The city's published records show little recorded distress here in the last three years. Less recorded distress than 100% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty
points per 10 units; this building carries 0. In ZIP 10021, 81% of residential buildings hold an A and
3% grade D or F.
How grades work
this building
A
B
C
Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
Open HPD violations
1 total — 1 class C (immediately hazardous), 0 class B, 0 class A. Oldest open since 2001-08-02.
status snapshot refreshed weekly from HPD records
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
11 service requests in the last three years. Most common: Encampment (3) · Missed Collection (2) · Obstruction (2) · Sidewalk Condition (1) · Illegal Parking (1) · General Construction/Plumbing (1).
Filed construction activity
$2,593,600 in permitted construction work filed since
2016 (13 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1911)
Yes
Six or more residential units (11)
No
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
823 PARK AVENUE CONDO
Head officer
CAROLE WHITE
Managing agent
BROWN HARRIS STEVENS
Last registered
2025-09-12
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$1,255,405
$564,932
2026
$1,507,640
$678,438
2027
$0
$0
The city's market estimate has fallen
100% between tax years 2025 and 2027.
For property tax, the Department of Finance values this condo
as if it were a rental building. Its 2023 estimate: gross income $2,895,513 a year
($51.93 per sq ft), operating expenses $1,013,680
($18.18 per sq ft), net operating income $1,881,833. These are the
city's estimates from comparable rentals, not the building's actual budget, rents or maintenance
charges.
Building systems
Heating fuel
NATURALGAS
Facade (Local Law 11)
SWARMP — "Safe With A Repair and Maintenance Program": known facade conditions that must be repaired (cycle 9)
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
77 St — 6 · 500 ft straight-line (about a 3-minute walk) · station accessibility: none 72 St — Q · 0.3 mi straight-line (about a 9-minute walk) · station accessibility: full
Bus
Nearest boarding stop: Lexington Av / E 77 St — M101 M102 M103 · 500 ft
Citi Bike
E 76 St & Park Ave · 250 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
11 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Job filed: MINOR RENOVATION TO AN EXISTING PENTHOUSE, INCLUDING PARTITION CHANGES. NEW PAVERS ON EXISTING TERRACES. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER
2026-06-17
Permit General Construction — Permit Issued
2026-06-12
Permit Sidewalk Shed — Permit Issued
2026-06-12
Permit Sidewalk Shed — Signed-off
2026-05-16
311: Homeless Person Assistance — Chronic
2026-05-15
311: Encampment — N/A
2026-05-15
311: Encampment — N/A
2026-03-25
Job filed: MINOR RENOVATION TO AN EXISTING PENTHOUSE, INCLUDING PARTITION CHANGES. NEW PAVERS ON EXISTING TERRACES. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER
2026-03-18
Permit Sidewalk Shed — Permit Issued
2026-03-18
Permit Sidewalk Shed — Signed-off
2026-03-12
Permit Suspended Scaffold — Permit Issued
2026-03-10
Permit General Construction — Permit Issued
2026-03-06
Boiler inspection
2026-03-06
Boiler inspection
2026-02-26
311: Obstruction — Cone
2026-02-12
Mortgage satisfied — from PARK PENTHOUSE HOLDINGS, LLC to HSBC BANK USA, N.A.,
2026-02-09
311: Obstruction — Trash or Recycling
2026-01-05
Job filed: INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2025-12-30
Bedbug filing: 0 infested units
2025-12-30
Deed $24,200,000 — from PARK PENTHOUSE HOLDINGS LLC; PARK PENTHOUSE HOLDINGS LLC to NEWER EVERY DAY LLC; NEWER EVERY DAY LLC
2025-12-30
Deed $24,200,000 — from PARK PENTHOUSE HOLDINGS LLC; PARK PENTHOUSE HOLDINGS LLC to NEWER EVERY DAY LLC; NEWER EVERY DAY LLC
2025-12-30
PAT — from NEWER EVERY DAY LLC to CONDO BOARD OF 823 PARK AVENUE CONDOMINI
2025-12-18
Sold for $24,200,000
2025-12-18
Sold for $24,200,000
2025-12-02
FDNY inspection (RISK)
2025-11-25
TL&R — from CIBC BANK USA to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; BANK OF AMERICA, N.A; HOOLEY SHANAHAN, CATHERINE
2025-11-25
Mortgage satisfied — from SHANAHAN, BRENDAN; HOOLEY SHANAHAN, CATHERINE; FARINELLA, PETER to SHANAHAN, BRENDAN; CIBC BANK USA
2025-11-25
Mortgage satisfied — from FARINELLA, PETER; SHANAHAN, BRENDAN; SHANAHAN, CATHERINE H to CIBC BANK USA
The full timeline
2026
2026-09-02ADEC — from 823 PARK AVENUE CONDOMINIUM
2026-09-02ADEC — from 823 PARK AVENUE CONDOMINIUM
2026-09-02ADEC — from 823 PARK AVENUE CONDOMINIUM
2026-09-02ADEC — from 823 PARK AVENUE CONDOMINIUM
2026-09-02ADEC — from 823 PARK AVENUE CONDOMINIUM
2026-09-02ADEC — from 823 PARK AVENUE CONDOMINIUM
2026-09-02ADEC — from 823 PARK AVENUE CONDOMINIUM
2026-09-02ADEC — from 823 PARK AVENUE CONDOMINIUM
2026-09-02ADEC — from 823 PARK AVENUE CONDOMINIUM
2026-09-02ADEC — from 823 PARK AVENUE CONDOMINIUM
2026-09-02ADEC — from 823 PARK AVENUE CONDOMINIUM
2026-07-06Job filed: MINOR RENOVATION TO AN EXISTING PENTHOUSE, INCLUDING PARTITION CHANGES. NEW PAVERS ON EXISTING TERRACES. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER $464,800
2026-06-17Permit General Construction — Permit Issued
2026-06-12Permit Sidewalk Shed — Permit Issued
2026-06-12Permit Sidewalk Shed — Signed-off
2026-05-16311: Homeless Person Assistance — Chronic
2026-05-15311: Encampment — N/A
2026-05-15311: Encampment — N/A
2026-03-25Job filed: MINOR RENOVATION TO AN EXISTING PENTHOUSE, INCLUDING PARTITION CHANGES. NEW PAVERS ON EXISTING TERRACES. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER $464,800
2024-03-04Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2024-03-01Job filed: Installation of suspended scaffold for facade work or inspection
2024-01-25Mortgage assigned — from FEDERAL DEPOSIT INSURANCE CORPORATION; JPMORGAN CHASE BANK, N.A.; FIRST REPUBLIC BANK to JPMORGAN CHASE BANK NATIONAL ASSOCIATION
2023-11-30Job filed: Masonry facade work as per plans. No change to use, egress, or occupanyc.$500,000
2023-11-08Mortgage assigned — from FEDERAL DEPOSIT INSURANCE CORPORATION; FIRST REPUBLIC BANK; JPMORGAN CHASE BANK, N.A. to JPMORGAN CHASE BANK NATIONAL ASSOCIATION
2023-09-08AL&R — from TEARMANN II, LLC to RENASANT BANK, A MISSISSIPPI BANKING COR
2023-09-08Mortgage $7,000,000 — from TEARMANN II, LLC to RENASANT BANK, A MISSISSIPPI BANKING COR$7,000,000
2023-06-12Permit General Construction — Signed-off
2023-05-17Mortgage satisfied — from GHUSSON, SAM S; GHUSSON, SUZANNE to UBS BANK USA; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2023-04-25PAT — from TEARMANN II, LLC to BOARD OF MANAGERS OF 823 PARK AVENUE CON
2023-04-25Deed $13,500,000 — from GHUSSON, SUZANNE; GHUSSON, SAM S to TEARMANN II, LLC$13,500,000
2023-04-19Sold for $13,500,000$13,500,000
2023-03-10AL&R $7,887,750 — from THE BRENDAN SHANAHAN 2007 TRUST, DATED 9; BRENDAN SHANAHAN AS TRUSTEES; CATHERINE HOOLEY S to CIBC BANK, USA$7,887,750
2023-03-10Mortgage assigned — from BANK OF AMERICA, N.A. to CIBC BANK, USA
