The city's published records show little recorded distress here in the last three years. Less recorded distress than 64% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty
points per 10 units; this building carries 8.6. In ZIP 10002, 64% of residential buildings hold an A and
5% grade D or F.
How grades work
this building
A
B
C
Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
Open HPD violations
5 total — 0 class C (immediately hazardous), 2 class B, 3 class A. Oldest open since 2009-08-25.
status snapshot refreshed weekly from HPD records
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
12 service requests in the last three years. Most common: Noise (7) · Graffiti (2) · Illegal Dumping (2) · Lead (1).
Filed construction activity
$196,000 in permitted construction work filed since
2016 (6 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974 (1987)
Yes
Six or more residential units (7)
No
421-a / J-51 tax benefit on the current tax roll
1 of 3 signals present. Only a partial profile — stabilization is possible but less likely. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
MING TOWER CONDOMINIUM
Head officer
ANNIE WANG
Managing agent
BETHEL MANAGEMENT INC
Last registered
2025-09-17
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$550,277
$247,625
2026
$736,490
$331,420
2027
$763,506
$343,578
The city's market estimate has risen
39% between tax years 2025 and 2027.
Tax exemptions on the roll: SENIOR CITIZEN HOMEOWNER
Building systems
Facade (Local Law 11)
SAFE (cycle 9)
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
East Broadway — F · 150 ft straight-line (about a 1-minute walk) · station accessibility: none Delancey St-Essex St — F J M Z · 0.3 mi straight-line (about an 8-minute walk) · station accessibility: none
Bus
Nearest boarding stop: Essex St / East Broadway — M9 · 200 ft
Citi Bike
Canal St & Rutgers St · 250 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
12 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
2024-02-27Job filed: INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS $9,000
2024-02-22DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
2021-08-22Tenant complaint: WATER LEAK — HEAVY FLOW
2021-06-10Rodent inspection: Passed
2021-06-09DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2021-04-13Bedbug filing: 0 infested units
2021-04-01HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021-03-16ECB CLASS - 1 violation: 1RCNY-MUSC.RS-MISC=OWNER FAILED TO REPAIR BUILDING EXTEIROR FACADE AND APPURTENANCES ROOF-ROOF AND BALCONY GUARDS NOTED BY QEWI TO$2,500
2020
2020-10-28311: Elevator — Elevator - Single Device On Property/No Alternate Service
2020-10-28DOB complaint, category ?
2020-09-16Job filed: INSTALL ONE GAS HOT WATER HEATER AND ONE STORAGE TANK IN THE CELLAR EXSTING BOILER ROOM FOR ABOVE EXISTING APTS. NO CHANGE IN USE,OCCUPANCY OR EGRESS.$8,000
2020-09-15Bedbug filing: 0 infested units
2020-07-22Job filed: FILE BOILER WORK TYPE FOR INSPECTION ONLY, IN CONJ WITH PLUMBING JOB # M00241177 TO INSTALL ONE NEW GAS HOT WATER HEATER AND STORAGE TANK IN THE CELL$1,000
2020-01-20Elevator permit: PROVIDE NEW DOOR LOCK MONITORING SYSTEM PER SECTION 3.10.12 OF CHAPTER K3 OF APPENDIX K OF THE NEW YORK CITY BUILDING CODE. ALL W$27,000
2020-01-07Deed $800,000 — from 141 DIVISION LLC to OZ BEN ARROUS, LAURENT$800,000
2020-01-07Mortgage $560,000 — from OZ BEN ARROUS, LAURENT to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; UNITY BANK$560,000
2020-01-07PAT — from OZ BEN ARROUS, LAURENT to MING TOWER CONDOMINIUM
2020-01-07Deed — from SCARDINO, NIEVES to 141 DIVISION LLC
2020-01-07CORRD — from SCARDINO, SURVIVING TENANT, NIEVES; STAGER, SURVIVING TENANT, DIANA; SCARDINO, DECEASED, E to SCARDINO, NIEVES
2019
2019-12-17Sold for $800,000$800,000
2019-12-12311: Graffiti — Graffiti
2019-12-09Rodent inspection: Passed
2019-12-04Bedbug filing: 0 infested units
2019-11-07Permit Plumbing — Signed-off
2019-10-23Job filed: FILE BOILER WORK TYPE FOR INSPECTION ONLY, IN CONJ WITH PLUMBING JOB # M00241177 TO INSTALL ONE NEW GAS HOT WATER HEATER AND STORAGE TANK IN THE CELL$1,000
2019-10-23Job filed: INSTALL ONE GAS HOT WATER HEATER AND ONE STORAGE TANK IN THE CELLAR EXSTING BOILER ROOM FOR ABOVE EXISTING APTS. NO CHANGE IN USE,OCCUPANCY OR EGRESS.$8,000
2019-09-16311: HEAT/HOT WATER — APARTMENT ONLY
2019-09-16Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2019-09-12311: HEAT/HOT WATER — APARTMENT ONLY
2019-09-12Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2019-04-05Mortgage satisfied — from CHU, SHIU MING; CHU, MAY WAN to THE FEDERAL DEPOSIT INSURANCE CORPORATIO; WASHINGTON MUTUAL BANK, FA; JPMORGAN CHASE BANK,
2019-03-27311: Noise - Vehicle — Car/Truck Music
2019-03-12Mortgage assigned — from ZALE, MARTA to EASTBANK, N.A.
