Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

900 Lenox Road · Brooklyn · BBL 3046607501 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

Where the penalty points come from

ComponentWhat it coversPoints
Housing codeHPD violations by class, complaints, emergency repairs, litigation, vacate orders, AEP57
Structural & safetyDOB violations, ECB/OATH violations by class0
PestsBedbug filings, failed rodent inspections, rodent 311s6.5
DisplacementMarshal evictions executed20
GRADE A

The city's published records show little recorded distress here in the last three years. More recorded distress than 52% of 25-99-unit residential buildings citywide. The citywide median for 25-99-unit residential buildings is 23.6 penalty points per 10 units; this building carries 26.9. In ZIP 11203, 76% of residential buildings hold an A and 7% grade D or F. How grades work

this building
A
B
C

Among 17,252 25-99-unit residential buildings citywide · left is less recorded distress, right is more

Open with the city right now

Open HPD violations43 total — 7 class C (immediately hazardous), 26 class B, 10 class A. Oldest open since 2015-01-08.
Pending HPD litigation1 case(s) pending in housing court

status snapshot refreshed weekly from HPD records

Patterns

No heat or hot-water complaints in the last three years.

No bedbug-infested units reported in the last three years of filings.

What 311 hears from this address

19 service requests in the last three years. Most common: DOOR/WINDOW (4) · GENERAL (3) · Illegal Parking (3) · Blocked Driveway (2) · ELECTRIC (1) · UNSANITARY CONDITION (1).

Filed construction activity

No permitted work with a declared cost filed in the last decade. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

Rent-stabilization signals

NoBuilt before 1974 (2007)
YesSix or more residential units (31)
No421-a / J-51 tax benefit on the current tax roll

1 of 3 signals present. Only a partial profile — stabilization is possible but less likely. The definitive answer for any unit: request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).

Registered with HPD — the names behind the building

Registered owner(s)900 Lenox Garden Condominium/ATE KAYS 3 LLC
Head officerALEX YELON
Managing agentBuilding Equity Management LLC
Last registered2026-07-27

as filed by the owner in the building's HPD registration

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$16,463 $7,409
2026$84,834 $38,176
2027$16,230 $7,304

The city's market estimate has fallen 1% between tax years 2025 and 2027.

For property tax, the Department of Finance values this condo as if it were a rental building. Its 2023 estimate: gross income $859,625 a year ($31.25 per sq ft), operating expenses $361,180 ($13.13 per sq ft), net operating income $498,445. These are the city's estimates from comparable rentals, not the building's actual budget, rents or maintenance charges.

Building systems

Energy grade (LL33)A — ENERGY STAR score 100/100 (2022 disclosure cycle)

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Not in a hurricane evacuation zone.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

3 street-flooding or sewer-backup complaints at this address since 2017 (0 in the last three years).

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

SubwaySutter Av-Rutland Rd — 3 · 0.7 mi straight-line (about an 18-minute walk) · station accessibility: none
BusNearest boarding stop: Remsen Av / Lenox Rd — B17 B47 · 750 ft
Citi BikeE 54 St & Linden Blvd · 450 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: P.S. 268 Emma Lazarus
Middle: The Middle School of Media, Law and Fine Arts. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

900 Lenox Road

Heat or hot waterHeat or hot water
Apartment maintenanceApartment maintenance
Bed bugsBed bugs
Residential pestsResidential pests
Rats or miceRats or mice
Anything elseAnything else

19 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

The landlord's report card

Managed by BUILDING EQUITY MANAGEMENT LLC — 103 buildings, 1,953 units. Grades across the portfolio: A71 · B18 · C7 · D5 · F1. See the whole portfolio

BuildingBoroughUnitsGrade
135 West 52 Street MN109 A
419 Bleecker Street MN87 A
270 St Nicholas Avenue MN77 B
160 Imlay Street BK70 A
421 West 162 Street MN65 C
860 Riverside Drive MN61 D
67 West 107 Street MN56 A
42-14 Crescent Street QN48 A
374 Wadsworth Avenue MN43 A
215 East 81 Street MN40 A
951 Carroll Street BK38 A
212 East 57 Street MN38 A
259 21 Street BK37 A
191 Grand Street MN35 A
334 East 13 Street MN34 A
900 Lenox Road BK31 A
28 Vestry Street MN31 A
10 Lenox Avenue MN29 A
1260 Amsterdam Avenue MN29 A
268 West 84 Street MN28 A
76 Pinehurst Avenue MN27 A
326 East 65 Street MN27 A
31 East 127 Street MN25 A
649 Warren Street BK24 A
377 Warren Street BK24 A
174 Delancey Street MN22 B
42 East 20 Street MN22 A
178 East 117 Street MN22 B
611 West 180 Street MN21 B
409 East 74 Street MN20 A
26 Henry Street MN20 B
17 West 76 Street MN20 B
474 West 146 Street MN20 A
160 East 117 Street MN19 A
35 East 12 Street MN18 A
20 Bethune Street MN18 A
845 2 Avenue MN18 A
24 Varick Street MN18 A
422 East 75 Street MN18 A
23 Canal Street MN17 B
1324 2 Avenue MN17 A
66 East 80 Street MN17 A
52 Carmine Street MN16 A
329 East 75 Street MN16 A
407 East 90 Street MN16 A
514 East 82 Street MN15 A
191 Hester Street MN15 A
105 Wooster Street MN15 B
259 East Broadway MN15 A
516 East 82 Street MN15 A
409 East 90 Street MN15 A
297 Driggs Avenue BK14 A
104 Hudson Street MN14 A
177 Wadsworth Avenue MN14 B
1695 Lexington Avenue MN13 B
1082 Madison Avenue MN13 A
19 Greenwich Avenue MN12 A
9 West 107 Street MN12 C
320 West 105 Street MN11 B
268 West 77 Street MN10 A

showing 60 of 103 buildings

Sales, deeds & mortgages

DateRecordAmountPer res. unit
2025-11-03Deed $515,000 — from SMITH, HAKIM to WILLIAMS, ADENEIKI; STOMER, AKIM D $515,000
2025-11-03Mortgage $412,000 — from WILLIAMS, ADENEIKI; STOMER, AKIM D to CITIZENS BANK, N.A. $412,000
2025-10-23Sold for $515,000 $515,000 $16,613
2025-10-23Sold for $515,000 $515,000 $16,613
2025-02-28Mortgage $250,250 — from LENOX5G LLC to BPL MORTGAGE, LLC $250,250
2022-06-03Mortgage $280,800 — from HAJ AHMED, AMINA I.; KHAMISE, MOHAMMED A.; KHAMISE, AHMED A. to MORTGAGE ELECTRONIC REGISTRATIONS SYSTEM $280,800
2022-06-03Mortgage $280,800 — from HAJ AHMED, AMINA I.; KHAMISE, MOHAMMED A.; KHAMISE, AHMED A. to MORTGAGE ELECTRONIC REGISTRATIONS SYSTEM $280,800
2022-06-03Deed $312,000 — from ARCHBALD, MICHELE A. to KHAMISE, AHMED A.; HAJ AHMED, AMINA I.; KHAMISE, MOHAMMED A. $312,000
2022-06-03Deed $312,000 — from ARCHBALD, MICHELE A. to KHAMISE, AHMED A.; HAJ AHMED, AMINA I.; KHAMISE, MOHAMMED A. $312,000
2022-05-09Sold for $312,000 $312,000 $10,065
2022-05-09Sold for $312,000 $312,000 $10,065
2021-09-23Deed $420,000 — from SALCEDO, JORGE; BARRAGAN, LUISA to YOUNG, ANGELA $420,000
2021-09-23Deed $420,000 — from SALCEDO, JORGE; BARRAGAN, LUISA to YOUNG, ANGELA $420,000
2021-09-02Sold for $420,000 $420,000 $13,548
2021-09-02Sold for $420,000 $420,000 $13,548

