The city's published records show little recorded distress here in the last three years. Less recorded distress than 87% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty
points per 10 units; this building carries 1.3. In ZIP 10014, 69% of residential buildings hold an A and
5% grade D or F.
How grades work
this building
A
B
C
Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
12 service requests in the last three years. Most common: Homeless Person Assistance (4) · Sewer (3) · Noise (1) · Lost Property (1) · Taxi Report (1) · Non (1).
Filed construction activity
$1,909,133 in permitted construction work filed since
2016 (24 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1957)
Yes
Six or more residential units (24)
No
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
GREENWICH CORP.
Head officer
MAGDALENA KOSZ
Managing agent
A.J. CLARKE REAL ESTATE CORP.
Last registered
2026-07-15
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$5,761,000
$2,592,450
2026
$5,483,000
$2,467,350
2027
$5,539,000
$2,492,550
The city's market estimate has fallen
4% between tax years 2025 and 2027.
For property tax, the Department of Finance values this co-op
as if it were a rental building. Its 2022 estimate: gross income $974,058 a year
($51.18 per sq ft), operating expenses $336,295
($17.67 per sq ft), net operating income $637,762. These are the
city's estimates from comparable rentals, not the building's actual budget, rents or maintenance
charges.
Building systems
Heating fuel
NATURALGAS
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 2 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
1 street-flooding or sewer-backup complaints at this address since
2025 (1 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
14 St — A C E L · 0.2 mi straight-line (about a 6-minute walk) · station accessibility: full 14 St — 1 2 3 F L M · 0.3 mi straight-line (about an 8-minute walk) · station accessibility: full
Bus
Nearest boarding stop: Greenwich St / Horatio St — M11 · 100 ft
Citi Bike
W 12 St & Hudson St · 500 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
12 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $391,813 on
2021-01-25 (lender: Investors Bank). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2026-05-04
RPTT&RET $1,425,000 — from GABBIANELLI, CHRISTINE; TIMMERMANS, CHRISTINE to GABBIANELLI, GINO J
$1,425,000
2026-04-30
RPTT&RET $3,300,000 — from SHER, PHILLIP; SHER, ANITA to BLAIR, MCGOWAN; MCGOWAN, DAVID JR
$3,300,000
2026-04-28
Sold for $498,750
$498,750
$20,781
2026-04-16
Sold for $3,300,000
$3,300,000
$137,500
2024-08-07
RPTT&RET $2,850,000 — from GOUTAL, TONI; GOUTAL, CHLOE to BROWN, MICHAEL; BROWN, BAHARA
$2,850,000
2024-07-24
Sold for $2,850,000
$2,850,000
$118,750
2024-01-16
RPTT&RET $1,250,000 — from VAN ROIJEN, VALAER; MONTROSE VAN ROIJEN, VALAER to RUCKER, BETH; RUCKER, DARIUS
$1,250,000
2024-01-04
Sold for $1,250,000
$1,250,000
$52,083
2023-11-30
RPTT&RET $1,825,000 — from DZIEDZIC, ERICA to COHEN-SHAPIRO, JUDITH; SHAPIRO, CLIFFORD H
$1,825,000
2023-11-15
Sold for $1,825,000
$1,825,000
$76,042
2023-08-17
RPTT&RET $1,275,000 — from NEWBURGH, ZACHARY; EISEN, NATALIE to FLANAGAN, LINDA; FLANAGAN, ROBERT
$1,275,000
2023-06-29
RPTT&RET $2,470,000 — from ESTATE OF MARTIN SCHEINBERG to GABBIANELLI, CHRISTINE; GABBIANELLI, GINO
$2,470,000
2023-05-16
RPTT&RET $3,650,000 — from WALDMAN, MYRA to COHEN-SHAPIRO, JUDITH; SHAPIRO, CLIFFORD H
$3,650,000
2023-05-05
Sold for $3,650,000
$3,650,000
$152,083
2023-05-04
Sold for $1,275,000
$1,275,000
$53,125
Ten-year activity
50250
2017
2018
2019
2020
2021
2022
24
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
3
0
0
0
1
4
2018
0
1
1
0
2
4
2019
8
1
2
6
4
21
2020
0
0
3
2
1
6
2021
0
3
7
6
2
18
2022
4
1
3
2
2
12
2023
8
0
2
11
3
24
2024
10
0
1
4
2
17
2025
5
0
8
0
3
16
2026
1
1
5
4
2
13
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Job filed: HEREBY FILING FOR THE RENOVATION OF APARTMENT 1M (1ST FLOOR AND BASEMENT). NO CHANGE IN USE, EGRESS OR OCCUAPANCY.
