Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

210 West 21 Street · Manhattan · BBL 1007700048 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

Where the penalty points come from

ComponentWhat it coversPoints
Housing codeHPD violations by class, complaints, emergency repairs, litigation, vacate orders, AEP2
Structural & safetyDOB violations, ECB/OATH violations by class6
PestsBedbug filings, failed rodent inspections, rodent 311s0
DisplacementMarshal evictions executed0
GRADE A

The city's published records show little recorded distress here in the last three years. Less recorded distress than 80% of 25-99-unit residential buildings citywide. The citywide median for 25-99-unit residential buildings is 23.6 penalty points per 10 units; this building carries 2.9. In ZIP 10011, 68% of residential buildings hold an A and 5% grade D or F. How grades work

this building
A
B
C

Among 17,252 25-99-unit residential buildings citywide · left is less recorded distress, right is more

Open with the city right now

No current HPD flags in the latest weekly snapshot: no open violations, no pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.

Patterns

No heat or hot-water complaints in the last three years.

No bedbug-infested units reported in the last three years of filings.

What 311 hears from this address

14 service requests in the last three years. Most common: General Construction/Plumbing (6) · Real Time Enforcement (3) · Homeless Person Assistance (1) · Encampment (1) · Lead (1) · Asbestos (1).

Filed construction activity

$1,210,310 in permitted construction work filed since 2016 (26 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

Rent-stabilization signals

YesBuilt before 1974 (1902)
YesSix or more residential units (28)
No421-a / J-51 tax benefit on the current tax roll

2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit: request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).

Registered with HPD — the names behind the building

Registered owner(s)210 EQUITIES CORP.
Head officerSARAH J CORNHILL
Managing agentSYNOPTIC MANAGEMENT CORP.
Last registered2025-08-22

as filed by the owner in the building's HPD registration

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$6,232,000 $2,804,400
2026$7,126,000 $3,206,700
2027$6,873,000 $3,092,850

The city's market estimate has risen 10% between tax years 2025 and 2027.

For property tax, the Department of Finance values this co-op as if it were a rental building. Its 2022 estimate: gross income $1,129,530 a year ($44.96 per sq ft), operating expenses $433,372 ($17.25 per sq ft), net operating income $696,158. These are the city's estimates from comparable rentals, not the building's actual budget, rents or maintenance charges.

Building systems

Energy grade (LL33)D — ENERGY STAR score 53/100, posted at the entrance by law (2022 disclosure cycle)
Heating fuelNATURALGAS
Facade (Local Law 11)SWARMP — "Safe With A Repair and Maintenance Program": known facade conditions that must be repaired (cycle 9)

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Hurricane evacuation zone 5 of 6 — zone 1 evacuates first.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

No street-flooding or sewer-backup complaints on record at this address.

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

Subway23 St — 1 · 600 ft straight-line (about a 3-minute walk) · station accessibility: none
BusNearest boarding stop: 7 Av / W 20 St — M7 M20 · 300 ft
Citi BikeW 20 St & 7 Ave · 200 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: P.S. 011: The Sarah J. Garnet Elementary School
Middle: M.S. 297. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

210 West 21 Street

Heat or hot waterHeat or hot water
Apartment maintenanceApartment maintenance
Bed bugsBed bugs
Residential pestsResidential pests
Rats or miceRats or mice
Anything elseAnything else

14 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

The landlord's report card

Managed by SYNOPTIC MANAGEMENT CORP — 91 buildings, 1,632 units. Grades across the portfolio: A71 · B14 · C3 · D1. See the whole portfolio

BuildingBoroughUnitsGrade
230 West End Avenue MN114 B
321 East 45 Street MN112 A
840A 9 Avenue MN102 B
244 Riverside Drive MN63 A
255 West End Avenue MN58 A
510 West 123 Street MN48 A
30 West 90 Street MN46 A
49 Pinehurst Avenue MN44 A
699 2 Avenue MN40 A
210 West 78 Street MN38 A
320 West 89 Street MN36 A
149 West 93 Street MN31 A
145 East 29 Street MN30 A
511 West 122 Street MN30 A
340 West 87 Street MN29 A
210 West 21 Street MN28 A
413 West 57 Street MN28 A
599 West End Avenue MN28 A
161 East 90 Street MN27 A
531 East 88 Street MN25 A
343 East 50 Street MN23 A
317 East 111 Street MN21 A
46 West 65 Street MN20 A
153 West 80 Street MN20 A
66 Rivington Street MN20 A
79 Barrow Street MN19 A
414 East 88 Street MN19 A
227 West 116 Street MN16 A
257 West 93 Street MN15 A
165 Spring Street MN14 A
481 Washington Street MN13 A
203 West 112 Street MN13 A
12 Warren Street MN13 B
111 West 113 Street MN12 A
46 West 96 Street MN12 A
151 Charles Street MN12 A
146 West 22 Street MN12 A
2 East 75 Street MN12 A
108 Duane Street MN11 A
468 West 23 Street MN11 A
145 West 80 Street MN10 A
74 Laight Street MN10 A
114 West 81 Street MN10 A
1 Gramercy Park West MN10 A
335 East 90 Street MN10 A
172 East 90 Street MN10 A
170 East 90 Street MN10 A
36 West 87 Street MN10 A
168 East 90 Street MN10 A
322 West 23 Street MN10 A
36 West 96 Street MN10 A
8 West 65 Street MN10 B
62 West 89 Street MN9 A
182 Grand Street MN9 A
261 West 71 Street MN9 A
56 Crosby Street MN9 A
228 West 21 Street MN9 A
36 West 69 Street MN9 A
324 West 88 Street MN9 A
624 West End Avenue MN9 B

showing 60 of 91 buildings

Sales, deeds & mortgages

Most recent mortgage recorded against this lot: $250,000 on 2021-02-18 (lender: National Consumer Cooperative Bank). Face amount at recording — it may have since been paid down, refinanced or satisfied. View the recorded document.

