The city's published records show little recorded distress here in the last three years. Less recorded distress than 100% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty
points per 10 units; this building carries 0. In ZIP 10003, 67% of residential buildings hold an A and
4% grade D or F.
How grades work
this building
A
B
C
Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
13 service requests in the last three years. Most common: Missed Collection (8) · Noise (2) · Consumer Complaint (1) · Encampment (1) · Homeless Person Assistance (1).
Filed construction activity
$3,231,630 in permitted construction work filed since
2016 (15 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1905)
Yes
Six or more residential units (8)
No
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
40 E 19TH ST CORP
Head officer
AMIT (ANDY) GAUr
Managing agent
BUCHBINDER & WARREN LLC
Last registered
2025-07-25
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$8,584,800
$3,863,160
2026
$10,302,000
$4,635,900
2027
$12,362,000
$5,562,900
The city's market estimate has risen
44% between tax years 2025 and 2027.
For property tax, the Department of Finance values this co-op
as if it were a rental building. Its 2022 estimate: gross income $1,642,891 a year
($48.47 per sq ft), operating expenses $554,522
($16.36 per sq ft), net operating income $1,088,368. These are the
city's estimates from comparable rentals, not the building's actual budget, rents or maintenance
charges.
Building systems
Heating fuel
NO2FUEL
Facade (Local Law 11)
SAFE (cycle 9)
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
14 St-Union Sq — 4 5 6 L N Q R W · 600 ft straight-line (about a 3-minute walk) · station accessibility: partial
Bus
Nearest boarding stop: Park Av South / E 18 St — M1 M2 M3 · 450 ft
Citi Bike
Broadway & E 19 St · 300 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
13 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $450,823 on
2022-04-07 (lender: Investors Bank). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2025-07-10
RPTT&RET $5,750,000 — from GIROUX, RICHARD; GIROUX, AMY to LEE, ANDREW; KWAN, CANDICE
$5,750,000
2025-06-30
Sold for $5,750,000
$5,750,000
$718,750
2022-06-23
RPTT&RET $3,950,000 — from ABRAHAMS, RIAD; ABRAHAMS, TARA to SOKOLOV, LISA; MILLER, MARC
$3,950,000
2022-06-15
Sold for $3,950,000
$3,950,000
$493,750
2022-04-07
Mortgage $450,823 — from 40 E. 19TH ST. CORP. to INVESTORS BANK
$450,823
2022-04-07
Agreement $1,900,000 — from 40 E. 19TH ST. CORP. to INVESTORS BANK
$1,900,000
2022-04-07
AL&R $1,900,000 — from 40 E. 19TH ST. CORP. to INVESTORS BANK
$1,900,000
2019-06-06
RPTT&RET $4,225,000 — from WEINBERG, ZACHARY to GIROUX, AMY; GIROUX, RICHARD
$4,225,000
2019-06-04
Sold for $4,225,000
$4,225,000
$528,125
2017-08-31
RPTT&RET $4,385,000 — from SECREST, MARK F. to STEIN, MARK JOSHUA
$4,385,000
2017-08-25
Sold for $4,385,000
$4,385,000
$548,125
2015-02-25
RPTT&RET $4,606,541 — from MILLER VIRAY, SUSAN; VIRAY, RICO to LEVIN, LINDSAY; LEVIN, DAVID
$4,606,541
2015-02-06
RPTT&RET $5,419,459 — from MILLER VIRAY, SUSAN; VIRAY, RICO to LEVIN, DAVID; LEVIN, LINDSAY
$5,419,459
2014-12-02
Agreement $1,700,000 — from 40 E. 19TH ST. OWNERS CORP.; 40 E. 19TH ST. CORP. to INVESTORS BANK
$1,700,000
2014-12-02
Mortgage $146,754 — from 40 E. 19TH ST. OWNERS CORP.; 40 E. 19TH ST. CORP. to INVESTORS BANK
$146,754
Ten-year activity
50250
2017
26
2018
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
0
5
1
2
2
10
2018
22
0
3
0
1
26
2019
2
3
7
2
2
16
2020
7
0
10
0
1
18
2021
5
1
5
0
1
12
2022
4
1
12
7
1
25
2023
0
2
4
0
2
8
2024
0
0
7
0
1
8
2025
1
0
5
2
2
10
2026
2
1
0
0
1
4
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2023-02-22DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
2023-01-17DOB complaint, category ?
