The city's published records show little recorded distress here in the last three years. Less recorded distress than 88% of 25-99-unit residential buildings citywide. The citywide median for 25-99-unit residential buildings is 23.6 penalty
points per 10 units; this building carries 1.2. In ZIP 10075, 82% of residential buildings hold an A and
2% grade D or F.
How grades work
this building
A
B
C
Among 17,252 25-99-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
21 service requests in the last three years. Most common: Homeless Person Assistance (4) · Noise (3) · Sidewalk Condition (3) · Lead (2) · Cooling Tower (2) · Illegal Parking (1).
Filed construction activity
$1,682,990 in permitted construction work filed since
2016 (15 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974 (2006)
Yes
Six or more residential units (33)
Yes
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. Buildings receiving 421-a or J-51 benefits are generally required to register their units as rent-stabilized for the duration of the benefit. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
300 E 79TH STREET CONDOMINIUM
Head officer
PAUL T BRENSILBER
Managing agent
JORDAN COOPER LLC
Last registered
2025-09-17
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$6,851,120
$3,083,004
2026
$560,517
$252,233
2027
$564,661
$254,097
The city's market estimate has fallen
92% between tax years 2025 and 2027.
Tax exemptions on the roll: 421A 10 YR NO CAP
For property tax, the Department of Finance values this condo
as if it were a rental building. Its 2021 estimate: gross income $3,922,859 a year
($53.99 per sq ft), operating expenses $1,056,462
($14.54 per sq ft), net operating income $2,866,398. These are the
city's estimates from comparable rentals, not the building's actual budget, rents or maintenance
charges.
Building systems
Energy grade (LL33)
D — ENERGY STAR score 30/100, posted at the entrance by law (2022 disclosure cycle)
Heating fuel
NATURALGAS
Facade (Local Law 11)
SWARMP — "Safe With A Repair and Maintenance Program": known facade conditions that must be repaired (cycle 9)
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
86 St — Q · 0.2 mi straight-line (about a 6-minute walk) · station accessibility: full 77 St — 6 · 0.2 mi straight-line (about a 6-minute walk) · station accessibility: none
Bus
Nearest boarding stop: E 79 St / 2 Av — M79-SBS · 50 ft · Select Bus Service
Citi Bike
E 78 St & 2 Ave · 250 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
21 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
2025-10-08Mortgage satisfied — from CHEN, CHUN-KANG; HUANG, TZU-HUA to CITIBANK; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2025-09-19Mortgage satisfied — from FILSTRUP, PATRICIA ANN; FILSTRUP, MARK CURTIS to WELLS FARGO BANK, N.A.
2025-09-16Permit Sidewalk Shed — Permit Issued
2025-09-16Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF$1,000
2025-08-14Deed — from NIKKAH, FARIDEH; NIKKHAH, HAMID to FARIDEH NIKKAH, TRUSTEE; HAMID NIKKHAH AND FARIDEH NIKKAH REVOCAB; HAMID NIKKHAH, TRUSTEE
2025-08-14311: Homeless Person Assistance — Non-Chronic
2025-08-14311: Homeless Person Assistance — Non-Chronic
2025-06-24Job filed: Installation of suspended scaffold for facade inspection/Repair.
2025-05-15Cooling tower inspection
2025-05-15Boiler inspection
2025-05-15Boiler inspection
2025-04-30311: Missed Collection — Compost
2025-03-26311: Lead — Lead Kit Request (Residential) (L10)
2025-03-03311: Taxi Complaint — Driver Complaint - Non Passenger
2025-02-24311: Illegal Parking — Unauthorized Bus Layover
2025-02-18Permit Structural — Signed-off
2025-02-06Deed $1,925,000 — from CHIPEE VALUE FUND, LLC to NIKKHAH, HAMID; NIKKAH, FARIDEH$1,925,000
2025-02-06PAT — from NIKKHAH, HAMID; NIKKAH, FARIDEH to 300 EAST 79TH STREET CONDOMINIUM
2025-01-23Sold for $1,925,000$1,925,000
2025-01-07Job filed: Install new steel beams in cellar to support new bank ATM, drop box and safe on first floor.$6,000
2024
2024-12-13Bedbug filing: 0 infested units
2024-12-06311: Noise — Noise: Construction Before/After Hours (NM1)
2024-11-18Permit Sprinklers — Signed-off
2024-11-13Permit Mechanical Systems — Signed-off
2024-11-13Permit Plumbing — Signed-off
2024-11-13Permit General Construction — Signed-off
2024-10-24Job filed: Proposing to remove and install interior partitions, millwork, casework & finishes.$576,600
2024-10-23Job filed: Remove/Installation/Relocation of Supply, returns, registers and new ductwork, install (2) water source heat pump units,electric baseboard heater, ele$122,400
2024-10-11PAT — from KY, WILLY to MCKENNA, BRYAN
2024-10-11PAT — from KY, ALEJANDRA to MCKENNA, BRYAN
2024-10-11PAT — from KY, ALEJANDRA; KY, WILLY to 1510 SECOND LLC; CONDOMINIUM BOARD
2024-10-11Deed $2,700,000 — from CP ADVENTURES LLC to KY, WILLY; KY, ALEJANDRA$2,700,000
2024-10-11Mortgage $2,000,000 — from KY, WILLY; KY, ALEJANDRA to MERS$2,000,000
2024-09-11Mortgage satisfied — from KY, WILLY to TD BANK N.A.
2024-08-27Permit Sign — Signed-off
2024-08-27Permit Sign — Signed-off
2024-08-27Permit Sign — Signed-off
2024-08-26Job filed: ERECT AN ILLUMINATED ACCESSORY BUSINESS CHANNEL WALL SIGN - A @79TH STREET ELEVATION VIEW, NO CHANGE IN USE, EGRESS OR OCCUPANCY$3,420
2024-08-26Job filed: ERECT AN ILLUMINATED ACCESSORY BUSINESS CHANNEL WALL SIGN - B @ SECOND AVENUE ELEVATION VIEW, NO CHANGE IN USE, EGRESS OR OCCUPANCY$3,420
2024-08-26Job filed: ERECT AN ILLUMINATED ACCESSORY BUSINESS CHANNEL WALL SIGN- C @ SECOND AVENUE ELEVATION VIEW, NO CHANGE IN USE, EGRESS OR OCCUPANCY$3,420
2024-08-20Job filed: Proposing to replace (2) water closets, (2) lavatories, (2) non-residential sink, install (1) drinking fountain & (1) hot water heater. remove (1) ho$24,000
2024-08-20Job filed: Proposing to remove and install interior partitions, millwork, casework & finishes.$576,600
2024-08-20Job filed: Remove/Installation/Relocation of Supply, returns, registers and new ductwork, install (2) water source heat pump units,electric baseboard heater, ele$122,400
2024-08-20Job filed: Proposing work to include installation of new & relocation of existing sprinkler heads & piping. All work as per plans.$38,800
2024-08-14311: Homeless Person Assistance
2024-06-20Deed $1,985,000 — from JAMALA LLC to HUANG, TZU-HUA; CHEN, CHUN-KANG$1,985,000
2024-06-20TL&R — from SIG CRE 2023 VENTURE LLC to 1510 COMMERCIAL OWNER LLC
2024-06-20Mortgage assigned — from SIG CRE 2023 VENTURE LLC to CITY NATIONAL BANK
2024-06-20Mortgage $1,389,500 — from CHEN, CHUN-KANG; HUANG, TZU-HUA to MERS$1,389,500
2024-06-20PAT — from CHEN, CHUN-KANG; HUANG, TZU-HUA to 400 EAST 79TH STREET CONDOMINIUM
2024-06-20Agreement $4,000,000 — from 1510 COMMERCIAL OWNER LLC to CITY NATIONAL BANK$4,000,000
2024-06-12Sold for $1,985,000$1,985,000
2024-06-04AALR — from IN ITS CAPACITY AS RECEIVER FOR; FEDERAL DEPOSIT INSURANCE CORPORATION; SIGNATURE BRIDGE B to SIG CRE 2023 VENTURE LLC
2024-06-04Mortgage assigned — from IN ITS CAPACITY AS RECEIVER FOR; FEDERAL DEPOSIT INSURANCE CORPORATION; SIGNATURE BANK, NE to SIGNATURE BRIDGE BANK, N.A.
2024-06-04AALR — from IN ITS CAPACITY AS RECEIVER FOR; FEDERAL DEPOSIT INSURANCE CORPORATION; SIGNATURE BANK, NE to SIGNATURE BRIDGE BANK, N.A.
2024-06-04Mortgage assigned — from IN ITS CAPACITY AS RECEIVER FOR; FEDERAL DEPOSIT INSURANCE CORPORATION; SIGNATURE BRIDGE B to SIG CRE 2023 VENTURE LLC
2024-06-03LOCC — from 1510 SECOND LLC to BOARDOFMANAGERS OF 300 EAST 79THSTREET C
2024-05-28LOCC — from 1510 SECOND LLC to BOARDOFMANAGERS OF 300 EAST 79THSTREET C
2024-05-28LOCC — from 1510 SECOND LLC to BOARDOFMANAGERS OF 300 EAST 79THSTREET C
2024-05-14Permit General Construction — Signed-off
2024-05-10Job filed: INTERIOR DEMO OF NON LOAD BEARING PARTITIONS IN EXISTING BANK SPACE ON GROUND/1ST FLOOR & CELLAR AS PER PLANS FILED. NO CHANGE IN USE, OCCUPANCY, OR E$25,000
2024-05-09Job filed: INTERIOR DEMO OF NON LOAD BEARING PARTITIONS IN EXISTING BANK SPACE ON GROUND/1ST FLOOR & CELLAR AS PER PLANS FILED. NO CHANGE IN USE, OCCUPANCY, OR E$25,000
2022-11-03HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2022-10-12TL&R — from CAPITAL ONE, N.A. to NATIONAL COOPERATIVE BANK, NA
2022-10-12AL&R $500,000 — from THE BOARD OF MANAGERS OF THE 300 EAST 79 to NATIONAL COOPERATIVE BANK, NA$500,000
2022-10-12Agreement $500,000 — from THE BOARD OF MANAGERS OF THE 300 EAST 79 to NATIONAL COOPERATIVE BANK, NA$500,000
2022-10-12Mortgage $23,573 — from THE BOARD OF MANAGERS OF THE 300 EAST 79 to NATIONAL COOPERATIVE BANK, NA$23,573
2022-10-12Mortgage assigned — from CAPITAL ONE, N.A. to NATIONAL COOPERATIVE BANK, N.A.
