The city's published records show little recorded distress here in the last three years. Less recorded distress than 62% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty
points per 10 units; this building carries 10. In ZIP 10022, 72% of residential buildings hold an A and
6% grade D or F.
How grades work
this building
A
B
C
Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
42 service requests in the last three years. Most common: For Hire Vehicle Complaint (12) · Sewer (5) · Food Establishment (4) · Noise (3) · Sidewalk Condition (3) · UNSANITARY CONDITION (3).
Filed construction activity
$1,190,265 in permitted construction work filed since
2016 (26 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1875)
Yes
Six or more residential units (23)
No
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
ZURICH HOLDING CO LLC
Head officer
ZOHAR BENDOV
Managing agent
BUCHBINDER & WARREN LLC
Last registered
2025-07-18
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$22,875,000
$10,293,750
2026
$24,320,000
$10,944,000
2027
$21,784,000
$9,802,800
The city's market estimate has fallen
5% between tax years 2025 and 2027.
4 Food Establishment complaints to 311 at this address in the last three years (most often: Food Temperature, Food Worker Hygiene, Rodents/Insects/Garbage), shared by 2 restaurants · complaints filed by the public; DOHMH investigates, outcomes aren't published.
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
14 street-flooding or sewer-backup complaints at this address since
2015 (5 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
5 Av/59 St — N R W · 750 ft straight-line (about a 4-minute walk) · station accessibility: none 59 St — 4 5 6 N R W · 900 ft straight-line (about a 4-minute walk) · station accessibility: none
Bus
Nearest boarding stop: Madison Av / E 58 St — M1 M2 · 100 ft
Citi Bike
E 58 St & Madison Ave · 150 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
42 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $18,948,389 on
2008-01-07 (lender: Washington Mutual Bank, A Federal Association), covering 3 lots — the amount covers all of them. Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2024-05-30
Agreement $46,382,000 — from J-2 LLC; ZURICH HOLDING CO. LLC; 2-J LLC to APPLE BANK
$46,382,000
2024-05-30
AL&R $46,382,000 — from J-2 LLC; 2-J LLC; ZURICH HOLDING CO. LLC to APPLE BANK
$46,382,000
2017-12-29
Agreement $48,882,000 — from J-2 LLC; 2-J LLC; ZURICH HOLDING CO. LLC to BANK LEUMI USA
$48,882,000
2017-12-29
AL&R $48,882,000 — from 2-J LLC; ZURICH HOLDING CO. LLC; J-2 LLC to BANK LEUMI USA
$48,882,000
2014-12-01
AL&R $48,882,000 — from 2-J LLC; ZURICH HOLDING CO. LLC; J-2 LLC to BANK LEUMI USA
$48,882,000
2014-12-01
Agreement $48,882,000 — from 2-J LLC; ZURICH HOLDING CO. LLC; J-2 LLC to BANK LEUMI USA
$48,882,000
2010-12-10
RPTT $750,000 — from SASSOON, EDUARDO to ZURICH HOLDING CO, LLC
$750,000
2008-01-07
Agreement $50,000,000 — from ZURICH HOLDING CO., LLC; 2-J LLC; J-2 LLC to WASHINGTON MUTUAL BANK, A FEDERAL ASSOCI
$50,000,000
2008-01-07
Mortgage $18,948,389 — from J-2 LLC; 2-J LLC; ZURICH HOLDING CO., LLC to WASHINGTON MUTUAL BANK, A FEDERAL ASSOCI
$18,948,389
2001-03-02
Mortgage $250,000 — from J-2 LLC; 2-J LLC; ZURICH HOLDING CO. LLC to DIME SAVINGS BANK OFNEW YORK
$250,000
1998-07-30
Mortgage $7,416,666 — from ZURICH HOLDING CO LLC to DIME SAVINGS BANK OFNEW YORK
$7,416,667
1995-02-07
Mortgage $5,000,000 — from ZURICH HOLDING CO to STERLING NATIONAL BANK & TRUST COMPANY O
$5,000,000
1987-01-30
Mortgage $300,000 — from CLUB OASIS INC to JAY HOLDINGS INC
$300,000
1985-12-09
Mortgage $2,609,061 — from ZURICH HOLDING CO to MORGAN GUARANTY ETCTRST
$2,609,061
1982-01-29
Mortgage $750,000 — from ZURICH HOLDING CO. to CHEMICAL BANK
$750,000
Ten-year activity
50250
2017
2018
36
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
4
2
10
3
1
20
2018
2
1
18
0
2
23
2019
18
0
14
0
4
36
2020
11
2
5
0
1
19
2021
7
2
8
0
3
20
2022
5
0
11
0
1
17
2023
5
1
12
0
2
20
2024
4
0
7
4
7
22
2025
0
0
21
0
3
24
2026
4
1
26
0
3
34
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
HPD class C: § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING HOOK AND EYE INSTALLED AT SOUTH DOOR LEADING TO PARTY BALCONY
2026-07-08
311: Obstruction — Cone
2026-07-07
311: Sidewalk Condition — Broken Sidewalk
2026-06-29
Job filed: HEREWITH FILE TO CONVERT FROM EXISTING DELI STORE TO BAGEL STORE. WORK SCOPE TO INCLUDE INSTALLATION AND REARRAGEMENT OF EQUIPEMENT AS WELL AS REFINIS
HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM NORTH LOC
2026-05-13
HPD class C: HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FR
311: Noise — Noise: Construction Before/After Hours (NM1)
2026-03-09
Permit Mechanical Systems — Signed-off
2026-03-09
Permit General Construction — Signed-off
2026-01-12
Job filed: HEREWITH FILE TO CONVERT FROM EXISTING DELI STORE TO BAGEL STORE. WORK SCOPE TO INCLUDE INSTALLATION AND REARRAGEMENT OF EQUIPEMENT AS WELL AS REFINIS
2025-12-23
Bedbug filing: 0 infested units
2025-12-23
Bedbug filing: 0 infested units
2025-10-30
311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-10-30
311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-10-30
311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-10-30
311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-10-30
311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-10-30
311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-10-30
311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-10-30
311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-10-30
311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-10-30
311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-10-30
311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-07-11HPD class C: § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING HOOK AND EYE INSTALLED AT SOUTH DOOR LEADING TO PARTY BALCONY
2026-06-29Job filed: HEREWITH FILE TO CONVERT FROM EXISTING DELI STORE TO BAGEL STORE. WORK SCOPE TO INCLUDE INSTALLATION AND REARRAGEMENT OF EQUIPEMENT AS WELL AS REFINIS$45,000
2026-05-13HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM NORTH LOC
2026-05-13HPD class C: HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FR
2026-03-19311: Noise — Noise: Construction Before/After Hours (NM1)
2026-03-09Permit Mechanical Systems — Signed-off
2026-03-09Permit General Construction — Signed-off
2026-01-12Job filed: HEREWITH FILE TO CONVERT FROM EXISTING DELI STORE TO BAGEL STORE. WORK SCOPE TO INCLUDE INSTALLATION AND REARRAGEMENT OF EQUIPEMENT AS WELL AS REFINIS$45,000
