Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

136 East 79 Street · Manhattan · BBL 1014130057 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

Where the penalty points come from

ComponentWhat it coversPoints
Housing codeHPD violations by class, complaints, emergency repairs, litigation, vacate orders, AEP0
Structural & safetyDOB violations, ECB/OATH violations by class14
PestsBedbug filings, failed rodent inspections, rodent 311s0
DisplacementMarshal evictions executed0
GRADE A

The city's published records show little recorded distress here in the last three years. Less recorded distress than 73% of 25-99-unit residential buildings citywide. The citywide median for 25-99-unit residential buildings is 23.6 penalty points per 10 units; this building carries 5.4. In ZIP 10075, 82% of residential buildings hold an A and 2% grade D or F. How grades work

this building
A
B
C

Among 17,252 25-99-unit residential buildings citywide · left is less recorded distress, right is more

Open with the city right now

No current HPD flags in the latest weekly snapshot: no open violations, no pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.

Patterns

No heat or hot-water complaints in the last three years.

No bedbug-infested units reported in the last three years of filings.

$1,280 in enforcement penalties imposed (ECB/OATH) in the last three years.

What 311 hears from this address

7 service requests in the last three years. Most common: Sidewalk Condition (2) · Missed Collection (2) · Illegal Parking (1) · Curb Condition (1) · Air Quality (1).

Filed construction activity

$4,471,587 in permitted construction work filed since 2016 (34 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

Rent-stabilization signals

YesBuilt before 1974 (1929)
YesSix or more residential units (26)
No421-a / J-51 tax benefit on the current tax roll

2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit: request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).

Registered with HPD — the names behind the building

Registered owner(s)136 EAST 79TH CORP
Head officerJANET ROMAN
Managing agentBROWN HARRIS STEVENS
Last registered2025-09-16

as filed by the owner in the building's HPD registration

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$29,052,000 $13,073,400
2026$31,009,000 $13,954,050
2027$31,328,000 $14,097,600

The city's market estimate has risen 8% between tax years 2025 and 2027.

For property tax, the Department of Finance values this co-op as if it were a rental building. Its 2022 estimate: gross income $5,639,278 a year ($52.59 per sq ft), operating expenses $2,086,715 ($19.46 per sq ft), net operating income $3,552,563. These are the city's estimates from comparable rentals, not the building's actual budget, rents or maintenance charges.

Building systems

Energy grade (LL33)D — ENERGY STAR score 13/100, posted at the entrance by law (2022 disclosure cycle)
Heating fuelNO2FUEL
Facade (Local Law 11)SWARMP — "Safe With A Repair and Maintenance Program": known facade conditions that must be repaired (cycle 9)

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Not in a hurricane evacuation zone.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

No street-flooding or sewer-backup complaints on record at this address.

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

Subway77 St — 6 · 450 ft straight-line (about a 2-minute walk) · station accessibility: none
86 St — Q · 0.4 mi straight-line (about a 9-minute walk) · station accessibility: full
BusNearest boarding stop: Lexington Av / E 79 St — M98 M101 M102 M103 · 100 ft
Citi BikeE 77 St & 3 Ave · 650 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: P.S. 006 Lillie D. Blake
Middle: J.H.S. 167 Robert F. Wagner. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

136 East 79 Street

Heat or hot waterHeat or hot water
Apartment maintenanceApartment maintenance
Bed bugsBed bugs
Residential pestsResidential pests
Rats or miceRats or mice
Anything elseAnything else

7 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

The landlord's report card

Managed by BROWN HARRIS STEVENS — 160 buildings, 9,488 units. Grades across the portfolio: A156 · B1 · C1. See the whole portfolio

BuildingBoroughUnitsGrade
60 Sutton Place South MN367 A
1296 2 Avenue MN289 A
15 Central Park West MN229 A
48 East 89 Street MN210 A
1965 Broadway MN205 A
422 East 72 Street MN197 A
445 5 Avenue MN174 A
250 East 54 Street MN174 A
880 5 Avenue MN162 A
180 East End Avenue MN159 A
605 East 82 Street MN159 A
1197 Park Avenue MN148 A
235 East 87 Street MN139 A
145 Central Park West MN138 A
1 Beekman Place MN136 A
31 East 37 Street MN131 A
2 Sutton Place South MN127 A
35 Sutton Place MN127 A
263 West End Avenue MN124 A
205 West 57 Street MN115 A
1498 York Avenue MN112 A
420 East 51 Street MN110 A
1761 1 Avenue MN110 A
505 Greenwich Street MN102 A
681 Madison Avenue MN100 A
201 East 80 Street MN100 A
1150 3 Avenue MN96 A
7 Lexington Avenue MN93 A
14 Sutton Place South MN93 A
111 East 67 Street MN90 A
1050 5 Avenue MN90 A
20 Sutton Place South MN88 A
50 United Nations Plaza MN88 A
1150 Park Avenue MN85 A
239 Central Park West MN84 A
8 East 83 Street MN84 A
23 East 74 Street MN83 A
785 Park Avenue MN80 A
962 5 Avenue MN77 A
1 East 66 Street MN77 A
188 East 76 Street MN73 A
907 5 Avenue MN71 A
1095 Park Avenue MN68 A
1000 Park Avenue MN66 A
92 Laight Street MN65 A
826 Lexington Avenue MN65 A
610 Park Avenue MN64 A
1215 5 Avenue MN62 A
433 East 57 Street MN62 A
317 East 57 Street MN62 A
1289 Lexington Avenue MN61 A
1170 5 Avenue MN60 A
114 East 66 Street MN58 A
1115 Madison Avenue MN57 A
1080 5 Avenue MN57 A
30 Sutton Place MN56 A
470 Park Avenue MN56 A
2 East 98 Street MN54 A
1020 Park Avenue MN54 A
275 West 10 Street MN54 A

showing 60 of 160 buildings

Sales, deeds & mortgages

Most recent mortgage recorded against this lot: $256,057 on 2020-01-15 (lender: The Bank Of New York Mellon). Face amount at recording — it may have since been paid down, refinanced or satisfied. View the recorded document.

DateRecordAmountPer res. unit
2026-04-14RPTT&RET $3,680,000 — from JOHNSON, THOMAS S; JOHNSON, MARGARET ANN to DIAZ, MICHAEL; DIAZ, SAMANTHA $3,680,000
2026-04-01RPTT&RET $4,600,000 — from DENEUFVILLE, PETER BAYON; BAKER, JOANNA JOHNSON to LEVINE, MAX JONATHAN; TEMEL, ERICA LEE $4,600,000
2026-03-30Sold for $3,680,000 $3,680,000 $141,538
2026-03-26Sold for $4,600,000 $4,600,000 $176,923
2026-03-19RPTT&RET $2,050,000 — from SARAH E. MARSHALL, EXECUTOR; THE ESTATE OF ALTON G. MARSHALL to RASTODER, ILDA; BRUUN, ERIC $2,050,000
2026-03-05Sold for $2,050,000 $2,050,000 $78,846
2026-02-03RPTT&RET $5,600,000 — from DURKIN, KRISTEN G; DURKIN, CHARLES P III to OSHMAN, STEPHEN; HOLLENDER, MEIKA $5,600,000
2026-01-30Sold for $5,600,000 $5,600,000 $215,385
2025-09-11RPTT&RET $9,900,000 — from ZARO, LOIS R; ZARO, ANDREW to LEMBO, MATTHEW; LEMBO, EMILY $9,900,000
2025-08-27Sold for $9,900,000 $9,900,000 $380,769
2025-08-13RPTT&RET $3,650,000 — from DAHLIA DAMAS, ADMINISTRATOR; ESTATE OF LILA MEREDITH to LOCHIATTO, JENNA; CROWLEY, ZACHARY; LOCHIATTO, KENNETH $3,650,000
2025-08-01Sold for $3,650,000 $3,650,000 $140,385
2025-06-05RPTT&RET $4,750,000 — from NIEHAUS, JOHN; NIEHAUS, DIANA to TRETHAWAY, HALEY O'BRIEN; TRETHAWAY, PAUL WU $4,750,000
2025-06-02Sold for $4,750,000 $4,750,000 $182,692
2025-02-14RPTT&RET $2,000,000 — from LAURENCE F. WHITTEMORE III, AS EXECUTOR; EDWARD B. WHITTEMORE, AS EXECUTOR; ESTATE OF FRED to DAHLBACK, HENRIK; DAHLBACK, BRITA $2,000,000