2022-09-01Boiler inspection
2022-09-01Boiler inspection
2022-06-27311: Dirty Condition — Trash
2022-06-23Cooling tower inspection
2022-06-21Agreement $1,275,000 — from GRANT, ROBERT T to MORGAN STANLEY PRIVATE BANK, NA; MERS$1,275,000
2022-06-21Mortgage $25,408 — from GRANT, ROBERT T to MORGAN STANLEY PRIVATE BANK, NA; MERS$25,408
2022-06-21Mortgage assigned — from UBS BANK USA; MERS to MORGAN STANLEY PRIVATE BANK, NA; MERS
2022-06-14Boiler inspection
2022-05-31AL&R $8,250,000 — from 1510 SECOND LLC to INTERAUDI BANK$8,250,000
2022-05-31Mortgage $8,250,000 — from 1510 SECOND LLC to INTERAUDI BANK$8,250,000
2022-04-26PAT — from MCINERNEY, THOMAS J to NUTMAN, MARTHA J
2022-04-26Deed $4,699,888 — from MCINERNEY, THOMAS J to MILLER, KURT T; MANSUR, MELISSA$4,699,888
2022-04-26Mortgage $3,524,916 — from MILLER, KURT T; MANSUR, MELISSA to CITIBANK, N.A.; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$3,524,916
2022-04-26PAT — from MILLER, KURT T; MANSUR, MELISSA to 1510 SECOND LLC; CONDO BOARD OF 300 EAST 79TH STREET COND
2022-04-19Sold for $4,699,888$4,699,888
2022-03-30311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-03-11311: Street Condition — Plate Condition - Noisy
2022-03-10Bedbug filing: 0 infested units
2022-03-10311: Street Condition — Plate Condition - Noisy
2022-03-09311: Street Condition — Plate Condition - Noisy
2022-03-09HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2022-01-11PAT — from RIM, SHIN HYUNG; RIM, YONG-KYOO to 300 EAST 79TH STREET CONDOMINIUM
2022-01-11PAT — from GULFO, JOSEPH V to KOTZ, ALEX; SAXTON, RYAN; ESSNER, ALLISON
2022-01-11PAT — from GULFO, ADELE M to SAXTON, RYAN; ESSNER, ALLISON; KOTZ, ALEX
2022-01-11Deed $4,386,250 — from GULFO, ADELE M; GULFO, JOSEPH V to RIM, SHIN HYUNG; RIM, YONG-KYOO$4,386,250
2022-01-11Mortgage $3,289,687 — from RIM, YONG-KYOO; RIM, SHIN HYUNG to FIRST REPUBLIC BANK$3,289,687
2021-06-03PAT — from ALMAN, LARRY to BOARD OF MANAGERS OF 300 EAST 79TH STREE
2021-06-03Deed $1,660,000 — from LAKEWOOD HOLDINGS, INC to ALMAN, LARRY$1,660,000
2021-06-03PAT — from ALMAN, LARRY to CHURGIN, DANIEL
2021-05-06Mortgage satisfied — from HALPIN, JAMES C to BETHPAGE FEDERAL CREDIT UNION
2021-05-04Sold for $1,660,000$1,660,000
2021-04-23Boiler inspection
2021-04-23Boiler inspection
2021-04-22Bedbug filing: 0 infested units
2021-04-19HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021-02-23Mortgage assigned — from QUICKEN LOANS LLC to QUICKEN LOANS LLC; MERS
2021-02-23Agreement $706,170 — from YARNELL, STEVEN to MERS$706,170
2021-02-23Mortgage assigned — from JPMORGAN CHASE BANK, N.A. to QUICKEN LOANS LLC
2021-02-23Mortgage assigned — from JPMORGAN MORTGAGE TRUST 2013-2BY; JPMORGAN CHASE BANK, N.A. ITS ATTORNEY-I to JPMORGAN CHASE BANK, N.A.
2021-02-23Mortgage $7,828 — from YARNELL, STEVEN to MERS$7,828
2021-01-29Mortgage satisfied — from FILSTRUP, MARK CURTIS; FILSTRUP, PATRICIA ANN to WELLS FARGO BANK, N.A.
2020
2020-09-28Cooling tower inspection
2020-08-04311: Damaged Tree — Branch Cracked and Will Fall
2020-05-11Boiler inspection
2020-05-06PAT — from PADELL, ELLEN; HECHTMAN, HOWARD SCOTT to 300 EAST 79TH STREET CONDOMINIUM
2020-05-06Deed $975,000 — from PADELL, ELLEN to PADELL, ELLEN; HECHTMAN, HOWARD SCOTT$975,000
2020-04-30Sold for $975,000$975,000
2020-04-29Boiler inspection
2020-04-29Boiler inspection
2020-04-29311: Street Sign - Missing — No Parking, Standing, Stopping
2020-04-05311: Non-Emergency Police Matter — Social Distancing
2020-03-25Mortgage satisfied — from PADELL, ELLEN to RIDGEWOOD SAVINGS BANK
2019-11-04HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2019-06-27Mortgage satisfied — from LAKEWOOD HOLDINGS INC to JPMORGAN CHASE BANK NA
2019-05-29Boiler inspection
2019-05-03DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2019-04-25311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2019-04-05DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
2019-03-08Elevator permit: Furnish and install components and software providing Door Monitor Circuitry to existing controller. All work to comply with ASME$28,500
2019-01-07Rodent inspection: Passed
2018
2018-12-28Bedbug filing: 0 infested units
2018-11-01Mortgage satisfied — from MCINERNEY, THOMAS J to BANK OF AMERICA NA
2018-10-31Facade (LL11) filing, cycle 8: SAFE
2018-09-28311: Noise — Noise: Construction Before/After Hours (NM1)
2018-03-20PAT — from DATNY , KAREN to YEHOSHUA, SHARON; LUFTIG, ANDREW; HE, TAO; WHELAN, AMI; WEISSER, JENNIFER; SPALLINO, DANIE
2018-03-20PAT — from TEFILA GATE LLC to CONDOMINIUM BOARD OF THE 300 EAST 79TH S; 1510 SECOND LLC
2018-03-20Deed $1,600,000 — from DATNY , KAREN to TEFILA GATE LLC$1,600,000
2018-03-08Sold for $1,600,000$1,600,000
2017
2017-12-15Boiler inspection
2017-12-15Boiler inspection
2017-12-08HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2017-10-05Rodent inspection: Passed
2017-09-15DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
2017-03-21Job filed: INSTALLATION OF ONE (1) GAS-FIRED HOT WATER BOILER AND MODIFICATION OF EXISTING HVAC SYSTEM TO ACCOMMODATE ONE (1) HOT WATER COIL. NO CHANGE IN USE, E$139,250
2016
2016-12-29Mortgage satisfied — from HETTENBACH, CRAIG; HETTENBACH, CARLA to RESIDENTIAL HOME DIVISION LLC
2016-12-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
2016-11-28HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2016-11-02Mortgage satisfied — from FUENMAYOR, CARLOS; CADENAS, MARIA ISABEL to AS NOMINEE FOR HSBC BANK USA NA; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2016-11-01PAT — from LIU, TIANYONG to ZHOU, YOU
2016-11-01Deed $3,800,000 — from FUENMAYOR, CARLOS; CADENAS, MARIA ISABEL to LIU, TIANYONG$3,800,000
2016-09-21Agreement $450,000 — from FILSTRUP, PATRICIA ANN; FILSTRUP, MARK CURTIS to WELLS FARGO BANK, N.A.$450,000
2016-09-21Mortgage $100,000 — from FILSTRUP, PATRICIA ANN; FILSTRUP, MARK CURTIS to WELLS FARGO BANK, N.A.$100,000
2016-08-08Mortgage satisfied — from SHANE, WILLIAM R; SHANE, GAIL M to BANK OF AMERICA NA
2016-06-29PAT — from JAMALA LLC to THE CONDOMINIUM BOARD OF 300 EAST 79TH S
2016-06-29Deed $2,485,000 — from 300 E 79 LLC to JAMALA LLC$2,485,000
2016-06-22Rodent inspection: Passed
2016-06-13Sold for $2,485,000$2,485,000
2016-06-07Mortgage $3,487,500 — from HALPIN , JAMES C to BETHPAGE FEDERAL CREDIT UNION$3,487,500
2016-06-07Mortgage $465,000 — from HALPIN , JAMES C to BETHPAGE FEDERAL CREDIT UNION$465,000
2016-06-07PAT — from HALPIN , JAMES C to THE CONDOMINIUM BOARD OF; 300 EAST 79TH STREET CONDOMINIUM
2016-06-07Deed $4,650,000 — from SAGITTARIUS INVESTMENTS HOLDINGS LIMITED to HALPIN , JAMES C$4,650,000
2016-05-24Sold for $4,650,000$4,650,000
2016-05-02Mortgage $1,100,000 — from MITTMAN, ROBERTA R to RAYMOND JAMES BANK, N.A.$1,100,000
2016-05-02PAT — from MITTMAN, ROBERTA R to 300 EAST 79TH STREET CONDOMINIUM
2016-05-02Deed $2,575,000 — from CECILE C. ROSNER, AS TRUSTEE; THE ROBERT L. ROSNER FAMILY TRUST to MITTMAN, ROBERTA R$2,575,000
2016-04-22Sold for $2,575,000$2,575,000
2016-04-19Mortgage satisfied — from ZHENG, JIE; QIAN, BEIJUN to CITIBANK, N.A.