2025
2025-12-23Bedbug filing: 0 infested units
2025-12-23Bedbug filing: 0 infested units
2025-10-30311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-10-30311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-10-30311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-10-30311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-10-30311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-10-30311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-10-30311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-10-30311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-10-30311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-10-30311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-10-30311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-05-02311: Food Establishment — Food Temperature
2024-02-08Job filed: ERECT NON-ILLUMINATED ACCESSORY WALL SIGN-A2 @ EAST 58 STREET ELEVATION, NON-FLASHING, NON-ADVERTISING SIGN, NO CHANGE IN USE, EGRESS, OR OCCUPANCY$500
2024-02-08Job filed: ERECT NON-ILLUMINATED ACCESSORY WALL SIGN-A1 @ MADISON AVENUE ELEVATION, NON-FLASHING, NON-ADVERTISING SIGN, NO CHANGE IN USE, EGRESS, OR OCCUPANCY$500
2023-11-20Permit General Construction — Signed-off
2023-11-13Job filed: INTERIOR RENOVATION OF EXG RETAIL. TO REMOVE NON-LOADBEARING PARTITION WALL, REPLACE FLOORING, AND INSTALL DISPLAY MILLWORK.REFER TO PLAN FOR ADDITION$100,170
2022-06-18311: Broken Parking Meter — Out of Order
2022-05-26311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-05-26Permit Sign — Permit Issued
2022-05-14311: Lost Property — Electronics/Phones
2022-05-12311: Food Poisoning — 3 or More
2022-04-29Permit General Construction — Permit Issued
2022-04-27Job filed: APPLICATION FILED FOR AN ILLUMINATED BUSINESS SIGN ON WALL. SIGN TO READ "WOLFORD" NOT WITHIN VIEW OF AN ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR$7,500
2022-04-26Job filed: Application filed for interior renovation of non-load bearing partitions, ceilings and finishes for retail space (Wolford) on the cellar and 1st floor$128,025
2022-03-20311: Illegal Dumping — Removal Request
2022-03-18311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-02-17Bedbug filing: 0 infested units
2022-02-15HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2022-02-15HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2022-02-09Job filed: Propose mechanical modifications, installation of HVAC units at cellar and 001 floors all as per plans herewith filed. No change in use, egress or occ$175,000
2021-06-15Asbestos abatement: Removal — The Asbestos Contractor, Inc.
2021-06-07Job filed: INSTALLATION OF 300PSF SIDEWALK SHED & PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE IN USE, E$5,000
2021-06-07Permit Supported Scaffold — Signed-off
2021-06-07Permit Sidewalk Shed — Signed-off
2021-05-26311: Taxi Complaint — Driver Complaint - Non Passenger
2021-05-26311: Noise — Noise: Construction Equipment (NC1)
2021-05-14Job filed: Propose mechanical modifications, installation of HVAC units at cellar and 001 floors all as per plans herewith filed. No change in use, egress or occ$175,000
2020-08-30311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-08-09Permit Supported Scaffold — Signed-off
2020-08-06Job filed: INSTALLATION OF TEMPORARY (52'-65') HIGH PIPE SCAFFOLD AT VARIOUS LEVELS FOR FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE$1,000
2020-08-05Boiler inspection
2020-06-30Permit Supported Scaffold — Signed-off
2020-06-02Permit Sidewalk Shed — Signed-off
2020-06-02Permit Supported Scaffold — Signed-off
2020-06-02Permit Sidewalk Shed — Signed-off
2020-05-14Job filed: PLUMBING WORK RELATED TO ALTERATION TYPE II APPLICATION 123725585 FOR 2ND FLOOR GENERAL CONSTRUCTION WORK. POST APPROVAL AMENDMENT TO REFLECT FIXTURE $8,580
2020-03-19DOB complaint, category ?
2020-02-27Job filed: PLUMBING WORK RELATED TO ALTERATION TYPE II APPLICATION 123725585 FOR 2ND FLOOR GENERAL CONSTRUCTION WORK. NO CHANGE IN OCCUPANCY, USE OR EGRESS UNDER$10,010
2020-02-03311: Homeless Person Assistance — N/A
2020-01-31311: Missed Collection (All Materials) — 1RG Missed Recycling Paper
2020-01-27Permit EW — ISSUED
2020-01-17Permit Plumbing — Signed-off
2020-01-13Job filed: PLUMBING WORK RELATED TO ALTERATION TYPE II APPLICATION 123725585 FOR 2ND FLOOR GENERAL CONSTRUCTION WORK. POST APPROVAL AMENDMENT TO REFLECT FIXTURE $8,580
2019
2019-12-20Job filed: REMOVE AND INSTALL NEW NON-LOAD BEARING INTERIOR PARTITIONS, DOORS, FINISHES & APPLIANCES. NO CHANGE IN OCCUPANCY, USE OR EGRESS. PLUMBING FILED U$50,000
2019-12-20Job filed: REMOVE AND INSTALL NEW NON-LOAD BEARING INTERIOR PARTITIONS, DOORS, FINISHES & APPLIANCES. NO CHANGE IN OCCUPANCY, USE OR EGRESS. PLUMBING FILED U$50,000
2019-12-20Job filed: REMOVE AND INSTALL NEW NON-LOAD BEARING INTERIOR PARTITIONS, DOORS, FINISHES & APPLIANCES. NO CHANGE IN OCCUPANCY, USE OR EGRESS. PLUMBING FILED U$50,000
2019-12-19Bedbug filing: 0 infested units
2019-12-19Bedbug filing: 0 infested units
2019-10-14Permit EW — ISSUED
2019-10-03311: Taxi Complaint — Driver Complaint - Non Passenger
2019-09-12311: Industrial Waste — Grease In Sewer/Catch Basin (IDG)
2019-07-16Eviction executed
2019-07-16Eviction executed
2019-06-28Job filed: APPLICATION FILED FOR FACADE REPAIR LOCAL LAW 11/98. NO CHANGE TO USE EGRESS OR OCCUPANCY.$50,000
2019-06-28Job filed: APPLICATION FILED FOR FACADE REPAIR LOCAL LAW 11/98. NO CHANGE TO USE EGRESS OR OCCUPANCY.$50,000
2019-06-26Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2019-06-26Permit Supported Scaffold — Signed-off
2019-06-21Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2019-06-21Permit Sidewalk Shed — Signed-off
2019-06-18Permit Supported Scaffold — Signed-off
2019-06-17Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2019-06-13311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-06-11Permit Sidewalk Shed — Signed-off
2019-06-10Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2019-05-28Permit EW — ISSUED
2019-05-28Permit EW — ISSUED
2019-05-28Permit PL — ISSUED
2019-05-24Job filed: REPLACE BOILER AND GAS/OIL BURNER (NYC BOILER NO. 69099-01) WITH BOILER AND GAS BURNER. DECOMMISSION OIL TANK AND REPLACE SECTION OF CHIMNEY PER PLAN$137,000
2017-07-20Job filed: INSTALLATION OF MANUAL AND AUTOMATIC SMOKE/HEAT DETECTION & SPRINKLER FA SYSTEM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$9,800
2017-06-11311: Special Projects Inspection Team (SPIT) — Advertising Sign/Billboard/Posters/Flexible Fabric - Illegal
2017-06-11DOB complaint, category ?
