A sustained record of distress well beyond its peers. More recorded distress than 97% of 1-5-unit residential buildings citywide. The citywide median for 1-5-unit residential buildings is 0 penalty
points per 10 units; this building carries 62. In ZIP 10035, 36% of residential buildings hold an A and
17% grade D or F.
How grades work
this building
A
C
Among 699,345 1-5-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
Open HPD violations
1 total — 0 class C (immediately hazardous), 0 class B, 1 class A. Oldest open since 2026-04-29.
status snapshot refreshed weekly from HPD records
Patterns
18 heat or hot-water complaints in the last three years (winter 2024–25: 8 · winter 2025–26: 10). Repeated winter clusters suggest a chronic heating problem.
8
’24–25
10
’25–26
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
27 service requests in the last three years. Most common: HEAT/HOT WATER (9) · Noise (7) · Dirty Condition (4) · New Tree Request (1) · Abandoned Vehicle (1) · Illegal Parking (1).
Filed construction activity
$559,700 in permitted construction work filed since
2016 (5 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1900)
No
Six or more residential units (5)
No
421-a / J-51 tax benefit on the current tax roll
1 of 3 signals present. Only a partial profile — stabilization is possible but less likely. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
East Harlem/ El Barrio MHA HDFC
Head officer
Hope Burgess
Managing agent
Banana Kelly CIA Inc.
Last registered
2025-10-11
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$907,000
$408,150
2026
$726,000
$326,700
2027
$658,000
$296,100
The city's market estimate has fallen
27% between tax years 2025 and 2027.
Tax exemptions on the roll: ARTICLE XI
Building systems
Heating fuel
NO2FUEL
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 4 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
116 St — 6 · 0.2 mi straight-line (about a 6-minute walk) · station accessibility: none 125 St — 4 5 6 · 0.3 mi straight-line (about a 7-minute walk) · station accessibility: full
Bus
Nearest boarding stop: 3 Av / E 121 St — M101 M103 · 200 ft
Citi Bike
E 118 St & 3 Ave · 600 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
27 311 service requests from this address in the last three years — 9 of them about heat or hot water.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $2,673,438 on
2026-09-29 (lender: Cpc Funding Spe 1 LLC), covering 4 lots — the amount covers all of them. Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2026-09-29
AL&R $399,183 — from CLT EAST HARLEM/EL BARRIO COMMUNITY LAND; EAST HARLEM/EL BARRIO MHA HOUSING DEVELO to CPC FUNDING SPE 1 LLC
$399,183
2026-09-29
AL&R $5,102,109 — from EAST HARLEM/EL BARRIO MHA HOUSING DEVELO; CLT EAST HARLEM/EL BARRIO COMMUNITY LAND to CPC FUNDING SPE 1 LLC
$5,102,109
2026-09-29
Mortgage $2,673,438 — from CLT EAST HARLEM/EL BARRIO COMMUNITY LAND; EAST HARLEM/EL BARRIO MHA HOUSING DEVELO to CPC FUNDING SPE 1 LLC
$2,673,438
2026-09-29
Mortgage $158,611 — from EAST HARLEM/EL BARRIO MHA HOUSING DEVELO; CLT EAST HARLEM/EL BARRIO COMMUNITY LAND to CPC FUNDING SPE 1 LLC
$158,611
2026-09-29
Mortgage $399,183 — from EAST HARLEM/EL BARRIO MHA HOUSING DEVELO; CLT EAST HARLEM/EL BARRIO COMMUNITY LAND to CPC FUNDING SPE 1 LLC