DateRecordAmountPer res. unit
2026-09-23RPTT&RET $1,250,000 — from BROWNE, WILLIAM H to SCROOPE, TERENCE; BERNOR, JOEL $1,250,000
2026-09-09Sold for $1,250,000 $1,250,000 $44,643
2025-07-29RPTT&RET $904,206 — from LUFKIN REALTY CO. to CHANG, RACHEL CHENG-YI $904,206
2025-07-21Sold for $904,206 $904,206 $32,293
2025-06-23RPTT&RET $1,150,000 — from NATHAN, CHARLES to BARLAGE, MARY; BARLAGE, MICHAEL $1,150,000
2025-06-17Sold for $1,150,000 $1,150,000 $41,071
2024-04-03RPTT&RET $1,325,000 — from MARCHAND, JESSICA to HENKET, PIETER; INNISS, ROGER A $1,325,000
2024-03-26Sold for $1,325,000 $1,325,000 $47,321
2023-12-29RPTT&RET $1,078,431 — from CORNHILL, SARAH to ALONZO, JILLIAN $1,078,431
2023-12-18Sold for $1,078,431 $1,078,431 $38,515
2023-04-11RPTT&RET $774,000 — from FEIFAREK, MATTHEW to MARGOLIES, LISBETH $774,000
2023-03-29Sold for $774,000 $774,000 $27,643
2022-10-26RPTT&RET $650,000 — from RAMASWAMY, ASHWIN to WISE, KELLY J $650,000
2022-10-20Sold for $650,000 $650,000 $23,214
2022-08-02RPTT&RET $560,000 — from WECHARATANA, MALISA to VELIZ, ADRIANA $560,000

Ten-year activity

50250
2017
2018
40
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
201784281032
20184384524
20191135101140
2020101031125
202143715231
20222038518
20231184317
2024004239
2025510124536
20262032411
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 22 records

DateRecord
2026-09-23RPTT&RET $1,250,000 — from BROWNE, WILLIAM H to SCROOPE, TERENCE; BERNOR, JOEL
2026-09-09Sold for $1,250,000
2026-08-11Boiler inspection
2026-07-11311: Dirty Condition — Trash
2026-07-02Permit General Construction — Permit Issued
2026-07-02Permit General Construction — Permit Issued
2026-06-10Rodent inspection: Stoppage done
2026-05-27Rodent inspection: Passed
2026-05-13Bedbug filing: 0 infested units
2026-04-29HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2026-03-24Elevator permit: New hoistway entrance at "R" level, new gal tracks, hanger, and interlocks, new car station with visual, new hall station at "R" l
2025-12-17Job filed: Construction of new accessible residential common roof deck and ramp as per plans. No change to use, egress, or occupancy.
2025-11-21Job filed: HEREBY FILING FILING FOR THE REMOVAL, REPLACEMENT, RELOCATION AND INSTALLATION OF FIXTURES IN APARTMENT 2RE. NO CHANGE TO USE OCCUPANCY OR EGRESS.
2025-11-20Job filed: HEREBY FILING FOR THE REMOVAL OF INTERIOR PARTITIONS. FILING TO COMPLY WITH VIOLATION 39158611M. NO CHANGE TO USE OCCUPANCY OR EGRESS.
2025-10-29311: Asbestos — Asbestos Complaint (B1)
2025-10-29311: General Construction/Plumbing — Working Contrary To Stop Work Order
2025-10-29DOB complaint, category ?
2025-10-28Asbestos abatement: Removal — Sully Construction Corp.
2025-10-28Asbestos abatement: Removal — Sully Construction Corp.
2025-10-28Asbestos abatement: Removal — Sully Construction Corp.
2025-10-28311: General Construction/Plumbing — Working Contrary To Stop Work Order
2025-10-28DOB complaint, category ?

