Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

4 East 72 Street · Manhattan · BBL 1013860064 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

Where the penalty points come from

ComponentWhat it coversPoints
Housing codeHPD violations by class, complaints, emergency repairs, litigation, vacate orders, AEP0
Structural & safetyDOB violations, ECB/OATH violations by class10
PestsBedbug filings, failed rodent inspections, rodent 311s0
DisplacementMarshal evictions executed0
GRADE A

The city's published records show little recorded distress here in the last three years. Less recorded distress than 75% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty points per 10 units; this building carries 5. In ZIP 10021, 81% of residential buildings hold an A and 3% grade D or F. How grades work

this building
A
B
C

Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more

Open with the city right now

No current HPD flags in the latest weekly snapshot: no open violations, no pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.

Patterns

No heat or hot-water complaints in the last three years.

No bedbug-infested units reported in the last three years of filings.

$5,000 in enforcement penalties imposed (ECB/OATH) in the last three years.

What 311 hears from this address

16 service requests in the last three years. Most common: Noise (13) · Illegal Parking (2) · Consumer Complaint (1).

Filed construction activity

$7,524,784 in permitted construction work filed since 2016 (42 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

Rent-stabilization signals

YesBuilt before 1974 (1929)
YesSix or more residential units (20)
No421-a / J-51 tax benefit on the current tax roll

2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit: request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).

Registered with HPD — the names behind the building

Registered owner(s)6 EAST 72 STREET CORP
Head officerKEVIN KORN
Managing agentBROWN HARRIS STEVENS
Last registered2025-09-08

as filed by the owner in the building's HPD registration

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$28,312,000 $12,740,400
2026$29,983,000 $13,492,350
2027$30,194,000 $13,587,300

The city's market estimate has risen 7% between tax years 2025 and 2027.

For property tax, the Department of Finance values this co-op as if it were a rental building. Its 2021 estimate: gross income $5,514,172 a year ($52.02 per sq ft), operating expenses $1,981,159 ($18.69 per sq ft), net operating income $3,533,013. These are the city's estimates from comparable rentals, not the building's actual budget, rents or maintenance charges.

Building systems

Facade (Local Law 11)SAFE (cycle 10)

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Not in a hurricane evacuation zone.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

No street-flooding or sewer-backup complaints on record at this address.

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

Subway68 St-Hunter College — 6 · 0.3 mi straight-line (about an 8-minute walk) · station accessibility: full
BusNearest boarding stop: 5 Av / E 72 St — M72 · 250 ft
Citi Bike5 Ave & E 72 St · 350 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: East Side Elementary School, PS 267
Middle: J.H.S. 167 Robert F. Wagner. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

4 East 72 Street

Heat or hot waterHeat or hot water
Apartment maintenanceApartment maintenance
Bed bugsBed bugs
Residential pestsResidential pests
Rats or miceRats or mice
Anything elseAnything else

16 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

The landlord's report card

Managed by BROWN HARRIS STEVENS — 160 buildings, 9,488 units. Grades across the portfolio: A156 · B1 · C1. See the whole portfolio

BuildingBoroughUnitsGrade
60 Sutton Place South MN367 A
1296 2 Avenue MN289 A
15 Central Park West MN229 A
48 East 89 Street MN210 A
1965 Broadway MN205 A
422 East 72 Street MN197 A
445 5 Avenue MN174 A
250 East 54 Street MN174 A
880 5 Avenue MN162 A
180 East End Avenue MN159 A
605 East 82 Street MN159 A
1197 Park Avenue MN148 A
235 East 87 Street MN139 A
145 Central Park West MN138 A
1 Beekman Place MN136 A
31 East 37 Street MN131 A
2 Sutton Place South MN127 A
35 Sutton Place MN127 A
263 West End Avenue MN124 A
205 West 57 Street MN115 A
1498 York Avenue MN112 A
420 East 51 Street MN110 A
1761 1 Avenue MN110 A
505 Greenwich Street MN102 A
681 Madison Avenue MN100 A
201 East 80 Street MN100 A
1150 3 Avenue MN96 A
7 Lexington Avenue MN93 A
14 Sutton Place South MN93 A
111 East 67 Street MN90 A
1050 5 Avenue MN90 A
20 Sutton Place South MN88 A
50 United Nations Plaza MN88 A
1150 Park Avenue MN85 A
239 Central Park West MN84 A
8 East 83 Street MN84 A
23 East 74 Street MN83 A
785 Park Avenue MN80 A
962 5 Avenue MN77 A
1 East 66 Street MN77 A
188 East 76 Street MN73 A
907 5 Avenue MN71 A
1095 Park Avenue MN68 A
1000 Park Avenue MN66 A
92 Laight Street MN65 A
826 Lexington Avenue MN65 A
610 Park Avenue MN64 A
1215 5 Avenue MN62 A
433 East 57 Street MN62 A
317 East 57 Street MN62 A
1289 Lexington Avenue MN61 A
1170 5 Avenue MN60 A
114 East 66 Street MN58 A
1115 Madison Avenue MN57 A
1080 5 Avenue MN57 A
30 Sutton Place MN56 A
470 Park Avenue MN56 A
2 East 98 Street MN54 A
1020 Park Avenue MN54 A
275 West 10 Street MN54 A

showing 60 of 160 buildings

Sales, deeds & mortgages

Most recent mortgage recorded against this lot: $100,962 on 2017-10-12 (lender: Valley National Bank). Face amount at recording — it may have since been paid down, refinanced or satisfied. View the recorded document.

