The city's published records show little recorded distress here in the last three years. Less recorded distress than 59% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty
points per 10 units; this building carries 10.7. In ZIP 10001, 68% of residential buildings hold an A and
6% grade D or F.
How grades work
this building
A
B
C
Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
Open HPD violations
1 total — 0 class C (immediately hazardous), 1 class B, 0 class A. Oldest open since 1993-11-19.
status snapshot refreshed weekly from HPD records
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
$11,180 in enforcement penalties imposed (ECB/OATH) in the last three years.
What 311 hears from this address
67 service requests in the last three years. Most common: Illegal Parking (25) · For Hire Vehicle Complaint (18) · Encampment (10) · General Construction/Plumbing (3) · Missed Collection (2) · Noise (2).
Filed construction activity
$5,969,019 in permitted construction work filed since
2016 (41 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1928)
Yes
Six or more residential units (22)
No
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
FIFTH AVE ARCADE INC C/O HOFFMAN
Head officer
STEVEN R HOFFMAN
Managing agent
HOFFMAN MANAGEMENT
Last registered
2025-07-28
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$17,701,000
$7,965,450
2026
$17,935,000
$8,070,750
2027
$20,904,000
$9,406,800
The city's market estimate has risen
18% between tax years 2025 and 2027.
For property tax, the Department of Finance values this co-op
as if it were a rental building. Its 2022 estimate: gross income $3,084,754 a year
($44.29 per sq ft), operating expenses $944,440
($13.56 per sq ft), net operating income $2,140,314. These are the
city's estimates from comparable rentals, not the building's actual budget, rents or maintenance
charges.
Building systems
Energy grade (LL33)
A — ENERGY STAR score 100/100 (2022 disclosure cycle)
Heating fuel
NATURALGAS
Facade (Local Law 11)
UNSAFE — unsafe conditions reported (cycle 9)
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
28 St — R W · 300 ft straight-line (about a 1-minute walk) · station accessibility: none 34 St-Herald Sq — B D F M N Q R W · 0.2 mi straight-line (about a 5-minute walk) · station accessibility: full
Bus
Nearest boarding stop: 5 Av / W 28 St — M1 M2 M3 M55 · 350 ft
Citi Bike
5 Ave & E 30 St · 400 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
67 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $1,400,000 on
2003-06-10 (lender: National Consumer Cooperative Bank). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2021-12-01
RPTT&RET $1,836,125 — from LYNGEN, NARISSA; LYNGEN, IAN to BEHESHTIAN, ARASH
$1,836,125
2021-11-16
Sold for $1,836,125
$1,836,125
$83,460
2015-09-21
RPTT&RET $6,350,000 — from DE SEGONZAC-LEVIN, LAURENCE; LEVIN, MICHAEL to CHIRANIA, MANOJ; JAIN, NIDHI
$6,350,000
2014-06-17
RPTT&RET $600,000 — from GALLEN, DAVID to GALLEN, JONATHAN
$600,000
2003-06-10
Mortgage $1,400,000 — from FIFTH AVENUE ARCADE INC. to NATIONAL CONSUMER COOPERATIVE BANK
$1,400,000
1988-12-23
Mortgage $499,000 — from FIFTH AVE ARCADE INC to LINCOLN SVGS BK
$499,000
1987-03-04
Mortgage $334,030 — from FIFTH AVE ARCADE INC to LINCOLN SVGS BK, FSB
$334,030
1984-11-14
Mortgage $43,823 — from FIFTH AVE ARCADE, INC. to WENDELL CORPORATION
$43,823
1983-01-21
Mortgage $56,500 — from FIFTH AVENUE ARCADE,INC to ARCADE ASSOCIATES
$56,500
Ten-year activity
100500
2017
2018
2019
2020
2021
2022
2023
56
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
4
3
4
0
0
11
2018
22
3
8
0
2
35
2019
0
4
16
0
2
22
2020
1
2
5
0
1
9
2021
4
2
7
2
1
16
2022
16
2
10
0
1
29
2023
12
7
21
3
3
46
2024
14
7
32
0
3
56
2025
20
6
14
0
3
43
2026
13
3
13
0
1
30
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Permit Protection and Mechanical Methods — Permit Issued
2026-09-29
Job filed: Install plumbing fixtures in kitchen and bathrooms as general construction plans on the 9th floor. No change to use, egress or occupancy.
2026-08-28
311: Missed Collection — Bulky Trash
2026-08-20
311: Noise - Street/Sidewalk — Loud Talking
2026-08-10
Permit Plumbing — Permit Issued
2026-07-29
Boiler inspection
2026-07-28
Job filed: Interior renovation of existing Class A residential units on the 9th floor and combine into one unit. No change to use, egress or occupancy.
2026-07-20
Permit General Construction — Permit Issued
2026-06-23
Permit Supported Scaffold — Permit Issued
2026-06-09
Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2026-05-25
311: Encampment — N/A
2026-05-25
311: Encampment — N/A
2026-05-25
311: Encampment — N/A
2026-05-25
311: Encampment — N/A
2026-05-24
311: Encampment — N/A
2026-05-24
311: Encampment — N/A
2026-05-24
311: Encampment — N/A
2026-05-24
311: Encampment — N/A
2026-05-23
311: Encampment — N/A
2026-05-23
311: Encampment — N/A
2026-05-14
Job filed: Install plumbing fixtures in kitchen and bathrooms as general construction plans on the 9th floor. No change to use, egress or occupancy.
2026-05-13
Job filed: Interior renovation of existing Class A residential units on the 9th floor and combine into one unit. No change to use, egress or occupancy.
2026-05-12
311: Water System — No Water (WNW)
2026-05-04
Job filed: Job filed to show modification of exist sprinkler system as per plans attached herewith. No change in use, egress and occupancy.
2026-03-25
DOB complaint, category ?