The full timeline

2026
2026-09-23RPTT&RET $1,250,000 — from BROWNE, WILLIAM H to SCROOPE, TERENCE; BERNOR, JOEL$1,250,000
2026-09-09Sold for $1,250,000$1,250,000
2026-08-11Boiler inspection
2026-07-11311: Dirty Condition — Trash
2026-07-02Permit General Construction — Permit Issued
2026-07-02Permit General Construction — Permit Issued
2026-06-10Rodent inspection: Stoppage done
2026-05-27Rodent inspection: Passed
2026-05-13Bedbug filing: 0 infested units
2026-04-29HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2026-03-24Elevator permit: New hoistway entrance at "R" level, new gal tracks, hanger, and interlocks, new car station with visual, new hall station at "R" l$148,000
2025
2025-12-17Job filed: Construction of new accessible residential common roof deck and ramp as per plans. No change to use, egress, or occupancy.$200,000
2025-11-21Job filed: HEREBY FILING FILING FOR THE REMOVAL, REPLACEMENT, RELOCATION AND INSTALLATION OF FIXTURES IN APARTMENT 2RE. NO CHANGE TO USE OCCUPANCY OR EGRESS.$15,000
2025-11-20Job filed: HEREBY FILING FOR THE REMOVAL OF INTERIOR PARTITIONS. FILING TO COMPLY WITH VIOLATION 39158611M. NO CHANGE TO USE OCCUPANCY OR EGRESS.$55,000
2025-10-29311: Asbestos — Asbestos Complaint (B1)
2025-10-29311: General Construction/Plumbing — Working Contrary To Stop Work Order
2025-10-29DOB complaint, category ?
2025-10-28Asbestos abatement: Removal — Sully Construction Corp.
2025-10-28Asbestos abatement: Removal — Sully Construction Corp.
2025-10-28Asbestos abatement: Removal — Sully Construction Corp.
2025-10-28311: General Construction/Plumbing — Working Contrary To Stop Work Order
2025-10-28DOB complaint, category ?
2025-09-08311: General Construction/Plumbing — Posted Notice Or Order Removed/Tampered With
2025-09-08DOB complaint, category ?
2025-09-05311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2025-09-05311: General Construction/Plumbing — Working Contrary To Stop Work Order
2025-09-05311: General Construction/Plumbing — Working Contrary To Stop Work Order
2025-09-05DOB complaint, category ?
2025-09-05DOB complaint, category ?
2025-09-05DOB complaint, category ?
2025-08-28311: Real Time Enforcement — Work Without A Permit - Occupied Multiple Dwelling
2025-08-28DOB complaint, category ?
2025-08-27311: Real Time Enforcement — Work Without A Permit - Occupied Multiple Dwelling
2025-08-27311: Real Time Enforcement — Work Without A Permit - Occupied Multiple Dwelling
2025-08-27ECB CLASS - 1 violation: ATOI OBSERVED AT APT #2RE, REMOVAL OF PARTITION WALLS APPROX: 30-40 FEET IN TOTAL, IN DINING ROOM, LIVING ROOM AND KITCHEN AREA. T
2025-08-27DOB complaint, category ?
2025-08-27DOB complaint, category ?
2025-08-21311: Lead — Lead Kit Request (Residential) (L10)
2025-08-18Job filed: PROPOSED PLUMBING WORK IN UNIT #5RE ON FIFTH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$5,000
2025-08-18Job filed: PROPOSED INTERIOR RENOVATION IN UNIT #5RE ON FIFTH FLOOR. NOCHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$41,400
2025-07-29RPTT&RET $904,206 — from LUFKIN REALTY CO. to CHANG, RACHEL CHENG-YI$904,206
2025-07-21Sold for $904,206$904,206
2025-06-26Rodent inspection: Passed
2025-06-23RPTT&RET $1,150,000 — from NATHAN, CHARLES to BARLAGE, MARY; BARLAGE, MICHAEL$1,150,000
2025-06-17Sold for $1,150,000$1,150,000
2025-04-29Boiler inspection
2025-02-27Bedbug filing: 0 infested units
2024
2024-08-13Boiler inspection
2024-07-16Rodent inspection: Passed
2024-04-03RPTT&RET $1,325,000 — from MARCHAND, JESSICA to HENKET, PIETER; INNISS, ROGER A$1,325,000
2024-04-02Bedbug filing: 0 infested units
2024-04-01HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2024-03-27Air permit (REGISTRATION), fuel: NATURALGAS
2024-03-26Sold for $1,325,000$1,325,000
2024-02-27311: Encampment — N/A
2024-02-04311: Homeless Person Assistance
2023
2023-12-29RPTT&RET $1,078,431 — from CORNHILL, SARAH to ALONZO, JILLIAN$1,078,431
2023-12-18Sold for $1,078,431$1,078,431
2023-10-05311: Illegal Dumping — Removal Request
2023-08-16311: Homeless Person Assistance
2023-08-15311: Homeless Person Assistance
2023-08-12Facade (LL11) filing, cycle 9: SWARMP
2023-08-01311: Homeless Person Assistance
2023-08-01311: Homeless Person Assistance
2023-07-31311: Homeless Person Assistance
2023-06-23Rodent inspection: Passed
2023-06-15Boiler inspection
2023-04-11RPTT&RET $774,000 — from FEIFAREK, MATTHEW to MARGOLIES, LISBETH$774,000
2023-03-29Sold for $774,000$774,000