DateRecordAmountPer res. unit
2024-07-10RPTT&RET $8,600,000 — from MELHADO, TERESA SMITH to ROBERT RACHESKY, TRUSTEE; MARK H. RACHESKY 2018 FAMILY TRUST $8,600,000
2024-07-02Sold for $8,600,000 $8,600,000 $430,000
2024-06-21RPTT&RET $8,200,000 — from L'ESPERANCE, FRANCIS A; L'ESPERANCE, ROSALYN STEPHENSON to THE NSB 2011 GST TRUST; BRAM, TRUSTEE, BENJAMIN S; BRAM, TRUSTEE, SUSAN S $8,200,000
2024-06-06Sold for $8,200,000 $8,200,000 $410,000
2022-09-13RPTT&RET $250,000 — from MELHADO, TERESA to EHRENKRANZ, ANNE B $250,000
2022-08-30Sold for $250,000 $250,000 $12,500
2021-10-01RPTT&RET $15,978,950 — from HILL, JANINE W; HILL, J. TOMILSON to ARNHOLD, PAUL $15,978,950
2021-09-23Sold for $15,978,950 $15,978,950 $798,948
2020-03-12RPTT&RET $225,000 — from L'ESPERANCE, ROSALYN S; L'ESPERANCE, FRANCIS A to EHRENKRANZ, ANNE B $225,000
2020-03-06Sold for $225,000 $225,000 $11,250
2019-07-10RPTT&RET $7,000,000 — from TAYLOR, ROGER KING to MUTCHNIK, NICOLE; MUTCHNIK, ALLAN $7,000,000
2019-07-10RPTT&RET $7,000,000 — from TAYLOR, ROGER KING to MUTCHNIK, NICOLE; MUTCHNIK, ALLAN $7,000,000
2019-06-28Sold for $7,000,000 $7,000,000 $350,000
2019-04-17RPTT&RET $16,750,000 — from MOSCAHLAIDIS, EVEE to TISCH, BENJAMIN; WEBER TISCH, DANIELA $16,750,000
2019-04-10Sold for $16,750,000 $16,750,000 $837,500

Ten-year activity

100500
54
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
2017324214254
201815130221
201916235430
20205032111
2021103217
202210032217
20236041112
202414244024
202534252649
20262190012
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 14 records

DateRecord
2026-09-18311: Illegal Parking — Double Parked Blocking Traffic
2026-07-18311: Noise - Residential — Loud Music/Party
2026-06-01311: Noise - Residential — Loud Music/Party
2026-06-01311: Noise - Residential — Loud Music/Party
2026-06-01311: Noise - Residential — Loud Music/Party
2026-05-28DOB complaint, category ?
2026-05-15311: Noise - Residential — Loud Music/Party
2026-05-15311: Noise - Residential — Loud Music/Party
2026-05-15311: Noise - Residential — Loud Music/Party
2026-05-14311: Noise - Residential — Loud Music/Party
2026-05-05Permit Plumbing — Permit Issued
2026-01-08Permit Mechanical Systems — Signed-off
2025-12-30Bedbug filing: 0 infested units
2025-12-02Facade (LL11) filing, cycle 10: SAFE