Ten-year activity

100500
2017
2018
2019
2020
2021
2022
2023
2024
2025
67
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
2017001247
20185210412
2019102047
20203023311
20218612118
202210024016
20230414211
20244450417
20251903131752
20264301111267
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 70 records

DateRecord
2026-10-13Permit Supported Scaffold — Permit Issued
2026-10-12Job filed: Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress a
2026-10-08Permit Mechanical Systems — Permit Issued
2026-10-05Permit Structural — Permit Issued
2026-10-05Permit General Construction — Permit Issued
2026-10-05Permit General Construction — Permit Issued
2026-10-05Permit Structural — Permit Issued
2026-09-21Permit Plumbing — Permit Issued
2026-08-04Job filed: Renovation of the of an existing apartment#8A on the 8th floor. Work includes non-structural demolition, general construction and new opening as per p
2026-07-29Permit General Construction — Permit Issued
2026-07-28Permit Protection and Mechanical Methods — Permit Issued
2026-07-28Permit Protection and Mechanical Methods — Permit Issued
2026-07-28Permit Protection and Mechanical Methods — Permit Issued
2026-07-27Job filed: Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/o
2026-07-21Job filed: INSTALLATION OF A SUSPENDED SCAFFOLD FOR FACADE INSPECTION AND REPAIR AS PER PLAN SUBMITTED
2026-07-10311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2026-07-06Asbestos abatement: Removal — Setanta Inc.
2026-07-06Asbestos abatement: Removal — Setanta Inc.
2026-07-06Asbestos abatement: Removal — Setanta Inc.
2026-06-23Permit Mechanical Systems — Permit Issued
2026-06-23Permit Plumbing — Permit Issued
2026-06-22RPTT&RET — from DAHLBACK, BRITA; DAHLBACK, HENRIK to DAHLBACK, AS TRUSTEE, CLAES HENRIK GUSTA; DAHLBACK, AS TRUSTEE, BRITA MARIA BERGH; BRITA M
2026-06-22RPTT&RET — from DAHLBACK, BRITA; DAHLBACK, HENRIK to DAHLBACK, AS TRUSTEE, CLAES HENRIK GUSTA; DAHLBACK, AS TRUSTEE, BRITA MARIA BERGH; BRITA M
2026-06-22Job filed: Plumbing work filed in conjunction with apartment #4B renovation.
2026-06-22Job filed: Mechanical work file in conjunction with apartment # 4B renovation.
2026-06-17Job filed: Exterior work modification of existing openings and one window replacement. No change to use, egress or occupancy.
2026-06-16Permit Suspended Scaffold — Permit Issued
2026-06-16Permit Suspended Scaffold — Permit Issued
2026-06-09Deed transfer (nominal price)
2026-06-05Permit General Construction — Permit Issued
2026-06-04Job filed: INSTALLATION OF A SUSPENDED SCAFFOLD FOR FACADE INSPECTION AND REPAIR AS PER PLAN SUBMITTED
2026-05-27Job filed: Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, eg
2026-05-21Asbestos abatement: Removal — Microtech Contracting Corp.
2026-05-21Asbestos abatement: Removal — Microtech Contracting Corp.
2026-05-21Asbestos abatement: Removal — Microtech Contracting Corp.
2026-05-21Asbestos abatement: Removal — Microtech Contracting Corp.
2026-05-15Permit Structural — Signed-off
2026-05-15Permit General Construction — Signed-off
2026-04-29Asbestos abatement: Removal — Setanta Inc.
2026-04-29Asbestos abatement: Removal — Setanta Inc.
2026-04-29Asbestos abatement: Removal — Setanta Inc.
2026-04-24Job filed: Renovation of the of an existing apartment#4B on the 4th floor. Work includes non-structural demolition and general construction as per plans filed h
2026-04-23Permit Plumbing — Permit Issued
2026-04-22Permit Mechanical Systems — Permit Issued
2026-04-22Permit Mechanical Systems — Permit Issued
2026-04-22Job filed: Mechanical work as shown on plans for Apt 6B.
2026-04-21Permit General Construction — Permit Issued
2026-04-21Permit General Construction — Permit Issued
2026-04-14RPTT&RET $3,680,000 — from JOHNSON, THOMAS S; JOHNSON, MARGARET ANN to DIAZ, MICHAEL; DIAZ, SAMANTHA
2026-04-01RPTT&RET $4,600,000 — from DENEUFVILLE, PETER BAYON; BAKER, JOANNA JOHNSON to LEVINE, MAX JONATHAN; TEMEL, ERICA LEE
2026-03-30Sold for $3,680,000
2026-03-26Sold for $4,600,000
2026-03-19RPTT&RET $2,050,000 — from SARAH E. MARSHALL, EXECUTOR; THE ESTATE OF ALTON G. MARSHALL to RASTODER, ILDA; BRUUN, ERIC
2026-03-05Sold for $2,050,000
2026-02-23Job filed: MASONRY AND FACADE RESTORATION AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2026-02-03RPTT&RET $5,600,000 — from DURKIN, KRISTEN G; DURKIN, CHARLES P III to OSHMAN, STEPHEN; HOLLENDER, MEIKA
2026-01-30Sold for $5,600,000
2026-01-30Job filed: Mechanical work filed in conjunction with apartment renovation on the 8th Floor.
2026-01-30Job filed: Renovation of the of an existing apartment#8A on the 8th floor. Work includes non-structural demolition, general construction and new opening as per p
2026-01-30Job filed: Plumbing word filing in conjunction of apartment #8A renovation
2026-01-23Permit Sidewalk Shed — Permit Issued
2026-01-23Permit Sidewalk Shed — Permit Issued
2026-01-23Permit Sidewalk Shed — Permit Issued
2026-01-23Permit Sidewalk Shed — Permit Issued
2026-01-20Job filed: Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, eg
2026-01-13Boiler inspection
2026-01-13Boiler inspection
2025-12-30Bedbug filing: 0 infested units
2025-12-19Permit Suspended Scaffold — Permit Issued
2025-12-17Job filed: INSTALLATION OF A SUSPENDED SCAFFOLD FOR FACADE REPAIR/INSPECTION AS PER PLAN SUBMITTED.