2019-03-12AL&R $400,000 — from CHU, SHIU MING; CHU, MAY WAN to EASTBANK, N.A.$400,000
2019-03-12Agreement $400,000 — from EASTBANK, N.A. to CHU, MAY WAN; CHU, SHIU MING$400,000
2019-03-12Mortgage $100,000 — from CHU, MAY WAN; CHU, SHIU MING to EASTBANK, N.A.$100,000
2018
2018-12-11Rodent inspection: Passed
2018-10-30Boiler inspection
2018-10-09Mortgage $300,000 — from CHU, MAY WAN; CHU, SHIU MING to ZALE, MARTA$300,000
2018-09-25FDNY inspection (RISK)
2018-06-14Rodent inspection: Passed
2018-05-29DOB violation E:
2018-03-28Mortgage $19,523 — from ED-MAR DEVELOPMENT INC. to EASTBANK, N.A.$19,523
2018-03-28REL — from EASTBANK, N.A. to CHU & SON INC.
2018-03-28Mortgage assigned — from UNITED ORIENT BANK to EASTBANK, N.A.
2018-03-28AL&R $450,000 — from ED-MAR DEVELOPMENT INC. to EASTBANK, N.A.$450,000
2018-03-28TL&R — from UNITED ORIENT BANK to CHU & SON INC.; ED-MAR DEVELOPMENT INC.
2018-03-28Agreement $450,000 — from EASTBANK, N.A. to ED-MAR DEVELOPMENT INC.$450,000
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2017
2017-09-07311: Noise - Park — Loud Talking
2017-09-05Rodent inspection: Passed
2017-05-26DOB violation E:
2017-03-22Facade (LL11) filing, cycle 8: SWARMP
2017-03-13311: Graffiti — Graffiti
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2016
2016-12-20Rodent inspection: Passed
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-02311: Noise — Noise: Construction Before/After Hours (NM1)
2016-05-12DOB violation E:
2016-05-09Rodent inspection: Passed
2016-02-26311: Graffiti — Graffiti
2016-02-23Deed — from SUM, KUN WUI; SUM, CHEUK WUI to CHEUK LUN SUM AS TRUSTEE; KUN WUI SUM LIVING TRUST; KUN WUI SUM AS TRUSTEE; CHEUK LUN SUM
2016-01-28Deed transfer (nominal price)
2016-01-21Permit SG — ISSUED
2015
2015-12-07ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE TECHNICAL REPORT IN COMPLIANCE WITH CODEPROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS AND APPURT$2,000
2015-11-07HPD class B: § 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNS
2015-10-01HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2015-08-21Deed — from LIEN, HSU HSIU; LIEN, CHIEN HSU HSIU to HSIU LIEN HSU LIVING TRUST; HSIU LIEN HSU, AS TRUSTEE
2015-06-16311: Graffiti — Graffiti
2015-06-08DOB complaint, category ?