Ten-year activity

5002500
2017
2018
2019
2020
314
2021
2022
2023
2024
2025
2026
EnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
20171420043
20181410042
20191353039
20200540155
20211532600314
20221417049
20232160018
20241410143
20250511218
202604004
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 11 records

DateRecord
2026-10-13311: Illegal Parking — Double Parked Blocking Traffic
2026-06-09311: Dead/Dying Tree — Planted More Than 2 Years Ago
2026-04-24Eviction executed (5F)
2026-01-27311: Illegal Parking — Blocked Crosswalk
2025-12-18Bedbug filing: 0 infested units
2025-11-03Deed $515,000 — from SMITH, HAKIM to WILLIAMS, ADENEIKI; STOMER, AKIM D
2025-11-03Mortgage $412,000 — from WILLIAMS, ADENEIKI; STOMER, AKIM D to CITIZENS BANK, N.A.
2025-11-03PAT — from WILLIAMS, ADENEIKI; STOMER, AKIM D to 900 LENOX GARDEN CONDOMINIUM ASSOCIATION
2025-10-28311: Blocked Driveway — No Access
2025-10-23Sold for $515,000
2025-10-23Sold for $515,000

The full timeline

2026
2026-10-13311: Illegal Parking — Double Parked Blocking Traffic
2026-06-09311: Dead/Dying Tree — Planted More Than 2 Years Ago
2026-04-24Eviction executed (5F)
2026-01-27311: Illegal Parking — Blocked Crosswalk
2025
2025-12-18Bedbug filing: 0 infested units
2025-11-03Deed $515,000 — from SMITH, HAKIM to WILLIAMS, ADENEIKI; STOMER, AKIM D$515,000
2025-11-03Mortgage $412,000 — from WILLIAMS, ADENEIKI; STOMER, AKIM D to CITIZENS BANK, N.A.$412,000
2025-11-03PAT — from WILLIAMS, ADENEIKI; STOMER, AKIM D to 900 LENOX GARDEN CONDOMINIUM ASSOCIATION
2025-10-28311: Blocked Driveway — No Access
2025-10-23Sold for $515,000$515,000
2025-10-23Sold for $515,000$515,000
2025-10-10Eviction executed (2E)
2025-10-09Rodent inspection: Failed for Rat Activity
2025-09-09Rodent inspection: Failed for Rat Activity
2025-09-04Mortgage assigned — from BPL MORTGAGE LLC to BPL MORTGAGE LLC; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2025-05-03311: Illegal Parking — Blocked Hydrant
2025-05-03311: Blocked Driveway — No Access
2025-03-13Mortgage satisfied — from DOOKER, KENY R to SELECT PORTFOLIO SERVICING, INC; FEDERAL HOME LOAN MORTGAGE CORPORATION; FREDDIE MAC SEASO
2025-03-13Mortgage assigned — from SELECT PORTFOLIO SERVICING, INC to FREDDIE MAC SEASONED CREDIT RISK TRANSFE; FEDERAL HOME LOAN MORTGAGE CORPORATION
2025-02-28Mortgage $250,250 — from LENOX5G LLC to BPL MORTGAGE, LLC$250,250
2025-02-28Deed — from DOOKER, KENY R to LENOX5G LLC
2025-02-20Deed transfer (nominal price)
2024
2024-12-27Bedbug filing: 0 infested units
2024-12-11Rodent inspection: Passed
2024-11-26311: Rodent — Rat Sighting
2024-11-22311: Sewer — Catch Basin Search (SC2)
2024-08-30311: Illegal Dumping — Removal Request
2024-06-05HPD class B: § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT COMPACTOR CLOSET DOOR AT PUBLIC HALL, 2nd STORY
2024-06-05HPD class B: § 27-2005 HMC: REFIT CLOSET DOOR AT EAST IN THE PRIVATE HALLWAY LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT
2024-06-05HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOORING IN THE PRIVATE HALLWAY LOCATED AT APT 2A, 2nd
2024-06-05HPD class A: § 27-2005 HMC: REFIT DOORS AT SINK BASE CABINETS IN THE KITCHEN LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT
2024-06-05HPD class B: § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 2n
2024-06-05HPD class C: HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FR
2024-06-05HPD class A: § 27-2005 HMC: REFIT DOORS AT WALL CABINETS IN THE KITCHEN LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT EAST
2024-06-05HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2024-05-21FDNY inspection (RISK)
2024-04-16Eviction executed (UNIT 5D)
2024-04-14HPD class B: § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 1 SQ FT AT CEILING IN THE BATHROOM LOCATE
2024-04-14HPD class A: § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPE
2024-04-14HPD class B: § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 2n
2024-04-14HPD class A: § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CLOSET DOOR IN THE PRIVATE HALLWAY LOCATED AT APT 2A, 2nd STORY, 2nd APART
2024-04-14HPD class A: § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 1 SQ FT AT CEILING IN THE BATHROOM LOCATE
2024-04-14HPD class A: § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET DOOR IN THE KITCHEN LOCATED AT APT 2A, 2nd STORY, 2nd APARTME
2024-04-14HPD class A: § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WALL CABINET DOOR AT WEST WALL IN THE KITCHEN LOCATED AT APT 2A, 2nd STORY
2024-04-14HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE THE WOOD FLOOR IN THE 3rd ROOM FROM NORTH AT EAST LOCATED A
2024-04-14HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 2A, 2nd ST
2024-04-14HPD class C: § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO H
2024-04-14HPD class A: § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE KITCHEN LOCATED AT APT 2A, 2nd S
2024-04-10311: GENERAL — VENTILATION SYSTEM
2024-04-10311: FLOORING/STAIRS — FLOOR
2024-04-10311: DOOR/WINDOW — DOOR
2024-04-10311: GENERAL — CABINET
2024-04-10311: UNSANITARY CONDITION — MOLD
2024-04-10311: GENERAL — CABINET
2024-04-10Tenant complaint: FLOORING/STAIRS — FLOOR
2024-04-10Tenant complaint: GENERAL — VENTILATION SYSTEM
2024-04-10Tenant complaint: UNSANITARY CONDITION — MOLD
2024-04-10Tenant complaint: DOOR/WINDOW — DOOR
2024-04-10Tenant complaint: GENERAL — CABINET
2024-04-10Tenant complaint: GENERAL — CABINET
2024-02-01311: DOOR/WINDOW — DOOR
2024-02-01Tenant complaint: DOOR/WINDOW — DOOR
2024-01-18Eviction executed (5F)
2024-01-05311: DOOR/WINDOW — DOOR
2024-01-05Tenant complaint: DOOR/WINDOW — DOOR
2023
2023-12-14311: ELECTRIC — WIRING
2023-12-14311: DOOR/WINDOW — DOOR
2023-12-14Tenant complaint: DOOR/WINDOW — DOOR
2023-12-14Tenant complaint: ELECTRIC — WIRING
2023-12-11Bedbug filing: 0 infested units
2023-11-27Eviction executed (3H)
2023-10-07311: UNSANITARY CONDITION — GARBAGE/RECYCLING STORAGE
2023-10-07Tenant complaint: UNSANITARY CONDITION — GARBAGE/RECYCLING STORAGE
2023-06-07311: Sewer — Catch Basin Clogged/Flooding (Use Comments) (SC)
2023-06-02311: Missed Collection — Trash
2023-05-03DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2023-04-13FDNY inspection (RISK)
2023-04-03311: Sewer — Catch Basin Clogged/Flooding (Use Comments) (SC)
2023-03-16311: HEAT/HOT WATER — APARTMENT ONLY
2023-03-16Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2023-02-14311: Noise — Noise: Construction Before/After Hours (NM1)
2023-01-27311: Missed Collection — Trash
