The city's published records show little recorded distress here in the last three years. Less recorded distress than 68% of 25-99-unit residential buildings citywide. The citywide median for 25-99-unit residential buildings is 23.6 penalty
points per 10 units; this building carries 8.1. In ZIP 11216, 38% of residential buildings hold an A and
19% grade D or F.
How grades work
this building
A
B
C
Among 17,252 25-99-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
Open HPD violations
7 total — 2 class C (immediately hazardous), 0 class B, 5 class A. Oldest open since 2026-05-11.
status snapshot refreshed weekly from HPD records
Patterns
16 heat or hot-water complaints in the last three years (winter 2026–27: 4).
No bedbug-infested units reported in the last three years of filings.
$5,000 in enforcement penalties imposed (ECB/OATH) in the last three years.
What 311 hears from this address
20 service requests in the last three years. Most common: HEAT/HOT WATER (8) · Noise (4) · Illegal Parking (3) · Emergency Response Team (ERT) (1) · General Construction/Plumbing (1) · Sewer (1).
Filed construction activity
$598,236 in permitted construction work filed since
2016 (16 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974 (2024)
Yes
Six or more residential units (37)
No
421-a / J-51 tax benefit on the current tax roll
1 of 3 signals present. Only a partial profile — stabilization is possible but less likely. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
DEKALB COMMONS NY LLC
Head officer
FRANK LANG
Managing agent
ST NICKS ALLIANCE
Last registered
2026-02-11
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$1,724,000
$103,440
2026
$1,836,000
$826,200
2027
$8,592,000
$3,866,400
The city's market estimate has risen
398% between tax years 2025 and 2027.
Tax exemptions on the roll: 420C
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
1 street-flooding or sewer-backup complaints at this address since
2025 (1 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Bedford-Nostrand Avs — G · 700 ft straight-line (about a 3-minute walk) · station accessibility: none
Bus
Nearest boarding stop: Nostrand Av / DeKalb Av — B44 · 350 ft
Citi Bike
Kosciuszko St & Nostrand Ave · 400 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
20 311 service requests from this address in the last three years — 8 of them about heat or hot water.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $1,223,232 on
2023-07-25 (lender: St. Kings Alliance Corp.), covering 3 lots — the amount covers all of them. Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2023-07-25
Mortgage $28,177,415 — from DEKALB COMMONS NY HOUSING DEVELOPMENT FU; DEKALB COMMONS NY LLC to WEBSTER BANK, NATIONAL ASSOCIATION
$28,177,415
2023-07-25
AL&R $2,500,000 — from DEKALB COMMONS NY HOUSING DEVELOPMENT FU; DEKALB COMMONS NY LLC to WEBSTER BANK, NATIONAL ASSOCIATION
$2,500,000
2023-07-25
Mortgage $2,500,000 — from DEKALB COMMONS NY LLC; DEKALB COMMONS NY HOUSING DEVELOPMENT FU to WEBSTER BANK, NATIONAL ASSOCIATION
$2,500,000
2023-07-25
AL&R $16,723,258 — from DEKALB COMMONS NY LLC; DEKALB COMMONS NY HOUSING DEVELOPMENT FU to WEBSTER BANK, NATIONAL ASSOCIATION
$16,723,258
2023-07-25
Mortgage $14,888,928 — from DEKALB COMMONS NY LLC; DEKALB COMMONS NY HOUSING DEVELOPMENT FU to WEBSTER BANK, NATIONAL ASSOCIATION
$14,888,928
2023-07-25
Mortgage $1,834,330 — from DEKALB COMMONS NY HOUSING DEVELOPMENT FU; DEKALB COMMONS NY LLC to WEBSTER BANK, NATIONAL ASSOCIATION
$1,834,330
2023-07-25
Mortgage $15,219,992 — from DEKALB COMMONS NY HOUSING DEVELOPMENT FU; DEKALB COMMONS NY LLC to THE CITY OF NEW YORK
$15,219,992
2023-07-25
Mortgage $1,223,232 — from DEKALB COMMONS NY LLC; DEKALB COMMONS NY HOUSING DEVELOPMENT FU to ST. KINGS ALLIANCE CORP.