2026-03-18
Job filed: KITCHEN AND LAUNDRY ROOM RENOVATIONS ON THE 8TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2026-03-12
Permit General Construction — Permit Issued
2026-03-02
ECB CLASS - 2 violation: PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS. DEFECTIVE/INADEQUATE UNSECURED NETTING ON SUPPORTED SCAFFOLD ON EAST AND
2026-03-02
DOB violation C: FTM BLDG. OBSERVED AT EXP 2: MISSING/ DAMAGED BRICKWORK. OBSERVED AT EXP 4: BROKEN WINDOW PANE AT 13TH FLOOR & 11TH FLOOR, ERRODE
2025-12-23
Facade (LL11) filing, cycle 9: UNSAFE
2025-12-10
Bedbug filing: 0 infested units
2025-10-23
Permit Sidewalk Shed — Permit Issued
2025-10-22
311: Illegal Parking — Parking Permit Improper Use
2026-10-02Permit Protection and Mechanical Methods — Permit Issued
2026-09-29Job filed: Install plumbing fixtures in kitchen and bathrooms as general construction plans on the 9th floor. No change to use, egress or occupancy.$38,000
2026-07-28Job filed: Interior renovation of existing Class A residential units on the 9th floor and combine into one unit. No change to use, egress or occupancy.$315,000
2026-07-20Permit General Construction — Permit Issued
2026-06-09Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2026-05-25311: Encampment — N/A
2026-05-25311: Encampment — N/A
2026-05-25311: Encampment — N/A
2026-05-25311: Encampment — N/A
2026-05-24311: Encampment — N/A
2026-05-24311: Encampment — N/A
2026-05-24311: Encampment — N/A
2026-05-24311: Encampment — N/A
2026-05-23311: Encampment — N/A
2026-05-23311: Encampment — N/A
2026-05-14Job filed: Install plumbing fixtures in kitchen and bathrooms as general construction plans on the 9th floor. No change to use, egress or occupancy.$38,000
2026-05-13Job filed: Interior renovation of existing Class A residential units on the 9th floor and combine into one unit. No change to use, egress or occupancy.$315,000
2026-05-12311: Water System — No Water (WNW)
2026-05-04Job filed: Job filed to show modification of exist sprinkler system as per plans attached herewith. No change in use, egress and occupancy.$12,000
2026-03-25DOB complaint, category ?
2026-03-18Job filed: KITCHEN AND LAUNDRY ROOM RENOVATIONS ON THE 8TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$24,000
2026-03-12Permit General Construction — Permit Issued
2026-03-02ECB CLASS - 2 violation: PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS. DEFECTIVE/INADEQUATE UNSECURED NETTING ON SUPPORTED SCAFFOLD ON EAST AND $2,400
2026-03-02DOB violation C: FTM BLDG. OBSERVED AT EXP 2: MISSING/ DAMAGED BRICKWORK. OBSERVED AT EXP 4: BROKEN WINDOW PANE AT 13TH FLOOR & 11TH FLOOR, ERRODE
2025
2025-12-23Facade (LL11) filing, cycle 9: UNSAFE
2025-12-10Bedbug filing: 0 infested units
2025-10-23Permit Sidewalk Shed — Permit Issued
2025-10-22311: Illegal Parking — Parking Permit Improper Use
2025-10-22311: Blocked Driveway — No Access
2025-10-16ECB CLASS - 2 violation: NOTE: AT TIME OF INSPECTION, I OBSERVED SIDEWALK IN PLACE AT EXPOSURES# 1, UPON REVIEWING DEPARTMENT RECORDS (BIS/DOBNOW), IT WAS $6,250
2025-10-15311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2025-04-25311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2025-04-25DOB complaint, category ?
2025-04-25DOB complaint, category ?
2025-04-21Job filed: installation of new multizone AC system with indoor condenser, associated air handlers and ductwork as per plan filed herewith. No change in use, egre$120,000
2025-04-21Job filed: PARTIAL APARTMENT RENOVATION ON THE 8TH FLOOR INCLUDING KITCHEN, LAUNDRY ROOM RENOVATIONS, INSTALLATION OF INTERIOR FINISHES AND LENGHTENING OF TWO EX$300,000
2025-04-21Job filed: KITCHEN AND LAUNDRY ROOM RENOVATIONS ON THE 8TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$24,000
2025-04-21Job filed: Job filed to show modification of exist sprinkler system as per plans attached herewith. No change in use, egress and occupancy.$12,000
2025-04-14311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2025-04-14ECB CLASS - 2 violation: AT OF INSPECTION OF A 16 STORY BUILDING OBSERVED SUSPENDED SCAFFOLD IN PLACE AT EXPOSURE 4. UPON REVIEW DEPARTMENT OF RECORD GC FA$2,530
2025-04-14Permit General Construction — Permit Issued
2025-04-14DOB complaint, category ?
2025-03-20Job filed: TEMPORARY SHORING FOR SIDEWALK SHED AS PER DRAWINGS. SHORING SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS $5,000
2025-03-20Job filed: TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION$15,000
2025-01-28Permit Sprinklers — Permit Issued
2024
2024-12-15311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-10-01Permit Protection and Mechanical Methods — Permit Issued
2024-09-30Job filed: TEMPORARY SHORING FOR SIDEWALK SHED AS PER DRAWINGS. SHORING SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS $5,000
2024-09-20Job filed: TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION$15,000
2024-09-11DOB violation C: EMERGENCY WORK ORDER DUE TO DETERIORIATED MASONRY BRICKS AT NORTH/ WEST CORNER AND MISSING STONE UNITS AT 14TH FLOOR. REMEDY: I
2024-09-11ECB CLASS - 1 violation: FAILURE TO TAKE REQUIRED MEASURES TO SECURE PUBLIC SAFETY-UNSAFE FACADE. NOTE: OBSERVED AT EXPOSURE 4, WEST ELEVATION, INADEQUATE/
2024-07-15Permit EW — ISSUED
2024-07-10Permit Structural — Permit Issued
2024-07-10Permit Mechanical Systems — Permit Issued
2024-07-02311: Obstruction — Sign
2024-06-05Rodent inspection: Passed
2024-06-03Job filed: INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN US$5,000
2024-05-07Job filed: INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN US$5,000
2024-05-06311: Illegal Parking — Parking Permit Improper Use
2023-11-01DOB violation FISPFCS: FAILURE TO CORRECT SWARMP CONDITIONS
2023-10-21311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-10-21311: Illegal Parking — Blocked Bike Lane
2023-10-19Permit Sidewalk Shed — Permit Issued
2023-10-02Job filed: in conjunction with renovation of existing penthouse apartment on the 16th floor and penthouse. Plumbing work only for the 16th floor, penthouse leve$32,984
2023-08-29311: Missed Collection — Bulky Trash
2023-08-16Boiler inspection
2023-07-18Permit Sprinklers — Permit Issued
2023-07-10Job filed: minor construction work, to remove masonry partition at the elevator shaft. on the 16th floor only. and install new door, with a zero clearance vestib$4,000
2023-07-10Permit EW — ISSUED
2023-06-29Permit Structural — Permit Issued
2023-06-27Permit Mechanical Systems — Permit Issued
2023-06-12311: Noise - Vehicle — Engine Idling
2023-06-06311: Water System — Hydrant Defective (WC2)
2023-05-24311: Water System — Hydrant Leaking (WC1)
2023-05-11311: Animal-Abuse — No Shelter
2023-05-11311: Animal-Abuse — Chained
2023-04-03Permit Plumbing — Permit Issued
2023-03-08311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-03-08311: Illegal Parking — Blocked Bike Lane
2023-02-22DOB complaint, category ?