2016-02-09Agreement $400,000 — from KY, WILLY to TD BANK N.A.$400,000
2016-02-09Mortgage $315,960 — from KY, WILLY to TD BANK N.A.$315,960
2015
2015-10-20HPD class I: SECTION27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE ?27-2097 AND IS THER
2015-07-06311: Street Condition — Failed Street Repair
2015-06-10DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
2015-05-20Mortgage satisfied — from ROUBIN, GARY S; ROUGIN, PETA L to MERS
2015-03-23PAT — from OLD HOUSE STREET,LLC to 300 EAST 79TH STREET CONDOMINIUM
2015-03-23Deed $9,380,000 — from ROUBIN, GARY S; ROUBIN, PETA L to OLD HOUSE STREET,LLC$9,380,000
2015-03-23PAT — from ROUBIN, PETA L to NADER AHARI, M
2015-03-23PAT — from ROUBIN, GARY S to NADER AHARI, M
2015-01-15MAPS — from 300 EAST 79TH STREET CONDOMINIUM
2015-01-15ADEC — from 300 EAST 79TH STREET CONDOMINIUM
2012-09-26Mortgage satisfied — from SHANE, GAIL M; SHANE, WILLIAM R to BANK OF AMERICA, N.A.
2012-08-21Certificate of occupancy Temporary
2012-08-13Mortgage $6,295 — from KY, WILLY to MERS$6,295
2012-08-13Agreement $964,000 — from KY, WILLY to TD BANK, NA.$964,000
2012-07-23Job filed: INSTALLATION OF MANUAL ALARM AND AUTOMATIC SMOKE DETECTION FIRE ALARM SYSTEM. COC. POST FIRE SMOKE PURGE.$18,000
2012-06-25Permit EW — ISSUED
2012-06-15Rodent inspection: Passed
2012-06-04Deed — from CVECICH, ANGELA SKREPETOU to CVECICH, SANDRO
2012-05-19311: Noise Survey — People Created Noise
2012-05-19311: Noise Survey — People Created Noise
2012-05-09CORRM $685,000 — from HETTENBACH, CRAIG; HETTENBACH, CARLA to RESIDENTIAL HOME DIVISION, LLC$685,000
2012-05-09Mortgage $6,352 — from HETTENBACH, CRAIG; HETTENBACH, CARLA to WELLS FARGO BANK, N.A$6,352
2012-05-09Agreement — from HETTENBACH, CARLA; HETTENBACH, CRAIG to WELLS FARGO BANK, N.A
2012-04-30Permit EW — ISSUED
2012-04-30Permit EW — ISSUED
2012-04-12Permit PL — ISSUED
2012-04-10Permit EW — ISSUED
2012-03-19Agreement $1,000,000 — from 300 E 79 LLC; SHANE, GAIL M; SHANE, WILLIAM R to BANK OF AMERICA, N.A.$1,000,000
2012-03-08PAT — from FUENMAYOR, CARLOS; CADENAS, MARIA ISABEL to 300 EAST 79TH STREET CONDOMINIUM
2012-03-08Deed $3,105,662 — from 1510 SECOND LLC to FUENMAYOR, CARLOS; CADENAS, MARIA ISABEL$3,105,663
2012-03-08Mortgage $1,800,000 — from CADENAS, MARIA ISABEL; FUENMAYOR, CARLOS to MERS$1,800,000
2012-02-10AL&R $788,000 — from THE BOARD OF MANAGERS OF THE 300 EAST 79 to CAPITAL ONE, N.A.$788,000
2012-02-10Deed $984,500 — from 1510 SECOND LLC to THE BOARD OF MANAGERS OF THE 300 EAST 79$984,500
2012-02-10Mortgage $788,000 — from THE BOARD OF MANAGERS OF THE 300 EAST 79 to CAPITAL ONE, N.A.$788,000
2011
2011-12-20Rodent inspection: Passed
2011-12-13Job filed: HEREWITH FILING FOR MECHANICAL WORK FOR NEW OPENING & STAIRS AS PER PLANS FILED.$16,000
2011-12-13Job filed: HEREWITH FILING FOR STRUCUTRAL WORK FOR NEW OPENING AND STAIRS AS PER PLANS FILED.$25,000
2011-12-13Job filed: HEREWITH FILING FOR VERTICLE COMBINATION OF APARTMENTS AT 17TH - 18TH FLOORS WITH INTERIOR PARTITIONS, CEILINGS & PLUMBING WORK AS PER PLANS FILED$757,000
2011-12-13Job filed: A2$38,000
2011-12-13Job filed: HEREWITH FILING FOR MECHANICAL WORK FOR NEW OPENING & STAIRS AS PER PLANS FILED.$16,000
2011-11-25311: Taxi Complaint — Driver Complaint
2011-11-16Agreement $7,000,000 — from 1510 COMMERCIAL OWNER LLC to SIGNATURE BANK$7,000,000
2011-11-16AL&R $7,000,000 — from 1510 COMMERCIAL OWNER LLC to SIGNATURE BANK$7,000,000
2011-11-03Mortgage assigned — from CAPITAL ONE, NATIONAL ASSOCIATION to SIGNATURE BANK
2011-11-03PAT — from 1510 COMMERCIAL OWNER LLC to CONDO BOARD OF 300 EAST 79TH CONDOMINIUM
2011-11-03Deed $10,500,000 — from 1510 SECOND LLC to 1510 COMMERCIAL OWNER LLC$10,500,000
2011-11-03Mortgage $1,185,039 — from 1510 COMMERCIAL OWNER LLC to SIGNATURE BANK$1,185,039
2011-10-18Mortgage satisfied — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2011-10-18TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION
2011-09-10311: Noise — Noise: Air Condition/Ventilation Equip, Residential (NJ1)
2011-09-07311: Noise — Noise: Air Condition/Ventilation Equip, Residential (NJ1)
2011-08-23311: Noise — Noise: Construction Before/After Hours (NM1)
2011-08-22PAT — from NAZARENO, CECILIA R to DEL ROSARIO, CYNTHIA J
2011-08-22PAT — from NAZARENO, CECILIA R to THE BD OF MGRS OF THE 300 EAST 79TH STRE
2011-08-22Deed $1,354,272 — from 1510 SECOND LLC to NAZARENO, CECILIA R$1,354,273
2011-08-19311: Noise — Noise: Air Condition/Ventilation Equip, Commercial (NJ2)
2011-08-17Deed $3,863,438 — from 1510 SECOND LLC to ROUBIN, PETA L$3,863,438
2011-08-17PAT — from ROUBIN, PETA L to 300 EAST 79TH STREET CONDOMINIUM
2011-08-17PAT — from ROUBIN, PETA L to AHARI, M NADER
2011-08-04311: Street Condition — Failed Street Repair
2011-08-02311: Street Condition — Pothole
2011-07-12311: Street Condition — Cave-in
2011-07-12311: Street Condition — Pothole
2011-06-13Deed $1,362,319 — from 1510 SECOND LLC to YARNEL, STEVEN$1,362,319
2011-06-13Mortgage $850,000 — from YARNELL, STEVEN to JPMORGAN CHASE BANK, N.A.$850,000
2011-06-13PAT — from YARNELL, STEVEN to THE CONDOMINIUM BOARD OF
2011-05-14311: Vending — Unlicensed
2011-03-23PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2011-03-23REL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2011-03-23PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2011-03-22Permit EQ — ISSUED
2011-03-22Job filed: INSTALLATION OF 116 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY W
2011-03-22Job filed: INSTALLATION OF 116 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY W
2011-03-11Mortgage satisfied — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2011-03-11Mortgage satisfied — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2011-03-11Mortgage satisfied — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2011-03-11Mortgage satisfied — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2011-03-11Mortgage satisfied — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2011-03-11Mortgage satisfied — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2011-03-11Mortgage satisfied — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2011-03-11Mortgage satisfied — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2011-03-11Mortgage satisfied — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2011-02-28Mortgage $200,000 — from LAKEWOOD HOLDINGS, INC. to JPMORGAN CHASE BANK, N.A.$200,000
2011-02-21Permit PL — ISSUED
2011-02-08Agreement $1,000,000 — from VAN NESS, WILLIAM A to GONZALEZ, ADRIEL; VAN NESS, CANDACE$1,000,000
2011-01-31Mortgage $55,000 — from FILSTRUP, MARK C; FILSTRUP, PATRICIA A to WELLS FARGO BANK, N.A.$55,000
2011-01-31Deed $1,450,000 — from 1510 SECOND LLC to FILSTRUP, PATRICIA A; FILSTRUP, MARK C$1,450,000
2011-01-31PAT — from FILSTRUP, PATRICIA A; FILSTRUP, MARK C to THE CONDOMINIUM BOARD OF 300 EAST 79TH S
2011-01-31Mortgage $729,750 — from FILSTRUP, MARK C; FILSTRUP, PATRICIA A to WELLS FARGO BANK, N.A.$729,750
2010
2010-12-10Mortgage assigned — from WELLS FARGO BANK to RESIDENTIAL HOME DIVISION, LLC
2010-12-10Agreement $715,300 — from BAUM, DANIEL L to RESIDENTIAL HOME DIVISION, LLC$715,300
2010-12-03Rodent inspection: Passed
2010-11-10Mortgage $7,321 — from BAUM, DANIEL L to RESIDENTIAL HOME DIVISION, LLC$7,321
2010-10-08DOB violation VCAT1:
2010-10-05Mortgage assigned — from RESIDENTIAL HOME DIVISION, LLC to WELLS FARGO BANK, N.A.