2023-03-27Bedbug filing: 0 infested units
2023-03-15HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2023-02-22DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
2023-02-16Permit Sidewalk Shed — Signed-off
2022
2022-12-20Job filed: Installation of new roof deck as per plans. No change to use, egress, or occupancy.$200,000
2022-10-26RPTT&RET $650,000 — from RAMASWAMY, ASHWIN to WISE, KELLY J$650,000
2022-10-20Sold for $650,000$650,000
2022-10-17Rodent inspection: Stoppage done
2022-10-11Rodent inspection: Passed
2022-08-02RPTT&RET $560,000 — from WECHARATANA, MALISA to VELIZ, ADRIANA$560,000
2022-07-18Sold for $560,000$560,000
2022-07-14Boiler inspection
2022-06-28Permit EW — ISSUED
2022-06-08RPTT&RET — from DIAB, WALEED; MISTOVICH, MARK to MISTOVICH, MARK
2022-06-08Elevator permit: Modernization of one (1) Passenger Elevator, please see the attached other documents for the scope of work. All work to comply wit$174,335
2022-05-18Deed transfer (nominal price)
2022-05-12Bedbug filing: 0 infested units
2022-03-09Rodent inspection: Passed
2022-02-16HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2022-02-03RPTT&RET $1,435,000 — from WENDT, KEVIN; DINGES, ASHLEY to DRENNAN, KEVIN; KLIMCHUK, NICHOLAS$1,435,000
2022-01-25311: Lead — Lead Kit Request (Residential) (L10)
2022-01-20Sold for $1,435,000$1,435,000
2021
2021-11-12Bedbug filing: 0 infested units
2021-10-20311: Noise - Helicopter — Other
2021-09-20RPTT&RET $1,404,000 — from BALLANTYNE, GARTH; BALLANTYNE, MEGHAN to NATHAN, CHARLES$1,404,000
2021-08-24Sold for $1,404,000$1,404,000
2021-07-21Rodent inspection: Passed
2021-06-18AALR — from NATIONAL COOPERATIVE BANK, N.A. to WILMINGTON TRUST, N.A. AS TRUSTEE FOR TH
2021-06-18Mortgage assigned — from NATIONAL COOPERATIVE BANK, N.A. to WILMINGTON TRUST, N.A. AS TRUSTEE FOR TH
2021-06-16RPTT&RET $1,250,000 — from BARUA, RAHUL to GREENBERG, STEPHEN C JR; BERNDT, VIRGINA J$1,250,000
2021-06-14DOB complaint, category ?
2021-06-10Permit EW — ISSUED
2021-06-09Boiler inspection
2021-06-01Sold for $1,250,000$1,250,000
2021-04-26Permit EW — ISSUED
2021-04-16ECB CLASS - 2 violation: TEMPORARY CONSTRUCTION EQUIPMNET SITE EXPIRED PERMIT AT THE TIME OF MY INSPECTION OF AN ACTIVE JOBSITE OBSERVED THAT PERMIT #12388
2021-04-02DOB complaint, category ?
2021-04-01HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021-03-31311: Lead — Lead Kit Request (Residential) (L10)
2021-03-10311: Sidewalk Condition — Sidewalk Violation
2021-02-18AALR — from NATIONAL CONSUMER COOPERATIVE BANK to NATIONAL COOPERATIVE BANK, N.A.
2021-02-18AALR — from NATIONAL CONSUMER COOPERATIVE BANK to NATIONAL COOPERATIVE BANK, N.A.
2021-02-18Mortgage assigned — from NATIONAL CONSUMER COOPERATIVE BANK to NATIONAL COOPERATIVE BANK, N.A.
2021-02-18Mortgage assigned — from NATIONAL CONSUMER COOPERATIVE BANK to NATIONAL COOPERATIVE BANK, N.A.
2021-02-18AL&R $250,000 — from 210 EQUITIES CORP. to NATIONAL CONSUMER COOPERATIVE BANK$250,000
2021-02-18Mortgage $250,000 — from 210 EQUITIES CORP. to NATIONAL CONSUMER COOPERATIVE BANK$250,000
2021-02-18AL&R $1,500,000 — from 210 EQUITIES CORP. to NATIONAL CONSUMER COOPERATIVE BANK$1,500,000
2021-02-18Mortgage $1,500,000 — from 210 EQUITIES CORP. to NATIONAL CONSUMER COOPERATIVE BANK$1,500,000
2021-01-20RPTT&RET $1,200,000 — from DOTSON, JOSHUA; DOTSON, LISA to BARNEA, JEAN-DAVID; ZIPF, BENJAMIN$1,200,000
2021-01-14Permit Supported Scaffold — Signed-off
2021-01-13Job filed: PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANC$7,000
2021-01-09311: Noise - Helicopter — Other
2021-01-09311: Noise - Helicopter — Other
2020
2020-12-30Sold for $1,200,000$1,200,000
2020-12-10Permit EW — ISSUED
2020-11-23DOB complaint, category ?
2020-11-14ECB CLASS - 2 violation: OWNER FAILURE TO REPAIR SWARMP CONDITIONS IN A TIMELY MANNER. ON 11/14/2020 OBSERVED EXISTING SWARMP CONDITIONS AT EXPOSURE 1 NORT$3,125
2020-11-14ECB CLASS - 2 violation: FAILURE TO COMPLY W/ COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION W/ THE DOB. NOTE:AT THE TIME OF INSPECTION RESPONDEN$1,250
2020-11-11DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2020-11-04Permit Sidewalk Shed — Signed-off
2020-10-30Permit Plumbing — Signed-off
2020-09-02DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2020-08-19Job filed: Plumbing work$9,800
2020-08-11ECB CLASS - 1 violation: OWNER FAILURE TO REPAIR SWARMP CONDITIONS IN A TIMELY MANNER,ON 8/11/2020 OBSERVED EXISTING SWARMP CONDITION AT 1 NORTH ELEVATION $2,500
