The city's published records show little recorded distress here in the last three years. Less recorded distress than 81% of 25-99-unit residential buildings citywide. The citywide median for 25-99-unit residential buildings is 23.6 penalty
points per 10 units; this building carries 2.6. In ZIP 10010, 74% of residential buildings hold an A and
5% grade D or F.
How grades work
this building
A
B
C
Among 17,252 25-99-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
Open HPD violations
2 total — 2 class C (immediately hazardous), 0 class B, 0 class A. Oldest open since 2012-12-27.
status snapshot refreshed weekly from HPD records
Patterns
4 heat or hot-water complaints in the last three years (winter 2023–24: 2 · winter 2024–25: 2). Repeated winter clusters suggest a chronic heating problem.
2
’23–24
2
’24–25
No bedbug-infested units reported in the last three years of filings.
$2,495 in enforcement penalties imposed (ECB/OATH) in the last three years.
What 311 hears from this address
43 service requests in the last three years. Most common: Noise (22) · General Construction/Plumbing (3) · For Hire Vehicle Complaint (3) · HEAT/HOT WATER (2) · Illegal Parking (2) · Water System (1).
Filed construction activity
$31,993,725 in permitted construction work filed since
2016 (24 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1927)
Yes
Six or more residential units (74)
No
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
270 PARK AVE SOUTH, LLC
Head officer
GEOFF RINGLER
Managing agent
PAN AM EQUITIES INC
Last registered
2025-08-28
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$28,385,000
$12,773,250
2026
$29,518,000
$13,283,100
2027
$30,197,000
$13,588,650
The city's market estimate has risen
6% between tax years 2025 and 2027.
Building systems
Energy grade (LL33)
D — ENERGY STAR score 3/100, posted at the entrance by law (2022 disclosure cycle)
Heating fuel
NATURALGAS
Facade (Local Law 11)
SAFE (cycle 9)
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
1 street-flooding or sewer-backup complaints at this address since
2017 (0 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
23 St-Baruch College — 6 · 150 ft straight-line (about a 1-minute walk) · station accessibility: full 23 St — R W · 700 ft straight-line (about a 4-minute walk) · station accessibility: none
Bus
Nearest boarding stop: Park Av South / E 21 St — M1 M2 M3 · 150 ft
Citi Bike
E 20 St & Park Ave · 350 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
43 311 service requests from this address in the last three years — 2 of them about heat or hot water.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $10,088,157 on
2019-09-18 (lender: People's United Bank, National Association). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2019-09-18
AL&R $30,000,000 — from 270 PARK AVE SOUTH LLC to PEOPLE'S UNITED BANK, NATIONAL ASSOCIATI
$30,000,000
2019-09-18
Mortgage $10,088,158 — from 270 PARK AVE SOUTH LLC to PEOPLE'S UNITED BANK, NATIONAL ASSOCIATI
$10,088,158
2019-09-18
Agreement $30,000,000 — from 270 PARK AVE SOUTH LLC to PEOPLE'S UNITED BANK, NATIONAL ASSOCIATI
$30,000,000
2010-04-09
CORRM $23,925,000 — from 270 PARK AVENUE SOUTH LLC to HSBC BANK USA, NATIONAL ASSOCIATION
$23,925,000
2009-11-10
Mortgage $23,925,000 — from 270 PARK AVE SOUTH LLC to HSBC BANK USA NATIONAL ASSOCIATION
$23,925,000
2006-05-04
SPRD $18,120,253 — from PAMELA EQUITIES CORP.; FARBOD REALTY CORP to FEDERAL HOME LOAN MORTGAGE CORPORATION
$18,120,253
2003-12-31
Mortgage $18,608,000 — from PAMELA EQUITIES CORP to HSBC BANK USA
$18,608,000
2003-12-31
Agreement $18,608,000 — from PAMELA EQUITIES CORP to HSBC BANK USA
$18,608,000
1996-12-11
Mortgage $26,795,153 — from PAMELA EQUITIES CORP. to REPUBLIC NATIONAL BANK OF NEW YORK
$26,795,153
1996-12-11
Mortgage $606,662 — from PAMELA EQUITIES CORP. to REPUBLIC NATIONALB ANK OF NEW YORK
$606,662
1988-09-23
Mortgage $18,991,451 — from PAMELA EQUITIES CORP to CROSSLAND SVGS FSB
$18,991,451
Ten-year activity
100500
2017
2018
87
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
1
3
15
0
8
27
2018
7
3
21
0
3
34
2019
9
27
44
4
3
87
2020
6
3
14
0
4
27
2021
13
4
17
0
5
39
2022
8
2
16
0
7
33
2023
9
8
15
0
5
37
2024
0
5
10
0
2
17
2025
2
6
15
0
2
25
2026
3
0
20
0
3
26
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-06-01
Permit General Construction — Permit Issued
2026-05-27
Bedbug filing: 0 infested units
2026-04-30
311: Noise - Street/Sidewalk — Loud Music/Party
2026-04-29
HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2026-04-28
311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-04-29HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2026-04-28311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-10-31Job filed: REMOVE AND RELOCATE PLUMBING FIXTURES IN CONJUNCTION WITH PART OF 2ND FLOOR MODIFICATION. ALL AS PER PLAN..$12,000
2025-10-11311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-10-11311: Illegal Parking — Blocked Bike Lane
2025-10-09Job filed: CONVERT PART OF SECOND FLOOR INTO TENANT RECREATION SPACE. WORK TO INCLUDE GENERAL CONSTRUCTION, AS PER PLANS. OBTAIN AMENDED CO UPON COMPLETION.$176,550
2025-09-27311: Lead — Lead Kit Request (Residential) (L10)
2025-08-25ECB CLASS - 2 violation: NOTED: 2 NEW EXHAUST FANS LOCATED ON ROOF DECK OF APARTMENT PH 2C AND LOCATED ADJACENT TO DU BEDROOM WITHIN ABOUT A FOOT OF THE DU$1,250
2025-08-25ECB CLASS - 2 violation: NOTED: 2 NEW EXHAUST FANS LOCATED ON ROOF DECK OF APARTMENT PH 2C, AND LOCATED ADJACENT TO DU BEDROOM, SERVICING THE F AND G LINE $620
2024-10-11ECB CLASS - 2 violation: OBSERVED IN BASEMENT SPRINKLER HEADS COVERED IN DEBRIS WHICH CONTRARY TO CODE NFPA 13 SECTION 9.5.5.3, REPAIR AND/OR REPLACE$625
2024-10-09Air permit (CERTIFICATE TO OPERATE), fuel: NATURALGAS
2024-10-03311: Plumbing — Sprinkler System - Inadequate
2024-10-03DOB complaint, category ?
2024-10-01FDNY inspection (RISK)
2024-06-23DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)
2024-06-17Boiler inspection
2024-01-27311: HEAT/HOT WATER — ENTIRE BUILDING
2024-01-27Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2024-01-22311: Noise — Noise: air condition/ventilation equipment (NV1)
2023-04-22DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2022
2023-02-17Facade (LL11) filing, cycle 9: SAFE
2023-01-31Permit General Construction — Permit Issued
2023-01-18311: Noise — Noise: Construction Equipment (NC1)
2022
2022-12-19Bedbug filing: 0 infested units
2022-12-19Permit Mechanical Systems — Permit Issued
2022-12-08311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-12-08311: Illegal Parking — Blocked Bike Lane
2022-10-22Permit Plumbing — Permit Issued
2022-10-20Permit Sprinklers — Permit Issued
2022-09-02Facade (LL11) filing, cycle 8: SAFE
2022-08-16Boiler inspection
2022-08-16Boiler inspection
2022-08-16Boiler inspection
2022-07-27311: Street Condition — Pothole
2022-06-24311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-05-27311: HEAT/HOT WATER — ENTIRE BUILDING
2022-05-27311: Elevator — Elevator - Single Device On Property/No Alternate Service
2022-05-27Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2022-05-27DOB complaint, category ?