$399,183
2026-09-29
Mortgage $5,102,109 — from CLT EAST HARLEM/EL BARRIO COMMUNITY LAND; EAST HARLEM/EL BARRIO MHA HOUSING DEVELO to CPC FUNDING SPE 1 LLC
$5,102,109
2026-09-29
Agreement $7,558,318 — from CLT EAST HARLEM/EL BARRIO COMMUNITY LAND; EAST HARLEM/EL BARRIO MHA HOUSING DEVELO to CPC FUNDING SPE 1 LLC
$7,558,318
2026-09-29
Agreement $2,117,255 — from EAST HARLEM/EL BARRIO MHA HOUSING DEVELO; CLT EAST HARLEM/EL BARRIO COMMUNITY LAND to CPC FUNDING SPE 1 LLC
$2,117,255
2026-09-29
Agreement $337,634 — from EAST HARLEM/EL BARRIO MHA HOUSING DEVELO; CLT EAST HARLEM/EL BARRIO COMMUNITY LAND to CPC FUNDING SPE 1 LLC
$337,634
2026-09-29
AL&R $2,673,438 — from CLT EAST HARLEM/EL BARRIO COMMUNITY LAND; EAST HARLEM/EL BARRIO MHA HOUSING DEVELO to CPC FUNDING SPE 1 LLC
$2,673,438
2026-09-29
AL&R $158,611 — from EAST HARLEM/EL BARRIO MHA HOUSING DEVELO; CLT EAST HARLEM/EL BARRIO COMMUNITY LAND to CPC FUNDING SPE 1 LLC
$158,611
2020-12-08
AL&R $7,558,318 — from CLT EAST HARLEM/EL BARRIO COMMUNITY LAND; EAST HARLEM/EL BARRIO MHA HOUSING DEVELO to CPC FUNDING SPE 1 LLC
$7,558,318
2020-12-08
AL&R $2,796,792 — from EAST HARLEM/EL BARRIO MHA HOUSING DEVELO; CLT EAST HARLEM/EL BARRIO COMMUNITY LAND to CPC FUNDING SPE 1 LLC
$2,796,792
2020-12-08
AL&R $2,391,154 — from EAST HARLEM/EL BARRIO MHA HOUSING DEVELO; CLT EAST HARLEM/EL BARRIO COMMUNITY LAND to CPC FUNDING SPE 1 LLC
$2,391,154
2020-12-08
Mortgage $2,796,792 — from CLT EAST HARLEM/EL BARRIO COMMUNITY LAND; EAST HARLEM/EL BARRIO MHA HOUSING DEVELO to CPC FUNDING SPE 1 LLC
$2,796,792
Ten-year activity
50250
2017
2018
2019
2020
2021
2022
2023
2024
2025
32
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
0
1
3
0
1
5
2018
0
1
0
0
3
4
2019
2
4
5
0
1
12
2020
6
0
0
16
0
22
2021
7
3
4
0
0
14
2022
2
0
1
1
1
5
2023
2
1
1
0
3
7
2024
3
0
13
0
3
19
2025
0
0
21
0
4
25
2026
0
2
12
14
4
32
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
AL&R $399,183 — from CLT EAST HARLEM/EL BARRIO COMMUNITY LAND; EAST HARLEM/EL BARRIO MHA HOUSING DEVELO to CPC FUNDING SPE 1 LLC
2026-09-29
AL&R $5,102,109 — from EAST HARLEM/EL BARRIO MHA HOUSING DEVELO; CLT EAST HARLEM/EL BARRIO COMMUNITY LAND to CPC FUNDING SPE 1 LLC
2026-09-29
Mortgage $2,673,438 — from CLT EAST HARLEM/EL BARRIO COMMUNITY LAND; EAST HARLEM/EL BARRIO MHA HOUSING DEVELO to CPC FUNDING SPE 1 LLC
2026-09-29
Mortgage $158,611 — from EAST HARLEM/EL BARRIO MHA HOUSING DEVELO; CLT EAST HARLEM/EL BARRIO COMMUNITY LAND to CPC FUNDING SPE 1 LLC
2026-09-29
Mortgage $399,183 — from EAST HARLEM/EL BARRIO MHA HOUSING DEVELO; CLT EAST HARLEM/EL BARRIO COMMUNITY LAND to CPC FUNDING SPE 1 LLC
2026-09-29
Mortgage $5,102,109 — from CLT EAST HARLEM/EL BARRIO COMMUNITY LAND; EAST HARLEM/EL BARRIO MHA HOUSING DEVELO to CPC FUNDING SPE 1 LLC
2026-09-29
Agreement $7,558,318 — from CLT EAST HARLEM/EL BARRIO COMMUNITY LAND; EAST HARLEM/EL BARRIO MHA HOUSING DEVELO to CPC FUNDING SPE 1 LLC
2026-09-29
Agreement $2,117,255 — from EAST HARLEM/EL BARRIO MHA HOUSING DEVELO; CLT EAST HARLEM/EL BARRIO COMMUNITY LAND to CPC FUNDING SPE 1 LLC
2026-09-29
Agreement $337,634 — from EAST HARLEM/EL BARRIO MHA HOUSING DEVELO; CLT EAST HARLEM/EL BARRIO COMMUNITY LAND to CPC FUNDING SPE 1 LLC
2026-09-29