2020-06-27ECB CLASS - 2 violation: FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.NOTE AT THE TIME $3,125
2020-06-11Job filed: Install new central VRF heat pump system for the apartment$10,000
2020-06-10Job filed: FILING TO REMOVE EXISTING PLUMBING FIXTURES IN THE BATHROOM AS PER PLANS UPLOADED. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION$7,500
2020-05-23311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-05-21311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-04-27Boiler inspection
2020-03-30Permit EW — ISSUED
2020-02-24DOB violation E:
2020-02-22ECB CLASS - 1 violation: OWNER FAILED TO REPAIR BLDG EXTERIOR FACADE & APPURTENANCES EXP1 DEFECTIVE CORNICE,CORRODED FIRE ESCAPE,DETERIORATED MORTAR JOINTS$2,500
2020-02-20Job filed: FILING MINOR INTERIOR PARTITIONS, DOORS, AND FINISHES AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$80,000
2020-02-20Job filed: FILING MINOR INTERIOR PARTITIONS, DOORS, AND FINISHES AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$80,000
2020-01-21DOB complaint, category ?
2020-01-07Permit Plumbing — Signed-off
2020-01-06311: Graffiti — Graffiti
2019
2019-12-13Rodent inspection: Bait applied
2019-12-03Rodent inspection: Bait applied
2019-11-26Rodent inspection: Bait applied
2019-11-25Permit Sidewalk Shed — Signed-off
2019-11-22Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE $5,000
2019-11-21Rodent inspection: Bait applied
2019-11-21Elevator permit: Provide door lock monitoring system to meet NYC Code requirements. All work to comply with A17.3 of 2002 as modified by Chapter $16,500
2019-11-19Permit EW — ISSUED
2019-11-12Job filed: Mechanical work$21,000
2019-11-04Job filed: Plumbing work$9,800
2019-11-01RPTT&RET $1,070,000 — from PATTEN, KATHLEEN to MILLER, STEPHEN$1,070,000
2019-10-30Job filed: INTERIOR RENOVATION OF APT 4FW AS PER PLANS.$40,000
2019-10-30Job filed: INTERIOR RENOVATION OF APT 4FW AS PER PLANS.$40,000
2019-10-29Sold for $1,070,000$1,070,000
2019-10-16311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-10-08Job filed: FACADE REPAIRS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$40,000
2019-08-29311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-08-26Rodent inspection: Passed
2019-08-07311: Non-Emergency Police Matter — Trespassing
2019-08-01RPTT&RET $1,134,150 — from REB MOSHE ROSEN FUND, INC. to REECE, RICHARD TYLER; WOLFFERS, TOM-SEBASTIAN$1,134,150
2019-07-25Sold for $1,134,150$1,134,150
2019-07-17ECB CLASS - 1 violation: AN UNLAWFUL ACT FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER FAILURE TO CORRECT AND CERTIFY SUMMONS#35359864X AND 35423655X
2019-07-16DOB complaint, category ?
2019-05-29RPTT&RET $1,095,000 — from SHAMBURA, MARK D; ROSS, PHILIP L to RAHN, ALEXANDER$1,095,000
2019-05-15Sold for $1,095,000$1,095,000
2019-05-10311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-04-29Permit PL — ISSUED
2019-04-26Rodent inspection: Bait applied
2019-04-18Rodent inspection: Bait applied
2019-04-11Permit EW — ISSUED
2019-04-05DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
2019-04-04Job filed: INTERIOR RENOVATION TO APARTMENT 2RW. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.$40,000
2019-04-02Boiler inspection
2019-03-07Rodent inspection: Bait applied
2019-02-19Rodent inspection: Passed
2019-01-14RPTT&RET $1,000,000 — from FORHMAN, EMILY to MCGALAGLY, JOHN; BERNARD, LAURA$1,000,000
2019-01-14RPTT&RET $625,000 — from BHATTACHARJI, PREETI to RAMASWAMY, ASHWIN$625,000
2019-01-09Sold for $1,000,000$1,000,000
2019-01-08Sold for $625,000$625,000
2019-01-05311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2018
2018-12-07RPTT&RET $1,070,000 — from MANSOURI, MICHAEL; ZEBA FRANK, SABRINA to KRACUN, ALEKSANDAR; VAN DYK, TRACY$1,070,000
2018-11-28Sold for $1,070,000$1,070,000
2018-10-24311: Illegal Tree Damage — Roots Damaged
2018-09-13Permit EW — ISSUED
2018-09-11Job filed: FILING HEREWITH FOR INSTALLATION OF HVAC CONDENSING UNIT. NO CHANGE IN USE EGRESS OR OCCUPANCY.$12,000
2018-09-11Job filed: FILING HEREWITH FOR INSTALLATION OF HVAC CONDENSING UNIT. NO CHANGE IN USE EGRESS OR OCCUPANCY.$12,000
2018-09-07Rodent inspection: Passed
2018-08-27Facade (LL11) filing, cycle 8: SWARMP
2018-07-31Rodent inspection: Failed for Other Reason
2018-07-31DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
2018-07-28HPD class C: § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING PADLOCKED GATE AT FIRE PASSAGE WAY ENCLOSURE AT LOT LINE FENCE AT BUILDING FRONT
