Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

670 Broadway · Brooklyn · BBL 3022730011 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

Where the penalty points come from

ComponentWhat it coversPoints
Housing codeHPD violations by class, complaints, emergency repairs, litigation, vacate orders, AEP20.8
Structural & safetyDOB violations, ECB/OATH violations by class0
PestsBedbug filings, failed rodent inspections, rodent 311s0
DisplacementMarshal evictions executed0
GRADE A

The city's published records show little recorded distress here in the last three years. More recorded distress than 52% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty points per 10 units; this building carries 17.3. In ZIP 11206, 43% of residential buildings hold an A and 17% grade D or F. How grades work

this building
A
B
C

Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more

Open with the city right now

Open HPD violations3 total — 0 class C (immediately hazardous), 2 class B, 1 class A. Oldest open since 2026-07-25.

status snapshot refreshed weekly from HPD records

Patterns

No heat or hot-water complaints in the last three years.

No bedbug-infested units reported in the last three years of filings.

What 311 hears from this address

11 service requests in the last three years. Most common: PLUMBING (4) · UNSANITARY CONDITION (2) · Water System (1) · Graffiti (1) · Dirty Condition (1) · Street Condition (1).

Filed construction activity

No permitted work with a declared cost filed in the last decade. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

Rent-stabilization signals

YesBuilt before 1974 (1931)
YesSix or more residential units (12)
No421-a / J-51 tax benefit on the current tax roll

2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit: request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).

Registered with HPD — the names behind the building

Registered owner(s)BROOKLYN NEIGHBORHOOD HDFC
Head officerFRANK LANG
Managing agentST NICKS ALLIANCE
Last registered2025-10-28

as filed by the owner in the building's HPD registration

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$744,000 $334,800
2026$698,000 $314,100
2027$770,000 $346,500

The city's market estimate has risen 3% between tax years 2025 and 2027.

Tax exemptions on the roll: 420C

Building systems

Heating fuelNATURALGAS

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Hurricane evacuation zone 4 of 6 — zone 1 evacuates first.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

1 street-flooding or sewer-backup complaints at this address since 2014 (0 in the last three years).

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

SubwayLorimer St — J M · 750 ft straight-line (about a 4-minute walk) · station accessibility: none
BusNearest boarding stop: Broadway / Cook St — B46 · 150 ft
Citi BikeBroadway & Whipple St · 250 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: P.S. 380 John Wayne Elementary. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

670 Broadway

Heat or hot waterHeat or hot water
Apartment maintenanceApartment maintenance
Bed bugsBed bugs
Residential pestsResidential pests
Rats or miceRats or mice
Anything elseAnything else

11 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

The landlord's report card

Managed by ST. NICKS ALLIANCE — 108 buildings, 1,556 units. Grades across the portfolio: A34 · B34 · C20 · D18 · F1. See the whole portfolio