The full timeline

2026
2026-09-18311: Illegal Parking — Double Parked Blocking Traffic
2026-07-18311: Noise - Residential — Loud Music/Party
2026-06-01311: Noise - Residential — Loud Music/Party
2026-06-01311: Noise - Residential — Loud Music/Party
2026-06-01311: Noise - Residential — Loud Music/Party
2026-05-28DOB complaint, category ?
2026-05-15311: Noise - Residential — Loud Music/Party
2026-05-15311: Noise - Residential — Loud Music/Party
2026-05-15311: Noise - Residential — Loud Music/Party
2026-05-14311: Noise - Residential — Loud Music/Party
2026-05-05Permit Plumbing — Permit Issued
2026-01-08Permit Mechanical Systems — Signed-off
2025
2025-12-30Bedbug filing: 0 infested units
2025-12-02Facade (LL11) filing, cycle 10: SAFE
2025-10-08FDNY inspection (RISK)
2025-10-01Permit General Construction — Permit Issued
2025-10-01Permit Mechanical Systems — Permit Issued
2025-10-01Permit Mechanical Systems — Permit Issued
2025-10-01Permit Structural — Permit Issued
2025-10-01Permit General Construction — Permit Issued
2025-10-01Permit General Construction — Permit Issued
2025-10-01Permit General Construction — Permit Issued
2025-10-01Permit Structural — Permit Issued
2025-09-30Job filed: HVAC unit replacement. No change in use egress and occupancy.$75,000
2025-09-22ECB CLASS - 1 violation: FAILURE TO MAINTAIN BUILDING FACADE WALLS AND APPURTENANCES.NOTE:AT THE TIME OF INSPECTION I OBSERVED AT ROOF LEVEL CRACKED STUCCO$5,000
2025-07-28Permit Mechanical Systems — Signed-off
2025-07-28Permit Mechanical Systems — Permit Issued
2025-07-08Job filed: HVAC unit replacement. No change in use egress and occupancy.$40,000
2025-06-27Permit Sidewalk Shed — Signed-off
2025-06-27Permit Supported Scaffold — Signed-off
2025-06-20311: Noise - Street/Sidewalk — Loud Music/Party
2025-06-20311: Noise - Street/Sidewalk — Loud Music/Party
2025-06-17311: Noise - Street/Sidewalk — Loud Music/Party
2025-06-12311: Noise - Street/Sidewalk — Loud Music/Party
2025-06-04Asbestos abatement: Removal — Maspeth Remodeling Co. Inc. DBA Maspeth Environmen
2025-06-04Asbestos abatement: Removal — Maspeth Remodeling Co. Inc. DBA Maspeth Environmen
2025-06-04Asbestos abatement: Removal — Maspeth Remodeling Co. Inc. DBA Maspeth Environmen
2025-06-04Asbestos abatement: Removal — Maspeth Remodeling Co. Inc. DBA Maspeth Environmen
2025-06-04Asbestos abatement: Removal — Maspeth Remodeling Co. Inc. DBA Maspeth Environmen
2025-06-04Permit General Construction — Permit Issued
2025-06-04Permit Structural — Permit Issued
2025-05-22Job filed: INSTALLATION OF PIPE AND SYSTEM SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR$10,000
2025-04-24Permit General Construction — Permit Issued
2025-04-24Permit General Construction — Permit Issued
2025-04-24Permit Plumbing — Permit Issued
2025-04-24Permit Mechanical Systems — Permit Issued
2025-04-22Permit General Construction — Signed-off
2025-04-22Permit General Construction — Permit Issued
2025-04-07Job filed: PLUMBING WORK IN CONJUNCTION WITH THE RENOVATION OF APARTMENT 4A ON THE 004 FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$53,000
2025-04-07Job filed: MECHANICAL WORK IN CONJUNCTION WITH THE RENOVATION OF APARTMENT 4A ON THE 004 FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$16,200
2025-04-07Job filed: INTERIOR ARCHITECTURAL WORK IN CONJUNCTION WITH THE RENOVATION OF APARTMENT 4A ON THE 004 FLOOR AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$429,992
2025-04-07Job filed: REPLACEMENT OF WINDOWS AND INSTALLATION OF NEW LOUVER AT APARTMENT 4A ON THE 004 FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$4,700
2025-03-21Job filed: MECHANICAL WORK IN CONJUNCTION WITH THE RENOVATION OF APARTMENT 4A ON THE 004 FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$16,200
2025-03-21Job filed: PLUMBING WORK IN CONJUNCTION WITH THE RENOVATION OF APARTMENT 4A ON THE 004 FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$53,000
2025-03-20Job filed: ARCHITECTURAL WORK IN CONJUNCTION WITH THE INTERIOR RENOVATION OF APARTMENT 4A ON THE 004 FLOOR AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$429,992
2025-03-20Job filed: REPLACEMENT OF WINDOWS AND INSTALLATION OF NEW LOUVER AT APARTMENT 4A ON THE 004 FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$4,700
2025-03-07Permit Supported Scaffold — Signed-off
2025-03-07Job filed: INSTALLATION OF PIPE AND SYSTEM SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR$10,000
2025-02-27RPTT&RET — from AMON, ROBERTA M to ROBERTA M. AMON, TRUSTEE; ROBERTA M. AMON REVOCABLE TRUST
2025-02-21Deed transfer (nominal price)
2025-01-09Permit General Construction — Permit Issued
2024
2024-12-27Bedbug filing: 0 infested units
2024-12-27311: Consumer Complaint — Pedicab
2024-12-17Permit General Construction — Permit Issued
2024-12-12Permit Suspended Scaffold — Signed-off
2024-11-18Job filed: Installation of suspended scaffold for facade work or inspection
2024-10-18311: Illegal Parking — Double Parked Blocking Traffic
2024-09-05Job filed: Filing for minor interior renovation. The work includes renovation o the primary bathroom, replacement of millwork in dressing room. No change in use,$90,000
2024-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2024-07-31Permit Suspended Scaffold — Signed-off