2017-05-23Job filed: INTERIOR RENOVATION OF EXISTING RETAIL STORE WITH GENERAL CONSTRUCTION, MECHANICAL WORK AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR OCCUPA$34,000
2017-05-23Permit EW — ISSUED
2017-05-23Permit EW — ISSUED
2017-05-14311: Noise — Noise: Construction Before/After Hours (NM1)
2016-08-27311: Broken Muni Meter — Coin or Card Did Not Register
2016-05-25311: Water System — Hydrant Running Full (WA4)
2016-05-05311: Broken Muni Meter — Coin or Card Did Not Register
2016-02-19311: Noise — Noise: Construction Equipment (NC1)
2016-02-11311: Broken Muni Meter — Coin or Card Did Not Register
2016-02-10311: Noise — Noise: Construction Before/After Hours (NM1)
2016-02-10311: Noise — Noise: Construction Before/After Hours (NM1)
2016-02-04311: Noise — Noise: Construction Equipment (NC1)
2016-01-27Job filed: LEGALIZATION OF EXISTING MANUAL & AUTOMATIC SMOKE DETECTION & SPRINKLER FA SYSTEM IN COMPLIANCE WITH FDNY LETTER DATED 12/09/215 (FPI#1511075)$5,000
2016-01-25Permit EW — ISSUED
2016-01-25Permit EW — ISSUED
2015
2015-12-29311: Broken Muni Meter — Coin or Card Did Not Register
2015-12-26311: Street Condition — Pothole
2015-12-10311: Noise — Noise: Construction Before/After Hours (NM1)
2015-12-09311: Broken Muni Meter — Coin or Card Did Not Register
2015-11-30311: Water System — Leak (Use Comments) (WA2)
2015-11-30311: Water System — Leak (Use Comments) (WA2)
2015-11-17311: General Construction/Plumbing — Failure To Maintain
2015-11-17DOB complaint, category ?
2015-11-04Job filed: REMOVAL OF WALL FINISHES, PARTITIONS, DOORS,FIXTURES AND MECHANICAL EQUIPMENT AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$15,000
2015-11-04Job filed: REMOVAL OF WALL FINISHES, PARTITIONS, DOORS,FIXTURES AND MECHANICAL EQUIPMENT AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$15,000
2014-12-01AL&R $48,882,000 — from 2-J LLC; ZURICH HOLDING CO. LLC; J-2 LLC to BANK LEUMI USA$48,882,000
2014-12-01Mortgage assigned — from FEDERAL DEPOSIT INSURANCE CORPORATION to WASHINGTON MUTUAL BANK
2014-12-01Mortgage assigned — from FEDERAL DEPOSIT INSURANCE CORPORATION to WASHINGTON MUTUAL BANK
2014-12-01Agreement $48,882,000 — from 2-J LLC; ZURICH HOLDING CO. LLC; J-2 LLC to BANK LEUMI USA$48,882,000
2014-12-01Mortgage assigned — from JPMORGAN CHASE BANK , NATIONAL ASSOCIATI to BANK LEUMI USA
2014-12-01Mortgage assigned — from FEDERAL DEPOSIT INSURANCE CORPORATION to WASHINGTON MUTUAL BANK
2014-11-10DOB violation E:
2014-08-08Job filed: INSTALLATION OF SPRINKLER/STANDPIPE SYSTEM FOR 6 STORY NEW BUILDING.$368,000
2014-08-08Job filed: INSTALLATION OF SPRINKLER/STANDPIPE SYSTEM FOR 6 STORY NEW BUILDING.$368,000
2014-08-08Job filed: INSTALLATION OF MANUAL & AUTOMATIC SMOKE/HEAT DETECTION & SP FA SYSTEM WITH VO ICE COMMUNICATION SYSTEM & PURGE SYSTEM$60,000
2014-07-10311: Broken Muni Meter — Coin or Card Did Not Register
2014-06-30311: Broken Muni Meter — Coin or Card Did Not Register
2014-06-20311: Broken Muni Meter — Coin or Card Did Not Register
2014-05-29FDNY inspection (RISK)
2014-05-22FDNY inspection (RISK)
2014-05-20FDNY inspection (RISK)
2014-05-16FDNY inspection (RISK)
2014-05-11311: Special Projects Inspection Team (SPIT) — Illegal Hotel Rooms In Residential Building
2014-05-11DOB complaint, category ?
2014-04-16Job filed: PROPOSE TO ERECT 7 STORY NEW RETAIL AND OFFICE BUILDING.
2014-04-16Job filed: FOUNDATION AND STRUCTURAL PLANS FOR 6 STORY NEW BUILDING.
2014-04-16Job filed: INSTALLATION OF PLUMBING AND MECHANICAL SYSTEMS FOR 6 STORY NEW BUILDING.
2014-04-16Job filed: PROPOSE TO ERECT 7 STORY NEW RETAIL AND OFFICE BUILDING.
2014-04-16Job filed: INSTALLATION OF PLUMBING AND MECHANICAL SYSTEMS FOR 6 STORY NEW BUILDING.
2014-04-16Job filed: FOUNDATION AND STRUCTURAL PLANS FOR 6 STORY NEW BUILDING.
