permit Issued
2025-08-06Tenant complaint: APPLIANCE — ELECTRIC/GAS RANGE
2025-08-06Tenant complaint: UNSANITARY CONDITION — MOLD
2025-08-06Tenant complaint: UNSANITARY CONDITION — SEWAGE
2025-08-06Tenant complaint: ELECTRIC — OUTLET/SWITCH
2025-07-28Permit Plumbing — Signed-off
2025-07-28Permit Mechanical Systems — Signed-off
2025-07-28Permit Boiler Equipment — Signed-off
2025-07-23Asbestos abatement: Removal — Mid Valley Contractors, Inc
2025-07-23Asbestos abatement: Removal — Mid Valley Contractors, Inc
2025-07-23Asbestos abatement: Removal — Mid Valley Contractors, Inc
2025-07-23Asbestos abatement: Removal — Mid Valley Contractors, Inc
2025-07-23Asbestos abatement: Removal — Mid Valley Contractors, Inc
2025-07-23Asbestos abatement: Removal — Mid Valley Contractors, Inc
2025-07-23Asbestos abatement: Removal — Mid Valley Contractors, Inc
2025-07-23Asbestos abatement: Removal — Mid Valley Contractors, Inc
2025-07-23Asbestos abatement: Removal — Mid Valley Contractors, Inc
2025-07-23Asbestos abatement: Removal — Mid Valley Contractors, Inc
2025-06-27HPD litigation: Tenant Action
2025-06-17FDNY inspection (RISK)
2025-06-07311: Dirty Condition — Trash
2025-05-31311: Noise - Residential — Loud Music/Party
2025-04-18311: Noise - Residential — Loud Music/Party
2025-04-01Permit Sidewalk Shed — Signed-off
2025-03-31Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDE$1,200
2025-03-11311: Non-Emergency Police Matter — Trespassing
2025-02-28311: Noise - Residential — Banging/Pounding
2025-02-06311: Noise - Residential — Loud Talking
2025-01-24311: Noise - Residential — Banging/Pounding
2025-01-22311: Noise - Residential — Banging/Pounding
2025-01-18311: Non-Emergency Police Matter — Other (complaint details)
2025-01-15DOB complaint, category ?
2025-01-15DOB complaint, category ?
2025-01-15DOB complaint, category ?
2024
2024-12-30Bedbug filing: 0 infested units
2024-12-07HPD class C: HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4E, 4th STORY, 1st APARTMENT FR
2024-12-07HPD class C: § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ASSEMBLY LOCK AT BUILDING DOOR ENTRANCE , 1st STORY
2024-12-07HPD class B: § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING, EAST AND WEST WALLS IN THE PRIVATE HALLWAY LOCATED AT APT 4E,
2024-12-07HPD class A: § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES
2024-12-07HPD class A: § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT THE CEILING AND EAST WALL IN THE
2024-12-07HPD class A: § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGE
2024-12-07HPD class B: § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE AT PUBLIC HALL, 3rd STORY
2024-12-07HPD class B: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING AND WEST WALL AT PUBLIC HALL, 1st STOR
2024-12-07HPD class C: § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER WINDOW SASH CREATING CUT HAZARD AT 3RD STORY INTERMEDIATE LANDING AT
2024-12-07HPD class A: § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM
2024-12-07HPD class A: § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON
2024-12-07HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDENT MATERIAL AT THE CEILING AND WEST WALL AT PUB
2024-12-07HPD class A: § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND
2024-12-07HPD class C: § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO H
2024-12-07HPD class A: § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND WEST WALL AT PUBLIC HALL, 1st STORY
2024-12-07HPD class A: § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX ...