2023-03-10Agreement $7,887,750 — from BRENDAN SHANAHAN AS TRUSTEES; THE BRENDAN SHANAHAN 2007 TRUST, DATED 9; CATHERINE HOOLEY S to CIBC BANK, USA$7,887,750
2023-02-16Permit Plumbing — Signed-off
2023-01-10Permit General Construction — Signed-off
2022
2022-12-30Bedbug filing: 0 infested units
2022-12-29Permit General Construction — Signed-off
2022-11-02HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2022-10-22Job filed: ESTABLISHMENT OF EXISTING AS-BUILT CONDITIONS AS PREVIOUSLY APPROVED UNDER JOB #103993966; GENERAL CONSTRUCTION; NO CHANGE TO USE, EGRESS OR OCCUPANCY$150,000
2022-10-22Job filed: ESTABLISHMENT OF THE EXISTING INSTALLATION OF PLUMBING FIXTURES IN THE PENTHOUSE APARTMENT ON THE 12TH AND 13TH FLOORS; NO CHANGE TO USE, EGRESS OR OC$40,000
2022-10-12Permit General Construction — Signed-off
2022-09-27Permit General Construction — Signed-off
2022-05-06Job filed: Filing plumbing work for existing residential space on 6th floor as per plan filed herewith. No change in use, egress, and occupancy under this applic$75,000
2021
2021-12-30Bedbug filing: 0 infested units
2021-11-15Permit General Construction — Signed-off
2021-10-08Mortgage satisfied — from KRAUS, LINDSAY E; KRAUS, STEPHEN R to FIRST REPUBLIC BANK
2021-09-14Mortgage $6,055 — from KRAUS, STEPHEN R; KRAUS, LINDSAY E to FIRST REPUBLIC BANK$6,055
2021-09-14Agreement $1,381,055 — from KRAUS, STEPHEN R; KRAUS, LINDSAY E to FIRST REPUBLIC BANK$1,381,055
2021-08-05Permit Plumbing — Signed-off
2021-08-03Permit General Construction — Signed-off
2021-07-30Permit General Construction — Signed-off
2021-07-20Facade (LL11) filing, cycle 9: SWARMP
2021-06-15Job filed: INTERIOR RENOVATION OF RESIDENTIAL UNIT 3 INCLUDING DEMOLITION OF NON-LOAD BEARING PARTITION, INSTALLATION OF MILLWORK, REPLACEMENT OF BATHROOM FLOOR $251,970
2021-06-09Job filed: Filing plumbing work for existing residential space on 6th floor as per plan filed herewith. No change in use, egress, and occupancy under this applic$75,000
2021-06-09Job filed: Filing interior renovation in existing residential space on 6th floor as per plan filed herewith. No change in use, egress, and occupancy under this a$400,000
2017-10-23Job filed: REPLACEMENT OF THE FACP FOR AN EXISTING APPROVED FIRE ALARM SYSTEM IN ACCORDANCE WITH ITEM 2.A OF DOB BULLETIN 2015-025$9,500
2017-10-23Job filed: REPLACEMENT OF THE FACP FOR AN EXISTING APPROVED FIRE ALARM SYSTEM IN ACCORDANCE WITH ITEM 2.A OF DOB BULLETIN 2015-025$9,500
2017-10-19Permit EQ — ISSUED
2017-09-29Mortgage satisfied — from SHANIHAN, CATHERINE H; SHANIHAN, BRENDAN to BANK OF AMERICA, N.A.
2017-09-14Rodent inspection: Passed
2017-08-18Agreement $7,930,000 — from BRENDAN SHANAHAN, AS TRUSTEE; BRENDAN SHANAHAN 2007 TRUST to BANK OF AMERICA, N.A.$7,930,000
2017-08-18Mortgage $6,930,000 — from BRENDAN SHANAHAN 2007 TRUST; BRENDAN SHANAHAN, AS TRUSTEE to BANK OF AMERICA, N.A.$6,930,000
2017-08-18Mortgage assigned — from MERS; BANK OF AMERICA, N.A. to BANK OF AMERICA, N.A.
2017-08-18Mortgage assigned — from BANK OF AMERICA, N.A. to BANK OF AMERICA, N.A.; MERS
2017-07-27Permit EW — ISSUED
2017-06-05RPTT&RET $7,650,000 — from KAUFMAN, IVAN; KAUFMAN, LISA to JOSEPH MARTELLO COTRUSTEE OF THE PARK; JOHN NATALONE COTRUSTEE OF THE PARK$7,650,000
2017-05-10Job filed: FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$76,515
2017-05-10Job filed: FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$76,515
2017-04-24Rodent inspection: Passed
2017-03-20Mortgage satisfied — from KAUFMAN, IVAN; KAUFMAN, LISA to BANK OF AMERICA, N.A.
2017-02-24Permit EQ — ISSUED
2017-02-21Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH 2014 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2017-01-25311: Street Sign - Damaged — No Parking, Standing, Stopping
2017-01-09Facade (LL11) filing, cycle 8: SAFE
2017-01-09DOB violation FISP:
2016
2016-10-26HPD class I: SECTION27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE ?27-2097 AND IS THER
2016-10-26Permit EQ — ISSUED
2016-10-24Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2014 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2016-10-24Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2014 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2016-09-14Agreement $5,600,000 — from GHUSSON, SUZANNE; GHUSSON, SAM S to MERS$5,600,000
2016-09-14Mortgage $1,667,266 — from GHUSSON, SAM S; GHUSSON, SUZANNE to MERS$1,667,266
2016-07-07Rodent inspection: Passed
2016-01-27311: Vending — In Prohibited Area
2015
2015-12-24FDNY inspection (SPECIAL-OTH)
2015-10-20311: Street Condition — Cave-in
2015-10-14311: Street Condition — Failed Street Repair
2015-09-01Mortgage $4,000,000 — from 823 PARK MAISONETTE, LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION$4,000,000
2015-06-17Deed $13,350,000 — from MICHELE CARLINO, AS TRUSTEE; MICHELE CARLINO TRUST, DATED NOVEMBER 1,; MICHELLE CARLINO, A to GERSTNER, GERVAISE L$13,350,000
2015-06-17PAT — from GERSTNER, GERVAISE L to 823 PARK AVENUE CONDOMINIUM
2015-03-30Mortgage $20,000,000 — from PARK PENTHOUSE HOLDINGS, LLC to HSBC USA, N.A.$20,000,000
2015-03-05Permit EW — ISSUED
2015-03-05Permit EW — ISSUED
2014
2014-12-02Job filed: REPLACEMENT OF EXISTING PIPE INSULATION AND DUCTWORK REPLACEMENT OF MOISTURE AND MOLD RESISTANCE GYPSUM WALLBOARD AS PER PLANS. NO CHANGE IN USE EGRES$587,200
2014-12-02Job filed: REPLACEMENT OF EXISTING PIPE INSULATION AND DUCTWORK REPLACEMENT OF MOISTURE AND MOLD RESISTANCE GYPSUM WALLBOARD AS PER PLANS. NO CHANGE IN USE EGRES$587,200
2014-06-16Job filed: REPLACE EXISTING GATE AND FENCE WITH NEW. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,000
2014-05-15DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
2014-05-15DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
2014-03-28Certificate of occupancy Final
2013
2013-12-23Certificate of occupancy Temporary
2013-11-08Mortgage $7,000,000 — from DJVI LLC to GOLDMAN SACHS BANK USA$7,000,000
2013-09-24Certificate of occupancy Temporary
2013-07-15Permit PL — ISSUED
2013-06-27Certificate of occupancy Temporary
2013-06-03Agreement $4,000,000 — from SALVATORE, LOUIS; SALVATORE, JEANINE to JPMORGAN CHASE BANK, N.A.$4,000,000
2013-04-25Permit EW — ISSUED
2013-04-17Permit PL — ISSUED
2013-04-12Permit EW — ISSUED
2013-03-28Certificate of occupancy Temporary
2013-03-25Job filed: INTERIOR RENOVATION OF AN EXISTING RESIDENTIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$420,000
2013-03-05Mortgage $981,517 — from CORGAN, KEVIN J; CORGAN, URSULA LEVEILLE to JPMORGAN CHASE BANK, N.A.$981,517
2013-03-05Agreement $8,718,575 — from CORGAN, URSULA LEVEILLE; CORGAN, KEVIN J to JPMORGAN CHASE BANK, N.A.$8,718,575
2013-01-28Deed $12,900,000 — from BANKS, JENNIFER A; OUGHOURLIAN, JOSEPH M to UGER, THOMAS C$12,900,000
2013-01-28Mortgage $2,000,000 — from UGER, THOMAS C to JPMORGAN CHASE BANK, N.A.$2,000,000
2013-01-28PAT — from UGER, THOMAS C to 823 PARK AVENUE CONDOMINIUM
2013-01-28PAT — from BANKS, JENNIFER A to RUBIN, SAMUEL JED ESQ.
2013-01-28PAT — from OUGHOURLIAN, JOSEPH M to RUBIN, SAMUEL JED ESQ.
