The city's published records show little recorded distress here in the last three years. More recorded distress than 77% of 1-5-unit residential buildings citywide. The citywide median for 1-5-unit residential buildings is 0 penalty
points per 10 units; this building carries 1.3. In ZIP 11225, 70% of residential buildings hold an A and
6% grade D or F.
How grades work
this building
A
C
Among 699,345 1-5-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
29 service requests in the last three years. Most common: Noise (13) · Dirty Condition (6) · Missed Collection (2) · UNSANITARY CONDITION (1) · Drinking (1) · Building/Use (1).
Filed construction activity
$193,000 in permitted construction work filed since
2016 (2 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1925)
No
Six or more residential units (2)
No
421-a / J-51 tax benefit on the current tax roll
1 of 3 signals present. Only a partial profile — stabilization is possible but less likely. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
589 Flatbush Owner LLC
Head officer
Oren Neria
Managing agent
Redstone Realty NYC
Last registered
2025-05-28
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$2,227,000
$133,620
2026
$2,819,000
$169,140
2027
$3,204,000
$192,240
The city's market estimate has risen
44% between tax years 2025 and 2027.
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
29 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $500,000 on
2026-04-02 (lender: Ridgewood Savings Bank). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2026-04-02
Mortgage $500,000 — from 589 FLATBUSH OWNER LLC to RIDGEWOOD SAVINGS BANK
$500,000
2026-04-02
Agreement $1,500,000 — from 589 FLATBUSH OWNER LLC to RIDGEWOOD SAVINGS BANK
$1,500,000
2026-04-02
AL&R $1,500,000 — from 589 FLATBUSH OWNER LLC to RIDGEWOOD SAVINGS BANK
$1,500,000
2025-07-11
Agreement $1,000,000 — from 589 FLATBUSH OWNER LLC to 966 UTICA AVENUE LLC
$1,000,000
2025-05-02
Deed $1,530,000 — from MBH 589 FLATBUSH AVE LLC to 589 FLATBUSH OWNER LLC
$1,530,000
2025-04-23
Sold for $1,530,000
$1,530,000
$765,000
2017-08-01
Mortgage $550,000 — from MBH 589 FLATBUSH AVE LLC to SIGNATURE BANK
$550,000
2017-08-01
Agreement $1,425,000 — from MBH 589 FLATBUSH AVE LLC to SIGNATURE BANK
$1,425,000
2017-08-01
AL&R $1,425,000 — from MBH 589 FLATBUSH AVE LLC to SIGNATURE BANK
$1,425,000
2016-01-29
AL&R $875,000 — from MBH 589 FLATBUSH AVE LLC to SIGNATURE BANK
$875,000
2016-01-29
Mortgage $875,000 — from MBH 589 FLATBUSH AVE LLC to SIGNATURE BANK
$875,000
2015-12-24
Deed $1,200,000 — from ALI, MOBARACK to MBH 589 FLATBUSH AVE LLC
$1,200,000
1999-01-28
Mortgage $215,950 — from ALI, MOBARACK to AMERITRUST NATIONALMORTGAGE BANKERS INC
$215,950
1995-10-19
Mortgage $90,000 — from ALMANSORI, ALI AHMEDKASSIM to GREENPOINT BANK
$90,000
1990-02-20
Mortgage $40,000 — from HEPBURN, MAVIS to TUTHILL FINANCE
$40,000
Ten-year activity
50250
2017
30
2018
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
1
3
6
4
0
14
2018
0
1
27
0
2
30
2019
0
1
15
0
0
16
2020
0
0
4
0
0
4
2021
0
0
6
0
1
7
2022
0
0
4
0
2
6
2023
0
3
4
0
1
8
2024
0
1
19
4
1
25
2025
0
0
6
5
1
12
2026
0
0
6
4
0
10
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2024-04-30Mortgage assigned — from FEDERAL DEPOSIT INSURANCE CORPORATION; IN ITS CAPACITY AS RECEIVER FOR; SIGNATURE BANK, NE to SIGNATURE BRIDGE BANK, N.A.
2024-04-30AALR — from SIGNATURE BANK, NEW YORK, NEW YORK; IN ITS CAPACITY AS RECEIVER FOR; FEDERAL DEPOSIT INSUR to SIGNATURE BRIDGE BANK, N.A.