2024-12-07HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, EAST AND WEST WALLS IN THE PR
2024-12-07HPD class B: § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT THE CEILING AND EAST WALL IN THE
2024-12-04Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2024-12-04311: HEAT/HOT WATER — APARTMENT ONLY
2024-12-03Permit Mechanical Systems — Signed-off
2024-12-03Permit Plumbing — Signed-off
2024-11-27Job filed: Installation of plumbing fixtures along with related piping.$92,000
2024-11-27Job filed: Scope of work includes the repair and/or replacement of ventilation components and heating elements in bathroom/kitchen of existing apartments, as nee$21,800
2024-11-24Permit General Construction — Permit Issued
2024-11-24Permit General Construction — Signed-off
2024-11-13Job filed: WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES.$1,109,040
2024-11-12HPD class C: HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4E, 4th STORY, 1st APARTMENT FR
2024-11-10Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2024-11-10311: HEAT/HOT WATER — APARTMENT ONLY
2024-11-02311: Noise - Residential — Loud Music/Party
2024-08-26Air permit (REGISTRATION), fuel: NATURALGAS
2024-08-23Tenant complaint: DOOR/WINDOW — DOOR
2024-08-23311: DOOR/WINDOW — DOOR
2024-08-20Permit Plumbing — Signed-off
2024-08-16Permit Boiler Equipment — Signed-off
2024-08-16Permit Mechanical Systems — Signed-off
2024-08-15Job filed: Installation of plumbing fixtures along with related piping.$20,000
2024-05-09FDNY inspection (RISK)
2024-04-11HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2024-04-10Job filed: SCOPE OF WORK INCLUDES THE REPLACEMENT OF GAS BOILERS AND ASSOCIATED PIPING AND DUCTWORK.$42,500
2024-04-10Job filed: MECHANICAL WORK INCLUDES INSTALLATION OF NEW GAS VENT DUCT IN BOILER ROOM EXISTING CHIMNEY$11,200
2024-03-27City emergency repair (OMO): work location: 1st floor public hall trace, locate and properly repair the sources of concealed water leak(s) at ceiling$3,500
2024-03-25HPD litigation: Heat and Hot Water
2024-02-28Job filed: Facade repairs and roof replacement. No change in egress, use or occupancy.$853,450
2024-02-19Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2024-02-19311: HEAT/HOT WATER — ENTIRE BUILDING
2024-02-18Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2024-02-18311: HEAT/HOT WATER — ENTIRE BUILDING
2024-02-16HPD class C: HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FR
2024-02-16HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AND WEST WALL AT PUBLIC
2024-02-16HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM GATE LOCKED AT BOILER ROOM
2024-02-16HPD class B: § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE UPPER AND LOWER SASH AT WINDOW SOUTH WALL IN THE KITCHEN L
2024-02-16HPD class B: § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL LIGHT FIXTURE AT CEILING AT PUBLIC HALL, 3rd STORY
2024-02-16HPD class B: § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 3B, 3rd STORY, 1st APARTMEN
2024-02-16HPD class C: HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM
2024-02-16HPD class C: § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT
2024-02-16HPD class C: § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCKING ASSEMBLY AT PUBLIC HALL, 3rd STORY
2024-02-16HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM NORTH LOCA
2024-02-16HPD class A: § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 3rd STORY
2024-02-15Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2024-02-15311: HEAT/HOT WATER — ENTIRE BUILDING
2024-02-15HPD class A: § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND WEST WALL AT PUBLIC HALL, 1st STORY
2024-02-15HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL CEILING AND WEST WALL AT PUBLIC HAL
2024-02-15HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT BASEMENT
2024-02-15HPD class C: § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT
2024-02-15HPD class C: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT PUBLIC HALL, 1st STORY
2024-02-14Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2024-02-14311: HEAT/HOT WATER — APARTMENT ONLY
2024-02-08HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT BASEMENT
2024-02-08HPD class C: § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 3rd STORY, 2nd APARTMENT
2024-02-08HPD class A: § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND WEST WALL AT PUBLIC HALL, 1st STORY
2024-02-08HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL CEILING AND WEST WALL. AT PUBLIC HA
2024-02-07Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2024-02-07311: HEAT/HOT WATER — APARTMENT ONLY
2024-02-06Air permit (REGISTRATION), fuel: NATURALGAS
2023
2023-12-14DECL — from NEW YORK CITY HOUSING AUTHORITY; U.S. DEPARTMENT OF HOUSING AND URBAN DEV; NYC PACT PRESER
2023-12-14DECL — from REID PARK ROCK HOUSING DEVELOPMENT FUNDC to NYC PACT PRESERVATION PARTNERS LLC
2023-12-14Mortgage assigned — from MERCHANTS CAPITAL CORP to FANNIE MAE
2023-12-14Mortgage assigned — from MERCHANTS CAPITAL CORP to FANNIE MAE