BuildingBoroughUnitsGrade
100 Throop Avenue BK140 A
590 DeKalb Avenue BK111 B
75 Bushwick Avenue BK96 A
250 Pulaski Street BK72 A
609 Metropolitan Avenue BK65 A
330 Union Avenue BK59 A
695 Grand Street BK51 B
106 Gerry Street BK46 B
DeKalb Ave BK45 A
324 Devoe Street BK45 A
633-639 DeKalb Avenue BK37 A
654 Grand Street BK33 B
11 Ten Eyck Street BK24 A
140 Johnson Avenue BK24 B
306 Union Avenue BK21 C
601 Metropolitan Avenue BK20 B
1371 Atlantic Avenue BK20 B
607 Metropolitan Avenue BK20 B
1369 Atlantic Avenue BK20 B
124 Graham Avenue BK16 B
161 Halsey Street BK16 B
20 Maujer Street BK16 C
19 Humboldt Street BK15 A
214 Scholes Street BK15 B
9 Mac Donough Street BK12 B
276 Jackson Street BK12 B
464 Nostrand Avenue BK12 B
28 Kingsland Avenue BK12 B
22 Stagg Street BK12 A
670 Broadway BK12 A
167 Newport Street BK12 B
140 Newport Street BK12 C
662 Broadway BK12 B
29 Debevoise Avenue BK12 A
20 Stagg Street BK11 B
18 Stagg Street BK9 B
302 Jackson Street BK9 A
486 Gates Avenue BK8 B
108 Meserole Street BK8 B
100 Macon Street BK8 C
512 Morgan Avenue BK8 B
127 Guernsey Street BK8 A
131 Thames Street BK8 A
143 Jefferson Avenue BK8 A
447 Tompkins Avenue BK8 C
586A Morgan Avenue BK8 A
586 Morgan Avenue BK8 A
110 Meserole Street BK7 B
161 Graham Avenue BK6 A
27 Ingraham Street BK6 A
110 Seigel Street BK6 A
315 Harman Street BK6 D
910 Rockaway Avenue BK6 A
431 Jefferson Avenue BK6 B
116 Jefferson Avenue BK6 B
543 Graham Avenue BK6 A
235 Driggs Avenue BK6 B
345 Lorimer Street BK6 A
895 Mother Gaston Blvd BK6 C
40 Scholes Street BK6 B

showing 60 of 108 buildings

Sales, deeds & mortgages

Most recent mortgage recorded against this lot: $2,873,086 on 1988-12-09 (lender: NYC Hpd), covering 4 lots — the amount covers all of them. Face amount at recording — it may have since been paid down, refinanced or satisfied. View the recorded document.

DateRecordAmountPer res. unit
2024-10-29Agreement $2,721,760 — from BROOKLYN NEIGHBORHOOD HOUSING DEVELOPMEN to THE CITY OF NEW YORK $2,721,760
2009-07-09AL&R $442,184 — from BROOKLYN NEIGHBORHOOD HDFC to THE CITY OF NEW YORK $442,184
2009-07-09Mortgage $2,721,760 — from BROOKLYN NEIGHBORHOOD HDFC to THE CITY OF NEW YORK $2,721,760
2009-07-09Mortgage $442,184 — from BROOKLYN NEIGHBORHOOD HDFC to THE CITY OF NEW YORK $442,184
2009-07-09RPTT&RET $2,559,136 — from NEW YORK EQUITY FUND 1988 L.P. to BROOKLYN NEIGHBORHOOD HDFC, INC. $2,559,136
1988-12-09Mortgage $2,873,086 — from NEXT WAVE LTD PARTNERSHP to NYC HPD $2,873,086

Ten-year activity

50250
2017
2018
2019
2020
2021
2022
2023
2024
2025
21
2026
EnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
201707029
201822026
201902002
202003025
20213110216
202206028
2023090211
202402136
202503025
20260190221
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 21 records

DateRecord
2026-09-21Boiler inspection
2026-09-21Boiler inspection
2026-09-06HPD class A: §27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WIT
2026-08-11311: UNSANITARY CONDITION — SEWAGE
2026-08-11Tenant complaint: UNSANITARY CONDITION — SEWAGE
2026-08-10311: PLUMBING — TOILET
2026-08-10Tenant complaint: PLUMBING — TOILET
2026-07-25HPD class B: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 1B,
2026-07-25HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT
2026-07-19311: WATER LEAK — HEAVY FLOW
2026-07-19Tenant complaint: WATER LEAK — HEAVY FLOW
2026-07-12311: PLUMBING — BASIN/SINK
2026-07-12311: UNSANITARY CONDITION — SEWAGE
2026-07-12311: PLUMBING — TOILET
2026-07-12311: PLUMBING — BATHTUB/SHOWER
2026-07-12Tenant complaint: PLUMBING — TOILET
2026-07-12Tenant complaint: UNSANITARY CONDITION — SEWAGE
2026-07-12Tenant complaint: PLUMBING — BASIN/SINK
2026-07-12Tenant complaint: PLUMBING — BATHTUB/SHOWER
2026-04-29311: Street Condition — Pothole
2026-01-15Bedbug filing: 0 infested units