2023-02-21DOB violation C: EMERGENCY WORK ORDER DUE TO LOOSE BRICK PANEL SECTION ON THE NORTH/ WEST CORNER OF THE BLDG AT 14FL LEVEL, ALSO STEPPED CRACKED/
2023-02-21ECB CLASS - 1 violation: UNLAWFUL ACTS.FAILURE TO COMPLY WITH COMMISSIONER'S ORDER.OWNER/RESPONDENT FAILED TO COMPLY WITH ECB VIOLATION #35669504X ISSUED 1$2,500
2023-01-13Job filed: FILING FOR FACADE REPAIR AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$500,000
2023-01-06DOB complaint, category ?
2023-01-06DOB complaint, category ?
2022
2022-12-14Bedbug filing: 0 infested units
2022-12-01ECB CLASS - 1 violation: FAILURE TO PROVIDE ADEQUATE SAFETY MEASURES SUCH AS SHED,NETTING,ETC. WHERE REQUIRED TO PROTECT PUBLIC AND PROPERTY FROM DOCUMENTE$10,000
2022-11-02HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2022-10-17Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OC$18,000
2022-10-17Permit Sidewalk Shed — Permit Issued
2022-10-13Job filed: INSTALLATION OF SYSTEM SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS U$5,000
2022-10-13Permit Supported Scaffold — Signed-off
2022-09-29Permit Plumbing — Signed-off
2022-09-28Permit General Construction — Signed-off
2022-09-20Job filed: INTERIOR APARTMENT RENOVATION ON THE 8TH FLOOR INCLUDING BATHROOM RENOVATION AND INSTALLATION OF NEW FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$360,000
2022-09-20Job filed: RENOVATION OF ONE EXISTING BATHROOM ON THE 8TH FLOOR INCLUDING REPLACEMENT OF (2) EXISTING LAVATORIES, RELOCATION OF (1) TOILET, (1) STALL SHOWER, (1)$20,000
2022-08-25311: Illegal Parking — Blocked Bike Lane
2022-08-16311: General Construction/Plumbing — Site Conditions Endangering Workers
2022-08-16DOB complaint, category ?
2022-07-13Permit EW — ISSUED
2022-07-07Boiler inspection
2022-07-06Permit Sprinklers — Permit Issued
2022-06-23Permit Mechanical Systems — Permit Issued
2022-06-23Permit Structural — Permit Issued
2022-05-23311: Illegal Parking — Blocked Bike Lane
2022-05-20311: Sidewalk Condition — Blocked - Construction
2022-05-20311: Sidewalk Condition — Blocked - Construction
2022-05-20Permit EW — ISSUED
2022-05-19Permit Plumbing — Permit Issued
2022-05-18311: Illegal Parking — Blocked Bike Lane
2021-04-10311: Illegal Parking — Blocked Bike Lane
2021-01-29Job filed: in conjunction with renovation of existing penthouse apartment on the 16th floor and penthouse. Plumbing work only for the 16th floor, penthouse leve$32,984
2021-01-29Job filed: In conjunction with renovation of penthouse apartment on the 16th floor and penthouse level. New Mechanical work thru the duplex apartment.$89,951
2021-01-29Job filed: in conjunction with renovation of penthouse apartment on the 16th floor and penthouse level. modification work to existing sprinkler$40,000
2021-01-25Job filed: in conjunction with renovation of penthouse apartment on the 16th and penthouse level. structural work on the roof and penthouse level$500,000
2020
2020-12-29311: Street Condition — Blocked - Construction
2020-12-16Bedbug filing: 0 infested units
2020-12-11Job filed: RENOVATION OF EXISTING PENTHOUSE APARTMENT ON THE 16HT FLOOR AND PENTHOUSE LEVEL.(ROOF) MINOR WORK ON THE ROOF. ARCHITECTURAL WORK... NO CHANGE OF $574,280
2019-11-15311: Broken Parking Meter — Coin or Card Did Not Register
2019-10-24311: Illegal Parking — Blocked Bike Lane
2019-10-21311: Broken Parking Meter — No Receipt
2019-10-09311: HEAT/HOT WATER — ENTIRE BUILDING
2019-10-09Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019-10-01311: Illegal Parking — Blocked Bike Lane
2019-09-11Boiler inspection
2019-08-06Elevator permit: Alteration of Two (2 ) Passenger Elevators. All new work in compliance with ASME A17.1-2000/RS A17.1b-2003 with supplements Chapt$20,850
2018-08-13311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2018-07-25Permit EW — ISSUED
2018-07-25Permit EW — ISSUED
2018-07-24Permit EW — ISSUED
2018-07-24Permit PL — ISSUED
2018-07-24Permit EW — ISSUED
2018-07-23Permit EW — ISSUED
2018-07-23Permit EW — ISSUED
2018-07-20Job filed: RENOVATION OF AN EXISTING DWELLING UNIT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPANCY OR EGRESS PROPOSED UNDER THIS APPLICATION.$348,000
2018-07-20Job filed: RENOVATION OF AN EXISTING DWELLING UNIT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPANCY OR EGRESS PROPOSED UNDER THIS APPLICATION.$348,000