2012-10-25Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2012-10-25Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2012-10-25Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2012-10-25Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2012-10-25Permit EQ — ISSUED
2012-10-25Permit EQ — ISSUED
2012-10-25Permit EQ — ISSUED
2012-10-08311: Broken Muni Meter — No Receipt
2012-10-05311: Food Establishment — Odor
2012-09-26311: For Hire Vehicle Complaint — Driver Complaint
2012-09-19Rodent inspection: Passed
2012-09-19Permit EQ — ISSUED
2012-09-18Job filed: REPAIRS TO FACADE OF BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION.$75,000
2012-09-17Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2012-09-10311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2012-09-10DOB complaint, category ?
2012-08-02DOB violation E:
2012-07-26Permit EQ — ISSUED
2012-07-25Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2012-07-25Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2012-07-25Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2012-07-25Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2012-07-25Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2012-07-25Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2012-07-25Permit EQ — ISSUED
2012-07-25Permit EQ — ISSUED
2012-07-25Permit EQ — ISSUED
2012-07-24Job filed: INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2012-07-24Job filed: INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2012-07-24Permit EQ — ISSUED
2012-06-28311: PLUMBING — WATER-SUPPLY
2012-06-28Tenant complaint: PLUMBING — WATER SUPPLY
2012-03-17311: Drinking — Underage - Licensed Est
2012-01-28311: Public Payphone Complaint — Phone Blocking Sidewalk
2011-10-15Tenant complaint: HEATING — HEAT RELATED
2011-09-30311: Noise - Vehicle — Car/Truck Horn
2011-09-16311: Noise - Vehicle — Car/Truck Horn
2011-09-16311: Noise Survey — People Created Noise
2011-08-29Permit PL — ISSUED
2011-07-26Permit PL — ISSUED
2011-07-26Permit EW — ISSUED
2011-07-26Permit EW — ISSUED
2011-07-15Permit EW — ISSUED
2011-06-30Job filed: MODIFY EXISTING SPRINKLER SYSTEM ON SECOND FLOOR ONLY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$26,500
2011-06-30Job filed: INSTALL MECHANICAL VENTILATION AND PLUMBING FIXTURES ON SECOND FLOOR ONLY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$42,000
2011-06-20Permit PL — ISSUED
2011-06-06Rodent inspection: Passed
2011-06-02Permit EW — ISSUED
2011-06-02Permit EW — ISSUED
2011-05-31Job filed: INSTALLATION OF MINOR INTERIOR PARTITIONS, NEW DOORS, NEW CEILING AND INTERIOR FINISHES IN THE 2ND FL AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPA$50,000
2011-05-31Job filed: INSTALLATION OF MINOR INTERIOR PARTITIONS, NEW DOORS, NEW CEILING AND INTERIOR FINISHES IN THE 2ND FL AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPA$50,000
2011-05-31Job filed: MODIFICATION TO MECHANICAL DUCT LAYOUT WITH THE INSTALLATION OF TWO A/C UNITS AND REPLACEMENT OF PLUMBING FIXTURES ON THE 2ND FL AS PER PLANS. NO CHAN$28,000
2010-05-13Job filed: INSTALL CONVENIENCE STAIR BETWEEN 1ST AND 2ND FLOORS AS PER PLANS FILED HEREWI TH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$25,000
2010-05-13Job filed: INSTALL CONVENIENCE STAIR BETWEEN 1ST AND 2ND FLOORS AS PER PLANS FILED HEREWI TH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$25,000
2010-05-13Job filed: INSTALL CONVENIENCE STAIR BETWEEN 1ST AND 2ND FLOORS AS PER PLANS FILED HEREWI TH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$25,000
2010-02-01311: HEATING — HEAT
2010-02-01Tenant complaint: HEATING — HEAT RELATED
2010-01-30311: HEATING — HEAT
2010-01-30Tenant complaint: HEATING — HEAT RELATED
2010-01-22311: HEATING — HEAT
2010-01-22Tenant complaint: HEATING — HEAT RELATED
2010-01-10311: HEATING — HEAT
2010-01-10Tenant complaint: HEATING — HEAT RELATED
2009
2009-12-19Tenant complaint: HEATING — HEAT RELATED
2009-11-24Tenant complaint: HEATING — HEAT RELATED
2009-11-17Permit EW — ISSUED
2009-11-06Tenant complaint: HEATING — HEAT RELATED
2009-10-28Tenant complaint: HEATING — HEAT RELATED
2009-10-15Tenant complaint: HEATING — HEAT RELATED
2009-09-14Permit EW — ISSUED
2009-09-10DOB complaint, category ?
2009-09-09Job filed: INSTALL AUTOMATIC FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH JOB#120078165. NO CHANGE IN USE, EGRESS OR OCCUPANCY. GAS VALVE WAS FILED IN JOB#1010229$3,000
2009-09-09Job filed: INSTALL AUTOMATIC FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH JOB#120078165. NO CHANGE IN USE, EGRESS OR OCCUPANCY. GAS VALVE WAS FILED IN JOB#1010229$3,000
2009-08-25Permit PL — ISSUED
2009-08-21Permit EW — ISSUED
2009-08-21Permit EW — ISSUED
2009-08-20Permit EW — ISSUED
2009-08-20Permit EQ — ISSUED
2009-08-03Job filed: INTERIOR RENOVATION FOR EXISTING STORE ON FIRST FLOOR AND INSTALL PLUMBING FIXTURE. THERE IS NO CHANGE OCCUPANCY, USE OR EGRESS.$95,000
2009-08-03Job filed: INTERIOR RENOVATION FOR EXISTING STORE ON FIRST FLOOR AND INSTALL PLUMBING FIXTURE. THERE IS NO CHANGE OCCUPANCY, USE OR EGRESS.$95,000
2009-08-03Job filed: INTERIOR RENOVATION FOR EXISTING STORE ON FIRST FLOOR AND INSTALL PLUMBING FIXTURE. THERE IS NO CHANGE OCCUPANCY, USE OR EGRESS.$95,000
2009-07-24DOB complaint, category ?
2009-07-23DOB complaint, category ?