2026-07-15
311: Non-Emergency Police Matter — Trespassing
2026-07-13
311: Homeless Person Assistance — Non-Chronic
2026-05-05
311: Sewer — Catch Basin Search (SC2)
2026-05-04
RPTT&RET $1,425,000 — from GABBIANELLI, CHRISTINE; TIMMERMANS, CHRISTINE to GABBIANELLI, GINO J
2026-05-01
FDNY inspection (E-CIDS)
2026-04-30
RPTT&RET $3,300,000 — from SHER, PHILLIP; SHER, ANITA to BLAIR, MCGOWAN; MCGOWAN, DAVID JR
2026-04-28
Sold for $498,750
2026-04-19
311: Sewer — Catch Basin Search (SC2)
2026-04-16
Sold for $3,300,000
2025-12-16
Boiler inspection
2025-12-11
311: Taxi Report — Driver Report - Passenger
2025-12-09
Bedbug filing: 0 infested units
2025-11-17
HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2025-11-17HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2025-07-09311: Homeless Person Assistance — Non-Chronic
2025-06-28311: Homeless Person Assistance — Non-Chronic
2025-06-27311: Homeless Person Assistance — Non-Chronic
2025-04-15Permit General Construction — Signed-off
2025-03-25Asbestos abatement: Removal — Everest Construction Enterprises, Corp.
2025-03-25Asbestos abatement: Removal — Everest Construction Enterprises, Corp.
2025-03-10Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY W$1,000
2025-02-06Permit Supported Scaffold — Signed-off
2025-02-06Permit Sidewalk Shed — Signed-off
2025-02-06Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY W$1,000
2024
2024-12-13Bedbug filing: 0 infested units
2024-11-19Boiler inspection
2024-10-04Job filed: Plumbing work related to the renovation and combination of apartments 4B and 4C on the fourth floor.$69,000
2024-09-27Job filed: GENERAL CONSTRUCTION FOR ROOF MEMBRANE REPLACEMENT AT MAIN ROOF AND BULKHEAD ROOF, MISCELLANEOUS REPAIRS AT BULKHEAD & PARAPET WALLS AS PER PLANS FILE$350,030
2024-09-05Rodent inspection: Passed
2024-08-07RPTT&RET $2,850,000 — from GOUTAL, TONI; GOUTAL, CHLOE to BROWN, MICHAEL; BROWN, BAHARA$2,850,000
2024-07-24Sold for $2,850,000$2,850,000
2024-04-17Job filed: Replace (1) rooftop packaged HVAC unit and install (1) new roof-top split HVAC unit related to the combination and renovation of apartments 4B and 4C $63,626
2024-04-08Job filed: Modification to interior partitions and related general construction related to the renovation and combination of apartments 4B and 4C on the fourth f$164,550
2024-03-25Job filed: Plumbing work related to the renovation and combination of apartments 4B and 4C on the fourth floor.$69,000
2024-03-21Permit Structural — Signed-off
2024-01-22Job filed: Structural work related to the creation of a new doorway related to the combination of apartments 4B and 4C on the 4th floor. In addition, extending t$41,976
2024-01-16RPTT&RET $1,250,000 — from VAN ROIJEN, VALAER; MONTROSE VAN ROIJEN, VALAER to RUCKER, BETH; RUCKER, DARIUS$1,250,000
2024-01-11Permit Plumbing — Signed-off
2024-01-09Job filed: Modification to interior partitions along with related general construction related to the renovation and combination of apartments 4B and 4C on the f$137,700
2024-01-09Job filed: Plumbing work related to the renovation and combination of apartments 4B and 4C on the fourth floor.$39,000
2024-01-04Sold for $1,250,000$1,250,000