2010-09-17Mortgage $1,000,000 — from SHANE, GAIL M; SHANE, WILLIAM R to BANK OF AMERICA, NA$1,000,000
2010-08-23311: Taxi Complaint — Driver Complaint
2010-08-20Mortgage $516,840 — from LYNCH, CATHERINE; LYNCH, JAMES to WELLS FARGO BANK, NA$516,840
2010-08-20Deed $877,121 — from 1510 SECOND LLC to LYNCH, CATHERINE; LYNCH, JAMES$877,121
2010-08-20PAT — from LYNCH, JAMES; LYNCH, CATHERINE to THE CONDOMINIUM BOARD OF 300 EAST 79TH S
2010-06-18Deed $2,225,000 — from JOSHUA NASH, AS TRUSTEE; GERSON KEKST, AS TRUSTEE; THE JOSEPH J KEKST PROTECTIVE TRUST to SCHMERIN, JONATHAN E; GELLER, RACHEL L$2,225,000
2010-06-18PAT — from SCHMERIN, JONATHAN E; GELLER, RACHEL L to THE CONDOMINIUM BOARD OF 300 EAST 79TH S
2010-06-14Deed $3,797,667 — from 1510 SECOND LLC to SAGITTARIUS INVESTMENTS HOLDINGS LIMITED$3,797,667
2010-06-14PAT — from SAGITTARIUS INVESTMENTS HOLDINGS LIMITED to BOARD OF MANAGERS OF 300EAST 79TH STREET
2010-06-14PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2010-06-14REL — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2010-05-18REL — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2010-05-18PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2010-05-18PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2010-05-17PAT — from GULFO, JOSEPH V; GULFO, ADELE M to 300 EAST 79TH STREET CONDOMINIUM
2010-05-17Deed $3,818,438 — from 1510 SECOND LLC to GULFO, ADELE M; GULFO, JOSEPH V$3,818,438
2010-05-17Mortgage $1,000,000 — from GULFO, JOSEPH V; GULFO, ADELE M to BANK OF AMERICA, N.A.$1,000,000
2010-05-13REL — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2010-05-13REL — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2010-05-13REL — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2010-05-11PREL — from CAPITAL ONE, NA to 1510 SECOND LLC
2010-05-11PREL — from CAPITAL ONE, NA to 1510 SECOND LLC
2010-05-11REL — from 1510 SECOND LLC to CAPITAL ONE, NA
2010-03-23Mortgage $729,750 — from QIAN, BEIJUN; ZHENG, JIE to RESIDENTIAL HOME DIVISION, LLC$729,750
2010-03-23PAT — from ZHENG, JIE; QIAN, BEIJUN to CONDOMINIUM BOARD
2010-03-23Deed $1,242,265 — from 1510 SECOND LLC to ZHENG, JIE; QIAN, BEIJUN$1,242,265
2010-03-16DOB violation E:
2010-03-16DOB violation E:
2010-03-10PAT — from KY, WILLY to 300 EAST 79TH CONDOMINIUM
2010-03-10Mortgage $990,000 — from KY, WILLY to MERS; TD BANK, N.A.$990,000
2010-03-10Deed $1,320,000 — from 1510 SECOND LLC to KY, WILLY$1,320,000
2010-03-10PAT — from KY, WILLY to GOURARI, ESQ, NATALIA
2010-03-05PREL — from CAPITAL ONE, N.A to 1510 SECOND LLC
2010-03-05PREL — from CAPITAL ONE, N.A to 1510 SECOND LLC
2010-03-05REL — from 1510 SECOND LLC to CAPITAL ONE, N.A
2010-02-25PREL — from CAPITAL ONE, NA to 1510 SECOND LLC
2010-02-25PREL — from CAPITAL ONE, NA to 1510 SECOND LLC
2010-02-25TL&R — from CAPITAL ONE, NA to 1510 SECOND LLC
2010-01-28Mortgage assigned — from RESIDENTIAL HOME DIVISION, LLC to WELLS FARGO BANK, N.A.
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-14TL&R — from CAPITAL ONE NA to 1510 SECOND LLC
2010-01-08Mortgage $685,000 — from HETTENBACH, CARLA; HETTENBACH, CRAIG to RESIDENTIAL HOME DIVISION, LLC$685,000
2010-01-08PAT — from HETTENBACH, CARLA; HETTENBACH, CRAIG to CONDOMINIUM BOARD OF MANAGERS
2010-01-08Deed $1,325,000 — from 1510 SECOND LLC to HETTENBACH, CARLA; HETTENBACH, CRAIG$1,325,000
2010-01-05Permit PL — ISSUED
2009
2009-12-04PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-12-04PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-12-04PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-12-04REL — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2009-12-04REL — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2009-12-04REL — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2009-11-10PAT — from EDWARDS, EDITHA; EDWARDS, BRUCE to BOARD OF MANAGERS OF THE 300 EAST 79TH S
2009-11-09SMTG $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09SMTG $6,000,000 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$6,000,000
2009-11-09Agreement $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09Agreement $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09Mortgage satisfied — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2009-11-09SMTG $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09Mortgage satisfied — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2009-11-09SPRD $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09AL&R $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09Agreement $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-11-09PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-11-09SMTG $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09SMTG $6,000,000 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$6,000,000
2009-11-09Agreement $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09Agreement $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09SMTG $6,000,000 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$6,000,000
2009-11-09Agreement $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09Agreement $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09Agreement $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09Agreement $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09SMTG $6,000,000 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$6,000,000
2009-11-09PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-11-09PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-11-09Agreement $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09Agreement $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09SMTG $6,000,000 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$6,000,000
2009-11-09SMTG $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-11-09PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-11-09Agreement $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09Agreement $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09AL&R $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09AL&R $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09SPRD $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09Mortgage satisfied — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2009-11-09AL&R $6,000,000 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$6,000,000
2009-11-09Mortgage satisfied — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2009-11-09SPRD $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09SPRD $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09Mortgage satisfied — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2009-11-09AL&R $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09Agreement $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09SPRD $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09Agreement $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09Agreement $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09SMTG $6,000,000 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$6,000,000
2009-11-09SMTG $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-11-09PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-11-09Agreement $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09AL&R $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09SPRD $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09Mortgage satisfied — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2009-11-09AL&R $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09Agreement $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09Mortgage satisfied — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2009-11-09PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-11-09SPRD $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-11-09Agreement $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09SMTG $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09SMTG $6,000,000 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$6,000,000
2009-11-09Agreement $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09Agreement $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-11-09Agreement $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09Agreement $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09Agreement $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09SMTG $6,000,000 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$6,000,000
2009-11-09SMTG $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-11-09PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-11-09Mortgage satisfied — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2009-11-09SMTG $6,000,000 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$6,000,000
2009-11-09PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-11-09PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-11-09Agreement $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09AL&R $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09Agreement $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09Mortgage satisfied — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2009-11-09SMTG $6,000,000 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$6,000,000
2009-11-09Agreement $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09AL&R $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09SPRD $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09Mortgage satisfied — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2009-11-09SPRD $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-11-09Agreement $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09Agreement $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09SMTG $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-11-09PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-11-09Agreement $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09Mortgage satisfied — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2009-11-09Agreement $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09SMTG $6,000,000 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$6,000,000
2009-11-09Mortgage satisfied — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2009-11-09SPRD $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09AL&R $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09Agreement $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-11-09PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-11-09SMTG $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09SMTG $6,000,000 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$6,000,000
2009-11-09SMTG $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09AL&R $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09SPRD $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09Mortgage satisfied — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2009-11-09PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-11-09PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-11-09Agreement $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09Agreement $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09Agreement $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09Agreement $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09SMTG $6,000,000 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$6,000,000
2009-11-09SMTG $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09Agreement $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09Agreement $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09SMTG $6,000,000 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$6,000,000
2009-11-09SMTG $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09Agreement $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-11-09Agreement $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09AL&R $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09Mortgage satisfied — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2009-11-09SPRD $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09Agreement $6,000,000 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$6,000,000
2009-11-09PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-11-09PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-11-09PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-11-09Mortgage satisfied — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2009-11-09SPRD $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09AL&R $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09Agreement $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-11-09PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-11-09SMTG $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09SMTG $6,000,000 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$6,000,000
2009-11-09Agreement $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09Agreement $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09SPRD $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09AL&R $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09Mortgage satisfied — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2009-11-09SPRD $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09AL&R $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09Agreement $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-11-09Agreement $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09Agreement $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09SMTG $6,000,000 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$6,000,000
2009-11-09SMTG $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-11-09PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-11-09Agreement $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09AL&R $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09SPRD $18,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$18,494,365
2009-11-09SMTG $12,494,365 — from 1510 SECOND LLC to CAPITAL ONE, N.A.$12,494,365
2009-11-09PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-11-05PREL — from CAPITAL ONE, N.A., A NATIONAL BANKING AS to 1510 SECOND LLC,
2009-11-05PREL — from CAPITAL ONE, N.A., A NATIONAL BANKING AS to 1510 SECOND LLC,
2009-11-05PAT — from LOUVET, PATRICE; LOUVET, CHRISTINE to CONDOMINIUM BOARD OF MANAGERS
2009-11-05REL — from 1510 SECOND LLC, to CAPITAL ONE, N.A., A NATIONAL BANKING AS
2009-11-05REL — from 1510 SECOND LLC, to CAPITAL ONE, N.A., A NATIONAL BANKING AS
2009-11-05REL — from 1510 SECOND LLC, to CAPITAL ONE, N.A., A NATIONAL BANKING AS
2009-11-05PREL — from CAPITAL ONE, N.A., A NATIONAL BANKING AS to 1510 SECOND LLC,
2009-10-29REL — from 1510 SECOND LLC to NORTH FORK BANK; CAPITAL ONE, NA
2009-10-29REL — from 1510 SECOND LLC to CAPITAL ONE, NA; NORTH FORK BANK
2009-10-29REL — from 1510 SECOND LLC to CAPITAL ONE, NA; NORTH FORK BANK
2009-10-29PREL — from NORTH FORK BANK; CAPITAL ONE, NA to 1510 SECOND LLC
2009-10-29PREL — from CAPITAL ONE, NA; NORTH FORK BANK to 1510 SECOND LLC
2009-10-29PREL — from CAPITAL ONE, NA; NORTH FORK BANK to 1510 SECOND LLC
2009-10-27Deed $1,378,881 — from 1510 SECOND LLC to EDWARDS, EDITHA; EDWARDS, BRUCE$1,378,881
2009-10-27PAT — from EDWARDS, BRUCE to EDWARDS, EDITHA
2009-10-26PAT — from JACQUES LEON MELKONIAN, CHRISTOPHE JEAN to CONDOMINIUM BOARD
2009-10-26Deed $712,775 — from 1510 SECOND LLC to MELKONIAN, CHRISTOPHE JEAN-JACQUES L$712,775
2009-10-26PAT — from JACQUES LEON MELKONIAN, CHRISTOPHE JEAN to DEBBAS, PIERRE E
2009-10-26DOB violation E:
2009-10-26DOB violation E:
2009-10-26DOB violation E:
2009-10-20PAT — from LOUVET, CHRISTINE to LOUVET, PATRICE
2009-10-20Deed $1,400,094 — from 1510 SECOND LLC to LOUVET, CHRISTINE; LOUVET, PATRICE$1,400,094
2009-10-13Permit EQ — ISSUED
2009-10-13Job filed: INSTALLATION OF 75 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WI
2009-09-11Mortgage $1,000,000 — from VAN NESS, CANDACE G; GONZALEZ, ADRIEL to VAN NESS, WILLIAM A$1,000,000
2009-09-08Deed $1,400,000 — from 1510 SECOND LLC to VAN NESS, CANDACE; GONZALEZ, ADRIEL$1,400,000
2009-09-08PAT — from GONZALEZ, ADRIEL; VAN NESS, CANDACE to BOARD MANAGERS OF 300 EAST 79TH STREET C
2009-06-11PREL — from CAPITAL ONE, NA SUCCESSOR IN INTEREST BY to 1510 SECOND LLC
2009-06-11PREL — from CAPITAL ONE, NA SUCCESSOR IN INTEREST BY to 1510 SECOND LLC
2009-06-11REL — from 1510 SECOND LLC to CAPITAL ONE, NA SUCCESSOR IN INTEREST BY
2009-06-11REL — from 1510 SECOND LLC to CAPITAL ONE, NA SUCCESSOR IN INTEREST BY
2009-06-11REL — from 1510 SECOND LLC to CAPITAL ONE, NA SUCCESSOR IN INTEREST BY
2009-06-11Deed $1,374,638 — from 1510 SECOND LLC to M&P INT., LLC$1,374,638
2009-06-11PAT — from M&P INT., LLC to THE 300 EAST 79TH STREET CONDOMINIUM BOA
2009-06-11PREL — from CAPITAL ONE, NA SUCCESSOR IN INTEREST BY to 1510 SECOND LLC
2009-05-06PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-05-06PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-05-06PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-05-06REL — from CAPITAL ONE, N.A.