2015-05-06DOB violation E:
2015-04-09Rodent inspection: Passed
2015-03-31Rodent inspection: Passed
2015-03-19Mortgage satisfied — from CHATHAM ELECTRIC, LLC to SECURITY NATIONAL LIFE INSURANCE COMPANY
2015-02-02HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2015-01-28Permit EW — ISSUED
2015-01-05ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE CYCLE 7 TECHNICAL REPORT IN COMPLIANCE W/ CODE PROVISIONS:PERIODIC INSPECTION OF EXTERIOR WALLS & AP$800
2014
2014-12-24AL&R $637,328 — from CHATHAM ELECTRIC LLC to ZIONS FIRST NATIONAL BANK$637,328
2014-12-24Mortgage $509,861 — from CHATHAM ELECTRIC LLC to EMPIRE STATE CERTIFIED DEVELOPMENT CORPO$509,861
2014-12-24Mortgage assigned — from EMPIRE STATE CERTIFIED DEVELOPMENT CORPO to U.S. SMALL BUSINESS ADMINISTRATION
2014-12-24Mortgage $526,000 — from CHATHAM ELECTRIC LLC to EMPIRE STATE CERTIFIED DEVELOPMENT CORPO$526,000
2014-12-24Agreement — from ZIONS FIRST NATIONAL BANK to EMPIRE STATE CERTIFIED DEVELOPMENT CORPO
2014-12-24Deed $1,239,993 — from 141 DIVISION STREET RETAIL LLC to CHATHAM ELECTRIC LLC$1,239,993
2014-12-24PAT — from CHATHAM ELECTRIC LLC to CHU & MUI ASSOCIATES; BOARD OF MANAGERS
2014-12-24Mortgage $637,328 — from CHATHAM ELECTRIC LLC to ZIONS FIRST NATIONAL BANK$637,328
2014-12-24Mortgage assigned — from EMPIRE STATE CERTIFIED DEVELOPMENT CORPO to SECURITY NATIONAL LIFE INSURANCE COMPANY
2014-12-24AL&R $509,861 — from CHATHAM ELECTRIC LLC to SECURITY NATIONAL LIFE INSURANCE COMPANY$509,861
2014-12-09Permit AL — ISSUED
2014-12-04Job filed: INSTALLATION OF APPROX. 40 LINEAR FEET DUCT WORK FOR FRESH AIR INTAKE AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY & EGRESS.$8,000
2014-12-04Job filed: INSTALLATION OF APPROX. 40 LINEAR FEET DUCT WORK FOR FRESH AIR INTAKE AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY & EGRESS.$8,000
2014-11-18FDNY inspection (STRUC_INT)
2014-11-06FDNY inspection (STRUC_INT)
2014-10-22DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2014-10-16Permit EW — ISSUED
2014-10-07Job filed: FA?ADE REPAIRS CONSISTING OF STUCCO REPLACEMENT, EIFS REPLACEMENT AND WINDOW REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCU$148,700
2014-09-24ECB CLASS - 2 violation: FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES. DEFECTS NOTED: AT FRONT FACADE BETWEEN 7TH FL & 8TH FL STUCCO FINISH IS CRACKED L$5,000
2014-09-22311: Graffiti — Graffiti
2014-08-13Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33
2014-08-13Permit EQ — ISSUED
2014-08-04ECB CLASS - 2 violation: 67L10,41C9,68B7,16#10,39O2. 67L1-REPAIR 2WAY COMMUNICATION; 41C9-REMOVE PADLOCK AND PROVIDE SELF CLOSING SELF LOCKING DOOR; 68B7-P
2014-07-30City emergency repair (OMO): immediate emergency for sidewalk shed > permanent 1.erect steel post shed with lights at front of building.shed to be ap$8,600
2014-07-29DOB violation IMEGNCY:
2014-07-28ECB CLASS - 1 violation: FAIL TO BLDG WALLS NOTED LOC @ FRONT FACADE BTWN 7TH & 8TH FL STUCCO FINISH IS CRACKED LOOSE & MISSING & IN DANGER OF FALLING INTO$5,000
2014-07-28DOB violation IMEGNCY:
2014-07-27311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2014-07-27DOB complaint, category ?