2023
2023-12-27Bedbug filing: 0 infested units
2023-12-12311: Noise - Helicopter — Other
2023-11-30RPTT&RET $1,825,000 — from DZIEDZIC, ERICA to COHEN-SHAPIRO, JUDITH; SHAPIRO, CLIFFORD H$1,825,000
2023-09-28Permit General Construction — Signed-off
2023-08-17RPTT&RET $1,275,000 — from NEWBURGH, ZACHARY; EISEN, NATALIE to FLANAGAN, LINDA; FLANAGAN, ROBERT$1,275,000
2023-07-21RPTT&RET — from WALDMAN, MYRA to COHEN-SHAPIRO, JUDITH; SHAPIRO, CLIFFORD H
2023-06-30Job filed: Replace (1) rooftop packaged HVAC unit and install (1) new roof-top split HVAC unit related to the combination and renovation of apartments 4B and 4C $63,626
2023-06-29RPTT&RET $2,470,000 — from ESTATE OF MARTIN SCHEINBERG to GABBIANELLI, CHRISTINE; GABBIANELLI, GINO$2,470,000
2023-06-19Job filed: Modification to interior partitions and related general construction related to the renovation and combination of apartments 4B and 4C on the fourth f$164,550
2023-06-19Job filed: Plumbing work related to the renovation and combination of apartments 4B and 4C on the fourth floor.$69,000
2023-05-24Rodent inspection: Passed
2023-05-16RPTT&RET $3,650,000 — from WALDMAN, MYRA to COHEN-SHAPIRO, JUDITH; SHAPIRO, CLIFFORD H$3,650,000
2023-05-05Deed transfer (nominal price)
2023-05-05Sold for $3,650,000$3,650,000
2023-05-04Sold for $1,275,000$1,275,000
2023-03-16Job filed: REPLACE BATHROOM FIXTURES ON EXISTING ROUGH. RELOCATE/ REPLACE GAS RANGE, KITCHEN SINK, DISHWASHER AND REFRIGERATOR IN THE KITCHEN. INSTALLATION OF A $30,400
2023-03-15RPTT&RET $3,321,500 — from MILLER, DEBORAH A to VAGTS, AARON$3,321,500
2023-03-01Job filed: REPLACE BATHROOM FIXTURES ON EXISTING ROUGH. RELOCATE/ REPLACE GAS RANGE, KITCHEN SINK, DISHWASHER AND REFRIGERATOR IN THE KITCHEN. INSTALLATION OF A $30,400
2023-02-28Sold for $3,321,500$3,321,500
2023-02-27Permit Plumbing — Signed-off
2022
2022-12-22Bedbug filing: 0 infested units
2022-12-03311: Noise - Vehicle — Car/Truck Music
2022-09-29Permit Supported Scaffold — Signed-off
2022-09-28Permit Sidewalk Shed — Signed-off
2022-09-28Job filed: Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egre$3,500
2022-09-28Job filed: Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress a$3,500
2022-07-27Rodent inspection: Passed
2022-05-09RPTT&RET $875,000 — from ESTATE OF MICHAEL FORTE to MORTON, DAVID$875,000
2022-04-20Boiler inspection
2022-04-07Sold for $875,000$875,000
2022-02-17FDNY inspection (RISK)
2022-01-31Bedbug filing: 0 infested units
2021
2021-12-31311: Noise - Helicopter — Other
2021-11-26311: Noise - Helicopter — Other
2021-11-15311: Noise - Helicopter — Other
2021-10-20311: Noise - Helicopter — Other
2021-10-17311: Noise - Helicopter — Other
2021-10-16311: Noise - Helicopter — Other
2021-10-12RPTT&RET $940,000 — from ESTATE OF JOSEPH A. FOCARINO; CARYN R. YOUNG, EXECUTOR to DZIEDZIC, ERICA$940,000
2021-09-22Sold for $940,000$940,000
2021-08-26Rodent inspection: Passed
2021-07-12Boiler inspection
2021-07-09ECB CLASS - 2 violation: AT ROOF LEVEL VENTILATION PIPE OBSERVED LEANING TOWARDS STREET FRONTAGE, REPAIR AND/OR REPLACE$312
2021-07-08311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2021-07-08DOB complaint, category ?