2012
2012-12-28Certificate of occupancy Temporary
2012-10-10PAT — from JAMESON, ANNE to HERRICK, PAUL R
2012-10-10Deed $13,000,000 — from EISENHOFER, JAY; JAMESON, ANNE to GHUSSON, SAM; GHUSSON, SUZANNE$13,000,000
2012-10-10PAT — from GHUSSON, SAM S to FRIED, ALAN; KLEIMAN, RACHEL
2012-10-10PAT — from GHUSSON, SUZANNE to KLEIMAN, RACHEL; FRIED, ALAN
2012-10-10PAT — from EISENHOFER, JAY to HERRICK, PAUL R
2012-10-10PAT — from GHUSSON, SUZANNE; GHUSSON, SAM to BOARD OF MANAGERS FOR 823 PARK AVENUE CO
2012-10-10Mortgage $5,000,000 — from GHUSSON, SUZANNE; GHUSSON, SAM S to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$5,000,000
2012-10-05SUBM — from BANK OF AMERICA, N.A. to BANK OF AMERICA, N.A.
2012-10-05Agreement $1,000,000 — from HOOLEY SHANAHAN, TRUSTEE, CATHERINE; SHANAHAN, TRUSTEE, BRENDAN; THE BRENDAN SHANAHAN 2007 to BANK OF AMERICA, N.A.$1,000,000
2009-12-18PAT — from 823 PARK MAISONETTE, LLC to BOARD OF MANAGERS OF 823 PARK AVENUE CON
2009-12-07PAT — from KAUFMAN, LISA to CONNOLLY, WILLIAM
2009-12-07PAT — from KAUFMAN, IVAN to CONNOLLY, WILLIAM
2009-12-07Mortgage $5,000,000 — from KAUFMAN, IVAN; KAUFMAN, LISA to BANK OF AMERICA NA$5,000,000
2009-11-18Permit EW — ISSUED
2009-11-16Permit EW — ISSUED
2009-11-13Permit PL — ISSUED
2009-10-14DOB violation E:
2009-10-14DOB violation E:
2009-08-31Job filed: INSTALLATION OF SPRINKLERS FOR APT RENO ALL AS PER PLANS FILED HEREWITH . NO C HANGE IN USE EGRESS OR OCC FILED UNDER THIS APPLICATION$13,000
2009-08-31Job filed: REMOVAL & INSTALLATION OF NON LOAD BEARING PARTITIONS & RELATED FINISHES, MECH & PLBG MODIFICATIONS FOR APT RENO. ALLA S PER PLANS FILED H$624,000
2009-06-18Permit EW — ISSUED
2009-06-12Permit AL — ISSUED
2009-03-23Mortgage satisfied — from SINGH, RAMESH; KHAN, FARIDA to BANK OF AMERICA, N.A.,
2009-03-23Deed $9,264,252 — from 823 PARK AVENUE LLC to KAUFMAN, IVAN; KAUFMAN, LISA$9,264,252
2009-03-23PAT — from KAUFMAN, LISA
2009-03-23PAT — from KAUFMAN, IVAN to CONNOLLY, WILLIAM
2009-03-23Mortgage $5,098,210 — from KAUFMAN, IVAN; KAUFMAN, LISA to 823 PARK AVENUE LLC$5,098,210
2009-03-23PAT — from KAUFMAN, LISA; KAUFMAN, IVAN to 823 PARK AVENUE CONDOMINIUM
2009-03-16Permit EW — ISSUED
2009-03-13Permit EW — ISSUED
2009-01-13Mortgage $9,999,999 — from EISENHOFER, JAY; JAMESON, ANNE to RBS CITIZENS, NA$9,999,999
2008
2008-12-04Job filed: . RAISE TERRACE LEVEL AROUND TUB ON STRUCTURAL FRAMING AND STONE PAVERS, NEW GUARD RAILS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$33,300
2008-12-04Job filed: FILING HEREWITH STRUCTURAL DRAWINGS FOR RENOVATION OF ROOF TERRACE.$20,000
2008-09-12Deed $13,815,107 — from 823 PARK AVENUE LLC to DJVI LLC$13,815,107
2008-09-12PAT — from DJVI LLC to CONDOMINIUM BOARD OF 823 PARK AVENUE CON
2008-08-21Permit EW — ISSUED
2008-08-20Permit EW — ISSUED
2008-08-14Mortgage satisfied — from 823 PARK AVENUE, LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE, LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE, LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE, LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE, LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE, LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE, LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE, LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE, LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE, LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE, LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE, LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE, LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE, LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE, LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE, LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE, LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE, LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE, LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE, LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE, LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE, LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC.
2008-08-14Mortgage satisfied — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC.
2008-08-12TL&R — from ARBOR REALTY SR, INC.
2008-08-12PAT — from PARK PENTHOUSE HOLDINGS, LLC to BOARD OF MANAGERS OF
2008-08-12TL&R — from ARBOR REALTY SR, INC.
2008-08-12TL&R — from ARBOR REALTY SR, INC.
2008-08-12TL&R — from ARBOR REALTY SR, INC.
2008-08-12TL&R — from ARBOR REALTY SR, INC.
2008-08-12TL&R — from ARBOR REALTY SR, INC.
2008-08-12TL&R — from ARBOR REALTY SR, INC.
2008-08-12Deed $30,547,500 — from 823 PARK AVENUE LLC to PARK PENTHOUSE HOLDINGS, LLC$30,547,500
2008-08-12TL&R — from ARBOR REALTY SR, INC.
2008-08-12TL&R — from ARBOR REALTY SR, INC.
2008-08-12TL&R — from ARBOR REALTY SR, INC.
2008-08-11DOB complaint, category ?
2008-08-01ECB CLASS - 2 violation: WORK WITHOUT A PERMIT; EXPIRED PERMIT REMEDY: RENEW PERMIT
2008-07-15DOB violation E:
2008-07-15DOB violation E:
2008-07-08PREL — from ARBOR REALTY SR, INC to 823 PARK AVENUE LLC
2008-07-08REL — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC
2008-07-07PAT — from KHAN, FARIDA; SINGH, RAMESH to 823 PARK AVENUE CONDOMINIUM
2008-07-07PAT — from KHAN, FARIDA to JOHNSON, SCOTT; FRANKEL ESQ, ROBERT; DARR, JACQUELINE; COHEN, BRUCE M; CORTINA, LUCIANA
2008-07-07Deed $20,365,000 — from 823 PARK AVENUE LLC to SINGH, RAMESH; KHAN, FARIDA$20,365,000
2008-07-07Mortgage $1,100,000 — from KHAN, FARIDA; SINGH, RAMESH to BANK OF AMERICA, N.A.$1,100,000
2008-07-07PAT — from SINGH, RAMESH to JOHNSON, SCOTT; DARR, JACQUELINE; COHEN, BRUCE M; FRANKEL ESQ, ROBERT; CORTINA, LUCIANA
2008-06-26Job filed: REPLACEMENT OF THE EXIST'G SIDEWALK AT 823 PARK AVENUE. NO CHANGE IN USE (U.G.), OCCUPANCY OR EGRESS.$20,000
2008-06-26Job filed: SIDEWALK REPLACEMENT. SCOPE TO INCLUDE, STRUCTURAL FRAMING, METAL DECKING AND CONCRETE SLAB AS SHOWN ON PLANS. NO CHANGE IN USE (U.G.), OCCUPANCY OR E$15,000
2008-06-26Job filed: REPLACEMENT OF THE EXIST'G SIDEWALK AT 823 PARK AVENUE. NO CHANGE IN USE (U.G.), OCCUPANCY OR EGRESS.$20,000
2008-06-09Permit PL — ISSUED
2008-06-06Permit EW — ISSUED
2008-06-06Permit EW — ISSUED
2008-06-06Permit AL — ISSUED
2008-06-04DOB violation E:
2008-06-04DOB violation E:
2008-04-24REL — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC.
2008-04-24PREL — from ARBOR REALTY SR, INC. to 823 PARK AVENUE LLC
2008-04-24PAT — from SALVATORE, LOUIS; SALVATORE, JEANINE to THE CONDOMINIUM BOARD OF
2008-04-24Mortgage $3,500,000 — from SALVATORE, JEANINE; SALVATORE, LOUIS to JPMORGAN CHASE BANK, N.A.$3,500,000
2008-04-24PAT — from SALVATORE, JEANINE to CUTLER, ANDREW N; RUBIN, TYLER R
2008-04-24Deed $12,015,350 — from 823 PARK AVENUE LLC to SALVATORE, LOUIS; SALVATORE, JEANINE$12,015,350
2008-04-24Mortgage $4,500,000 — from SALVATORE, JEANINE; SALVATORE, LOUIS to JPMORGAN CHASE BANK, N.A.$4,500,000
2008-04-07Permit EQ — ISSUED
2008-04-07Permit EQ — ISSUED
2008-04-03Mortgage satisfied — from EISENHOFER, JAY; JAMESON, ANNE to RBS CITIZENS, N.A.