2018-07-17HPD class A: § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES
2018-07-17HPD class A: § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM
2018-07-17HPD class A: § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPE
2018-07-17HPD class A: § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON
2018-07-03311: APPLIANCE — ELECTRIC/GAS RANGE
2018-07-03Tenant complaint: APPLIANCE — ELECTRIC/GAS RANGE
2018-06-07RPTT&RET $1,355,000 — from LEMBERGER, ITAI; TADIR, YAEL to PETRE, CAITLIN; BRAND, ARI$1,355,000
2018-05-31Sold for $1,355,000$1,355,000
2018-05-24Rodent inspection: Passed
2018-04-24Permit PL — ISSUED
2018-03-07Boiler inspection
2018-01-29DOB violation E:
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2017
2017-11-18ECB CLASS - 2 violation: FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES.OBSERVED FLOWER POTS PROJECTING FROM WINDOW SILLS ON EAST,SOUTH AND$250
2017-10-31311: Plumbing — Gas Utility Referral
2017-10-31DOB complaint, category ?
2017-09-30311: Noise — Noise: Construction Equipment (NC1)
2017-09-15RPTT&RET $1,225,000 — from MITCHELL, ALLISON; MITCHELL, MATTHEW; MUI, ALLISON to BARUA, RAHUL$1,225,000
2017-09-12Sold for $1,225,000$1,225,000
2017-08-07RPTT&RET $1,075,000 — from JUDGE, KYLE WILLIAM; BOWIE, ALEXANDRA NICHOLSON to STRIANO, CAROL$1,075,000
2017-07-25Sold for $1,075,000$1,075,000
2017-06-20RPTT&RET $1,195,000 — from MORANDINI, MICHAEL; DORSEY, TIMOTHY C to PFEIFFER, ELYSE; PFEIFFER, JOSEF$1,195,000
2017-06-12Sold for $1,195,000$1,195,000
2017-06-01RPTT&RET $1,260,000 — from KUSNER, JONATHAN to DINGES, ASHLEY; WENDT, KEVIN$1,260,000
2017-05-17Sold for $1,260,000$1,260,000
2017-04-17Rodent inspection: Bait applied
2017-04-10Rodent inspection: Bait applied
2017-04-03Rodent inspection: Bait applied
2017-03-21Rodent inspection: Monitoring visit
2017-03-14Permit PL — ISSUED
2017-03-13Rodent inspection: Monitoring visit
2017-03-06Rodent inspection: Bait applied
2017-02-28Rodent inspection: Bait applied
2017-02-21Rodent inspection: Bait applied
2017-02-13Rodent inspection: Monitoring visit
2017-02-02Permit PL — ISSUED
2017-02-01Permit PL — ISSUED
2017-01-31Permit EW — ISSUED
2017-01-31Permit EW — ISSUED
2017-01-30Permit EW — ISSUED
2017-01-24DOB violation E:
2017-01-20Rodent inspection: Passed
2017-01-20Permit EW — ISSUED
2017-01-19Permit EW — ISSUED
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2016
2016-12-28Job filed: APPLICATION FILED FOR A MINOR INTERIOR RENOVATION TO APARTMENT 1FE TO INCLUDE NEW KITCHEN LAYOUT. NO CHANGE TO EGRESS, OCCUPANCY OR USE UNDER THIS AP$24,780
2016-12-28Job filed: APPLICATION FILED FOR A MINOR INTERIOR RENOVATION TO APARTMENT 1FE TO INCLUDE NEW KITCHEN LAYOUT. NO CHANGE TO EGRESS, OCCUPANCY OR USE UNDER THIS AP$24,780
2016-12-27Job filed: THIS APPLICATION IS BEING FILED TO PROPOSE INTERIOR RENOVATIONS TO APT 4FW. ALL PLUMBING FIXTURES TO BE RELOCATED AND REPLACED. BUILDING ENVELOPE WILL$75,000
2016-12-27Job filed: THIS APPLICATION IS BEING FILED TO PROPOSE INTERIOR RENOVATIONS TO APT 4FW. ALL PLUMBING FIXTURES TO BE RELOCATED AND REPLACED. BUILDING ENVELOPE WILL$75,000
2016-12-10311: Dirty Conditions — E15 Illegal Postering
2016-12-05Job filed: RENOVATION OF BATHROOM AND KITCHEN, COMBINATION OF 2 BEDROOMS INTO 1 IN EXISTING 3-BEDROOM APARTMENT. INSTALLATION OF NEW SPLIT SYSTEM A/C. NO CHANG$80,250
2016-10-27RPTT&RET $1,115,000 — from HOWLETT, SCOTT J to HLADILEK, BEN$1,115,000
2016-10-20Sold for $1,115,000$1,115,000
2016-09-02RPTT&RET $1,275,000 — from JACOB, FABRICE; JACOB, NICOLAS to MARCHAND, JESSICA B$1,275,000
2016-08-17Sold for $1,275,000$1,275,000
2016-03-17311: Water System — Hydrant Running Full (WA4)
2016-03-10RPTT&RET $1,044,000 — from FLYNN, MICHAEL; FLYNN, MARY-CLAIRE to MISTOVICH, MARK; DIAB, WALEED$1,044,000
2016-02-29Rodent inspection: Passed
2016-02-24Sold for $1,044,000$1,044,000
2016-02-14311: HEAT/HOT WATER — ENTIRE BUILDING
2016-02-14Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2016-01-20DOB violation E:
2015
2015-12-15311: Derelict Vehicle — With License Plate
2015-05-26DOB violation E:
2015-03-17FDNY inspection (RISK)
2014
2014-12-09311: Street Condition — Pothole
2014-09-16311: Street Condition — Rough, Pitted or Cracked Roads
2014-08-26RPTT&RET $1,100,000 — from CROSBY, KATHRYN E to JACOB, NICOLAS; JACOB, FABRICE$1,100,000
2014-07-14Permit PL — ISSUED
2014-07-05311: Noise - Residential — Loud Music/Party