2021-06-07DOB violation E:
2021-01-25Mortgage assigned — from STERLING NATIONAL BANK; ASTORIA BANK; ASTORIA FEDERAL SAVINGS AND LOAN ASSOCIA to INVESTORS BANK
2021-01-25Mortgage $391,813 — from GREENWICH CORP. to INVESTORS BANK$391,813
2021-01-25AL&R $2,600,000 — from GREENWICH CORP. to INVESTORS BANK$2,600,000
2021-01-25Agreement $2,600,000 — from GREENWICH CORP. to INVESTORS BANK$2,600,000
2020
2020-12-31Bedbug filing: 0 infested units
2020-11-11311: Damaged Tree — Branch or Limb Has Fallen Down
2020-07-16RPTT&RET $875,000 — from PROTHEROE, PAULA; PROTHEROE, GERALD to COY, ETHAN K$875,000
2020-07-10Sold for $875,000$875,000
2020-06-05Boiler inspection
2020-01-31311: Lost Property — Bag/Wallet
2019
2019-12-13Permit Plumbing — Signed-off
2019-12-11Permit EW — ISSUED
2019-12-04Bedbug filing: 0 infested units
2019-12-04Job filed: REPLACE BATHROOM FIXTURES ON EXISTING ROUGH. RELOCATE/ REPLACE GAS RANGE, KITCHEN SINK, DISHWASHER AND REFRIGERATOR IN THE KITCHEN. INSTALLATION OF A $30,400
2019-11-06Job filed: RENOVATION OF APARTMENT 2D ON THE 2ND FLOOR OF AN EXISTING RESIDENTIAL BUILDING. ARCHITECTURAL AND PLUMBING WORK. NO CHANGE TO USE, OCCUPANCY OR EGRES$68,900
2019-11-06Job filed: RENOVATION OF APARTMENT 2D ON THE 2ND FLOOR OF AN EXISTING RESIDENTIAL BUILDING. ARCHITECTURAL AND PLUMBING WORK. NO CHANGE TO USE, OCCUPANCY OR EGRES$68,900
2019-10-08RPTT&RET $1,200,000 — from ALLARY, ERIC; GRIGSBY, JOSEPH S to DUYAN, JOSHUA$1,200,000
2019-09-27Sold for $1,200,000$1,200,000
2019-08-27Permit PL — ISSUED
2019-08-21DOB complaint, category ?
2019-08-01Boiler inspection
2019-07-09Permit EW — ISSUED
2019-06-21Job filed: HEREWITH FILE PLANS TO RENOVATE APT, 2A. GENERAL CONSTRUCTION TO INCLUDE LIMITED REMOVAL AND CONSTRUCTION OF NON-STRUCTURAL PARTITIONS, NEW LIGHTING T$88,375
2019-06-14Elevator permit: Modification to the existing controller to install Door Position Monitoring System (DPM) {software and/or hardware} as per require$5,000
2019-06-12RPTT&RET $950,000 — from GOLDBERG, LESLEY E to DIAMOND, LESLIE$950,000
2019-05-29Sold for $950,000$950,000
2019-04-16RPTT&RET $851,000 — from CHAGNON, SUSAN to EISEN, NATALIE; NEWBURGH, ZACHARY$851,000
2019-04-03Sold for $851,000$851,000
2019-03-22Rodent inspection: Passed
2019-02-14Boiler inspection — defects found
2019-01-18Bedbug filing: 0 infested units
2018
2018-10-09HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2018-06-01Rodent inspection: Passed
2018-05-23DOB violation E:
2018-03-19Boiler inspection
2017
2017-09-22Permit PL — ISSUED
2017-08-22Permit EW — ISSUED
2017-07-31Rodent inspection: Passed
2017-06-07Job filed: RENOVATION OF AN EXISTING APARTMENT ON THE 2ND FLOOR. ARCHITECTURAL AND PLUMBING WORK TYPES. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.$145,700
2016
2016-12-30RPTT&RET $2,450,000 — from HUNT, JOLIE; POTTER, WILLIAM to GOUTAL, CHLOE; GOUTAL, TONI$2,450,000
2016-12-21Sold for $2,450,000$2,450,000
2016-11-14Rodent inspection: Passed
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-08-18Permit PL — ISSUED
2016-08-09Permit EW — ISSUED
2016-06-03Job filed: INTERIOR RENOVATION OF THE EXISTING CONDO APARTMENT #3C, REPLACEMENT OF PLUMBING FIXTURES IN THE BATHROOM AND KITCHEN AS PER PLANS FILED HEREWITH. NO $80,000
2015
2015-11-10RPTT&RET $1,250,000 — from RIORDAN, BRIAN to ROIJEN, VALAER VAN$1,250,000
2015-08-07Certificate of occupancy Final
2015-08-03RPTT&RET $1,320,000 — from SUMNER, BRIGITTE M to CAPONNETTO, MARIANNE$1,320,000
2015-06-10DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
2015-02-13311: Taxi Complaint — Driver Complaint
2014
2014-11-02FDNY inspection (RISK)
2014-10-10DOB complaint, category ?