2008-03-21DOB violation LL1081:
2008-02-04PREL — from ARBOR REALTY SR, INC.,
2008-02-04REL — from ARBOR REALTY SR, INC.,
2008-02-04PAT — from EISENHOFER, JAY to JAMESON, ANNE
2008-02-04Mortgage $11,088,000 — from EISENHOFER, JAY; JAMESON, ANNE to RBS CITIZENS, N.A.$11,088,000
2008-02-04PAT — from EISENHOFER, JAY; JAMESON, ANNE to BOARD OF MANAGERS FOR 823 PARK AVENUE CO
2008-02-04Deed $13,860,000 — from 823 PARK AVENUE LLC to EISENHOFER, JAY; JAMESON, ANNE$13,860,000
2008-01-22REL — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC.
2008-01-22PREL — from ARBOR REALTY SR, INC. to 823 PARK AVENUE LLC
2008-01-22PAT — from FIFTH FLOOR 823 PARK AVENUE LLC to THE CONDOMINIUM BOARD OF THE 823 PARK AV
2008-01-22Deed $12,524,475 — from 823 PARK AVENUE LLC to FIFTH FLOOR 823 PARK AVENUE LLC$12,524,475
2008-01-08PAT — from OUGHOURLIAN, JOSEPH M; BANKS, JENNIFER A to BOARD OF MANAGERS OF 823 PARK AVENUE CON
2008-01-08Deed $11,200,750 — from 823 PARK AVENUE LLC to MICHELE CARLINO TRUST; MICHELE CARLINO TRUSTEE$11,200,750
2008-01-08TL&R — from ARBOR REALTY SR, INC to 823 PARK AVENUE LLC
2008-01-08PREL — from ARBOR REALTY SR, INC to 823 PARK AVENUE LLC
2008-01-08PAT — from CORGAN, KEVIN J; CORGAN, URSULA LEVEILLE to BOARD OF MANAGERS OF 823 PARK AVENUE CON
2008-01-08Deed $11,709,875 — from 823 PARK AVENUE LLC to CORGAN, URSULA LEVEILLE; CORGAN, KEVIN J$11,709,875
2008-01-08PREL — from ARBOR REALTY SR, INC to 823 PARK AVENUE LLC
2008-01-08PAT — from CARLINO, MICHELE to MONTCLARE, PAUL D
2008-01-08Mortgage $3,450,000 — from CORGAN, URSULA LEVEILLE; CORGAN, KEVIN J to JPMORGAN CHASE BANK NA$3,450,000
2008-01-08SUBM — from ARBOR REALTY SR, INC to 823 PARK AVENUE LLC
2008-01-08PAT — from MICHELE CARLINO TRUSTEE to BOARD OF MANAGERS OF 823 PARK AVENUE CON
2008-01-08Deed $13,827,835 — from 823 PARK AVENUE LLC to OUGHOURLIAN, JOSEPH M; BANKS, JENNIFER A$13,827,835
2008-01-08Mortgage $6,900,000 — from CORGAN, KEVIN J; CORGAN, URSULA LEVEILLE to JP MORGAN CHASE BANK, NA$6,900,000
2008-01-08TL&R — from ARBOR REALTY SR, INC to 823 PARK AVENUE LLC
2008-01-08REL — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC
2008-01-08PREL — from ARBOR REALTY SR, INC to 823 PARK AVENUE LLC
2007
2007-12-31PREL — from ARBOR REALTY SR, INC. to 823 PARK AVENUE LLC
2007-12-31PAT — from BRENDAN SHANAHAN 2007 TRUST DATED 9/01/2; BRENDAN SHANAHAN, TRUSTEE; CATHERINE HOOLEY SHAN to BOARD OF MANAGERS OF THE 823 PARK AVENUE
2007-12-31Mortgage $1,000,000 — from BRENDAN SHANAHAN 2007 TRUST DATED 9/01/2; BRENDAN SHANAHAN, TRUSTEE; CATHERINE HOOLEY SHAN to BANK OF AMERICA, N.A.$1,000,000
2007-12-31Mortgage $1,000,000 — from BRENDAN SHANAHAN, TRUSTEE; BRENDAN SHANAHAN 2007 TRUST DATED 9/01/2; CATHERINE HOOLEY SHAN to BANK OF AMERICA, N.A.$1,000,000
2007-12-31REL — from 823 PARK AVENUE LLC to ARBOR REALTY SR, INC.
2007-10-31MAPS — from 823 PARK AVENUE CONDOMINIUM
2007-10-31MAPS — from 823 PARK AVENUE CONDOMINIUM
2007-10-31CDEC — from 823 PARK AVENUE CONDOMINIUM
2007-10-31CDEC — from 823 PARK AVENUE CONDOMINIUM
2007-10-31MAPS — from 823 PARK AVENUE CONDOMINIUM
2007-10-31CDEC — from 823 PARK AVENUE CONDOMINIUM
2007-10-31CDEC — from 823 PARK AVENUE CONDOMINIUM
2007-10-31MAPS — from 823 PARK AVENUE CONDOMINIUM
2007-10-31CDEC — from 823 PARK AVENUE CONDOMINIUM
2007-10-31MAPS — from 823 PARK AVENUE CONDOMINIUM
2007-10-31CDEC — from 823 PARK AVENUE CONDOMINIUM
2007-10-31MAPS — from 823 PARK AVENUE CONDOMINIUM
2007-10-31CDEC — from 823 PARK AVENUE CONDOMINIUM
2007-10-31MAPS — from 823 PARK AVENUE CONDOMINIUM
2007-10-31CDEC — from 823 PARK AVENUE CONDOMINIUM
2007-10-31CDEC — from 823 PARK AVENUE CONDOMINIUM
2007-10-31MAPS — from 823 PARK AVENUE CONDOMINIUM
2007-10-31CDEC — from 823 PARK AVENUE CONDOMINIUM
2007-10-31MAPS — from 823 PARK AVENUE CONDOMINIUM
2007-10-31CDEC — from 823 PARK AVENUE CONDOMINIUM
2007-10-31MAPS — from 823 PARK AVENUE CONDOMINIUM
2007-10-31MAPS — from 823 PARK AVENUE CONDOMINIUM
2007-10-22Permit EW — ISSUED
2007-10-15Permit EW — ISSUED
2007-10-15Permit EW — ISSUED
2007-10-15Permit PL — ISSUED
2007-09-24Job filed: FIRE PROTECTION PLAN IN CONJUNCTION WITH MAJOR ALTRATION OF BUILDING
2007-08-11DOB violation C:
2007-07-02Permit EW — ISSUED
2007-06-25Job filed: INSTALLATION OF SPRINKLER ALARM/SMOKE DETECTION SYSTEM AS PER PLAN FILED HEREWITH IN CONJUNCTION ALT.1 # 103993966.$20,000
2007-06-21Permit EW — ISSUED
2007-06-21Permit EW — ISSUED
2007-06-21Permit AL — ISSUED
2007-06-05Permit PL — ISSUED
2007-05-12DOB complaint, category ?
2007-04-28DOB complaint, category ?
2007-04-17DOB complaint, category ?
2007-04-12Permit EQ — ISSUED
2007-03-27Permit EQ — ISSUED
2007-03-27Permit EQ — ISSUED
2007-03-27Permit EQ — ISSUED
2007-03-16Permit EW — ISSUED
2007-02-20Facade (LL11) filing, cycle 6: SAFE
2007-01-19DOB violation LL6291:
2006
2006-08-23Permit AL — ISSUED
2006-08-21Permit EW — ISSUED
2006-08-21Permit EW — ISSUED
2006-08-01Permit EQ — ISSUED
2006-07-12Job filed: INSTALLATION OF A PLYWOOD-FENCE 33' LONG BY 4' WIDE DURING FACADE REPAIR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2006-07-12Job filed: INSTALLATION OF A PLYWOOD-FENCE 33' LONG BY 4' WIDE DURING FACADE REPAIR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2006-06-26DOB complaint, category ?
2006-06-24DOB violation C:
2006-05-17Permit EW — ISSUED
2006-05-17Permit EW — ISSUED
2006-05-08Permit EQ — ISSUED
2006-05-08Permit EQ — ISSUED
2006-05-08Permit EQ — ISSUED
2006-03-30ECB Hazardous violation: WORK CONTRARY TO APPROVED DEPT. OF BLDGS PLANS AND APPLICATION. OBSERVED CONTRACTOR WORKING ON PLATFORM WITH INSUFFICIENT COUNTERW$500
2006-02-11DOB complaint, category ?