2018-07-13Job filed: INSTALLATION OF 3 TON HEAT PUMP IN APT.3N. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$20,000
2018-06-01Job filed: INSTALLATION OF REPEATER AUXILIARY RADIO COMMUNICATION SYSTEM WITH PASSIVE DIS TRIBUTED ANTENNA SYSTEM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$25,000
2018-06-01Job filed: INSTALLATION OF REPEATER AUXILIARY RADIO COMMUNICATION SYSTEM WITH PASSIVE DIS TRIBUTED ANTENNA SYSTEM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$25,000
2018-05-09Boiler inspection
2018-03-22Job filed: INSTALLATION OF AUTOMATIC SMOKE/HEAT/CO DETECTION AND SPRINKLER FIRE ALARM SYSTEM WITH ONE-WAY VOICE COMMUNICATION (ARCS FLED UNDER A SEPERATE APPLIC$100,000
2018-03-22Job filed: STRUCTURAL WORK BEING FILED IN CONJUNCTION WITH LOBBY RENOVATION.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$37,000
2018-03-22Job filed: INTERIOR RENOVATION OF LOBBY, WORK TO INCLUDE MINOR PARTITION CHANGES,REPLACEMENT OF DOORS, LIGHTING AND FINISH WORK.NO CHANGE IN USE, REGRESS, OR OCC$340,000
2018-03-22Job filed: MODIFICATION TO EXISTING SPRINKLER SYSSTEM BEING FILED IN CONJUNCTION WITH LOBBY RENOVATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$18,000
2018-03-22Job filed: MODIFICATION OF EXISTING MECHANICAL DUCTWORK, INSTALLATION OF NEW HVAC UNITS, AND MODIFIED PLUMBING FIXTURES BEING FILED IN CONJUNCTION WITH LOBBY REN$70,000
2018-03-22Job filed: INSTALLATION OF AUTOMATIC SMOKE/HEAT/CO DETECTION AND SPRINKLER FIRE ALARM SYSTEM WITH ONE-WAY VOICE COMMUNICATION (ARCS FLED UNDER A SEPERATE APPLIC$100,000
2018-02-20Facade (LL11) filing, cycle 8: SWARMP
2017
2017-11-16311: Graffiti — Graffiti
2017-10-04FDNY inspection (RISK)
2017-09-30311: For Hire Vehicle Complaint — Driver Complaint
2017-07-21Permit PL — ISSUED
2017-07-20Permit PL — ISSUED
2017-07-20Permit EW — ISSUED
2017-07-20Permit EW — ISSUED
2017-03-08FDNY inspection (RISK)
2017-03-08311: Homeless Person Assistance — N/A
2017-02-24DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
2016-04-18ECB CLASS - 2 violation: FAILURE TO MAINTAIN BLD IN CODE COMPLIANT MANNER.ON THE ABOVE DATE AT 2PM I OBSERVED NEW GAS RISER VALVE INSTALLED W. ASSOCIATED P$500
2016-04-18DOB complaint, category ?
2016-04-15Permit PL — ISSUED
2016-03-30Permit EW — ISSUED
2016-03-17311: Water System — Hydrant Running (WC3)
2016-03-01Permit PL — ISSUED
2016-02-17Permit EW — ISSUED
2016-02-17Permit EW — ISSUED
2016-01-29Job filed: INTERIOR RENOVATION INCLUDING GENERAL CONSTRUCTION, PLUMBING, SPRINKLER AND MECHANICAL WORK. THERE IS NO CHANGE TO USE OCCUPANCY OR EGRESS UNDER THIS $556,410
2016-01-29Job filed: INTERIOR RENOVATION INCLUDING GENERAL CONSTRUCTION, PLUMBING, SPRINKLER AND MECHANICAL WORK. THERE IS NO CHANGE TO USE OCCUPANCY OR EGRESS UNDER THIS $556,410
2016-01-22311: Water System — Hydrant Leaking (WC1)
2015-12-01Job filed: INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$125,000
2015-12-01Job filed: INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$125,000
2015-11-11311: Street Sign - Missing — No Parking, Standing, Stopping
2015-10-19Permit EW — ISSUED
2015-10-16Job filed: INTERIOR DEMOLITION OF PARTITIONS AND PLUMBING AT EXISTING CLASS A APARTMENT. NO CHANGE TO OCCUPANCY, USE OR EGRESS. SUBSEQUENT APPLICATION TO BE FIL$42,010
2015-10-16Job filed: INTERIOR DEMOLITION OF PARTITIONS AND PLUMBING AT EXISTING CLASS A APARTMENT. NO CHANGE TO OCCUPANCY, USE OR EGRESS. SUBSEQUENT APPLICATION TO BE FIL$42,010
2015-09-21RPTT&RET $6,350,000 — from DE SEGONZAC-LEVIN, LAURENCE; LEVIN, MICHAEL to CHIRANIA, MANOJ; JAIN, NIDHI$6,350,000
2015-07-15Job filed: INSTALLATION OF A SPECIAL SERVICE SPRINKLER PUMP ON THE ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$10,000
2015-06-26Permit PL — ISSUED
2015-06-23Permit EW — ISSUED
2015-06-23Permit EW — ISSUED
2015-06-12311: Street Condition — Pothole
2015-04-16Permit EW — ISSUED
2015-04-16Permit PL — ISSUED
2015-04-16Permit EW — ISSUED
2015-04-15Job filed: RENOVATION OF AN EXISTING APARTMENT ON THE 15TH FLOOR. ARCHITECTURAL WORK. NO CHANGE OF USE, OCCUPANCY OR EGRESS.$332,416
2015-04-15Job filed: RENOVATION OF AN EXISTING APARTMENT ON THE 15TH FLOOR. ARCHITECTURAL WORK. NO CHANGE OF USE, OCCUPANCY OR EGRESS.$332,416
2015-04-15Job filed: MECHANICAL, PLUMBING AND SPRINKLER WORK IN CONJUNCTION WITH THE RENOVATION OF AN EXISTING APARTMENT ON THE 15TH FLOOR. NO CHANGE OF USE, OCCUPANCY OR$127,900