2022-05-16Permit General Construction — Signed-off
2022-05-02Elevator permit: Remove 1D10892 in entirety. (Rule 8.11.1.4.1.2) All work to comply with A17.1 2000 with A17.1a-02 and A17.1b-03 Addendum and modif$5,800
2022-04-27Rodent inspection: Passed
2022-04-18Job filed: Interior renovation of fitness center. No change in egress, use or occupancy.$5,933,000
2022-04-12311: Rodent — Rat Sighting
2022-03-22FDNY inspection (RISK)
2022-03-01311: Noise — Noise: Construction Equipment (NC1)
2022-01-20Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF$1,000
2022-01-20Permit Sidewalk Shed — Signed-off
2022-01-11311: HEAT/HOT WATER — ENTIRE BUILDING
2022-01-11311: HEAT/HOT WATER — ENTIRE BUILDING
2022-01-11Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2022-01-11Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2022-01-11Permit General Construction — Permit Issued
2022-01-10Elevator permit: REMOVAL OF ELEVATOR CITY ID# 1P46232 The removal of this device will not eliminate accessability as required by code$6,800
2022-01-10Bedbug filing: 0 infested units
2021
2021-11-23Permit General Construction — Signed-off
2021-11-19Permit Sprinklers — Permit Issued
2021-11-19Permit Plumbing — Permit Issued
2021-11-16Permit General Construction — Permit Issued
2021-10-28Asbestos abatement: Removal — Total Construction Consulting Corp.
2021-10-28Asbestos abatement: Removal — Total Construction Consulting Corp.
2021-09-14311: HEAT/HOT WATER — ENTIRE BUILDING
2021-09-14Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2021-09-07DOB violation E:
2021-09-07DOB violation E:
2021-09-01311: WATER LEAK — SLOW LEAK
2021-09-01Tenant complaint: WATER LEAK — SLOW LEAK
2021-08-27311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2021-08-25311: General Construction/Plumbing — Fence - None/Inadequate
2021-08-25DOB complaint, category ?
2021-08-19Job filed: FACADE MASONRY REPAIR AT NORTH WALL. NO CHANGE TO OCCUPANCY, EGRESS, USE OR BULK.$144,495
2021-07-30Permit General Construction — Permit Issued
2021-04-29DOB violation EGRADE: FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2021-04-05Bedbug filing: 0 infested units
2021-04-01HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021-03-30Permit Sidewalk Shed — Signed-off
2021-03-27311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2021-03-25Permit Structural — Signed-off
2021-03-16311: Noise - Vehicle — Car/Truck Horn
2020
2020-12-15Boiler inspection
2020-12-15Boiler inspection
2020-12-15Boiler inspection
2020-11-12311: NonCompliance with Phased Reopening — Business not in compliance
2020-11-11311: NonCompliance with Phased Reopening — Business not in compliance
2020-11-08311: Noise — Noise: Construction Before/After Hours (NM1)
2020-11-01311: Homeless Street Condition — N/A
2020-10-29311: DOOR/WINDOW — DOOR
2020-10-29Tenant complaint: DOOR/WINDOW — DOOR
2020-10-09311: Construction Lead Dust — Coming into Apartment
2020-10-03311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2020-08-31311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-08-26DOB violation E:
2020-08-26DOB violation E:
2020-08-10Job filed: ROOF DECK REPLACEMENT AND SPANDREL BEAM$363,000
2020-07-22Permit Supported Scaffold — Signed-off
2020-07-08Permit EW — ISSUED
2020-06-24311: Illegal Fireworks — N/A
2020-06-23311: Noise — Noise: Construction Equipment (NC1)
2020-05-19Job filed: ROOF DECK REPLACEMENT AND SPANDREL BEAM$363,000
2020-05-07311: Homeless Person Assistance — N/A
2020-05-01311: Homeless Street Condition — N/A
2020-04-30311: Homeless Street Condition — N/A
2020-04-01Permit Sidewalk Shed — Signed-off
2020-03-17Certificate of occupancy Temporary
2020-03-06FDNY inspection (RISK)
2020-01-31Cooling tower inspection
2019
2019-12-30Bedbug filing: 0 infested units
2019-12-11DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019-12-11DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019-12-11DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019-12-11DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019-12-11DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019-12-11DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019-12-11DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019-12-11DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019-12-11DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019-09-18AL&R $30,000,000 — from 270 PARK AVE SOUTH LLC to PEOPLE'S UNITED BANK, NATIONAL ASSOCIATI$30,000,000
2019-09-18Mortgage assigned — from FANNIE MAE to PEOPLE'S UNITED BANK, NATIONAL ASSOCIATI
2019-09-18Mortgage $10,088,158 — from 270 PARK AVE SOUTH LLC to PEOPLE'S UNITED BANK, NATIONAL ASSOCIATI$10,088,158
2019-09-18Agreement $30,000,000 — from 270 PARK AVE SOUTH LLC to PEOPLE'S UNITED BANK, NATIONAL ASSOCIATI$30,000,000
2019-09-15311: Homeless Encampment — N/A
2019-09-13311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2019-09-13ECB CLASS - 1 violation: BC3303.10.1/NO TENANT PROTECTION PLAN.AT TIME OF INSPECTION OF 13 STORY OCCUPIED BUILDING I OBSERVED WORK AT ROOF LEVEL PARAPET WA$2,500
2019-09-13ECB CLASS - 1 violation: FAILURE TO MAINTAIN DOCUMENTS ON SITE.AT TIME OF INSPCTION OF A 13 STOTY OCCUPIED BUILDING EXTERIOR WORK IN PROGRESS I OBSERVED HO$2,500
2019-09-13ECB CLASS - 1 violation: BC3314.3.4-NO LOADS IMPOSED LETTER.AT TIME OF INSPECTION OF A 13 STORYOCCUPIED BUILDING I OBSERVED SUPPORTED PIPE SCAFFOLD SITS ON$2,500
2019-09-13ECB CLASS - 1 violation: FAILURE TO INSTITUTE/MAINTAIN SAFETY MEASURES NO GUARDRAIL SYSTEM.AT TIME OF INSPECTION OF A 13 STORY OCCUPIED BUILDING WORK IN PR$5,000
2019-09-13ECB CLASS - 1 violation: BC3309.10/FAILURE TO PROVIDE ROOF PROTECTION OF ADJACENT PROPERTY.AT TIME OF INSPECTION OF A 13 STORY OCCUPIED BUILDING I OBSERVED$2,500
