Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

109 East 73 Street · Manhattan · BBL 1014080007 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

Where the penalty points come from

ComponentWhat it coversPoints
Housing codeHPD violations by class, complaints, emergency repairs, litigation, vacate orders, AEP40.8
Structural & safetyDOB violations, ECB/OATH violations by class0
PestsBedbug filings, failed rodent inspections, rodent 311s0
DisplacementMarshal evictions executed0
GRADE A

The city's published records show little recorded distress here in the last three years. More recorded distress than 59% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty points per 10 units; this building carries 24. In ZIP 10021, 81% of residential buildings hold an A and 3% grade D or F. How grades work

this building
A
B
C

Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more

Open with the city right now

Open HPD violations2 total — 1 class C (immediately hazardous), 1 class B, 0 class A. Oldest open since 2025-01-15.

status snapshot refreshed weekly from HPD records

Patterns

4 heat or hot-water complaints in the last three years (winter 2024–25: 2 · winter 2025–26: 2). Repeated winter clusters suggest a chronic heating problem.

2
’24–25
2
’25–26

No bedbug-infested units reported in the last three years of filings.

What 311 hears from this address

5 service requests in the last three years. Most common: HEAT/HOT WATER (2) · APPLIANCE (1) · PLUMBING (1) · Asbestos (1).

Filed construction activity

$1,195,800 in permitted construction work filed since 2016 (6 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

Rent-stabilization signals

YesBuilt before 1974 (1912)
YesSix or more residential units (17)
No421-a / J-51 tax benefit on the current tax roll

2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit: request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).

Registered with HPD — the names behind the building

Registered owner(s)THE BUCKLEY SCHOOL
Head officerMAGDALENA KOSZ
Managing agentA.J. CLARKE REAL ESTATE CORP.
Last registered2026-07-20

as filed by the owner in the building's HPD registration

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$3,133,000 $1,409,850
2026$3,331,000 $1,498,950
2027$3,473,000 $1,562,850

The city's market estimate has risen 11% between tax years 2025 and 2027.

Building systems

Heating fuelNATURALGAS

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Not in a hurricane evacuation zone.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

No street-flooding or sewer-backup complaints on record at this address.

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

Subway77 St — 6 · 950 ft straight-line (about a 5-minute walk) · station accessibility: none
BusNearest boarding stop: Lexington Av / E 74 St — M101 M102 M103 · 300 ft
Citi BikeE 72 St & Park Ave · 500 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: P.S. 006 Lillie D. Blake
Middle: J.H.S. 167 Robert F. Wagner. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

109 East 73 Street

Heat or hot waterHeat or hot water
Apartment maintenanceApartment maintenance
Bed bugsBed bugs
Residential pestsResidential pests
Rats or miceRats or mice
Anything elseAnything else

5 311 service requests from this address in the last three years — 2 of them about heat or hot water.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

The landlord's report card

Managed by A.J. CLARKE REAL ESTATE CORP — 186 buildings, 3,651 units. Grades across the portfolio: A116 · B45 · C15 · D4. See the whole portfolio

BuildingBoroughUnitsGrade
310 West 72 Street MN120 A
37 West 72 Street MN92 A
57 West 58 Street MN88 A
620 Ft Washington Avenue MN82 A
464 Hudson Street MN79 A
1429 Lexington Avenue MN74 A
260 Riverside Drive MN66 A
415 West 24 Street MN65 A
255 West 75 Street MN62 A
4791 Broadway MN62 A
401 West End Avenue MN61 A
227 East 25 Street MN60 A
309 West 109 Street MN60 A
448 West 58 Street MN53 A
203 East 27 Street MN52 A
302 East 38 Street MN50 A
42 West 72 Street MN50 A
610 West 143 Street MN49 B
315 East 108 Street MN48 A
502 Hudson Street MN47 A
166 East 92 Street MN41 A
105 East 10 Street MN41 A
332 East 95 Street MN41 A
412 West End Avenue MN40 A
201 Columbus Avenue MN40 B
152 West 58 Street MN38 A
321 East 108 Street MN36 A
104 Sullivan Street MN35 B
202 West 82 Street MN30 C
64 Thompson Street MN30 A
169 East 101 Street MN30 A
28 West 83 Street MN30 A
173 East 101 Street MN30 A
175 East 101 Street MN30 A
171 East 101 Street MN30 A
141 East 13 Street MN26 A
1701 1 Avenue MN26 B
58 West 72 Street MN25 A
45 Spring Street MN25 A
822 Greenwich Street MN24 A
30 St Marks Place MN24 A
320 East 81 Street MN24 A
339 East 9 Street MN23 B
34 St Marks Place MN22 A
235 East 25 Street MN22 A
227 East 111 Street MN22 A
5 East 67 Street MN22 A
107 Thompson Street MN22 B
506 Amsterdam Avenue MN22 B
406 East 9 Street MN22 A
243 West 15 Street MN22 A
223 East 10 Street MN21 A
133 East 30 Street MN21 A
241 West 15 Street MN21 B
312 West 89 Street MN20 A
32 St Marks Place MN20 A
144 West 10 Street MN20 B
162 East 88 Street MN20 B
214 West 82 Street MN20 B
245 East 94 Street MN20 A