$1,223,232
2023-07-25
AL&R $28,177,415 — from DEKALB COMMONS NY LLC; DEKALB COMMONS NY HOUSING DEVELOPMENT FU to WEBSTER BANK, NATIONAL ASSOCIATION
$28,177,415
Ten-year activity
100500
2017
2018
2019
2020
2021
2022
66
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
0
0
0
0
8
8
2018
0
0
0
0
8
8
2019
0
0
0
0
8
8
2020
4
0
3
0
5
12
2021
8
0
1
0
4
13
2022
0
0
7
0
9
16
2023
17
3
13
20
13
66
2024
29
3
4
0
10
46
2025
16
1
2
0
8
27
2026
5
0
28
0
2
35
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-10-03
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-10-02
HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 7B, 7th STORY, 2nd APARTMENT FROM EAST
2026-10-01
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-10-01
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-09-27
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-09-27
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-09-25
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-09-25
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-09-25
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-09-25
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-09-24
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-09-24
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-09-24
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-09-24
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-09-24
HPD class A: § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND
2026-09-24
HPD class A: § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPE
2026-09-24
HPD class C: § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO H
2026-09-24
HPD class A: § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES
2026-09-24
HPD class A: § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM
2026-09-23
Certificate of occupancy Final
2026-09-23
Certificate of occupancy Final
2026-09-13
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
Job filed: Mechanical work in conjunction with New Building Application # 321590444.
The full timeline
2026
2026-10-03Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-10-03311: HEAT/HOT WATER — ENTIRE BUILDING
2026-10-02HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 7B, 7th STORY, 2nd APARTMENT FROM EAST
2026-10-01Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-10-01311: HEAT/HOT WATER — ENTIRE BUILDING
2026-09-27Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-09-27311: HEAT/HOT WATER — ENTIRE BUILDING
2026-09-25Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-09-25Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-09-25311: HEAT/HOT WATER — ENTIRE BUILDING
2026-09-25311: HEAT/HOT WATER — ENTIRE BUILDING
2026-09-24Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-09-24Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-09-24311: HEAT/HOT WATER — ENTIRE BUILDING
2026-09-24311: HEAT/HOT WATER — ENTIRE BUILDING
2026-09-24HPD class A: § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND
2026-09-24HPD class A: § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPE
2026-09-24HPD class C: § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO H
2026-09-24HPD class A: § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES
2026-09-24HPD class A: § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM
2026-09-23Certificate of occupancy Final
2026-09-23Certificate of occupancy Final
2026-09-13Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-09-13311: HEAT/HOT WATER — ENTIRE BUILDING
2026-08-24Certificate of occupancy Renewal Without Change
2026-08-10Rodent inspection: Passed
2026-06-01Certificate of occupancy Renewal Without Change
2026-05-11HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2025-10-31Job filed: Mechanical work in conjunction with New Building Application # 321590444.$1,000
2025-10-03Elevator permit: Furnish and install One (1) MRL traction passenger elevator-All work to comply with Safety Code for Elevators and Escalators ASME $230,000
2025-09-05Permit Plumbing — Signed-off
2025-09-04Permit Plumbing — Signed-off
2025-08-05Rodent inspection: Passed
2025-07-29Permit Solar — Signed-off
2025-07-17Permit General Construction — Signed-off
2025-05-19311: Illegal Parking — Blocked Bike Lane
2025-04-29Permit Suspended Scaffold — Signed-off
2025-04-25Permit NB — ISSUED
2025-04-21Permit Protection and Mechanical Methods — Signed-off
2025-04-07Permit Supported Scaffold — Signed-off
2025-03-25Permit Sidewalk Shed — Signed-off
2025-03-25Permit Supported Scaffold — Signed-off
2025-03-05Elevator permit: FURNISH AND INSTALL ONE NEW DUMBWAITER All work to comply with Safety Code for Elevators and Escalators ASME A17.1-2013, Part 7, S$83,200
2025-03-04FDNY inspection (CONSTR)
2025-02-11Job filed: INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT.
