The city's published records show little recorded distress here in the last three years. Less recorded distress than 100% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty
points per 10 units; this building carries 0. In ZIP 10003, 67% of residential buildings hold an A and
4% grade D or F.
How grades work
this building
A
B
C
Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
40 service requests in the last three years. Most common: Encampment (16) · For Hire Vehicle Complaint (4) · Noise (3) · Abandoned Bike (3) · Illegal Dumping (3) · Homeless Person Assistance (2).
Filed construction activity
$149,000 in permitted construction work filed since
2016 (23 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1920)
Yes
Six or more residential units (12)
No
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
120 SECOND AVE OWNERS CORP
Head officer
ROBIN WENRICK
Managing agent
BUCHBINDER & WARREN LLC
Last registered
2025-08-26
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$4,275,000
$1,923,750
2026
$3,755,000
$1,689,750
2027
$3,422,000
$1,539,900
The city's market estimate has fallen
20% between tax years 2025 and 2027.
For property tax, the Department of Finance values this co-op
as if it were a rental building. Its 2022 estimate: gross income $704,968 a year
($43.38 per sq ft), operating expenses $222,151
($13.67 per sq ft), net operating income $482,817. These are the
city's estimates from comparable rentals, not the building's actual budget, rents or maintenance
charges.
Building systems
Heating fuel
NATURALGAS
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 6 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Astor Pl — 6 · 0.2 mi straight-line (about a 6-minute walk) · station accessibility: none 8 St-NYU — R W · 0.3 mi straight-line (about an 8-minute walk) · station accessibility: none
Bus
Nearest boarding stop: Saint Marks Pl / 2 Av — M8 · 250 ft
Citi Bike
St Marks Pl & 2 Ave · 200 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)
Elementary: Elementary schools in this district are not zoned. Confirm with the DOE's school search.
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
40 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $163,501 on
2023-03-31 (lender: Valley National Bank). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2026-07-27
RPTT&RET $999,000 — from CURRY, MICHAEL L; CURRY, EVA; CURRY, WILLIAM to DOWSETT, KIRSTIN MARIE SOTO; DOWSETT, DRAKE PENNINGTON
$999,000
2026-05-28
Sold for $999,000
$999,000
$83,250
2023-03-31
AL&R $600,000 — from 120 SECOND AVENUE OWNERS CORP. to VALLEY NATIONAL BANK
$600,000
2023-03-31
Agreement $600,000 — from 120 SECOND AVENUE OWNERS CORP. to VALLEY NATIONAL BANK
$600,000
2023-03-31
Mortgage $163,501 — from 120 SECOND AVENUE OWNERS CORP. to VALLEY NATIONAL BANK
$163,501
2022-10-04
RPTT&RET $710,000 — from BILBAO GOXENCIA, ALEXANDER INAKI; DE CASTRO, HENRIQUE CESAR to JAIN, CHARU
$710,000
2021-08-13
RPTT&RET $670,000 — from DEL PEON, GONZALO SR. to CHOY, XIULUNG
$670,000
2021-08-05
Sold for $670,000
$670,000
$55,833
2021-06-30
RPTT&RET $925,000 — from MELHADO, BRITTANY; MELHADO, NICHOLAS; MCANDREW, BRITTANY to LU, YUCHENG
$925,000
2021-06-18
Sold for $925,000
$925,000
$77,083
2020-09-01
RPTT&RET $999,800 — from CIANCI, DONNA M; CIANCI, ANTHONY R to WENRICK, N. ROBIN; WENRICK, EDWARD J
$999,800
2020-08-17
Sold for $999,800
$999,800
$83,317
2020-08-13
RPTT&RET $545,000 — from HANNA, STEPHEN; SHUFORD, BRET to GWOZDZIK, SPENSER PAUL; CAPUTO, GRACE LORETTA
$545,000
2020-08-06
Sold for $545,000
$545,000
$45,417
2018-08-09
RPTT&RET $557,000 — from MIGA, MATTHEW BRENDAN to DE CASTRO, HENRIQUE CESAR; GOXENCIA, ALEXANDER INAKI BILBAO
$557,000