2024-07-10RPTT&RET $8,600,000 — from MELHADO, TERESA SMITH to ROBERT RACHESKY, TRUSTEE; MARK H. RACHESKY 2018 FAMILY TRUST$8,600,000
2024-07-02Sold for $8,600,000$8,600,000
2024-07-02Permit Supported Scaffold — Signed-off
2024-07-02Permit Sidewalk Shed — Signed-off
2024-07-01Permit Sidewalk Shed — Signed-off
2024-07-01Permit Supported Scaffold — Signed-off
2024-06-21RPTT&RET $8,200,000 — from L'ESPERANCE, FRANCIS A; L'ESPERANCE, ROSALYN STEPHENSON to THE NSB 2011 GST TRUST; BRAM, TRUSTEE, BENJAMIN S; BRAM, TRUSTEE, SUSAN S$8,200,000
2024-06-06Sold for $8,200,000$8,200,000
2024-05-17311: Noise - Residential — Loud Music/Party
2024-05-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2024-04-12Permit General Construction — Permit Issued
2024-02-28Permit Suspended Scaffold — Signed-off
2024-02-27Job filed: Installation of outrigger for facade repair & inspection.
2024-02-23Permit General Construction — Permit Issued
2024-01-26Job filed: INSTALLATION OF 300PSF SIDEWALK SHED, OVERHEAD PROTECTION, ROOF PROTECTION AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER $5,000
2023
2023-12-30Bedbug filing: 0 infested units
2023-09-19Facade (LL11) filing, cycle 9: SWARMP
2023-07-31311: Illegal Dumping — Chronic Dumping
2023-07-31Job filed: INSTALLATION OF 300PSF SIDEWALK SHED, OVERHEAD PROTECTION, ROOF PROTECTION AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER $5,000
2023-07-03Permit Supported Scaffold — Signed-off
2023-07-03Permit Sidewalk Shed — Signed-off
2023-07-01Job filed: INSTALLATION OF 300PSF SIDEWALK SHED, OVERHEAD PROTECTION, ROOF PROTECTION AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER $5,000
2023-06-10311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-05-12DECL — from BODINI, FRANCESCA
2023-05-12311: Noise - Residential — Loud Music/Party
2023-04-18Permit General Construction — Permit Issued
2023-04-06Job filed: create two windows at eastern elevation of building. no change in use, egress or occupancy,$14,400
2022
2022-12-30Bedbug filing: 0 infested units
2022-11-16Job filed: Facade Restoration as per plans filed herewith. No change in use, egress or occupancy.$112,610
2022-11-02HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2022-09-13RPTT&RET $250,000 — from MELHADO, TERESA to EHRENKRANZ, ANNE B$250,000
2022-08-30Sold for $250,000$250,000
2022-08-30Job filed: Renovation with addition replacement and relocation of plumbing fixtures.$50,000
2022-07-20Permit General Construction — Signed-off
2022-07-20Permit Mechanical Systems — Signed-off
2022-06-26311: Water System — Leak (Use Comments) (WA2)
2022-05-19Permit Plumbing — Signed-off
2022-05-19Permit Mechanical Systems — Signed-off
2022-05-03Asbestos abatement: Removal — Branch Restoration, Inc.
2022-05-03Asbestos abatement: Removal — Branch Restoration, Inc.
2022-04-21Permit General Construction — Signed-off
2022-04-13Job filed: Renovation with addition/replacement of split systems and PTACS$340,000
2022-04-13Job filed: Renovation with addition replacement and relocation of plumbing fixtures.$50,000
2022-03-23Job filed: Renovation of apartment 12 on the 12th Floor. No change to use, egress or occupancy.$610,000
2021
2021-12-30Bedbug filing: 0 infested units
2021-12-04311: Noise - Residential — Loud Music/Party
2021-12-04311: Noise - Street/Sidewalk — Loud Music/Party
2021-10-20Facade (LL11) filing, cycle 9: SWARMP
2021-10-01RPTT&RET $15,978,950 — from HILL, JANINE W; HILL, J. TOMILSON to ARNHOLD, PAUL$15,978,950
2021-09-23Sold for $15,978,950$15,978,950
2021-08-17Permit PL — ISSUED
2020
2020-12-28Permit EW — ISSUED
2020-12-28Permit EW — ISSUED
2020-12-08Bedbug filing: 0 infested units
2020-12-07Permit Structural — Signed-off
2020-09-24311: Illegal Parking — Blocked Hydrant
2020-08-18Permit PL — ISSUED
2020-07-08Elevator permit: MODERNIZATION OF 1 ELEVATOR$150,000
2020-07-06Permit PL — ISSUED
2020-05-21311: Non-Emergency Police Matter — Face Covering Violation
2020-03-12RPTT&RET $225,000 — from L'ESPERANCE, ROSALYN S; L'ESPERANCE, FRANCIS A to EHRENKRANZ, ANNE B$225,000
2020-03-06Sold for $225,000$225,000
2019
2019-12-30Permit EW — ISSUED
2019-12-30Permit EW — ISSUED
2019-12-17Bedbug filing: 0 infested units
2019-11-07Rodent inspection: Passed
2019-10-30Job filed: structural work associated with the apartment renovation including floor framing and lintels installation as shown on plans filed herewith. no change $10,000
2019-09-18Permit EW — ISSUED
2019-09-18Permit EW — ISSUED
2019-08-20Permit PL — ISSUED
2019-08-20Permit PL — ISSUED
2019-08-01311: Bike/Roller/Skate Chronic — N/A
2019-07-10RPTT&RET $7,000,000 — from TAYLOR, ROGER KING to MUTCHNIK, NICOLE; MUTCHNIK, ALLAN$7,000,000
2019-07-10RPTT&RET $7,000,000 — from TAYLOR, ROGER KING to MUTCHNIK, NICOLE; MUTCHNIK, ALLAN$7,000,000
2019-06-28Sold for $7,000,000$7,000,000
2019-06-13Asbestos abatement: Removal — AGG Contracting Inc.
2019-06-13Asbestos abatement: Removal — AGG Contracting Inc.
2019-06-13Asbestos abatement: Removal — AGG Contracting Inc.
2019-06-11Permit PL — ISSUED
2019-05-20Permit EW — ISSUED
2019-05-20Permit EW — ISSUED
2019-05-20DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2019-05-20DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2019-05-01Permit EW — ISSUED