2024-04-30Mortgage assigned — from SIGNATURE BRIDGE BANK, N.A.; FEDERAL DEPOSIT INSURANCE CORPORATION; IN ITS CAPACITY AS REC to SIG CRE 2023 VENTURE LLC
2024-04-30AALR — from IN ITS CAPACITY AS RECEIVER FOR; SIGNATURE BRIDGE BANK, N.A.; FEDERAL DEPOSIT INSURANCE CO to SIG CRE 2023 VENTURE LLC
2022-11-17HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2022-06-15311: Noise — Noise: air condition/ventilation equipment (NV1)
2022-03-21Boiler inspection
2022-01-17Bedbug filing: 0 infested units
2021
2021-12-01Boiler inspection — defects found
2021-11-02311: Vaccine Mandate Non-Compliance — Customer Proof of Vaccination Not Checked
2019-11-08DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
2019-10-30HPD class C: § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF EXTREMELY HOT WATER WITH A TEMPERATURE OF 157F EXCEEDING THE MAXIMUM ALLOW
2019-10-30HPD class B: § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF A BICYCLE AT PUBLIC HALL, 2nd STORY
2019-10-23HPD class A: § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE FIRE RETARDED PLASTER CEILING AT PUBLIC HAL
2019-10-23HPD class A: § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDED PLASTER CEILING AT PUBLIC HALL, 3rd STORY
2019-09-18311: Noise - Vehicle — Car/Truck Music
2019-09-18311: Noise - Vehicle — Car/Truck Music
2019-03-17311: HEAT/HOT WATER — ENTIRE BUILDING
2019-03-17311: HEAT/HOT WATER — ENTIRE BUILDING
2019-03-17Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019-03-17Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019-03-02311: HEAT/HOT WATER — ENTIRE BUILDING
2019-03-02311: HEAT/HOT WATER — ENTIRE BUILDING
2019-03-02Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019-03-02Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2017-03-28Job filed: FILING FOR A FIRE SUPPRESSION SYSTEM. COOKING EQUIPMENT AND GAS VALVE WERE FILED UNDER APPL#301772856. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,000
2017-03-16ECB CLASS - 2 violation: B265 AS PER CLASS 2 (B265) 28-303.7 FAILURE TO FILE A COMPLETE BOILER INSPECTION REPROT AS PER DOB RECORDS. SUBMIT A CURRENT B09 R$500
2017-02-24DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
2016
2016-03-30Mortgage satisfied — from ALI, MOBARACK to M&T MORTGAGE CORPORATION; M&T BANK
2016-03-02Permit PL — ISSUED
2016-02-23Permit EW — ISSUED
2016-02-23Permit EW — ISSUED
2016-02-23Job filed: INTERIOR RENOVATION OF AN EXISTING 3 STORY, TWO- FAMILY DWELLING INCLUDING INSTALLATION OF NEW AND REPLACEMENT OR RELOCATION OF EXISTING FIXTURES, FIN$190,000
2016-02-18311: Graffiti — Graffiti
2016-01-29AL&R $875,000 — from MBH 589 FLATBUSH AVE LLC to SIGNATURE BANK$875,000
2016-01-29Mortgage $875,000 — from MBH 589 FLATBUSH AVE LLC to SIGNATURE BANK$875,000
2015
2015-12-24Deed $1,200,000 — from ALI, MOBARACK to MBH 589 FLATBUSH AVE LLC$1,200,000
2015-10-15Permit EW — ISSUED
2015-10-01DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
2010-04-02311: Street Condition — Defective Hardware
2009
2009-12-31DOB violation LBLVIO:
2009-01-01DOB violation LL6291:
2008
2008-01-03DOB violation LL6291:
2007
2007-01-19DOB violation LL6291:
2006
2006-01-06DOB violation LL6291:
2005
2005-01-31DOB violation LL6291:
2004
2004-07-15Permit PL — ISSUED
2004-05-24HPD class B: HMC ADM CODE: § 27-2018.4 ABATE THE NUISANCE CONSISTING OF VERMIN MICE AND ROACHES THROUGHOUT, 3RD STORY APT 2.
2004-05-24HPD class C: § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE CEILING CENTER & WEST ROOM, 3RD STORY APT #03.
2004-05-24HPD class C: § 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES KITCHEN AND BATHROOM, 3RD STORY APT 2.
2004-05-24HPD class C: § 27-2073 ADM CODE - PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES 3RD STORY APT 2.
2004-05-24HPD class C: § 27-2026 ADMIN. CODE: REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN SINK KITCHEN WASTE LINE. 3RD STORY APT #2.
2004-05-24HPD class C: § 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES KITCHEN AND BATHROOM, 3RD STORY APT 2.
2004-05-24HPD class C: § 27-2010,2011,2012 ADMIN. CODE: CLEANSE AND DISINFECT TO THE SATISFACTION OF THIS DEPARTMENT AFTER REMOVING THE SEWAGE CELLAR CENTER.
2004-05-24HPD class B: § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING KITCHEN & FOYER 3RD STORY APT. #
2004-05-24HPD class B: § 27-2073 ADM CODE - PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES GAS RANGE KITCHEN 3RD STORY APT. #03.
2004-05-24HPD class C: § 27-2026 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTELINE UNDER KITCHEN SINK, 3RD STORY APT 2.