2023-12-14Mortgage $249,509,952 — from REID PARK ROCK HOUSING DEVELOPMENT FUNDC; NYC PACT PRESERVATION PARTNERS LLC to NEW YORK CITY HOUSING DEVELOPMENT FUND C$249,509,952
2023-12-14Agreement — from MERCHANTS CAPITAL CORP to NEW YORK CITY HOUSING DEVELOPMENT FUND C; NYC PACT PRESERVATION PARTNERS LLC
2023-12-14Mortgage $34,000,000 — from NYC PACT PRESERVATION PARTNERS LLC; REID PARK ROCK HOUSING DEVELOPMENT FUNDC to NEW YORK CITY HOUSING AUTHORITY$34,000,000
2023-12-14Mortgage $181,723,673 — from NYC PACT PRESERVATION PARTNERS LLC; REID PARK ROCK HOUSING DEVELOPMENT FUNDC to MERCHANTS CAPITAL CORP$181,723,673
2023-12-14Mortgage $166,276,327 — from REID PARK ROCK HOUSING DEVELOPMENT FUNDC; NYC PACT PRESERVATION PARTNERS LLC to MERCHANTS CAPITAL CORP$166,276,327
2023-12-14Agreement — from REID PARK ROCK HOUSING DEVELOPMENT FUNDC; NYC PACT PRESERVATION PARTNERS LLC; NEW YORK CIT to NYC PACT PRESERVATION PARTNERS LLC; REID PARK ROCK HOUSING DEVELOPMENT FUNDC; NEW YORK CI
2023-12-14Agreement — from MERCHANTS CAPITAL CORP to NEW YORK CITY HOUSING AUTHORITY; NYC PACT PRESERVATION PARTNERS LLC
2023-12-14Agreement — from FANNIE MAE to MERCHANTS CAPITAL CORP
2023-12-14REL — from UNITED STATES OF AMERICAS; SECRETARY OF HOUSING AND URBAN DEVELOPME to NEW YORK CITY HOUSING AUTHORITY
2023-12-14MLEA $23,258,391 — from NEW YORK CITY HOUSING AUTHORITY to REID PARK ROCK HOUSING DEVELOPMENT FUND; NYC PACT PRESERVATION PARTNERS LLC$23,258,391
2023-12-14Agreement — from REID PARK ROCK HOUSING DEVELOPMENT FUNDC; NYC PACT PRESERVATION PARTNERS LLC to THE CITY OF NEW YORK; NEW YORK CITY HOUSING DEVELOPMENT FUND C
2023-12-14Agreement — from NEW YORK CITY HOUSING DEVELOPMENT FUND C; THE CITY OF NEW YORK to MERCHANTS CAPITAL CORP
2023-11-27Air permit (REGISTRATION), fuel: NATURALGAS
2023-11-21CERT — from THE CITY OF NEW YORK
2023-09-26Job filed: STRUCTURAL WORK FOR EXISTING FIRE ESCAPE REPAIRS AT SOUTH 2ND FLOOR LANDING AND WEST 2ND AND 3RD FLOOR LANDING AS NEEDED.$19,000
2023-05-10Boiler inspection
2023-05-10Boiler inspection
2023-03-06Boiler inspection — defects found
2023-03-06Boiler inspection — defects found
2023-02-24311: Indoor Air Quality — Chemical Vapors/Gases/Odors
2022
2022-12-20311: Non-Emergency Police Matter — Other (complaint details)
2022-11-15311: Noise - Residential — Banging/Pounding
2022-03-16Boiler inspection
2022-03-16Boiler inspection
2022-02-09HPD litigation: Tenant Action
2021
2021-10-30311: Noise - Residential — Loud Music/Party
2021-09-10311: Illegal Parking — Double Parked Blocking Vehicle
2021-04-15Boiler inspection
2021-04-15Boiler inspection
2021-03-02Rodent inspection: Failed for Other Reason
2021-02-16311: Illegal Parking — Blocked Sidewalk
2021-02-16311: Rodent — Condition Attracting Rodents
2020
2020-12-17311: Illegal Parking — Double Parked Blocking Vehicle
2020-12-11311: Noise - Residential — Loud Music/Party
2020-09-28Boiler inspection
2020-09-28Boiler inspection
2020-05-21311: New Tree Request — For One Address
2020-05-12311: Illegal Parking — Double Parked Blocking Vehicle
2019
2019-12-30311: Noise - Residential — Banging/Pounding
2019-02-27Boiler inspection — defects found
2019-02-27Boiler inspection
2019-02-23311: Noise - Residential — Banging/Pounding
2018
2018-10-28311: Noise - Residential — Loud Music/Party
2018-05-22Boiler inspection — defects found
2018-05-22Boiler inspection — defects found
2018-04-07311: Noise - Residential — Loud Music/Party
2017
2017-09-07Boiler inspection — defects found
2017-09-07Boiler inspection
2017-08-13311: Noise - Street/Sidewalk — Loud Music/Party
2017-07-25311: Noise - Residential — Banging/Pounding
2017-05-18311: Noise - Residential — Banging/Pounding
2017-04-14311: Noise - Residential — Banging/Pounding
2017-04-14311: Noise - Residential — Banging/Pounding
2017-03-30311: Noise - Residential — Banging/Pounding
2017-03-28Rodent inspection: Passed
2017-01-03311: Noise - Residential — Loud Music/Party
2016
2016-05-08311: Noise - Residential — Loud Music/Party
2016-03-17311: Lead — Lead Kit Request (Residential) (L10)
2015
2015-10-19311: Sewer — Sewer Backup (Use Comments) (SA)
2015-04-11311: Disorderly Youth — Playing in Unsuitable Place
2014
2014-01-19FDNY inspection (RISK)
2013
2013-12-30311: Noise - Residential — Loud Talking
2011
2011-11-01311: Noise - Residential — Loud Talking
2011-09-25311: Noise - Residential — Loud Music/Party
2011-06-09311: Noise - Residential — Loud Music/Party
2011-04-26311: Noise - Residential — Loud Music/Party
2011-02-02311: Noise - Residential — Loud Music/Party
2010
2010-10-13311: Noise - Residential — Banging/Pounding
2010-10-01311: Noise - Residential — Loud Talking
2010-03-04311: Street Condition — Failed Street Repair
2008
2008-12-23Permit EW — ISSUED
2008-09-30Job filed: REPLACE EXISTING STAIR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$105,512
2008-09-30Job filed: REPLACE EXISTING STAIR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$105,512
2005
2005-05-06DECL — from NEW YORK CITY HOUSING AUTHORITY to UNITED STATES DEPT. OF HOUSING AND URBAN
2004
2004-06-03DOB complaint, category ?