2023-01-27311: Missed Collection — Trash
2022
2022-12-14Bedbug filing: 0 infested units
2022-10-16311: Blocked Driveway — No Access
2022-09-22311: Lead — Lead Kit Request (Residential) (L10)
2022-09-15311: DOOR/WINDOW — WINDOW FRAME
2022-09-15Tenant complaint: DOOR/WINDOW — WINDOW FRAME
2022-08-23311: Derelict Vehicles — Derelict Vehicles
2022-08-22311: Derelict Vehicles — Derelict Vehicles
2022-08-16311: Derelict Vehicles — Derelict Vehicles
2022-07-01311: Blocked Driveway — No Access
2022-06-26HPD class B: § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET .. IN THE 2nd BATHROOM FROM E
2022-06-26HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 5D, 5th ST
2022-06-26HPD class B: § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE DOOR IN THE ENTRANCE LOCATED AT APT 5D, 5th STORY, 2nd APARTMENT FROM WEST AT NO
2022-06-26HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 3rd ROOM FROM EAST LOCATED AT APT 5D, 5th
2022-06-26HPD class B: § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE RUBBER GASKET AT BOTH DOOR AT REFRIGERATOR IN THE KITCHEN LOCATED AT APT 5D, 5th
2022-06-26HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCK AND ASSEMBLY AT DOOR IN THE ENTRANCE LOCATED AT APT 5D, 5th STORY, 2nd APART
2022-06-26HPD class B: § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE WASH BASIN IN THE 1st BATHROOM FROM EAST LOCATED AT APT 5D, 5th STORY, 2nd APARTMENT FROM
2022-06-26HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT AP
2022-06-06Mortgage satisfied — from ARCHBALD, MICHELE A to NATIONWIDE TITLE CLEARING, LLC; JPMORGAN CHASE BANK, N.A.
2022-06-03Mortgage $280,800 — from HAJ AHMED, AMINA I.; KHAMISE, MOHAMMED A.; KHAMISE, AHMED A. to MORTGAGE ELECTRONIC REGISTRATIONS SYSTEM$280,800
2022-06-03Mortgage $280,800 — from HAJ AHMED, AMINA I.; KHAMISE, MOHAMMED A.; KHAMISE, AHMED A. to MORTGAGE ELECTRONIC REGISTRATIONS SYSTEM$280,800
2022-06-03Deed $312,000 — from ARCHBALD, MICHELE A. to KHAMISE, AHMED A.; HAJ AHMED, AMINA I.; KHAMISE, MOHAMMED A.$312,000
2022-06-03Deed $312,000 — from ARCHBALD, MICHELE A. to KHAMISE, AHMED A.; HAJ AHMED, AMINA I.; KHAMISE, MOHAMMED A.$312,000
2022-05-09Sold for $312,000$312,000
2022-05-09Sold for $312,000$312,000
2022-04-13311: DOOR/WINDOW — DOOR
2022-04-13311: GENERAL — CABINET
2022-04-13311: APPLIANCE — REFRIGERATOR
2022-04-13311: PLUMBING — BASIN/SINK
2022-04-13311: FLOORING/STAIRS — FLOOR
2022-04-13Tenant complaint: APPLIANCE — REFRIGERATOR
2022-04-13Tenant complaint: FLOORING/STAIRS — FLOOR
2022-04-13Tenant complaint: GENERAL — CABINET
2022-04-13Tenant complaint: DOOR/WINDOW — DOOR
2022-04-13Tenant complaint: PLUMBING — BASIN/SINK
2022-03-28311: Day Care — Day Care Facility
2022-03-28311: Day Care — Day Care Facility
2022-03-22FDNY inspection (RISK)
2022-03-03Bedbug filing: 0 infested units
2022-02-16HPD class C: § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CI
2022-02-16HPD class A: § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROXIMATELY 8 SQ FT IN THE 1st BATHROOM FR
2022-02-16HPD class C: § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CI
2022-02-16HPD class B: § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 5E, 5th STORY, 2n
2022-02-16HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st BATHROOM FROM EAST
2022-02-16HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MAKE LOWER SASH WINDOW OPERATIVE AT SOUTH WALL IN THE 1st ROOM FROM EAST AT SOUTH
2022-02-16HPD class B: § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROXIMATELY 8 SQ FT IN THE 1st BATHROOM FR
2022-01-13311: DOOR/WINDOW — WINDOW FRAME
2022-01-13311: UNSANITARY CONDITION — MOLD
2022-01-13Tenant complaint: UNSANITARY CONDITION — MOLD
2022-01-13Tenant complaint: DOOR/WINDOW — WINDOW FRAME
2021
2021-12-06311: UNSANITARY CONDITION — MOLD
2021-12-06311: UNSANITARY CONDITION — MOLD
2021-12-06311: WATER LEAK — HEAVY FLOW
2021-12-06Tenant complaint: UNSANITARY CONDITION — MOLD
2021-12-06Tenant complaint: WATER LEAK — HEAVY FLOW
2021-12-06Tenant complaint: UNSANITARY CONDITION — MOLD
2021-11-20311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-11-07311: Illegal Parking — Blocked Sidewalk
2021-11-01311: Street Condition — Failed Street Repair
2021-10-30311: Street Condition — Failed Street Repair
2021-10-22311: Derelict Vehicles — Derelict Vehicles
2021-10-08Mortgage satisfied — from SALCEDO, JORGE; BARRAGAN, LUISA to WILMINGTON SAVINGS FUND SOCIETY FSB
2021-10-06311: Missed Collection — Trash
2021-10-01311: Missed Collection — Trash
2021-09-23Deed $420,000 — from SALCEDO, JORGE; BARRAGAN, LUISA to YOUNG, ANGELA$420,000
2021-09-23PAT — from YOUNG, ANGELA to BOARD OF MANAGERS
2021-09-23Deed $420,000 — from SALCEDO, JORGE; BARRAGAN, LUISA to YOUNG, ANGELA$420,000
2021-09-23PAT — from YOUNG, ANGELA to BOARD OF MANAGERS
2021-09-02Sold for $420,000$420,000
2021-09-02Sold for $420,000$420,000
2021-08-02FDNY inspection (RISK)
2021-06-02Deed $320,000 — from WILBERT BISHOP, AS ADMINISTRATOR; RUDY BISHOP, AS ADMINISTRATOR; ESTATE OF KENRICK L. BISH to SMITH, HAKIM$320,000
2021-06-02PAT — from SMITH, HAKIM to THE 900 LENOX GARDEN CONDOMINIUM
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage assigned — from BANKUNITED, N.A. to FLUSHING BANK
2021-05-26CERR $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26AL&R $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26TL&R — from BANKUNITED, N.A. to ATE KAYS 3 LLC
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-26Mortgage $5,265,000 — from ATE KAYS 3 LLC to FLUSHING BANK$5,265,000
2021-05-25311: Illegal Parking — Blocked Hydrant
2021-05-19Sold for $320,000$320,000
2021-05-08311: Illegal Parking — Commercial Overnight Parking
2021-05-07311: Illegal Parking — Commercial Overnight Parking
2021-05-01311: Illegal Parking — Commercial Overnight Parking
2021-05-01311: Illegal Parking — Commercial Overnight Parking
2021-04-21Bedbug filing: 0 infested units
2021-04-19HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021-04-05HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND SINK IN THE KITCHEN LOCATED AT APT 2G, 2nd
2021-04-05HPD class C: § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS ... IN THE ENTRANCE LOCATED AT APT 2G, 2nd STORY, 3rd APARTMENT FROM WEST A
2021-04-05HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MECHANICAL VENTILATOR AT CEILING IN THE BATHROOM LOCATED AT APT 2G, 2nd STORY, 3r
2021-04-05HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MECHANICAL VENTILATOR AT CEILING IN THE KITCHEN LOCATED AT APT 2G, 2nd STORY, 3rd