2019-09-13ECB CLASS - 1 violation: BC3307.6.5.8-FAILURE TO PROVIDE SIDEWALK SHED PERIODIC INSPECTION.AT TIME OF INSPECTION OF A 13 STORY OCCUPIED BUILDING I OBSERVED$625
2019-09-13ECB CLASS - 1 violation: FAILURE TO MAINTAIN DOCUMENTS ON SITE AT TIME OF INSPECTION OF A 13 STORY OCCUPIED BUILDING EXTERIOR WORK IN PROGRESS SUPPORTED PI$625
2019-09-13ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMMENDMENTS.AT TIME OF INSPECTION OF A 13 STORY OCCUPIED $625
2019-09-13ECB CLASS - 1 violation: FAILURE TO IMMEDIATELY NOTIFY DEPARTMENT OF AN ACCIDENT.IN RESPONSE TOAN ACCIDENT WHERE IT WAS REPORTED BY FDNY THAT FACADE FELL O$5,000
2019-09-13ECB CLASS - 1 violation: FAILURE TO SAFEGUARD PUBLIC AND PROPERTY IN RESPONSE TO AN ACCIDENT WHERE IT WAS REPORTED DURING HOISTING OPERATIONS DEBRIS BEING
2019-09-13ECB CLASS - 1 violation: WORK DOES NOT CONDORM TO APPROVED CONSTRUCTION DOCUMENTS AND OR APPROVED AMENDMENTS.AT TIME OF INSPECTION OF A 13 STORY OCCUPIED B$2,500
2019-06-26311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-06-22311: Noise — Noise: Construction Before/After Hours (NM1)
2019-06-16311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-06-05Elevator permit: Filing this application to furnish and install a new software/hardware to existing controller to provide door lock monitoring. Al$20,572
2019-05-28Certificate of occupancy Temporary
2019-05-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2019-05-01311: Street Condition — Defective Hardware
2018-08-14ECB CLASS - 1 violation: FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. AS NOTED:EXPOSURE 4:DAMAGED BRICKS AROUND WINDOW, SPALLED/BULGING $2,500
2017-04-11311: Broken Muni Meter — Coin or Card Did Not Register
2017-03-07ECB CLASS - 2 violation: 16D6,11B7,41M7,60D6,59H1,68B7. 16D5-PIN 2ND FLOOR DOOR; PROVIDE "BLANK" FOR 2ND FLOOR CAR STATION BUTTON. PROPERLY LOCK OUT 2ND F
2016-01-13Job filed: MODIFICATION OF SPRINKLER HEAD LAYOUT AT PART OF 1ST AND CELLAR LEVEL. ALL AS PLAN.$25,000
2016-01-06311: Homeless Person Assistance — Status Call
2016-01-05311: Homeless Person Assistance — Status Call
2016-01-04311: HEAT/HOT WATER — ENTIRE BUILDING
2016-01-04311: Homeless Person Assistance — Status Call
2016-01-04Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2015
2015-12-16Permit EW — ISSUED
2015-12-14Job filed: MODIFICATION TO SPRINKLER HEAD LAYOUT.$28,500
2015-12-09Permit PL — ISSUED
2015-12-03Permit EW — ISSUED
2015-11-25Permit EQ — ISSUED
2015-11-25Permit EW — ISSUED
2015-11-18Permit EW — ISSUED
2015-11-18Permit EW — ISSUED
2015-11-18Permit EW — ISSUED
2015-11-17Job filed: MODIFICATION TO MECHANICAL SYSTEM & PLUMBING FIXTURES FOR NEW LAYOUT.$39,500
2015-11-13Job filed: MODIFICATION TO SPRINKLER HEAD LAYOUT.$28,500
2015-10-27Job filed: REMOVE SOME EXISTING & INSTALL NEW: PARTITIONS, DOORS, RAILINGS, SHELVING & CABINETRY.$345,000
2015-10-09Job filed: A1$35,000
2015-10-09Job filed: A1$35,000
2015-10-09Job filed: A1$35,000
2015-10-06311: Homeless Encampment — N/A
2015-08-19Job filed: REMOVE PART OF MEZZANNIE SLAB AND CUT DUMBWAITER OPENING IN FIRST FLOOR SLAB.I NSTALL OPENING STEEL FRAMING AS PER DRAWINGS (THE WORK WILL NOT AFFECT $30,000
2015-06-27311: Broken Muni Meter — Out of Order
2015-06-27311: Broken Parking Meter — Out of Order
2015-06-24311: Homeless Person Assistance — No Status Call
2015-06-07311: Street Condition — Pothole
2015-06-06311: Lead — Lead Kit Request (Residential) (L10)
2015-05-06Job filed: INTERIOR RENOVATION TO COMMERCIAL SPACE AT 1ST FLOOR AND COMMERCIAL STORAGE AT CELLAR LEVEL , REMOVE AND CONSTRUCT NEW INTERIOR PARTITIONS. NEW STORE $55,000
2015-05-06Job filed: INTERIOR RENOVATION TO COMMERCIAL SPACE AT 1ST FLOOR AND COMMERCIAL STORAGE AT CELLAR LEVEL , REMOVE AND CONSTRUCT NEW INTERIOR PARTITIONS. NEW STORE $55,000
2014-03-11ECB CLASS - 2 violation: FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES.DEFECTS NOTED 1-CEILING IS MISSING LAYER OF PLASTER SHEATHING APPROX: 2'WI
2014-03-07311: General Construction/Plumbing — Failure To Maintain
2014-03-05Rodent inspection: Passed
2014-03-05311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2014-03-05311: General Construction/Plumbing — Failure To Maintain
2014-03-05DOB complaint, category ?
2014-03-03311: General Construction/Plumbing — Failure To Maintain
2013-06-21ECB CLASS - 2 violation: 02X10,05I10,17J01,40O02. 02X-2WAY COMMUNICATION-INOPERABLE; 05I-ACCORDIAN CAR GATE DAMAGED;17J-ADJUST SWING DOORS & CONTACTS (INT
2013-06-10DOB violation E:
2013-06-10DOB violation E:
2013-05-05HPD class C: SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SCALDING HOT WATER IN THE ENTIRE APARTMENT LOCATED AT APT 3G, 3rd ST
2013-04-03Certificate of occupancy Temporary
2013-03-12311: Drinking — Underage - Licensed Est
2013-03-09HPD class C: SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SCALDING HOTWATER AT ALL HOTWATER FIXTURES IN THE ENTIRE APARTMENT L
2013-03-07311: HEATING — HEAT
2013-03-07Tenant complaint: HEATING — HEAT RELATED
2013-02-21HPD class C: SECTION 27-2028, 2032 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FROM AN APPROVED CENTRAL HEATING SYSTEM, OR AN APPROVED SYSTEM OF GAS OR E
2013-02-20311: HEATING — HEAT
2013-02-20Tenant complaint: HEATING — HEAT RELATED
2013-02-19HPD litigation: Heat and Hot Water
2013-02-13Tenant complaint: HEATING — HEAT RELATED
2013-02-12311: Elevator — Elevator - Defective/Not Working
2013-02-12311: ELECTRIC — BELL-BUZZER/INTERCOM
2013-02-12Tenant complaint: HEATING — HEAT RELATED
2013-02-12Tenant complaint: ELECTRIC — BELL-BUZZER/INTERCOM
2013-02-12DOB complaint, category ?