The full timeline

2026
2026-10-13Permit Supported Scaffold — Permit Issued
2026-10-12Job filed: Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress a$5,000
2026-10-08Permit Mechanical Systems — Permit Issued
2026-10-05Permit Structural — Permit Issued
2026-10-05Permit General Construction — Permit Issued
2026-10-05Permit General Construction — Permit Issued
2026-10-05Permit Structural — Permit Issued
2026-09-21Permit Plumbing — Permit Issued
2026-08-04Job filed: Renovation of the of an existing apartment#8A on the 8th floor. Work includes non-structural demolition, general construction and new opening as per p$285,000
2026-07-29Permit General Construction — Permit Issued
2026-07-28Permit Protection and Mechanical Methods — Permit Issued
2026-07-28Permit Protection and Mechanical Methods — Permit Issued
2026-07-28Permit Protection and Mechanical Methods — Permit Issued
2026-07-27Job filed: Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/o$3,000
2026-07-21Job filed: INSTALLATION OF A SUSPENDED SCAFFOLD FOR FACADE INSPECTION AND REPAIR AS PER PLAN SUBMITTED
2026-07-10311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2026-07-06Asbestos abatement: Removal — Setanta Inc.
2026-07-06Asbestos abatement: Removal — Setanta Inc.
2026-07-06Asbestos abatement: Removal — Setanta Inc.
2026-06-23Permit Mechanical Systems — Permit Issued
2026-06-23Permit Plumbing — Permit Issued
2026-06-22RPTT&RET — from DAHLBACK, BRITA; DAHLBACK, HENRIK to DAHLBACK, AS TRUSTEE, CLAES HENRIK GUSTA; DAHLBACK, AS TRUSTEE, BRITA MARIA BERGH; BRITA M
2026-06-22RPTT&RET — from DAHLBACK, BRITA; DAHLBACK, HENRIK to DAHLBACK, AS TRUSTEE, CLAES HENRIK GUSTA; DAHLBACK, AS TRUSTEE, BRITA MARIA BERGH; BRITA M
2026-06-22Job filed: Plumbing work filed in conjunction with apartment #4B renovation.$72,000
2026-06-22Job filed: Mechanical work file in conjunction with apartment # 4B renovation.$150,000
2026-06-17Job filed: Exterior work modification of existing openings and one window replacement. No change to use, egress or occupancy.$50,000
2026-06-16Permit Suspended Scaffold — Permit Issued
2026-06-16Permit Suspended Scaffold — Permit Issued
2026-06-09Deed transfer (nominal price)
2026-06-05Permit General Construction — Permit Issued
2026-06-04Job filed: INSTALLATION OF A SUSPENDED SCAFFOLD FOR FACADE INSPECTION AND REPAIR AS PER PLAN SUBMITTED
2026-05-27Job filed: Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, eg$3,750
2026-05-21Asbestos abatement: Removal — Microtech Contracting Corp.
2026-05-21Asbestos abatement: Removal — Microtech Contracting Corp.
2026-05-21Asbestos abatement: Removal — Microtech Contracting Corp.
2026-05-21Asbestos abatement: Removal — Microtech Contracting Corp.
2026-05-15Permit Structural — Signed-off
2026-05-15Permit General Construction — Signed-off
2026-04-29Asbestos abatement: Removal — Setanta Inc.
2026-04-29Asbestos abatement: Removal — Setanta Inc.
2026-04-29Asbestos abatement: Removal — Setanta Inc.
2026-04-24Job filed: Renovation of the of an existing apartment#4B on the 4th floor. Work includes non-structural demolition and general construction as per plans filed h$245,000
2026-04-23Permit Plumbing — Permit Issued
2026-04-22Permit Mechanical Systems — Permit Issued
2026-04-22Permit Mechanical Systems — Permit Issued
2026-04-22Job filed: Mechanical work as shown on plans for Apt 6B.$60,000
2026-04-21Permit General Construction — Permit Issued
2026-04-21Permit General Construction — Permit Issued
2026-04-14RPTT&RET $3,680,000 — from JOHNSON, THOMAS S; JOHNSON, MARGARET ANN to DIAZ, MICHAEL; DIAZ, SAMANTHA$3,680,000
2026-04-01RPTT&RET $4,600,000 — from DENEUFVILLE, PETER BAYON; BAKER, JOANNA JOHNSON to LEVINE, MAX JONATHAN; TEMEL, ERICA LEE$4,600,000
2026-03-30Sold for $3,680,000$3,680,000
2026-03-26Sold for $4,600,000$4,600,000
2026-03-19RPTT&RET $2,050,000 — from SARAH E. MARSHALL, EXECUTOR; THE ESTATE OF ALTON G. MARSHALL to RASTODER, ILDA; BRUUN, ERIC$2,050,000
2026-03-05Sold for $2,050,000$2,050,000
2026-02-23Job filed: MASONRY AND FACADE RESTORATION AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$188,415
2026-02-03RPTT&RET $5,600,000 — from DURKIN, KRISTEN G; DURKIN, CHARLES P III to OSHMAN, STEPHEN; HOLLENDER, MEIKA$5,600,000
2026-01-30Sold for $5,600,000$5,600,000
2026-01-30Job filed: Mechanical work filed in conjunction with apartment renovation on the 8th Floor.$150,000
2026-01-30Job filed: Renovation of the of an existing apartment#8A on the 8th floor. Work includes non-structural demolition, general construction and new opening as per p$285,000
2026-01-30Job filed: Plumbing word filing in conjunction of apartment #8A renovation$80,000
2026-01-23Permit Sidewalk Shed — Permit Issued
2026-01-23Permit Sidewalk Shed — Permit Issued
2026-01-23Permit Sidewalk Shed — Permit Issued
2026-01-23Permit Sidewalk Shed — Permit Issued
2026-01-20Job filed: Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, eg$3,750
2026-01-13Boiler inspection
2026-01-13Boiler inspection
2025
2025-12-30Bedbug filing: 0 infested units
2025-12-19Permit Suspended Scaffold — Permit Issued
2025-12-17Job filed: INSTALLATION OF A SUSPENDED SCAFFOLD FOR FACADE REPAIR/INSPECTION AS PER PLAN SUBMITTED.
2025-09-11RPTT&RET $9,900,000 — from ZARO, LOIS R; ZARO, ANDREW to LEMBO, MATTHEW; LEMBO, EMILY$9,900,000
2025-08-27Sold for $9,900,000$9,900,000
2025-08-13RPTT&RET $3,650,000 — from DAHLIA DAMAS, ADMINISTRATOR; ESTATE OF LILA MEREDITH to LOCHIATTO, JENNA; CROWLEY, ZACHARY; LOCHIATTO, KENNETH$3,650,000
2025-08-07Job filed: Renovation of apt. 6A to include removal and installation of partitions, doors, flooring and finishes. Bricking up of an existing exterior opening. Ex$400,000