2021-04-05HPD class C: HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2G, 2nd STORY, 3rd APARTMENT FROM
2021-03-30Tenant complaint: UNSANITARY CONDITION — PESTS
2021-03-30Tenant complaint: UNSANITARY CONDITION — MOLD
2021-03-30Tenant complaint: UNSANITARY CONDITION — PESTS
2021-03-30Tenant complaint: UNSANITARY CONDITION — MOLD
2021-03-30Tenant complaint: DOOR/WINDOW — DOOR
2021-03-30Tenant complaint: GENERAL — VENTILATION SYSTEM
2021-03-30Tenant complaint: GENERAL — VENTILATION SYSTEM
2021-03-30Tenant complaint: PLUMBING — BASIN/SINK
2021-03-29HPD litigation: Tenant Action
2021-03-20City emergency repair (HWO): apartment 2b. install / repair window guards throughout entire apt remove all work related debris
2021-03-18City emergency repair (OMO): division nyc - ''essential hpd emergency operations service work'' install hinges to make door self-closing arrange and $250
2021-03-04City emergency repair (OMO): at public halls, multiple stories ------ scope of work: install hinges to make door self-closing at compactor rooms at n$610
2021-02-20City emergency repair (OMO): scope of work: install hinges to make door self-closing at apartment entrance located at apt 5c, 5th story, 1st apartmen$300
2021-02-12HPD class C: HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5C, 5th STORY, 1st APARTMENT FROM
2021-02-12HPD class A: § 27-2005 ADM CODE REFIT METAL GARBAGE CHUTE DOORS AT COMPACTOR ROOMS ON 3RD AND 4TH STORY PUBLIC HALLS
2021-02-12HPD class C: § 27-2005, 2007, 204.1 HMC CODE: ARRANGE AND MAKE SELF-CLOSING THE DOORS ... IN THE ENTRANCE LOCATED AT APT 5C, 5th STORY, 1st APARTMENT FRO
2021-02-12HPD class C: § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CI
2021-02-12HPD class C: § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS ... IN THE ENTRANCE LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM WEST A
2021-02-12HPD class C: § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CI
2021-02-12HPD class B: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT
2021-02-12HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 2nd BATHROOM FROM NORTH LOC
2021-02-12HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 2nd ROOM FROM NORTH LOCATED
2021-02-12HPD class C: § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SCALDING HOT WATER EXCEEDING THE MAXIMUM TEMPERATURE OF 130 DEGREES AT ALL
2021-02-12HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR BY SLIDING GLASS DOOR IN THE 1st ROOM FROM NORTH
2021-02-12HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 4H, 4th STORY,
2021-02-12HPD class B: § 27-2050 ADM CODE SEAL IN OPEN POSITION THE O.S.Y. VALVE OF THE SPRINKLER SYSTEM IN ACCORDANCE WITH THE RULES AND REGULATIONS OF THIS DEPAR
2021-02-12HPD class C: § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS AT COMPACTOR ROOM AT NORTH WALL ON 2ND, 3RD, 4TH AND 5TH STORY PUBLIC HALLS
2021-02-12HPD class C: HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM
2020
2020-08-16HPD class B: § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM EAST
2020-08-16HPD class B: § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
2020-08-16HPD class C: HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FR
2020-08-12HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 3rd ROOM FROM EAST LOCATED
2020-08-12HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST LOCATED AT APT 4A, 4th
2020-07-29HPD class B: § 27-2021 ADM CODE PROVIDE SUFFICIENT, PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AN
2020-07-11311: UNSANITARY CONDITION — GARBAGE/RECYCLING STORAGE
2020-07-11Tenant complaint: UNSANITARY CONDITION — GARBAGE/RECYCLING STORAGE
2020-07-06311: Illegal Fireworks — N/A
2020-06-27HPD class C: HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4E, 4th STORY, 3rd APARTMENT FROM
2020-06-24311: UNSANITARY CONDITION — PESTS
2020-06-24311: Rodent — Mouse Sighting
2020-06-24Tenant complaint: UNSANITARY CONDITION — PESTS
2020-06-15City emergency repair (HWO): at apt# 3d : install/repair window guards throughout in the entire apt. remove all work related debris.$25
2020-06-11311: WATER LEAK — SLOW LEAK
2020-06-11Tenant complaint: WATER LEAK — SLOW LEAK
2020-06-11HPD class C: § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CI
2020-06-11HPD class C: § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CI
2020-06-08Tenant complaint: PAINT/PLASTER — WALL
2020-06-08Tenant complaint: SAFETY — WINDOW GUARD BROKEN/MISSING
2020-06-04HPD litigation: Tenant Action
2020-05-27311: SAFETY — WINDOW GUARD BROKEN/MISSING
2020-05-27Tenant complaint: SAFETY — WINDOW GUARD BROKEN/MISSING
2020-03-26HPD class C: § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CI
2020-03-26HPD class C: HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 3rd STORY, 3rd APARTMENT FR
2020-03-26HPD class B: § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET IN THE 2nd BATHROOM FROM EAST
2020-03-26HPD class C: HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 3rd STORY, 3rd APARTMENT FROM
2020-03-26HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MORTISE DOIOR LOCK AND ASSEMBLY IN THE ENTRANCE LOCATED AT APT 3D, 3rd STORY, 3rd
2020-03-26HPD class B: § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASHBASIN IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 3D, 3rd STORY, 3rd AP
2020-03-26HPD class B: § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET IN THE 1st BATHROOM FROM EAST
2020-03-13311: SAFETY — WINDOW GUARD BROKEN/MISSING
2020-03-13311: PLUMBING — BASIN/SINK
2020-03-13311: PLUMBING — TOILET
2020-03-13311: DOOR/WINDOW — DOOR
2020-03-13311: UNSANITARY CONDITION — PESTS
2020-03-13Tenant complaint: PLUMBING — TOILET
2020-03-13Tenant complaint: DOOR/WINDOW — DOOR
2020-03-13Tenant complaint: UNSANITARY CONDITION — PESTS
2020-03-13Tenant complaint: PLUMBING — BASIN/SINK
2020-03-13Tenant complaint: SAFETY — WINDOW GUARD BROKEN/MISSING
2020-01-30Elevator permit: All work to comply with ASME/ANSI A17.1 2000/2003, Chapter 30, Appendix K. All necessary test/inspection to be performed in the p$12,000
2020-01-30HPD class A: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE 2nd BATHROOM LOCATED AT APT 2B,
2020-01-30HPD class B: § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING , KEY OPERATED LOCK AT DOOR TO FIRE STAIR LEADING TO PUBLIC HALL, NORTHEAST SECTION ,
2020-01-30HPD class C: § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS , RECYCLING CHUTE DOOR, NORTHEAST SECTION AT NORTH WALL, PUBLIC HALL , 2nd