2025-02-06Permit Supported Scaffold — Signed-off
2025-02-05Rodent inspection: Passed
2025-02-05Rodent inspection: Passed
2025-02-05Rodent inspection: Passed
2025-02-05Rodent inspection: Passed
2025-01-17Elevator permit: Furnish and install One (1) new overhead MRL traction passenger elevator-All work to comply with Safety Code for Elevators and Esc$230,000
2024
2024-12-11Permit Suspended Scaffold — Signed-off
2024-12-10Job filed: INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT.
2024-12-05Permit Structural — Signed-off
2024-11-19311: Noise — Noise: Construction Equipment (NC1)
2024-11-06Permit Standpipe — Signed-off
2024-11-06Permit Sprinklers — Signed-off
2024-11-04Permit Sprinklers — Signed-off
2024-11-04Permit Standpipe — Signed-off
2024-09-06FDNY inspection (CONSTR)
2024-09-05Permit Plumbing — Signed-off
2024-09-05Permit Plumbing — Signed-off
2024-08-28Permit Supported Scaffold — Signed-off
2024-08-27Job filed: TEMPORARY INSTALLATION OF SUPPORTED PIPE SCAFFOLD AS SHOWN ON PLANS. SHALL COMPLY WITH BSA-362-44-SM, LL-33/91, CHAP 33, SECTION 33 OF 2014 NYC DOB B$385,000
2024-08-26Permit Solar — Signed-off
2024-08-22Job filed: INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$169,036
2024-08-20Rodent inspection: Passed
2024-08-20Rodent inspection: Passed
2024-08-20Rodent inspection: Passed
2024-08-20Rodent inspection: Passed
2024-07-30Permit Construction Fence — Signed-off
2024-07-28Job filed: INSTALLATION OF 300 PSF SIDEWALK SHED, ROOF PROTECTION AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE$5,000
2024-07-18Permit General Construction — Signed-off
2024-07-18Permit Mechanical Systems — Signed-off
2024-07-08Job filed: INSTALLATION OF 300 PSF SIDEWALK SHED, ROOF PROTECTION AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE$5,000
2024-07-01Elevator permit: Furnish and install One (1) MRL traction passenger elevator-All work to comply with Safety Code for Elevators and Escalators ASME $230,000
2024-06-12FDNY inspection (CONSTR)
2024-05-06311: Noise — Noise: Construction Equipment (NC1)
2024-05-03Elevator permit: INSTALLATION OF 6000LB SINGLE HOIST CAR AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. INSTALLATION AND $10,200
2024-04-29Permit FO — ISSUED
2024-04-29Permit NB — ISSUED
2024-04-29Permit FO — ISSUED
2024-04-24Permit Protection and Mechanical Methods — Signed-off
2024-04-24Job filed: INSTALLATION OF 6000 LB SINGLE PERSONNEL/MATERIAL HOIST CAR AS PER PLANS DURING CONSTRUCTION. HOIST SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO$10,200
2024-04-22Permit NB — ISSUED
2024-04-22Permit FO — ISSUED
2024-04-22Permit FO — ISSUED
2024-04-11311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2024-03-28Permit Supported Scaffold — Signed-off
2024-03-28Permit Sidewalk Shed — Signed-off
2024-03-27Job filed: INSTALLATION OF 300 PSF SIDEWALK SHED, ROOF PROTECTION AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE$5,000
2024-03-21FDNY inspection (CONSTR)
2024-03-12311: Noise — Noise: Construction Before/After Hours (NM1)
2024-02-05Rodent inspection: Passed
2024-02-05Rodent inspection: Passed
2024-02-05Rodent inspection: Passed
2024-02-05Rodent inspection: Passed
2023
2023-12-20ECB CLASS - 2 violation: FAILURE TO COMPLY WITH ASTM C31 STANDARD FOR CONRETE CILINDER TEST SAMPLES. NO CURING BOX. AS NOTED: AT TIME OF INSPECTION AT AN A$5,000
2023-12-20DOB complaint, category ?