AL&R $2,673,438 — from CLT EAST HARLEM/EL BARRIO COMMUNITY LAND; EAST HARLEM/EL BARRIO MHA HOUSING DEVELO to CPC FUNDING SPE 1 LLC
2026-09-29
SUBM — from CPC FUNDING SPE 1 LLC to CPC FUNDING SPE 1 LLC
2026-09-29
SAGE — from CITY OF NEW YORK to CPC FUNDING SPE 1 LLC
2026-09-29
AL&R $158,611 — from EAST HARLEM/EL BARRIO MHA HOUSING DEVELO; CLT EAST HARLEM/EL BARRIO COMMUNITY LAND to CPC FUNDING SPE 1 LLC
2026-09-29
SUBM — from CITY OF NEW YORK to CPC FUNDING SPE 1 LLC
2026-08-15
311: Dirty Condition — Trash
2026-07-23
Rodent inspection: Passed
2026-06-22
Boiler inspection
2026-06-22
Boiler inspection
2026-04-29
311: Noise - Street/Sidewalk — Loud Music/Party
2026-04-29
HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2026-04-28
FDNY inspection (RISK)
2026-04-02
311: Real Time Enforcement — Work Without A Permit - Occupied Multiple Dwelling
2026-04-02
311: Noise — Noise: Construction Equipment (NC1)
2026-04-02
DOB complaint, category ?
2026-03-08
311: Noise - Residential — Banging/Pounding
2026-02-13
311: Noise - Residential — Banging/Pounding
2026-02-01
311: Noise - Residential — Banging/Pounding
2026-01-30
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-30
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-25
311: Noise - Residential — Banging/Pounding
2026-01-25
311: Noise - Residential — Banging/Pounding
2026-01-21
Rodent inspection: Passed
2025-12-18
Boiler inspection
2025-12-18
Boiler inspection
2025-12-09
HPD class A: § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM
2025-11-10
311: HEAT/HOT WATER — ENTIRE BUILDING
2025-11-10
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-11-04
311: HEAT/HOT WATER — ENTIRE BUILDING
2025-11-04
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-11-03
311: HEAT/HOT WATER — ENTIRE BUILDING
2025-11-03
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-10-23
311: HEAT/HOT WATER — ENTIRE BUILDING
2025-10-23
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
The full timeline
2026
2026-09-29AL&R $399,183 — from CLT EAST HARLEM/EL BARRIO COMMUNITY LAND; EAST HARLEM/EL BARRIO MHA HOUSING DEVELO to CPC FUNDING SPE 1 LLC$399,183
2026-09-29AL&R $5,102,109 — from EAST HARLEM/EL BARRIO MHA HOUSING DEVELO; CLT EAST HARLEM/EL BARRIO COMMUNITY LAND to CPC FUNDING SPE 1 LLC$5,102,109
2026-09-29Mortgage $2,673,438 — from CLT EAST HARLEM/EL BARRIO COMMUNITY LAND; EAST HARLEM/EL BARRIO MHA HOUSING DEVELO to CPC FUNDING SPE 1 LLC$2,673,438
2026-09-29Mortgage $158,611 — from EAST HARLEM/EL BARRIO MHA HOUSING DEVELO; CLT EAST HARLEM/EL BARRIO COMMUNITY LAND to CPC FUNDING SPE 1 LLC$158,611
2026-09-29Mortgage $399,183 — from EAST HARLEM/EL BARRIO MHA HOUSING DEVELO; CLT EAST HARLEM/EL BARRIO COMMUNITY LAND to CPC FUNDING SPE 1 LLC$399,183
2026-09-29Mortgage $5,102,109 — from CLT EAST HARLEM/EL BARRIO COMMUNITY LAND; EAST HARLEM/EL BARRIO MHA HOUSING DEVELO to CPC FUNDING SPE 1 LLC$5,102,109
2026-09-29Agreement $7,558,318 — from CLT EAST HARLEM/EL BARRIO COMMUNITY LAND; EAST HARLEM/EL BARRIO MHA HOUSING DEVELO to CPC FUNDING SPE 1 LLC$7,558,318
2026-09-29Agreement $2,117,255 — from EAST HARLEM/EL BARRIO MHA HOUSING DEVELO; CLT EAST HARLEM/EL BARRIO COMMUNITY LAND to CPC FUNDING SPE 1 LLC$2,117,255
2026-09-29Agreement $337,634 — from EAST HARLEM/EL BARRIO MHA HOUSING DEVELO; CLT EAST HARLEM/EL BARRIO COMMUNITY LAND to CPC FUNDING SPE 1 LLC$337,634