showing 60 of 186 buildings

Sales, deeds & mortgages

DateRecordAmountPer res. unit
2023-06-16Deed $7,500,000 — from 109 EAST 73, LLC to THE BUCKLEY SCHOOL $7,500,000
2023-06-08Sold for $7,500,000 $7,500,000 $441,176
2019-08-05Mortgage $1,500,000 — from 109 EAST 73, LLC to APPLE BANK FOR SAVINGS $1,500,000
2019-08-05AL&R $1,500,000 — from 109 EAST 73, LLC to APPLE BANK FOR SAVINGS $1,500,000

Ten-year activity

50250
2017
2018
2019
2020
2021
2022
2023
2024
2025
42
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
2017000022
2018002035
2019401229
2020003014
2021006028
20222170111
2023203229
2024002114
202500172625
2026180202242
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 45 records

DateRecord
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-10-14Job filed: Application filed for soft interior demolition on non-load-bearing partitions only. No change in use, egress, or occupancy. The proposed work is an ex
2026-08-14Permit Sidewalk Shed — Permit Issued
2026-08-14Permit Sidewalk Shed — Permit Issued
2026-08-14Permit Supported Scaffold — Permit Issued
2026-08-14Permit Construction Fence — Permit Issued
2026-08-14Permit Construction Fence — Permit Issued
2026-08-14Permit Supported Scaffold — Permit Issued
2026-06-24Job filed: Application filed for soft interior demolition on non-load-bearing partitions only. No change in use, egress, or occupancy. The proposed work is an ex
2026-05-22Permit Supported Scaffold — Permit Issued
2026-05-22Permit Construction Fence — Permit Issued
2026-05-22Permit Construction Fence — Permit Issued
2026-05-22Permit Construction Fence — Permit Issued
2026-05-22Permit Supported Scaffold — Permit Issued
2026-05-22Permit Sidewalk Shed — Permit Issued
2026-05-22Permit Sidewalk Shed — Permit Issued
2026-05-22Permit Supported Scaffold — Permit Issued
2026-05-22Permit Sidewalk Shed — Permit Issued
2026-05-21Job filed: INSTALLATION OF 300PSF SIDEWALK SHED, CONSTRUCTION FENCE AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH THE CHAPTER #33 OF THE NYC
2026-02-13Boiler inspection
2026-01-27311: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-27Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-12-11Bedbug filing: 0 infested units
2025-12-04CERT — from STEWART TITLE GUARANTY COMPANY
2025-12-04ZONE — from THE BUCKLEY SCHOOL IN THE CITY OF NEW YO