2025-08-04Asbestos abatement: Removal — A&G Restoration Services Inc
2025-08-04Asbestos abatement: Removal — A&G Restoration Services Inc
2025-08-04Asbestos abatement: Removal — A&G Restoration Services Inc
2025-08-04Asbestos abatement: Removal — A&G Restoration Services Inc
2025-08-04Asbestos abatement: Removal — A&G Restoration Services Inc
2025-08-04Asbestos abatement: Removal — A&G Restoration Services Inc
2025-08-04Asbestos abatement: Removal — A&G Restoration Services Inc
2025-08-01Sold for $3,650,000$3,650,000
2025-07-30Job filed: Plumbing modifications for renovation of apt. 6A. No change to use, egress or occupancy is involved.$48,000
2025-07-30Job filed: Replace and modify heating/cooling/ventilation system in apt. 6A. New AC split system, new radiators and new floor heating system.$64,000
2025-07-18Asbestos abatement: Removal — New York Insulation, Inc.
2025-07-18Asbestos abatement: Removal — New York Insulation, Inc.
2025-07-18Asbestos abatement: Removal — New York Insulation, Inc.
2025-07-18Asbestos abatement: Removal — New York Insulation, Inc.
2025-07-18Asbestos abatement: Removal — New York Insulation, Inc.
2025-07-18Asbestos abatement: Removal — New York Insulation, Inc.
2025-07-18Asbestos abatement: Removal — New York Insulation, Inc.
2025-06-24RPTT&RET — from BOVIN, TERRY to TERRY BOVIN AS TRUSTEE; TERRY BOVIN 2022 REVOCABLE TRUST
2025-06-12Permit Plumbing — Signed-off
2025-06-11Permit General Construction — Signed-off
2025-06-11Permit Structural — Signed-off
2025-06-10Permit Mechanical Systems — Signed-off
2025-06-09Deed transfer (nominal price)
2025-06-05RPTT&RET $4,750,000 — from NIEHAUS, JOHN; NIEHAUS, DIANA to TRETHAWAY, HALEY O'BRIEN; TRETHAWAY, PAUL WU$4,750,000
2025-06-02Sold for $4,750,000$4,750,000
2025-06-02Permit Mechanical Systems — Permit Issued
2025-06-02Permit Plumbing — Permit Issued
2025-05-28Permit General Construction — Permit Issued
2025-04-18Job filed: Mechanical work as shown on plans for Apt 6B.$60,000
2025-04-18Job filed: Plumbing work as shown on plans for Apt 6B$69,992
2025-04-18Job filed: Work in includes interior and exterior general construction work in Apt 6b, as well as partial demolition to create openings for mechanical units in t$200,012
2025-04-10Asbestos abatement: Removal — A&G Restoration Services Inc
2025-03-27Job filed: Replace and modify heating/cooling/ventilation system in apt. 6A. New AC split system, new radiators and new floor heating system.$64,000
2025-03-27Job filed: Plumbing modifications for renovation of apt. 6A. No change to use, egress or occupancy is involved.$48,000
2025-03-26Job filed: Renovation of apt. 6A to include removal and installation of partitions, doors, flooring and finishes. Bricking up of an existing exterior opening. Ex$400,000
2025-02-18Job filed: INSTALLATION OF MECHANICAL SYSTEMS IN APARTMENT 5B ON THE FIFTH FLOOR. NO CHANGE IN USE EGRESS OR OCCUPANCY.$30,000
2025-02-14RPTT&RET $2,000,000 — from LAURENCE F. WHITTEMORE III, AS EXECUTOR; EDWARD B. WHITTEMORE, AS EXECUTOR; ESTATE OF FRED to DAHLBACK, HENRIK; DAHLBACK, BRITA$2,000,000
2025-02-14RPTT&RET $2,000,000 — from LAURENCE F. WHITTEMORE III, AS EXECUTOR; EDWARD B. WHITTEMORE, AS EXECUTOR; ESTATE OF FRED to DAHLBACK, HENRIK; DAHLBACK, BRITA$2,000,000
2025-02-14RPTT&RET $3,862,500 — from EDWARD B. WHITTEMORE, AS EXECUTOR; ESTATE OF FREDERICK B. WHITTEMORE; LAURENCE F. WHITTEMO to NELSON, MITCHELL J; NELSON, LESLIE M$3,862,500
2025-02-06Sold for $3,862,500$3,862,500
2025-02-03Sold for $2,000,000$2,000,000
2025-01-09311: Missed Collection — Recycling - Metal/Glass/Rigid Plastic
2025-01-09311: Missed Collection — Bulky Recycling
2025-01-07Boiler inspection
2025-01-07Boiler inspection
2024
2024-12-23Bedbug filing: 0 infested units
2024-10-06311: Curb Condition — Broken Curb
2024-10-06311: Sidewalk Condition — Broken Sidewalk
2024-07-28311: Illegal Parking — Posted Parking Sign Violation
2024-06-20Permit Structural — Signed-off
2024-06-18ECB CLASS - 2 violation: FAILURE TO MAINTAIN BUILDING EXTERIOR FACADE AND APPURTENANCES.-NOTE AT TIME OF INSPECTION, I OBSERVED VERTICAL CRACKED BRICK AT M
2024-06-17Permit Mechanical Systems — Signed-off
2024-06-12DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2024-05-15ECB CLASS - 2 violation: FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS #35548855R ISSUED ON 2/24/2021, AND FAILURE TO FILE A CERTIFICATE$1,280
2024-05-08311: Sidewalk Condition — Broken Sidewalk
2024-05-08Job filed: STRUCTURAL FRAMING FOR NEW THRU WALL MECHANICAL UNIT IN APARTMENT 5B ON THE 5TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCPANCY.$28,943
2024-05-07Job filed: INSTALLATION OF MECHANICAL SYSTEMS IN APARTMENT 5B ON THE FIFTH FLOOR. NO CHANGE IN USE EGRESS OR OCCUPANCY.$30,000
2024-04-15Boiler inspection
2024-04-15Boiler inspection
2024-03-20ECB CLASS - 1 violation: FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES.AT THE TIME OF INSPECTION I OBSERVED AT EXP#3 SOUTH ELEVATION BROKE
2024-03-14Air permit (REGISTRATION INSPECTION), fuel: NO2FUEL
2024-01-30Facade (LL11) filing, cycle 9: SWARMP
2023
2023-12-30Bedbug filing: 0 infested units
2023-10-20RPTT&RET $4,050,000 — from BARON HERSHEY, MARCIA to BOVIN, TERRY$4,050,000
2023-10-13Sold for $4,050,000$4,050,000
2023-08-21Boiler inspection
2023-08-21Boiler inspection
2023-06-30DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
2023-06-30DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
2023-05-31RPTT&RET $1,225,000 — from SCHOENHOF, GRETCHEN to GONZALEZ- BUNSTER, MATIAS; GONZALEZ- BUNSTER, ROLANDO$1,225,000
2023-05-23Sold for $1,225,000$1,225,000