2014-06-01FDNY inspection (RISK)
2014-05-15DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
2013-11-04TL&R — from GREENWICH CORP. to WELLS FARGO BANK, N.A.
2013-11-04Agreement $2,600,000 — from GREENWICH CORPORATION to ASTORIA FEDERAL SAVINGS AND LOAN ASSOCIA$2,600,000
2013-11-04Mortgage $560,726 — from GREENWICH CORPORATION to ASTORIA FEDERAL SAVINGS AND LOAN ASSOCIA$560,726
2013-11-04Mortgage assigned — from NCB, FSB to ASTORIA FEDERAL SAVINGS AND LOAN ASSOCIA
2013-11-04Mortgage assigned — from WELLS FARGO BANK, N.A. to ASTORIA FEDERAL SAVINGS AND LOAN ASSOCIA
2013-10-17DOB violation E:
2013-09-24Certificate of occupancy Temporary
2013-09-12311: Taxi Complaint — Driver Complaint
2013-08-24311: Damaged Tree — Tree Alive - in Poor Condition
2013-08-07Permit EW — ISSUED
2013-08-07Job filed: MOVE LOCATION OF ENTRY DOOR TO APT 2FG, NEW FLOORING AT HALL, NEW CEILING PORTION AND REMOVE PARTITIONS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$14,480
2013-08-07Job filed: MOVE LOCATION OF ENTRY DOOR TO APT 2FG, NEW FLOORING AT HALL, NEW CEILING PORTION AND REMOVE PARTITIONS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$14,480
2013-06-21DOB complaint, category ?
2013-06-06Job filed: MOVE LOCATION OF ENTRY DOOR TO APT 3G AND NEW FLOORING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$4,780
2013-03-04RPTT&RET $15,000 — from GREENWICH CORP. to POTTER, WILLIAM; HUNT, JOLIE$15,000
2012
2012-10-31RPTT&RET $960,000 — from DURKIN, WILLIAM J; DURKIN, CECILE to GRIGSBY, JOSEPH; ALLARY, ERIC$960,000
2012-10-24RPTT&RET $2,125,000 — from DIVINCENZO, GLENN to HUNT, JOLIE; POTTER, WILLIAM$2,125,000
2012-09-26RPTT&RET $15,000 — from GREENWICH CORP. to MORTON, DAVID$15,000
2012-07-27311: Overgrown Tree/Branches — Hitting Building
2012-05-25311: Overgrown Tree/Branches — Hitting Building
2012-04-25Rodent inspection: Passed
2012-02-07RPTT&RET $725,000 — from WALDMAN, MYRA to FOCARINO, JOSEPH$725,000
2011
2011-12-13DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
2011-12-09311: Overgrown Tree/Branches — Hitting Building
2011-11-16Permit EW — ISSUED
2011-11-10Permit EW — ISSUED
2011-11-04Mortgage $350,000 — from GREENWICH CORP. to NCB; NATIONAL CONSUMER COOPERATIVE BANK$350,000
2011-11-04AL&R $350,000 — from GREENWICH CORP. to NATIONAL CONSUMER COOPERATIVE BANK; NCB$350,000
2011-11-04Mortgage assigned — from NATIONAL CONSUMER COOPERATIVE BANK; NCB to NCB, FSB
2011-11-04Mortgage satisfied — from GREENWICH CORP. to NATIONAL CONSUMER COOPERATIVE BANK
2011-11-04TL&R — from GREENWICH CORP. to NATIONAL CONSUMER COOPERATIVE BANK
2011-11-04AALR — from NCB; NATIONAL CONSUMER COOPERATIVE BANK to NCB, FSB
2011-10-26ECB CLASS - 2 violation: B254,15,22C,34A,50,50A.(50)CLOTHES DRYER DUCT VENTING INTO CUMBUSTION.AIR SPACE OF BOILER.(50A)COMBUSTABLE STORAGE IN BOILER ROOM.