2022
2022-12-20Bedbug filing: 0 infested units
2022-11-20Permit Sidewalk Shed — Signed-off
2022-11-17Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE $5,000
2022-11-16311: Noise — Noise: air condition/ventilation equipment (NV1)
2022-11-09311: Noise — Noise: air condition/ventilation equipment (NV1)
2022-11-09Permit General Construction — Permit Issued
2022-11-01Boiler inspection
2022-10-16311: New Tree Request — For One Address
2022-10-14311: Noise — Noise: air condition/ventilation equipment (NV1)
2022-10-05311: Noise — Noise: air condition/ventilation equipment (NV1)
2022-09-20311: Noise — Noise: air condition/ventilation equipment (NV1)
2022-09-13311: Noise — Noise: air condition/ventilation equipment (NV1)
2022-08-17FDNY inspection (RISK)
2022-06-23RPTT&RET $3,950,000 — from ABRAHAMS, RIAD; ABRAHAMS, TARA to SOKOLOV, LISA; MILLER, MARC$3,950,000
2022-06-15Sold for $3,950,000$3,950,000
2022-06-07311: Noise — Noise: air condition/ventilation equipment (NV1)
2022-04-07Mortgage $450,823 — from 40 E. 19TH ST. CORP. to INVESTORS BANK$450,823
2022-04-07Agreement $1,900,000 — from 40 E. 19TH ST. CORP. to INVESTORS BANK$1,900,000
2022-04-07AL&R $1,900,000 — from 40 E. 19TH ST. CORP. to INVESTORS BANK$1,900,000
2022-04-07TL&R — from INVESTORS BANK to 40 E. 19TH ST. CORP.
2022-04-07Agreement — from 40 E. 19TH ST. CORP. to INVESTORS BANK
2022-02-04Job filed: PARTIAL INTERIOR RENOVATION INCLUDING WALLS AND DOORS RELOCATION$5,000
2022-01-30311: HEAT/HOT WATER — ENTIRE BUILDING
2022-01-30Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2021
2021-12-16Bedbug filing: 0 infested units
2021-11-04Permit Plumbing — Signed-off
2021-09-14311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2021-09-14DOB complaint, category ?
2021-06-28Boiler inspection
2021-06-15311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-04-14311: Encampment — N/A
2021-04-13Job filed: Installation of condensing units, air handling units, and associated ductwork on the 7th floor. No change to use, egress or occupancy.$30,000
2021-04-06Permit EW — ISSUED
2021-04-01Permit EW — ISSUED
2021-03-15311: Noise — Noise: Construction Before/After Hours (NM1)
2021-02-04Permit Plumbing — Signed-off
2020
2020-12-21Bedbug filing: 0 infested units
2020-11-05Permit EW — ISSUED
2020-10-19Job filed: Plumbing work related to the interior renovation in the apartment on the 7th floor. No change to use, egress, or occupancy.$40,000
2020-10-01Job filed: INTERIOR RENOVATION OF APARTMENT #7 INCLUDING INTERIOR PARTITIONS, DOORS AND FINISHES ON THE 7TH FLOOR. MECHANICAL AND PLUMBING WORK TO BE FILED IN DO$275,380
2019-01-09311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2018
2018-11-15Permit EW — ISSUED
2018-11-15Permit EW — ISSUED
2018-10-24311: Homeless Encampment — N/A
2018-10-23311: Homeless Person Assistance
2018-10-23311: Homeless Person Assistance
2018-10-23Permit EW — ISSUED
2018-10-23Permit EW — ISSUED
2018-10-10Job filed: SUBSEQUENT FILING FOR THE STRUCTURAL WORK FOR EXTERIOR RENOVATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$250,000