2013-01-27HPD class C: SECTION 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM IN CELLAR
2013-01-27HPD class C: SECTION 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 3G, 3rd STORY, 1st APAR
2013-01-27HPD class C: SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SCALDING HOT WATER IN THE KITCHEN LOCATED AT APT 3G, 3rd STORY, 1st
2013-01-23HPD class C: SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SCALDING HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT
2013-01-22Tenant complaint: PLUMBING — WATER SUPPLY
2013-01-22Tenant complaint: NONCONST — VERMIN
2013-01-18311: HEATING — HEAT
2013-01-18Tenant complaint: HEATING — HEAT RELATED
2013-01-08Certificate of occupancy Temporary
2013-01-04311: HEATING — HEAT
2013-01-04Tenant complaint: HEATING — HEAT RELATED
2013-01-01311: HEATING — HEAT
2013-01-01Tenant complaint: HEATING — HEAT RELATED
2012
2012-12-28311: HEATING — HEAT
2012-12-28Tenant complaint: HEATING — HEAT RELATED
2012-12-27HPD class C: SECTION 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 3G, 3rd STORY, 1st APAR
2012-12-27HPD class C: SECTION 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM STAIR LEADING TO BOILER ROOM WAS JUST PAINTED AT TIME OF INSPECTIO
2012-12-26311: HEATING — HEAT
2012-12-26Tenant complaint: HEATING — HEAT RELATED
2012-12-14311: HEATING — HEAT
2012-12-14Tenant complaint: HEATING — HEAT RELATED
2012-12-12311: HEATING — HEAT
2012-12-12Tenant complaint: HEATING — HEAT RELATED
2012-12-05Rodent inspection: Passed
2012-12-05311: Taxi Complaint — Driver Complaint
2012-11-30311: HEATING — HEAT
2012-11-30Tenant complaint: HEATING — HEAT RELATED
2012-11-29311: HEATING — HEAT
2012-11-29Tenant complaint: HEATING — HEAT RELATED
2012-11-28311: HEATING — HEAT
2012-11-28311: HEATING — HEAT
2012-11-28Tenant complaint: HEATING — HEAT RELATED
2012-11-28Tenant complaint: HEATING — HEAT RELATED
2012-11-27311: HEATING — HEAT
2012-11-27Tenant complaint: HEATING — HEAT RELATED
2012-11-25311: HEATING — HEAT
2012-11-25311: HEATING — HEAT
2012-11-25311: HEATING — HEAT
2012-11-25311: HEATING — HEAT
2012-11-25311: HEATING — HEAT
2012-11-25Tenant complaint: HEATING — HEAT RELATED
2012-11-25Tenant complaint: HEATING — HEAT RELATED
2012-11-25Tenant complaint: HEATING — HEAT RELATED
2012-11-25Tenant complaint: HEATING — HEAT RELATED
2012-11-25Tenant complaint: HEATING — HEAT RELATED
2012-10-16Certificate of occupancy Temporary
2012-10-04Job filed: MANUAL AND AUTOMATIC SMOKE/HEAT DETECTION/SP ALARM SYSTEM.$15,000
2012-08-30DOB violation E:
2012-08-16Permit EW — ISSUED
2012-07-26ECB CLASS - 2 violation: 40D06,70M07,100Y11,35D06: 40;RESERVE PERTITION WALL BETWEEN HOISTWAY & MACHINE ROOM. 70;PROVIDE COVER/GUARD FOR SUMP PUMP. 100;CYL
2012-06-07Job filed: ERECT HEAVY DUTY SIDEWALK SHED PER DRAWINGS. INSTALLATION SHALL COMPLY WITH BSA-351-74-SM, LL-33/91,CHAPTER 33, SECTION 3307 OF 2008 NYC BC AND TPPN#9
2012-06-07Permit EQ — ISSUED
2012-04-30311: Food Establishment — Food Spoiled
2012-03-07Permit PL — ISSUED
2012-03-07Permit EW — ISSUED
2012-03-06Permit EW — ISSUED
2012-02-02Job filed: SUBSEQUENT FILING OF MECHANICAL, PLUMBING, AND SPRINKLER WORKTYPES FOR 2ND FLOOR BUILDOUT.$44,900
2012-02-02Job filed: INTERIOR BUILDOUT OF 2ND FLOOR SPACE$200,000
2012-02-02Job filed: SUBSEQUENT FILING OF MECHANICAL, PLUMBING, AND SPRINKLER WORKTYPES FOR 2ND FLOOR BUILDOUT.$44,900
2012-02-02Job filed: INTERIOR BUILDOUT OF 2ND FLOOR SPACE$200,000
2011
2011-11-12311: HEATING — HEAT
2011-11-12Tenant complaint: HEATING — HEAT RELATED
2011-09-30ECB CLASS - 1 violation: ERECTED OR INSTALLED SUPPORTED SCAFFOLD 40' OR HIGHER W/O A PERMIT. NOTE: SUPPORTED SCAFFOLD APPROX 60' HIGH INSTALLED ON EXP 1
2011-09-20311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2011-09-20DOB complaint, category ?
2011-09-14311: Food Establishment — Food Temperature
2011-01-25ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE 6TH ROUND TECHNICAL REPORT IN COMPLIANCEW/CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS & A
2011-01-17311: Water System — Leak (Use Comments) (WA2)
2010
2010-12-21DOB violation E:
2010-12-20311: Water System — Leak (Use Comments) (WA2)
2010-12-03311: Public Payphone Complaint — Damaged Telephone
2010-10-18311: Water System — Leak (Use Comments) (WA2)
2010-10-08DOB violation VCAT1:
2010-09-21Job filed: INSTALLATION OF 125 LINEAR FT OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERNATION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY W
2010-09-21Job filed: INSTALLATION OF 125 LINEAR FT OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERNATION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY W
2010-09-21Permit EQ — ISSUED
2010-07-26311: Sanitation Condition — 12 Dead Animals
2010-07-12311: Rodent — Mouse Sighting
2010-06-21Rodent inspection: Passed
2010-06-08DOB violation E:
2010-06-08DOB violation E:
2010-04-16Permit EW — ISSUED
2010-04-09CORRM $23,925,000 — from 270 PARK AVENUE SOUTH LLC to HSBC BANK USA, NATIONAL ASSOCIATION$23,925,000
2010-03-29ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE 6TH ROUND TECHNICAL REPORT IN COMPLIANCEW/CODE PROVISIONS:PERIODIC INSPECTION OF EXTERIOR WALLS & AP$800
2010-03-25311: Noise - Vehicle — Car/Truck Music
2010-03-03311: HEATING — HEAT
2010-03-03Tenant complaint: HEATING — HEAT RELATED
2010-02-17Job filed: PA
2010-02-12311: Beach/Pool/Sauna Complaint — Beach/Pool Water
2010-02-10Mortgage assigned — from HSBC BANK USA to FANNIE MAE
2010-02-07311: HEATING — HEAT
2010-02-07311: HEATING — HEAT
2010-02-07Tenant complaint: HEATING — HEAT RELATED
2010-02-07Tenant complaint: HEATING — HEAT RELATED
2010-02-05311: HEATING — HEAT
2010-02-05Tenant complaint: HEATING — HEAT RELATED
2010-02-02311: HEATING — HEAT
2010-02-02Tenant complaint: HEATING — HEAT RELATED
2010-01-31311: HEATING — HEAT
2010-01-31Tenant complaint: HEATING — HEAT RELATED
2010-01-30311: HEATING — HEAT