2014-07-23ECB CLASS - 2 violation: 97#05. FAILURE TO MAINTAIN ELEVATOR DEVICE.RESPONDENT FAILED TO ALLOW MANDATORY ANNUAL ROUTINE INSPECTION BY THE DEPT OR APPROVED
2014-06-06ECB CLASS - 2 violation: TEMPORARY CONST EQUIPMENT ON SITE-EXPIRED PERMIT.NOTED:@ TIME OF INSP PERMIT FOR SIDEWALK SHED @ EXP#1 EXPIRED ON 01/13/12.REM:REN$4,000
2014-01-15DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2013
2013-12-31DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013
2013-05-03Permit PL — ISSUED
2013-04-26Permit EW — ISSUED
2013-04-22Job filed: REMOVAL OF NON-LOAD BEARING PARTITIONS, CONSTRUCTION OF NEW NON-LOAD BEARING PARTITIONS, MINOR PLUMBING AND MECHANICAL WORK ON THE FIRST FLOOR AND BAS$143,100
2013-04-22Job filed: REMOVAL OF NON-LOAD BEARING PARTITIONS, CONSTRUCTION OF NEW NON-LOAD BEARING PARTITIONS, MINOR PLUMBING AND MECHANICAL WORK ON THE FIRST FLOOR AND BAS$143,100
2013-04-09Rodent inspection: Passed
2013-03-14311: General Construction/Plumbing — Failure To Maintain
2013-03-14DOB complaint, category ?
2013-03-01DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
2012
2012-11-26DOB violation EGNCY:
2012-11-21Mortgage satisfied — from LIPTON ENTERPRISES, INC to CHU & MIU ASSOCIATES
2012-11-21PAT — from 141 DIVISION STREET RETAIL, LLC to MING TOWER CONDOMINIUM
2012-11-21Deed $760,000 — from LIPTON ENTERPRISES, INC. to 141 DIVISION STREET RETAIL, LLC$760,000
2012-11-21311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2012-11-21DOB complaint, category ?
2012-11-15Deed — from SCARDINO, ERNEST; SCARDINO, NIEVES to SCARDINO, ERNEST; STAGER, DIANA; SCARDINO, NIEVES
2012-11-15311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2012-11-15ECB CLASS - 1 violation: FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES.NOTED AT EXPOSURE#1 AT 7TH/8TH FLRS STUCCO FINISH HAS DISLODGED & FALLEN ONTO PE$1,000
2012-11-15DOB complaint, category ?
2012-08-08DOB violation E:
2012-06-11ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE 6TH ROUND TECHNICAL REPORT IN COMPLIANCEW/ARTICLE 28.302 OF THE BLDG CODE AND DOB'S RULES AND REGULA$2,000
2012-03-30Mortgage $194,489 — from ED-MAR DEVELOPMENT, INC; CHU & SON, INC. to UNITED ORIENT BANK$194,489
2012-03-30Agreement $495,000 — from UNITED ORIENT BANK to CHU & SON, INC.; ED-MAR DEVELOPMENT, INC$495,000
2012-03-30AL&R $495,000 — from CHU & SON, INC.; ED-MAR DEVELOPMENT, INC to UNITED ORIENT BANK$495,000
2012-03-29Mortgage satisfied — from CHU & SON, INC. to UNITED ORIENT BANK
2012-03-20311: Graffiti — Graffiti
2012-01-26311: GENERAL CONSTRUCTION — FLOOR
2012-01-26311: GENERAL CONSTRUCTION — FLOOR
2012-01-26311: GENERAL CONSTRUCTION — FLOOR
2012-01-26Tenant complaint: GENERAL — FLOOR
2012-01-26Tenant complaint: GENERAL — FLOOR
2012-01-26Tenant complaint: GENERAL — FLOOR
2011
2011-12-15ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE 6 ROUND TECH REPORT IN COMPLIANCE W/ CODE PROVISIONS.PERIODIC INSPEC OF EXTERIOR WALLS & APPURTENANC$8,000
2011-12-13DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
2011-12-10311: HEATING — HEAT
2011-12-10Tenant complaint: HEATING — HEAT RELATED
2011-03-15ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE SIXTH ROUND TECHNICAL REPORT IN COMPLIANCE W/ CODE PROVISIONS PERIODIC INSP OF EXTERIOR WALLS AND AP$8,000
2011-01-13Permit EQ — ISSUED
2010
2010-11-15311: Noise — Noise: Construction Before/After Hours (NM1)
2010-10-21DOB violation E:
2010-10-05Rodent inspection: Failed for Rat Activity
2010-08-13Mortgage satisfied — from LIPTON ENTERPRISES,INC. to BANK OF AMERICA, N. A. SUCCESSOR IN INTE; NATWEST BANK N.A.