2015-04-15Job filed: MECHANICAL, PLUMBING AND SPRINKLER WORK IN CONJUNCTION WITH THE RENOVATION OF AN EXISTING APARTMENT ON THE 15TH FLOOR. NO CHANGE OF USE, OCCUPANCY OR$127,900
2015-04-13Permit EW — ISSUED
2015-03-06Job filed: REPLACE BOILER AND OIL BURNER (NYC BOILER NO. MD37370-01) WITH BOILER AND GAS/OIL BURNER. INSTALL NEW GAS SERVICE, GAS METER AND GAS PIPING.$40,000
2015-03-06Job filed: REPLACE BOILER AND OIL BURNER (NYC BOILER NO. MD37370-01) WITH BOILER AND GAS/OIL BURNER. INSTALL NEW GAS SERVICE, GAS METER AND GAS PIPING.$40,000
2015-03-06Job filed: REPLACE BOILER AND OIL BURNER (NYC BOILER NO. MD37370-01) WITH BOILER AND GAS/OIL BURNER. INSTALL NEW GAS SERVICE, GAS METER AND GAS PIPING.$40,000
2015-03-06Job filed: REPLACE BOILER AND OIL BURNER (NYC BOILER NO. MD37370-01) WITH BOILER AND GAS/OIL BURNER. INSTALL NEW GAS SERVICE, GAS METER AND GAS PIPING.$40,000
2014-11-20Job filed: MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$24,000
2014-11-03Permit EW — ISSUED
2014-10-27Permit EW — ISSUED
2014-09-29Permit PL — ISSUED
2014-09-26Permit AL — ISSUED
2014-09-26Permit SG — ISSUED
2014-09-24Job filed: TO INSTALL A STRUCTURE FOR A WALL ADVERTISING SIGN, SIGN FILED UNDER A SEPARATE APPLICATION.$5,000
2014-09-23Job filed: CHANGE GRADE OF FUEL OIL FROM #6 TO #2 FOR NYC BOILER NO. MD37370-01.$5,000
2014-09-19Job filed: MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$30,000
2014-08-20Job filed: REPLACE BOILER AND OIL BURNER (NYC BOILER NO. MD37370-01) WITH BOILER AND GAS/OIL BURNER. INSTALL NEW GAS SERVICE, METER AND PIPING. CHANGE GRADE OF$25,000
2014-08-04Permit EW — ISSUED
2014-07-22Permit EW — ISSUED
2014-07-18Permit EW — ISSUED
2014-07-15DOB violation E:
2014-07-15DOB violation E:
2014-07-15DOB violation E:
2014-07-15Job filed: PROVIDE NEW MASONRY OPENING AND FENESTRATION. SEE DRAWINGS ATTACHED FOR DETAILS$9,725
2014-07-10Permit EW — ISSUED
2014-07-09Job filed: APPLICATION FILED FOR THE COMBINATION OF APTS 6N AND 6S AS SHOWN ON PLANS FILED HEREWITH AND AS PER TPPN-03-97. PLUMBING WORK AS SHOWN. NO CHANGE IN U$142,250
2014-07-09Job filed: APPLICATION FILED FOR THE COMBINATION OF APTS 6N AND 6S AS SHOWN ON PLANS FILED HEREWITH AND AS PER TPPN-03-97. PLUMBING WORK AS SHOWN. NO CHANGE IN U$142,250
2014-07-01311: Water System — Hydrant Defective (WC2)
2014-06-17RPTT&RET $600,000 — from GALLEN, DAVID to GALLEN, JONATHAN$600,000
2014-05-23Permit PL — ISSUED
2014-05-15DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
2014-05-08Permit EW — ISSUED
2014-05-08Permit EW — ISSUED
2014-05-03311: Water System — Hydrant Running (WC3)
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-19Rodent inspection: Passed
2014-03-18Job filed: MECHANICAL, PLUMBING AND SPRINKLER MODIFICATIONS IN CONJUNCTION WITH RENOVATION WORK OF EXISTING SUITE 3S ON THE 3RD FLOOR. NO CHANGE IN USE, EGRESS O$83,000
2014-03-18Job filed: MECHANICAL, PLUMBING AND SPRINKLER MODIFICATIONS IN CONJUNCTION WITH RENOVATION WORK OF EXISTING SUITE 3S ON THE 3RD FLOOR. NO CHANGE IN USE, EGRESS O$83,000
2014-03-18Job filed: MECHANICAL, PLUMBING AND SPRINKLER MODIFICATIONS IN CONJUNCTION WITH RENOVATION WORK OF EXISTING SUITE 3S ON THE 3RD FLOOR. NO CHANGE IN USE, EGRESS O$83,000
2014-03-18Job filed: RENOVATION OF EXISTING SUITE 3S ON THE 3RD FLOOR. WORK INCLUDES GENERAL CONSTRUCTION, REMOVAL AND INSTALLATION OF INTERIOR NON-LOAD BEARING PARTITIONS$180,000
2014-03-11Permit EW — ISSUED
2014-02-20Job filed: ADD TWO (2) STEAM RADIATORS$1,000
2014-01-14Job filed: REMOVE PARTITION, REINFORCE SOUND RATING AT DEMISING PARTITION, PROVIDE NEW PARTITIONS AND DOOR, PROVIDE NEW MASONRY OPENING AND FENESTRATION, PROVIDE$29,950
2013
2013-12-22311: Noise — Noise: Construction Before/After Hours (NM1)
2013-10-25311: Noise — Noise: Construction Before/After Hours (NM1)
2013-10-09Permit PL — ISSUED
2013-10-04Job filed: REMOVE PARTITION, REINFORCE SOUND RATING AT DEMISING PARTITION, PROVIDE NEW PARTITIONS AND DOOR, PROVIDE NEW MASONRY OPENING AND FENESTRATION, PROVIDE$15,000
2013-10-04Job filed: REMOVE PARTITION, REINFORCE SOUND RATING AT DEMISING PARTITION, PROVIDE NEW PARTITIONS AND DOOR, PROVIDE NEW MASONRY OPENING AND FENESTRATION, PROVIDE$15,000
2013-09-09311: Noise — Noise: Construction Before/After Hours (NM1)
2013-09-08311: Noise — Noise: Construction Before/After Hours (NM1)
2013-09-05311: Noise — Noise: Construction Before/After Hours (NM1)