2018-10-10Job filed: FILING FOR APPROVAL OF EXTERIOR WORK FOR THE EXISTING PENTHOUSE, STRUCTURAL WORK RELATED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$250,000
2018-10-10Job filed: SUBSEQUENT FILING FOR THE STRUCTURAL WORK FOR EXTERIOR RENOVATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$250,000
2018-09-14Permit PL — ISSUED
2018-09-14Permit PL — ISSUED
2018-08-31Permit EW — ISSUED
2018-08-15Permit EW — ISSUED
2018-08-15Permit EW — ISSUED
2018-07-20Permit EW — ISSUED
2018-05-23Boiler inspection
2018-04-26Job filed: RENOVATE EXISTING 6TH FL APARTMENT. REMOVE AND INSTALL INTERIOR PARTITION WORK, PLUMBING WORK, MECHANICAL AND SPRINKLER WORK. NO CHANGE IN USE,EGRESS$320,250
2018-04-26Permit PL — ISSUED
2018-04-02Permit EW — ISSUED
2018-04-02Permit EW — ISSUED
2018-03-21Job filed: FILING FOR MODIFICATION OF EXISTING SPRINKLER SYSTEM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$10,000
2018-03-20Job filed: SUBSEQUENT FILING FOR MECHANICAL AND PLUMBING WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$145,000
2018-03-20Job filed: SUBSEQUENT FILING FOR MECHANICAL AND PLUMBING WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$145,000
2018-03-20Job filed: SUBSEQUENT FILING FOR MECHANICAL AND PLUMBING WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$145,000
2018-03-20Job filed: FILING FOR APPROVAL OF THE INTERIOR RENOVATION OF 9TH & 10TH FLOOR PENTHOUSE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,345,000
2017
2017-12-12311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2017-10-27ECB CLASS - 2 violation: OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY OR BUILDING DEPT RECORDS.AT THE TIME OF INSPECTION I OBSERVED A$600
2017-09-06DOB complaint, category ?
2017-08-31RPTT&RET $4,385,000 — from SECREST, MARK F. to STEIN, MARK JOSHUA$4,385,000
2017-08-25Sold for $4,385,000$4,385,000
2017-08-08ECB CLASS - 2 violation: 16R9,16R9. REDUCE CLEARANCE BETWEEN HOISTWAY DOOR AND PRIVACY DOOR TO6 INCHES AS PER CODE AND REMOVE LOCK; 16R8-REMOVE LOCKS FROM$1,250
2017-08-01DOB violation E:
2017-08-01DOB violation E:
2017-07-10Boiler inspection
2017-06-06Facade (LL11) filing, cycle 8: SWARMP
2016
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-07-16311: Homeless Person Assistance — N/A
2016-07-06DOB violation E:
2016-07-06DOB violation E:
2016-05-18Permit PL — ISSUED
2016-05-13Permit EW — ISSUED
2016-05-13Permit EW — ISSUED
2016-02-02Job filed: APPLICATION IS BEING FILED TO ADD A BATHROOM AS SHOWN ON PLANS. MINOR RECONFIGURATION OF FLOOR LAYOUT FOLLOWING THE NEW BATHROOM. NO CHANGE IN USE, EG$16,000
2015-07-08Job filed: INTERIOR RENOVATION OF EXISTING APARTMENT ON THE 9TH FLOOR AND PENTHOUSE. ARCHITECTURAL AND PLUMBING WORK. NO CHANGE ON USE OCCUPANCY OR EGRESS. ENERG$231,000
2014-05-13Job filed: INSTALLATION CONDENSER AND SPIT UNITS ON 9TH FLOOR AND 10TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$25,000
2014-05-13Job filed: INSTALLATION CONDENSER AND SPIT UNITS ON 9TH FLOOR AND 10TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$25,000