2023-04-25DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
2023-04-25DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
2022
2022-12-30Bedbug filing: 0 infested units
2022-08-01RPTT&RET $4,750,000 — from RILEY, ELLEN C; RILEY, JAMES P JR to NIEHAUS, DIANA; NIEHAUS, JOHN$4,750,000
2022-07-20Sold for $4,750,000$4,750,000
2022-07-06Permit Sidewalk Shed — Signed-off
2022-07-06Permit Supported Scaffold — Signed-off
2022-07-01RPTT&RET $4,500,000 — from RILEY, JAMES P JR; RILEY, ELLEN C to BARR, LESLIE; PERLE, RICHARD$4,500,000
2022-06-21Sold for $4,500,000$4,500,000
2022-03-15Permit Supported Scaffold — Signed-off
2022-03-15Permit Sidewalk Shed — Signed-off
2022-03-14Permit Sidewalk Shed — Signed-off
2022-03-14Permit Supported Scaffold — Signed-off
2022-03-09Permit Plumbing — Signed-off
2022-02-18Permit General Construction — Signed-off
2022-02-02Job filed: CONNECT GAS COOKTOP ON EXISTING ROUGHING AS PER PLANS TO SEPARATE APTS. 10A & 10B PREVIOUSLY COMBINED UNDER DOB APPLICATION#: 120760042. GC WORK FILED$10,000
2022-02-02Job filed: INFILL OPENING BETWEEN APARTMENTS 10A & 10B TO RE-CREATE TWO SEPARATE APARTMENTS PREVIOUSLY COMBINED UNDER DOB APPLICATION#: 120760042. NO CHANGE IN U$10,000
2022-01-12311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021
2021-12-30Bedbug filing: 0 infested units
2021-12-15RPTT&RET — from GRETCHEN SCHOENHOF, EXECUTOR; ESTATE OF EUGENE P. GRISANTI; CRISTOPHER GRISANTI, EXECUTOR to SCHOENHOF, GRETCHEN
2021-10-22Deed transfer (nominal price)
2021-07-21DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2021-05-13ECB CLASS - 2 violation: FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES.NOTE ATTIME OF INSPECTION OBSERVED A 1)ROOF CRACKED BROKEN STONE CA
2021-04-21Permit General Construction — Signed-off
2021-03-22Job filed: FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$266,685
2021-03-06Permit Supported Scaffold — Signed-off
2021-03-06Permit Sidewalk Shed — Signed-off
2021-02-24Facade (LL11) filing, cycle 8: SWARMP
2021-02-24ECB CLASS - 2 violation: FAILURE TO MAINTAIN EXTERIOR BLDG&APPURTENANCES I OBSERVED FOLLOWING CONDITIONS (1)OPEN MORTAR JOINTS@LEVEL15PH TERR EXP1,4,3 (2)S
2021-02-24ECB CLASS - 1 violation: 103-04 OWNER FAILED TO REPAIR (1)CRACKED COPINGS (2)SPALLED COPING (3)SPALLED BRICKS (4)CRACKED BRICKS (5)OPEN MORTAR JOINTS (6)CR
2021-02-24ECB CLASS - 2 violation: FAILURE TO MAINTAIN EXTERIOR BUILDING AND APPURTENANCES.I OBSERVED THEFOLLOWING CONDITIONS.1)OPEN MORTAR JOINTS AT PENTHOUSE TERRA$1,250
2021-02-24ECB CLASS - 1 violation: FAILED TO REPAIR DOCUMENTED CONDITIONS.1)CRACKED COPINGS 2)SPALLED COPING 3)SPALLED BRICK 4)CRACKED BRICK 5)OPEN MORTAR JOINTS 6)C
2021-02-18Permit Supported Scaffold — Signed-off
2021-02-18Permit Sidewalk Shed — Signed-off
2021-02-11Permit Supported Scaffold — Signed-off
2021-02-11Permit Sidewalk Shed — Signed-off
2020
2020-12-09Bedbug filing: 0 infested units
2020-11-30Permit Sidewalk Shed — Signed-off
2020-11-30Permit Supported Scaffold — Signed-off
2020-11-30Job filed: PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AT THE STREET LEVEL AND SUPPORTED SCAFFOLD AT ROOF LEVEL. WORK SHALL COMPLY WITH 2014 BUILDING CODE$20,000
2020-08-18Boiler inspection
2020-08-18Boiler inspection
2020-06-10311: Dead/Dying Tree — Planted More Than 2 Years Ago
2020-02-21Elevator permit: Door Lock Monitoring System.$5,850
2020-01-15AL&R $3,000,000 — from 136 EAST 79TH STREET CORPORATION to THE BANK OF NEW YORK MELLON$3,000,000
2020-01-15Agreement $3,000,000 — from 136 EAST 79TH STREET CORPORATION to THE BANK OF NEW YORK MELLON$3,000,000
2020-01-15Mortgage $256,057 — from 136 EAST 79TH STREET CORPORATION to THE BANK OF NEW YORK MELLON$256,057
2019
2019-12-24Bedbug filing: 0 infested units
2019-12-05Rodent inspection: Passed
2019-11-11Boiler inspection
2019-11-11Boiler inspection
2019-06-27Job filed: INTERIOR RENOVATION OF EXISTING 5TH FLOOR APARTMENT 5B. REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS, CEILING AND DOOR MODIFICATIONS, RELAT$351,440
2019-02-19Facade (LL11) filing, cycle 8: SWARMP
2019-01-30Bedbug filing: 0 infested units
2018
2018-12-13Rodent inspection: Passed
2018-10-25Boiler inspection
2018-10-25Boiler inspection
2018-08-17DOB violation E:
2018-08-17DOB violation E:
2018-06-28Permit PL — ISSUED
2018-06-28Permit EW — ISSUED
2018-06-25Job filed: FILING TO RENOVATE PENTHOUSE-B WITH NEW MILLWORK AND NEW BATHROOM FIXTURES. NO CHANGE IN OCCUPANCY, EGRESS, OR USE.$263,200
2018-06-25Job filed: FILING TO RENOVATE PENTHOUSE-B WITH NEW MILLWORK AND NEW BATHROOM FIXTURES. NO CHANGE IN OCCUPANCY, EGRESS, OR USE.$263,200
2018-06-25Job filed: FILING TO RENOVATE PENTHOUSE-B WITH NEW MILLWORK AND NEW BATHROOM FIXTURES. NO CHANGE IN OCCUPANCY, EGRESS, OR USE.$263,200
2018-04-25Rodent inspection: Passed
2018-04-13311: Street Condition — Pothole
2017
2017-11-20Boiler inspection
2017-11-20Boiler inspection
2017-09-15Rodent inspection: Passed
2017-04-28311: Street Condition — Failed Street Repair
2017-04-24RPTT&RET $4,516,750 — from HEIMOWITZ, DEBORAH; HEIMOWITZ, DANIEL to HASIOTIS, FOTIS G; HASIOTIS, DORIAN MAY$4,516,750
2017-04-21Rodent inspection: Passed
2017-04-12Sold for $4,516,750$4,516,750
2016
2016-10-25HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2016-10-10311: Street Condition — Pothole
2016-09-22Permit EW — ISSUED
2016-07-15Rodent inspection: Passed
2016-03-23Permit EW — ISSUED
2016-03-14Permit EQ — ISSUED
2016-03-13Job filed: ERECT TEMPORARY SIDEWALK SHED AS SHOWN ON PLANS. INSTALLATION SHALL COMPLY WITH BSA-351-74-SM, LL-33/91, CHAPTER 33 OF 2014 BC. NO CHANGE IN EGRESS, O