2006-01-20Permit PL — ISSUED
2005
2005-10-12Permit EW — ISSUED
2005-10-12Permit EW — ISSUED
2005-10-02DOB complaint, category ?
2005-08-11Permit AL — ISSUED
2005-08-10Permit EW — ISSUED
2005-06-02Job filed: PROPOSED INSTALLATION OF HVAC SYSTEM, ASSOCIATED DUCTWORK AND AIR HANDLI NG UNITS THROUGHOUT AND PLUMBING FIXTURES THROUGHOUT. TWO NEW BOILERS IN MECH$3,300,000
2005-06-02Job filed: PROPOSED INSTALLATION OF HVAC SYSTEM, ASSOCIATED DUCTWORK AND AIR HANDLI NG UNITS THROUGHOUT AND PLUMBING FIXTURES THROUGHOUT. TWO NEW BOILERS IN MECH$3,300,000
2005-05-11DOB complaint, category ?
2005-04-29Permit EQ — ISSUED
2005-04-26Permit AL — ISSUED
2005-04-21Permit EQ — ISSUED
2005-04-20Job filed: INSTALLATION OF ALIMAK 28/37 TD PERSONNEL/ MATERIAL HOIST 175' HIGH DURING BUILDING RENOVATION # 103993966. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2005-04-18Job filed: INSTALLATION OF A SCAFFOLD 130' LONG X 150' HIGH DURING BUILDING RENOVATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHED TO BE FILED SEPERATELY.
2005-04-13Permit EQ — RE-ISSUED
2005-03-25Permit PL — ISSUED
2005-03-25Permit EW — ISSUED
2005-03-25Permit EW — ISSUED
2005-03-17Permit EQ — ISSUED
2005-03-15Job filed: INSTALLATION OF A SIDEWALK SHED 230' DURING BUILDING RENOVATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHED TO COMPLY WITH LL33/91 AND TPPN 9/99.
2005-03-15Job filed: INSTALLATION OF A SIDEWALK SHED 230' DURING BUILDING RENOVATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHED TO COMPLY WITH LL33/91 AND TPPN 9/99.
2005-02-03Job filed: PROPOSED INSTALLATION OF SPRINKLER SYSTE M AND PLUMBING FOR SPRINKLER CO NECTION TO STREET MAIN AND PUMPS IN CONN ECTION TO RENOVATION PROJECT OF EXIS$200,000
2005-02-03Job filed: PROPOSED INSTALLATION OF SPRINKLER SYSTE M AND PLUMBING FOR SPRINKLER CO NECTION TO STREET MAIN AND PUMPS IN CONN ECTION TO RENOVATION PROJECT OF EXIS$200,000
2005-01-31DOB violation LL6291:
2005-01-27Permit EW — ISSUED
2005-01-18Permit PL — ISSUED
2005-01-18Permit PL — ISSUED
2004
2004-12-15Permit EQ — ISSUED
2004-12-15Job filed: PROPOSING NEW STRUCTURAL STEEL AND REIN- FORCED CONCRETE FOR NEW SCISSOR STAIR AND REAR ENLARGEMENT
2004-12-15Job filed: A1$6,000,000
2004-12-09Permit EQ — ISSUED
2004-12-07Job filed: Erect temporary scaffold 60 x 170 on Park Ave. & 100' x 170' tall in walkway west side of bldg. Scaffol for the washing of bricks, pointing on fac
2004-12-02Job filed: Herewith filing for repair and restoration of all facades to existing building. No change to use, egress or occupancy.$2,000,000
2004-11-30Permit EQ — ISSUED
2004-11-24Permit EW — ISSUED
2004-11-24Job filed: Erect 168' of Temporary Heavy Duty Sidewalk Shed 300 psf for protection during washing of bricks, pointing on face of bldg. on Park Ave. also repair o
2004-11-15Job filed: DEMOLITION OF INTERIOR NON-BEARING PARTITIONS & REMOVING PLUMBING FIXTURES. NO CHANGE IN USE (U.G.), OCCUPANCY OR EGRESS.$20,000
2004-09-10Permit EQ — ISSUED
2004-09-09Permit EW — ISSUED
2004-08-19Job filed: WE SHALL INSTALL 100 L.F. OF HEAVY DUTY SIDEWALK SHED. THERE WILL BE NO CHANGE IN USED EGRESS OR OCCUPANCY. IT WILL BE USED FOR FACADE REPAIR.
2004-08-19Job filed: WE SHALL INSTALL 100 L.F. OF HEAVY DUTY SIDEWALK SHED. THERE WILL BE NO CHANGE IN USED EGRESS OR OCCUPANCY. IT WILL BE USED FOR FACADE REPAIR.
2004-07-22Job filed: DEMOLITION OF INTERIOR PARTITIONS AND REMOVING PLUMBING FIXTURES. NO CHANGE IN USE (U.G.), OCCUPANCY OR EGRESS.$100,000
2004-07-22Job filed: DEMOLITION OF INTERIOR PARTITIONS AND REMOVING PLUMBING FIXTURES. NO CHANGE IN USE (U.G.), OCCUPANCY OR EGRESS.$100,000
2004-05-07DOB complaint, category ?
2004-03-23Permit EQ — ISSUED
2003
2003-07-18DOB violation E:
2003-07-18DOB violation E:
2003-04-08Permit EQ — ISSUED
2003-01-08Permit EQ — ISSUED
2002
2002-10-29DOB complaint, category ?
2002-04-26Permit EW — ISSUED
2002-04-15Permit EQ — ISSUED
2002-04-01Permit EQ — ISSUED
2002-01-28Permit EW — ISSUED
2001
2001-08-02HPD class C: SECTION 27-2005 ADM CODE REPLACE WITH NEW THE MISSING SECTIONS OF PARAPET WALL AT NORTH AND EAST. AT PARPET WALL, ROOF
2001-05-16DOB complaint, category ?
2001-04-26Permit EQ — ISSUED
2001-04-18Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 56'DURING FACADE REPAIR NO CHANGE IN USE EGRESS OR OCCUPANCY SHED TO COMPLY WITH LL33/91
2001-04-18Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 56'DURING FACADE REPAIR NO CHANGE IN USE EGRESS OR OCCUPANCY SHED TO COMPLY WITH LL33/91
2001-03-28Permit EQ — ISSUED
2000
2000-07-20DOB complaint, category ?
2000-04-05Permit EQ — ISSUED
2000-03-16Permit EW — ISSUED
2000-01-03ECB Non-Hazardous violation: 75B. PROPERLY TAG, FIVE YEAR TEST TAG WITH THE CORRECT DATE THE DEVICEWAS TESTED. THE TAG SHOWA 9/96. TEST REPORT SHOWS 12/14/99.
1999
1999-09-13DOB violation E: 1P7928
1999-03-04Permit EQ — ISSUED
1998
1998-08-17DOB complaint, category ?
1998-08-12Permit EQ — ISSUED
1998-08-12ECB Hazardous violation: FAILURE TO PROVIDE ADEQUATE PROTECTION OF WALLWAYS DURING CONSTRUCTION ACTIVITIES NOTED: AT NORTH SIDE EXTERIOR WALL REMOVAL OF BR$2,000
1998-08-07Permit EW — ISSUED
1998-07-10Permit EQ — ISSUED
1998-05-04ECB Non-Hazardous violation: SIDEWALK SHED ERECTED WITH EXPIRED PERMIT #100954831, WHICH EXPIRED 04-01-98. SIDE WALK SHED ERECTED AT TIME STREET WALL OF PARK
1998-01-13ECB Non-Hazardous violation: 35I,13M,57P,15B,57O,15M, 35I-REPAIR HOLES IN MOTOR ROOM FLOOR 57-P-PROVIDE LADDER IN PIT MISSING 15B-REPLACE SIGHT GUARDS ON HATCH
1997
1997-09-16DOB violation LL6291:
1997-04-30Permit EQ — ISSUED
1997-03-05Permit EW — ISSUED
1996
1996-11-15ECB Non-Hazardous violation: FAILURE TO MAINTAIN ROOF LEVEL AT NORTH BULK HEAD EXTERIRO BRICK WALL PARAPET AT TOP FLOOR IS CRACKED FROM NRTH CORNER TO SOUTH CO
1996-11-15ECB Non-Hazardous violation: FAILURE TO MAINTAIN NOTED AT NORTH SIDE COURT YARD THE RETAINING WALL SUPORTING PARK AVE SIDEWALK HAS VERTICAL & HORIZONTAL & DIAS$350
1996-01-25ECB Non-Hazardous violation: 7511,50Y,74U,11Q. 73- CITY I.D LABELS
1995
1995-12-15Permit EQ — ISSUED
1995-09-27DOB complaint, category ?