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-29DOB violation E:
2014-05-15DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
2014-01-05FDNY inspection (RISK)
2013
2013-07-15RPTT&RET $880,000 — from POWERS, KIRSTEN to JUDGE, KYLE WILLIAM; BOWIE, ALEXANDRA NICHOLSON$880,000
2013-07-13311: Indoor Sewage — Sewage Odor
2013-04-03Permit PL — ISSUED
2013-03-03311: Dirty Conditions — E15 Illegal Postering
2013-02-25Permit EW — ISSUED
2013-02-25Permit EW — ISSUED
2013-02-15Job filed: SOME PLUMBING AND MINOR PARTITION WORK IN APT 6FE , NO CHANGE TO OCCUPANCY,USE OR EGRESS.$23,000
2012
2012-12-27DOB violation E:
2012-11-07RPTT&RET $805,000 — from ENGLANDER, ALEXA; MASO, JACOB to CORNHILL, SARAH J$805,000
2012-09-27Rodent inspection: Passed
2012-06-07RPTT&RET $895,000 — from LUFKIN REALTY COMPANY to MUI, ALLISON; MITCHELL, MATTHEW$895,000
2012-04-20311: Street Condition — Cave-in
2012-04-04RPTT&RET $900,000 — from LUFKIN REALTY CO. to TADIR, YAEL; LEMBURGER, ITAI$900,000
2012-01-19311: Sidewalk Condition — Broken Sidewalk
2011
2011-11-28311: Indoor Air Quality — Other (Explain Below)
2011-10-22311: Water System — Other Water Problem (Use Comments) (WZZ)
2011-10-20Permit PL — ISSUED
2011-09-23Permit EW — ISSUED
2011-09-20Job filed: RENOVATION TO APT 2FE SOME PLUMBING AND PARTITION WORK, NO CHANGE TO OCCUPANCY,USE OR EGRESS.$55,000
2011-09-20Job filed: RENOVATION TO APT 2FE SOME PLUMBING AND PARTITION WORK, NO CHANGE TO OCCUPANCY,USE OR EGRESS.$55,000
2011-09-04311: Street Condition — Cave-in
2011-08-30Permit PL — ISSUED
2011-08-26Permit EW — ISSUED
2011-08-22Job filed: RENOVATION TO APT 7EF SOME PLUMBING AND PARTITION WORK, NO CHANGE TO OCCUPANCY,USE OR EGRESS.$55,000
2011-08-04311: Street Condition — Cave-in
2011-07-18RPTT&RET $500,000 — from GARGANO, GABRIELA to BHATTACHARJI, PREETI$500,000
2011-05-25Rodent inspection: Passed
2011-02-01DOB violation E:
2010
2010-12-06Facade (LL11) filing, cycle 7: SAFE
2010-12-06Facade (LL11) filing, cycle 6: SAFE
2010-06-30RPTT&RET $725,000 — from DOHERTY, CHRISTOPHER; MAWJI, NASIM to SHAMBURA, MARK DANIEL; ROSS, PHILIP LANGDON$725,000
2010-06-22ECB CLASS - 2 violation: FAIL TO MAINTAIN EXTERIOR BLDG. NORTH ELEVATION OBSERVE FLOWER POTS STORED ON THE 5TH FL FACADE SILLS, EAST ELEVATION OBSERVE CRAC
2010-06-03Rodent inspection: Passed
2010-05-27RPTT&RET $720,000 — from RANESE, THOMAS; JACKSON, BRIAN to HOWLETT, SCOTT$720,000
2010-05-04311: Noise — Noise: Construction Before/After Hours (NM1)
2010-05-03311: Street Condition — Rough, Pitted or Cracked Roads
2010-04-28ECB CLASS - 2 violation: FAILURE TO FILE AN ACCPETABLE SIXTH ROUND TECHNICAL REPORT IN COMPLIANCE W/ CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS$2,000
2010-04-21311: Street Condition — Failed Street Repair
2010-03-24311: Taxi Complaint — Driver Complaint
2010-03-03311: Street Condition — Pothole
2010-02-23311: Street Condition — Failed Street Repair
2009
2009-08-25RPTT&RET $749,000 — from WILSON , JAMES F; LUSTIK, KEVIN to FLYNN, MARY-CLAIRE; FLYNN, MICHAEL$749,000
2009-08-06RPTT&RET $687,500 — from COLLINS, GARY R; SIEGEL, ADAM to MASO, JACOB; ENGLANDER, ALEXA$687,500
2009-06-12DOB violation E:
2008
2008-11-28ECB CLASS - 2 violation: FAILURE TO SUBMIT AN ACCEPTABLE SIXTH ROUND TECHNICAL REPORT IN COMPLIANCE W/CODE PROVISIONS:PERIODIC INSPECTION OF EXTERIOR WALLS$800
2008-09-05RPTT&RET $875,000 — from TAHERI, ASHLEY; PYKE, WILLIAM R to DOTSON, JOSHUA; SHAPIRO, LISA$875,000
2008-06-04ECB Non-Hazardous violation: 36P16.85BB05.86M05.86BB12.32B12.55Y13.55Y02.55M07.39T07.64X10.02X10. 36P PROVIDE ACCESSS TO OVERHEAD 85BB PERFORM & FILE CURRENT 5
2008-04-07RPTT&RET $965,000 — from FARKAS, CASSIA B to BROWNE, WILLIAM H$965,000
2008-02-25RPTT&RET $206,000 — from CROSBY, KATHRYN; STAPLE, ARTHUR to CROSBY, KATHRYN$206,000
2008-01-25RPTT&RET $760,000 — from ROGERS, CECELIA to MORANDINI, MICHAEL; DORSEY, TIMOTHY C$760,000
2008-01-03RPTT&RET $885,000 — from JACQUEMART, GEORGES to BALLANTYNE, MEGHAN; BALLANTYNE, GARTH$885,000
2007
2007-12-04RPTT&RET $803,500 — from TINSLEY , DAVID S; TINSLEY, EUGENIA to POWERS , KIRSTEN A$803,500
2007-11-30DOB violation LL1198:
2007-06-27DOB violation E:
2007-04-17Permit PL — ISSUED
2007-02-23Permit EW — ISSUED
2007-02-06Job filed: interior renovation in apartment 5RW, general consrtuction and plumbing work. no change in use egress, or occupancy.$46,000
2007-02-06Job filed: interior renovation in apartment 5RW, general consrtuction and plumbing work. no change in use egress, or occupancy.$46,000