2010-01-30Tenant complaint: HEATING — HEAT RELATED
2010-01-24311: HEATING — HEAT
2010-01-24311: HEATING — HEAT
2010-01-24311: HEATING — HEAT
2010-01-24311: HEATING — HEAT
2010-01-24311: HEATING — HEAT
2010-01-24311: HEATING — HEAT
2010-01-24Tenant complaint: HEATING — HEAT RELATED
2010-01-24Tenant complaint: HEATING — HEAT RELATED
2010-01-24Tenant complaint: HEATING — HEAT RELATED
2010-01-24Tenant complaint: HEATING — HEAT RELATED
2010-01-24Tenant complaint: HEATING — HEAT RELATED
2010-01-24Tenant complaint: HEATING — HEAT RELATED
2010-01-23311: HEATING — HEAT
2010-01-23311: HEATING — HEAT
2010-01-23Tenant complaint: HEATING — HEAT RELATED
2010-01-23Tenant complaint: HEATING — HEAT RELATED
2010-01-10311: HEATING — HEAT
2010-01-10Tenant complaint: HEATING — HEAT RELATED
2009
2009-12-16Job filed: INTALL NEW 2 FLAGPOLES INFRONT OF THE BUILDING. ALL AS PER PLAN NO CHANGE IN USE EGRESS OR OCCUPANCY.$5,000
2009-12-16Job filed: INTALL NEW 2 FLAGPOLES INFRONT OF THE BUILDING. ALL AS PER PLAN NO CHANGE IN USE EGRESS OR OCCUPANCY.$5,000
2009-11-10Mortgage assigned — from HSBC BANK USA NATIONAL ASSOCIATION to FANNIE MAE
2009-11-10Mortgage $23,925,000 — from 270 PARK AVE SOUTH LLC to HSBC BANK USA NATIONAL ASSOCIATION$23,925,000
2009-11-10Deed — from PAMELA EQUITIES CORP. to 270 PARK AVE SOUTH LLC
2009-11-03Tenant complaint: PLUMBING — RADIATOR
2009-10-30Permit EW — ISSUED
2009-09-23Permit AL — ISSUED
2009-09-22Permit EW — ISSUED
2009-09-15Job filed: INSTALL AUTOMATIC FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH JOB#120106786. NO CHANGE IN USE, EGRESS OR OCCUPANC. GAS VALVE WAS FILED IN JOB#10320171$5,000
2009-08-21DOB violation E:
2009-08-21DOB violation E:
2009-08-19Permit EW — ISSUED
2009-08-11Job filed: FILING HEREWITH STRUCTURAL WORK ASSOCIATED WITH ALT 1 #110150559$76,000
2009-08-10Permit PL — ISSUED
2009-08-07Permit PL — ISSUED
2009-08-04Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED 25'L X 12'H X 15'W IN FRONT OF THE BUILDING AND ADDITIONAL TWO (2) 20' EXTENSIONS OF "NO WORK ZONES" IN COMP
2009-08-04Permit EQ — ISSUED
2009-07-16Job filed: TEMPORARY KITCHEN REPLACEMENT. PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.$25,000
2009-07-16Job filed: TEMPORARY KITCHEN REPLACEMENT. PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.$25,000
2009-05-22Permit EW — ISSUED
2009-05-22Permit EW — ISSUED
2009-05-13Permit EW — ISSUED
2009-05-13Permit EQ — ISSUED
2009-05-01Permit EW — ISSUED
2009-05-01Permit EW — ISSUED
2009-05-01Permit EW — ISSUED
2009-05-01Permit EQ — ISSUED
2009-03-24Permit EW — ISSUED
2009-03-18Permit EW — ISSUED
2009-03-13Job filed: SPRINKLER WORK WITH ASSOCIATED PIPING AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$58,000
2009-03-13Job filed: MECHANICAL & PLUMBING WORK WITH ASSOCIATED PIPING AS SHOWN ON PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH ALT 1 #110150559$600,000
2009-02-14DOB complaint, category ?
2009-02-07ECB CLASS - 2 violation: EXPIRED SHED PERMIT. NOTED: SHED PERMIT #104585976 WAS EXPIRED ON 04/01/08. REMEDY: RENEW PERMIT.$4,000
2009-01-01DOB violation LL6291:
2008
2008-12-09Permit EW — ISSUED
2008-12-08Tenant complaint: HEATING — HEAT RELATED
2008-12-08DOB complaint, category ?
2008-11-07Job filed: APPLICATION FILED FOR GENERAL CONSTRUCTION ONLY AS SHOWN ON PLANS FILED HEREWITH. MEP TRADES TO BE FILED SEPARATELY AT A LATER DATE.$100,000
2008-11-07Job filed: APPLICATION FILED FOR GENERAL CONSTRUCTION ONLY AS SHOWN ON PLANS FILED HEREWITH. MEP TRADES TO BE FILED SEPARATELY AT A LATER DATE.$100,000
2008-06-05DOB violation E:
2008-06-05DOB violation E:
2008-04-18Job filed: HVAC & PLUMBING FILED IN CONJUNCTION WITH NEW PHYSICAL CULTURE ESTABLISHMENT AS SHOWN ON PLANS FILED HEREWITH.
2008-04-18Job filed: A1$430,000
2008-04-03DOB complaint, category ?
2008-04-03DOB complaint, category ?
2008-04-01Permit EW — ISSUED
2008-04-01Permit EW — ISSUED
2008-04-01Permit EW — ISSUED
2008-03-25Permit EQ — ISSUED
2008-03-25Permit EW — ISSUED
2008-03-24Permit EW — ISSUED
2008-03-24Permit EW — ISSUED
2008-03-24Permit EW — ISSUED
2008-03-21DOB violation LL1081:
2008-03-19Job filed: SPRINKLER WORK IN CONJUNTION WITHG VAULT REHAB AS SHOWN ON PLANS FILED HEREWITH.$3,000
2008-03-14DOB violation C:
2008-02-29Job filed: BUILDERS PAVING PLAN FILING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2008-02-29Job filed: BUILDERS PAVING PLAN FILING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2008-02-12Job filed: Application filed for Vault Rehab and sidewalk replacement as shown on plans filed herewith. No change in use, egress or occupancy.$200,000
2008-02-12Job filed: Structural work in conjunction with vault rehab & sidewalk replacement as shown on plans filed herewith.$125,000
2008-02-12Permit EW — ISSUED
2008-02-07Permit EQ — ISSUED
2008-02-07Permit EW — ISSUED
2008-01-30Job filed: INTERIOR DEMO AND REPLACEMENT OF STOREFRONT AS SHOWN ON PLANS FILED HERE WITH. ERECT TEMPORARY CONSTRUCTION FENCE NO MORE THAN 3' FROM PROPERTY LINE. $39,000
2008-01-11ECB Non-Hazardous violation: FAILED TO NOTIFY THE DEPARTMENT OF BUILDINGS PROIR TO THE USE OR INSTALLATION OF "C" HOOKS OR OUTRIGGER BEAMS IN CONNECTION WITH S$500
2007
2007-11-30DOB violation LL1198:
2007-06-07Permit EW — ISSUED
2007-06-04Job filed: Reconstruct Northeast Corner from the 7th floor up. Remove and replace terra cotta at pilesters. Remove and replace loos brick at window openings. $120,000
2007-05-26Tenant complaint: NONCONST — RUBBISH
2007-05-26DOB complaint, category ?
2007-05-04Tenant complaint: HEATING — HEAT RELATED
2007-04-24Permit EW — ISSUED
2007-04-18ECB Non-Hazardous violation: EXIT PASSAGE OR CORRIDOR: REQUESTED WIDTH DECREASED BY OBSTRUCTION. NOTED: 2ND FL LEVEL STAIRS "A" HAVING STORED CONST DEBRIS 1N B$180
2007-04-18DOB complaint, category ?
2007-04-12Permit EQ — ISSUED
2007-04-10DOB complaint, category ?