2014-03-07Rodent inspection: Passed
2014-02-25Permit PL — ISSUED
2014-02-21Permit EW — ISSUED
2014-02-05Job filed: INTERIOR RENOVATION OF EXISTING APARTMENT 9 ON THE 9TH FLOOR. ARCHITECTURAL AND PLUMBING WORK. NO CHANGE OF USE, OCCUPANCY, OR EGRESS.$65,000
2013
2013-08-01Permit PL — ISSUED
2013-07-08Permit EW — ISSUED
2013-07-01RPTT&RET — from MILLER, SUSAN to MILLER VIRAY, SUSAN; VIRAY, RICO
2013-06-20DOB violation E:
2013-06-20DOB violation E:
2013-06-18311: Noise — Noise: Construction Equipment (NC1)
2013-05-30311: Noise — Noise: air condition/ventilation equipment (NV1)
2013-05-21Job filed: COMBINATION OF TWO APARTMENTS AT THE SECOND FLOOR. NO CHANGE IN USE, EGRESS O R OCCUPACY FILED UNDER THIS APPLICATION.$155,000
2013-05-01Permit EW — ISSUED
2013-04-23Job filed: CONSTRUCTION OF NEW 8' NON-LOAD BEARING PARTITIONS TO CREATE A COAT AND STORAGE CLOSET ON THE 3RD FLOOR APARTMENT, AS PER PLANS FILED HEREWITH. NO CH$8,000
2013-04-02RPTT&RET $3,000,000 — from ESTATE OF JACQUELINE END; JOSEPH ARLOTTA, EXECUTOR to ABRAHAMS, TARA; ABRAHAMS, RIAD$3,000,000
2013-03-12311: Noise — Noise: Construction Before/After Hours (NM1)
2013-01-24Vacate order: Fire Damage (1 units)
2013-01-23HPD class I: SECTION 27-2142 ADM CODE APTS HAVE BEEN VACATED BY THIS DEPARTMENT AND CANNOT BE REOCCUPIED UNTIL SO ORDERED AFTER PROOF OF COMPLIANCE FOR A
2013-01-04HPD class C: SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF FIRE DAMAGE WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT
2012
2012-12-07Rodent inspection: Passed
2012-12-06RPTT&RET $3,395,000 — from GRAY, SUSANNAH; LYONS, JOHN F to MILLER, SUSAN; VIRAY, RICO$3,395,000
2011-09-15Job filed: CONSTRUCTION OF NEW PARTITIONS; INSTALLATION OF WINDOWS; INSTALLATION OF PLUMBING FIXTURES AND HVAC SYSTEM; NO CHANGE TO USE, EGRESS OR OCCUPANCY.$178,312
2011-07-15Permit EW — ISSUED
2011-07-13Job filed: DEMOLITION OF INTERIOR NON-LOADBEARING PARTITIONS; NO CHANGE TO USE, EGRESS OR OCCUPANCY; SEE COMMENTS.$8,000
2011-06-28Permit EW — ISSUED
2011-06-27Rodent inspection: Passed
2011-06-23DOB violation E:
2011-06-23DOB violation E:
2011-06-14Permit PL — ISSUED
2011-04-29ECB CLASS - 2 violation: 70P16. 70P-PROVIDE ACCESS TO PIT (NOTE: PARKING DEVICE).
2011-03-31Permit EW — ISSUED
2011-03-25Permit EW — ISSUED
2011-03-15Permit EW — ISSUED
2011-03-07Job filed: INTERIOR DEMOLITION OF EXISTING APARTMENT NUMBER 7 ON THE 7TH FLOOR. ARCHITECTURAL WORK. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$20,000
2011-03-07Job filed: INTERIOR DEMOLITION OF EXISTING APARTMENT NUMBER 7 ON THE 7TH FLOOR. ARCHITECTURAL WORK. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$20,000
2011-03-04Job filed: RENOVATION OF AN EXISTING APARTMENT #7 ON THE 7TH FLOOR. ARCHITECTURAL AND PLUMBING WORK. NO CHANGE OF USE, OCCUPANCY, OR EGRESS.$140,700
2011-01-10RPTT&RET $3,800,000 — from GLICK, ALEXIS; GLICK, OREN to MICHALOW, DANIEL$3,800,000
2010
2010-12-15Permit EW — ISSUED
2010-08-30RPTT&RET $3,500,000 — from DESENA, NEIL V to WEINBERG, ZACHARY$3,500,000