2009-05-06REL — from CAPITAL ONE, N.A.
2009-05-06REL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2009-04-27Deed — from AGNOFF, STEVEN to AGNOFF, MINDY; AGNOFF, STEVEN
2009-04-08PAT — from SKREPETOU CVECICH, ANGELA to BOARD OF MANAGERS OF THE 300 EAST 79TH S
2009-04-08Deed $1,272,812 — from 1510 SECOND LLC to SKREPETOU CVECICH, ANGELA$1,272,813
2009-03-30Agreement $16,131,300 — from 1510 SECOND LLC to CAPITAL ONE NA$16,131,300
2009-03-30Agreement $9,153,822 — from 1510 SECOND LLC to CAPITAL ONE NA$9,153,822
2009-03-30Agreement $16,131,300 — from 1510 SECOND LLC to CAPITAL ONE NA$16,131,300
2009-03-30Agreement $16,131,300 — from 1510 SECOND LLC to CAPITAL ONE NA$16,131,300
2009-03-30Agreement $16,131,300 — from 1510 SECOND LLC to CAPITAL ONE NA$16,131,300
2009-03-30Agreement $9,153,822 — from 1510 SECOND LLC to CAPITAL ONE NA$9,153,822
2009-03-30Agreement $16,131,300 — from 1510 SECOND LLC to CAPITAL ONE NA$16,131,300
2009-03-30Agreement $9,153,822 — from 1510 SECOND LLC to CAPITAL ONE NA$9,153,822
2009-03-30Agreement $16,131,300 — from 1510 SECOND LLC to CAPITAL ONE NA$16,131,300
2009-03-30Agreement $9,153,822 — from 1510 SECOND LLC to CAPITAL ONE NA$9,153,822
2009-03-30Agreement $9,153,822 — from 1510 SECOND LLC to CAPITAL ONE NA$9,153,822
2009-03-30Agreement $9,153,822 — from 1510 SECOND LLC to CAPITAL ONE NA$9,153,822
2009-03-30Agreement $16,131,300 — from 1510 SECOND LLC to CAPITAL ONE NA$16,131,300
2009-03-30Agreement $9,153,822 — from 1510 SECOND LLC to CAPITAL ONE NA$9,153,822
2009-03-30Agreement $16,131,300 — from 1510 SECOND LLC to CAPITAL ONE NA$16,131,300
2009-03-30Agreement $9,153,822 — from 1510 SECOND LLC to CAPITAL ONE NA$9,153,822
2009-03-30Agreement $16,131,300 — from 1510 SECOND LLC to CAPITAL ONE NA$16,131,300
2009-03-30Agreement $9,153,822 — from 1510 SECOND LLC to CAPITAL ONE NA$9,153,822
2009-03-30Agreement $16,131,300 — from 1510 SECOND LLC to CAPITAL ONE NA$16,131,300
2009-03-30Agreement $16,131,300 — from 1510 SECOND LLC to CAPITAL ONE NA$16,131,300
2009-03-30Agreement $9,153,822 — from 1510 SECOND LLC to CAPITAL ONE NA$9,153,822
2009-03-30Agreement $9,153,822 — from 1510 SECOND LLC to CAPITAL ONE NA$9,153,822
2009-03-30Agreement $9,153,822 — from 1510 SECOND LLC to CAPITAL ONE NA$9,153,822
2009-03-30Agreement $16,131,300 — from 1510 SECOND LLC to CAPITAL ONE NA$16,131,300
2009-03-30Agreement $9,153,822 — from 1510 SECOND LLC to CAPITAL ONE NA$9,153,822
2009-03-30Agreement $16,131,300 — from 1510 SECOND LLC to CAPITAL ONE NA$16,131,300
2009-03-30Agreement $16,131,300 — from 1510 SECOND LLC to CAPITAL ONE NA$16,131,300
2009-03-30Agreement $9,153,822 — from 1510 SECOND LLC to CAPITAL ONE NA$9,153,822
2009-03-30Agreement $16,131,300 — from 1510 SECOND LLC to CAPITAL ONE NA$16,131,300
2009-03-30Agreement $9,153,822 — from 1510 SECOND LLC to CAPITAL ONE NA$9,153,822
2009-03-30Agreement $16,131,300 — from 1510 SECOND LLC to CAPITAL ONE NA$16,131,300
2009-03-30Agreement $9,153,822 — from 1510 SECOND LLC to CAPITAL ONE NA$9,153,822
2009-03-30Agreement $16,131,300 — from 1510 SECOND LLC to CAPITAL ONE NA$16,131,300
2009-03-30Agreement $9,153,822 — from 1510 SECOND LLC to CAPITAL ONE NA$9,153,822
2009-03-30Agreement $16,131,300 — from 1510 SECOND LLC to CAPITAL ONE NA$16,131,300
2009-03-30Agreement $9,153,822 — from 1510 SECOND LLC to CAPITAL ONE NA$9,153,822
2009-03-30Agreement $16,131,300 — from 1510 SECOND LLC to CAPITAL ONE NA$16,131,300
2009-03-30Agreement $16,131,300 — from 1510 SECOND LLC to CAPITAL ONE NA$16,131,300
2009-03-30Agreement $16,131,300 — from 1510 SECOND LLC to CAPITAL ONE NA$16,131,300
2009-03-30Agreement $9,153,822 — from 1510 SECOND LLC to CAPITAL ONE NA$9,153,822
2009-03-30Agreement $16,131,300 — from 1510 SECOND LLC to CAPITAL ONE NA$16,131,300
2009-03-30Agreement $9,153,822 — from 1510 SECOND LLC to CAPITAL ONE NA$9,153,822
2009-03-30Agreement $9,153,822 — from 1510 SECOND LLC to CAPITAL ONE NA$9,153,822
2009-03-30Agreement $16,131,300 — from 1510 SECOND LLC to CAPITAL ONE NA$16,131,300
2009-03-30Agreement $9,153,822 — from 1510 SECOND LLC to CAPITAL ONE NA$9,153,822
2009-03-30Agreement $9,153,822 — from 1510 SECOND LLC to CAPITAL ONE NA$9,153,822
2009-02-27DOB violation LL1081:
2009-02-04ADEC — from 300 EAST 79TH STREET CONDOMINIUM
2009-02-04MAPS — from 300 EAST 79TH STREET CONDOMINIUM
2009-02-04ADEC — from 300 EAST 79TH STREET CONDOMINIUM
2009-02-04ADEC — from 300 EAST 79TH STREET CONDOMINIUM
2009-02-04ADEC — from 300 EAST 79TH STREET CONDOMINIUM
2009-02-04ADEC — from 300 EAST 79TH STREET CONDOMINIUM
2009-02-04ADEC — from 300 EAST 79TH STREET CONDOMINIUM
2009-02-04ADEC — from 300 EAST 79TH STREET CONDOMINIUM
2009-02-04ADEC — from 300 EAST 79TH STREET CONDOMINIUM
2009-02-04ADEC — from 300 EAST 79TH STREET CONDOMINIUM
2009-02-04ADEC — from 300 EAST 79TH STREET CONDOMINIUM
2009-02-04ADEC — from 300 EAST 79TH STREET CONDOMINIUM
2009-02-04ADEC — from 300 EAST 79TH STREET CONDOMINIUM
2009-02-04ADEC — from 300 EAST 79TH STREET CONDOMINIUM
2009-02-04ADEC — from 300 EAST 79TH STREET CONDOMINIUM
2009-02-04ADEC — from 300 EAST 79TH STREET CONDOMINIUM
2009-02-04ADEC — from 300 EAST 79TH STREET CONDOMINIUM
2009-02-04ADEC — from 300 EAST 79TH STREET CONDOMINIUM
2009-02-04ADEC — from 300 EAST 79TH STREET CONDOMINIUM
2009-02-04ADEC — from 300 EAST 79TH STREET CONDOMINIUM
2009-02-04ADEC — from 300 EAST 79TH STREET CONDOMINIUM
2009-02-04ADEC — from 300 EAST 79TH STREET CONDOMINIUM
2009-02-04ADEC — from 300 EAST 79TH STREET CONDOMINIUM
2009-02-04ADEC — from 300 EAST 79TH STREET CONDOMINIUM
2009-02-04ADEC — from 300 EAST 79TH STREET CONDOMINIUM
2009-02-04ADEC — from 300 EAST 79TH STREET CONDOMINIUM
2009-02-04ADEC — from 300 EAST 79TH STREET CONDOMINIUM
2009-02-04ADEC — from 300 EAST 79TH STREET CONDOMINIUM
2009-02-04ADEC — from 300 EAST 79TH STREET CONDOMINIUM
2009-02-04ADEC — from 300 EAST 79TH STREET CONDOMINIUM
2009-02-04ADEC — from 300 EAST 79TH STREET CONDOMINIUM
2009-02-04ADEC — from 300 EAST 79TH STREET CONDOMINIUM
2009-02-04ADEC — from 300 EAST 79TH STREET CONDOMINIUM
2009-02-04ADEC — from 300 EAST 79TH STREET CONDOMINIUM
2009-02-04ADEC — from 300 EAST 79TH STREET CONDOMINIUM
2009-01-23Permit PL — ISSUED
2009-01-01DOB violation LL6291:
2008
2008-11-20Permit SG — ISSUED
2008-11-20Permit SG — ISSUED
2008-11-06PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2008-11-06PAT — from GAMBA, CAROL; GAMBA, ROBERT V to 1510 SECOND LLC; THE CONDOMINIUM BOARD
2008-11-06Deed $1,917,338 — from 1510 SECOND LLC to GAMBA, ROBERT V; GAMBA, CAROL$1,917,338
2008-11-06PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2008-11-06REL — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2008-11-06REL — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2008-11-06REL — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2008-11-06PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2008-11-05PAT — from WORTH, TERRY S to THE BOARD OF MANAGERS OF 300 EAST 79TH S
2008-11-05PAT — from WORTH, TERRY S to WORTH, HARVEY
2008-10-31Permit SG — ISSUED
2008-10-23REL — from 1510 SECOND LLC; 1510 SECOND LLC to CAPITAL ONE, N.A.; CAPITAL ONE, N.A.