Ten-year activity
50250
2017
37
2018
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
0
1
17
0
4
22
2018
0
0
32
2
3
37
2019
0
1
13
2
2
18
2020
0
0
7
6
1
14
2021
0
0
3
4
2
9
2022
0
2
3
1
4
10
2023
1
0
2
5
2
10
2024
0
0
14
0
2
16
2025
3
0
19
0
2
24
2026
0
1
9
2
3
15
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2016-03-03Job filed: NEW BOILER AND WATER HEATER AT CELLAR FOR APT. 4B.$6,000
2016-03-03Job filed: NEW BOILER AND WATER HEATER AT CELLAR FOR APT. 4A.$6,000
2016-03-03Job filed: NEW BOILER AND WATER HEATER AT CELLAR FOR APT.5C.$6,000
2016-03-03Job filed: NEW BOILER AND WATER HEATER FOR APARTMENT 3A$6,000
2016-03-03Job filed: NEW BOILER AND WATER HEATER AT CELLAR FOR APT. 2C$6,000
2016-03-03Job filed: REPLACE ORIGINAL CENTRAL BOILER WITH INDIVIDUAL MODULAR BOILER AND WATER HEATER SETUP WITH BREECHING FOR EACH INDIVIDUAL APARTMENT. ALL WORK TO BE DON$5,000
2016-03-03Job filed: NEW BOILER AND WATER HEATER AT CELLAR FOR APARTMENT 3C$6,000
2016-03-03Job filed: NEW BOILER AND WATER HEATER AT CELLAR FOR APT. 5A$6,000
2016-03-03Job filed: NEW BOILER AND WATER HEATER FOR APARTMENT 3A$6,000
2016-03-03Job filed: NEW BOILER AND WATER HEATER AT CELLAR FOR APT. 4A.$6,000
2016-03-03Job filed: NEW BOILER AND WATER HEATER AT CELLAR FOR APT 4C.$6,000
2016-03-03Job filed: NEW BOILER AND WATER HEATER AT CELLAR FOR APT. 5B.$6,000
2016-03-03Job filed: NEW BOILER AND WATER HEATER AT CELLAR FOR APARTMENT 2A.$6,000
2016-03-03Job filed: NEW BOILER AND WATER HEATER AT CELLAR FOR APT.5C.$6,000
2016-03-03Job filed: NEW BOILER AND WATER HEATER FOR APARTMENT 2B.$6,000
2016-03-03Job filed: NEW BOILER AND WATER HEATER AT CELLAR FOR APT. 2C$6,000
2016-03-03Job filed: REPLACE ORIGINAL CENTRAL BOILER WITH INDIVIDUAL MODULAR BOILER AND WATER HEATER SETUP WITH BREECHING FOR EACH INDIVIDUAL APARTMENT. ALL WORK TO BE DON$5,000
2016-03-03Job filed: NEW BOILER AND WATER HEATER AT CELLAR FOR APT. 4B.$6,000
2016-03-03Job filed: NEW BOILER AND WATER HEATER AT CELLAR FOR APT. 3B.$6,000
2016-03-03Job filed: NEW BOILER AND WATER HEATER AT CELLAR FOR APT. 5B.$6,000
2016-03-03Job filed: NEW BOILER AND WATER HEATER AT CELLAR FOR APT. 4A.$6,000
2016-01-08Rodent inspection: Passed
2015
2015-12-22Permit PL — ISSUED
2015-12-09Permit EW — ISSUED
2015-11-25311: Miscellaneous Categories — Inspection Work Order (DOB)
2015-10-23Job filed: INTERIOR RENOVATION OF EXISTING APARTMENT 5B. MINOR PARTITIONS AND PLUMBING FIXTURES WILL BE INSTALLED. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER TH$62,000
2015-10-23Job filed: INTERIOR RENOVATION OF EXISTING APARTMENT 5B. MINOR PARTITIONS AND PLUMBING FIXTURES WILL BE INSTALLED. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER TH$62,000
2015-10-01Permit SG — ISSUED
2015-08-28Rodent inspection: Passed
2015-06-24Permit PL — ISSUED
2015-06-22RPTT&RET $520,000 — from MILLER, ROBERT to DEL PEON, SR., GONZALO$520,000
2015-06-19Permit EW — ISSUED
2015-06-19Permit EW — ISSUED
2015-06-19Job filed: APPLICATION FILED FOR MINOR REVISIONS TO INTERIOR NON-LOAD BEARING PARTITIONS WITH MECHANICAL DUCT WORK, REMOVAL & CAPPING OF PLUMBING FIXTURES AN$336,000
2015-05-26Permit EW — ISSUED
2015-05-26Permit EW — ISSUED
2015-05-26Permit EQ — ISSUED
2015-04-28RPTT&RET $1,051,575 — from ARNAV INDUSTRIES, INC. EMPLOYEE RETIREME to CIANCI, DONNA M; CIANCI, ANTHONY R$1,051,575
2015-04-04City emergency repair (OMO): bldg: apt 2b: install new lock. repair door frame. repair (4) window sashes. apt 2c: correct door frame. repair (3) wind$6,397
2015-03-27311: HEAT/HOT WATER — ENTIRE BUILDING
2015-03-27Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2015-03-26311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2015-03-26DOB complaint, category ?