2010-08-13TL&R — from LIPTON ENTERPRISES,INC. to NATWEST BANK N.A.; BANK OF AMERICA, N. A. SUCCESSOR IN INTE
2010-07-28HPD class A: § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM
2010-07-28HPD class A: § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND
2010-07-28HPD class A: § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPE
2010-07-23311: NONCONST — VERMIN
2010-07-23311: NONCONST — VERMIN
2010-07-23311: Rodent — Rat Sighting
2010-07-23311: NONCONST — VERMIN
2010-07-23Tenant complaint: NONCONST — VERMIN
2010-07-23Tenant complaint: NONCONST — VERMIN
2010-07-23Tenant complaint: NONCONST — VERMIN
2010-07-22311: Rodent — Rat Sighting
2010-06-23311: PLUMBING — WATER-SUPPLY
2010-06-23Tenant complaint: PLUMBING — WATER SUPPLY
2010-06-23Job filed: PROPOSED ONE NEW BOILER AND ONE NEW HOT WATER STORAGE TANK AT ROOFTOP OF EXISTING NINE STORY BRICK BUILDING .NO CHANGE IN USE,MEAN OF EGRESS OR OCCUPA$30,000
2010-05-21Job filed: INSTALL NEW METAL PANEL SYSTEM ON EXTERIOR OF EXISTING 9 STORY BRICK BUILDING. SIDEWALK SHED & SCAFFOLDING WILL BE FILED UNDER SEPARATE APPLICATIO$94,500
2010-05-05311: NONCONST — RUBBISH
2010-05-05Tenant complaint: NONCONST — RUBBISH
2010-04-01Rodent inspection: Passed
2010-03-29ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE SIXTH ROUND TECHNICAL REPORT IN COMPLIANCE W/ CODE PROVISIONS: PERIODIC INSP. OF EXTERIOR WALLS & AP$8,000
2010-01-26ECB CLASS - 2 violation: 50A,36,50B. A.O. SMITH COIL W.T. BOILER GAS FIRED,YR(UNKNOWN) 50A-EVEIDENCE OF RESTRICTED FLUE GAS EMISSIONS FROM BOILER THROUGH F$2,500
2010-01-26DOB complaint, category ?
2010-01-07Permit EQ — ISSUED
2009
2009-12-31DOB violation LBLVIO:
2009-12-30Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATIO
2009-12-30Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATIO
2009-12-11DOB complaint, category ?
2009-11-24City emergency repair (OMO): shed only 1. install standard steel post shed with lights at front of building and extend to adjacent properties as per $24,400
2009-11-19DOB violation IMEGNCY:
2009-11-16ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE SIXTH ROUND TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS:PERIODIC INSPECTION OF EXTERIOR WALL$4,000
2009-11-13DOB complaint, category ?
2009-11-13ECB CLASS - 1 violation: FAILURE TO MAINTAIN BUILDING WALL OF APPURTENANCES DEFECT NOTED: EXTERIOR BUILDING WALL AT FRONT FACADE AT PARAPET WALL LEVEL A SE$5,000
2009-08-25HPD class B: § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF DISCARDED CHAIRS & BOXES ON THE LANDING FROM 4TH TO 8TH STY. THROUGHOUT AT NO
2009-06-16ECB CLASS - 1 violation: FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY NOTED: AT CELLAR STAIRS DEBRIS & MATERIAL BLOCK DOORWAY ENTRANCE/EXIT DEBRIS & MAT$1,200
2009-06-16ECB CLASS - 2 violation: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENT: NOTED: AT CELLAR ENTRANCE & CELLAR PUBLIC HALLWAY EXCESSIVE DEB
2008-11-21ECB CLASS - 2 violation: FAILURE TO SUBMIT AN ACCEPTABLE SIXTH ROUND TECHNICAL REPORT IN COMPLAINCE WITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR W$4,000
2008-04-28DOB violation E:
2008-01-07DOB complaint, category ?