2008-10-23REL — from 1510 SECOND LLC; 1510 SECOND LLC to CAPITAL ONE, N.A.; CAPITAL ONE, N.A.
2008-10-23PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2008-10-23REL — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2008-10-23PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2008-10-23PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2008-10-23Mortgage $729,000 — from LAKEWOOD HOLDINGS, INC. to JPMORGAN CHASE BANK, N.A.$729,000
2008-10-23PAT — from LAKEWOOD HOLDINGS, INC. to 300 EAST 79TH STREET CONDOMINIUM
2008-10-23Deed $1,481,534 — from 1510 SECOND LLC to LAKEWOOD HOLDINGS, INC.$1,481,534
2008-10-23REL — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2008-10-09Permit EW — ISSUED
2008-10-09Permit EW — ISSUED
2008-10-09Permit EW — ISSUED
2008-10-07REL — from 1510 SECOND LLC to CAPITAL ONE, N.A., A NATIONAL BANKING AS; NORTH FORK BANK
2008-10-07REL — from 1510 SECOND LLC to CAPITAL ONE, N.A., A NATIONAL BANKING AS; NORTH FORK BANK
2008-10-07PAT — from HAY, NEIL to HAY, SUSAN
2008-10-07Deed $1,578,288 — from 1510 SECOND LLC to HAY, NEIL; HAY, SUSAN$1,578,288
2008-10-07Mortgage $1,400,000 — from HAY, SUSAN; HAY, NEIL to BANK OF SCOTLAND PLC$1,400,000
2008-10-07PAT — from HAY, NEIL; HAY, SUSAN to THE CONDOMINIUM BOARD OF
2008-10-07PREL — from CAPITAL ONE, N.A., A NATIONAL BANKING AS; NORTH FORK BANK to 1510 SECOND LLC
2008-10-07PREL — from NORTH FORK BANK; CAPITAL ONE, N.A., A NATIONAL BANKING AS to 1510 SECOND LLC
2008-10-07REL — from 1510 SECOND LLC to CAPITAL ONE, N.A., A NATIONAL BANKING AS; NORTH FORK BANK
2008-10-07PREL — from CAPITAL ONE, N.A., A NATIONAL BANKING AS; NORTH FORK BANK to 1510 SECOND LLC
2008-08-29PREL — from CAPITAL ONE, N.A.; SUCCESSOR IN INTEREST BY MERGER TO to 1510 SECOND LLC
2008-08-29REL — from 1510 SECOND LLC to SUCCESSOR IN INTEREST BY MERGER TO; CAPITAL ONE, N.A.
2008-08-29PREL — from CAPITAL ONE, N.A.; SUCCESSOR IN INTEREST BY MERGER TO to 1510 SECOND LLC
2008-08-29REL — from 1510 SECOND LLC to CAPITAL ONE, N.A.; SUCCESSOR IN INTEREST BY MERGER TO
2008-08-29Deed $2,902,012 — from 1510 SECOND LLC to TRUSTEES OF THE JOSEPH J. KEKST PROTECTI; JOSHUA NASH, AS TRUSTEES; GERSHON KEKST, AS TRUS$2,902,013
2008-08-29PAT — from TRUSTEES OF THE JOSEPH J. KEKST PROTECTI; GERSHON KEKST, AS TRUSTEES; JOSHUA NASH, AS TRUS to THE CONDOMINIUM BOARD OF
2008-08-29PREL — from CAPITAL ONE, N.A.; SUCCESSOR IN INTEREST BY MERGER TO to 1510 SECOND LLC
2008-08-29REL — from 1510 SECOND LLC to SUCCESSOR IN INTEREST BY MERGER TO; CAPITAL ONE, N.A.
2008-08-26REL — from 1510 SECOND LLC to CAPITAL ONE, N.A., A NATIONAL BANKING AS
2008-08-26REL — from 1510 SECOND LLC to CAPITAL ONE, N.A., A NATIONAL BANKING AS
2008-08-26REL — from CAPITAL ONE, N.A., A NATIONAL BANKING AS
2008-08-26PREL — from CAPITAL ONE, N.A., A NATIONAL BANKING AS
2008-08-26PREL — from CAPITAL ONE, N.A., A NATIONAL BANKING AS
2008-08-26PREL — from CAPITAL ONE, N.A., A NATIONAL BANKING AS
2008-08-26PAT — from UCCA STYLE CO., INC. to 300 EAST 79TH STREET CONDOMINIUM BOARD O
2008-08-06Deed $4,887,600 — from 1510 SECOND LLC to MCINERNEY, THOMAS J$4,887,600
2008-08-06PREL — from CAPITAL ONE, N.A. A NATIONAL BANKING ASS; SUCCESSOR IN INTEREST BY MERGER to 1510 SECOND LLC
2008-08-06PREL — from SUCCESSOR IN INTEREST BY MERGER; CAPITAL ONE, N.A. A NATIONAL BANKING ASS to 1510 SECOND LLC
2008-08-06REL — from 1510 SECOND LLC to CAPITAL ONE, N.A. A NATIONAL BANKING ASS; SUCCESSOR IN INTEREST BY MERGER
2008-08-06REL — from 1510 SECOND LLC to CAPITAL ONE, N.A. A NATIONAL BANKING ASS; SUCCESSOR IN INTEREST BY MERGER
2008-08-06REL — from 1510 SECOND LLC to CAPITAL ONE, N.A. A NATIONAL BANKING ASS; SUCCESSOR IN INTEREST BY MERGER
2008-08-06PAT — from MCINERNEY, THOMAS J to THE CONDOMINIUM BOARD OF
2008-08-06Mortgage $1,500,000 — from MCINERNEY, THOMAS J to BANK OF AMERICA, N.A.$1,500,000
2008-08-06PREL — from CAPITAL ONE, N.A. A NATIONAL BANKING ASS; SUCCESSOR IN INTEREST BY MERGER to 1510 SECOND LLC
2008-08-04REL — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2008-08-04REL — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2008-08-04PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2008-08-04PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2008-08-04PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2008-08-04REL — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2008-07-28PAT — from EIGES, SELMA; EIGES, NATHAN to BOARD OF MANAGERS
2008-07-28Deed $1,731,025 — from 1510 SECOND LLC to EIGES, SELMA; EIGES, NATHAN$1,731,025
2008-07-24REL — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2008-07-24REL — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2008-07-24PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2008-07-24PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2008-07-24PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2008-07-24REL — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2008-07-09Deed $1,284,013 — from 1510 SECOND LLC to DATNY, KAREN$1,284,013
2008-07-09PAT — from DATNY, KAREN to THE CONDOMINIUM BOARD
2008-07-08REL — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2008-07-08Deed $1,878,671 — from 1510 SECOND LLC to BAUM, DANIEL L$1,878,671
2008-07-08Mortgage $729,000 — from BAUM, DANIEL L to WELLS FARGO BANK, N.A.$729,000
2008-07-08PAT — from BAUM, DANIEL L to 300 EAST 79TH STREET CONDOMINIUM
2008-07-08PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2008-07-08PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2008-07-08PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2008-07-08REL — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2008-07-08PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2008-07-02SUBM — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02SUBM — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02SUBM — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02SUBM — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02SUBM — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02SUBM — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02SUBM — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02SUBM — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02SUBM — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02SUBM — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02SUBM — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02SUBM — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02REL — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02REL — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02SUBM — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02REL — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02PREL — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02PREL — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02PREL — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02PAT — from AGNOFF, STEVEN to THE CONDOMINIUM BOARD OF
2008-07-02SUBM — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02PAT — from AGNOFF, STEVEN to STRAUSS, ESQ., MICHAEL
2008-07-02SUBM — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02SUBM — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02SUBM — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02SUBM — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02SUBM — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02SUBM — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02SUBM — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02SUBM — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02SUBM — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02SUBM — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02SUBM — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02SUBM — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02SUBM — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02SUBM — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02SUBM — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02SUBM — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02Deed $2,112,869 — from 1510 SECOND LLC to AGNOFF, STEVEN$2,112,869
2008-07-02SUBM — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-02SUBM — from CAPITAL ONE, N. A. to 1510 SECOND LLC
2008-07-01Deed $1,909,219 — from 1510 SECOND LLC to UCCA STYLE CO., INC.$1,909,219
2008-06-30PAT — from 300 E 79 LLC to CONDOMINIUM BOARD
2008-06-30Deed $2,087,412 — from 1510 SECOND LLC to 300 E 79 LLC$2,087,413
2008-06-30REL — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2008-06-30REL — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2008-06-30REL — from 1510 SECOND LLC to CAPITAL ONE, N.A.