2007-04-06Tenant complaint: NONCONST — RUBBISH
2007-04-04DOB violation E:
2007-03-09Permit EQ — ISSUED
2007-03-07Tenant complaint: HEATING — HEAT RELATED
2007-02-28Permit EW — ISSUED
2007-02-28Permit EW — ISSUED
2007-02-27Job filed: Interior renovation of lobby to include minor demo, construction, hvac and storefront work as shown on plans filed herewith. Erect temp plywood const$95,000
2007-02-27Job filed: Interior renovation of lobby to include minor demo, construction, hvac and storefront work as shown on plans filed herewith. Erect temp plywood const$95,000
2007-02-22Tenant complaint: NONCONST — RUBBISH
2007-02-13Tenant complaint: HEATING — HEAT RELATED
2007-02-07Tenant complaint: HEATING — HEAT RELATED
2007-01-26Tenant complaint: HEATING — HEAT RELATED
2007-01-22Tenant complaint: HEATING — HEAT RELATED
2007-01-21Tenant complaint: HEATING — HEAT RELATED
2007-01-17Tenant complaint: HEATING — HEAT RELATED
2007-01-16Tenant complaint: ELECTRIC — BELL-BUZZER/INTERCOM
2007-01-16Tenant complaint: ELECTRIC — ELECTRIC-SUPPLY
2007-01-16Tenant complaint: HEATING — HEAT RELATED
2007-01-16Tenant complaint: HEATING — HEAT RELATED
2007-01-16Tenant complaint: HEATING — HEAT RELATED
2007-01-15Tenant complaint: HEATING — HEAT RELATED
2007-01-13Tenant complaint: HEATING — HEAT RELATED
2007-01-11Tenant complaint: HEATING — HEAT RELATED
2007-01-11Tenant complaint: HEATING — HEAT RELATED
2007-01-11Tenant complaint: ELECTRIC — BELL-BUZZER/INTERCOM
2007-01-11Tenant complaint: NONCONST — RUBBISH
2007-01-11Tenant complaint: HEATING — HEAT RELATED
2007-01-11DOB complaint, category ?
2007-01-08Tenant complaint: PLUMBING — WATER SUPPLY
2007-01-07Tenant complaint: GENERAL — DOORS
2007-01-07Tenant complaint: HEATING — HEAT RELATED
2006
2006-12-08Tenant complaint: HEATING — HEAT RELATED
2006-12-08Tenant complaint: HEATING — HEAT RELATED
2006-12-08Tenant complaint: HEATING — HEAT RELATED
2006-12-05Tenant complaint: HEATING — HEAT RELATED
2006-11-29Tenant complaint: HEATING — HEAT RELATED
2006-11-28Tenant complaint: PLUMBING — WATER SUPPLY
2006-11-27Tenant complaint: PLUMBING — WATER SUPPLY
2006-11-18Tenant complaint: HEATING — HEAT RELATED
2006-11-14Tenant complaint: ELECTRIC — BELL-BUZZER/INTERCOM
2006-11-14Tenant complaint: HEATING — HEAT RELATED
2006-11-14Permit PL — ISSUED
2006-11-14Permit PL — ISSUED
2006-11-13Tenant complaint: HEATING — HEAT RELATED
2006-11-10Tenant complaint: PLUMBING — WATER SUPPLY
2006-11-06Tenant complaint: PLUMBING — WATER SUPPLY
2006-11-03Tenant complaint: HEATING — HEAT RELATED
2006-11-02Tenant complaint: PLUMBING — WATER SUPPLY
2006-11-02Tenant complaint: PLUMBING — WATER SUPPLY
2006-11-01Tenant complaint: PLUMBING — WATER SUPPLY
2006-11-01Tenant complaint: HEATING — HEAT RELATED
2006-11-01Tenant complaint: HEATING — HEAT RELATED
2006-10-31Tenant complaint: HEATING — HEAT RELATED
2006-10-30Tenant complaint: HEATING — HEAT RELATED
2006-10-25Tenant complaint: HEATING — HEAT RELATED
2006-10-25ECB Hazardous violation: USING RIGGING EQUIPMENT W/O PROPER DANGER SIGNS. LICENSED RIGGER DESIGNATED UNQUALIFIED FOREMAN. NO SPECIAL RIGGERS LICENSE ON- SI$1,750
2006-10-25DOB complaint, category ?
2006-10-23Tenant complaint: HEATING — HEAT RELATED
2006-10-23Permit PL — ISSUED
2006-10-22Tenant complaint: HEATING — HEAT RELATED
2006-10-21Tenant complaint: HEATING — HEAT RELATED
2006-10-20Tenant complaint: HEATING — HEAT RELATED
2006-10-20Permit EQ — ISSUED
2006-10-17DOB complaint, category ?
2006-10-17DOB complaint, category ?
2006-10-16Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 225' LONG DURING FACADE REPAIR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. SHED TO COMPLY WITH TPPN 9/99 AN
2006-10-15Tenant complaint: HEATING — HEAT RELATED
2006-10-15Tenant complaint: HEATING — HEAT RELATED
2006-10-14Tenant complaint: HEATING — HEAT RELATED
2006-10-14Tenant complaint: HEATING — HEAT RELATED
2006-10-14Tenant complaint: PLUMBING — WATER SUPPLY
2006-10-12Permit EW — ISSUED
2006-10-07DOB complaint, category ?
2006-09-27Permit EW — ISSUED
2006-09-27Permit EW — ISSUED
2006-09-26Tenant complaint: PLUMBING — WATER SUPPLY
2006-09-25Job filed: Interior renovation to include minor demo, general construction and plumbing work with associated piping as shown on plans filed herewith. Work in t$90,000
2006-09-25Job filed: Interior renovation to include minor demo, general construction and plumbing work with associated piping as shown on plans filed herewith. Work to be$90,000
2006-09-25Job filed: Interior renovation to include minor demo, general construction and plumbing work with associated piping as shown on plans filed herewith. Work in t$90,000
2006-09-22Job filed: Interior renovation to include minor demo, general construction and plumbing work as shown on plan filed herewith. The apts covered under this applic$90,000
2006-09-21Tenant complaint: PLUMBING — WATER SUPPLY
2006-09-21Tenant complaint: PLUMBING — WATER SUPPLY
2006-09-21Tenant complaint: PLUMBING — WATER SUPPLY
2006-09-19DOB complaint, category ?
2006-09-18Tenant complaint: HEATING — HEAT RELATED
2006-09-18Tenant complaint: NONCONST — VERMIN
2006-09-13DOB complaint, category ?
2006-09-11Tenant complaint: PLUMBING — WATER SUPPLY
2006-09-11DOB complaint, category ?
2006-09-07Tenant complaint: PLUMBING — WATER SUPPLY
2006-09-06Tenant complaint: PLUMBING — WATER SUPPLY
2006-09-05Tenant complaint: PLUMBING — WATER SUPPLY
2006-09-05Tenant complaint: PLUMBING — WATER SUPPLY
2006-05-04REL — from PAMELA EQUITIES CORP. to FEDERAL HOME LOAN MORTGAGE CORPORATION
2006-05-04SPRD $18,120,253 — from PAMELA EQUITIES CORP.; FARBOD REALTY CORP to FEDERAL HOME LOAN MORTGAGE CORPORATION$18,120,253
2006-03-06Tenant complaint: HEATING — HEAT RELATED
2006-03-01Tenant complaint: HEATING — HEAT RELATED
2006-02-16Tenant complaint: GENERAL — MOLD
2006-02-13Tenant complaint: HEATING — HEAT RELATED
2006-02-13Tenant complaint: HEATING — HEAT RELATED
2006-02-12Tenant complaint: HEATING — HEAT RELATED
2006-02-10ECB Non-Hazardous violation: 50. MOBILE STEAM BOILER L.P. 50)PIPE DOWN SAFETY VALVE DISCHARGE TO A SAFE POINT TO PREVENT SCALDING OF PERSONS.