The full timeline

2026
2026-09-21Boiler inspection
2026-09-21Boiler inspection
2026-09-06HPD class A: §27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WIT
2026-08-11311: UNSANITARY CONDITION — SEWAGE
2026-08-11Tenant complaint: UNSANITARY CONDITION — SEWAGE
2026-08-10311: PLUMBING — TOILET
2026-08-10Tenant complaint: PLUMBING — TOILET
2026-07-25HPD class B: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 1B,
2026-07-25HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT
2026-07-19311: WATER LEAK — HEAVY FLOW
2026-07-19Tenant complaint: WATER LEAK — HEAVY FLOW
2026-07-12311: PLUMBING — BASIN/SINK
2026-07-12311: UNSANITARY CONDITION — SEWAGE
2026-07-12311: PLUMBING — TOILET
2026-07-12311: PLUMBING — BATHTUB/SHOWER
2026-07-12Tenant complaint: PLUMBING — TOILET
2026-07-12Tenant complaint: UNSANITARY CONDITION — SEWAGE
2026-07-12Tenant complaint: PLUMBING — BASIN/SINK
2026-07-12Tenant complaint: PLUMBING — BATHTUB/SHOWER
2026-04-29311: Street Condition — Pothole
2026-01-15Bedbug filing: 0 infested units
2025
2025-10-16Boiler inspection
2025-10-16Boiler inspection
2025-08-06311: Dirty Condition — Trash
2025-06-10Bedbug filing: 0 infested units
2025-06-06HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2024
2024-11-25HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2024-10-29Agreement $2,721,760 — from BROOKLYN NEIGHBORHOOD HOUSING DEVELOPMEN to THE CITY OF NEW YORK$2,721,760
2024-05-06Boiler inspection
2024-05-06Boiler inspection
2024-02-21Air permit (REGISTRATION), fuel: NATURALGAS
2024-02-08311: Graffiti — Graffiti
2023
2023-12-08Bedbug filing: 0 infested units
2023-12-04311: Water System — Dirty Water (WE)
2023-10-23HPD class A: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 1B, 1st
2023-10-23HPD class A: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL GLAZE AT BATHTUB IN THE BATHROOM LOCATED A
2023-10-23HPD class A: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND BATHTUB PERIMETER IN THE BATHROOM LOCATED A
2023-10-23HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT
2023-10-23HPD class A: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 1B, 1st STO
2023-10-20311: Missed Collection — Trash
2023-10-04Bedbug filing: 0 infested units
2023-09-28Boiler inspection
2023-09-28Boiler inspection
2022
2022-12-07Bedbug filing: 0 infested units
2022-09-30311: Blocked Driveway — No Access
2022-09-30311: Blocked Driveway — No Access
2022-09-30311: Blocked Driveway — No Access
2022-07-05Boiler inspection
2022-07-05Boiler inspection
2022-02-01311: Graffiti — Graffiti
2022-01-20Bedbug filing: 0 infested units
2021
2021-09-24Boiler inspection
2021-09-24Boiler inspection
2021-09-21HPD class B: § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF PLEXI GLASS INSTALLED AT BUILDING FRONT ENTRANCE DOOR AT PUBLIC HALL, 1st
2021-09-21HPD class C: § 27-2005, 2007, 204.1 HMC CODE: ARRANGE AND MAKE SELF-CLOSING THE DOORS AT BUILDING FRONT ENTRANCE AT PUBLIC HALL, 1st STORY
2021-09-21HPD class A: § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON
2021-09-21HPD class A: § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND
2021-09-21HPD class C: § 27-2005, 2007, 204.1 HMC CODE: ARRANGE AND MAKE SELF-CLOSING THE DOORS AT VESTIBULE , 1st STORY
2021-09-21HPD class B: § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE GLASS PANE AT BUILDING ENTRANCE DOOR , 1st STORY