2009-07-09Permit EW — ISSUED
2009-07-09Permit EW — ISSUED
2009-07-08Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED 50' LONG X 8' - 12' HIGH X 10' WIDE DURING EXTERIOR MASONRY REPAIRS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER
2009-07-08Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED 50' LONG X 8' - 12' HIGH X 10' WIDE DURING EXTERIOR MASONRY REPAIRS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER
2009-07-08Permit EQ — ISSUED
2009-07-02Permit EQ — ISSUED
2009-07-01Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED 50' LONG X 8' - 12' HIGH X 10' WIDE DURING EXTERIOR MASONRY REPAIRS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER
2009-07-01Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED 50' LONG X 8' - 12' HIGH X 10' WIDE DURING EXTERIOR MASONRY REPAIRS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER
2009-06-12Permit EW — ISSUED
2009-06-12Permit EW — ISSUED
2009-06-10Job filed: PROPOSED INTERIOR RENOVATION TO EXISTING RETAIL ESTABLISHMENT. PARTITION WORK, MECHANICAL WORK, RENOVATION TO STOREFRONT. NO CHANGE IN USE EGRESS AND $368,000
2009-06-10Job filed: PROPOSED INTERIOR RENOVATION TO EXISTING RETAIL ESTABLISHMENT. PARTITION WORK, MECHANICAL WORK, RENOVATION TO STOREFRONT. NO CHANGE IN USE EGRESS AND $368,000
2009-06-05Job filed: PROPOSED TO ERECT TEMPORARY FENCE AT FRONT OF STORE DURING SOTREFRONT RENOVATION. NO CHANGE IN USE EGRESS AND OCCUPANCY.
2009-06-05Job filed: PROPOSED TO ERECT TEMPORARY FENCE AT FRONT OF STORE DURING SOTREFRONT RENOVATION. NO CHANGE IN USE EGRESS AND OCCUPANCY.
2009-06-05Job filed: PROPOSED TO ERECT TEMPORARY FENCE AT FRONT OF STORE DURING SOTREFRONT RENOVATION. NO CHANGE IN USE EGRESS AND OCCUPANCY.
2009-01-25Tenant complaint: HEATING — HEAT RELATED
2009-01-09Permit EW — ISSUED
2009-01-09Permit EW — ISSUED
2008
2008-12-10Job filed: REPLACE AND REPAIR WINDOW AND BRICK FACADE AS PER PLANS FILED$67,500
2008-12-10Job filed: REPLACE AND REPAIR WINDOW AND BRICK FACADE AS PER PLANS FILED$67,500
2008-11-09Tenant complaint: HEATING — HEAT RELATED
2008-11-07Job filed: STRUCTURAL MODIFICATIONS IN CONJUNCTION WITH INTERIOR REMOVALS AS PER PLANS FI LED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY FILED UNDER THIS AP$5,000
2008-11-07Job filed: INTERIOR REMOVALS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCC UPANCY FILED UNDER THIS APPLICATION.$5,000
2008-11-07Job filed: INTERIOR REMOVALS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCC UPANCY FILED UNDER THIS APPLICATION.$5,000
2008-11-07Job filed: INTERIOR REMOVALS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCC UPANCY FILED UNDER THIS APPLICATION.$5,000
2008-10-24Tenant complaint: HEATING — HEAT RELATED
2008-09-18Job filed: PA
2008-09-18Job filed: PA
2008-08-14Permit PL — ISSUED
2008-08-14Permit PL — ISSUED
2008-06-13DOB complaint, category ?
2008-05-13DOB violation E:
2008-05-02Facade (LL11) filing, cycle 6: SWARMP
2008-04-14DOB complaint, category ?
2008-03-17DOB complaint, category ?
2008-03-14Permit EW — ISSUED
2008-03-14Permit EW — ISSUED
2008-03-07Job filed: REMOV TENANT PARTITIONS /PLUMBNG FIXZTURES AS PER PLANS$25,000
2008-03-07Job filed: REMOVAL AND IONSTALLATION OF TENANT PARTITIONS AND PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY FILED UNDER T$10,000
2008-03-07Job filed: REMOV TENANT PARTITIONS /PLUMBNG FIXZTURES AS PER PLANS$25,000
2008-03-07Job filed: REMOVAL AND IONSTALLATION OF TENANT PARTITIONS AND PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY FILED UNDER T$10,000
2008-03-03Tenant complaint: HEATING — HEAT RELATED
2008-01-07Mortgage assigned — from WASHINGTON MUTUAL BANK, A FEDERAL ASSOCI; THE DIME SAVINGS BANK OF NEW YORK, FSB to LASALLE BANK NATIONAL ASSOCIATION, AS TR
2008-01-07Agreement $50,000,000 — from ZURICH HOLDING CO., LLC; 2-J LLC; J-2 LLC to WASHINGTON MUTUAL BANK, A FEDERAL ASSOCI$50,000,000
2008-01-07Mortgage assigned — from WASHINGTON MUTUAL BANK, A FEDERAL to WASHINGTON MUTUAL BANK, A FEDERAL ASSOCI
2008-01-07Mortgage assigned — from WASHINGTON MUTUAL BANK, A FEDERAL to WASHINGTON MUTUAL BANK, A FEDERAL ASSOCI
2008-01-07Mortgage $18,948,389 — from J-2 LLC; 2-J LLC; ZURICH HOLDING CO., LLC to WASHINGTON MUTUAL BANK, A FEDERAL ASSOCI$18,948,389
2008-01-07Mortgage assigned — from THE DIME SAVINGS BANK OF NEW YORK, FSB; WASHINGTON MUTUAL BANK, A FEDERAL ASSOCI to LASALLE BANK NATIONAL ASSOCIATION, AS TR
2007
2007-11-30DOB violation LL1198:
2007-11-30DOB violation LL1198:
2007-10-29Tenant complaint: GENERAL — WINDOWS
2007-10-29Tenant complaint: GENERAL — WINDOWS
2007-09-12Permit AL — ISSUED
2007-09-12Permit AL — ISSUED
2007-09-05Job filed: NON ILLUMINATED NON ADVERTISING ACCESSORY BUSINESS AWNING WORDING - FOGAL NO CHANGE TO USE, EGRESS OR OCCUPANCY$2,000
2007-09-05Job filed: NON ILLUMINATED NON ADVERTISING ACCESSORY BUSINESS AWNING WORDING - FOGAL NO CHANGE TO USE, EGRESS OR OCCUPANCY$3,000
2007-09-05Job filed: NON ILLUMINATED NON ADVERTISING ACCESSORY BUSINESS AWNING WORDING - FOGAL NO CHANGE TO USE, EGRESS OR OCCUPANCY$2,000
2007-09-05Job filed: NON ILLUMINATED NON ADVERTISING ACCESSORY BUSINESS AWNING WORDING - FOGAL NO CHANGE TO USE, EGRESS OR OCCUPANCY$3,000
2007-08-07Permit EW — ISSUED
2007-08-02Job filed: REMOVAL AND REPLACEMENT OF SHEEROCK HUNG CEILLING AS PRE PLANS. NO CHANGE IN OCCUPANCY,USE, OR EGRESS.$15,000
2007-07-17Permit PL — ISSUED
2007-07-03DOB violation E:
2007-07-02DOB complaint, category ?