2023-12-08Permit Structural — Signed-off
2023-11-19311: Emergency Response Team (ERT) — After Hours Work - Illegal
2023-11-08Permit Sprinklers — Signed-off
2023-11-08Permit Standpipe — Signed-off
2023-11-06Permit Standpipe — Signed-off
2023-11-06Permit Sprinklers — Signed-off
2023-10-11Rodent inspection: Bait applied
2023-09-28FDNY inspection (CONSTR)
2023-09-27Rodent inspection: Failed for Rat Activity
2023-09-12Permit General Construction — Signed-off
2023-09-12Permit FO — ISSUED
2023-09-12Permit FO — ISSUED
2023-09-12Permit NB — ISSUED
2023-09-06Job filed: Demolition of existing freestanding wall on vacant lot.$10,000
2023-08-24Permit Plumbing — Signed-off
2023-08-23Permit Plumbing — Signed-off
2023-08-11Rodent inspection: Failed for Rat Activity
2023-08-11Rodent inspection: Failed for Rat Activity
2023-08-11Rodent inspection: Failed for Rat Activity
2023-08-11Rodent inspection: Failed for Rat Activity
2023-07-27Permit Construction Fence — Signed-off
2023-07-25Mortgage $28,177,415 — from DEKALB COMMONS NY HOUSING DEVELOPMENT FU; DEKALB COMMONS NY LLC to WEBSTER BANK, NATIONAL ASSOCIATION$28,177,415
2023-07-25AL&R $2,500,000 — from DEKALB COMMONS NY HOUSING DEVELOPMENT FU; DEKALB COMMONS NY LLC to WEBSTER BANK, NATIONAL ASSOCIATION$2,500,000
2023-07-25Mortgage $2,500,000 — from DEKALB COMMONS NY LLC; DEKALB COMMONS NY HOUSING DEVELOPMENT FU to WEBSTER BANK, NATIONAL ASSOCIATION$2,500,000
2023-07-25AL&R $16,723,258 — from DEKALB COMMONS NY LLC; DEKALB COMMONS NY HOUSING DEVELOPMENT FU to WEBSTER BANK, NATIONAL ASSOCIATION$16,723,258
2023-07-25Mortgage $14,888,928 — from DEKALB COMMONS NY LLC; DEKALB COMMONS NY HOUSING DEVELOPMENT FU to WEBSTER BANK, NATIONAL ASSOCIATION$14,888,928
2023-07-25Mortgage $1,834,330 — from DEKALB COMMONS NY HOUSING DEVELOPMENT FU; DEKALB COMMONS NY LLC to WEBSTER BANK, NATIONAL ASSOCIATION$1,834,330
2023-07-25SUBM — from THE CITY OF NEW YORK to WEBSTER BANK, NATIONAL ASSOCIATION
2023-07-25Mortgage $15,219,992 — from DEKALB COMMONS NY HOUSING DEVELOPMENT FU; DEKALB COMMONS NY LLC to THE CITY OF NEW YORK$15,219,992
2023-07-25SUBM — from WEBSTER BANK, NATIONAL ASSOCIATION to ST. NICKS ALLIANCE CORP.