2026-09-29AL&R $2,673,438 — from CLT EAST HARLEM/EL BARRIO COMMUNITY LAND; EAST HARLEM/EL BARRIO MHA HOUSING DEVELO to CPC FUNDING SPE 1 LLC$2,673,438
2026-09-29SUBM — from CPC FUNDING SPE 1 LLC to CPC FUNDING SPE 1 LLC
2026-09-29SAGE — from CITY OF NEW YORK to CPC FUNDING SPE 1 LLC
2026-09-29AL&R $158,611 — from EAST HARLEM/EL BARRIO MHA HOUSING DEVELO; CLT EAST HARLEM/EL BARRIO COMMUNITY LAND to CPC FUNDING SPE 1 LLC$158,611
2026-09-29SUBM — from CITY OF NEW YORK to CPC FUNDING SPE 1 LLC
2026-04-29HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2026-04-28FDNY inspection (RISK)
2026-04-02311: Real Time Enforcement — Work Without A Permit - Occupied Multiple Dwelling
2026-04-02311: Noise — Noise: Construction Equipment (NC1)
2025-12-09HPD class A: § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM
2025-11-10311: HEAT/HOT WATER — ENTIRE BUILDING
2025-11-10Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-11-04311: HEAT/HOT WATER — ENTIRE BUILDING
2025-11-04Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-11-03311: HEAT/HOT WATER — ENTIRE BUILDING
2025-11-03Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-10-23311: HEAT/HOT WATER — ENTIRE BUILDING
2025-10-23Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-09-22311: Dead/Dying Tree — Planted Less Than 2 Years Ago
2025-09-22311: Water System — Hydrant Running (WC3)
2025-07-18Rodent inspection: Passed
2025-05-23311: Damaged Tree — Branch or Limb Has Fallen Down
2025-05-15311: Dirty Condition — Trash
2025-04-13311: HEAT/HOT WATER — ENTIRE BUILDING
2025-04-13Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-04-05311: HEAT/HOT WATER — ENTIRE BUILDING
2025-04-05Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-03-26311: Illegal Parking — Blocked Bike Lane
2025-01-15311: HEAT/HOT WATER — ENTIRE BUILDING
2025-01-15Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-01-14Rodent inspection: Passed
2025-01-02HPD class C: § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK ASSEMBLY AT BUILDING ENTRANCE DOOR , 1st STORY
2024
2024-12-30311: HEAT/HOT WATER — ENTIRE BUILDING
2024-12-30Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2024-12-12HPD class A: § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND
2024-12-12HPD class A: § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON
2024-12-12HPD class A: § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES
2024-12-12HPD class A: § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGE
2024-12-12HPD class A: § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX AT P
2024-12-12HPD class C: § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO H
2024-12-12HPD class A: § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM
2024-11-21311: Dirty Condition — Trash
2024-11-14311: Abandoned Vehicle — With License Plate
2024-09-08311: Dirty Condition — Trash
2024-07-16Rodent inspection: Passed
2024-06-28Boiler inspection
2024-04-05Certificate of occupancy Final
2024-04-05Certificate of occupancy Final
2024-02-29311: New Tree Request — For One Address
2024-01-25Certificate of occupancy Renewal Without Change
2024-01-23Rodent inspection: Passed
2023
2023-10-30Certificate of occupancy Renewal Without Change
2022-01-27SAGE — from EAST HARLEM/EL BARRIA MHA HOUSING DEVELO; CLT EAST HARLEM/EL BARRIO COMMUNITY LAND to THE CITY OF NEW YORK DEPT OF HPD