2020-01-30HPD class C: § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CI
2020-01-30HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOORING IN THE PRIVATE HALLWAY LOCATED AT APT 2B, 2nd
2020-01-30HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOORING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT
2020-01-30HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd BATHROOM LOCATED AT
2020-01-30HPD class C: § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS , FIRE STAIR DOOR AT SOUTH WALL, PUBLIC HALL, AT LOBBY, 1st STORY
2020-01-29311: Dirty Conditions — E8 Canine Violation
2020-01-29311: UNSANITARY CONDITION — MOLD
2020-01-29Tenant complaint: UNSANITARY CONDITION — MOLD
2020-01-23311: WATER LEAK — HEAVY FLOW
2020-01-23Tenant complaint: WATER LEAK — HEAVY FLOW
2020-01-23Tenant complaint: DOOR/WINDOW — DOOR
2019
2019-12-30Bedbug filing: 0 infested units
2019-12-14311: Noise - Residential — Loud Music/Party
2019-11-22311: FLOORING/STAIRS — FLOOR
2019-11-22Tenant complaint: UNSANITARY CONDITION — PESTS
2019-11-22Tenant complaint: UNSANITARY CONDITION — MOLD
2019-11-22Tenant complaint: FLOORING/STAIRS — FLOOR
2019-11-20311: FLOORING/STAIRS — FLOOR
2019-11-20Tenant complaint: FLOORING/STAIRS — FLOOR
2019-11-04HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2019-09-05Eviction executed (4-E)
2019-07-25HPD class C: HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5C, 5th STORY, 1st APARTMENT FR
2019-07-25HPD class A: § 27-2005 ADM CODE REFIT SLIDING WINDOW IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 5C, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
2019-07-25HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELETRIC BELL BUZZER INTERCOM SYSTEM IN THE ENTRANCE LOCATED AT APT 5C, 5th STORY,
2019-07-22Mortgage assigned — from NEWREZ LLC to SELECT PORTFOLIO SERVICING, INC
2019-07-11Eviction executed (3-E)
2019-07-11Eviction executed (2-D)
2019-05-31HPD class A: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INTERCOMMUNICATION SYSTEM IN THE ENTRANCE LOCATED AT APT 5C, 5th STORY, 1st APART
2019-05-31HPD class A: § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING SAFETY CAP / ELECTRICAL OUTLET COVER AT SOUTH WALL AT PUBLIC HALL, 1st STORY
2019-05-31HPD class B: § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS APARTMENT ENTRANCE IN THE ENTRANCE LOCATED AT APT 5C, 5th STORY, 1st APARTM
2019-05-31HPD class A: § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND
2019-05-31HPD class C: § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO H
2019-05-31HPD class A: § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON
2019-05-31HPD class A: § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISS
2019-05-17311: GENERAL — BELL/BUZZER/INTERCOM
2019-05-17Tenant complaint: GENERAL — BELL/BUZZER/INTERCOM
2019-05-01311: WATER LEAK — SLOW LEAK
2019-05-01311: PLUMBING — TOILET
2019-05-01311: DOOR/WINDOW — DOOR
2019-05-01311: PLUMBING — TOILET
2019-05-01Tenant complaint: PLUMBING — TOILET
2019-05-01Tenant complaint: PLUMBING — TOILET
2019-05-01Tenant complaint: WATER LEAK — SLOW LEAK
2019-05-01Tenant complaint: DOOR/WINDOW — DOOR
2019-04-06311: Curb Condition — Defacement
2019-03-12Eviction executed (2-F)
2019-03-07FDNY inspection (RISK)
2019-02-11Mortgage assigned — from DITECH FINANCIAL LLC; GREEN TREE SERVICING LLC to CSMC 2018-RPL12 TRUST; WILMINGTON SAVINGS FUND SOCIETY FSB; CHRISTIANA TRUST
2019-02-11Mortgage assigned — from DITECH FINANCIAL LLC; GREEN TREE SERVICING LLC to CSMC 2018-RPL12 TRUST; WILMINGTON SAVINGS FUND SOCIETY FSB; CHRISTIANA TRUST
2019-01-24Bedbug filing: 0 infested units
2018
2018-11-21DOB violation E:
2018-11-14HPD class A: § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING PLASTIC SAFETY CAPS OR COVERS AT ELECTRIC OUTLETS AT SOUTH AND EAST WALLS AT PUBLIC HALL, 4t
2018-11-07HPD class B: § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS FROM VESTIBULE TO PUBLIC HALL , 1st STORY
2018-11-02HPD class A: § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON
2018-11-02HPD class A: § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND
2018-11-02HPD class A: § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPE
2018-11-02HPD class C: § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO H
2018-11-02HPD class A: § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISS
2018-10-29311: SAFETY — SMOKE DETECTOR
2018-10-29Tenant complaint: SAFETY — SMOKE DETECTOR
2018-10-26HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2018-10-11City emergency repair (OMO): trace and repair roof leak from extention roof above rm. (e1) in apt. 4h. remove obstruction from drain pipe and properl$949
2018-10-09HPD class A: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND EAST WALL IN THE 1st ROOM FROM
2018-10-09HPD class A: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST LOCATED AT APT 4H, 4th
2018-10-09HPD class B: § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 4H, 4th STORY, 1st APARTME
2018-10-03Tenant complaint: FLOORING/STAIRS — FLOOR
2018-10-03Tenant complaint: WATER LEAK — SLOW LEAK
2018-10-03Tenant complaint: PAINT/PLASTER — WALL
2018-10-01HPD litigation: Tenant Action
2018-09-11HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INTERCOM IN THE FOYER LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM WEST AT NO
2018-09-11HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST LOCATED AT APT 4H, 4th
2018-09-11HPD class C: § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 4H, 4th STORY, 1st APARTMENT
2018-09-11HPD class C: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM EAST LOCATED
2018-09-10311: WATER LEAK — HEAVY FLOW
2018-09-10311: PAINT/PLASTER — CEILING
2018-09-10311: FLOORING/STAIRS — FLOOR
2018-09-10Tenant complaint: PAINT/PLASTER — CEILING
2018-09-10Tenant complaint: FLOORING/STAIRS — FLOOR
2018-09-10Tenant complaint: WATER LEAK — HEAVY FLOW
2018-09-10HPD class C: § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 4H, 4th STORY, 1st APARTME
2018-09-10HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING & WALLS IN THE 1st ROOM FROM EAST
2018-09-10HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST LOCATED AT APT 4H, 4th
2018-08-16Eviction executed (5F)
2018-08-15Eviction executed (5B)
2018-07-29311: Illegal Parking — Posted Parking Sign Violation
2018-07-25311: Illegal Parking — Parking Permit Improper Use
2018-07-22HPD class C: § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4H, 4th STORY, 1st
2018-07-22HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE 1st ROOM F