2007-06-13Permit EW — ISSUED
2007-06-13Permit EW — ISSUED
2006
2006-12-16DOB complaint, category ?
2006-11-28Permit EW — ISSUED
2006-11-28Permit EW — ISSUED
2006-11-08Job filed: Apt 6B: Remove and install interior partitions, HVAC equipment, plumbing fixtures and finishes at existing apartment as per plans filed herewith. Inst$40,000
2006-07-17Permit EW — ISSUED
2006-07-12Job filed: Renovation of an existing store on the first floor including new storefront. Architectural work. Change in egress. No change in use or occupancy. Fenc$40,000
2006-07-12Job filed: Renovation of an existing store on the first floor including new storefront. Architectural work. Change in egress. No change in use or occupancy. Fenc$40,000
2006-06-26Permit EW — ISSUED
2006-06-26Permit EQ — ISSUED
2006-06-19Job filed: Interior demolition of an existing store on the first floor and removal of existing storefront. No new construction work to be done under this applica$10,000
2006-06-19Job filed: Interior demolition of an existing store on the first floor and removal of existing storefront. No new construction work to be done under this applica$10,000
2006-02-04DOB complaint, category ?
2006-01-07DOB complaint, category ?
2005
2005-12-02Permit EW — ISSUED
2005-12-02Permit PL — ISSUED
2005-12-01Permit EQ — ISSUED
2005-12-01Permit EW — ISSUED
2005-12-01Permit EW — ISSUED
2005-12-01Permit EW — ISSUED
2005-11-15Job filed: Structural work in conjunction with the renovation of a hair salon at the first and second floors. Change of use filed under DOB application #1042415$20,000
2005-11-15Job filed: Mechanical, plumbing and sprinkler work in conjunction with the renovation of a hair salon at the cellar, first and second floors. Change of use file$130,000
2005-11-15Job filed: Interior renovation of a hair salon at the cellar, first and second floors . Architectural work. Change of use filed under DOB application #104241544$70,000
2005-11-15Job filed: Interior renovation of a hair salon at the cellar, first and second floors . Architectural work. Change of use filed under DOB application #104241544$70,000
2005-11-15Job filed: Structural work in conjunction with the renovation of a hair salon at the first and second floors. Change of use filed under DOB application #1042415$20,000
2005-11-15Job filed: Mechanical, plumbing and sprinkler work in conjunction with the renovation of a hair salon at the cellar, first and second floors. Change of use file$130,000
2005-11-14Job filed: Structural work in conjunction with the renovation of a hair salon at the first and second floors. Change of use filed under DOB application #1042415$20,000
2005-11-14Job filed: Mechanical, plumbing and sprinkler work in conjunction with the renovation of a hair salon at the cellar, first and second floors. Change of use file$130,000
2005-11-02Job filed: Installation of new Non Coded I.F.A. fire alarm system in a hair salon at the cellar, first and second floors. Change of use filed under DOB applicati$15,000
2005-11-02Job filed: Interior renovation of a hair salon at the cellar, first and second floors . Architectural work. Change of use filed under DOB application #104241544$70,000
2005-11-02Job filed: Installation of new Non Coded I.F.A. fire alarm system in a hair salon at the cellar, first and second floors. Change of use filed under DOB applicati$15,000
2005-10-31Permit EQ — ISSUED
2005-10-28Job filed: Installation of construction fence. No change of use, occupancy or egress.
2005-10-20Tenant complaint: HEATING — HEAT RELATED
2005-10-19Tenant complaint: HEATING — HEAT RELATED
2005-10-16Tenant complaint: HEATING — HEAT RELATED
2005-09-23Permit AL — ISSUED
2005-09-23Permit EQ — ISSUED
2005-09-22Job filed: Renovation and conversion of an existing retail space to beauty salon on cellar, first and second floors. Architectural work. Amended Certificate of$125,000
2005-06-09Mortgage assigned — from WASHINGTON MUTUAL BANK, FA, A FEDERAL AS to LASALLE BANK NATIONAL ASSOCIATION, AS TR
2005-06-06Permit EW — ISSUED
2005-06-02Job filed: Interior demolition of existing retail space at the first and second floor. Architectural work. No change of use, occupancy or egress.$20,000
2005-06-02Job filed: Interior demolition of existing retail space at the first and second floor. Architectural work. No change of use, occupancy or egress.$20,000
2005-04-22Tenant complaint: PLUMBING — TOILET
2004
2004-02-17Permit PL — ISSUED
2004-02-17Permit EW — ISSUED
2004-01-21Permit EW — ISSUED
2004-01-21Permit EW — RE-ISSUED
2004-01-03ECB Non-Hazardous violation: PLACE OF ASSEMBLY EXIT DOOR NOT SELF CLOSING AT MEZZAZINE LEVEL ON EAST SIDE OF PREMISES EXIT DOOR NOT SELF CLOSING REMEDY:MAKE EX
2004-01-03ECB Non-Hazardous violation: PLACE OF ASSEMBLY EXIT SIGN DOES NOT MEET BULDRY CODE STANDARDS DEFECTIS EXIT SIGN ILLUMINATED & NONE DIRECTIONAL.REMEDY:REPAIR /O
2004-01-03DOB complaint, category ?
2003
2003-12-09Job filed: PERFORM STRUCTURAL WORK AT 4TH & 5TH FLOOR APARTMENTS BY INSTALLING NEW FLOOR JOISTS AND PERFORM REPAIR WORK AT BRICK WALL. NO CHANGE TO USE, OCCU$25,000
2003-11-25Job filed: PERFORM MINOR INTERIOR RENOVATION AT 4TH & 5TH FLOOR APARTMENTS AND 6TH & PENTHOUSE DUPLEX. PEFORM PLUMBING WORK AND INSTALL 2 NEW GAS FIRD FI$97,000
2003-11-18Permit EW — ISSUED
2003-11-18Permit EQ — ISSUED
2003-11-18Permit EW — ISSUED
2003-10-28Permit EW — ISSUED
2003-10-27Job filed: Remove partitions and ceiling, erect partitions and ceiling. Install new storefront and modify HVAC system. No change in use, occupancy or egress unde$28,000
2003-10-27Job filed: Remove partitions and ceiling, erect partitions and ceiling. Install new storefront and modify HVAC system. No change in use, occupancy or egress unde$28,000
2003-10-10Job filed: INSTALL FIRE SUPPRESIION SYSTEM ONLY NO CHANGE IN USE EGRESS OR OCCUPANC Y.$3,000
2003-10-10Job filed: INSTALL FIRE SUPPRESIION SYSTEM ONLY NO CHANGE IN USE EGRESS OR OCCUPANC Y.$3,000
2003-01-03ECB Non-Hazardous violation: 16B07 - REMOVE OBSTRUCTION OVERHEAD OF BASEMENT DOOR TO ALLOW FULL OPENING. SECURE ALL OVERHEAD, GREENFIELD FINISH AREA AROUND DOO
2002
2002-12-20DOB complaint, category ?