2006-02-01Tenant complaint: HEATING — HEAT RELATED
2006-01-25Tenant complaint: HEATING — HEAT RELATED
2006-01-25Tenant complaint: HEATING — HEAT RELATED
2006-01-25Tenant complaint: HEATING — HEAT RELATED
2006-01-25Tenant complaint: HEATING — HEAT RELATED
2006-01-25Tenant complaint: HEATING — HEAT RELATED
2006-01-25Tenant complaint: HEATING — HEAT RELATED
2006-01-06DOB violation LL6291:
2005
2005-12-15Permit SG — ISSUED
2005-11-03Permit EW — ISSUED
2005-11-03Permit EQ — ISSUED
2005-10-28Job filed: REPLACE STORE FRONT WITH NEW. CONSTRUCT 82 FOOTLONG PLYWOOD SIDEWALK FENCE 8' HIGH. FILED IN CONJUCTION WITH JOB # 104247913. NO CHANGE OF USE, EGR$65,000
2005-10-28Job filed: REPLACE STORE FRONT WITH NEW. CONSTRUCT 82 FOOTLONG PLYWOOD SIDEWALK FENCE 8' HIGH. FILED IN CONJUCTION WITH JOB # 104247913. NO CHANGE OF USE, EGR$65,000
2005-10-21Permit PL — ISSUED
2005-10-03Permit EW — ISSUED
2005-10-01DOB violation LL1081:
2005-09-30Job filed: REMOVE PART OF EXISTING MEZZANINE$10,000
2005-09-30Job filed: REMOVE PART OF EXISTING MEZZANINE$10,000
2005-09-30Job filed: CONSTRUCT HANDICAPPED TOILET, INTERIOR PARTITIONS INSTALL TWO SPLIT TYPE HVAC UNITS: BLOWERS TO BE CARRIER MODELS 50BZN006 & 50BZN008 WITH MEA 1$75,000
2005-01-29Tenant complaint: PLUMBING — WATER SUPPLY
2004
2004-12-17Tenant complaint: PLUMBING — WATER SUPPLY
2004-11-22DOB violation E:
2004-11-22DOB violation E:
2004-11-19DOB violation LL1081:
2004-11-18ECB Non-Hazardous violation: 31H10,83B10,55O02.31-H-EXCESSIVE PLAY IN GUIDESHOES.83-B-VIBRATIONS IN UP+DOWN TRAVEL.55-0-CLEAN MACHINE.
2004-11-12ECB Non-Hazardous violation: FAILURE TO SUBMIT FIFTH ROUND TECHNICAL REPORT:PERIODIC INSPECTION OF EXTERIOR WALLS & APPURTENANCES AS REQUIRED BY LOCAL LAW 11 O
2004-09-25DOB complaint, category ?
2004-01-23ECB Non-Hazardous violation: FAILURE TO SUBMIT A FIFTH ROUND TECHNICAL REPORT:PERIODIC INSPECTION OF EXTERIOR WALLS AND APPURENTENANCES AS REQUIRED BY LOCAL LA$700
2004-01-09DOB violation E:
2004-01-09DOB violation E:
2003
2003-12-31Mortgage $18,608,000 — from PAMELA EQUITIES CORP to HSBC BANK USA$18,608,000
2003-12-31Agreement $18,608,000 — from PAMELA EQUITIES CORP to HSBC BANK USA$18,608,000
2003-12-31Mortgage assigned — from HSBC BANK USA to FEDERAL HOME LOAN MORTGAGE CORPORATION
2003-12-30Mortgage assigned — from FANNIE MAE F/K/A to HSBC BANK USA
2002-08-22Job filed: INSTALL NEW ANSUL SYSTEM ONLY, HEREWITH FILING FIRE DEPT. APPROVAL PLAN . GAS SHUT-OFF VALVE WAS FILED UNDER SEPERATED APPLICATION # 103201713. NO$1,500
2002-08-08DOB violation L1198:
2002-07-10Permit PL — ISSUED
2002-07-05Permit EW — ISSUED
2002-07-05Permit EW — ISSUED
2002-07-05Permit EQ — ISSUED
2002-07-01Job filed: RENOVATION OF EXISTING STORE. MODIFY STORE FRONT, REPLACEMENT OF EXISTING A/C UNITS, NEW PLUMBING FIXTURES, REMOVE EXISTING STAIR TO MEZZ, NEW EXHAUS$81,000
2002-06-24DOB complaint, category ?
2002-05-30DOB violation E: 1P11985
2002-05-30DOB violation E: 1P11986
2002-04-10DOB complaint, category ?
2001
2001-12-03Permit EQ — RE-ISSUED
2001-11-28Job filed: INSTALLATION OF HEAVYDUTY SIDEWALK SHED 226'DURING FACADE REPAIR NO CHANGE IN USE EGRESS OR OCCUPANCY SHED TO COMPLY WITH LL33/91
2001-11-28Job filed: INSTALLATION OF HEAVYDUTY SIDEWALK SHED 226'DURING FACADE REPAIR NO CHANGE IN USE EGRESS OR OCCUPANCY SHED TO COMPLY WITH LL33/91
2000
2000-08-15Permit EQ — ISSUED
2000-08-10Job filed: INSTALL HEAVY DUTY SIDEWALK SHED:180' LONG WORK SHALL COMPLY WITH LL33/91 NO CHANGE IN USE EGRESS OR OCCUPANCY
2000-07-10DOB violation E: 1P11985
2000-07-10DOB violation E: 1P11986
2000-02-18Permit EW — ISSUED
2000-02-09Job filed: INSTALL FIRE SUPPRESSION SYSTEM. NO CHANGE IN USE,EGRESS OR OCCUPANCY.$2,000
1999
1999-07-16DOB violation E: 1P11986
1999-07-16DOB violation E: 1P11985
1999-03-16DOB violation LL6291:
1998
1998-08-11SMIS — from PAMELA EQUITIES CORP. to REPUBLIC NATIONAL BANK OF NEW YORK
1998-05-04DOB violation LL6291:
1997
1997-09-16DOB violation LL6291:
1997-02-10DOB violation LL6291:
1996
1996-12-11Mortgage assigned — from PAMELA EQUITIES CORP. to REPUBLIC NATIONAL BANK OF NEW YORK
1996-12-11Mortgage assigned — from REPUBLIC NATIONAL BANK OF NEW YORK to FEDERAL NATIONAL MORTGAGE ASSOCIATION
1996-12-11Mortgage assigned — from REPUBLIC NATIONAL BANK OF NEW YORK to FEDERAL NATIONAL MORTGAGE ASSOCIATION
1996-12-11Mortgage $26,795,153 — from PAMELA EQUITIES CORP. to REPUBLIC NATIONAL BANK OF NEW YORK$26,795,153
1996-12-11Mortgage $606,662 — from PAMELA EQUITIES CORP. to REPUBLIC NATIONALB ANK OF NEW YORK$606,662
1996-06-06DOB complaint, category ?
1996-05-29Permit EW — ISSUED
1995
1995-08-29DOB violation LL6291:
1995-08-23Permit SG — ISSUED
1995-08-23Permit SG — ISSUED
1995-05-15Permit EW — ISSUED
1995-03-15Permit EW — ISSUED
1995-03-15Permit EW — ISSUED
1994
1994-07-29ECB Non-Hazardous violation: 75U, 74M 75)PERFORM 5 YR. SAFETY TEST; PROPERLY DATE & TAG DEVICE FOR SAME & FILE ELEV. #3 FORM WITH THIS DEPT. 74) PROVIDE CITY I
1994-07-26ECB Non-Hazardous violation: 75U,74M, (75) PERFORM 5 YEAR SAFETY TEST; PROPERLY DATE & DATE DEVICE FOR SAME. (74) PROVIDE CITY I.D. NUMBER ON CONTROLLER, GENER
1994-03-23Permit EW — ISSUED
1994-03-23Permit EW — ISSUED
1994-03-23Permit PL — ISSUED
1993
1993-03-18DOB violation LL6291:
1992
1992-10-22Agreement — from PAMELA EQUITIES CORP to CROSSLAND FED SVGS BANK
1992-05-12ECB Hazardous violation: USE OF RIGGING EQUIPMENT WITHOUT SPECIAL RIGGERS LICENSE OBTAIN LICENSE FAILURE TO PROVIDE CENTER IRON ON A SWINGING SCAFFOLD OBTA$1,075
1991
1991-11-07Permit EQ — ISSUED
1991-09-17DOB complaint, category ?