2008-06-30PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2008-06-30PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2008-06-30PREL — from CAPITAL ONE, N.A. to 1510 SECOND LLC
2008-06-05DOB violation E:
2008-06-05DOB violation E:
2008-05-22CDEC — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22MAPS — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22MAPS — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22CDEC — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22CDEC — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22MAPS — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22CDEC — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22CDEC — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22MAPS — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22CDEC — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22MAPS — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22CDEC — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22MAPS — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22MAPS — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22CDEC — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22CDEC — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22MAPS — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22MAPS — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22CDEC — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22MAPS — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22CDEC — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22MAPS — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22MAPS — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22CDEC — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22CDEC — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22MAPS — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22MAPS — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22CDEC — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22MAPS — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22CDEC — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22CDEC — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22MAPS — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22CDEC — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22MAPS — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22CDEC — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22MAPS — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22MAPS — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22CDEC — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22CDEC — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22MAPS — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22CDEC — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22MAPS — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22CDEC — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22MAPS — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22CDEC — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22MAPS — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22MAPS — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22CDEC — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22CDEC — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22CDEC — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22MAPS — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22MAPS — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22CDEC — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22MAPS — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22MAPS — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22CDEC — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22MAPS — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22CDEC — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22CDEC — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22MAPS — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22MAPS — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22CDEC — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22MAPS — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22CDEC — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22MAPS — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22CDEC — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-22CDEC — from 300 EAST 79TH STREET CONDOMINIUM
2008-05-16Permit EW — ISSUED
2008-05-13Permit PL — ISSUED
2008-04-08Permit EW — ISSUED
2008-04-08Permit EW — ISSUED
2008-04-08Permit EW — ISSUED
2008-04-07Job filed: CONDOMINIUM SUBDIVISION ONLY. NO CHANGE TO METES AND BOUNDS OR ZONING LOT. NO WORK TO BE PERFORMED.
2008-03-21DOB violation LL1081:
2008-03-21DOB violation LL1081:
2008-03-21Job filed: MODIFY EXISTING SPRINKLER SYSTEM AS SHOWNON PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 104477282.$1,000
2008-03-21Job filed: INSTALLATION OF INDIVIDUALLY CODED FIRE ALARM SYSTEM$1,000
2008-03-21Job filed: INSTALLATION OF INDIVIDUALLY CODED FIRE ALARM SYSTEM$1,000
2008-03-21Job filed: MODIFY EXISTING SPRINKLER SYSTEM AS SHOWNON PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 104477282.$1,000
2008-03-21Job filed: INSTALLATION OF INDIVIDUALLY CODED FIRE ALARM SYSTEM$1,000
2008-03-20Permit EW — ISSUED
2008-03-20Job filed: STRUCTURAL WORK IN CONJUNCTION WITH INTERIOR RENOVATION AS SHOWN ON PLANS FILED HEREWITH.$1,000
2008-03-20Job filed: STRUCTURAL WORK IN CONJUNCTION WITH INTERIOR RENOVATION AS SHOWN ON PLANS FILED HEREWITH.$1,000
2008-03-20Job filed: HVAC AND PLUMBING WORK WITH ASSOCIATED PIPING AS SHOWN ON PLANS FILED HEREWITH.$2,000
2008-03-10Job filed: DEMOLISH AND CONSTRUCT NEW PARTITIONS AND FINISHES IN EXISTING COMMERCIAL SPACE AS SHOWN ON PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 10447$1,000
2008-02-21Permit PL — ISSUED
2008-01-24Job filed: FIRE PROTECTION PLAN$1,000
2008-01-16DOB violation E:
2008-01-10Permit EQ — ISSUED
2008-01-10Permit EQ — ISSUED
2008-01-03DOB violation LL6291:
2007
2007-12-23DOB complaint, category ?
2007-12-15Permit NB — ISSUED
2007-12-15Permit EQ — ISSUED
2007-12-14Permit EW — ISSUED
2007-10-29DOB complaint, category ?
2007-10-11DOB complaint, category ?
2007-10-11ECB Hazardous violation: LICENSED RIGGER FAILED TO INSURE THAT SCAFFOLD WORKERS MET MINIMUM REQUIREMENTS.NO CERTIFICATE OF FITNESS.AT TIME OF INSPECTION SC$1,500
2007-09-12DOB complaint, category ?
2007-09-11Permit PL — ISSUED
2007-09-10Permit EQ — ISSUED
2007-09-10Permit NB — RE-ISSUED
2007-08-20DOB complaint, category ?
2007-08-16Permit EW — ISSUED
2007-07-30Job filed: REPLACE 2 NEW GAS FIRED HOT WATER LOW PRESSURE BOILERS W/INTEGRAL BURNER S. CONNECT TO NEW LOW PRESSURE GAS LINE.NEW DOUBLEWALL STACK, STRUTURAL DETAI$3,000
2007-07-28DOB complaint, category ?
2007-04-10DOB complaint, category ?
2007-04-02Permit EQ — ISSUED
2007-04-02DOB violation LL1081:
2007-03-28DOB complaint, category ?
2007-03-27DOB complaint, category ?
2007-03-26Permit EQ — ISSUED
2007-03-23DOB complaint, category ?
2007-03-16DOB complaint, category ?
2007-03-06DOB complaint, category ?
2007-03-06DOB complaint, category ?
2007-03-06ECB Hazardous violation: OPENINGS/ HOLES NOT COVERED. NOTED: AT TIME OF INSP AT THE ABOVE SITE BLDG STRUCTURE IS COMPLETE TO ROOF (19 STY W/ ROOF). OPENING$500
2007-03-06ECB Hazardous violation: SAFETY NETTING DAMAGED &/OR BROKEN. NOTED: AT TIME OF INSP AN ACTIVE SITE CONCRETE STRUCTURE HAS BEEN COMPLETED TO ROOF THRU-OUT T$5,000
2007-03-06ECB Hazardous violation: FAILURE TO PROTECT ROOFS ROOF OUTLETS OR SKYLIGHTS OF ADJOINING PROPERTY. NOTED: AT TIME OF INSP AN ACTIVE SITE CONCRETE WORK HAS $500
2007-03-01DOB complaint, category ?
2007-02-23DOB complaint, category ?
2007-02-22ECB Non-Hazardous violation: NO DOT PERMIT POSTED. UPON INSP CONST MATERIALS IN ST APPROX 25' PASSED PROPERTY LINE OF 1510 2 AVE ON THE 79ST SIDE MATERIALS FRO$200
2007-02-22ECB Hazardous violation: FAILURE TO SAFEGUARD PUBLIC & PROPERTY. UPON INSP ADJOINING PROPERTY 308 E 79 ST DOES NOT HAVE OVERHEAD PROTECTION ON TERRACE LOCA$1,000
2007-02-22ECB Hazardous violation: FAILURE TO PROVIDE HORIZONTAL SAFETY NETTING. UPON INSP HORIZONTAL SAFETY NETTING NOT TO CODE STIPPING OPERATION ARE ON 17 FL HORI
2007-02-14ECB Non-Hazardous violation: SEC 27-1039:FAILURE TO PROPERLY STORE COMBUSTIBLE MATERIAL OR OTHER MATERIAL & EQUIPMENT DURING CONSTRUCTION OPERATIONS. AS NOTED:$500
2007-01-30DOB complaint, category ?
2007-01-26DOB complaint, category ?
2007-01-23DOB complaint, category ?
2007-01-23DOB complaint, category ?
2007-01-23ECB Hazardous violation: FAILURE TO PROTECT/SAFEGUARD PUBLIC & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS WHILE STRIPPING THE 10TH FL A PIECE OF CEMENT F$1,000
2007-01-23ECB Hazardous violation: FAILURE TO PERFORM ADEQUATE HOUSEKEEPING.NOTED:AT TIME OF INSPECTION CONSTRUCTION DEBRIS & MATERIAL STILL ON FLS 2,5,6,7.INADEQUAT
2007-01-19DOB violation LL6291:
2007-01-13DOB complaint, category ?
2007-01-12DOB complaint, category ?
2007-01-10DOB complaint, category ?
2007-01-03DOB complaint, category ?
2006
2006-12-28Permit EW — ISSUED
2006-12-20DOB complaint, category ?
2006-12-18DOB complaint, category ?
2006-12-18DOB complaint, category ?
2006-12-18DOB complaint, category ?
2006-12-13DOB complaint, category ?
2006-12-08Permit EQ — ISSUED
2006-12-08Permit EQ — ISSUED
2006-12-08Job filed: PROPOSED INSTALLATION OF 191 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR NB CONSTRUCTION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH LL 33/91.