The full timeline

2026
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-11-02Asbestos abatement: Removal — Volk Industrial Services Corp.
2026-10-14Job filed: Application filed for soft interior demolition on non-load-bearing partitions only. No change in use, egress, or occupancy. The proposed work is an ex$571,500
2026-08-14Permit Sidewalk Shed — Permit Issued
2026-08-14Permit Sidewalk Shed — Permit Issued
2026-08-14Permit Supported Scaffold — Permit Issued
2026-08-14Permit Construction Fence — Permit Issued
2026-08-14Permit Construction Fence — Permit Issued
2026-08-14Permit Supported Scaffold — Permit Issued
2026-06-24Job filed: Application filed for soft interior demolition on non-load-bearing partitions only. No change in use, egress, or occupancy. The proposed work is an ex$571,500
2026-05-22Permit Supported Scaffold — Permit Issued
2026-05-22Permit Construction Fence — Permit Issued
2026-05-22Permit Construction Fence — Permit Issued
2026-05-22Permit Construction Fence — Permit Issued
2026-05-22Permit Supported Scaffold — Permit Issued
2026-05-22Permit Sidewalk Shed — Permit Issued
2026-05-22Permit Sidewalk Shed — Permit Issued
2026-05-22Permit Supported Scaffold — Permit Issued
2026-05-22Permit Sidewalk Shed — Permit Issued
2026-05-21Job filed: INSTALLATION OF 300PSF SIDEWALK SHED, CONSTRUCTION FENCE AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH THE CHAPTER #33 OF THE NYC$5,000
2026-02-13Boiler inspection
2026-01-27311: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-27Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025
2025-12-11Bedbug filing: 0 infested units
2025-12-04CERT — from STEWART TITLE GUARANTY COMPANY
2025-12-04ZONE — from THE BUCKLEY SCHOOL IN THE CITY OF NEW YO
2025-07-09311: Asbestos — Asbestos Complaint (B1)
2025-07-07Asbestos abatement: Removal — Alba Environmental Inc.
2025-07-07Asbestos abatement: Removal — Alba Environmental Inc.
2025-07-07Asbestos abatement: Removal — Alba Environmental Inc.
2025-07-07Asbestos abatement: Removal — Alba Environmental Inc.
2025-07-07Asbestos abatement: Removal — Alba Environmental Inc.
2025-07-02Bedbug filing: 0 infested units
2025-06-04HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2025-01-29Boiler inspection
2025-01-15HPD class B: § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM SOU
2025-01-15HPD class C: § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING HOOK AND EYE INSTALLED AT BUILDING ENTRANCE DOOR AT PUBLIC HA
2025-01-15HPD class C: § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING HOOK AND EYE INSTALLED AT VESTIBULE DOOR AT PUBLIC HALL, 1st
2025-01-15HPD class B: § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT SINK IN THE KITCHEN LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT
2025-01-15HPD class C: § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT GAS RANGE IN THE KITCHEN LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT
2025-01-15HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2025-01-15HPD class B: § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1s
2025-01-14311: HEAT/HOT WATER — APARTMENT ONLY
2025-01-14311: PLUMBING — WATER SUPPLY
2025-01-14311: APPLIANCE — ELECTRIC/GAS RANGE
2025-01-14Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-01-14Tenant complaint: PLUMBING — WATER SUPPLY
2025-01-14Tenant complaint: APPLIANCE — ELECTRIC/GAS RANGE
2024
2024-11-20Bedbug filing: 0 infested units
2024-08-12CORRD — from THE BUCKLEY SCHOOL, A NONPUBLIC SCHOOL; THE BUCKLEY SCHOOL IN THE CITY OF NEW YO to THE BUCKLEY SCHOOL IN THE CITY OF NEW YO
2024-03-19Bedbug filing: 0 infested units
2024-02-23Boiler inspection
2023
2023-07-06Boiler inspection
2023-06-24311: PAINT/PLASTER — CEILING
2023-06-24Tenant complaint: PAINT/PLASTER — CEILING
2023-06-16Deed $7,500,000 — from 109 EAST 73, LLC to THE BUCKLEY SCHOOL$7,500,000
2023-06-08Sold for $7,500,000$7,500,000
2023-05-31Air permit (REGISTRATION), fuel: NATURALGAS
2023-04-10Permit PL — ISSUED
2023-04-10Permit EW — ISSUED