2013-07-25Permit EW — ISSUED
2013-07-23Job filed: HEREWITH FILE PLANS TO RENOVATE APT. 16NS. WORK TO INCLUDE REMOVAL OF INTERIOR NON LOAD BEARING PARTITION WALL AND NEW PARTITION WALL AND FINISHES, RE$109,600
2013-06-26Permit EW — ISSUED
2013-06-21Job filed: PARTIAL RENOVATION OF APARTMENT #5 ON THE 5TH FLOOR. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$139,000
2013-06-21Job filed: PARTIAL RENOVATION OF APARTMENT #5 ON THE 5TH FLOOR. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$139,000
2013-03-13Job filed: APPLICATION FILED TO REPLACE EXISTING STOREFRONT WITH NEW DOORS AND GLASS. NO INTERIOR WORK IS PROPOSED UNDER THIS APPLICATION. NO CHANGE IN USE, EGRE$8,500
2013-03-13Job filed: APPLICATION FILED TO REPLACE EXISTING STOREFRONT WITH NEW DOORS AND GLASS. NO INTERIOR WORK IS PROPOSED UNDER THIS APPLICATION. NO CHANGE IN USE, EGRE$8,500
2013-03-01DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
2013-01-11Permit EW — ISSUED
2013-01-04311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2012-11-13Job filed: MODIFICATION OF PARTITIONS AND PLUMBING, MECHANICAL AND SPRINKLER WORK IN APARTMENT 7NS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$269,000
2012-11-13Permit EW — ISSUED
2012-11-13Permit EW — ISSUED
2012-08-20Facade (LL11) filing, cycle 7: SAFE
2012-07-31311: Graffiti — Graffiti
2012-03-01DOB violation E:
2012-03-01DOB violation E:
2012-03-01DOB violation E:
2011
2011-12-29311: Graffiti — Graffiti
2011-06-20Rodent inspection: Passed
2011-02-14311: Broken Muni Meter — Credit Card Stuck in Meter
2010
2010-12-18311: HEATING — HEAT
2010-12-18Tenant complaint: HEATING — HEAT RELATED
2010-12-09DOB violation E:
2010-12-09DOB violation E:
2010-11-01311: Noise — Noise: Alarms (NR3)
2010-10-14Permit PL — ISSUED
2010-09-15311: Graffiti — Graffiti
2010-06-25Rodent inspection: Passed
2010-04-14311: General Construction/Plumbing — Site Conditions Endangering Workers
2010-04-14DOB complaint, category ?
2009
2009-08-24Permit EW — ISSUED
2009-08-04DOB violation E:
2009-08-04DOB violation E:
2009-07-07Permit EW — ISSUED
2009-06-30Permit PL — ISSUED
2009-06-12Permit EW — ISSUED
2009-06-12Permit EW — ISSUED
2009-02-25Job filed: RENOVATION OF AN EXISTING APARTMENT #7NS ON 7TH FLOOR. ARCHITECTURAL, MECHANICAL, PLUMBING AND SPRINKLER WORK. NO CHANGE OF USE, OCCUPANCY OR EGRESS.$45,000
2009-01-01DOB violation LL6291:
2008
2008-12-05DOB violation E:
2008-12-05DOB violation E:
2008-10-27Permit PL — ISSUED
2008-10-22DOB complaint, category ?
2008-02-08DOB violation E:
2008-02-08DOB violation E:
2008-02-07Permit EW — ISSUED
2008-02-07Permit EW — ISSUED
2007
2007-12-01Permit EW — ISSUED
2007-11-14Permit EQ — ISSUED
2007-11-08Job filed: ERECT PIPE SCAFFOLD 19 L.F. BY 40 L.F. HIGH AS PER PLAN AT 2 WEST 29 ST. DURING REMEDIAL REPAIRS .WORK SHALL COMPLY WITH LL33/98. NO CHANGE IN USE, E
2007-11-05Job filed: Create two new window opening on west facade and install new windows. No change in use, egress, or occupancy.$15,000
2007-11-05Permit EW — ISSUED
2007-08-16Permit EQ — ISSUED
2007-08-16Permit EQ — ISSUED
2007-08-15Job filed: INSTALL HEAVY DUTY SIDEWALK SHED A TOTAL OF 208 FT LONG AT 2 WEST 29 STREET. DURING REMEDIAL REPAIRS. WORK SHALL COMPLY WITH LL33/91. NO CHANGE IN USE
2007-08-15Job filed: INSTALL HEAVY DUTY SIDEWALK SHED A TOTAL OF 208 FT LONG AT 2 WEST 29 STREET. DURING REMEDIAL REPAIRS. WORK SHALL COMPLY WITH LL33/91. NO CHANGE IN USE
2007-08-13Permit EW — ISSUED
2007-08-08Permit PL — ISSUED
2007-08-02Permit EW — ISSUED
2007-08-02Permit EW — ISSUED
2007-07-10Job filed: Renovate apartment 16N/S. No change to use, egress, or occupancy.$65,000
2007-05-29Job filed: Miscellaneous brick replacement. No change in use, egress or occupancy.$60,000
2007-05-18Permit PL — ISSUED
2007-05-16Permit EW — ISSUED
2007-05-16Permit EW — ISSUED
2007-05-01Job filed: INTERIOR RENOVATION TO INCLUDE REMOVAL OF NON-BEARING PARTITIONS & PLUMBING FIXTURES, INSTALL NEW PARTITION PER NEW LAYOUT, INSTALL NEW PLUMBING F$45,000
2007-04-12Permit EW — ISSUED
2007-04-12Permit EW — ISSUED
2007-04-02DOB violation E:
2007-04-02DOB violation E:
2007-03-22Permit EW — ISSUED
2007-03-21ECB Non-Hazardous violation: WORK W/O PERMIT. WORK NOTED:WORK ONGOING AT APT 3N.UNDER APPLICATION #104700067-REMOVAL OF WOOD FLOORS,REMOVAL OF NON BEARING WALL
2007-03-21DOB complaint, category ?