2009-11-02Job filed: REPLACE, RELOCATE, INSTALL NEW PLUMBING FIXTURES. .$7,000
2009-11-02Job filed: PROPOSE TO INSTALL NEW STRUCTURAL FRAMING FOR CONVENIENCE STAIR.$24,000
2009-11-02Job filed: INSTALL AND RELOCATED SPRINKLER HEADS AND RELATED PIPING. AS SHOWN ON DRAWINGS FILED HEREWITH NO CHANGE IN USE,EGRESS OR OCCUPANCY$5,000
2009-11-02Job filed: PROPOSE TO INSTALL NEW STRUCTURAL FRAMING FOR CONVENIENCE STAIR.$24,000
2009-11-02Job filed: INSTALL AND RELOCATED SPRINKLER HEADS AND RELATED PIPING. AS SHOWN ON DRAWINGS FILED HEREWITH NO CHANGE IN USE,EGRESS OR OCCUPANCY$5,000
2009-11-02Job filed: PROPOSE TO DEMOLISH EXISTING INTERIOR PARTITIONS, CEILINGS AND DOORS. INSTALL NEW CONVENIENCE STAIR, INSTALL NEW PARTITIONS, CEILINGS AND DOORS. AS S$117,750
2009-11-02Job filed: REPLACE, RELOCATE, INSTALL NEW PLUMBING FIXTURES. .$7,000
2009-11-02Job filed: INSTALL AND RELOCATED SPRINKLER HEADS AND RELATED PIPING. AS SHOWN ON DRAWINGS FILED HEREWITH NO CHANGE IN USE,EGRESS OR OCCUPANCY$5,000
2009-07-15Job filed: MODIFICATIONS TO SPRINKLER HEADS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$5,000
2009-07-15Job filed: MODIFICATIONS TO SPRINKLER HEADS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$5,000
2009-07-15Job filed: GENERAL CONSTRUCTION WITHIN RESIDENTIAL LOBBY INCLUSIVE OF RELOCATION OF SECURITY DOOR AND RENOVATIONS TO FLOORING AND FINISHES. NO CHANGE IN USE, EG$40,000
2009-07-15Job filed: GENERAL CONSTRUCTION WITHIN RESIDENTIAL LOBBY INCLUSIVE OF RELOCATION OF SECURITY DOOR AND RENOVATIONS TO FLOORING AND FINISHES. NO CHANGE IN USE, EG$40,000
2008
2008-12-18DOB violation E:
2008-12-18DOB violation E:
2008-08-08ECB CLASS - 2 violation: 16I10.100M07 16I10 9 & 5 FL DOORS BOTTOM OF DOORS CUT OFF 100M07 LANDING SILLS MISSING ON 8 & 5 & 2 FL$500
2005-10-05AALR — from NCB, FSB to LASALLE BANK NATIONAL ASSOCIATION
2005-10-05Mortgage assigned — from NCB, FSB to LASALLE BANK NATIONAL ASSOCIATION
2005-09-13DOB violation E:
2005-09-13DOB violation E:
2005-09-13DOB violation E:
2005-08-30ECB Non-Hazardous violation: NO CONTRACTOR SIGN WAS OBSERVED ON THE SIDEWALK SHED AT THIS ADDRESS REMEDY:POST SIGN AS REQUIRED$500
2005-08-30ECB Non-Hazardous violation: FAILURE TO POST PERMIT HOLDER SIGNS AS REQUIRED BY THE ADMIN CODE.NOTENO PERMIT HOLDER SIGN OBSERVED FOR THE SIDEWALK SHED AT THIS$400
2005-08-10Permit EW — ISSUED
2005-08-03Permit EQ — ISSUED
2005-07-29Job filed: Install 80 lf of sidewalk shed for exterior work. No change in use , egress or occupancy.
2004-12-30Job filed: Interior renovation of existing class "A" apartment at 6th floor. No change of use, egress or occupancy.$60,000
2004-12-28AL&R — from NATIONAL CONSUMER COOPERATIVE BANK to A/K/A 40 E. 19TH ST. OWNERS CORP.; 40 E. 19TH ST. CORP.
2004-12-28Mortgage $1,300,000 — from A/K/A 40 E. 19TH ST. OWNERS CORP.; 40 E. 19TH ST. CORP. to NATIONAL CONSUMER COOPERATIVE BANK$1,300,000
2004-12-28AL&R — from NATIONAL CONSUMER COOPERATIVE BANK to 40 E. 19TH ST.CORP.; A/K/A 40 E. 19TH ST. OWNERS CORP.