2021
2021-11-30311: Litter Basket Request — New Basket
2021-11-26Permit PL — ISSUED
2021-10-23311: Asbestos — Asbestos Complaint (B1)
2021-10-08Permit Sidewalk Shed — Signed-off
2021-10-07Permit Construction Fence — Signed-off
2021-07-16Job filed: INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY $5,000
2021-06-24Permit Supported Scaffold — Signed-off
2021-06-22Job filed: INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY $5,000
2021-05-26FDNY inspection (ALT)
2021-05-21311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2021-05-21311: Noise — Noise: Construction Equipment (NC1)
2021-05-10FDNY inspection (ALT)
2021-04-09FDNY inspection (SPECIAL-OTH)
2021-02-22Permit AL — ISSUED
2020
2020-12-08AL&R $7,558,318 — from CLT EAST HARLEM/EL BARRIO COMMUNITY LAND; EAST HARLEM/EL BARRIO MHA HOUSING DEVELO to CPC FUNDING SPE 1 LLC$7,558,318
2020-12-08AL&R $2,796,792 — from EAST HARLEM/EL BARRIO MHA HOUSING DEVELO; CLT EAST HARLEM/EL BARRIO COMMUNITY LAND to CPC FUNDING SPE 1 LLC$2,796,792
2020-12-08AL&R $2,391,154 — from EAST HARLEM/EL BARRIO MHA HOUSING DEVELO; CLT EAST HARLEM/EL BARRIO COMMUNITY LAND to CPC FUNDING SPE 1 LLC$2,391,154
2020-12-08SUBM — from THE CITY OF NEW YORK DEPT OF HPD to CPC FUNDING SPE 1 LLC
2020-12-08Mortgage $2,796,792 — from CLT EAST HARLEM/EL BARRIO COMMUNITY LAND; EAST HARLEM/EL BARRIO MHA HOUSING DEVELO to CPC FUNDING SPE 1 LLC$2,796,792
2020-12-08Mortgage $2,391,154 — from CLT EAST HARLEM/EL BARRIO COMMUNITY LAND; EAST HARLEM/EL BARRIO MHA HOUSING DEVELO to CPC FUNDING SPE 1 LLC$2,391,154
2020-12-08SAGE — from CLT EAST HARLEM/EL BARRIO COMMUNITY LAND to EAST HARLEM/EL BARRIO MHA HOUSING DEVELO
2020-12-08SAGE — from EAST HARLEM/EL BARRIO MHA HOUSING DEVELO; CLT EAST HARLEM/EL BARRIO COMMUNITY LAND to THE CITY OF NEW YORK DEPT OF HPD
2020-12-08SAGE — from CLT EAST HARLEM/EL BARRIO COMMUNITY LAND to EAST HARLEM/EL BARRIO MHA HOUSING DEVELO
2020-12-08Deed — from THE CITY OF NEW YORK to CLT EAST HARLEM/EL BARRIO COMMUNITY LAND
2020-12-08SAGE — from THE CITY OF NEW YORK DEPT OF HPD to CLT EAST HARLEM/EL BARRIO COMMUNITY LAND; EAST HARLEM/EL BARRIO MHA HOUSING DEVELO
2020-12-08Mortgage $7,558,318 — from EAST HARLEM/EL BARRIO MHA HOUSING DEVELO; CLT EAST HARLEM/EL BARRIO COMMUNITY LAND to CPC FUNDING SPE 1 LLC$7,558,318
2020-12-08SAGE — from THE CITY OF NEW YORK DEPT OF HPD to THE COMMUNITY PRESERVATION CORPORATION
2020-12-08SAGE — from CLT EAST HARLEM/EL BARRIO COMMUNITY LAND to EAST HARLEM/EL BARRIO MHA HOUSING DEVELO
2020-12-08Mortgage $12,459,996 — from CLT EAST HARLEM/EL BARRIO COMMUNITY LAND; EAST HARLEM/EL BARRIO MHA HOUSING DEVELO to THE CITY OF NEW YORK DEPT OF HPD$12,459,996
2020-11-23Deed transfer (nominal price)
2020-11-10Permit PL — ISSUED
2020-10-19Permit AL — ISSUED
2020-10-14Permit Sidewalk Shed — Signed-off
2020-10-13Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE$8,000
2020-10-02Job filed: PROPOSED INSTALLATION OF CONSTRUCTION FENCE FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$8,500
2020-10-02Permit Construction Fence — Signed-off
2019
2019-11-08DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
2019-10-18311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2019-10-18DOB complaint, category ?