2015-03-24Rodent inspection: Failed for Rat Activity
2015-02-03RPTT&RET $339,900 — from MAHONEY, CATHY E; MAHONEY, JAMES B; MAHONEY, KEVIN to POTENZA, AMY; MAHONEY, JAMES B$339,900
2015-02-02HPD class I: SECTION27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE ?27-2097 AND IS THER
2015-01-21Permit EW — ISSUED
2015-01-21Permit EW — ISSUED
2015-01-21Permit EQ — ISSUED
2015-01-21Permit PL — ISSUED
2014
2014-12-30Job filed: MINOR INTERIOR STRUCTURAL WORK PROPOSED FOR INSTALLATION OF WOODEN STAIR AT THE CELLAR TO FIRST FLOOR AS PER PLAN. ALL ASSOCIATED GENERAL CONSTRUCTION$4,000
2014-12-30Job filed: SUBSEQUENT APPLICATION FILED FOR THE MINOR REVISIONS TO INTERIOR NON-LOAD BEARING PARTITIONS WITH REMOVAL OF EXISTING PLUMBING FIXTURES AND STOREFRONT$26,625
2014-12-30Job filed: MINOR INTERIOR STRUCTURAL WORK PROPOSED FOR INSTALLATION OF WOODEN STAIR AT THE CELLAR TO FIRST FLOOR AS PER PLAN. ALL ASSOCIATED GENERAL CONSTRUCTION$4,000
2014-12-30Job filed: SUBSEQUENT APPLICATION FILED FOR THE MINOR REVISIONS TO INTERIOR NON-LOAD BEARING PARTITIONS WITH REMOVAL OF EXISTING PLUMBING FIXTURES AND STOREFRONT$26,625
2014-10-16Permit EQ — ISSUED
2014-10-15Permit AL — ISSUED
2014-10-08Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
2014-10-08Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
2014-10-07Permit EQ — ISSUED
2014-10-07Job filed: INSTALLATION OF STUCCO AS PER PLAN.NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$3,000
2014-10-07Job filed: INSTALLATION OF STUCCO AS PER PLAN.NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$3,000
2014-10-06RPTT&RET $1,046,925 — from ARNAV INDUSTRIES, INC. EMPLOYEE RETIREME to CURRY, MICHAEL L$1,046,925
2014-10-06Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAIRS AND INSTALLATION OF TWO SIDEWALK POSTS ON THE ROAD AS PER PLANS. NO CHANG
2014-07-31RPTT&RET $965,000 — from WOLF, SARAH ANN to MELHADO, NICHOLAS; MCANDREW, BRITTANY$965,000
2014-07-09Job filed: INSTALLATION OF A SPRINKLER SYSTEM FOR THE FIRST FLOOR AND CELLAR ONLY IN CONJUNCTION WITH ALT 2 APPLICATION # 121557154. NO CHANGE IN USE, EGRESS, O$30,800
2014-05-01Job filed: INSTALLATION OF A SPRINKLER SYSTEM FOR THE FIRST FLOOR AND CELLAR ONLY IN CONJUNCTION WITH ALT 2 APPLICATION # 121557154. NO CHANGE IN USE, EGRESS, O$30,800
2014-04-03Rodent inspection: Passed
2014-03-18RPTT&RET $515,000 — from GREENE, VIVIEN to MIGA, MATTHEW$515,000
2014-02-03RPTT&RET — from LESTER, JERROLD to LESTER, JERROLD; LESTER, DEBORAH L
2014-01-15DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2013
2013-11-23ECB CLASS - 2 violation: FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES. AT EXP 1 (FRONT OF BLDG) MASONRY LINTELS ABOVE 3RD AND 4TH FLRS WINDOWS ARE SPA$500
2013-09-26ECB CLASS - 2 violation: FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES: MASONRY LINTELS ABOVE3RD FL WINDOWS (FRONT OF BLDG) ARE DEFECTIVE IN THAT THEY AR$500
2013-09-25311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2013-07-09ECB CLASS - 1 violation: WORK W/O PERMIT.AT TIME OF INSPECTION I OBSERVED 7 AUTOMATIC SPRINKLERS INSTALLED IN THE CELLAR W/O A PERMIT.PERMIT#103100528 WAS $1,600
2013-07-09ECB CLASS - 2 violation: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION I OBSERVED AN AUTOMATIC SPRINKLER SYSTEM INSTALLE$500
2013-07-09ECB CLASS - 2 violation: 27MISC.28MISC.BC-MISC.INSUFFICIENT SOURCES OF WATER SUPPLY FOR SPRINK-LER SYSTEM/MISCELLANEOUS VIOLATIONS AT TIME OF INSPECTION I $800
2013-07-02311: Plumbing — Sprinkler System - Inadequate
2013-07-02DOB complaint, category ?