2004-12-28AALR — from NATIONAL CONSUMER COOPERATIVE BANK to NCB, FSB
2004-12-28Mortgage assigned — from NATIONAL CONSUMER COOPERATIVE BANK to NCB, FSB
2004-12-28Mortgage $500,000 — from A/K/A 40 E. 19TH ST. OWNERS CORP.; 40 E. 19TH ST.CORP. to NATIONAL CONSUMER COOPERATIVE BANK$500,000
2004-08-04Permit PL — ISSUED
2004-07-20Permit EW — ISSUED
2004-06-30Job filed: Mechanical work related to the apartment renovation on the 5th floor.$15,000
2004-06-29Job filed: Modification to rear windows and door to the fire escape of existing apartment on the 5th floor. This application is filed in conjunction with #103795$10,000
2004-05-28Job filed: Plumbing and sprinkler work related to the apartment renovation on the 5th floor.$25,000
2004-05-27Job filed: A2$80,000
2004-04-23Permit EW — ISSUED
2004-04-01Job filed: To install HVAC unit. No change in use egress or occupancy.$10,000
2004-01-09Permit PL — ISSUED
2004-01-09Permit PL — ISSUED
2003
2003-10-21Permit EW — ISSUED
2003-09-17DOB violation E:
2003-09-17DOB violation E:
2003-07-28Job filed: To rearrange non bearing partitions, rearrange bathrooms & kitchen & perform gen. construction work which includes relocating 2 elecric hot wa$12,000
2003-04-17DOB violation LANDMK:
2002
2002-11-18DOB complaint, category ?
2002-10-29DOB complaint, category ?
2002-10-24DOB violation E: 1P3894
2002-10-24DOB violation E: 1P3895
2002-09-11Permit PL — ISSUED
2002-08-15Permit EW — ISSUED
2002-08-15Permit EW — ISSUED
2002-08-08DOB violation L1198:
2002-07-03Permit EW — ISSUED
2002-06-27Job filed: COMBINE APARTMENTS 9F&9R INTO ONE UNIT R EARRANGE NON LOAD BEARING INTER OR PARTITIONS TO CREATE NEW ROOMSVKITCHE N & BATHROOMS RELOCATE &$57,000
2002-06-26Job filed: REPLACE EXISTING STAIR FROM 1ST FLOOR TO CELLAR WITH NEW STAIR ,INSTALL NEW 2 PEICE BATH ROOM IN CELLAR AS PER ATTACHED PLAN. NO$12,000
2001
2001-08-17DOB violation E: 1P3894
2001-08-17DOB violation E: 1P3895
2000
2000-07-12DOB violation E: 1P3895
2000-07-12DOB violation E: 1P3894
2000-03-27Mortgage assigned — from NATIONAL CONSUMER COOPERATIVE BANK to FEDERAL NATIONAL MORTGAGE ASSOCIATION
2000-03-27Mortgage assigned — from NATIONAL CONSUMER COOPERATIVE BANK to FEDERAL NATIONAL MORTGAGE ASSOCIATION
1999
1999-12-13ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL. DEFECT IS CONCRETE TERRACES THROUGHT BUILDING HAVE AREAS OF MISSING CONCRETE WITH EXP$2,500
1998
1998-08-26Mortgage assigned — from NCB MORTGAGE CORPORATION to NATIONAL CONSUMER COOPERATIVE BANK
1998-08-26Mortgage assigned — from 40 E. 19TH ST. OWNERS CORP. to NCB MORTGAGE CORPORATION
1998-08-26Mortgage $451,966 — from 40 E. 19TH ST. OWNERS CORP. to CLARK FINANCIAL SERVICES INC$451,966
1998-08-26Mortgage $17,403 — from 40 E. 19TH ST. OWNERS CORP to NCB MORTGAGE CORPORATION$17,403
1998-08-26Agreement — from 40 E. 19TH ST. OWNERS CORP. to NCB MORTGAGE CORPORATION
1998-08-26SAGE — from VIENNA MORTGAGE CORP.
1998-08-26Mortgage assigned — from VIENNA MORTGAGE CORP. to NCB MORTGAGE CORPORATION
1998-08-26Mortgage assigned — from NCB MORTGAGE CORPORATION to NATIONAL CONSUMER COOPERATIVE BANK
1998-08-26SAGE — from VIENNA MORTGAGE CORP.