2019-10-11311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2018-04-06DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
2018-02-22Rodent inspection: Passed
2017
2017-11-06HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2017-07-07311: Graffiti — Graffiti
2017-07-07311: Graffiti — Graffiti
2017-04-27Rodent inspection: Passed
2017-02-24DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
2016
2016-10-24HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2016-09-01Rodent inspection: Passed
2016-04-07ECB CLASS - 2 violation: PEDESTRIAN PROTECTION DOESN'T MEET CODE SPECIFICATION.NOTE: OBSERVED SIDEWALK SHED HAS BEEN ERECTED @ EXP#1 (3RD AVE) & EXP#4 (E 1
2016-03-21311: Scaffold Safety — Suspended (Hanging) Scaffolds - No Pmt/Lic/Dangerous/Accident
2016-03-21DOB complaint, category ?
2016-01-08311: Miscellaneous Categories — Inspection Work Order (DOB)
2016-01-08DOB complaint, category ?
2016-01-07Rodent inspection: Passed
2016-01-01ECB CLASS - 2 violation: SEC. 3307.6.5 FAILURE TO MAINTAIN ADEQUATE ILLUMINATION BENEATH SIDEWALK SHED AS REQUIRED BY CODE. NOTE: SIDEWALK SHED ERECTED UND
2016-01-01ECB CLASS - 2 violation: 3307.6.5 SIDEWALK SHED ERECTED UNDER JOB#140411711 ALONG EXP1 & 2 HAS INOPERABLE BULBS RENDERING AFFECTED VISIBILITY PARK SHADOWY
2015
2015-10-15Permit EQ — ISSUED
2015-10-13Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
2015-10-13Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
2015-10-07Permit EQ — ISSUED
2015-10-05Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION
2015-10-01HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2015-09-21311: General Construction/Plumbing — Egress - Doors Locked/Blocked/Improper/No Secondary Means
2015-09-21DOB complaint, category ?
2015-09-21ECB CLASS - 1 violation: FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER.NOTED:@EXP#4,EXTERIOR MASONRY WALL-SOUTH ELEVATION,STOE-CONCRETE CAST WINDOW LIN
2015-03-03DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
2015-02-02HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2015-01-22Rodent inspection: Passed
2014
2014-01-14311: Plumbing — Failure To Retain Water/Improper Drainage- (LL103/89)
2014-01-14DOB complaint, category ?
2013
2013-10-25Rodent inspection: Passed
2013-07-24Rodent inspection: Failed for Rat Activity
2013-07-17311: Rodent — Rat Sighting
2012
2012-05-02Rodent inspection: Passed
2012-04-27311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2012-04-27DOB complaint, category ?
2012-04-27DOB violation C: MATTRES NOT PROVIDED
2011
2011-05-09Rodent inspection: Passed
2011-02-16311: Noise — Noise: Jack Hammering (NC2)
2011-02-07311: Plumbing — Sprinkler System - Inadequate
2011-02-07DOB complaint, category ?
2010
2010-06-23311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2010-06-23DOB complaint, category ?
2010-06-23ECB CLASS - 2 violation: FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES.DEFECT IS: MASONRY WINDOW SILLS ARE CRACKED, MISSING AND DEFECTIVE AT VARIOU
2010-04-23Rodent inspection: Passed
2009
2009-12-31DOB violation LBLVIO:
2009-11-28ECB CLASS - 2 violation: B25.38.34.34B.15.32A.50A.50B.50C.5OD.50E.50F 50A PIPE SAFETY OR RELIEFVALVE DISCHARGE DOWN NO THREADED END 50F PIPE HOT WATER VALV
2009-08-17DOB complaint, category ?
2009-01-01DOB violation LL6291:
2008
2008-06-30DOB complaint, category ?
2008-06-30DOB complaint, category ?
2008-06-27DOB complaint, category ?
2008-01-03DOB violation LL6291:
2008-01-03DOB violation LL6291:
2008-01-03DOB violation LL6291:
2007
2007-02-16DOB complaint, category ?