2023-07-25Mortgage $1,223,232 — from DEKALB COMMONS NY LLC; DEKALB COMMONS NY HOUSING DEVELOPMENT FU to ST. KINGS ALLIANCE CORP.$1,223,232
2023-07-25AL&R $28,177,415 — from DEKALB COMMONS NY LLC; DEKALB COMMONS NY HOUSING DEVELOPMENT FU to WEBSTER BANK, NATIONAL ASSOCIATION$28,177,415
2023-07-25Job filed: Fence application as per plans filed in conjunction with NB# B00544817-I1$1,000
2023-07-19Rodent inspection: Failed for Rat Activity
2023-07-18SAGE — from THE CITY OF NEW YORK to WEBSTER BANK, NATIONAL ASSOCIATION
2023-07-18SAGE — from DEKALB COMMONS NY LLC; DEKALB COMMONS NY HOUSING DEVELOPMENT FU to THE CITY OF NEW YORK
2023-07-18SAGE — from DEKALB COMMONS NY HOUSING DEVELOPMENT FU; DEKALB COMMONS NY LLC to CITY OF NEW YORK
2023-07-18SAGE — from DEKALB COMMONS NY HOUSING DEVELOPMENT FU to DEKALB COMMONS NY LLC
2023-07-18Deed — from THE CITY OF NEW YORK to DEKALB COMMONS NY HOUSING DEVELOPMENT FU
2023-07-18SAGE — from THE CITY OF NEW YORK to DEKALB COMMONS NY HOUSING DEVELOPMENT FU; DEKALB COMMONS NY LLC
2023-07-11311: Rodent — Rat Sighting
2023-07-07Permit General Construction — Signed-off
2023-07-06ZONE — from DEKALB COMMONS NY LLC; DEKALB COMMONS NY HOUSING DEVELOPMENT FU
2023-07-06CERT — from NATIONAL STANDARD ABSTRACT LLC
2022-08-02Rodent inspection: Failed for Other Reason
2022-08-02Rodent inspection: Failed for Other Reason
2022-08-02Rodent inspection: Failed for Other Reason
2022-08-02Rodent inspection: Failed for Other Reason
2022-07-13311: Illegal Parking — Paper License Plates
2022-03-31Rodent inspection: Failed for Rat Activity
2022-02-28Rodent inspection: Passed
2022-02-28Rodent inspection: Failed for Rat Activity
2022-02-28Rodent inspection: Passed
2022-02-28Rodent inspection: Passed
2022-01-24311: Illegal Dumping — Chronic Dumping
2022-01-18311: Dirty Condition — Trash
2022-01-18311: Illegal Dumping — Chronic Dumping
2021
2021-11-12Job filed: STRUCTURAL WORK IN CONJUNCTION NEW BUILDING # 321590444.$1,000
2021-10-27Job filed: Application filed for civil site drainage, in conjunction with NB # 321590444$1,000
2021-10-01Job filed: PLUMBING WORK IN CONJUNCTION WITH NEW BUILDING APPLICATION # 321590444$1,000
2021-10-01Job filed: Mechanical work in conjunction with New Building Application # 321590444.$1,000
2021-10-01Job filed: SPRINKLER AND STANDPIPE WORK IN CONJUNCTION WITH NEW BUILDING APPLICATION #321590444$1,000
2021-09-29Job filed: Application filed for civil site grading in conjunction with NB # 321590444$1,000
2021-08-17311: Illegal Parking — Blocked Sidewalk
2021-08-08Rodent inspection: Failed for Rat Activity
2021-08-08Rodent inspection: Passed
2021-08-08Rodent inspection: Passed
2021-08-08Rodent inspection: Failed for Rat Activity
2021-04-22Job filed: SOE WORK IN CONJUNCTION WITH NB
2021-04-22Job filed: SOE WORK IN CONJUNCTION WITH NB
2020
2020-11-19311: Vacant Lot — 8 Request to Clean Vacant Lot
2020-11-19311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2020-08-18Rodent inspection: Stoppage done
2020-06-23Job filed: BUILDERS PAVEMENT PLAN FOR 100' LINEAR FEET AS SHOWN ON PLANS IN CONJUNCTION WITH NEW BUILDING APPLICATION # 321590444.