2007
2007-11-30DOB violation LL1198:
2007-08-21ECB Non-Hazardous violation: FAILURE TO MAINTAIN BLDG. NOTED: NO VISIBLE LEADERS OR GUTTERS @ THIS ADDRESS @ THE TIME OF INSPECTION. NO ADEQUATE MEANS OF DRAIN$180
2007-08-21ECB Non-Hazardous violation: WORK W/O A PERMIT. WORK NOTED: A CEMENT PATIO W/ CEMENT WALLS & FLR, STEEL RAILINGS. ALSO A BUILT OUT BTHRM ON THE PATIO A EXTENDE$250
2007-08-15DOB complaint, category ?
2007-06-13DOB violation E:
2007-04-19Mortgage satisfied — from WANG, HUI ZHEN to NATIONAL CITY BANK
2007-04-16Mortgage $500,000 — from HUI ZHEN WANG to WASHINGTON MUTUAL BANK, F.A.$500,000
2006
2006-12-27Mortgage satisfied — from WANG, HUI ZHEN to WELLS FARGO BANK, N.A.
2006-09-01DOB violation E:
2006-08-14Tenant complaint: GENERAL — MOLD
2006-08-14Tenant complaint: GENERAL — LOCKS
2006-08-14Tenant complaint: GENERAL — DOORS
2006-08-14Tenant complaint: GENERAL — MOLD
2006-07-24Mortgage $200,000 — from WANG, HUI ZHEN to NATIONAL CITY BANK$200,000
2006-07-24Mortgage $150,000 — from WANG, HUI ZHEN to WELLS FARGO BANK, N.A.$150,000
2006-07-24Deed $620,000 — from ZHENG, XIANG-PING; ZHENG, YAN-FENG to WANG, HUI ZHEN$620,000
2006-07-14Mortgage satisfied — from ZHENG, YAN-FENG; ZHENG, XIANG-PING to EQUITY ONE, INC.; FHB FUNDING CORP
2006-07-06Mortgage satisfied — from ZHENG, XIANG-PING; ZHENG, YAN-FENG to WASHINGTON MUTUAL BANK, FA
2005
2005-11-18DOB violation E:
2005-10-01DOB violation LL1081:
2005-07-08Mortgage satisfied — from CHENG, YAN-LO; ZHENG, JIMMY JING-DIAN to FLEET BANK
2004
2004-09-22Mortgage $145,600 — from ED-MAR DEVELOPMENT, INC.; CHU AND SON INC. to UNITED ORIENTED BANK$145,600
2004-09-22Agreement $515,000 — from ED-MAR DEVELOPMENT, INC.; CHU AND SON INC. to UNITED ORIENT BANK$515,000
2004-09-22AL&R $515,000 — from UNITED ORIENTED BANK to CHU AND SON INC.; ED-MAR DEVELOPMENT, INC.$515,000
2004-09-08TL&R — from UNITED ORIENT BANK to ED-MAR DEVELOPMENT INC
2004-09-08REL — from CHU & SON, INC to UNITED ORIENT BANK
2004-09-08TL&R — from UNITED ORIENT BANK to ED-MAR DEVELOPMENT INC
2003
2003-12-19DOB violation E:
2003-08-13Deed to CHENG, YAN LO; YEUNG, Y T CHENG; ZHENG, LILLY K Y
2003-07-15Agreement $350,000 — from ED- MAR DEVELOPMENT , INC. to UNITED ORIENT BANK$350,000
2003-07-15CMTG $350,000 — from CHU & SON , INC. to UNITED ORIENT BANK$350,000
2003-07-15AL&R $3,500,000 — from ED- MAR DEVELOPMENT , INC. to UNITED ORIENT BANK$3,500,000
2003-07-15Mortgage $164,885 — from ED- MAR DEVELOPMENT , INC. to UNITED ORIENT BANK$164,885
2002
2002-11-19ECB Non-Hazardous violation: 80M12-62O02-42M14-38I11-39U16-52U16-56U16. 30-M-12 ELEVATOR COMUNICATION SYSTEM MISSING REPLACE PHONE 42-M-14 MISSING ONE SEAL ON $350
2002-10-03DOB violation E: 1P35964
2002-03-15Agreement — from ED-MAR DEVELOPMENT,INC. to UNITED ORIENT BANK
2001
2001-11-28DOB violation E:
2001-08-15SAGE — from CHU, SHIU MING; CHU, MAY WON to HANG SENG BANK LIMITED
2001-08-15Mortgage satisfied — from CHU, MAY WAN; CHU, SHIU MING to HANG SENG BANK LIMITED
2001-03-30Deed — from SUM, KUN WUI; SUM, CHEUK LUN to SUM, JAMES; SUM, CHEUK; SUM, KUN WUI
2001-01-03Mortgage $250,000 — from CHU, SHIU MING; CHU, MAY WAN to WASHINGTON MUTUAL BANK, FA$250,000
2000
2000-06-22DOB violation E: 1P35964
2000-05-24WSAT — from ZHENG, XIANG-PING; ZHENG, YAN-FENG to FHB FUNDING CORP
2000-04-06Agreement — from CHU, MAY WAN; CHU, SHIU MING to MARINE MIDLAND BANK
2000-01-24Mortgage assigned — from HANG SENG BANK LIMITED to MARINE MIDLAND BANK
1999
1999-08-03Mortgage $20,000 — from ZHENG, XIANG-PING; ZHENG, YAN-FENG to FHB FUNDING CORP.$20,000
1999-07-14Mortgage $55,997 — from ZHENG, JIMMY JING-DIAN; CHENG, YAN-LO to FLEET BANK$55,997
1999-02-12REL — from BANK OF EAST ASIA to CHU & SON, INC.