2004-06-03DOB complaint, category ?
2002
2002-03-26DOB violation LL6291:
1999
1999-03-16DOB violation LL6291:
1998
1998-05-04DOB violation LL6291:
1996
1996-03-14HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING 1 STY PUBLIC HALL.
1996-03-14HPD class B: § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE VINYL FLOOR TILES THRU OUT 1 STY SOUTHWEST APT 1E. LOCATED AT APT 1E
1996-03-14HPD class B: § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF EVIDENCE OF CONCEALED WATER LEAK CEILINGS NORTH AND CENTER ROOMS 1 STY SOU
1996-03-14HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILINGS NORTH AND CENTER ROOMS 1 STY SOUT
1996-03-14HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRICAL OUTLETS WALLS NORTH ROOM 1 STY SOUTHWEST APT 1E. LOCATED AT APT 1E
1995
1995-07-19HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCKSET ENTRANCE DOOR TO BUILDING.
1995-07-19HPD class B: § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING GLASS PANE VESTIBULE WALL 1 STY PUBLIC HALL.
1995-07-19HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE COUNTER BALANCE SPRING LOWER SASH WINDOW BATHROOM 1 STY SOUTHEAST APT 1E. LOCATED
1995-07-19HPD class B: § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE FLOOR TILES 1ST FROM NORTH ROOM AND PRIVATE HALL 1 STY SOUTHEAST APT 1E. LOCATED
1995-07-19HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WALL OUTLET NORTH ROOM 1 STY SOUTHEAST APT 1E. LOCATED AT APT 1E
1995-07-19HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILINGS NORTH AND 1ST FROM NORTH ROOMS 1
1995-07-19HPD class B: § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF CONCEALED WATER LEAK CEILINGS NORTH AND 1ST FROOM NORTH ROOMS 1 STY SOUTHE
1995-07-19HPD class B: § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING 1 STY SOUTHWEST APT 1E COBBS. LOCATED AT APT 1E
1994
1994-06-01DOB violation LL6291:
1993
1993-08-16DOB violation LL6291:
1993-06-01DOB violation LL6291:
1991
1991-07-19HPD class A: D26-41.03 ADM CODE FILE WITH THIS DEPARTMENT A REGISTRATION STATEMENT FOR BUILDING.
1991-07-19HPD class A: D26-41.03 ADM CODE FILE WITH THIS DEPARTMENT A REGISTRATION AND OCCUPANCY STATEMENT OF BUILDING.
1991-07-19HPD class A: D26-11.01, 11.03, 11.05 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE AT WEST COURT YARD T
1990
1990-12-31Deed — from COLUMBUS AVE HSNG SYSTEM to NYC HOUSING AUTHORITY
1990-12-31Mortgage satisfied — from COLUMBUS AV HSNG SYSTEMS to CITICORP COMM DVLPTINC
1990-12-31Mortgage assigned — from CITICORP COMMUNITY DVLP to COLUMBUS AVE HSNG SYSTEM
1989
1989-10-02Mortgage $14,093,860 — from COLUMBUS AV HSNG SYSTEMS to CITICORP COMMUNITY DVLPT$14,093,860
1989-10-02Mortgage assigned — from COLUMBUS AV HSNG SYSTEMS to CITICORP COMMUNITY DVLP
1989-10-02Mortgage $736,723 — from COLUMBUS AV HSNG SYSTEMS to CITICORP COMMUNITY DVLP$736,723
1989-08-09Deed — from CITY OF NEW YORK to COLUMBUS AV HSNG SYSTEMS
1983
1983-07-28Deed — from COMMISSIONER OF FINANCE to NEW YORK CITY
1979
1979-11-21Deed — from HENDERSON PARIS B to 1578 STERLING PLACE CORP
1979-10-19Mortgage — from HENDERSON PARIS B to LUBAR REALTY CORP; MONROE MANAGEMENT CORP
1979-10-19Deed — from MONROE MANAGEMENT CORP to HENDERSON PARIS B

Support this site Back to the building page