2019-04-24Job filed: PLUMBING AND MECHANICAL WORK ASSOCIATED WITH THE APARTMENT RENOVATION AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$508,370
2019-04-24Job filed: APPLICATION IS FILED FOR INTERIOR AND EXTERIOR RENOVATION OF THE APARTMENT. AS SHOWN ON PLANS FILED HEREWITH.NO CHANGE TO USE, EGRESS OR OCCUPANCY.$683,000
2019-04-19Permit EW — ISSUED
2019-04-19Permit EW — ISSUED
2019-04-17RPTT&RET $16,750,000 — from MOSCAHLAIDIS, EVEE to TISCH, BENJAMIN; WEBER TISCH, DANIELA$16,750,000
2019-04-10Sold for $16,750,000$16,750,000
2019-02-26Job filed: CREATE TWO NEW WINDOWS AT EASTERN ELEVATION OF BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$14,400
2019-02-25Bedbug filing: 0 infested units
2018
2018-12-20Rodent inspection: Passed
2018-11-05Permit EW — ISSUED
2018-11-05Permit EW — ISSUED
2018-10-13311: Sewer — Manhole Cover Broken/Making Noise (SB)
2018-10-10311: Street Condition — Defective Hardware
2018-10-01Job filed: SUBSEQUENT FILING FOR STRUCTURAL WORK IN CONJUNCTION WITH THE WORK TO REPLACE THE EXISTING INTERIOR STAIRS.$25,000
2018-10-01Job filed: SUBSEQUENT FILING FOR STRUCTURAL WORK IN CONJUNCTION WITH THE WORK TO REPLACE THE EXISTING INTERIOR STAIRS.$25,000
2018-09-27Job filed: REPLACE EXISTING INTERIOR STAIRS. NO CHANGES TO USE, EGRESS OR OCCUPANCY.$50,000
2018-09-27Job filed: REPLACE EXISTING INTERIOR STAIRS. NO CHANGES TO USE, EGRESS OR OCCUPANCY.$50,000
2018-05-16Rodent inspection: Passed
2018-05-15Permit EQ — ISSUED
2018-05-11Permit EW — ISSUED
2018-05-09Permit EQ — ISSUED
2018-05-09Permit PL — ISSUED
2018-05-09Permit PL — ISSUED
2018-05-02Permit EW — ISSUED
2018-05-01Permit EW — ISSUED
2018-05-01Permit EW — ISSUED
2018-04-19Job filed: INTERIOR RENOVATION OF MAID'S APARTMENT ON 2ND FLOOR. REPLACE PLUMBING FIXTURES IN EXISTING LOCATIONS. NO CHANGE TO USE, EGRESS OF OCCUPANCY.$29,000
2018-03-15311: Plumbing — Gas Utility Referral
2018-03-15DOB complaint, category ?
2017
2017-12-22Permit EW — ISSUED
2017-12-22Permit EW — ISSUED
2017-10-12TL&R — from FANNIE MAE to 6 EAST 72ND STREET CORPORATION
2017-10-12Mortgage satisfied — from 6 EAST 72ND STREET CORPORATION to NCB, FSB; NATIONAL COOPERATIVE BANK, N.A.
2017-10-12AL&R $2,400,000 — from 6 EAST 72ND STREET CORPORATION to VALLEY NATIONAL BANK$2,400,000
2017-10-12Agreement $2,400,000 — from 6 EAST 72ND STREET CORPORATION to VALLEY NATIONAL BANK$2,400,000
2017-10-12Mortgage $100,963 — from 6 EAST 72ND STREET CORPORATION to VALLEY NATIONAL BANK$100,963
2017-10-12Mortgage assigned — from NATIONAL COOPERATIVE BANK, N.A.; NCB, FSB to VALLEY NATIONAL BANK
2017-10-12Mortgage assigned — from FANNIE MAE to VALLEY NATIONAL BANK
2017-10-12TL&R — from NCB, FSB; NATIONAL COOPERATIVE BANK, N.A. to 6 EAST 72ND STREET CORPORATION
2017-10-12TL&R — from NCB, FSB; NATIONAL COOPERATIVE BANK, N.A. to 6 EAST 72ND STREET CORPORATION
2017-10-12TL&R — from CREDIT SUISSE FIRST BOSTON MORTGAGE SECU; WELLS FARGO BANK, N.A. to 6 EAST 72ND STREET CORPORATION
2017-10-06Permit EW — ISSUED
2017-10-04Permit EW — ISSUED
2017-10-04Permit EW — ISSUED
2017-10-04Job filed: FACADE SSP FILED IN CONJUNCTION WITH THE APPLICATION NO.123186667. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$500
2017-10-03Job filed: SUBSEQUENT FILING FOR MECHANICAL WORK$3,000
2017-10-03Job filed: SUBSEQUENT FILING FOR MECHANICAL WORK$3,000
2017-10-02Job filed: FACADE AND LOCAL LAW REPAIRS AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY$450,000
2017-09-26Permit PL — RE-ISSUED
2017-09-19Rodent inspection: Passed
2017-09-01Permit EW — ISSUED
2017-08-31Job filed: INTERIOR RENOVATION OF PENTHOUSE APARTMENT. REMOVE AND ERECT NON-LOAD BEARING INTERIOR PARTITIONS. REPLACE EXISTING PLUMBING FIXTURES. NO CHANGES TO U$152,500
2017-08-29Permit EW — ISSUED
2017-07-26Permit PL — ISSUED
2017-07-20DOB violation E:
2017-07-20DOB violation E:
2017-07-14311: Food Establishment — Rodents/Insects/Garbage
2017-07-13Permit EQ — ISSUED
2017-07-10Job filed: INSTALLATION OF PIPE SCAFFOLD (+/-)424'-0" LONG AND 10'-0" / 18'-0" / 20'-" HIGH ON ROOF AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EG
2017-07-10Job filed: INSTALLATION OF PIPE SCAFFOLD (+/-)424'-0' LONG AND 10'-0' / 18'-0' / 20'-' HIGH ON ROOF AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EG
2017-07-03Permit EQ — ISSUED
2017-06-30Permit PL — ISSUED
2017-06-29Job filed: INSTALLATION OF (+/-)276 L.FT NEW HEAVY DUTY SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS
2017-06-29Job filed: INSTALLATION OF (+/-)276 L.FT NEW HEAVY DUTY SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS
2017-06-29Job filed: INSTALLATION OF (+/-)276 L.FT NEW HEAVY DUTY SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS
2017-06-28RPTT&RET $13,995,000 — from MIKLOS P. SALGO, EXECUTOR; ESTATE OF NICOLAS M. SALGO to ESCOBARI, MARTIN; ESCOBARI, DANIELA MEIRELLES$13,995,000
2017-06-28RPTT&RET $13,995,000 — from MIKLOS P. SALGO, EXECUTOR; ESTATE OF NICOLAS M. SALGO to ESCOBARI, MARTIN; ESCOBARI, DANIELA MEIRELLES$13,995,000
2017-06-28RPTT&RET $13,995,000 — from MIKLOS P. SALGO, EXECUTOR; ESTATE OF NICOLAS M. SALGO to ESCOBARI, MARTIN; ESCOBARI, DANIELA MEIRELLES$13,995,000
2017-06-28Permit EW — ISSUED
2017-06-28Job filed: INSTALLATION OF (+/-)276 L.FT NEW HEAVY DUTY SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS
2017-06-13Sold for $13,995,000$13,995,000
2017-04-13Job filed: GENERAL CONSTRUCTION: REMOVAL OF NON BEARING PARTITIONS, FINISHES, MILLWORK , CABINETRY AND DOORS. INSTALL NEW NON BEARING PARTITIONS, REPLACE FLOORIN$815,360
2017-04-13Job filed: GENERAL CONSTRUCTION: REMOVAL OF NON BEARING PARTITIONS, FINISHES, MILLWORK , CABINETRY AND DOORS. INSTALL NEW NON BEARING PARTITIONS, REPLACE FLOORIN$815,360
2017-04-13Job filed: CAP, REMOVE, REMOVE AND INSTALL NEW PLUMBING FIXTURES. REPLACE EXISTING UNITS AND ELECTRICAL WORK.$65,500
2017-04-11Rodent inspection: Passed
2017-02-22Permit EW — ISSUED
2017-02-22Permit EW — ISSUED
2017-02-16311: Street Condition — Defective Hardware
2017-01-05Permit EQ — ISSUED
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2017-01-03Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. PIPE SCAFFOLD SHALL COMPLY WITH CHA
2017-01-03Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. PIPE SCAFFOLD SHALL COMPLY WITH CHA
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2016
2016-12-28RPTT&RET $15,450,000 — from ESTATE OF DOROTHEA LEVINE; PHILIP LEVINE, AS EXECUTOR to BODINI , FRANCESCA$15,450,000
2016-12-28RPTT&RET $15,450,000 — from ESTATE OF DOROTHEA LEVINE; PHILIP LEVINE, AS EXECUTOR to BODINI , FRANCESCA$15,450,000
2016-12-19Sold for $15,450,000$15,450,000
2016-11-30Facade (LL11) filing, cycle 8: SWARMP
2016-11-09311: Blocked Driveway — No Access
2016-11-09311: Illegal Parking — Double Parked Blocking Vehicle
2016-09-20311: Derelict Vehicles — Derelict Vehicles
2016-07-22Rodent inspection: Passed
2016-06-27Permit PL — ISSUED
2016-06-03Permit EW — ISSUED
2016-06-03Permit EW — ISSUED
2016-06-03Permit EW — ISSUED
2016-06-02Permit PL — ISSUED
2016-04-28Job filed: MECHANICAL AND PLUMBING WORK FOR RENOVATION OF UNIT 7A AS SHOWN ON PLANS.$235,000
2016-04-28Job filed: GENERAL CONSTRUCTION FOR RENOVATION OF UNIT 7A AS SHOWN ON PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$765,000
2016-04-08Permit EW — ISSUED
2016-03-17Job filed: HEREBY FILING FOR THE INTERIOR RENOVATION TO EXISTING APARTMENT ON THE 11TH FLOOR. ALL AS PER PLANS FILED HEREWITH. NO CHANGE TO USE OCCUPANCY OR EGRE$400,000
2016-03-11311: Curb Condition — Broken Curb
2016-02-16311: Noise — Noise: Construction Before/After Hours (NM1)
2015
2015-12-23RPTT&RET $10,150,000 — from BRAVER, LOUISE to KARAOGLAN, LANA; KARAOGLAN, ALAIN$10,150,000
2015-12-02Permit EQ — ISSUED
2015-11-25Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.PIPE SCAFFOLD SHALL COMPLY WITH CHAPT
2015-08-21FDNY inspection (OTHER)
2015-07-31DOB violation E:
2015-06-14311: Water System — Hydrant Running (WC3)
2015-05-14311: Noise — Noise: Construction Before/After Hours (NM1)
2015-04-12311: Water System — Hydrant Running Full (WA4)
2014
2014-12-25311: Homeless Person Assistance — No Status Call
2014-12-04Permit PL — ISSUED
2014-10-13311: Illegal Parking — Double Parked Blocking Traffic
2014-08-29311: Sewer — Sewer Odor (SA2)
2014-08-05DOB violation E:
2014-08-05DOB violation E:
2014-05-09311: Noise — Noise: Construction Equipment (NC1)
2014-05-05311: Blocked Driveway — No Access
2014-01-14311: Noise — Noise: Private Carting Noise (NQ1)
2014-01-02311: Noise — Noise: Construction Equipment (NC1)
2013
2013-06-13DOB violation E:
2013-06-13DOB violation E:
2013-05-20311: Noise — Noise: Construction Before/After Hours (NM1)
2013-01-25311: Noise — Noise: Construction Before/After Hours (NM1)
2013-01-25311: General Construction/Plumbing — Adjacent Buildings Not Protected
2013-01-25DOB complaint, category ?
2012
2012-12-06DOB violation E:
2012-12-06DOB violation E:
2012-09-06Permit EW — ISSUED
2012-07-17Rodent inspection: Passed
2012-07-11Permit EQ — ISSUED
2012-07-03Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2012-07-03Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2012-07-03Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2012-06-19Permit EW — ISSUED
2012-03-29Mortgage $1,000,000 — from 6 EAST 72ND STREET CORPORATION to NCB; NATIONAL CONSUMER COOPERATIVE BANK$1,000,000
2012-03-29AALR — from NCB; NATIONAL CONSUMER COOPERATIVE BANK to NCB, FSB
2012-03-29Mortgage assigned — from NATIONAL CONSUMER COOPERATIVE BANK; NCB to NCB, FSB
2012-03-29AL&R $1,000,000 — from 6 EAST 72ND STREET CORPORATION to NCB; NATIONAL CONSUMER COOPERATIVE BANK$1,000,000
2012-03-02Job filed: PARAPERT REBUILDING, FACADE REPAIRS ON WEST FACADE. PENTHOUSE STUCCO REPAIRS. SIDEWALK SHED WILL BE FILED SEPERATELY. NO CHANGE IN USE, OCCUPANCY OR E$100,000
2012-01-19Facade (LL11) filing, cycle 7: SWARMP
2012-01-02311: Emergency Response Team (ERT) — After Hours Work - Illegal
2011
2011-12-07Rodent inspection: Passed
2011-12-06DOB violation E:
2011-12-06DOB violation E:
2011-08-30311: Noise — Noise: Jack Hammering (NC2)
2011-05-13Permit PL — ISSUED
2011-05-06Permit EW — ISSUED
2011-05-06Permit EW — ISSUED
2011-03-28Job filed: FILING HEREWITH MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF EXISTING DUPLEX APARTMENT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$45,000
2011-03-28Job filed: FILING HEREWITH RENOVATION OF EXISTING DUPLEX APARTMENT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$475,000