1999-02-12Mortgage satisfied — from CHU & SON INC. to BANK OF EAST ASIA LIMITED
1999-01-22DOB violation E:
1998
1998-09-08Mortgage satisfied — from CHU & SON INC. to HANG SENG BANK LIMITED
1998-08-07Deed — from CHU & SON INC to SCARDINO, NIEVES; SCARDINO, ERNEST
1998-08-07SAGE — from HANG SENG BANK LIMITED
1998-06-30DOB complaint, category ?
1998-06-26PAT — from ZHENG, YAN FENG to MING TOWER CONDOMINIUM
1998-06-26Deed — from LU, ZHAN WEN to ZHENG, XIANG-PING; ZHENG, YAN-FENG
1998-06-26Mortgage $126,000 — from ZHENG, XIANG-PING; ZHENG, YAN-FENG to UNITED STATES OF AMERICA$126,000
1998-06-26DOB complaint, category ?
1998-06-25Deed — from CHU & SON, INC. to LIEN, CHIEN HSU HSIU; LIEN, HSU HSIU
1997
1997-11-24Mortgage $100,000 — from ZHENG, JIMMY JING DIAN; CHENG, YAN LO to REPUBLIC CONSUMER LENDING GROUP, INC.$100,000
1997-11-24SAGE — from MING TOWER CONDOMINIUM BOARD OF MANAGERS
1997-11-24SAGE — from MING TOWER CONDOMINIUM BOARD OF MANAGERS
1997-11-24SAGE — from MING TOWER CONDOMINIUM BOARD OF MANAGERS
1997-11-24Deed — from O'FLAHERTY, DAVID to ZHENG, JIMMY JING-DIAN; CHENG, YAN-LO
1997-10-16Mortgage $50,000 — from CHU & SON, INC. to BANK OF EAST ASIA$50,000
1997-03-25Deed — from ENG, SHU YAN to USA
1997-01-15Deed — from FANG, RU HONG; LU, ZHAN WEN to LU, ZHAN WEN
1996
1996-11-08Mortgage assigned — from JARDINE CAPITAL CORP. to UNITED ORIENT BANK
1996-11-08Agreement — from UNITED ORIENT BANK to ED-MAR DEVELOPMENT,INC.
1996-11-08Mortgage assigned — from ED-MAR DEVELOPMENT,INC. to UNITED ORIENT BANK
1996-03-20Mortgage assigned — from CITIBANK, NA to OCI MORTGAGE CORPORATION
1995
1995-12-14Mortgage $30,000 — from LIPTON ENTERPRISES,INC. to CHU & MUI ASSOCIATES$30,000
1995-12-14Mortgage $217,500 — from LIPTON ENTERPRISES,INC. to NATWEST BANK N.A.$217,500
1995-12-14Mortgage assigned — from LIPTON ENTERPRISES,INC. to NATWEST BANK N.A.
1995-12-14Deed — from CHU & MUI ASSOCIATES to LIPTON ENTERPRISES,INC.
1995-12-14WSAT — from CHU & MUI ASSOCIATES to GOLDEN PACIFIC NATIONAL BANK