1995-08-29DOB violation LL6291:
1995-06-21Permit EW — ISSUED
1995-05-24ECB Hazardous violation: FAILURE TO MAINTAIN EXTEIOR BUILDING WALL DEFECT IS BRICKS MISSING IN VARIOUS LOCATION THROUGHOUT THE ENTIRE SOUTHSIDE EXTERIOR EX
1995-05-24ECB Hazardous violation: FORTHWITH. MAINTAIN EXTERIOR BUILDING WALL DEFECT IS CONCRETE SLAB AT NORTHSIDE COURTYARD IS CRACKED BROKEN & BUILDING UP CREATING
1995-05-24ECB Non-Hazardous violation: FAILURE TO MAINTAIN EXTEIOR BUILDING WALL DEFECT IS AT TOP OF WINDOW HEADS THERE IS A HORIZONTAL CRACK THROUGH THE TERRACOTTA FASC$2,000
1995-05-24ECB Hazardous violation: FAILURE TO EXTERIOR BUILDING WALL DEFECT IS AT NORTHSIDE COURTYARD RETAINING WALL THAT SUPPORTS PARK AVE SIDEWALK HAS VENTICAL HOR
1995-04-18DOB violation C:
1995-04-18DOB violation C:
1995-04-18DOB violation C:
1995-04-18DOB violation C:
1995-04-18DOB violation C:
1995-04-18DOB violation C:
1995-04-18DOB violation C:
1995-03-08ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BLDG WALL:DEFECT IS:BRICKS MISSING IN VARIOUS LOCATIONS THRU-OUT TH ENTIRE SOUTHSIDE EXTERIOR EXPOSUR
1995-03-08ECB Non-Hazardous violation: FAILURE TO MAINTAIN EXTERIOR WALL:DEFECT IS:AT TOP FLOOR WINDOW LEADS THERE IS HORIZONTAL CRACKTHRU-OUT THE TIME-COTTA FASCIA+BRIC$2,000
1995-03-08ECB Hazardous violation: FAILURE TO MAINTAIN BLDG WALL.DEFECT:AT NORTHSIDE COURTYARD RETAINING WALL THAT SUPPORTS PARK AVE SIDEWALK,HAS VERTICAL,HORIZONTAL
1995-03-08ECB Hazardous violation: FALIURE TO MAINTAIN EXTERIOR BLDG WLL:DEFECT IS:CONCRETE SLAB AT NORTHSIDE COURTYARD IS CRACKED,BROKEN+BLDG UP CREATING AT RIPPING
1995-02-28ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BLDG WALL:DEFECT IS;CONCRETE SLAB AT NRTHSIDE COURTYARD IS CARRIED,BROKEN AND BULGING UP CREATING A R
1995-02-28ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BLDG WALL DEFECT IS:BRICKS MISSING IN VA-RIOUS LOCATIONS THROUGHOUT THE EXTERIOR SOUTHSIDE EXTERIOR E
1995-02-28ECB Non-Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BLDG WALL:DEFECT IS:AT TOP FLR WINDOW HE-ADS THERE IS A HORIZONTAL CRACK THROUGH THE TERRA COTTA FACI$2,000
1995-02-28ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BLDG WALL;DEFECT IS:AT NORTHSIDE COURTYA-RD RETAINING WALL THAT SUPPORTS PARK AVE SIDEWALK HAS VERTIC
1995-01-19ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL DEFECT IS AT TOP FLOOR WINDOW HEADS THERE IS A HORIZONTAL CRACK THROUGH THE TERMS COTTA
1995-01-19ECB Hazardous violation: FAILURE MAINTAIN EXTERIOR BUILDING WALL DEFECT IS AT NORTHSIDE COURTYARD.RETAINIG WALL THAT SUPORTS PARK AVE.SIDE WALK HAS VENTICA$2,000
1995-01-19ECB Hazardous violation: FAILURE TO MAINTAIN BUILDING WALL DEFECT IS CONCUTE SLAB AT NONTHSIDE COURTYARD IS CRALLED BROKEN,&BUILDING UP CREATING ATRIPPING
1995-01-19ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL DEFECT IS BRICKS MISSING IN VARIORS LOCATIONS THROUGOUT THE ENTIRE SOUTHSIDE EXTERIOR E
1994
1994-12-29DOB violation C:
1994-12-29ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL: DEFECT IS: AT NORTH SIDE CCOURTYARD RETAINING WALL THAT SUPPORTS PARK AVE. SIDEWALKD,
1994-12-29ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL : DEFECT IS: CONCRETE SLAB AT NORTHSIDE COURTYARD IS CONCRETED BROKEN & BUGINGS UP CREA
1994-12-29ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL: DEFECT IS: BRICKS MISSING IN VARIOUS LOCATINS THROUGHOUT THE ENTIRE SOUTH SIDE EXTERIO$2,000
1994-12-29ECB Hazardous violation: FAILURE MAINTAIN EXTERIOR BUILDING WALL : DEFECT IS : AT TOP FLR. WINDOW HEADS THEREI IS A SHORTEN
1994-12-28ECB Non-Hazardous violation: WORK WITHOUT A PERMIT:WORK NOTED:REPLACEMENT OF LINTELS OVEN WINDOW ATNE SIDE OF REAR WALL CUARIOUS LOCATIONS.REMOVEAL&REPLACEMENT$350
1994-12-14Permit EQ — ISSUED
1994-12-14Permit EQ — ISSUED
1994-11-30ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING--DEFECT IS CONCREATE SLAB AT NORTHSIDE COURTYARD IS CRACKED, BROKEN AND BULDGING UP CREAT$1,000
1994-11-30ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL DEFECT IS: AT NORTHSIDE COURTYARD RETAINING WALL THAT SUPPORTS PARK AVENUE. SIDEWALK $800
1994-11-30ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL. DEFECT IS BRICKS MISSING IN VAROIUS LOCATIONS THROUGHOUT THE ENTIRE SOUTHSIDE EXTERIO$800
1994-11-30ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL. DEFECT IS AT TOP FROM WINDOW HEADS THERE IS A HORIZONTAL CRACK THROUGH THE TERRACO$800
1994-10-24ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDINGS WALL DEFECTIS AT NORTHSIDECOURTYARD RETAINING WALL THAT SUPPORTS PARK AVE.
1994-10-24ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BULDING WALL DEFECT IS CONCRETE SLAB AT NORTH SIDE COURTYARD BROKEN AND BULGING UP CREATING A TRIPPIN
1994-10-24ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL DEFECT IS AT TOP FLOOR WINDOW HEADS THERE IS A HORIZENTAL CRACK THROUGH THE TERRANCE
1994-10-24ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL DEFECTIS BRICKS MISSING IN VARIOUS LOCATION THROUGHTOUT THE ENTIRE SOUTHSIDE EXPOSURE.
1994-09-30ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL : DEFECT IS : BRICKS MISSING IN VARIOUS LICATIONS THROUGH THE ENTIRE SOUTHSIDE EX
1994-09-30ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL : DEFECT IS : AT NORTHSIDE COURTYARD RETAINING WALL THAT SUPPORTS PARK AVE. SIDEWALK HA
1994-09-30ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL: DEFECT IS AT TOP FLOOR WINDOW LEADS THERE IS A HORIZONTAL CRACK THROUGH THE TESSACO
1994-09-30ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL:DEFECT IS : CONCRETE SLAB AT NORTHSIDE COURTYARD IS CRACKED, BROKEN AND BULING UP CREA
1994-08-17ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL: DEFECT IS : AT TOP FLOOR WINDOW NEEDS THERE IS A HORIZONTAL CRACK THORUGH THE TESSA C
1994-08-17ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL: DEFECT IS :CONCRETE SLAK AT NORTHSIDE COURTYARD IS CRACKED BROKEN AND BRICKS UP CREAT
1994-08-17ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL : DEFECT IS : BRICKS MISSING IN VARIOUS LOCATIONS THROUGHTOUT THE ENTIRE SOUTH SI
1994-08-17ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL: DEFECT IS: AT NORTHSIDE COURTYARD, RETAINING WALL THAT SUPPORTS PARK AVE. SIDEWALK H
1994-07-27DOB violation C:
1994-07-21DOB violation C:
1994-07-21DOB violation C:
1994-07-21DOB violation C:
1994-07-21DOB violation C:
1994-07-07ECB Non-Hazardous violation: WORK WITHOUT A PERMIT. PERMIT #10039569-01 EQSH FOR SIDWALK SHED WAS EXPIRED AS OF 5/21/94. REMEDY: RENEW PERMIT.