2007-02-14DOB complaint, category ?
2007-01-19DOB violation LL6291:
2007-01-19DOB violation LL6291:
2006
2006-07-14Permit EW — ISSUED
2006-07-14Job filed: REPAIR/ REBUILD PARAPET WALL ABOVE ROOF LEVEL, APPROX. 100 L.F. AS NEEDED. PROVIDE COLD PROCESS BITUMINOUS ROOFING SYSTEM. REBUILD OLD BULKHEAD 3'X7'X$12,000
2006-07-14Job filed: REPAIR/ REBUILD PARAPET WALL ABOVE ROOF LEVEL, APPROX. 100 L.F. AS NEEDED. PROVIDE COLD PROCESS BITUMINOUS ROOFING SYSTEM. REBUILD OLD BULKHEAD 3'X7'X$12,000
2006-01-06DOB violation LL6291:
2006-01-06DOB violation LL6291:
2006-01-06DOB violation LL6291:
2005
2005-06-17Permit EQ — ISSUED
2005-05-13Job filed: CONSTRUCT A SCAFFOLD TO ASSIST IN RESUR- FACING THE LINTELS AND SILLSWIT NEW PIGMENTED EPOXY BASE CEMENT FINISH ON THE 2ND & 3RD FLOORS
1985-07-31Deed — from COMMISSIONER OF FINANCE to CITY OF NEW YORK
1984
1984-01-20HPD class A: D26-41.03 ADM CODE FILE WITH THIS DEPARTMENT A REGISTRATION STATEMENT FOR BUILDING.
1982
1982-05-07HPD class A: D26-41.03 ADM CODE FILE WITH THIS DEPARTMENT A REGISTRATION AND OCCUPANCY STATEMENT OF BUILDING.
1982-01-20HPD class A: D26-20.08,20.09 ADM CODE FILE CERTIFICATION OF SATISFACTORY INSTALLATION OF SMOKE DETECTING DEVICE IN ACCORDANCE WITH H.P.D. RULES AND REGUL
1981
1981-07-13Deed — from PANAGOPOULOS, CHRISTINE; MAROUDAS, ANGELO to GREATER EMANUEL ETAL
1981-07-13Mortgage — from GREATER EMANUEL ETAL to MAROUDAS, ANGELO; PANAGOPOULOS, CHRISTINE
1979
1979-12-26HPD class C: D26-17.07 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES 1 STY EAST APT 1E KITCHEN & BATHROOM. LOCATED AT APT 1E
1979-12-26HPD class C: D26-17.07 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES 2 STY NORTH APT 1W KITCHEN & BATHROOM. , SECTION '' ''
1979-10-17HPD class B: D26-10.01 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE FLUORESCENT LIGHT BULB 2 STY PUB HALL AT CENTER.
1979-10-17HPD class B: D26-10.01 ADM CODE REPLACE WITH NEW THE MISSING LIGHT BULB 2 STY PUB HALL AT EAST.
1979-10-17HPD class B: D26-10.01 ADM CODE REPLACE WITH NEW THE MISSING DOOR KNOB STREET LEVEL ENTRANCE DOOR TO VESTIBULE.
1979-10-17HPD class B: D26-10.01 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WALLS & CLG 2 STY PUB HALL.
1979-10-17HPD class A: D26-12.01 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS & CLG 2 STY PUB HALL.
1978
1978-05-18Deed — from MAROUDAS, NIKOLAS to PANAGOPOULOS, CHRISTINE; MAROUDAS, ANGELO
1977
1977-07-25HPD class B: D26-41.05 ADM CODE FILE WITH THIS DEPARTMENT REGISTRATION STATEMENT FOR CHANGE OF OWNERSHIP OF BUILDING.
1974
1974-08-16Deed — from MINARSKY, MAX FKA; MINARS, MAX; MINARSKY, RUTH FKA; MINARS, RUTH to MAROUDAS, NICHOLAS
1974-07-31Deed — from MINARSKY, JACOB; MINARSKY, JERRY EX; MINARO, JACK AKA to MAROUDAS, NICHOLAS
1974-07-31Mortgage — from MAROUDAS, NICHOLAS to MINARS, RUTH; MINARS, MAX