2004-05-24HPD class B: § 27-2026 ADMIN. CODE: REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN BATHTUB BATHROOM, 3RD STORY APT. #03.
2004-05-24HPD class B: § 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS SINK KITCHEN 3RD STORY APT. # 03.
2004-05-24HPD class B: § 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE ,HOT AND COLD WATER FAUCETS KITCHEN SINK, 3RD STORY APT 2.
2004-05-24HPD class C: § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CEMENT PLASTER CEILING 3RD STORY PUBLIC HALL.
2004-05-24HPD class B: § 27-2005 ADMIN. CODE: REMOVE THE ILLEGAL FASTENING HASP AND PADLOCK DOOR TO SCUTTLE CLOSET, PADLOCK REMOVE AT TIME OF INSPECTION.
2004-05-24HPD class B: § 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF WATER STAINED CEILING SOUTH WEST ROOM, 3RD STORY APT 2.
2004-05-24HPD class C: § 27-2026 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTE PIPE UNDER WASH BASIN IN BATHROOM, 3RD STORY APT #2
2004-05-24HPD class B: § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR WALL SOUTHWEST ROOM. 3RD STORY APT 2.
2004-05-24HPD class B: § 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES KITCHEN & BATHROOM 3RD STORY APT. #03.
2004-05-24HPD class C: § 27-2010,2011,2012 ADMIN. CODE: CLEANSE AND DISINFECT TO THE SATISFACTION OF THIS DEPARTMENT AFTER REMOVING THE WATER & SEWAGE CELLAR , CEN
2004-05-24HPD class C: § 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES BATHROOM & KITCHEN, 3RD STORY APT.
2004-05-24HPD class B: § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING CENTER & WEST ROOM, 3RD STORY AP
2004-05-24HPD class A: § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE BELL SYSTEM TO 3RD STORY APT 2.
2004-05-11Permit EW — ISSUED
2004-03-16Job filed: CONVERSION OF EXISTING STORE TO EATING & DRINKING ESTABLISHMENT T FIRST LOOR LEGALIZATION OF MINOR INTERIOR WALL S AND DOOR OPENING AT SECOND FLOO$12,000
2004-02-13DOB violation LL6291:
2004-01-16Tenant complaint: HEATING — HEAT RELATED
2003
2003-09-11Permit EW — ISSUED
2003-08-29Job filed: Install automatic fire suppression system in kitchen rangehood. No change in use, egress and occupancy.$2,200
2003-08-29Job filed: Install automatic fire suppression system in kitchen rangehood. No change in use, egress and occupancy.$2,200
2003-05-29DOB violation E:
2003-03-19DOB violation LL6291:
2003-03-14HPD class B: § 27-2026 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTE PIPE AT SINK IN THE KITCHEN LOCATED AT APT 2, 3rd STORY
2003-03-14HPD class B: § 27-2026 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTE PIPE AT WASH BASIN IN THE BATHROOM LOCATED AT APT 2, 3rd STORY
2003-03-14HPD class C: § 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2, 3rd STORY
2003-03-13Tenant complaint: PLUMBING — BASIN/SINK
2003-03-13Tenant complaint: HEATING — HEAT RELATED
2003-03-13Tenant complaint: GENERAL — WINDOWS
2003-03-13Tenant complaint: PLUMBING — BASIN/SINK
2003-02-28HPD class B: § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE BUZZER SYSTEM FROM ENTRANCE TO BLDG TO IN THE ENTIRE APARTMENT LOCATED AT APT
2003-02-28HPD class A: § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILINGS THROUGHOUT IN THE ENTIRE APA
2003-02-21Tenant complaint: PLUMBING — BASIN/SINK
2003-02-21Tenant complaint: ELECTRIC — BELL-BUZZER/INTERCOM
2003-02-21Tenant complaint: PLUMBING — BASIN/SINK
2002
2002-11-25HPD class B: § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE VANITY AT WEST WALL IN THE BATHROOM LOCATED AT APT 2, 3rd STORY
2002-11-25HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR NORTH WALL AT 4th ROOM FROM EAST, 3rd STOR
2002-11-25HPD class B: § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE (HOLLEY) AT ENTIRE APARTMENT, 3rd STORY, APARTMENT
2002-11-25HPD class A: § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 2,
2002-11-25HPD class A: § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 2,
2002-11-25HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE NORTH WINDOW AT 5th ROOM FROM EAST AT NORTH, 3rd STORY, APARTMENT
2002-11-25HPD class B: § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF TOILET, 3RD STORY AT PUBLIC HALL
2001
2001-09-19DOB violation C: WORK WITHOUT A PERMIT: WORK NOTED: RENOVATION IN PROGRESS AT 2ND STORY .OB ERVED NEW SHEET ROCK WALLS. (2) NEW DROP ARCH. (3) NEW
2001-09-19ECB Non-Hazardous violation: WORK WITHOUT A PERMIT: WORK NOTED: RENOVATION IN PROGRESS AT 2ND STORY. OBSERVED NEW SHEET ROCK WALLS(2) NEW DROP ARCH. (3) NEW BA$500
2001-09-10DOB complaint, category ?