1994-06-29DOB violation C:
1994-06-29DOB violation C:
1994-06-29DOB violation C:
1994-06-29DOB violation C:
1994-05-31DOB violation LL1081:
1994-05-25ECB Hazardous violation: FAILURE TO MAINTAIN BUILDING. BROKEN BULDGING & DEFECTIVE PAVING AT NORTH COURTYARD. BROKEN CRACKED BRICKWORK RETAING WALL AT R
1994-05-25ECB Non-Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL. ROOF LEVEL NORTH BULKHEADBRICKWORK IC CRACKED AND BULDIGN OUT OF PLUMB. PARAPET WALL
1994-05-18ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL. BRICKS MISSING AT VARIOUS LOCATIONS THROUGHOUT THE ENTIRE SOUTHSIDE EXTERIOR E
1994-05-18ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL. AT TOP FLOOR WINDOW HEADSTHERE IS A HORIZONTAL CRACK THROUGH THE TERRA COTTA FASCIA A
1994-05-18ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL. AT NORTHSIDE COURTYARD RETAINING WALL THAT SUPPORTS PARK AVE SIDEWALK HAS VERTICAL
1994-05-18ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL: DEFECT IS: CONCRETE SLABAT NORTHSIDE COURTYARD IS CRACKED, BROKEN & BULGING UP CREATIN$1,000
1994-04-04ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL. AT NORTHSIDE COURTYARD RETAINING WALL THAT SUPPORTS PARK AVE HAS VERTICAL HORIZONTA
1994-04-04ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUIDLING WALL. BRICKS MISSING AT VARIOUSAT VARIOUS LOCATIONS THROUGHOUT ENTIRE SOUTH SIDE EXTERIOR E
1994-04-04ECB Hazardous violation: FAILURE TO EXTERIOR BUILDING WALL. AT TOP FLOOR WINDOWS HEADS THERE IS A HAORIZONTAL CRACKS THROUGH THE TERRA COTTA FASCIA AND B
1994-04-04ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL. CONCRETE SLAB AT N/S COURTYARD OS CRACKED, BROKEN AND BUILDING UP CREATING A TRIP
1994-03-07ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL. METAL STAIRS PLATFORMS LOCATED AT NORTH COURTYARD ARE CORRODED, RUSTED AND DEFECTIV
1994-03-07ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL. BRICKS MISSING IN VARIOUS LOCATIONS ON EAST AND SOUTH WALLS. CRACKS RUNNING
1994-03-07ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL. SEVERE HORIZONTAL CRACKS AT RETAINING WALL FOR PARK AVE SIDEWALK LOCATED AT NORTH COU
1994-03-02ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL. BRICKS MISSING AT VARIOUS LOCATIONS THROUGHTOUT ENTIRE SOUTHSIDE EXTEROIOR EXP
1994-03-02ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL. AT NORTHSIDE COURTYARD RETAINING WALL THAT SUPPORTS PARK AVENUE SIDEWALK HAS VERTIC
1994-03-02ECB Hazardous violation: FAILURE TO MAINTAIN BUILDING WALL. CONCRETE SLAB AT NORTH SIDE COURT YARD IS CRACKED BROKEN BULDGING UP CREATING A TRIPPING
1994-03-02ECB Hazardous violation: FAILURE TO MAINTIAN EXTERIOR BUILDING WALL. AT TOP FLOOR WINDOW HEADS THERE IS A HORIZONTAL CRACK THROUGHOUT THE TERRA COTT
1994-02-09ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL. AT NORTHSIDE COURTYARD RETAINING WALL THAT SUPPORTS PARK AVENUE SIDEWALK HAS VERTIC
1994-02-09ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUIDLNG WALL. BRICKS MISSING AT VARIOUS LOCATIONS THROUGHOUT ENTIRE SOUTHSIDE EXTERIOR EXPOSURE
1994-02-09ECB Hazardous violation: FAILURE TO MAINTAIN BUILDING WALL. AT TOP FOUR WINDOW HEADS THERE IS A HORIZONTAL CRACK THROUGH THE TERRA COTTA FAXCIA & BRICK
1994-02-09ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL. CONCRETE SLAB AT NORTHSIDE COURTYARD IS CRACKED BROKEN AND BULDGING UP CREAT
1994-01-13ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL: DEFECT IS: BRICKING MISSING @ VARIOUS LOCATIONS THROUGHOUT ENTIRE SOUTHSIDE EXTERIOR E
1994-01-13ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL: DEFECT IS: CONCRETE SLAB AT NORTHSIDE COURTYARD IS CRACKED, BROKEN & BULGING UP CREATI
1994-01-13ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL: DEFECT IS: AT TOP FLOOR WINDOW HEADS, THERE IS A HORIZONTAL CRACK THROUGH THE TERRA CO
1994-01-13ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL: DEFECT IS: AT NORTHSIDE COURTYARD, RETAINING WALL THAT SUPPORTS PARK AV. SIDEWALK HAS
1993
1993-12-14Permit EQ — ISSUED
1993-12-14ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL. AT TOP FLOOR WINDOW HEADS, THERE IS A HORIZONTAL CRACK THROUGH TERRACOTTA FASCIA
1993-12-14ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL. AT NORTHSIDE COURTYARD RETAINING WALL THAT SUPPORTS PARK AVE SIDEWALK HAS VERTICAL,
1993-12-14ECB Hazardous violation: FAILURE TO TO MAINTAIN EXTERIOR BUILDING WALL. CONCRETE SLAB AT SIDE AT NORTHSIDE COURTYARD IS CRACKED BROKEN BULDGING UP CR
1993-12-14ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL. BRICKS MISSING AT VAR- IOUS LOCATIONS THROUGHOUT ENTIRE SOUTHSIDE EXTERIOR EXPOSURE
1993-12-10DOB violation C:
1993-12-10ECB Non-Hazardous violation: WORK WITHOUT A PERMIT. NO PERMIT FOR SIDEWALK SHED INSTALLED ON PARK AVE WEST OF BUILDING. APPLICATION 100739569
1993-11-19DOB violation C:
1993-11-19DOB violation C:
1993-11-19DOB violation C:
1993-11-19DOB violation C:
1993-11-19DOB violation C:
1993-11-01DOB violation C:
1993-10-18ECB Hazardous violation: FAILURE TO MAINTAIN NOTE AT NORTH SIDE COURTYARD THE RETAINING WALL SUPPORTING PARK AVE SIDEWALK THERE IS A LARGE VERTICAL CRACK R
1993-10-18ECB Hazardous violation: FAILURE TO MAINTAIN NOTE AT TOP FLOOR WINDOW LINTELS THERE IS A HORIZONTAL C4RACK REINNING FROM WINDOW TO WINDOW ACROSS ENTIRE PAR
1993-10-18ECB Hazardous violation: FAILURE TO MAINTAIN NOTE CONCRETE SLAB AT NORTH SIDE COURTYARD IS SEVERELY CRACKED BROKEN & BULGING CREATING AN IMMEDIATE TRIP HA
1993-10-18ECB Hazardous violation: FAILURE TO MAINTAIN NOTE BRICKS ARE MISSING ON VARIOUS LOCATIONS THROUGHOUT ENTIRE SOUTH SIDE EXTERIOR FACADE REMEDY REPAIR REPLAC
1993-10-12ECB Hazardous violation: FAILURE TO MAINTAIN. REAR COURT YARD PAVEMENT IS CRACKED AND BROKEN RETAINING WALL AT REAR COURTYARD IS CRACKED BROKEN AND BULDG
1993-10-12ECB Non-Hazardous violation: FAILURE TO MAINTAIN. ROOF LEVEL BULK HEAD IS OUT OF PLUMB BRICKWORK IS CRACKED BROKEN AND DEFECTIVE. PARAPET WALL AND DECORATIVE
1993-09-10DOB violation C:
1993-09-10DOB violation C:
1993-09-10DOB violation C:
1993-08-27DOB violation C:
1993-08-27DOB violation C:
1993-07-01ECB Hazardous violation: FAILURE TO MAINTAIN: EXTERIOR-NOTE-SEVERE HORIZONTAL CRACK AT RETAINING WALL FOR SIDEWALK ABOVE LOCATED AT NORTH COURTYARD. (2) TH
1993-07-01ECB Hazardous violation: FAILURE TO MAINTAIN, EXTERIOR-NOTE-METAL STAIRS, PLATFORMS LOCATED AT NORTH COURTYARD A CORRODED, RUSTED AND DEFECTIVE THROUGHOUT
1993-07-01ECB Hazardous violation: FAILURE TO MAINTAIN, EXTERIOR BULIDING WALL. NOTE (1) BRICKS MISSING AT VARIOUS LOCATIONS ON SOUTH SIDE WALLS. (2) CRACKS RUNNING
1993-06-28DOB violation LL1081: 2
1993-05-10ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL. ROOF-NORTH BULKHEAD CRACKED BULDING OUT OF PLUMB PARAPETS AND DECORATIVE FACADES
1993-05-10ECB Hazardous violation: FAILURE TO MAINTAIN. BROKEN BULDGING PAVING IN NORTH COURT. SOUTH RETAINING WALL CRACKED BRICK CRACKED. METAL STAIRS TO 1ST S
1993-05-10ECB Hazardous violation: FAILURE TO MAINTAIN. EXTERIOR STAIRS AND PLATFORM FROM 1ST STROY TO NORTH COURTYARD TRED SUPPORTS AND BOLTS CORRODED RUSTED AND
1993-05-06DOB complaint, category ?