2011-10-21Permit EQ — ISSUED
2011-10-21Permit EQ — ISSUED
2011-10-05Job filed: INSTALLATION OF A SCAFFOLD STAIR TOWER APPROXIMATELY 25' HIGH ON THE EXISTING SIDEWALK SHED (FILED SEPARATELY) AS PER PLANS DURING FACADE RESTORATION.
2011-10-05Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 40' LONG AS PER PLANS DURING FACADE RESTORATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHED TO COMPLY WITH
2011-10-05Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 40' LONG AS PER PLANS DURING FACADE RESTORATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHED TO COMPLY WITH
2011-10-05Job filed: INSTALLATION OF A SCAFFOLD STAIR TOWER APPROXIMATELY 25' HIGH ON THE EXISTING SIDEWALK SHED (FILED SEPARATELY) AS PER PLANS DURING FACADE RESTORATION.
2011-10-05Job filed: INSTALLATION OF A SCAFFOLD STAIR TOWER APPROXIMATELY 25' HIGH ON THE EXISTING SIDEWALK SHED (FILED SEPARATELY) AS PER PLANS DURING FACADE RESTORATION.
2011-08-29Permit EW — ISSUED
2011-08-29Permit PL — ISSUED
2011-08-25Job filed: REPLACE BOILER AND GAS BURNER (NYC BOILER NO: 66108-01). NO CHANGE IN USE EGRESS OR OCCUPANCY.$34,800
2011-08-25Job filed: REPLACE BOILER AND GAS BURNER (NYC BOILER NO: 66108-01). NO CHANGE IN USE EGRESS OR OCCUPANCY.$34,800
2011-08-08Job filed: LIMITED EXTERIOR REPAIRS ON THE COURTYARD ELEVATIONS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$40,000
2011-08-08Job filed: LIMITED EXTERIOR REPAIRS ON THE COURTYARD ELEVATIONS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$40,000
2011-05-31DOB violation E:
2011-03-21Rodent inspection: Passed
2011-03-10Permit PL — ISSUED
2011-03-03311: Lead — Lead Kit Request (Residential) (L10)
2011-02-09Permit EW — ISSUED
2011-02-09Permit EW — ISSUED
2011-02-07DOB complaint, category ?
2011-01-20RPTT&RET $775,000 — from CHENEY, CHRISTIAN to RIORDAN, BRIAN$775,000
2010
2010-11-17RPTT&RET $750,000 — from THE KAREN M. O'LEARY LIVING REVOCABLE TR to SUMNER, BRIGITTE M$750,000
2010-10-05Job filed: RENOVATE EXISTING APARTMENT; NEW BATHROOM, KITCHEN, NEW SPLIT A/C UNIT, REPLACE DECK ROOF MEMBRANE AND PAVERS AND MINOR PARTITION WORK AS PER PLANS FI$33,000
2010-10-05Job filed: RENOVATE EXISTING APARTMENT; NEW BATHROOM, KITCHEN, NEW SPLIT A/C UNIT, REPLACE DECK ROOF MEMBRANE AND PAVERS AND MINOR PARTITION WORK AS PER PLANS FI$33,000
2010-10-05Job filed: RENOVATE EXISTING APARTMENT; NEW BATHROOM, KITCHEN, NEW SPLIT A/C UNIT, REPLACE DECK ROOF MEMBRANE AND PAVERS AND MINOR PARTITION WORK AS PER PLANS FI$33,000
2010-08-18311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2010-08-18DOB complaint, category ?
2010-04-16DOB violation E:
2010-03-25Rodent inspection: Passed
2009
2009-06-29Job filed: CEILING AND PARTITION MODIFICATIONS, REPLACEMENT OF RADIATOR UNITS WITH FLOORING FINISHES. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$25,000
2009-06-04DOB violation E:
2008
2008-10-17RPTT&RET $1,700,000 — from CHANG, CHRISTA; SUTTON , PAUL to DIVINCENZO, GLENN H$1,700,000
2008-05-06DOB violation E:
2008-03-17DOB complaint, category ?