2021-09-21HPD class A: § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES
2021-09-21HPD class A: § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM
2021-04-07HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021-04-07HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2021-02-24311: Boilers — Boiler - Defective/Inoperative/No Permit
2021-02-24DOB complaint, category ?
2021-02-23ECB CLASS - 2 violation: COMBUSTION AIR INTAKE IS NOT 30 " ABOVE GRADE AS PER FGC 304.4.3, HOLES IN CEILING BOILER ROOM NOT PROTECTED AS PER BC 509.1, BC 5$625
2021-02-23ECB CLASS - 2 violation: CONSTRUCTION DOCUMENTS SHALL SHOW CORRECT INFORMATION AS PER FGC 106.7 MISSING CHIMNEY INFORMATION; FGC MISC, COMPLY WITH NOTICE O
2020
2020-12-27311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-12-02Boiler inspection
2020-12-02Boiler inspection
2020-11-16311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-07-09311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019
2019-10-21311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-09-24311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2018
2018-10-08311: Street Condition — Pothole
2018-09-12Boiler inspection
2018-09-12Boiler inspection
2018-04-25311: Blocked Driveway — No Access
2018-04-06DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
2018-04-06DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
2017
2017-11-03Boiler inspection
2017-11-03Boiler inspection
2017-08-29HPD class A: § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON
2017-08-29HPD class C: § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO H
2017-08-29HPD class A: § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES
2017-08-29HPD class A: § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGE
2017-07-27311: UNSANITARY CONDITION — GARBAGE/RECYCLING STORAGE
2017-07-27Tenant complaint: UNSANITARY CONDITION — GARBAGE/RECYCLING STORAGE
2017-01-13HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT WEST WALL AT BATHTUB IN THE BATHROOM LOCAT
2015
2015-10-08FDNY inspection (RISK)
2015-04-07HPD class A: SECTION 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF T
2015-04-06311: HEAT/HOT WATER — ENTIRE BUILDING
2015-04-06Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2015-02-01311: HEAT/HOT WATER — ENTIRE BUILDING
2015-02-01Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2014
2014-06-03HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE BATHROOM LOCATED AT A
2014-06-03HPD class B: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK WEST WALL IN THE BATHROOM LOCATED AT APT 1B, 1st STOR
2014-06-03HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SLOPPING CERAMIC TILE FLOOR IN THE BATHROOM LOCATED AT APT
2014-05-21311: HEAT/HOT WATER — ENTIRE BUILDING
2014-05-21Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2014-05-19311: PLUMBING — TOILET
2014-05-19311: FLOORING/STAIRS — FLOOR
2014-05-19311: FLOORING/STAIRS — FLOOR
2014-05-19311: HEAT/HOT WATER — ENTIRE BUILDING
2014-05-19311: PLUMBING — BATHTUB/SHOWER
2014-05-19Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2014-05-19Tenant complaint: FLOORING/STAIRS — FLOOR
2014-05-19Tenant complaint: FLOORING/STAIRS — FLOOR
2014-05-19Tenant complaint: PLUMBING — TOILET
2014-05-19Tenant complaint: PLUMBING — BATHTUB/SHOWER