2013-06-04311: Food Establishment — Pet/Animal
2013-05-15Permit PL — ISSUED
2013-05-14TL&R — from FANNIE MAE to 120 SECOND AVENUE OWNERS CORP.
2013-05-14AL&R $550,000 — from 120 SECOND AVENUE OWNERS CORP. to VALLEY NATIONAL BANK$550,000
2013-05-14Agreement $550,000 — from 120 SECOND AVENUE OWNERS CORP. to VALLEY NATIONAL BANK$550,000
2013-05-14Mortgage $44,104 — from 120 SECOND AVENUE OWNERS CORP. to VALLEY NATIONAL BANK$44,104
2013-05-14Mortgage assigned — from FANNIE MAE to SOVEREIGN BANK, N.A.
2013-05-14Mortgage assigned — from SOVEREIGN BANK, N.A. to VALLEY NATIONAL BANK
2013-05-07Permit EW — ISSUED
2013-04-12Rodent inspection: Passed
2013-03-20Job filed: DEMOLISH AND CONSTRUCT INTERIOR PARTITIONS, CEILINGS AND DOORS. INSTALL NEW PLUMBING FIXTURES AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. $265,800
2013-03-20Job filed: DEMOLISH AND CONSTRUCT INTERIOR PARTITIONS, CEILINGS AND DOORS. INSTALL NEW PLUMBING FIXTURES AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. $265,800
2010-11-29RPTT&RET $470,000 — from BERNOTA, GEORGE A to CHUNG, STEVEN$470,000
2010-04-21Rodent inspection: Passed
2010-03-08RPTT&RET $475,000 — from VERGARA, JOAQUIN to SHUFORD, BRET; HANNA, STEPHEN R$475,000
2009
2009-12-04RPTT&RET $460,000 — from O'CONNELL, MELISSA to NGUYEN, NICK$460,000
2008
2008-07-10RPTT&RET $515,000 — from ZADOROZNY, DEBORAH to MAHONEY, JAMES B; MAHONEY, KEVIN; MAHONEY, CATHY E$515,000
2008-06-06DOB complaint, category ?
2007
2007-08-29RPTT&RET $935,661 — from ARNAV INDUSTRIES, INC. EMPLOYEE RETIREME to WOLF, SARAH A; WOLF, KURT$935,661
2007-04-23RPTT $513,500 — from CHEE, ANDREW to VERGARA, JOAQUIN$513,500
2007-04-19DOB complaint, category ?
2006
2006-09-22Permit SG — ISSUED
2005
2005-03-25Tenant complaint: HEATING — HEAT RELATED
2004
2004-05-14HPD class C: SECTION 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FRO
2004-05-13Tenant complaint: PLUMBING — BASIN/SINK
2004-05-13Tenant complaint: HEATING — HEAT RELATED
2004-05-13Tenant complaint: NONCONST — VERMIN
2004-05-13Tenant complaint: GENERAL — FLOOR
2003
2003-06-19AALR — from INDEPENDENCE COMMUNITY BANK to FANNIE MAE
2003-06-19Mortgage assigned — from INDEPENDENCE COMMUNITY BANK to FANNIE MAE
2003-06-19AL&R — from INDEPENDENCE COMMUNITY BANK to 120 SECOND AVENUE OWNERS CORP.
2003-06-19Mortgage $33,493 — from 120 SECOND AVENUE OWNERS CORP. to INDEPENDENCE COMMUNITY BANK$33,493
2003-06-19Agreement — from 120 SECOND AVENUE OWNERS CORP. to INDEPENDENCE COMMUNITY BANK
2002
2002-03-19Permit PL — ISSUED
2002-02-27Permit AL — ISSUED
2002-02-27Permit EQ — ISSUED
2002-02-21Job filed: RENOVATING EXISTING RESTAURANT IN FIRST FLOOR TO NAIL SALON. THE WORK INCLUDES REPLACING OF EXISTING STORE FRONTS, AND INSTALLING OF PARTITION, PLUBM$22,000
2001
2001-08-02Permit EW — ISSUED
2001-06-08ECB Hazardous violation: FAILURE TO MAINTAIN BUILDING.NOTED:PARTIAL COLLAPSE OF 1 FT COMM SPACE.ROTTED FLOOR JOISTS,SAGGING BOUNING FLOOR.TEMPORARY TIMADEQ$800
2001-06-06DOB complaint, category ?