2011-01-25RPTT&RET $150,000 — from COLEMAN, JOHN B to L'ESPERANCE, FRANCIS A; L'ESPERANCE, ROSALYN S$150,000
2011-01-25RPTT&RET $5,825,000 — from COLEMAN, JOHN B to TIGHE, AARON; TIGHE, KIMBERLY$5,825,000
2010
2010-12-29DOB violation E:
2010-12-29DOB violation E:
2010-11-07311: Noise — Noise: Construction Before/After Hours (NM1)
2010-11-07311: Emergency Response Team (ERT) — After Hours Work - Illegal
2010-11-07DOB complaint, category ?
2010-10-29Rodent inspection: Passed
2010-03-02DOB violation E:
2010-03-02DOB violation E:
2009
2009-08-10DOB complaint, category ?
2009-07-28Permit EW — ISSUED
2009-07-28Permit EW — ISSUED
2009-07-17Permit PL — ISSUED
2009-05-27Permit EW — ISSUED
2009-05-27Permit EW — ISSUED
2009-05-06Mortgage assigned — from NCB, FSB to FANNIE MAE
2009-05-06AALR — from NCB, FSB to FANNIE MAE
2009-05-05Job filed: RENOVATE APARTMENT DUPLEX ON 3RD AND 4TH FLOORS AS PER PLANS FILED. REPLACE WINDOWS THROUGHOUT. NO CHANGE IN USE EGRESS OR OCCUPANCY.$892,000
2009-05-05Job filed: MECHANICAL & PLUMBING WORK FOR DUPLEX APARTMENT ON 3RD AND 4TH FLOORS.$190,000
2009-04-09Permit EW — ISSUED
2008
2008-10-02Permit PL — ISSUED
2008-09-08Permit EW — ISSUED
2008-08-27DOB violation E:
2008-08-27Job filed: FILING HEREWITH FOR INTERIOR DEMOLITION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$60,000
2008-08-27Job filed: FILING HEREWITH FOR INTERIOR DEMOLITION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$60,000
2008-08-27Job filed: FILING HEREWITH FOR INTERIOR DEMOLITION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$60,000
2008-08-27DOB violation E:
2008-08-12DOB complaint, category ?
2008-07-30ECB CLASS - 2 violation: FAILURE TO PROVIDE POST SIGN AT JOB SITE PURSUANT TO SUBSECTION NO SHED SIGNAGE REMEDY: PROVIDE CONTRACTORS SIGN
2008-07-30ECB CLASS - 1 violation: SEC. 3314.6.1. TIEBACKS ARE NOT PROPERLY ANCHORED. TIEBACKS (CABLE) CONSTRUCTED OF 3 DIFFERENT LINES ATTACHED W/ONLY 2J CLAMPS. RE$1,600
2008-07-23RPTT&RET $7,750,000 — from OSBORN, S. BARTLEY to RONSON, MYRNA$7,750,000
2008-07-23RPTT&RET — from ESTATE OF GLORIA S. OSBORN to OSBORN, S. BARTLEY
2008-04-18Permit PL — ISSUED
2008-04-16Permit EW — ISSUED
2008-01-16Mortgage $500,000 — from 6 EAST 72ND STREET CORPORATION to NATIONAL CONSUMER COOPERATIVE BANK; NCB$500,000
2008-01-16AALR — from NATIONAL CONSUMER COOPERATIVE BANK; NCB to NCB, FSB
2008-01-16Mortgage assigned — from NCB; NATIONAL CONSUMER COOPERATIVE BANK to NCB, FSB
2008-01-16AL&R $1,400,000 — from 6 EAST 72ND STREET CORPORATION to NATIONAL CONSUMER COOPERATIVE BANK; NCB$1,400,000
2008-01-16Agreement $1,400,000 — from 6 EAST 72ND STREET CORPORATION to NATIONAL CONSUMER COOPERATIVE BANK; NCB$1,400,000
2008-01-16Mortgage $800,000 — from 6 EAST 72ND STREET CORPORATION to NATIONAL CONSUMER COOPERATIVE BANK; NCB$800,000
2008-01-16Mortgage assigned — from WELLS FARGO BANK, NA to NCB; NATIONAL CONSUMER COOPERATIVE BANK
2008-01-16Mortgage assigned — from NCB, FSB to WELLS FARGO BANK, NA
2008-01-16TL&R — from WELLS FARGO BANK, NA to 6 EAST 72ND STREET CORPORATION
2008-01-16AALR — from NCB, FSB to WELLS FARGO BANK, NA
2008-01-16Mortgage assigned — from NCB; NATIONAL CONSUMER COOPERATIVE BANK to NCB, FSB
2008-01-16AALR — from NCB; NATIONAL CONSUMER COOPERATIVE BANK to NCB, FSB
2008-01-16Mortgage satisfied — from 6 EAST 72ND STREET CORPORATION to NATIONAL CONSUMER COOPERATIVE BANK
2008-01-16TL&R — from NATIONAL CONSUMER COOPERATIVE BANK to 6 EAST 72ND STREET CORPORATION
2008-01-16AL&R $500,000 — from 6 EAST 72ND STREET CORPORATION to NATIONAL CONSUMER COOPERATIVE BANK; NCB$500,000
2007
2007-12-27Permit EQ — ISSUED
2007-11-28Permit EW — ISSUED
2007-10-23DOB complaint, category ?
2007-07-25DOB complaint, category ?
2007-06-19Permit EW — ISSUED
2007-06-14DOB complaint, category ?
2007-06-08DOB complaint, category ?
2007-05-15Job filed: PARAPET REBUILDING , FACADE REPAIRS ANDPENTHOUSE STUCCO RESTORATION. IF SIDEWALK SHED REQUIRED WILL FILEDUNDER SEPARATE APPLIATION. NO CHANGE IN USE, $200,000
2007-05-15Job filed: PARAPET REBUILDING , FACADE REPAIRS ANDPENTHOUSE STUCCO RESTORATION. IF SIDEWALK SHED REQUIRED WILL FILEDUNDER SEPARATE APPLIATION. NO CHANGE IN USE, $200,000
2007-04-25Permit EQ — ISSUED
2007-04-24Job filed: INSTALL HEAVY DUTY SIDEWALK SHED TOTAL OF 115LF AT 4 EAST 72ND STREET. DURING REMEDIAL REPAIRS. WORK TO COMPLY WITH LL33/91. NO CHANGE IN USE, EGRES
2007-02-06Facade (LL11) filing, cycle 6: SWARMP
2006
2006-05-11Permit EW — ISSUED
2006-05-11Permit PL — ISSUED
2006-05-11Permit EW — ISSUED
2006-04-11Job filed: APARTMENT RENOVATIONS CONSISTING OFGENERAL CONSTRUCTION AS PER PLANS FILED HEREWITH. NO CHANGE TO USEEGRESS OR OCCUPANCY$350,000
2006-04-11Job filed: ALTERATIONS TO MECHANICAL VENTILATION/HVAC SYSTEM AND PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGETO USE, EGRESS OR OCCUPANCY$100,000
2006-04-11Job filed: APARTMENT RENOVATIONS CONSISTING OFGENERAL CONSTRUCTION AS PER PLANS FILED HEREWITH. NO CHANGE TO USEEGRESS OR OCCUPANCY$350,000
2006-04-11Job filed: ALTERATIONS TO MECHANICAL VENTILATION/HVAC SYSTEM AND PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGETO USE, EGRESS OR OCCUPANCY$100,000
2006-03-27RPTT&RET $8,651,000 — from MANICE, BEATRICE G to WHITMAN, LAURA B; DANZIGER, THOMAS C$8,651,000