2018-06-28311: WATER LEAK — HEAVY FLOW
2018-06-28311: WATER LEAK — HEAVY FLOW
2018-06-28Tenant complaint: WATER LEAK — HEAVY FLOW
2018-06-28Tenant complaint: WATER LEAK — HEAVY FLOW
2017
2017-12-13311: Lead — Lead Kit Request (Residential) (L10)
2017-11-06DOB violation E:
2017-09-19311: Day Care — Other
2017-08-19311: Noise - Residential — Banging/Pounding
2017-07-24311: Sewer — Street Flooding (SJ)
2017-07-17HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM NORTH AT WEST
2017-07-17HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST WALL IN THE 1st ROOM FROM NORTH AT EA
2017-07-17HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT AP
2017-07-07311: PAINT/PLASTER — WALL
2017-07-07311: FLOORING/STAIRS — FLOOR
2017-07-07311: GENERAL — BELL/BUZZER/INTERCOM
2017-07-07311: WATER LEAK — SLOW LEAK
2017-07-07311: PAINT/PLASTER — CEILING
2017-07-07311: PAINT/PLASTER — WALL
2017-07-07311: DOOR/WINDOW — DOOR
2017-07-07Tenant complaint: WATER LEAK — SLOW LEAK
2017-07-07Tenant complaint: DOOR/WINDOW — DOOR
2017-07-07Tenant complaint: PAINT/PLASTER — CEILING
2017-07-07Tenant complaint: PAINT/PLASTER — WALL
2017-07-07Tenant complaint: PAINT/PLASTER — WALL
2017-07-07Tenant complaint: FLOORING/STAIRS — FLOOR
2017-07-07Tenant complaint: GENERAL — BELL/BUZZER/INTERCOM
2017-06-20311: Water System — Dirty Water (WE)
2017-04-28311: Day Care — Other
2017-04-12311: Water System — Leak (Use Comments) (WA2)
2017-03-19311: Day Care — Other
2017-02-09311: PLUMBING — WATER SUPPLY
2017-02-09311: PLUMBING — WATER SUPPLY
2017-02-09Tenant complaint: PLUMBING — WATER SUPPLY
2017-02-09Tenant complaint: PLUMBING — WATER SUPPLY
2017-01-31311: Day Care — Unlicensed Day Care
2017-01-30311: Day Care — Unlicensed Day Care
2017-01-21HPD class B: § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES ... IN THE 3rd BATHROOM FROM EAST AT NORTH LOCATED AT APT 5C, 5th S
2017-01-21HPD class B: § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES ... IN THE 3rd BATHROOM FROM EAST AT NORTH LOCATED AT APT 5C, 5th
2017-01-20311: Water System — LOW WATER PRESSURE - WLWP
2017-01-19311: ELECTRIC — NO LIGHTING
2017-01-19311: WATER LEAK — SLOW LEAK
2017-01-19Tenant complaint: ELECTRIC — NO LIGHTING
2017-01-19Tenant complaint: WATER LEAK — SLOW LEAK
2017-01-14311: PLUMBING — WATER SUPPLY
2017-01-14311: PLUMBING — WATER SUPPLY
2017-01-14Tenant complaint: PLUMBING — WATER SUPPLY
2017-01-14Tenant complaint: PLUMBING — WATER SUPPLY
2016
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-09-29Mortgage assigned — from JPMORGAN CHASE BANK, N.A. to NEW PENN FINANCIAL LLC
2016-09-03311: Day Care — Other
2016-08-16311: Day Care — Other
2016-05-11ATL — from THE BANK OF NEW YORK MELLON to THE BANK OF NEW YORK MELLON
2016-02-22311: Indoor Air Quality — Other (Explain Below)
2015
2015-10-28311: ELECTRIC — LIGHTING
2015-10-28311: ELECTRIC — OUTLET/SWITCH
2015-10-28311: ELECTRIC — OUTLET/SWITCH
2015-10-28Tenant complaint: ELECTRIC — OUTLET/SWITCH
2015-10-28Tenant complaint: ELECTRIC — LIGHTING
2015-10-28Tenant complaint: ELECTRIC — OUTLET/SWITCH
2015-10-20HPD class I: SECTION27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE ?27-2097 AND IS THER
2015-08-10311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2015-06-30M&CON $416,083 — from SALCEDO, JORGE; BARRAGAN, LUISA to GREEN TREE SERVICING LLC$416,083
2015-04-14311: Illegal Parking — Posted Parking Sign Violation
2015-04-10311: Noise - Residential — Loud Music/Party
2015-04-10311: Noise - Residential — Loud Music/Party
2015-03-18311: Other Enforcement — E2A Storage Of Receptacles
2015-03-08311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2015-02-27311: UNSANITARY CONDITION — GARBAGE/RECYCLING STORAGE
2015-02-27Tenant complaint: UNSANITARY CONDITION — GARBAGE/RECYCLING STORAGE
2015-02-20311: PAINT/PLASTER — WALL
2015-02-20311: PAINT/PLASTER — CEILING
2015-02-20311: PAINT/PLASTER — CEILING
2015-02-20Tenant complaint: PAINT/PLASTER — WALL
2015-02-20Tenant complaint: PAINT/PLASTER — CEILING
2015-02-20Tenant complaint: PAINT/PLASTER — CEILING
2015-01-26City emergency repair (OMO): apt# 4h : at room east (1) aka living room : properly trace and repair the water leak(s) at the ceiling. also repair the$579
2015-01-08311: Blocked Driveway — No Access
2015-01-08HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INTERCOM SYTEM IN THE ENTIRE APARTMENT LOCATED AT APT 4H, 4th STORY, 1st APARTMEN
2015-01-08HPD class C: SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEING IN THE 1st ROOM FROM EAST L
2015-01-08HPD class B: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 4
2015-01-08HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST LOCATED AT APT 4H, 4th
2015-01-08HPD class B: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND EAST WALL IN THE 1st ROOM FROM EAST LO
2014
2014-12-11DOB violation E:
2014-12-07311: FLOORING/STAIRS — FLOOR
2014-12-07311: UNSANITARY CONDITION — MOLD
2014-12-07311: WATER LEAK — HEAVY FLOW
2014-12-07311: UNSANITARY CONDITION — MOLD
2014-12-07311: FLOORING/STAIRS — FLOOR
2014-12-07311: WATER LEAK — HEAVY FLOW
2014-12-07311: WATER LEAK — HEAVY FLOW
2014-12-07311: GENERAL — BELL/BUZZER/INTERCOM
2014-12-07Tenant complaint: GENERAL — BELL/BUZZER/INTERCOM
2014-12-07Tenant complaint: WATER LEAK — HEAVY FLOW
2014-12-07Tenant complaint: UNSANITARY CONDITION — MOLD
2014-12-07Tenant complaint: FLOORING/STAIRS — FLOOR
2014-12-07Tenant complaint: WATER LEAK — HEAVY FLOW
2014-12-07Tenant complaint: FLOORING/STAIRS — FLOOR
2014-12-07Tenant complaint: WATER LEAK — HEAVY FLOW
2014-12-07Tenant complaint: UNSANITARY CONDITION — MOLD
2014-11-04311: Blocked Driveway — No Access
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24AL&R $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Mortgage $2,363,123 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$2,363,123
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-09-24Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to BANKUNITED, N.A.
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to B.F.A.M. LLC C/O MIRIAM BOOSO
2014-09-24Agreement $6,600,000 — from ATE KAYS 3 LLC to BANKUNITED, N.A.$6,600,000
2014-09-24Deed $8,800,000 — from B.F.A.M. LLC to ATE KAY 3 LLC$8,800,000
2014-08-26FDNY inspection (RISK)
2014-08-20TLS — from CITY OF NEW YORK to BANK OF NEW YORK
2014-08-08311: Noise - Residential — Banging/Pounding
2014-07-21311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2014-07-16311: New Tree Request — For One Address