2002-12-12Job filed: New seating layout as per plan submitted. There will be no change in use, egress or occupancy under this application.$1,000
2002-11-26DOB complaint, category ?
2002-04-25ECB Hazardous violation: FAILURE TO PROVIDE PLACE OF ASEMBLY PLAN AT TIME OF INSPECTION PLACE OF ASSEMBLY PLANS ARE REQUIRED AT TIME OF INSPECTION TO CONFI$200
2002-04-25DOB violation C:
2002-03-25ECB Hazardous violation: CEASE USE 50U16/ 54U16/ 38U16/ ( 01X11 ) 15B09/ 50 - 54 - 37 PROPERLY TAG DEVICE SWITCH WITH CITY ID NO. 01X11 EMERGENCY STOP$500
2001
2001-03-08DOB violation LL1081:
2001-03-05DOB complaint, category ?
2001-03-02Mortgage $250,000 — from J-2 LLC; 2-J LLC; ZURICH HOLDING CO. LLC to DIME SAVINGS BANK OFNEW YORK$250,000
2001-03-02Mortgage assigned — from ZURICH HOLDING CO. LLC to DIME SAVINGS BANK OFNEW YORK
2001-03-02Agreement — from ZURICH HOLDING CO. LLC; J-2 LLC to DIME SAVINGS BANK OFNEW YORK
2000
2000-12-04DOB complaint, category ?
2000-11-03HPD class A: § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ceiling and walls IN THE 2nd ROOM FROM NORTH LOCATE
2000-09-26DOB violation E: 1P17252
2000-09-01ECB Hazardous violation: FAILURE TO MAINTAIN DEFECT NOTED:THE 1 1/2" BYPSUM PLASTED WITH ROCK LATH CEILING APPROX. 5'-0" WIDE X 14'0" LONG SEPERATED FROM T$800
2000-08-30DOB complaint, category ?
2000-03-21Permit PL — ISSUED
2000-03-02Job filed: REMOVAL OF EXISTING GAS METERS FOR APARTMENTS ON BUILDINGS #34 AND 36 AND INSTAL L A MASTER METER FOR ALL APARTMENTS IN BOTH BUILDINGS, WITH NEW RISER$6,000
2000-03-02Job filed: REMOVAL OF EXISTING GAS METERS FOR APARTMENTS ON BUILDINGS #34 AND 36 AND INSTAL L A MASTER METER FOR ALL APARTMENTS IN BOTH BUILDINGS, WITH NEW RISER$6,000
2000-01-31Permit EW — ISSUED
2000-01-13DOB complaint, category ?
1999
1999-12-03Permit EQ — ISSUED
1999-11-18Permit EQ — ISSUED
1999-11-17Permit EW — ISSUED
1999-11-17Permit EW — ISSUED
1999-11-15Permit EQ — ISSUED
1999-11-12Permit EW — ISSUED
1999-11-12Permit EW — ISSUED
1999-06-28Permit AL — ISSUED
1999-06-28Permit AL — ISSUED
1999-05-26City emergency repair (OMO): pa roof terrace : on roof install new guard rail at front north section approx. 75 l.f. with proper bracing 42' x 75 ' (
1999-05-24Permit EQ — ISSUED
1999-05-05Permit EW — ISSUED
1999-04-26Permit EQ — ISSUED
1999-04-26Permit EW — ISSUED
1999-03-11DOB complaint, category ?
1999-03-11DOB complaint, category ?
1999-03-11DOB complaint, category ?
1999-02-26DOB violation E: 1P17252
1999-02-10Permit PL — ISSUED
1999-01-28Permit EW — ISSUED
1999-01-25Permit EW — ISSUED
1999-01-25Permit EW — ISSUED
1999-01-13Permit EW — ISSUED
1998
1998-11-04Permit PL — ISSUED
1998-11-04Permit PL — ISSUED
1998-11-02DOB complaint, category ?
1998-10-30Permit EW — ISSUED
1998-09-08Permit EW — ISSUED
1998-09-04Permit EW — ISSUED
1998-09-04Permit EW — ISSUED
1998-07-30Deed — from ZURICH HOLDING CO., to ZURICH HOLDING CO. LLC,
1998-07-30Mortgage $7,416,666 — from ZURICH HOLDING CO LLC to DIME SAVINGS BANK OFNEW YORK$7,416,667
1998-07-30Agreement — from ZURICH HOLDING CO.,LLC to DIME SAVINGS BANK OFNEW YORK
1998-07-30Mortgage assigned — from ZURICH HOLDING CO.,LLC to DIME SAVINGS BANK OFNEW YORK
1998-07-30Mortgage assigned — from STERLING NATIONAL BANK & TRUST COMPANY O to DIME SAVINGS BANK OFNEW YORK
1998-07-30SAGE — from STERLING NATIONAL BANK & TRUST COMPANY O
1998-07-20Permit EW — ISSUED
1998-06-11HPD class B: § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF GATES ERECTED AT 3 STY PUBLIC HALL & STAIRS.
1998-04-13Permit SG — ISSUED
1998-03-03Permit EW — ISSUED
1998-01-28Permit EW — ISSUED
1998-01-28Permit EW — ISSUED
1996
1996-09-05Permit EW — ISSUED
1996-05-10DOB complaint, category ?
1996-04-05ECB Non-Hazardous violation: FAILURE TO PROVIDE APPROVED PLANS AT PREMISES AT TIME OF INSPECTION. REQUIRED UNDER APPLICATION 101112546-01EW-01. REMEDY- PROVID$200
1996-04-05ECB Hazardous violation: WORK DOES NOT CONFORM TO APPROVED PLANS. WORK NOTED: PORTION OF BEARING WALL ITERIOR SOUTH WEST SIDE OF CELLAR UNDEWR PINNED. PORT$350
1996-03-14Permit EQ — ISSUED
1996-02-05Permit EQ — ISSUED
1996-01-12DOB complaint, category ?