1993-05-06DOB violation C:
1993-05-06DOB violation C:
1993-05-06ECB Non-Hazardous violation: WORK WITHOUT A PERMIT. EXPIRED PERMIT. NOTE: SIDEWALK SHED INSTALLED AT FRONT OF PREMISES. PERMIT #1P0000829 HAS EXPIR
1993-05-03ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL. PIECES OF BRICK MISSING THROUGHOUT FACADE. CRACKS THROUGH BRICK IN VARIOUS LOCATION
1993-03-18DOB violation LL6291:
1993-02-18DOB violation C:
1993-02-18DOB violation C:
1992
1992-12-07ECB Hazardous violation: FAILURE TO MAINTAIN METAL EGRESS STAIR LOCATED AT NORTH COURTYARD. DEFECTS NOTED; TREADS RUSTED, SUPPORTS RUSTED, TREADS LOOSE.$6,000
1992-10-07ECB Non-Hazardous violation: 74I,36D, 74 REPAIR LADDER TO MACHINE ROOM$1,000
1992-07-01DOB violation LL1080:
1992-05-14ECB Hazardous violation: FAILURE TO MAINTAIN METAL EGRESS STAIR LOCATED AT NORTH COURTYARD. DETECTS NOTED: TREADS RUSTED, SUPPORTS RUSTED, TREADS LOOSE. ST$10,000
1992-04-16ECB Hazardous violation: FAILURE TO MAINTAIN DEFECT IS BULGING & DEFECTIVE PAVING AT REAR COURTYARD 2 BROKEN AND DEFECTIVE CRACKED BRICKWORK AT RETAINING W$5,000
1992-04-07DOB violation LL1081: 2
1991
1991-12-02DOB complaint, category ?
1991-10-28DOB complaint, category ?
1991-08-07ECB Non-Hazardous violation: FAILURE TO MAINTAIN: 1 EXTERIOR BRICKWALL AT NORTH BULKHEAD IS CRACKED & DEFECTIVE 2 PARAPETS AT N/W & S/W DEFECTIVE & OUT OF PLUM$720
1991-08-07ECB Non-Hazardous violation: 1 BROKEN & DEFECTIVE PAVING AT NORTH AND SOUTH COURTYARD 2 CRACKED & BROKEN RETAINING WALL AT REAR OF COURTYARD. # METAL STAIRS FR$720
1991-04-25DOB violation LL1081: 2
1990
1990-08-20ECB Non-Hazardous violation: BROKEN DEFECTIVE PAVING AT THE NORTH AND SOUTH COURTYARD BROKEN AND DEFECTIVE CRACK BRICKWORK RETAINING WALL YARD AT REAR OF PRE$3,400
1990-06-29DOB violation LL1081: 2
1990-05-02ECB Unknown violation: FAILURE TO MAINTAIN DEFECTS ARE BROKEN BULGING AND DEFECTIVE PAVING ATTHE NORTH AND SOUTH COURT YARD, BROKEN CRACKS AND DEFECTIVE $720
1990-03-07ECB Non-Hazardous violation: FAILURE TO MAINTAIN. BROKEN AND BULDGING AND DEFECTIVE PAVING AT THE NORTH COURT YARD AND SOUTH COURT YARD. REMEDY: REPAIR BROK$500
1990-01-02ECB Non-Hazardous violation: BROKEN BULGING AND DEFECTIVE PAVING AT THE NORTH AND SOUTH COURT YARD.BROKEN AND DEFECTIVE BRICKWORK AT RETAINING WALL AT REAR OF $625
1989
1989-11-08ECB Unknown violation: BROKEN BULGING AND DEFECTIVE PAVING AT THE NORTH EAST AND SOUTH COURT YARD BROKEN CRACK AND DEFECTIVE BRICK WORK AT NORTHW ALL ALS$500
1989-10-12DOB violation LL1081: 2
1989-09-12ECB Non-Hazardous violation: BROKEN BULGING & DEFECTIVE PAVING NORTH EAST AND SOUTH COURT YARD BROKEN DEFECTIVE & CRACK BRICK WORK RETAINING WALL AT REAR EAST $1,250
1989-08-02ECB Hazardous violation: BROKEN BULGING AND DEFECTIVE PAVING AT THE NORTH AND SOUT COURT YARD CRACK BRICKWORK RETAINING WALL AT REAR YARD CRACK DEVELOPE AT$1,000
1989-07-21DOB violation E:
1989-07-06ECB Non-Hazardous violation: FAILURE TO MAINTAIN DEFECTS ARE BROKEN BULDGING AND DEFECTIVE PAVING AT THE NORTH & SOUTH COURT YARD BROKEN DEFECTIVE CRACK BRICKW$625
1989-05-01ECB Hazardous violation: FAILURE TO MAINTAIN DEFECTS ARE BROKEN BULGING AND DEFECTIVE PAVIND AT THE NORTH COURNT YARD CRACK BRICK WORK RETAINTING WALL AT R$625
1989-03-07ECB Non-Hazardous violation: FAILING TO MAINTAIN BROKEN BULDGING DEFECTIVE PARING AT NORTH COURT SOUTH COURT AND YARD. BROKEN AND DEFECTIVE CRACKED BRICK RETAI$1,000
1989-03-07ECB Non-Hazardous violation: FAILING TO MAINTAIN ROOF-LEVEL NORTH BULKHEAD EXTERIOR BRICK WALL IS CRACKED, EXTERIOR + INTERIOR BLDG. OUT OF PLUMB. PARAPETS+DEC$1,000
1989-02-15ECB Hazardous violation: FAILURE TO MAINTAIN HAZARDOUS METAL STIAR FROM 1 STY TO NORTH COURT YARD TREAD SUPPORTS AND BOLTS CORRODED RUSWTY & DEFECTIVE THRO$1,000
1988
1988-12-28ECB Non-Hazardous violation: FAILING TO MAINTAIN METAL STAIRS AND PLATFORM FROM 1 STORY TO COURTYARD AT NORTHWEST EXTERIOR FO PREMISES TREAD SUPPORTS AND BOLTS$500
1988-10-26ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR METAL STAIR BROKEN DEFECTIVE & LOOSE TREADS MISSING HAND RAIL AT PLATFORM NORTH COURTYARD 2 PAVING A$625
1988-09-29DOB violation E:
1988-09-29DOB violation E: (51)PERFORM 5 YEAT TEST (52)REPAIR LIGHT IN CAR
1988-09-28ECB Hazardous violation: SIDEWALK SHED ERECTED IN FRONT PREMISES APPROXIMATELY 50' IN LENGTH REMEDY: OBTAIN A PERMIT OR REMOVE SHED.
1988-09-28ECB Non-Hazardous violation: FAILURE TO MAINTAIN. REMEDY: PROVIDE IMMEDIATE SHORING THAT WILL PREVENT ADDITIONAL COLLAPSE OF STAIRS.$1,000
1988-07-21ECB Non-Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BLDG. WALL DEFECT BRICK WORK CRACKED, LOOSE SPALLING OVER THE 1ST STORY NORTH WEST CORNER WINDOW RE$250
1988-06-22ECB Hazardous violation: FAILING TO MAINTAIN BROKEN BULGING DEFECTIVE PAUING AT NORTH COURT, SOUTH COURT & YARD. 2 BROKEN DEFECTIVE & CRACKED BRICKWORK RET$625
1988-06-22ECB Non-Hazardous violation: FAILURE TO PROVIDE & MAINTAIN METAL STAIRS AND PLATFORM FRON 1 ST DOWN TO REAR COURT YARD METAL STEP TREADS SUPPPORT AND BOLTS DET$500
1988-06-22ECB Hazardous violation: FAILURE TO MAINTAIN ROOF LEVEL AT NORTH BULK HEAD EXTERIOR BRICK WALL IS CRACKED DEFECTIVE INTERIOR & EXTERIOR BULDGING AND OUT OF$625