2014-07-16311: Illegal Tree Damage — Unauthorized Tree Removal
2014-07-12311: Blocked Driveway — No Access
2014-06-24311: Dead Tree — Dead/Dying Tree
2014-04-27HPD class B: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL AND CEILING IN THE 1st ROOM FROM NORTH A
2014-04-27HPD class B: SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCK AT VESTIBULE DOOR TO BUILDING AT PUBLIC HALL, 1st STORY
2014-04-27HPD class C: § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING DOUBLE CYLINER LOCK KEY OPERATED AT ENTRANCE DOOR TO BUILDING AT PUBLIC HALL, 1st STOR
2014-04-27HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING IN THE 1st ROOM FROM NOR
2014-04-27HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST WALL AND CEILING IN THE 1st ROOM FROM
2014-04-27HPD class B: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WALLS AND CEILING IN THE 1st ROOM FROM NORTH AT WE
2014-04-25Tenant complaint: WATER LEAK — HEAVY FLOW
2014-04-16311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2014-04-16311: WATER LEAK — DAMP SPOT
2014-04-16311: UNSANITARY CONDITION — MOLD
2014-04-16311: WATER LEAK — HEAVY FLOW
2014-04-16Tenant complaint: WATER LEAK — DAMP SPOT
2014-04-16Tenant complaint: UNSANITARY CONDITION — MOLD
2014-04-16Tenant complaint: WATER LEAK — HEAVY FLOW
2014-02-03311: New Tree Request — For One Address
2014-01-24311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2014-01-13311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2014-01-10311: Noise - Residential — Banging/Pounding
2014-01-01311: Noise - Residential — Banging/Pounding
2013
2013-12-27311: Noise - Residential — Banging/Pounding
2013-12-26311: Noise - Residential — Banging/Pounding
2013-12-10311: Noise - Residential — Banging/Pounding
2013-11-27311: Noise - Residential — Banging/Pounding
2013-11-25311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2013-11-18311: Blocked Driveway — Partial Access
2013-11-16311: Noise - Residential — Banging/Pounding
2013-10-26311: Noise - Residential — Banging/Pounding
2013-09-11311: Street Sign - Damaged — Street Cleaning - ASP
2013-06-27311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2013-06-21311: Missed Collection (All Materials) — 1 Missed Collection
2013-06-03Mortgage assigned — from BANK OF AMERICA, N.A to GREEN TREE SERVICING LLC
2013-05-17311: Consumer Complaint — False Advertising
2013-05-02Mortgage satisfied — from EVANS, CYNTHIA; BROWN, MATTIE to BERGMAN, BELLE; BERGMAN, DANIEL
2013-04-03311: General Construction/Plumbing — Failure To Maintain
2013-03-24311: Blocked Driveway — No Access
2013-03-21Mortgage $1,000 — from EVANS, CYNTHIA to SUSTAINABLE NEIGHBORHOODS, LLC$1,000
2013-02-06311: Plumbing — Plumbing-Defective/Leaking/Not Maintained
2013-01-28Agreement $219,160 — from EVANS, CYNTHIA to JPMORGAN CHASE BANK$219,160
2013-01-28Mortgage $6,219 — from EVANS, CYNTHIA to JPMORGAN CHASE BANK$6,219
2013-01-28SUBM — from BERGMAN, BELLE; BERGMAN, DANIEL to JPMORGAN CHASE BANK NA
2012
2012-10-20311: Damaged Tree — Tree Alive - in Poor Condition
2012-08-07311: New Tree Request — For One Address
2012-07-09311: Illegal Parking — Posted Parking Sign Violation
2012-05-31311: Street Condition — Unsafe Worksite
2012-05-23311: Blocked Driveway — Partial Access
2012-05-10311: Illegal Parking — Posted Parking Sign Violation
2012-05-09311: Blocked Driveway — No Access
2012-05-09311: Blocked Driveway — Partial Access
2012-05-09311: Blocked Driveway — No Access
2012-04-07Mortgage assigned — from COUNTRYWIDE BANK, FSB; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS to COUNTRYWIDE HOME LOANS SERVICING, LP; BANK OF AMERICA, N.A.; BAC HOME LOANS SERVICING, LP
2011
2011-12-13DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
2011-11-22DOB violation E:
2011-09-30311: Illegal Tree Damage — Unauthorized Tree Removal
2011-09-06311: PLUMBING — WATER-LEAKS
2011-09-06311: PAINT - PLASTER — CEILING
2011-09-06311: PLUMBING — WATER-LEAKS
2011-09-06311: PLUMBING — WATER-LEAKS
2011-09-06Tenant complaint: PLUMBING — WATER-LEAKS
2011-09-06Tenant complaint: PLUMBING — WATER-LEAKS
2011-09-06Tenant complaint: PAINT/PLASTER — CEILING
2011-09-06Tenant complaint: PLUMBING — WATER-LEAKS
2011-04-25311: Illegal Parking — Posted Parking Sign Violation
2011-04-18311: Blocked Driveway — No Access
2011-04-10311: Street Light Condition — Street Light Out
2010
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14Agreement $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-12-14CORRM $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-12-14AL&R — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2010-11-16DOB violation E:
2010-10-26Mortgage satisfied — from PEREZ, JENEVER to JPMORGAN CHASE BANK, N.A.
2010-10-26Mortgage satisfied — from PEREZ, JENEVER to JPMORGAN CHASE BANK, N.A.
2010-10-13Agreement $191,179 — from ARCHBALD, MICHELE A to JPMORGAN CHASE BANK, N.A.$191,179
2010-10-13Agreement $191,179 — from ARCHBALD, MICHELE A to JPMORGAN CHASE BANK, N.A.$191,179
2010-10-13Mortgage $5,571 — from ARCHBALD, MICHELE A to JPMORGAN CHASE BANK, N.A.$5,571
2010-10-13Mortgage $5,571 — from ARCHBALD, MICHELE A to JPMORGAN CHASE BANK, N.A.$5,571
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16AL&R $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-09-16M&CON $4,500,000 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$4,500,000
2010-09-16Mortgage $496,045 — from B.F.A.M. LLC to CAPITAL ONE, N.A.$496,045
2010-08-11Mortgage $5,918 — from DOOKER, KENY R to JPMORGAN CHASE BANK, N.A.$5,918
2010-08-11Agreement $208,325 — from DOOKER, KENY R to JPMORGAN CHASE BANK, N.A.$208,325
2010-03-03311: Water System — Hydrant Knocked Over/Missing (WC)
2010-01-08Deed — from EVANS, CYNTHIA; BROWN, MATTIE to EVANS, CYNTHIA
2009
2009-12-31DOB violation LBLVIO:
2009-12-15Tenant complaint: PLUMBING — WATER-LEAKS
2009-12-15Tenant complaint: PLUMBING — WATER-LEAKS
2009-10-19ECB CLASS - 2 violation: 67X10.40S11.40I10.100B10 67X CAR PHONE 40S NON FIRE PROOF DOOR AND BUCK IN MR TO PLUMBING AND SEWER 40I M/R CEILING 100B FIRE SERV$250
2009-08-19PREL — from CAPITAL ONE, N.A. to B.F.A.M. LLC
2009-08-19PAT — from ADEBOWALE, YETUNDE MUSILIAT to 900 LENOX GARDEN CONDOMINIUM BOARD OF MA
2009-08-19Deed $350,000 — from B.F.A.M. LLC to ADEBOWALE, YETUNDE MUSILIAT$350,000
2009-08-19REL — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2009-08-19PREL — from CAPITAL ONE, N.A. to B.F.A.M. LLC
2009-08-19PAT — from ADEBOWALE, YETUNDE MUSILIAT to 900 LENOX GARDEN CONDOMINIUM BOARD OF MA
2009-08-19Deed $350,000 — from B.F.A.M. LLC to ADEBOWALE, YETUNDE MUSILIAT$350,000