2008-03-15DOB violation C:
2007
2007-06-20RPTT&RET $949,000 — from BYRNE, BRIAN T to TREISER, SUSAN L$949,000
2007-03-19RPTT $842,000 — from JORGENSEN, KAREN to CHENEY, CHRISTIAN$842,000
2007-01-30RPTT&RET $1,650,000 — from NELSON, JAMES P; NELSON, ALLISON A to MORTON, DAVID BRUCE$1,650,000
2006
2006-06-02AALR — from NCB, FSB to WELLS FARGO BANK, N.A., AS TRUSTEE
2006-06-02Mortgage assigned — from NCB, FSB to WELLS FARGO BANK, N.A., AS TRUSTEE
2006-06-01DOB violation E:
2006-05-11Permit PL — ISSUED
2006-04-17RPTT&RET $905,000 — from DUMONT, YVETTE to DURKIN, WILLIAM; DURKIN, CECILE$905,000
2005
2005-09-22RPTT&RET $987,000 — from COLANTUONO, WILLIAM J to ELLIS, MARTHA ANNE; ZELSKI, THADDEUS J$987,000
2005-08-08AALR — from NATIONAL CONSUMER COOPERATIVE BANK to NCB, FSB
2005-08-08Mortgage assigned — from NATIONAL CONSUMER COOPERATIVE BANK to NCB, FSB
2005-05-04RPTT $325,000 — from LECROY, JEREMY to NELSON, JAMES P; NELSON, ALLISON A$325,000
2005-05-04Permit PL — ISSUED
2005-04-13Permit EW — ISSUED
2005-04-06Job filed: Partition and plumbing changes on the 3rd floor to combine apartment #3G & #3F as indicated on drawings. No change in use, egress or occupancy. No$30,000
2005-04-06Job filed: Partition and plumbing changes on the 3rd floor to combine apartment #3G & #3F as indicated on drawings. No change in use, egress or occupancy. No$30,000
2005-03-14AL&R — from NATIONAL CONSUMER COOPERATIVE BANK to GREENWICH CORP.
2005-03-14AL&R $200,000 — from NATIONAL CONSUMER COOPERATIVE BANK to GREENWICH CORP.$200,000
2005-03-14Mortgage $200,000 — from GREENWICH CORP. to NATIONAL CONSUMER COOPERATIVE BANK$200,000
2005-03-14Mortgage $1,900,000 — from GREENWICH CORP. to NATIONAL CONSUMER COOPERATIVE BANK$1,900,000
2004
2004-09-27Permit PL — ISSUED
2004-08-27Permit EW — ISSUED
2004-08-24Job filed: Herewith filing minor renovations to an existing apartment. Work to include minor partition changes and plumbing work as per plans. There will be no$26,500
2004-08-24Job filed: Herewith filing minor renovations to an existing apartment. Work to include minor partition changes and plumbing work as per plans. There will be no$26,500
2003
2003-12-26Permit PL — ISSUED
2003-12-03Permit EW — ISSUED
2003-11-10Job filed: Interior renovation of apartment #2B, including replacement and relocation of plumbing fixtures in kitchen and bathroom, ceiling and partition work a$25,000
2003-11-10Job filed: Interior renovation of apartment #2B, including replacement and relocation of plumbing fixtures in kitchen and bathroom, ceiling and partition work a$25,000
2002
2002-03-26DOB violation LL6291:
2001
2001-10-10Permit PL — ISSUED
2001-10-03Permit EW — ISSUED
2001-08-31Job filed: interior renovation of apartment #3C, including plumbing work in kitchen and bathroom, relocatiion of plumbing fixtures; and minor partition work with$18,000
2001-08-31Job filed: interior renovation of apartment #3C, including plumbing work in kitchen and bathroom, relocatiion of plumbing fixtures; and minor partition work with$18,000