1995
1995-03-22Permit PL — ISSUED
1994
1994-11-03HPD class B: § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER EAST BATHROOM 10 STY SOUTHEAST APT PH
1994-11-03HPD class B: § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF CONCEALED LEAK CEILING NORTHEAST ROOM LOWER LEVEL 10 STY SOUTHEAST APT PH
1994-11-03HPD class A: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILINGS & WALLS EAST BATHROOM & NORTHEAST
1994-11-03HPD class B: § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE GLASS SKYLIGHT AT TOP LEVEL 10 STY SOUTHEAST APT PH
1990-01-02DOB violation E: (10)FILE FOR AND HAVE INSPECTED AFTER APPROVEED.(74)HAVE ELEVATOR ANSWER ALL CALLS. A)REPAIR OR RENEW CAR FLOOR. (74)B*REMOVE
1990-01-02DOB violation E: (15) REMOVE ALL ILLEGAL LOCK (KEY ON MANUAL)
1990-01-02DOB violation E: (15)REMOVE ALL ILLEGAL LOCK (KEY ON MANUAL)
1989
1989-10-13SAGE — from LANDMARKS PRSVN CMMSN
1987
1987-12-29Agreement — from 40 E 19 ST OWRS CP to CLARK FINANCIAL SVCSINC
1987-12-29Agreement — from 40 E 19 ST OWNERS CP to CLARK FINANCIAL SVCSINC
1987-12-29Mortgage assigned — from CLARK FINANCIAL SVCSINC to WASHINGTON MTGE GP INC
1987-12-29Mortgage assigned — from CLARK FINANCIAL SVCSINC to WASHINGTON MTGE GROPINC
1987-12-29Mortgage assigned — from CITIBANK, N.A. to CLARK FINANCIAL SVCSINC
1987-12-29Mortgage assigned — from 40 E 19 ST OWRS CP to CLARK FINANCIAL SVCSINC
1987-12-29Mortgage $451,966 — from 40 E 19 ST OWNERS CP to CLARK FINCIAL SVCS INC$451,966
1986
1986-12-12Air permit (WORK PERMIT), fuel: NO4FUEL
1983
1983-08-15Mortgage satisfied — from GOLDWEP REALTY CORP. to NEMEROFF, MAE; BANK LEUMI TR. CO./N.Y.
1983-08-15Mortgage $336,900 — from 40 E 19 ST. OWNERS CORP to CITIBANK, N.A.$336,900
1983-08-15Mortgage satisfied — from KAUFMAN, ETYAN to FOUR STAR HOLDING CO.
1982
1982-06-22SAGE — from 1519 LOFT ASSOCIATES
1982-05-06DECL — from 40 E. 19TH ST OWNERSCRP; FOUR STAR HOLDING CO.; BANK LEUMI TRUST CO/NY
1982-05-06LEAS — from 1519 LOFT ASSOCIATES to SCULPTURE ASSOC.LTD.,INC
1979
1979-12-07Deed — from KAUFMAN, EYTAN to 1519 LOFT ASSOCIATES
1979-12-07Deed — from 1519 LOFT ASSOCIATES to 40 E 19TH ST ASSOCIATES
1978
1978-07-17Mortgage — from KAUFMAN, EYTAN to FOUR STAR HOLDING CO
1978-07-17Deed — from GOLDWEP REALTY CORP to FOUR STAR HOLDING CO
1978-07-17Agreement — from GOLDWEP REALTY CORP to NEMEROFF, MAE
1978-07-17Mortgage assigned — from FOUR STAR HOLDING CO to BANK LEUMI TR CO NY
1978-07-17Mortgage — from GOLDWEP REALTY CORP to NEMEROFF, MAE
1978-07-17Mortgage assigned — from BANK LEUMI TRUST OFNY to NEMEROFF, MAE
1978-07-17Deed — from FOUR STAR HOLDING CO to KAUFMAN, EYTAN
1978-07-17Deed — from FOUR STAR HOLDING CO to GOLDWEP REALTY CORP
1978-07-17Mortgage assigned — from NEMEROFF, MAE to FOUR STAR HOLDING CO
1978-02-22Mortgage — from GOLDWEP REALTY CORP to BANK LEUMI TRUST OFNY
1978-02-22Deed — from GOLDWEP REALTY CORP to FOUR STAR HOLDING CO
1978-02-22Deed — from FOUR STAR HOLDING CO to GOLDWEP REALTY CORP
1978-02-10Deed — from MONTE REALTY CO INC to FOUR STAR HOLDING CO
1900
1900-01-01Air permit (CERTIFICATE TO OPERATE), fuel: NO4FUEL