2007-03-13Job filed: Renovations of existing kitchen interior partitons with minor plumbing and mechanical ventilation work, as indicated on plans. No change in use, occu$22,500
2007-02-21Facade (LL11) filing, cycle 6: SWARMP
2007-01-19DOB violation LL6291:
2006
2006-08-31ECB Non-Hazardous violation: FAILURE TO SUBMIT A 5TH ROUND TECHNICAL REPORT IN COMPLIANCE WITH CODEPROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS AND APPURT
2006-05-19ECB Non-Hazardous violation: FAILURE TO SUBMIT A FIFTH ROUND TECHNICAL REPORT IN COMPLIANCE W/CODE PROVISIONS:PERIODIC INSPECTION OF EXTERIOR WALLS & APPURTENA
2006-05-01Permit EW — ISSUED
2006-04-28Job filed: Installation of new partitions.$17,000
2006-01-31ECB Non-Hazardous violation: FAILURE TO SUBMIT A FIFTH ROUND TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS AND APP
2006-01-06DOB violation LL6291:
2005
2005-10-28ECB Non-Hazardous violation: FAILURE TO SUBMIT A FIFTH ROUND TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS & APP$700
2005-02-11Permit PL — ISSUED
2005-01-31DOB violation LL6291:
2005-01-28Permit EW — ISSUED
2005-01-28Permit EW — ISSUED
2005-01-14Job filed: Combine existing apartments on 8th floor. Work includes partiton changes, plumbing, removal of one kitchen and new air conditioning equipment. This $300,000
2004
2004-03-11Permit EQ — ISSUED
2004-03-10Job filed: Install heavyduty sidewalk shed 40 ft long at 2 West 29 Street - during remedial repairs. Work shall comply with LL33/91. No change in use egress or o
2004-02-13DOB violation LL6291:
2003
2003-11-18AALR — from NCB, FSB to FANNIE MAE
2003-11-18Mortgage assigned — from NCB, FSB to FANNIE MAE
2003-09-12DOB violation E:
2003-09-12DOB violation E:
2003-09-12DOB violation E:
2003-06-10AL&R — from NATIONAL CONSUMER COOPERATIVE BANK to FIFTH AVENUE ARCADE INC.
2003-06-10Mortgage assigned — from NATIONAL CONSUMER COOPERATIVE BANK to NCB, FSB
2003-06-10AALR — from NATIONAL CONSUMER COOPERATIVE BANK to NCB, FSB
2003-06-10Mortgage satisfied — from FIFTH AVENUE ARCADE INC. to THE LINCOLN SAVINGS BANK, FSB.
2003-06-10Mortgage assigned — from NATIONAL CONSUMER COOPERATIVE BANK to FIRST BOSTON MORTGAGE SECURITIES CORP.
2003-06-10Mortgage assigned — from FIRST BOSTON MORTGAGE SECURITIES CORP. to CHEMICAL BANK ( AS TRUSTEE)
2003-06-10Mortgage satisfied — from FIFTH AVENUE ARCADE INC. to NATIONAL CONSUMER COOPERATIVE BANK
2003-06-10AALR — from NATIONAL CONSUMER COOPERATIVE BANK to FIRST BOSTON MORTGAGE SECURITIES CORP.
2003-06-10AALR — from FIRST BOSTON MORTGAGE SECURITIES CORP. to CHEMICAL BANK ( AS TRUSTEE)
2003-06-10Mortgage $1,400,000 — from FIFTH AVENUE ARCADE INC. to NATIONAL CONSUMER COOPERATIVE BANK$1,400,000
2003-06-10TL&R — from FIFTH AVENUE ARCADE, INC. to JP MORGAN CHASE BANK FKA CHEMICAL BANK
2003-03-19DOB violation LL6291:
2002
2002-10-04ECB Non-Hazardous violation: 08V01-46V16-50O02. 08-V-01 ADJUST LEVELING OFF BY 1/4 INCH 46-U-16 ROPE DATA TAG PROVIDE 50-O-02 MACHINE DIRTY WITH OIL PROPERLY C
2002-09-05Agreement — from RENAISSANCE ACQUISITIONS, LLC to FIFTH AVENUE ARCADEINC.
2001-12-03Job filed: Structural changes in conjunction with interior renovation of existing loft apartment at 15th floor. No change of use, occupancy, or egress.$5,000
2001-12-03Job filed: Structural changes in conjunction with interior renovation of existing loft apartment at 15th floor. No change of use, occupancy, or egress.$5,000
2001-12-03Job filed: Mechanical, plumbing and sprinkler changes in conjunction with interior renovation of existing loft apartment at 15th floor. No change of use, occupan$85,000
2001-12-03Job filed: Interior renovation of existing loft apartment at 15th floor. Partition changes. No change of use, occupancy, or egress.$150,000
2001-12-03Job filed: Mechanical, plumbing and sprinkler changes in conjunction with interior renovation of existing loft apartment at 15th floor. No change of use, occupan$85,000
2001-05-01Permit EW — ISSUED
2001-04-26Job filed: Interior renovation of existing residential loft. Partition changes. No change of use, occupancy or egress this application.$10,000
2001-04-26Job filed: Interior renovation of existing residential loft. Partition changes. No change of use, occupancy or egress this application.$10,000
2001-02-27DOB violation LL6291:
2000
2000-09-11Permit EW — ISSUED
2000-08-09Job filed: EXTERIOR REPAIRS TO BUILDING FACADES, LINTEL REPLACMENT, ETC, ALL AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY.$100,000
2000-08-04Permit EQ — ISSUED
2000-08-02Job filed: 8INSTALL HEAVY DUTY SIDEWALK SHED :50' LONG NO CHANGE IN USE, EGRESS, OR OCCUPANCY. WORK SHALL COMPLY WITH LL33/91.
2000-06-08DOB violation E: 1P15695
2000-06-08DOB violation E: 1P15693
2000-06-08DOB violation E: 1P15694
2000-02-07DOB violation LL6291:
1999
1999-09-27Permit PL — ISSUED
1999-09-22Permit EW — ISSUED
1999-09-22Permit EW — ISSUED
1999-08-30Permit EW — ISSUED
1999-08-30Permit EW — ISSUED
1999-05-27ECB Non-Hazardous violation: FAILURE TO OBTAIN A CERTIFICATE OF ELECTRICAL INSPECTION FROM THE BUREAU OF ELECTRICAL CONTROL FOR THE INSTALLATION OF EMERGEN
1999-03-16DOB violation LL6291:
1999-01-20DOB violation LL1081:
1999-01-13Permit EW — ISSUED
1998
1998-11-05ECB Non-Hazardous violation: FAILURE TO PROVIDE EMERGENCY POWER TO EXIT LIGHTS ON FLS 2,3,4,8 IN HALLWAYS TO STAIRCASE EXIT. FAILURE TO PROVIDE EMERGENCY PO$400
1998-11-05ECB Non-Hazardous violation: FAILURE TO FILE A REPORT OF COMPLIANCE W/ LL 16/84-CERTIFYING TO THE INSTALLATION OF REQUIRED FIRE PROTECTION SYSTEMS. REMEDY: F
1998-10-30Permit PL — ISSUED
1998-09-21Permit EW — ISSUED
1998-01-06DOB violation LL1081:
1997
1997-11-07Permit EW — ISSUED
1995
1995-07-17Permit EW — ISSUED
1994
1994-12-15Permit EW — ISSUED
1994-12-15Permit EW — ISSUED
1994-09-01DOB violation LL6291:
1994-09-01DOB violation LL6291:
1994-05-31DOB violation LL1081:
1993
1993-11-19HPD class B: SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF PAINTED SPRINKLERHEADS AT 12 STY PUBLIC HALL.