2006
2006-09-20DOB violation E:
2006-03-17RPTT&RET $450,000 — from ALPERT, CHARLES; ALPERT, JOSEPH; LUFKIN REALTY CO. to GARGANO, GABRIELA$450,000
2005
2005-12-12DOB violation E:
2005-11-23Permit PL — ISSUED
2005-10-31Permit EW — ISSUED
2005-10-25Job filed: This application is being filed to renovate existing Apartment unit 2FW on 2nd Floor per Plans herewith submitted. No change in Use, Egress or Occupan$60,000
2005-09-26RPTT&RET $700,000 — from CURTIS, CHRISTINA; HILLMAN CURTIS, DAVID to DOHERTY, CHRIS; MAWJI, NASIM$700,000
2005-02-09RPTT $625,000 — from FERGUSON, ARCHIE T; BREITLING, STEFANIE A to KAMINSKI, JENNIFER L; HAICK, TIFFANY M$625,000
2004
2004-12-14RPTT&RET $715,000 — from WOLF , RITA; CHAPMAN, WILLIAM to JACQUEMART, GEORGES$715,000
2004-12-13RPTT&RET $670,000 — from HULL, AMY to MANSOURI, MICHAEL; MANSOURI, SABRINA$670,000
2004-08-25RPTT $540,000 — from STARACE, THOMAS to MARTIN, ERIN E$540,000
2003
2003-04-30Mortgage assigned — from J.P. MORGAN INVESTMENT MANAGEMENT INC AS to JPMORGAN CHASE BANK, AS TRUSTEE
2003-04-30ASSTO — from J.P. MORGAN INVESTMENT MANAGEMENT INC AS to JPMORGAN CHASE BANK, AS TRUSTEE
2002
2002-08-27Permit PL — ISSUED
2002-07-17Permit EW — ISSUED
2002-06-21Job filed: Interior renovation of an existing apartment. Partition changes, minor plumbing work. There is to be no change of use, occupancy or egress under thi$26,000
2001
2001-11-01Permit EQ — ISSUED
2001-10-22Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 50' DURING FACADE REPAIR NO CHANGE IN USE EGRESS OR OCCUPANCY SHED TTO COMPLY WITH LL33/91
2001-02-05DOB violation E: 1P4011
1999
1999-02-08DOB violation E: 1P4011
1998
1998-08-19Mortgage satisfied — from ENMAR REALTY INC. to GAHREN, EMMA
1998-08-19Agreement — from 210 EQUITIES CORP. to J.P. MORGAN INVESTMENT MANAGEMENT INC.
1998-08-19Mortgage assigned — from ISLER, ROBERT to J.P MORGAN INVESTMENT MANAGEMENT INC.
1998-08-19Mortgage assigned — from ISLER, ROBERT to J.P. MORGAN INVESTMENT MANAGEMENT INC.
1998-08-19Mortgage assigned — from 210 EQUITIES CORP. to J.P. MORGAN INVESTMENT MANAGEMENT INC.
1998-08-19Mortgage $715,489 — from 210 EQUITIES CORP. to J.P. MORGAN INVESTMENT MANAGENT INC$715,489
1998-01-22PAT — from KUSNER, JONATHAN W.; KUSNER, JONATHAN WALTER to MICHAEL, MICHAEL H.ESQ.
1997
1997-06-17Permit EW — ISSUED
1997-06-17Permit PL — ISSUED
1997-06-17Permit EW — ISSUED
1997-01-13DOB violation LL1081:
1997-01-13DOB violation LL1081:
1994
1994-08-30ECB Non-Hazardous violation: 46T,49T,37L,33#,(33)PROVIDE A LOCK FOR THE CERTIFIED DOOR.$200
1994-03-18Mortgage assigned — from 210 WEST 21ST STREETASSOCIATES to ISLER, ROBERT
1993
1993-05-25Mortgage assigned — from ROTHSTEIN, LEA; ROTHSTEIN, MAKS to ISLER, ROBERT
1992
1992-10-24DOB violation C:
1992-10-24DOB violation C:
1989
1989-05-09Deed — from LUFKIN REALTY CP to 210 EQUITIES CP
1988
1988-07-20DOB violation E: (50)PROVIDE ACCESS TO PIT AND OVERHEAD
1988-01-12Agreement — from 210 W 21 ST ASSOCS to ROTHSTEIN, MAKS; ROTHSTEIN, LEAH
1986
1986-11-20Mortgage assigned — from LOCKPORT SAVINGS BANK to 210 WEST 21 ST CORP
1986-11-20Mortgage assigned — from LOCKPORT SAVINGS BK to STEVLEE FACTORS INC
1984
1984-05-29Mortgage $499,462 — from LUFKIN REALTY CORP. to 210 W. 21ST ST ASSOC$499,462
1984-05-29SAGE — from ROTHSTEIN, LEA; ROTHSTEIN, MAX
1984-05-29Mortgage satisfied — from 210 W.21ST ST. ASSOC. to 210 W.21ST ST. CO.
1984-05-29Deed — from 210 W. 21ST ST. ASSOC. to LUFKIN REALTY CORP.
1981
1981-01-21Deed — from 210 W 21ST ST CO to 210 W 21ST ST ASSOCIATES
1981-01-21Mortgage — from 210 W 21ST ST ASSOCIATES to 210 W 21ST ST CO
1977
1977-05-31Mortgage — from 210 W 21ST ST CO to ROTHSTEIN, LEA; ROTHSTEIN, MAKS
1977-05-31Deed — from ROTHSTEIN, LEA; ROTHSTEIN, MAKS to 210 W 21ST ST CO
1974
1974-07-25Agreement — from 210 W 21ST ST CORP to LOCKPORT SAVINGS BANK
1974-07-19Mortgage assigned — from 210 W 21ST ST CORP to LOCKPORT SAVINGS BANK
1974-07-19Deed — from 210 W 21ST ST CORP to ROTHSTEIN, MAKS; ROTHSTEIN, LEO
1974-07-19Deed — from ROTHSTEIN, LEO; ROTHSTEIN, MAKS to 210 W 21ST ST CORP
1974-07-19Deed — from 210 W 21ST ST CORP to GOLDSTEIN, WOLF; ROTHSTEIN, MAKS
1974-07-19Mortgage — from 210 W 21ST ST CORP to LOCKPORT SAVINGS BANK
1974-07-19Mortgage assigned — from NORTH SIDE SAVINGS to LOCKPORT SAVINGS BANK
1900
1900-01-01Air permit (CERTIFICATE TO OPERATE), fuel: NO4FUEL

Support this site Back to the building page