2016-01-14RPTT&RET — from ESTATE OF JAMES MEREDITH; MEREDITH, LILA; ALFREIDA B. KENNY, ADMINISTRATOR to MEREDITH, LILA
2015
2015-11-19Job filed: FACADE AND LEAK REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$118,150
2015-11-04AL&R $3,000,000 — from 136 EAST 79TH STREET CORPORATION to THE BANK OF NEW YORK MELLON; THE BANK OF NEW YORK$3,000,000
2015-11-04Agreement $3,000,000 — from 136 EAST 79TH STREET CORPORATION to THE BANK OF NEW YORK; THE BANK OF NEW YORK MELLON$3,000,000
2015-11-04Mortgage $1,275,000 — from 136 EAST 79TH STREET CORPORATION to THE BANK OF NEW YORK MELLON; THE BANK OF NEW YORK$1,275,000
2015-10-01HPD class I: SECTION27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE ?27-2097 AND IS THER
2015-09-30311: Water System — Leak (Use Comments) (WA2)
2015-08-26DOB violation E:
2015-08-26DOB violation E:
2015-08-10Permit PL — ISSUED
2015-08-10Permit EW — ISSUED
2015-08-10Job filed: REPLACE NEW LOW PRESSURE GAS SERVICE, GAS METER, GAS TRAIN, & ASSOCIATED PIPING AS PER CON EDISON. CONNECT NEW GAS SERVICE TO EXISTING COMBINATION$100,000
2015-07-03Permit EW — ISSUED
2015-07-02Permit EQ — ISSUED
2015-07-02Job filed: INSTALLATION OF NEW STAINLESS STEEL CHIMNEY LINER. ALL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$132,000
2015-07-02Job filed: INSTALLATION OF NEW STAINLESS STEEL CHIMNEY LINER. ALL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$132,000
2015-06-30Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2015-05-28311: Missed Collection (All Materials) — 1 Missed Collection
2014
2014-09-09Permit PL — ISSUED
2014-08-21DOB violation E:
2014-08-21DOB violation E:
2014-06-26Permit PL — ISSUED
2014-05-08Permit EW — ISSUED
2014-05-08Permit EW — ISSUED
2014-03-25Job filed: MODIFICATION OF EXISTING PLUMBING SYSTEM, INSTALLATION OF NEW AC SYSTEM AND EXHAUST VENTS FOR DRYER, BATHROOM AND KITCHEN HOOD. NO CHANGE IN USE, EGRE$196,000
2014-03-25Job filed: MODIFICATION OF EXISTING PLUMBING SYSTEM, INSTALLATION OF NEW AC SYSTEM AND EXHAUST VENTS FOR DRYER, BATHROOM AND KITCHEN HOOD. NO CHANGE IN USE, EGRE$196,000
2014-03-25Job filed: RENOVATION OF EXISTING CO-OP APARTMENT #11A. WORK TO INCLUDE NON-STRUCTURAL INTERIOR DEMOLITION, WINDOW REPLACEMENT AND GENERAL CONSTRUCTION, AS PER P$280,000
2013
2013-11-18311: Broken Muni Meter — Out of Order
2013-09-04DOB complaint, category ?
2013-08-08Permit EW — ISSUED
2013-08-08Permit EW — ISSUED
2013-07-05DOB violation E:
2013-07-05DOB violation E:
2013-07-01Permit PL — ISSUED
2013-06-17Permit EW — ISSUED
2013-06-17Permit EW — ISSUED
2013-06-14Job filed: INSTALL NEW MECHANICAL DUCTWORK ALONG WITH A/C UNITS. MODIFY PLUMBING FIXTURES AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN US$36,500
2013-06-14Job filed: INSTALL NEW MECHANICAL DUCTWORK ALONG WITH A/C UNITS. MODIFY PLUMBING FIXTURES AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN US$36,500
2013-06-14Job filed: DEMOLISH AND CONSTRUCT INTERIOR PARTITIONS, CEILINGS, DOORS, AND WINDOWS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$185,000
2013-05-29311: Illegal Parking — Double Parked Blocking Traffic
2013-03-30311: Taxi Complaint — Driver Complaint
2012
2012-12-26RPTT $4,830,000 — from KALLOP, ARTHUR GEORGE to BAYON DE NEUFVILLE, PETER; BAKER, JOANNA JOHNSON$4,830,000
2012-11-29RPTT&RET $4,550,000 — from DONN, ANTHONY; DONN, LINDA to DURKIN, KRISTEN G; DURKIN III, CHARLES P$4,550,000
2012-11-23Permit EW — ISSUED
2012-10-16Facade (LL11) filing, cycle 7: SWARMP
2012-10-16Job filed: REMOVE AND REPLACE CONCRETE SLAB ON GRADE IN REAR YARD AND RELATED WATERPROOFING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$51,000
2012-10-16Job filed: REMOVE AND REPLACE CONCRETE SLAB ON GRADE IN REAR YARD AND RELATED WATERPROOFING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$51,000
2012-07-17311: Water System — Fire Hydrant Emergency (FHE)
2012-07-17311: New Tree Request — For One Address
2012-07-02Rodent inspection: Passed
2012-05-17RPTT&RET $4,800,000 — from LANGNER, TRUSTEE, ELLEN V; ELLEN V. LANGNER REVOCABLE TRUST to RILEY, ELLEN C; RILEY, JAMES P JR.$4,800,000
2011
2011-12-06Rodent inspection: Passed
2011-11-02Permit EW — ISSUED
2011-11-02Permit EW — ISSUED
2011-08-05DOB violation E:
2011-08-05DOB violation E:
2011-07-27311: Non-Emergency Police Matter — Other (complaint details)
2011-07-26Permit PL — ISSUED
2011-07-22Permit PL — ISSUED
2011-07-20Rodent inspection: Passed
2011-07-19Permit EW — ISSUED
2011-07-19Permit EW — ISSUED
2011-07-15Job filed: HEREWITH FILE PLANS TO COMBINE APT.10A AND 10B. WORK TO INCLUDE REMOVAL OF INTERIOR PARTITIONS, DOORS, FIXTURES, SUSPENDED CEILINGS AND FLOOR FINISHES$32,376
2011-07-15Job filed: HEREWITH FILE PLANS TO COMBINE APT.10A AND 10B. WORK TO INCLUDE REMOVAL OF INTERIOR PARTITIONS, DOORS, FIXTURES, SUSPENDED CEILINGS AND FLOOR FINISHES$32,376
2011-07-15Job filed: HEREWITH FILE MECHANICAL AND PLUMBING PLANS IN CONJUNCTION WITH ARCHITECTURALS FILED TO COMBINE APTS. 10A AND 10B. NO CHANGE TO USE, EGRESS OR OCCUPA$83,000
2011-06-27311: Rodent — Condition Attracting Rodents
2011-06-22311: Vending — In Prohibited Area
2011-06-22Permit EW — ISSUED
2011-06-22Permit EW — ISSUED
2011-06-20311: Street Condition — Defective Hardware
2011-05-18Job filed: INTERIOR RENOVATION OF AN EXISTING APT, INCLUDING PARTITION CHANGES. MINOR PLUMBING AND MECHANICAL WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCU$289,200
2011-05-18Job filed: INTERIOR RENOVATION OF AN EXISTING APT, INCLUDING PARTITION CHANGES. MINOR PLUMBING AND MECHANICAL WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCU$289,200
2011-05-18Job filed: INTERIOR RENOVATION OF AN EXISTING APT, INCLUDING PARTITION CHANGES. MINOR PLUMBING AND MECHANICAL WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCU$289,200