1991-04-25DOB violation LL1081: 3
1991-03-16ECB Non-Hazardous violation: 53B$75
1991-02-21ECB Non-Hazardous violation: 73#,FAILURE TO PROMPTLY REPORT ELEVATOR ACCIDENT INVOLVING PERSONS INJURY REQUIRING SERVICE OF A PHEYSICIAN OR DAMAGE TO PROPERTY $460
1991-02-21DOB violation E: DEVICE #1S2274
1991-02-20DOB complaint, category ?
1990
1990-07-25Permit PL — ISSUED
1990-07-16Permit EW — ISSUED
1990-06-04Permit EW — ISSUED
1990-06-04Permit EW — ISSUED
1989
1989-01-17DOB violation E: (51)PROPERLY TAG GOVERNOR TO SHOW 5YR SAFETY TESTS (15)REPAIR TOP OF CAB (INSIDE CAR)
1989-01-17DOB violation E: (51)TAG GOVERNOR TO SHOW 5YR SAFETY TEST (52)RESTORE TO COMPLETE OPERATING CONDITION SO A COMPLETE INSPECTION CAN BE MADE
1988
1988-09-23Mortgage $18,991,451 — from PAMELA EQUITIES CORP to CROSSLAND SVGS FSB$18,991,451
1988-09-23Agreement — from PAMELA EQUITIES CORP to CROSSLAND SAVINGS FSB
1987
1987-09-17Air permit (CERTIFICATE TO OPERATE), fuel: NO2FUEL
1987-08-19HPD class A: D26-20.08,20.09 ADM CODE FILE CERTIFICATION OF SATISFACTORY INSTALLATION OF SMOKE DETECTING DEVICE IN ACCORDANCE WITH H.P.D. RULES AND REGUL
1982
1982-11-15SAGE — from CHASE MANHATTAN BANKN.A
1982-11-09Agreement — from PAMELA EQUITIES CORP. to METROPOLITAN SAVGS BANK
1982-11-09SAGE — from CHASE MANHATTAN BANKNA
1982-11-09Mortgage assigned — from CHASE MANHATTAN BANKNA to METROPOLITAN SAV'S BK
1982-11-09Mortgage assigned — from PAMELA EQUITIES CORP. to METROPOLITAN SAVGS BANK
1981
1981-10-06MISC — from CHASE MANHATTAN BANKN A
1980
1980-12-18MISC — from CHASE MANHATTAN BANKN A
1980-03-26Deed — from ATCU INC to PAMELA EQUITIES CORP
1980-03-10Mortgage assigned — from CITIBANK N A to CHASE MANHATTAN BANKN A
1980-03-10Mortgage — from ATCU INC to CHASE MANHATTAN BANK
1980-03-10Mortgage — from ATCU INC to CHASE MANHATTAN BANK
1980-03-10Mortgage — from ATCU INC to CHASE MANHATTAN BANK
1980-03-10Mortgage — from ATCU INC to CHASE MANHATTAN BANK
1980-03-10Agreement — from ATCU INC to CHASE MANHATTAN BANK
1980-03-10Mortgage — from ATCU INC to CHASE MANHATTAN BANK
1980-03-10Mortgage — from ATCU INC to CHASE MANHATTAN BANK
1978
1978-08-16Deed — from ST LOUIS TRMNL FLD WRHSE to SHRIRO TRADING CORPAKA; SHRIRO INC
1978-08-11Mortgage assigned — from 268 FOURTH AVE CO to MANOCHERIAN, FRAYDUN
1978-08-11Deed — from CAMUS CORP to PAMELA EQUITIES CORP
1978-08-11Mortgage assigned — from NEW YORK BANK FOR SVGS to CITIBANK NA
1978-08-11Agreement — from PAMELA EQUITIES CORP to CITIBANK NA
1978-08-11Mortgage — from PAMELA EQUITIES CORP to CITIBANK NA
1978-08-11Mortgage assigned — from PAMELA EQUITIES CORP to CITIBANK NA
1978-08-11Mortgage assigned — from MANOCHERIAN, FRAYDUN to CITIBANK NA
1978-07-18CNTR — from CAMUS CORP to PAMALA EQUITIES CORP
1976
1976-05-25Mortgage — from CAMUS CORP to 268 FOURTH AVE CO
1976-05-21Deed — from SCNEIR, MINNIE; SCHWARTZ, ADRIENNE TR; SHAW, ALAN; RUDEN, HARRIETTE; SCNEIR, PEARL; SCNEIR to CAMUS CORP
1975
1975-06-06Deed — from SCHNEIR, PEARL TR; SCHWARTZ, ADRIENNE TR; SCHNEIR, JEROME; SCHNEIR, MAX DECD to SCHNEIR, JEROME
1974
1974-11-06Agreement — from D N G REALTY CORP to NEW YORK BANK FOR SVGS
1974-11-06Deed — from SCHWARTZ, ADRIENNE TR; SCHNEIR, MINNIE; SCHNEIR, MAX DECD; RUDEN, HARRIETTE; SCHNEIR, JERO to D N G REALTY CORP
1974-11-06Deed — from SCHNEIR, JEROME; RUDEN, HARRIETTE; SCHNEIR, PEARL TR; ROSENBERG, NATHAN; SCHNEIR, MINNIE; to D N G REALTY CORP
1974-11-06Deed — from SCHNEIR, PEARL; SHAW, ALAN; SCHNEIR, JEROME; RUDEN, HARRIETTE; SCHNEIR, ALVIN I FKA; SCHWA to D N G REALTY CORP
1974-11-06Deed — from SCHWARTZ, ADRIENNE TR; SCHNEIR, PEARL; SCHNEIR, PEARL TR; SCHNEIR, ALVIN I FKA; SCHWARTZ, to D N G REALTY CORP
1974-11-06Deed — from SCHNEIR, MINNIE; SCHNEIR, PEARL; SCHNEIR, JEROME; ROSENBERG, NATHAN; SCHNEIR, FLORA; SCHNE to D N G REALTY CORP
1974-11-06Deed — from RUDEN, HARRIETTE; ROSENBERG, NATHAN; SCHNEIR, FLORA; SCHNEIR, PEARL; SCHNEIR, MAX DECD; SC to D N G REALTY CORP
1974-11-06Deed — from SCHWARTZ, ADRIENNE; SCHNEIR, MAX DECD; SCHNEIR, PEARL; SHAW, ALAN; RUDEN, HARRIETTE; SCHNE to D N G REALTY CORP
1974-11-06Deed — from D N G REALTY CORP to SCHNEIR, MINNIE; ROSENBERG, NATHAN; SCHNEIR, PEARL TR; SCHWARTZ, ADRIENNE TR; RUDEN, HARRI
1971
1971-03-15Deed — from SCHNEIR, MAX DECD; SCHNEIR PEARL TR; SCHWARTZ, ADRIENNE TR; SCHWARTZ,ADRIENE S F/B/O to SCHWARTZ, ADRIENNE