2023-03-15HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2022
2022-12-12311: Sidewalk Condition — Sidewalk Violation
2022-11-04Boiler inspection
2022-11-02HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2022-10-04Permit Mechanical Systems — Signed-off
2022-09-29Job filed: INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$39,800
2022-08-02311: Noise — Noise: lawn care equipment (NCL)
2022-07-26DOB complaint, category ?
2022-05-18311: Noise — Noise: lawn care equipment (NCL)
2022-04-14311: Noise — Noise: lawn care equipment (NCL)
2022-02-22Bedbug filing: 0 infested units
2022-02-15HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021
2021-12-25311: Missed Collection — Recycling - Paper
2021-08-29311: HEAT/HOT WATER — ENTIRE BUILDING
2021-08-29Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2021-06-08Bedbug filing: 0 infested units
2021-04-02Bedbug filing: 0 infested units
2021-04-01HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021-03-03Elevator permit: Provide New Door Lock Monitoring System per Section 3.10.12 of Chapter K3 of Appendix K of the New York City Building Code. All wo$14,000
2021-02-23Boiler inspection
2020
2020-07-24Boiler inspection
2020-01-29Bedbug filing: 0 infested units
2020-01-18311: Missed Collection (All Materials) — 1RB Missed Recycling - M/G/Pl
2020-01-18311: Missed Collection (All Materials) — 1 Missed Collection
2019
2019-12-17Rodent inspection: Passed
2019-08-12Boiler inspection
2019-08-05Mortgage $1,500,000 — from 109 EAST 73, LLC to APPLE BANK FOR SAVINGS$1,500,000
2019-08-05AL&R $1,500,000 — from 109 EAST 73, LLC to APPLE BANK FOR SAVINGS$1,500,000
2019-03-06Permit Sidewalk Shed — Signed-off
2019-03-06Permit Supported Scaffold — Signed-off
2019-03-06Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING$4,000
2019-03-06Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER$4,000
2019-01-29Bedbug filing: 0 infested units
2018
2018-12-20Rodent inspection: Passed
2018-05-11311: Sidewalk Condition — Broken Sidewalk
2018-04-30Rodent inspection: Passed
2018-03-20311: Street Sign - Damaged — Street Cleaning - ASP
2018-03-06Boiler inspection
2017
2017-09-12Rodent inspection: Passed
2017-04-18Rodent inspection: Passed
2016
2016-10-25HPD class I: SECTION27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE ?27-2097 AND IS THER
2016-07-01Rodent inspection: Passed
2016-06-27311: Street Sign - Damaged — No Parking, Standing, Stopping
2016-03-08311: Street Sign - Damaged — School Crossing
2016-02-27311: Street Sign - Damaged — School Crossing
2015
2015-11-19311: Sidewalk Condition — Blocked - Construction
2015-11-19311: Street Condition — Blocked - Construction
2015-10-15311: Missed Collection (All Materials) — 1 Missed Collection
2015-08-24DOB violation E:
2014
2014-08-19DOB violation E:
2014-02-18311: Indoor Air Quality — Other (Explain Below)
2012
2012-12-14HPD class B: SECTION 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd S
2012-12-14HPD class B: SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT
2012-07-05Rodent inspection: Passed
2012-06-20311: Noise — Noise: air condition/ventilation equipment (NV1)
2012-06-20DOB complaint, category ?
2012-05-03DOB violation E:
2012-03-06HPD class B: SECTION 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM
2011
2011-12-08Rodent inspection: Passed
2011-11-19311: NONCONST — VERMIN
2011-11-19311: NONCONST — VERMIN
2011-11-19Tenant complaint: NONCONST — VERMIN
2011-11-19Tenant complaint: NONCONST — VERMIN
2011-01-06311: Noise - Residential — Banging/Pounding
2011-01-05DOB violation E:
2010
2010-11-29311: Building/Use — Illegal. Commercial Use In Resident Zone
2010-11-29DOB complaint, category ?
2010-11-08Rodent inspection: Passed
2010-10-26311: Street Sign - Damaged — No Parking, Standing, Stopping
2010-10-08311: Building/Use — Illegal. Commercial Use In Resident Zone
2010-10-08DOB complaint, category ?
2010-10-07Permit EQ — ISSUED
2010-10-07Job filed: PROPOSED INSTALLATION OF HEAVYDUTY SIDEWALK SHED FILED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