2010
2010-11-26Rodent inspection: Passed
2010-11-23Rodent inspection: Passed
2010-09-17DOB violation E:
2010-09-17DOB violation E:
2010-06-14Permit PL — ISSUED
2010-06-09Permit EW — ISSUED
2010-05-19Job filed: INTERIOR RENOVATION TO APT 11B ON THE 11TH FLOOR. REMOVE AND INSTALL NEW PARTITION, REMOVE AND INSTALL NEW PLUMBING FIXTURES. ALL AS PER PLAN. NO CHAN$45,000
2010-05-19Job filed: INTERIOR RENOVATION TO APT 11B ON THE 11TH FLOOR. REMOVE AND INSTALL NEW PARTITION, REMOVE AND INSTALL NEW PLUMBING FIXTURES. ALL AS PER PLAN. NO CHAN$45,000
2010-04-12Permit EW — ISSUED
2009
2009-07-17Permit EW — ISSUED
2009-06-30Job filed: FACADE REPAIRS INCLUDING BRICK, WINDOW LINTEL, BRICK SPANDREL AND CORNER REPLACEMENT, MISC POINTING, STONE PATCHING, PAINTING AND RESTORATION . NO CHA$214,675
2009-05-15Permit EQ — ISSUED
2009-05-15Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED A TOTAL OF 130 LF AS PER PLAN AT 136 EAST 79 STREET WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO
2008
2008-11-10RPTT&RET $5,650,000 — from THE ELLEN K. BILGORE TRUST DATED AUGUST to JOHNSON, MARGARET ANN; JOHNSON, THOMAS S$5,650,000
2008-10-22RPTT&RET — from ROCKEFELLER, FKA SUSAN COHN, SUSAN to ROCKEFELLER, SUSAN; ROCKEFELLER, DAVID JR.
2008-06-11RPTT&RET $2,475,000 — from BONNIER, JEANETTE to EPHRON, NORA; PILEGGI, NICHOLAS$2,475,000
2008-06-06RPTT&RET $7,000,000 — from MOORE, DARLA D to RILEY, JAMES P JR; RILEY, ELLEN C$7,000,000
2008-04-30Permit PL — ISSUED
2008-04-10Permit EW — ISSUED
2008-04-10Permit EW — ISSUED
2008-04-09ECB Hazardous violation: WORK W/O A PERMIT. WORK NOTED: DEMOLITION OF INTERNAL PARTITION WALLS & DOORS IN THE CELLAR AND DIGGING TRENCHES IN CELLAR FLR FOR
2008-04-01DOB complaint, category ?
2008-03-13Job filed: HEREWITH FILING ARCHITECTURAL PLANS FOR A TENANTS GYUM IN THE CELLAR SPACE. WO RK TO INCLUDE DEMO OF EXISTING PARTITIONS AND NEW PARTITION LAYOUT. NO $75,000
2008-03-13Job filed: HEREWITH FILING ARCHITECTURAL PLANS FOR A TENANTS GYUM IN THE CELLAR SPACE. WO RK TO INCLUDE DEMO OF EXISTING PARTITIONS AND NEW PARTITION LAYOUT. NO $75,000
2008-03-13Job filed: HEREWITH FILE MECHANICAL AND PLUMBING PLANS IN CONJUCTION WITH ARCHITECTURAL PLANS FOR A TENANTS GYM IN THE CLEAR SPACE. NO CHANGE TO USE, EGRESS OR O$85,000
2008-01-22DOB violation E:
2008-01-22DOB violation E:
2007
2007-10-10Permit EW — ISSUED
2007-09-27Job filed: MASONRY FACADE REPAIRWAOK NO CHANGES$20,000
2007-09-17ECB Non-Hazardous violation: 55Y10,55O02,59Q07,36T07,86U05,36O02,84L07,84Q07.55Y-HOIST MACHINE OILED,FIX,REPAIR,SEAL & CLEAN.59Q-PROVIDE LIGHT GUARDS.36T-PROVI
2007-06-27Permit PL — ISSUED
2007-06-18Permit EW — ISSUED
2007-06-08Permit EW — ISSUED
2007-06-08Permit EW — ISSUED
2007-06-06DOB complaint, category ?
2007-04-12Job filed: Plumbing and Mechanical work as per plans filed herewith. No change of use, occupancy or egress.$50,000
2007-04-12Job filed: Interior renovation of an existing apartment. Partition work as per plans filed herewith. No change of use, occupancy or egress.$200,000
2007-01-24DOB violation E:
2007-01-24DOB violation E:
2006
2006-10-23Permit EW — ISSUED
2006-10-19Facade (LL11) filing, cycle 6: SWARMP
2006-10-04ECB Non-Hazardous violation: 46I10. 46-REPAIR MACHINE BRAKE DRUM.
2006-09-26ECB Non-Hazardous violation: 39Y13,58Y02,40B07. 58-Y- BRAKE COUPLING CAKED ON OIL. 40-B- PROVIDE SAIGNAGE ON MACHINE RM DOOR. (ELEVATOR MACHINE ROOM).$350
2006-09-26ECB Non-Hazardous violation: 58M07,55Y13. 58-M- COTTER PINS MISSING FROM BRAKE ASSEMBLY.$350
2006-09-07Job filed: REPLACEMENT OF EXISTING 10,000 GALLONABOVE GROUND VALTED FUEL OIL TANK. NO CHANGE IN USE EGRESS OROCCUPANCY.$80,000
2006-08-03RPTT $1,950,000 — from ADDINGTON, ANNE H to MAISEL, LAWRENCE; GRANT, SUSAN$1,950,000
2006-07-26Permit PL — ISSUED
2006-07-11RPTT&RET $4,200,000 — from FITZGIBBON, II, HERBERT S to COHN, SUSAN$4,200,000
2006-06-15Permit EW — ISSUED
2006-06-15Permit EW — ISSUED
2006-06-08RPTT&RET $3,400,000 — from EASTMAN, AS TRUSTEE, JOHN L; ESTATE OF LEE V. EASTMAN to KALLOP, ARTHUR GEORGE$3,400,000
2006-06-06Job filed: Remodel apartment 5-A on the 5th floor. No change to use, egress, or occupancy.$25,000
2005
2005-12-09Permit EW — ISSUED
2005-12-05DOB violation E:
2005-12-05DOB violation E:
2005-12-02AL&R $1,725,000 — from THE BANK OF NEW YORK to 136 EAST 79TH STREET CORPORATION$1,725,000
2005-12-02Agreement $1,725,000 — from 136 EAST 79TH STREET CORPORATION to THE BANK OF NEW YORK$1,725,000
2005-12-02Mortgage $75,100 — from 136 EAST 79TH STREET CORPORATION to THE BANK OF NEW YORK$75,100
2005-09-13Permit EW — ISSUED
2005-09-13Permit EW — ISSUED
2005-08-31Job filed: REPLACE BOILER AND OIL BURNER WITH TWO (2) BOILERS AND TWO (2) OIL BURNERS. NO CHANGE IN EGRESS, OCCUPANCY OR USE UNDER THIS APPLICATION.
2005-08-31Job filed: REPLACE BOILER AND OIL BURNER WITH TWO (2) BOILERS AND TWO (2) OIL BURNERS. NO CHANGE IN EGRESS, OCCUPANCY OR USE UNDER THIS APPLICATION.
2005-07-21Permit PL — ISSUED
2005-05-19Permit EW — ISSUED
2005-05-09RPTT $4,200,000 — from ESTATE OF VIRGINIA MOFFAT NICKERSON to DONN, LINDA; DONN, ANTHONY$4,200,000
2005-04-27Job filed: Propose to revise non-bearing stud partitionn; install new kitchen and laundry fixtures and relocate some existing HVAC ductwork. At 9th fl. All as pe$38,000
2005-04-27Job filed: Propose to revise non-bearing stud partitionn; install new kitchen and laundry fixtures and relocate some existing HVAC ductwork. At 9th fl. All as pe$38,000
2005-04-27Job filed: Propose to revise non-bearing stud partitionn; install new kitchen and laundry fixtures and relocate some existing HVAC ductwork. At 9th fl. All as pe$38,000