2006-12-08Job filed: PROPOSED INSTALLATION OF 191 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR NB CONSTRUCTION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH LL 33/91.
2006-12-08Job filed: PROPOSED INSTALLATION OF A 6000 DUAL HOIST DURING NB CONSTRUCTION, FILED SEPARATELY. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
2006-12-08Job filed: PROPOSED INSTALLATION OF A 6000 DUAL HOIST DURING NB CONSTRUCTION, FILED SEPARATELY. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
2006-12-08Job filed: PROPOSED INSTALLATION OF A 6000 DUAL HOIST DURING NB CONSTRUCTION, FILED SEPARATELY. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
2006-12-08Job filed: PROPOSED INSTALLATION OF 191 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR NB CONSTRUCTION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH LL 33/91.
2006-12-07DOB complaint, category ?
2006-12-04DOB complaint, category ?
2006-11-27Permit EQ — ISSUED
2006-11-11DOB complaint, category ?
2006-10-25DOB complaint, category ?
2006-10-17DOB complaint, category ?
2006-10-04Permit PL — ISSUED
2006-10-03DOB complaint, category ?
2006-10-03DOB violation C:
2006-09-29DOB complaint, category ?
2006-09-14Job filed: INSTALLATION OF FIRE ALARM SYSTEM NO CHANGE IN OCCUPANCY, USE OR EGRESS FILE IN CONJUNCTION WITH NEW BUILDING #104477282. SYSTEM IS FOR A SMOKE/SPRINK$1,000
2006-08-29Permit NB — ISSUED
2006-08-29Permit EQ — ISSUED
2006-08-07Permit EQ — ISSUED
2006-08-07Permit NB — ISSUED
2006-08-01Job filed: NB
2006-08-01Job filed: NB
2006-08-01Job filed: NB
2006-06-30Job filed: INSTATION OF STANPIPE SYSTEM. NO CHANGEIN OCCUPANCY, USE OR EGRESS. FIL ED IN CONJUNCTION WITH NEW BUILDING #104477282$1,000
2006-06-30Job filed: INSTALLATION OF SPRINKLER SYSTEM .NO CHANGE IN OCCUPANCY USE OR EGRESS FILED IN CONJUNCTION WITHNEW BUILDING 104477282.$1,000
2006-06-28Job filed: NB
2006-06-28Job filed: NB
2006-06-09Job filed: BUILDERS PAVEMENT PLAN. FRONTAGE ON 2NDAVENUE=76.17, FRONTAGE ON 79TH STREET=75.00'. TOTAL FRONTAGE=151 FT.FILED IN CONJUNCTION WITH NEW BUILDING # 10
2006-05-26Permit EQ — ISSUED
2006-05-26Job filed: MECHANICAL DEMOLITION CONSTRUCTION EQUIPMENT USE PERMITS FOR THE USE OF BOBCATS ON THE ELEVATED FLOORS OF THE BUILDING DURING DEMOLITION OPERATIONS. N
2006-05-24ECB Hazardous violation: FAILURE TOT POST D.O.T PERMIT FOR STREET/SIDEWALK CLOSING-WORK NOTED-WOOD ENCLOSED METAL STAIRCASE LEADING TO TOP OF SIDEWALK SHED
2006-05-18DOB complaint, category ?
2006-02-17ECB Hazardous violation: FAILURE TO WEATHER PROOF ADJ. BUILDING. NOTED: AT TIME OF INSPECTION BUILDING DOWN TO GRADE (SITE NOT GRADED) HOLE APPROX. 4'DEEP
2006-02-17ECB Hazardous violation: FAILURE TO SAFEGUARD PUBLIC AND PROPERTY DURING CONSTRUCTION OPERATION. UPON INSPECTION AT THE ABOVE PROPERTY BUILDING DOWN TO GRA
2006-02-16ECB Non-Hazardous violation: FAILURE TO WEATHERPROOF ADJ. BLDG NOTED: AT TIME OF INSPECTION THERE WAS NO CHANGE SINCE VIO #34509102Y ON 2/8/06 ADJ. BLDG ON BOT$1,250
2006-02-08ECB Non-Hazardous violation: EXPIRED PERMIT. NOTED: ACCORDING TO DOB RECORDS PERMIT FOR FENCE HAS BEEN EXPIRED SINCE 12/31/05 AT TIME OF INSP. SITE FENCE STILL$400
2006-02-08ECB Hazardous violation: FAILURE TO WEATHERPROOF ADJ. BLDG. NOTED: AT TIME OF INSP. BLDG WAS DOWN TO GRADE SINCE 11/18/05 BOTH ADJ. BLDG HOUSE # 1508 2ND A$500
2006-01-26Permit EQ — ISSUED
2006-01-17Permit EQ — ISSUED
2005
2005-09-27DOB complaint, category ?
2005-08-25DOB complaint, category ?
2005-08-25ECB Non-Hazardous violation: SIDEWALK SHED DOES NOT MEET BUILDING CODE SPECIFICATIONS. DEFECT- NO LIGHTS SIDEWALK SHED HAS EIGHT (8) BULBS BUT IS NOT ILLUMINAT
2005-08-24Permit EQ — ISSUED
2005-08-24Job filed: INSTALLATION OF SCAFFOLD ON TOP OF EXISTING SIDEWALK BRIDGE THAT IS FILED UNDER A SEPARATE APPLICATION.SCAFFOLD IS FOR PROTECTION OF THE STREET AND SI
2005-08-24Job filed: INSTALLATION OF SCAFFOLD ON TOP OF EXISTING SIDEWALK BRIDGE THAT IS FILED UNDER A SEPARATE APPLICATION.SCAFFOLD IS FOR PROTECTION OF THE STREET AND SI
2005-08-02Permit DM — ISSUED
2005-07-15Permit EQ — ISSUED
2005-07-13Job filed: DM
2005-06-30ECB Hazardous violation: SIDEWALK SHED DOES NOT MEET BLDG CODE SPECIFICATIONS. NO ILLUMINATION ON LIGHTS ON THE UNDER SIDE OF SHED. REMEDY: PROVIDE PROPER
2005-05-31DOB violation E:
2005-05-27ECB Hazardous violation: FAIL TO SAFE GUARD PUBLIC AND PROPERTY UPON INSPECTION AT THE ABOVE PROPERTY SIDE WALK SHED UP AND THE IS NO LIGHT, ELECTRIC WIRE $1,000
2005-05-26DOB complaint, category ?
2005-04-05Permit EQ — ISSUED
2005-04-05Permit EQ — ISSUED
2005-04-01Job filed: Filing herewith for installation of a fence. No change in occupancy, use, or egress
2005-04-01Job filed: Filing herewith for installation of a 7 ft long by 17 ft high scaffold. No change in occupancy, use, or egress
2005-03-20DOB complaint, category ?
2005-03-20ECB Hazardous violation: SIDEWALK SHED DOES NOT MEET BUILDING CODE SPECIFICATIONS.DEFECT:NO PLYWOOD SIDE ENCLOSURES AT ENTIRE LENGTH-AND NO SIDE ENCLOSURES
2005-02-11Permit EQ — ISSUED
2005-02-10Job filed: FILING HEREWIH FOR INSTALLATION OF A 168 LN FT BY 16 FT HIGH SIDEWALK SHED IN WHICH A TRAILER WILL BE PLACED ON TOP OF THE SHED. NO CHANGE IN OCCUPANC
2005-01-03Job filed: NB
2005-01-03Job filed: NB
2005-01-03Job filed: NB
2004
2004-10-20Permit EQ — ISSUED
2004-10-13Job filed: Filing herewith for installation of 24 ft long by 16 ft high sidewalk shed. No Change in occupancy, use, or egress
2004-06-15Permit EW — ISSUED
2004-05-19Permit EW — ISSUED
2004-05-04Job filed: Replacement of existing air conditioning units at roof with new units, as per plans submitted herewith. All unit support structures, dunnage, ductwork$50,000
2004-05-04Job filed: Replacement of existing air conditioning units at roof with new units, as per plans submitted herewith. All unit support structures, dunnage, ductwork$50,000
2003
2003-07-15Job filed: Interior renovation of an existing bank on the cellar and first floor for the installation of a wheelchair lift. No change of use, occupancy, or egres$35,000
2003-03-19DOB violation LL6291:
2002
2002-07-02DOB violation E: 1P29973
2002-03-27Permit SG — ISSUED
2002-03-27Permit SG — ISSUED
2002-03-27Permit SG — ISSUED
2002-03-26DOB violation LL6291:
2001
2001-05-10DOB violation E: 1P29973
2001-03-08DOB violation LL1081:
2001-02-27DOB violation LL6291:
1999
1999-09-15Permit EW — ISSUED
1999-03-16DOB violation LL6291:
1997
1997-02-10DOB violation LL6291:
1997-01-13DOB violation LL1081:
1997-01-13DOB violation LL1081:
1996
1996-03-08DOB violation LL1081:
1995
1995-09-26Mortgage $130,500 — from OTTAVIANO, ANNE T. to HOME FEDERAL SAVINGSBANK$130,500
1995-04-17DOB violation LL1081:
1994
1994-09-01DOB violation LL6291:
1994-05-31DOB violation LL1081:
1992
1992-10-20Permit SG — ISSUED
1992-10-20Permit SG — ISSUED
1991
1991-10-11DOB violation C:
1989
1989-10-26DOB complaint, category ?
1989-10-18ECB Non-Hazardous violation: WORK WITHOUT A PERMIT WORK NOTED INSTALLED WOOD GLASS INTERIOR PARTITION @ 1 STY FRONT APPROX 20FT X 12 FT HEIGHT REMEDY OBTAIN PE$250
1989-10-17DOB complaint, category ?
1989-09-27DOB violation C:
1989-09-27DOB violation C:
1989-09-26DOB complaint, category ?
1988
1988-07-14DOB violation E: (51)PROVIDE PHONE IN CAR