2009-08-19REL — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2009-06-24Job filed: PROPOSED TO INSTALL PLUMBING FIXTURES AND ALL RELATED PIPING ON THE FIRST FLOOR AND ONE EXH FAN IN TOILET OF A 5 STORY RESIDENTIAL BUILDING FILED UNDE$6,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A. to B.F.A.M. LLC$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-21Agreement $6,300,000 — from NORTH FORK BANK; CAPITAL ONE, N.A.$6,300,000
2009-05-15Mortgage $323,876 — from THOULOUIS, JANET C to HEARST, AUSTIN$323,876
2009-04-22REL — from B.F.A.M. LLC to NORTH FORK BANK
2009-04-22PREL — from CAPITAL ONE, NA. to B.F.A.M. LLC
2009-01-21PAT — from THOULOUIS, JANET C to THE 900 LENOX GARDEN CONDOMINIUM
2009-01-21Deed $310,000 — from B.F.A.M. LLC to THOULOUIS, JANET C$310,000
2009-01-21REL — from B.F.A.M. LLC to NORTH FORK BANK
2009-01-21PREL — from B.F.A.M. LLC to NORTH FORK BANK
2008
2008-11-21Job filed: FILING FOR FIRE ALARM SYSTEM FOR DAYCARE MULTIPURPOSE CENTER AT 1ST FLOOR$21,000
2008-11-10Mortgage $224,000 — from BROWN, MATTIE; EVANS, CYNTHIA to JPMORGAN CHASE BANK, N.A.$224,000
2008-11-10PAT — from EVANS, CYNTHIA; BROWN, MATTIE to THE 900 LENOX GARDEN CONDOMINIUM
2008-11-10Deed $280,000 — from B.F.A.M. LLC to EVANS, CYNTHIA; BROWN, MATTIE$280,000
2008-11-10PREL — from CAPITAL ONE, NA. to B.F.A.M. LLC
2008-11-10Mortgage $28,000 — from BROWN, MATTIE; EVANS, CYNTHIA to BERGMAN, BELLE; BERGMAN, DANIEL$28,000
2008-10-31DOB violation E:
2008-10-01Job filed: FILING FOR NEW DAYCARE AT 1ST FLOOR$82,000
2008-08-05PREL — from CAPITAL ONE, N.A. to B.F.A.M. LLC
2008-08-05PAT — from ARCHBALD, MICHELE A to THE 900 LENOX GARDEN CONDOMINIUM
2008-08-05PREL — from CAPITAL ONE, N.A. to B.F.A.M. LLC
2008-08-05PREL — from CAPITAL ONE, N.A. to B.F.A.M. LLC
2008-08-05PREL — from CAPITAL ONE, N.A. to B.F.A.M. LLC
2008-08-05REL — from CAPITAL ONE, N.A. to B.F.A.M. LLC
2008-08-05REL — from CAPITAL ONE, N.A. to B.F.A.M. LLC
2008-08-05REL — from CAPITAL ONE, N.A. to B.F.A.M. LLC
2008-08-05REL — from CAPITAL ONE, N.A. to B.F.A.M. LLC
2008-08-05PREL — from CAPITAL ONE, N.A. to B.F.A.M. LLC
2008-08-05REL — from CAPITAL ONE, N.A. to B.F.A.M. LLC
2008-08-05Mortgage $190,000 — from ARCHBALD, MICHELE A to JPMORGAN CHASE BANK, N.A.$190,000
2008-08-05PAT — from ARCHBALD, MICHELE A to THE 900 LENOX GARDEN CONDOMINIUM
2008-08-05PREL — from CAPITAL ONE, N.A. to B.F.A.M. LLC
2008-08-05Mortgage $190,000 — from ARCHBALD, MICHELE A to JPMORGAN CHASE BANK, N.A.$190,000
2008-08-05Deed $265,000 — from B.F.A.M. LLC to ARCHBALD, MICHELE A$265,000
2008-08-05Deed — from B.F.A.M. LLC to ARCHBALD, MICHELE A
2008-08-05REL — from CAPITAL ONE, N.A. to B.F.A.M. LLC
2008-08-04REL — from B.F.A.M. LLC to CAPITAL ONE, N.A.
2008-08-04PREL — from CAPITAL ONE, N.A. to B.F.A.M. LLC
2008-08-04Deed $236,900 — from B.F.A.M. LLC to DOOKER, KENY R$236,900
2008-08-04Mortgage $207,000 — from DOOKER, KENY R to JPMORGAN CHASE BANK, N.A.$207,000
2008-08-04PAT — from DOOKER, KENY R to THE 900 LENOX GARDEN CONDOMINIUM
2008-08-01REL — from CAPITAL ONE, NA to B.F.A.M. LLC
2008-08-01PREL — from CAPITAL ONE, NA to B.F.A.M. LLC
2008-08-01PREL — from CAPITAL ONE, NA to B.F.A.M. LLC
2008-08-01PREL — from CAPITAL ONE, NA to B.F.A.M. LLC
2008-08-01REL — from CAPITAL ONE, NA to B.F.A.M. LLC
2008-08-01REL — from CAPITAL ONE, NA to B.F.A.M. LLC
2008-08-01REL — from CAPITAL ONE, NA to B.F.A.M. LLC
2008-08-01Deed $450,000 — from B.F.A.M. LLC to PEREZ, JENEVER$450,000
2008-08-01Mortgage $350,000 — from PEREZ, JENEVER to JPMORGAN CHASE BANK, N.A.$350,000
2008-08-01Deed — from B.F.A.M. LLC to PEREZ, JENEVER
2008-08-01REL — from B.F.A.M. LLC to CAPITAL ONE, NA
2008-08-01REL — from CAPITAL ONE, NA to B.F.A.M. LLC
2008-08-01PREL — from CAPITAL ONE, NA
2008-08-01PREL — from CAPITAL ONE, NA to B.F.A.M. LLC
2008-08-01PREL — from CAPITAL ONE, NA to B.F.A.M. LLC
2008-08-01PREL — from CAPITAL ONE, NA to B.F.A.M. LLC
2008-08-01PAT — from PEREZ, JENEVER to THE 900 LENOX GARDEN CONDOMINIUM
2008-08-01REL — from CAPITAL ONE, NA to B.F.A.M. LLC
2008-08-01Mortgage $350,000 — from PEREZ, JENEVER to JPMORGAN CHASE BANK, N.A.$350,000
2008-08-01PAT — from PEREZ, JENEVER to THE 900 LENOX GARDEN CONDOMINIUM
2008-07-24Deed $325,000 — from B.F.A.M. LLC to SALCEDO, JORGE; BARRAGAN, LUISA$325,000
2008-07-24Deed $325,000 — from B.F.A.M. LLC to SALCEDO, JORGE; BARRAGAN, LUISA$325,000
2008-07-23Mortgage $308,750 — from BARRAGAN, LUISA; SALCEDO, JORGE to MERS$308,750
2008-07-23PAT — from SALCEDO, JORGE; BARRAGAN, LUISA to BOARD OF MANAGERS OF THE 900 LENOX GARDE
2008-07-23Mortgage $308,750 — from BARRAGAN, LUISA; SALCEDO, JORGE to MERS$308,750
2008-07-23PAT — from SALCEDO, JORGE; BARRAGAN, LUISA to BOARD OF MANAGERS OF THE 900 LENOX GARDE
2008-07-21Deed $349,830 — from B.F.A.M. LLC to BISHOP, KENRICK L$349,830
2008-07-21PAT — from BISHOP, KENRICK L to THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16MAPS — from THE 900 LENOX GARDEN CONDOMINIUM
2008-06-16CDEC — from THE 900 LENOX GARDEN CONDOMINIUM
2008-04-04Job filed: CONDOMINIUM SUBDIVISION
2007
2007-05-24Job filed: ERECTION OF 50' HIGH & 215' WIDE HEAVY DUTY SCAFFOLD AS PER ATTACHED BSA # 36244SM & SKETCH . FILED IN CONJ TO NB APPLICATION # 302076624
2006
2006-06-06Job filed: Installation of sprinkler system throughout the building and sprinkler water main. Filed in conjunction with new building application number 30207662$2,000
2006-03-23Job filed: Erect temporary heavy duty sidewalk shed in conjuncion with NB application #302076624
2006-03-09Job filed: NB
2006-03-09Job filed: NB
2006-03-02Job filed: Builder's pavement plan checklist submitted herewith for total lot frontage of 237.00 linear feet on Lenox Road and east 55th Street.
2006-01-30Job filed: C/C 10'-0"= 7'-0"+ (2) 1'-6" SPLAYS ON L ENOX ROAD 126.0'EAST OF EAST 55 H ST & 7'-0"+ (2) 1'-6" SPLAYS ON EAST 5 5TH ST 83.17' SOUTH OF LENOX RD
2006-01-30Job filed: NB
2005
2005-09-29Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 135' DURING FACADE RESTORATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHED TO COMPLY WITH LL33/91 AND TPPN
2005-09-20ECB Hazardous violation: FAILURE TO PROVIDE SIDEWALK SHED. UPON INSPECTION OF ABOVE PROPERTY INTERIOR DEMOLITION IN PROGRESS. 4' CHAINLINK AND IRON FENCE E$2,000
2005-09-20ECB Hazardous violation: FAILURE TO REMOVE GLASS PRIOR TO DEMO. AT THE TIME OF INSPECTION INTERIOR DEMOLITION IN PROGRESS. APPROX. 80% OF GLASS STILL IN PL$500
2005-07-06Job filed: DM

Support this site Back to the building page