2020-05-26311: Vacant Lot — 8 Request to Clean Vacant Lot
2020-05-08Job filed: FOOTING/FOUNDATION WORK IN CONJUNCTION WITH NEW BUILDING APPLICATION
2020-05-08Job filed: FOOTING/FOUNDATION WORK IN CONJUNCTION WITH NEW BUILDING APPLICATION
2020-05-01Job filed: NEW SEVEN (7) STORIES RESIDENTIAL BUILDING
2020-02-25Rodent inspection: Passed
2020-02-24Rodent inspection: Failed for Other Reason
2020-02-24Rodent inspection: Passed
2020-02-24Rodent inspection: Failed for Rat Activity
2019
2019-08-05Rodent inspection: Failed for Other Reason
2019-08-05Rodent inspection: Failed for Other Reason
2019-08-05Rodent inspection: Failed for Rat Activity and Other Reason
2019-08-05Rodent inspection: Failed for Other Reason
2019-02-21Rodent inspection: Passed
2019-02-21Rodent inspection: Passed
2019-02-21Rodent inspection: Failed for Rat Activity
2019-02-21Rodent inspection: Passed
2018
2018-08-01Rodent inspection: Passed
2018-08-01Rodent inspection: Passed
2018-08-01Rodent inspection: Passed
2018-08-01Rodent inspection: Passed
2018-02-09Rodent inspection: Passed
2018-02-09Rodent inspection: Failed for Other Reason
2018-02-09Rodent inspection: Failed for Other Reason
2018-02-09Rodent inspection: Passed
2017
2017-10-25Rodent inspection: Passed
2017-10-25Rodent inspection: Passed
2017-10-25Rodent inspection: Passed
2017-10-25Rodent inspection: Passed
2017-01-25Rodent inspection: Passed
2017-01-25Rodent inspection: Passed
2017-01-25Rodent inspection: Passed
2017-01-25Rodent inspection: Passed
2016
2016-09-21Rodent inspection: Failed for Rat Activity
2015
2015-04-23Rodent inspection: Passed
2015-04-23Rodent inspection: Passed
2015-04-23Rodent inspection: Passed
2015-04-23Rodent inspection: Passed
2014
2014-04-02Rodent inspection: Passed
2014-04-02Rodent inspection: Passed
2014-04-02Rodent inspection: Passed
2014-04-02Rodent inspection: Passed
2012
2012-02-08ECB CLASS - 3 violation: VIOLATION OF PARKING REGULATIONS IN A RESIDENTIAL DISTRICT. NOTE: MULTIPLE MOTOR VEHICLES 10-25 ARE BEING STORED IN SIDE VACANT LO
2011
2011-01-25Rodent inspection: Failed for Other Reason
2011-01-25Rodent inspection: Failed for Other Reason
2010
2010-12-17Rodent inspection: Failed for Other Reason
2010-12-17Rodent inspection: Failed for Other Reason
2010-12-17Rodent inspection: Failed for Other Reason
2010-12-17Rodent inspection: Failed for Other Reason
2002
2002-01-28Permit EQ — ISSUED
2002-01-28Permit EW — ISSUED
2001
2001-12-03Job filed: INSTALL NEW 10 HIGH MASONRY FENCE AND NE W CONCRETE WALK WITH CURB.$20,000
2001-12-03Job filed: INSTALL NEW 10 HIGH MASONRY FENCE AND NE W CONCRETE WALK WITH CURB.$20,000
2001-12-03Job filed: INSTALL NEW 10 HIGH MASONRY FENCE AND NE W CONCRETE WALK WITH CURB.$20,000
1974
1974-10-15SAGE — from CBMC HOUSING DEVELOPMENT CO INC; NYC; THE CITY OF NEW YORK; CBMC HOUSING DEVELOP CO INC; C
1973
1973-12-27Deed — from FINANCE ADMIN OF CITY OF NY; ZWICKEL, YETTA to CITY OF NY
1971
1971-12-30SAGE — from C B M C DEVELOPMENT CO INC; CBMC HOUSING DEVELOPMENT CO INC; CITY OF NY; CBMC HOSUING DEVE