1993-01-08Permit PL — ISSUED
1992
1992-12-10Permit EW — ISSUED
1992-05-15DOB complaint, category ?
1992-04-06ECB Non-Hazardous violation: FAILURE TO MAINTAIN. DEFECT PARAPET WALL AT PENTHOUSE,ROOF IS UNDER 3'6'HIGH. REMEDY: CONNECT HEIGHT OF PARAPET WALL.$285
1992-04-06ECB Non-Hazardous violation: OCCUPANCY CONTRARY TO CERTIFICATE OF OCCUPANCY. DEFECT: 2ND AND 7TH FLOORS CHANGED TO COMMENCIAL USE. REMEDY: COMPLY WITH CURREN$285
1992-04-06ECB Non-Hazardous violation: ILLEGAL OCCUPANCY CONTRARY TO CERTIFICATE OF OCCUPANCY DEFECT 2ND FL. AND 7TH FLOOR CHANGING TO COMMERICAIL USE. REMEDY: COMPLY WI$1,000
1992-03-27DOB complaint, category ?
1992-03-27DOB complaint, category ?
1991
1991-08-02DOB complaint, category ?
1991-04-19DOB complaint, category ?
1991-04-05ECB Non-Hazardous violation: WORK WITHOUT A PERMIT DEFECT IN THAT HAVING ERECTED A 10'X30' EXTENSION TO STORE WITH LOCKED ROLLDOWN GATES AT 2 W 29 ST WITHOUT H
1991-03-26DOB complaint, category ?
1991-03-15DOB complaint, category ?
1990
1990-10-25DOB complaint, category ?
1990-10-18ECB Non-Hazardous violation: FAILURE TO MAINTAIN: DEFECT IS: NEW PARAPET WALL CONSTRUCTED AT ROOF LEVEL REAR! HEIGHT OF PARAPET WAL AVERAGES BETWEEN 30" TO 37"$230
1990-10-15DOB complaint, category ?
1990-06-01DOB complaint, category ?
1990-04-09DOB complaint, category ?
1989
1989-10-10DOB violation E: (74)RAILING AT MOTOR ROOM STLPS
1989-10-10DOB violation E: (37)SECURE RELAYO BACK SIDE
1989-10-10DOB violation E:
1989-05-16DOB violation E: (51)REMOVE LOCKS FROM ALL HOISTWAY DOORS & CLOSE HOLES(52)PROVIDE CAPACITY PLATE IN CAR(53)REMOVE TOP FLOOR LOCK -OUT KEY SWIT
1989-05-16DOB violation E: (51)REMOVE LOCKS FROM ALL HOISTWAY DOORS & CLOSE HOLES (52)PROVID E CAPACITY PLATE IN ELEV.(53)REMOVE LOCK-OUT KEY SWITCH FOR
1988
1988-12-23Mortgage $499,000 — from FIFTH AVE ARCADE INC to LINCOLN SVGS BK$499,000
1988-10-12ECB Hazardous violation: FAIURE TO PROTECT ROOFS, ROOF OUTLETS OR SKYLIGHTS OF ADJOINING PROPETY DURING CONSTRUCTION OPERATIONS. $500
1988-06-09ECB Non-Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL. DEFECT IS: EXTERIOR MASONARY COLUMN IS CRACKED. REMEDY: REPAIR A REPLACE DEFECTIVE
1987
1987-03-04REL — from CROSSLAND SVGS, FSB to FIFTH AVE ARCADE INC
1987-03-04Mortgage satisfied — from HAMANDY INC; FIFTH AVE ARCADE INC to WENDELL CORP; TROBY ASSOCIATES; ARCADE ASSOC
1987-03-04Mortgage assigned — from EMPIRE SAVINGS BANK to LINCOLN SAVINGS BANK,FSB
1987-03-04Mortgage $334,030 — from FIFTH AVE ARCADE INC to LINCOLN SVGS BK, FSB$334,030
1987-03-04Mortgage assigned — from FIFTH AVE. ARCADE, INC. to LINCOLN SAVINGS BANK
1986
1986-08-25REL — from CROSSLAND SAVINGS FSB to FIFTH AVE ARCADE INC
1984
1984-11-14Agreement — from FIFTH AVE ARCADE, INC. to WENDELL CORPORATION
1984-11-14Mortgage $43,823 — from FIFTH AVE ARCADE, INC. to WENDELL CORPORATION$43,823
1983
1983-07-22Agreement — from 260 DELPHI ASSOCIATES to AMERICAN SAVINGS BANK
1983-01-21Mortgage $56,500 — from FIFTH AVENUE ARCADE,INC to ARCADE ASSOCIATES$56,500
1980
1980-09-08Agreement — from ARCADE ASSOCIATES to FIFTH AVE ARCADE INC
1980-09-08Deed — from ARCADE ASSOCIATIES to FIFTH AVE ARCADEINC
1968
1968-09-26Mortgage assigned — from WEIL, L VICTOR DECD; HAUSSMAN, CAROL W TR; SCHALLER, MAXWELL TR; DANZIGER, FREDERICKS TR to SCHALLER, MAXWELL TR; WEIL, BENJAMIN J DECD; WOLF, SIDNEY TR
1967
1967-09-15Agreement — from MIDTOWN PROPERTIES INC to JAEGER, FRANK E; LEVY, MELVILLE L
1900
1900-01-01Air permit (CERTIFICATE TO OPERATE), fuel: NO2FUEL