2005-02-02RPTT $9,500,000 — from SUSKIND, DENNIS to ZARO, LOIS R; ZARO, ANDREW N$9,500,000
2002
2002-08-21DOB complaint, category ?
2002-08-08DOB violation L1198:
2002-07-12Permit EQ — ISSUED
2002-06-27Permit PL — ISSUED
2002-06-26Job filed: Erection of heavy duty sidewalk shed (131 linear feet) as per BSA Standard #351- 74-SM. No change to use, egress or occupancy.
2002-06-26Job filed: Erection of heavy duty sidewalk shed (131 linear feet) as per BSA Standard #351- 74-SM. No change to use, egress or occupancy.
2002-06-03Permit EW — ISSUED
2002-05-16Job filed: Apartment renovations consisting of relocation of kitchen fixtures; gas stove, d ish washer, sink and addition of garbage disposal as per plans filed $25,000
2002-05-16Job filed: REVISE MECHANICAL SYSTEM TO COORDINATE WITH ARCHITECTURAL REVISIONS. REMOVE ONE BATHROOM AND RELOCATE FIXTURES IN THE OTHER BATHROOMS. CREATE NEW POWD$62,000
2002-05-16Job filed: AT LOWER LEVEL OF DUPLEX, PERFORM MINOR DEMOLITION. REVISE ROOM LAYOUT. NO CHANGE TO USE, OCCUPANCY,EGRESS OR FIREPROTECTION.$17,000
2001
2001-11-14Permit EQ — ISSUED
2001-11-13Job filed: Setting up a sidewalk shed 60 linear feet
2001-11-13Job filed: Setting up a sidewalk shed 60 linear feet
2001-08-07Permit PL — ISSUED
2001-07-26Permit PL — ISSUED
2001-06-06Permit PL — ISSUED
2001-05-25Permit EW — ISSUED
2001-05-25Permit EW — ISSUED
2001-05-09Job filed: Renovation of existing apartment. Remove and install new non-load bearing partitions, fixtures, and finishes as per plans filed herewith. No change $25,000
2001-04-26Permit EW — ISSUED
2001-04-26Permit EW — ISSUED
2001-03-23Job filed: RENOVATION OF EXISTING CLASS "A" APARTMENT INCLUDING PARTITION CHANGES, MINOR PLUMBING AND HVAC WORK. NO CHANGE TO USE EGRESS OR OCCUPANCY$270,000
2001-03-23Job filed: RENOVATION OF EXISTING CLASS 'A' APARTMENT INCLUDING PARTITION CHANGES, MINOR PLUMBING AND HVAC WORK. NO CHANGE TO USE EGRESS OR OCCUPANCY$270,000
2001-01-12Permit EW — ISSUED
2000
2000-09-13Job filed: FIXTURE REPLACEMENT IN APARTMENT 8B. There is no change in use, occupancy or egress under this application.$25,000
2000-07-28Permit PL — ISSUED
2000-07-12Job filed: Installation of a mechanical system in an existing apartment. No change of use, occupancy, or egress.$25,000
2000-06-28Permit PL — ISSUED
2000-06-23Permit EW — ISSUED
2000-06-16DOB complaint, category ?
2000-06-14ECB Non-Hazardous violation: FAILURE TO PROVIDE APPROVED PLANS AT TIME OF INSPECTION.WORK NOTED: NEW INTERIOR PARTITONS THROUGHOUT APT. & CONCRETE WORK.REMEDY:$130
2000-06-13Permit EW — ISSUED
2000-06-13DOB complaint, category ?
2000-06-06Permit PL — RE-ISSUED
2000-06-01Job filed: REPLACING EXISTING PLUMBING FIXTURES AND BRANCH LINES. REMOVING PARTITI NS NEW KITCHEN AND PANTRY CABINETS$25,000
2000-05-31Permit EW — ISSUED
2000-05-31Job filed: Exterior Repairs$164,455
2000-05-11Permit EW — ISSUED
2000-05-11Permit EW — ISSUED
2000-05-11Job filed: Apartment Alterations$143,900
1999
1999-09-18DOB violation E: 1P16946
1999-07-13Permit EW — RE-ISSUED
1999-06-24Permit PL — ISSUED
1999-06-17Permit PL — ISSUED
1999-06-10Permit PL — ISSUED
1999-06-07Permit EW — ISSUED
1999-06-03Permit EW — ISSUED
1999-06-03Permit EW — ISSUED
1999-05-26Permit EW — ISSUED
1999-03-16DOB violation LL6291:
1998
1998-07-02Permit PL — ISSUED
1998-05-20Permit EW — ISSUED
1998-05-20Permit EW — ISSUED
1997
1997-07-25Mortgage $499,000 — from 136 EAST 79TH STREETCORPORATION to BANK OF NEW YORK$499,000
1997-07-25Mortgage assigned — from 136 EAST 79TH STREETCORPORATION to BANK OF NEW YORK
1997-07-25Agreement — from 136 EAST 79TH STREETCORPORATION to BANK OF NEW YORK
1997-05-30Permit EW — ISSUED
1996
1996-07-02Permit EW — ISSUED
1996-04-12Permit EW — ISSUED
1996-04-11Permit EQ — ISSUED
1995
1995-09-29Permit PL — ISSUED
1995-08-18Permit EW — ISSUED
1994
1994-03-18DOB violation LL6291:
1993
1993-06-07Permit PL — ISSUED
1993-06-07Permit PL — ISSUED
1993-05-21Permit EW — ISSUED
1993-05-21Permit EW — ISSUED
1993-03-18DOB violation LL6291:
1993-02-24Permit PL — ISSUED
1992
1992-12-31Permit EW — ISSUED
1992-05-22SAGE — from FEDERAL HM LN MTG CORP
1992-05-22Mortgage $350,000 — from 136 EAST 79TH ST CORP to BANK OF NEW YORK$350,000
1992-05-22Agreement — from 136 EAST 79 ST CORP to BANK OF NEW YORK
1992-05-22SMIS — from 136 EAST 79TH ST CORP to BANK OF NEW YORK
1992-05-22Mortgage assigned — from FEDERAL HM LN MTG CORP to BANK OF NEW YORK
1992-04-27Permit PL — ISSUED
1992-03-17Permit EW — ISSUED
1991
1991-10-02Permit EQ — ISSUED
1991-06-04Permit AL — ISSUED
1991-05-13Permit EW — ISSUED
1989
1989-09-27Mortgage assigned — from APPLE BANK FOR SAVINGS to FEDERAL HM LN MTGE CORP
1989-09-27Mortgage assigned — from APPLE BANK FOR SAVINGS to FEDERAL HM LN MTGE CORP
1989-03-13DOB violation E:
1988
1988-12-13Agreement — from 136 E 79TH ST CORP to APPLE BANK SVGS
1988-12-06Mortgage assigned — from 136 EAST 79 ST CORP to APPLE BANK FOR SAVINGS
1988-12-06Mortgage assigned — from CROSSLAND SAVINGS FSB to APPLE BANK FOR SAVINGS
1988-12-06Mortgage $125,000 — from 136 E 79TH ST CORP to APPLE BANK SVGS$125,000
1979
1979-10-29Agreement — from 136 E 79TH ST CORP to BROOKLYN SAVINGS BANK
1979-07-09Mortgage — from 136 E 79TH ST CORP to BROOKLYN SAVINGS BANK
1979-07-09Mortgage assigned — from DRY DOCK SAVINGS BANK to BROOKLYN SAVINGS BANK
1974
1974-04-10Mortgage — from 136 E 79TH ST CORP to DRY DOCK SAVINGS BANK
1969
1969-03-24Mortgage — from 136 EAST 79TH ST CORP to DRY DOCK SVNGS BNK
1900
1900-01-01Air permit (CERTIFICATE TO OPERATE), fuel: NO6FUEL

Support this site Back to the building page