2001-02-27DOB violation LL6291:
2000
2000-09-21HPD class B: § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCKING DEVICE ENTRANCE DOOR TO BUILDING AT PUBLIC HALL
2000-09-21HPD class B: § 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE WASH BASIN AND SHOWER CURTAIN ROD AT BATHROOM, 2nd STORY, APARTMENT
2000-09-21HPD class C: § 27-2073 ADM CODE - PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES NO GAS NON PAYMENT GAS RANGE AT KITCHEN, 2nd STORY, APARTMENT
2000-09-21HPD class B: § 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ELECTRICAL EXTENTION CORDS AT FLOOR AT PUBLIC HALL, 1st STORY
2000-09-21HPD class A: § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT EAST WALL AT 2nd ROOM FROM NORTH AT WEST, 2nd S
2000-09-21HPD class A: § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE WASH BASIN CABINET AT BATHROOM, 2nd STORY, APARTMENT
2000-09-21HPD class B: § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRICAL WALL OUTLET AT 2nd ROOM FROM NORTH AT WEST, 2nd STORY, APARTMENT
2000-08-19HPD class C: § 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES KITCHEN AND IN THE BATHROOM LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FR
2000-02-07DOB violation LL6291:
1999
1999-06-04Mortgage satisfied — from ALMANSORI, ALI AHMEDKASSIM to GREENPOINT BANK
1999-03-16DOB violation LL6291:
1999-01-28Deed — from ALMANSORI, ALI AHMEDKASSIM; ALI, MUHAMMED to ALI, MOBARACK
1999-01-28Mortgage assigned — from AMERITRUST NATIONALMORTGAGE BANKERS, INC to M & T MORTGAGE CORPORATION
1999-01-28Mortgage $215,950 — from ALI, MOBARACK to AMERITRUST NATIONALMORTGAGE BANKERS INC$215,950
1998
1998-05-04DOB violation LL6291:
1997
1997-11-26ECB Hazardous violation: FAILURE TO MAINTIAN BUILDING. DEFECT IS: 3 WOOD FLOOR JOISTS ARE ROTTED AND DEFECIVE, TIN CEILING IS BROKEN AND HANGING, DROP CEIL$800
1997-11-26DOB violation C:
1997-11-13DOB complaint, category ?
1997-02-10DOB violation LL6291:
1996
1996-07-03ECB Non-Hazardous violation: 36$400
1996-04-25Deed — from ALMANSORI, ALI AHMEDKASSIM to ALI, MUHAMMED; ALMANSORI, ALI AHMEDKASSIM
1995
1995-10-19Mortgage $90,000 — from ALMANSORI, ALI AHMEDKASSIM to GREENPOINT BANK$90,000
1995-10-19Deed — from WAINCO FUNDING; WAIN, BERNARD to ALMANSORI, ALI AHMEDKASSIM
1995-10-19Deed — from COMPERE, WILFRED/DEF; NYC ENVIRONMENTAL CONTROL BOARD/DEF; BEACH, LOIS/DEF; NYC PARKING VI to ALMANSORI, ALI AHMEDKASSIM
1995-08-29DOB violation LL6291:
1994
1994-09-09Deed — from HEPBURN, MAVIS/DEF/ET AL; GIGANTE, ROBERT J/REF to WAINCO FUNDING; WAIN, BERNARD
1994-06-01DOB violation LL6291:
1993
1993-08-16DOB violation LL6291:
1993-06-01DOB violation LL6291:
1992
1992-08-20DOB complaint, category ?
1992-06-08Deed — from MOODY, MARK to HEPBURN, MAVIS
1991
1991-12-06Deed — from HEPBURN, MAVIS to MOODY, MARK
1991-10-23Mortgage assigned — from TUTHILL FINANCE to BENTLEY MOSHER & BABSON
1990
1990-02-20Mortgage $40,000 — from HEPBURN, MAVIS to TUTHILL FINANCE$40,000
1990-02-20Mortgage assigned — from TUTHILL FINANCE to BENTLEY M &B PC TRUSTEE
1985
1985-09-30Mortgage $45,000 — from HEPBURN, MAVIS to GREEN POINT SAVS BANK$45,000
1985-09-12Mortgage satisfied — from HEPBURN, MAVIS to SOLAGE RLTY CORP
1975
1975-03-27Mortgage — from HEPBURN MAVIS to SOLAGE RLTY CORP
1975-03-27Deed — from SOLAGE RLTY CORP to HEPBURN MAVIS