2010-07-07ECB CLASS - 2 violation: OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O. NOTED: AT BASEMENT LEVEL,REAR APT BUSINESS (COMMERCIAL) KNOW AS"RENEW" IS OCCUPY$1,200
2010-05-26311: Building/Use — Illegal. Commercial Use In Resident Zone
2010-05-26DOB complaint, category ?
2010-03-04311: HEATING — HEAT
2010-03-04Tenant complaint: HEATING — HEAT RELATED
2009
2009-06-26ECB CLASS - 2 violation: OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O OR BUILDING DEPT RECORDS. OCCUPANCY NOTED: BUILDING HAVING IN APT #4A INTERIOR DE$600
2009-06-25Tenant complaint: PAINT/PLASTER — CEILING
2009-06-25Tenant complaint: PLUMBING — WATER-LEAKS
2009-05-13DOB complaint, category ?
2008
2008-08-27DOB violation E:
2008-07-14DOB violation E:
2008-06-18Tenant complaint: PLUMBING — WATER SUPPLY
2007
2007-11-23Tenant complaint: HEATING — HEAT RELATED
2007-11-18Tenant complaint: HEATING — HEAT RELATED
2007-08-15DOB violation E:
2007-01-19DOB violation LL6291:
2007-01-19DOB violation LL6291:
2006
2006-08-17Tenant complaint: NONCONST — VERMIN
2006-08-17Tenant complaint: NONCONST — VERMIN
2006-08-01DOB violation E:
2003
2003-11-24ECB Non-Hazardous violation: 50A 50B WEIC MCLAIN CR LP HOISTWATER HEATING BOILER GAS FIRED 50A SCREW THREADS WERE FOUND ON THE END OF THE SAFETY VAVLE DISCHAR
2003-11-24ECB Non-Hazardous violation: 16 36 BQ9 50 RAYPAK COIL WT BLR LP DOMESTIC HW GAS FIRED 50 NO STRUCTURE SUPPORT CHANGER INSTALLED ON THE FLUE PIPE RUN TO THE C
2003-10-27DOB violation E:
2001
2001-01-30DOB complaint, category ?
2001-01-30ECB Non-Hazardous violation: OCCUPANCY CONTRARY TO THAT ALLOWED BY TGHE C/O NO 42051.NOTED:5TH FLOOR FRONT APT BEING USED AS OFFICE FOR NON PROFIT ORGANIZATION$800
2001-01-12DOB complaint, category ?
1998
1998-12-09Deed — from CASOLA, CARMELA L. to 109 EAST 73, LLC
1997
1997-05-29SAGE — from BUCKLEY SCHOOL
1997-05-29SAGE — from NEW YORK LAND SERVICES, INC.
1997-05-29SAGE — from BUCKLEY SCHOOL
1996
1996-12-09Deed — from MONDIAL REALTY LLC to CASOLA, CARMELA L.
1996-05-31Deed — from MONDIAL REALTY CORPORATION to MONDIAL REALTY LLC.
1995
1995-09-12Permit PL — ISSUED
1995-08-29DOB violation LL6291:
1995-06-05Permit EW — ISSUED
1994
1994-12-07DOB violation E:
1994-09-01DOB violation LL6291:
1993
1993-12-20Permit PL — ISSUED
1993-12-20Permit EW — ISSUED
1993-10-01Permit EW — ISSUED
1993-10-01Permit PL — ISSUED
1993-08-11Permit EW — ISSUED
1992
1992-12-21DOB violation E:
1988
1988-12-02DOB violation E:
1988-01-22Mortgage satisfied — from CASGIL ESTATES INC; SHANGRI LA ESTATES INC; ALAC CORP to JENNINGS, PERCY H.; FIRST FED SVGS LN ETC; FRANKLIN, ELIZABETHJ.; LURIE MTGE CORP; KNICKER
1983
1983-11-15DOB violation LANDMRK:
1982
1982-07-02LDMK — from LANDMARKS PRESERVTNCOMM to CITY OF NEW YORK
1979
1979-12-21MISC — from KAPLAN, SAUL
1979-06-26Deed — from MARVIN TUCKER ETAL to MONDIAL REALTY CORP
1978
1978-12-27Mortgage — from MARVIN TUCKER ETAL to KAPLAN, SAUL
1977
1977-12-21MISC — from KAPLAN, SAUL
1969
1969-12-15Mortgage assigned — from CHEMICAL BNK to KNICKERBOCKER FDRL S/L
1969-02-03Mortgage — from ALAC CORP to KNICKERBOCKER FDRL S/L
1969-02-03Mortgage assigned — from FIRST FDRL S/L ASSOCNY to KNICKERBOCKER FDRL S/L
1969-02-03Agreement — from ALAC CORP to KNICKERBOCKER FDRL S/L
1969-02-03Deed — from ALAC CORP to MARVIN TRUCKER DISTRBTRS
1969-02-03Mortgage assigned — from KNICKERBOCKER FDRL S/L to CHEMICAL BNK NY TRUST
1969-02-03Deed — from CHANANAU, ALEXANDER; HABER, LILLIAN G to ALAC CORP
1968
1968-05-06Mortgage assigned — from KASSIN, AARON Z to KASSIN, DEBORAH
1968-01-10Mortgage — from CASGIL ESTATES INC to KASSIN, AARON Z
1967
1967-07-27Mortgage assigned — from SIDNEY LEVINE INC to HABER, LILLIAN G
1967-07-27Mortgage — from CASGIL ESTATES INC to HABER, LILLIAN G
1967-07-27Mortgage — from CASGIL ESTATES INC to HABER, LILLIAN G
1966
1966-08-31Mortgage assigned — from MILLMAN, SUSAN; MILLMAN, ROSE; SCHECHTER, ROSE to SIDNEY LEVINE INC

Support this site Back to the building page