2001-08-31Job filed: interior renovation of apartment #3C, including plumbing work in kitchen and bathroom, relocatiion of plumbing fixtures; and minor partition work with$18,000
2001-02-27DOB violation LL6291:
2000
2000-11-01Permit EW — ISSUED
2000-11-01Permit PL — ISSUED
2000-07-07Job filed: APPLICATIONFILED HEREWITH TO PROPOSE RENOVATION OF EXISTING BATHROOMS. INTERIOR PARTITIONS AND PLUMBING FIXTURES AS PER PLAN. NO CHANGE TO USE, EGRESS$8,000
2000-03-29Mortgage assigned — from NATIONAL CONSUMER COOPERATIVE BANK to FEDERAL NATIONAL MORTGAGE ASSOCIATION
2000-03-29Mortgage assigned — from NATIONAL CONSUMER COOPERATIVE BANK to FEDERAL NATIONAL MORTGAGE ASSOCIATION
1998
1998-11-20Permit EQ — ISSUED
1998-11-09Permit EQ — ISSUED
1998-07-06Mortgage assigned — from GREENWICH CORP. to NCB CAPITAL CORPORATION
1998-07-06Mortgage assigned — from NCB CAPITAL CORPORATION to NATIONAL CONSUMER COOPERATIVE BANK
1998-07-06Mortgage assigned — from BANKERS TRUST COMPANY OF CALIFORNIA, N.A to NCB CAPITALCORPORATION
1998-07-06Mortgage assigned — from NCB CAPITAL CORPORATION to NATIONAL CONSUMER COOPERATIVE BANK
1998-07-06SAGE — from BANKERS TRUST COMPANY OF CALIFORNIA, N.A
1998-07-06Mortgage $283,573 — from GREENWICH CORP. to NCB CAPITAL CORPORATION$283,573
1998-07-06Agreement — from NATIONAL CONSUMER COOPERATIVE BANK to GREENWICH CORP.
1998-07-06Agreement — from GREENWICH CORP. to NCB CAPITAL CORPORATION
1998-05-13Permit EQ — ISSUED
1997
1997-11-03Permit PL — ISSUED
1997-11-03Permit PL — ISSUED
1997-09-09Permit AL — ISSUED
1997-08-19Mortgage $200,000 — from GREENWICH CORP. to NATIONAL CONSUMER COOPERATIVE BANK$200,000
1997-08-19Mortgage assigned — from GREENWICH CORP. to NATIONAL CONSUMER COOPERATIVE BANK
1996
1996-03-13Permit PL — ISSUED
1996-02-27Permit AL — ISSUED
1995
1995-08-29DOB violation LL6291:
1994
1994-12-08Mortgage satisfied — from KANSAS PACKING CO. INC. to BANKERS TRUST COMPANY
1993
1993-10-20Mortgage assigned — from FIRST BOSTON MTGE ETC. to BANKERS TRUST CO/CALIF
1993-04-30Mortgage assigned — from FIRST BOSTON MTGE ETC to BANKERS TRUST CO CALIF
1993-04-27Mortgage assigned — from NATIONAL CNSMR COOPBK to FIRST BOSTON MTGE ETC
1993-04-26Mortgage assigned — from NATIONAL CNSMR COOPBK to FIRST BOSTON MTGE ETC
1993-04-07Mortgage assigned — from NCB MORTGAGE CORP to NATIONAL CNSMR COOPBK
1993-04-07Mortgage assigned — from NCB MORTGAGE CORPORATION to NATIONAL CNSMR COOPBK
1993-03-18DOB violation LL6291:
1993-01-13Mortgage assigned — from GREENWICH CORP to NCB MORTGAGE CORP
1993-01-13Mortgage assigned — from MORGAN GUARANTY TRUST CO to NCB MORTGAGE CORP
1993-01-13SAGE — from MORGAN GUARANTY TRTETC
1993-01-13Mortgage $80,000 — from GREENWICH CORP to NBC MORTGAGE CORP$80,000
1993-01-13Agreement — from GREENWICH CORP to NCB MORTGAGE CORP
1992
1992-07-16ECB Non-Hazardous violation: 35P,28L,28L,8V,74#, (74) PROVIDE PROPER CLEARANCE BETWEEN THE CWT & THE BUFFER$1,000
1990
1990-10-16DOB violation E: 15 PROVIDE CATCH ON DOOR INTERLOCK KEEPERS IN ORDER TO OPEN SHAFT DOOR WITH DROP KEY FOR INSPECTION PURPOSES