1995
1995-10-23Permit EW — ISSUED
1995-10-23Permit EW — ISSUED
1995-10-23Permit EQ — ISSUED
1995-07-31Permit EW — ISSUED
1995-07-26Permit EQ — ISSUED
1995-04-18Permit PL — ISSUED
1995-04-04Permit EW — ISSUED
1995-03-30Permit EW — ISSUED
1995-03-01Permit PL — ISSUED
1995-02-09Permit EW — ISSUED
1995-02-09Permit EQ — ISSUED
1995-02-09Permit EW — ISSUED
1995-02-07Mortgage assigned — from MORGAN GUARANTY TRUST COMPANY OF NEW YOR to STERLING NATIONAL BANK TRUST COMPANY OF
1995-02-07Mortgage assigned — from ZURICH HOLDING CO to STERLING NAITONAL BANK & TRUST COMPANY
1995-02-07SAGE — from MORGAN GUARANTY TRUST COMPANY OF NEW YOR
1995-02-07Mortgage $5,000,000 — from ZURICH HOLDING CO to STERLING NATIONAL BANK & TRUST COMPANY O$5,000,000
1994
1994-09-01Permit AL — ISSUED
1994-07-05Permit PL — ISSUED
1994-06-22DOB violation PA:
1994-06-16Permit EW — ISSUED
1994-06-16Permit EQ — ISSUED
1994-06-16Permit EW — ISSUED
1994-06-14DOB complaint, category ?
1994-01-10ECB Non-Hazardous violation: FAILURE TO FILE A REPORT OF COMPLIANCE WITH LOCAL LAW 16/84 CERTIFYINGTO THE INSTALLATION OF REQUIRED FIRE PROTECTION SYSTEMS. REM
1993
1993-09-29ECB Non-Hazardous violation: OCCUPANCY CONTRARY TO THAT ALLOWED BY C OF O C OF O #86568 STATES THATTHE 5TH FLOOR TO BE OCCUPIED AS APARTMENTS PREMISES AT 5TH F$350
1993-09-27DOB complaint, category ?
1993-09-08Permit EW — ISSUED
1993-09-02DOB violation C:
1993-09-02DOB violation C:
1993-08-11DOB violation E:
1993-07-29Permit AL — ISSUED
1993-03-12DOB complaint, category ?
1993-01-20Permit AL — ISSUED
1992
1992-07-01DOB violation LL1080:
1992-03-25DOB complaint, category ?
1991
1991-11-12DOB violation E:
1991-11-08DOB complaint, category ?
1991-11-07DOB complaint, category ?
1991-09-03DOB complaint, category ?
1991-07-20DOB violation C:
1991-05-31ECB Non-Hazardous violation: USE OF PROHIBITED HARDWARE (SLIDE BOLT LOCK)ON 2ND MEANS OF EGGRESS. REMEDY:REMOVE ILLEGAL HARDWARE.
1991-05-07Permit EW — ISSUED
1991-02-07Permit PL — ISSUED
1991-02-07Permit EW — ISSUED
1991-01-22Permit EW — ISSUED
1990
1990-05-11DOB violation E:
1989
1989-07-27DOB complaint, category ?
1989-06-27DOB complaint, category ?
1989-03-24DOB complaint, category ?
1989-03-21DOB violation E: (51) PROVIDE SELECTOR STRAIN GUARD IN MOTOR ROOM (52) RENEW CAB FLOORING
1989-01-11ECB Hazardous violation: FAILURE TO MAINTAIN DEFGECTS ARE THE FOLLOWING PARTIONS OF THE BUILDING HAS BEEN BURNT BY FIRE APPROX 20 FLOOR JOIST BURNT AND CHA$500
1989-01-11ECB Hazardous violation: FAILURE TO DO ADEQUATE HOUSEDEEPING DEFECTS IS ACCUMULATION OF COMBUSTIBLE DEBRIS SUCH AS CHAIRS TABLES FALLEN MATERIAL FROM CEILI$300
1989-01-03DOB complaint, category ?
1988
1988-11-29DOB violation C:
1988-11-02ECB Non-Hazardous violation: THE FOLLOWING PROTIONS OF THE BUILDING HAVE BEEN DAMAGED BY FIRE AND ARE CHARRED AND DEFECTIVE AT 1 FL WOOD JOIST APPROX 25 FLOORI
1988-06-08ECB Non-Hazardous violation: FAILURE TO MAINTAIN. DEFECT: THE WALLS, FLOORS & CEILINGS AND APPROX30 WOOD JOISTS ARE BURNT, BROKEN AND DEFECTIVE AT THE EAST C
1988-06-08ECB Non-Hazardous violation: FAILURE TO MAINTAIN. DEFECTS: THE FLOOR JOISTS AT THE 2ND FLOOR FRONT, EAST STORE IN 32-36 EAST 58TH STREET ARE CUT, BROKEN,
1988-06-08ECB Non-Hazardous violation: FAILURE TO MAINTAIN. DEFECT: THE PUBLIC STAIR OF 32-36 EAST 58TH STREET IS LEANING OUT OF PLUMB APPROX. 4" BETWEEN THE 4 AND
1987
1987-01-30Mortgage $300,000 — from CLUB OASIS INC to JAY HOLDINGS INC$300,000
1987-01-30Mortgage assigned — from HOLLRON RESTAURANT INC to CLUB OASIS INC
1985
1985-12-09Agreement — from ZURICH HOLDING CO to MORGAN GUARANTY TR CO
1985-12-09Mortgage $2,609,061 — from ZURICH HOLDING CO to MORGAN GUARANTY ETCTRST$2,609,061
1985-12-09Mortgage assigned — from CHEMICAL BANK to MORGAN GUARANTY TR CO/NY
1985-12-09Mortgage assigned — from CROSSLAND SAVINGS, FSB to MORGAN GUARANTY TR CO/NY
1985-12-09Agreement — from ZURICH HOLDING CO to MORGAN GUARANTY TR CO
1982
1982-01-29Mortgage $750,000 — from ZURICH HOLDING CO. to CHEMICAL BANK$750,000
1980
1980-01-23Agreement — from ZURICH HOLDING CO to CHEMICAL BANK
1980-01-23Mortgage — from ZURICH HOLDING CO to CHEMICAL BANK
1980-01-23Mortgage assigned — from GOLDWEP NOMINEE HLDNG to CHEMICAL BANK
1979
1979-09-13Mortgage assigned — from BANK LEUMI TRST CO NY to GOLDWEP NOMINEE HOLDING
1979-02-07Deed — from ZURICH CAPITAL CO to ZURICH HOLDING CO
1977
1977-05-24Deed — from ARDEL APRTMNTS INC to ZURICH CAPITAL CO
1977-05-24Mortgage — from ZURICH CAPITAL CO to BANK LEUMI TRST CO NY