2006-03-27RPTT&RET $8,651,000 — from MANICE, BEATRICE G to WHITMAN, LAURA B; DANZIGER, THOMAS C$8,651,000
2005
2005-01-10TL&R — from HSBC BANK USA; REPUBLIC NATIONAL BANK OF NEW YORK F/K/A
2005-01-10AL&R $400,000 — from NATIONAL CONSUMER COOPERATIVE BANK to 6 EAST 72ND STREET CORPORATION$400,000
2005-01-10Mortgage $400,000 — from 6 EAST 72ND STREET CORPORATION to NATIONAL CONSUMER COOPERATIVE BANK$400,000
2005-01-10AL&R $600,000 — from NCB, FSB to 6 EAST 72ND STREET CORPORATION$600,000
2005-01-10Agreement $600,000 — from 6 EAST 72ND STREET CORPORATION to NCB, FSB$600,000
2005-01-10Mortgage $100,050 — from 6 EAST 72ND STREET CORPORATION to NCB, FSB$100,050
2005-01-10Mortgage assigned — from HSBC BANK USA F/K/A; REPUBLIC NATIONAL BANK OF NEW YORK S/B/M; THE MANHATTAN SAVINGS BANK to NCB, FSB
2004
2004-07-01Permit PL — ISSUED
2004-07-01DOB violation E:
2004-07-01DOB violation E:
2004-06-08Permit EW — ISSUED
2004-05-26Permit EW — ISSUED
2004-05-21Permit EW — ISSUED
2004-05-04Job filed: ALTERATION TO HVAC/MCHNCAL.VENTILATION SYSTEM AS PER PLANS FILED. ALTERATION TO PARTITIONS CEILINGS,PLUMBI NG SYSTEM AND STRUCTURAL WORK ARE FILED UND$50,000
2004-05-04Job filed: APARTMENT RENOVATIONS/GNRL CONST./PLUMB WOR AS PLANS FILED HVAC & STRUCT URAL WORK FILED UNDER SEPERATE APPLICATI ONS.NO CHANGE IN USE EGRESS OR O$400,000
2004-05-04Job filed: STRUCTURAL WORK ON 1 & 2 FLOORS APRTMNTS AS PER PLANS FILED PARTITIONS & PLUMB,HVAC AND OTHER WORK FILED SEPARTLY$50,000
2003
2003-05-21Permit PL — ISSUED
2003-04-16Permit EW — ISSUED
2003-04-16Permit EW — ISSUED
2003-03-13Job filed: Renovation of an existing apartment. General Construction and plumbing work to be performed as per plans filed herewith. There will be no change in $115,000
2003-03-13Job filed: Renovation of an existing apartment. General Construction and plumbing work to be performed as per plans filed herewith. There will be no change in $115,000
2003-03-13Job filed: Renovation of an existing apartment. Mechanical work to be performed as per plans filed herewith. There will be no change in use, egress or occupanc$20,000
2002
2002-12-04DOB complaint, category ?
2002-07-11Permit PL — ISSUED
2002-06-27Permit EW — ISSUED
2002-06-27Job filed: Propose to demo existing interior partitions, ceilings & doors. Install new partitions, ceilings & doors. Propose to remove & replace fi$120,000
2001
2001-07-27Permit EW — ISSUED
2001-06-26Job filed: Interior renovation of existing apartment. There is to be no change of use, occupancy or egress under this application.$12,000
2001-06-26Job filed: Interior renovation of existing apartment. There is to be no change of use, occupancy or egress under this application.$12,000
2001-03-08DOB violation LL1081:
2000
2000-07-31Permit PL — ISSUED
2000-05-26Permit EW — ISSUED
2000-05-26Permit EW — ISSUED
2000-05-11DOB violation E: 1P17686
2000-05-11DOB violation E: 1P17685
2000-05-08Job filed: MODIFICATION TO MECHANICAL SYSTEM AND PLUMBING CHANGES AS PER PLANS FILED HEREWITH.$45,000
2000-05-08Job filed: MODIFICATION TO MECHANICAL SYSTEM AND PLUMBING CHANGES AS PER PLANS FILED HEREWITH.$45,000
2000-05-08Job filed: REMOVAL AND INSTALLATION OF NON LOAD BEARING PARTITIONS AND RELATED FINISHES. E XTENSIVE EXTERIOR WORK AND WINDOW REPLACEMENT IN ACCORDANCE WITH MAST$110,000
2000-05-08Job filed: REMOVAL AND INSTALLATION OF NON LOAD BEARING PARTITIONS AND RELATED FINISHES. E XTENSIVE EXTERIOR WORK AND WINDOW REPLACEMENT IN ACCORDANCE WITH MAST$110,000
1999
1999-08-09ECB Non-Hazardous violation: 22D,35O,37G,37R,54T. SECURE, CLEAN JUMPER, REMOVE ALLIGATOR CLIPS ON BACK ON CONTROLLER, CITY NUMBER ON DEVICE.
1999-07-16Permit EW — ISSUED
1998
1998-06-01Permit PL — ISSUED
1998-05-01Permit EW — ISSUED
1998-05-01Permit EW — ISSUED
1996
1996-01-25ECB Unknown violation: 46H
1995
1995-05-25Permit AL — ISSUED
1995-05-25Permit EW — ISSUED
1994
1994-07-18Permit AL — ISSUED
1994-06-22Permit PL — ISSUED
1994-06-08Permit EW — ISSUED
1994-06-08Permit EW — ISSUED
1993
1993-03-30Permit EW — ISSUED
1993-03-30Permit EW — RE-ISSUED
1993-03-04Mortgage assigned — from 6 EAST 72ND STREET CORP to MANHATTAN SAVINGS BANK
1993-03-04Agreement — from 6 EAST 72ND STREET CORP to MANHATTAN SAVINGS BANK
1992
1992-09-17Permit PL — ISSUED
1992-09-11Permit EW — ISSUED
1992-07-10Permit PL — ISSUED
1992-06-29Permit PL — ISSUED
1992-06-22Permit EW — ISSUED
1992-06-22Permit EW — ISSUED
1992-05-26Permit EW — ISSUED
1992-05-26Permit EW — ISSUED
1989
1989-07-28Mortgage assigned — from INDEPENDENCE SAVINGSBK to MANHATTAN SAVINGS BANK
1989-07-28Mortgage $99,950 — from 6 EAST 72 ST CORP to MANHATTAN SAVINGS BANK$99,950
1989-07-28Agreement — from 6 EAST 72 ST CORP to MANHATTAN SAVINGS BANK
1984
1984-08-17Mortgage $65,000 — from 6 EAST 72ND ST CORP. to INDEPENDENCE SV BANK$65,000
1984-08-17Mortgage assigned — from NEW YORK LIFE INS. CO. to INDEPENDENCE SAVGS BANK
1984-08-17Agreement — from 6 E. 72ND ST. CORP. to INDEPENDENCE SAVGS BANK
1982
1982-07-02LDMK — from LANDMARKS PRESERVTNCOMM to CITY OF NEW YORK
1974
1974-07-15Agreement — from 6 E 72ND ST CORP to NY LIFE INS CO
1967
1967-10-09Agreement — from 6 EAST 72ND STR CORP. to NEW YORK LF INS CO
1967-10-09Mortgage — from 6 E 72ND ST CP to NY LF INS CO

Support this site Back to the building page