2014-05-18311: Sewer — Sewer Backup (Use Comments) (SA)
2014-04-22Permit PL — ISSUED
2013
2013-01-02311: Water System — Excessive Water In Basement (WEFB)
2012
2012-11-27311: PLUMBING — SEWER
2012-11-27Tenant complaint: PLUMBING — SEWER
2012-04-12311: Street Condition — Pothole
2011
2011-09-22Permit PL — ISSUED
2010
2010-10-04311: Blocked Driveway — No Access
2010-08-11Permit EW — ISSUED
2010-08-11Permit PL — ISSUED
2010-08-10Job filed: REPLACE GAS BOILER (NYC BOILER NO. MD67307-01) AND GAS HOT WATER HEATER WITH (2) GAS BOILERS AND (1) INDIRECT FIRED HOT WATER HEATER/STORAGE TANK.$55,000
2010-08-10Job filed: REPLACE GAS BOILER (NYC BOILER NO. MD67307-01) AND GAS HOT WATER HEATER WITH (2) GAS BOILERS AND (1) INDIRECT FIRED HOT WATER HEATER/STORAGE TANK.$55,000
2010-06-23Rodent inspection: Passed
2010-06-07Rodent inspection: Failed for Other Reason
2010-02-03Rodent inspection: Failed for Rat Activity and Other Reason
2010-01-14311: PLUMBING — SEWER
2010-01-14Tenant complaint: PLUMBING — SEWER
2009
2009-08-29ECB CLASS - 2 violation: SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS. NOTED: SIDEWALK SHED INSTALLED AT EXPOSURE #1 & #2 MISSING APPROX 8FFT OF SHED PA$2,400
2009-08-29ECB CLASS - 2 violation: FAILURE TO PROVIDE REQUIRED SIGNAGE & INFORMATION ON SIDEWALK SHED. NOTED: MISSING PERMIT # & EXPIRATION DATE ON SIDEWALK SHED SIG
2009-08-06Permit EQ — ISSUED
2009-07-27Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED A TOTAL OF 36 LINEAR FT. AS PER PLAN AT 670 BROADWAY. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. N
2009-07-27Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED A TOTAL OF 36 LINEAR FT. AS PER PLAN AT 670 BROADWAY. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. N
2009-07-09AL&R $442,184 — from BROOKLYN NEIGHBORHOOD HDFC to THE CITY OF NEW YORK$442,184
2009-07-09Agreement — from THE CITY OF NEW YORK to BROOKLYN NEIGHBORHOOD HDFC
2009-07-09Mortgage $2,721,760 — from BROOKLYN NEIGHBORHOOD HDFC to THE CITY OF NEW YORK$2,721,760
2009-07-09Mortgage $442,184 — from BROOKLYN NEIGHBORHOOD HDFC to THE CITY OF NEW YORK$442,184
2009-07-09Deed — from NEXT WAVE LIMITED PARTNERSHIP to BROOKLYN NEIGHBORHOOD HDFC, INC.
2009-07-09RPTT&RET $2,559,136 — from NEW YORK EQUITY FUND 1988 L.P. to BROOKLYN NEIGHBORHOOD HDFC, INC.$2,559,136
2008
2008-10-21Agreement — from NEXT WAVE LIMITED PARTNERSHIP to THE CITY OF NEW YORK
2005
2005-12-12Tenant complaint: HEATING — HEAT RELATED
2005-12-11Tenant complaint: HEATING — HEAT RELATED
2005-12-09Tenant complaint: HEATING — HEAT RELATED
1988
1988-12-09Mortgage $2,873,086 — from NEXT WAVE LTD PARTNERSHP to NYC HPD$2,873,086
1988-12-09Deed — from CITY OF NEW YORK to NEXT WAVE LTD PARTNERSHP
1988-12-09Agreement — from NYC HPD to NEW WAVE LTD PRTNSP
1988-12-09Agreement — from NEXT WAVE LTD PRTNSP to NYC HPD
1988-12-09Mortgage assigned — from NEXT WAVE LTD PARTNERSHP to NYC - HPD
1982
1982-08-18Deed — from COMMISSIONER FINANCENY to NEW YORK CITY
1974
1974-10-07Deed — from MARKOWITZ STEPHEN to BERNARD MARKOWITZ AND SON REALTY CORP
1973
1973-11-19Mortgage assigned — from MILLER SAMUEL; MILLER RACHEL to MARKOWITZ BERNARD
1973-11-19Deed — from BARTLETT CONSTRUCTION CORP to MARKOWITZ STEPHEN
1970
1970-09-02Deed — from 670 BROADWAY CORP to BARTLETT CONSTRUCTION CORP

Support this site Back to the building page