2000
2000-09-14Job filed: Partial replacement of the first floor framing and repair rear courtyard. No change to use, egress, or occupancy.$50,000
2000-09-14Job filed: Partial replacement of the first floor framing and repair rear courtyard. No change to use, egress, or occupancy.$50,000
1998
1998-09-09Mortgage $77,224 — from 120 SECOND AVENUE OWNERS CORP. to INDEPENDENCE SAVINGSBANK$77,224
1998-09-09Agreement — from 120 SECOND AVENUE OWNERS CORP. to INDEPENDENCE SAVINGSBANK
1997
1997-02-10DOB violation LL6291:
1997-02-10DOB violation LL6291:
1997-02-10DOB violation LL6291:
1997-02-10DOB violation LL6291:
1997-02-10DOB violation LL6291:
1997-02-10DOB violation LL6291:
1997-02-10DOB violation LL6291:
1997-02-10DOB violation LL6291:
1997-02-10DOB violation LL6291:
1997-02-10DOB violation LL6291:
1997-02-10DOB violation LL6291:
1997-02-10DOB violation LL6291:
1996
1996-02-23Permit PL — ISSUED
1996-02-08Permit EW — ISSUED
1996-02-08Permit EW — ISSUED
1995
1995-08-29DOB violation LL6291:
1995-08-29DOB violation LL6291:
1995-08-29DOB violation LL6291:
1995-08-29DOB violation LL6291:
1995-08-29DOB violation LL6291:
1995-08-29DOB violation LL6291:
1995-08-29DOB violation LL6291:
1995-08-29DOB violation LL6291:
1995-08-29DOB violation LL6291:
1995-08-29DOB violation LL6291:
1995-08-29DOB violation LL6291:
1995-08-29DOB violation LL6291:
1995-04-27Mortgage satisfied — from RIVERSIDE ASSOCIATES to ARNAV INDUSTRIES INC. EMPLOYEES RETIREME
1993
1993-03-18DOB violation LL6291:
1993-03-18DOB violation LL6291:
1993-03-18DOB violation LL6291:
1993-03-18DOB violation LL6291:
1993-03-18DOB violation LL6291:
1993-03-18DOB violation LL6291:
1993-03-18DOB violation LL6291:
1993-03-18DOB violation LL6291:
1993-03-18DOB violation LL6291:
1993-03-18DOB violation LL6291:
1993-03-18DOB violation LL6291:
1988
1988-02-26Agreement — from INDEPENDENCE SAVINGSBK to 120 SECOND AVE OWNERS CP
1988-02-26Agreement — from RIVERSIDE ASSOCIATES to INDEPENDENCE SAVINGSBK
1988-02-26Mortgage assigned — from T.G.B. COMPANY to INDEPENDENCE SAVINGSBK
1987
1987-10-26SAGE — from RIVERSIDE ASSOCIATES
1987-10-26Deed — from RIVERSIDE ASSOCIATES to 120 SECOND AVE OWNRSCP
1987-10-26Mortgage assigned — from ARNAV INDUSTRIES INC to RIVERSIDE ASSOCIATES
1987-10-26Agreement — from 120 SECOND AVE OWNRSCRP to RIVERSIDE ASSOCIATES
1987-10-26CERT — from ARNAV INDUSTRIES INCETC
1986
1986-01-14Deed — from T.G.B. COMPANY to RIVERSIDE ASSOCIATES
1986-01-14Mortgage $599,900 — from RIVERSIDE ASSOCIATES to T.G.B. COMPANY$599,900
1986-01-14Mortgage satisfied — from TGB COMPANY to PAMARU REALTY CORP
1986-01-14Agreement — from T.G.B. COMPANY to ARNAV INDUSTL, INC.ETC.
1986-01-14Mortgage satisfied — from TGB COMPANY to PAMARU REALTY CORP
1983
1983-01-10Mortgage assigned — from PAMARU REALTY CORP. to LANE, SYLVIA
1983-01-10Mortgage assigned — from PAMARU REALTY CORP. to LANE, SYLVIA
1980
1980-08-04Mortgage — from T G B COMPANY to PAMARU REALTY CORP
1980-08-04Deed — from PAMARU REALTY CORP to T G B COMPANY
1980-08-04Mortgage — from T G B COMPANY to PAMARU REALTY CORP
1975
1975-07-16Mortgage assigned — from BOWERY SAVINGS BANK to RIESNER, RUTH; SCHWARTZ, PAULINE
1973
1973-01-25Agreement — from PAMARU REALTY CORP to REDAS HOLDING CORP