The city's published records show little recorded distress here in the last three years. Less recorded distress than 100% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty
points per 10 units; this building carries 0. In ZIP 11355, 84% of residential buildings hold an A and
3% grade D or F.
How grades work
this building
A
B
C
Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
10 service requests in the last three years. Most common: Blocked Driveway (6) · General Construction/Plumbing (2) · Street Condition (1) · Illegal Dumping (1).
Filed construction activity
No permitted work with a declared cost filed in the last decade. Permit
costs cover filed construction work only — they do not capture routine maintenance or repairs done
without a permit.
Rent-stabilization signals
No
Built before 1974 (2008)
Yes
Six or more residential units (8)
Yes
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. Buildings receiving 421-a or J-51 benefits are generally required to register their units as rent-stabilized for the duration of the benefit. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
SHU YEN CONDOMINIUM
Head officer
TANIa LAi
Managing agent
TYME PROPERTY MANAGEMENT
Last registered
2025-07-16
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$120,046
$54,020
2026
$127,883
$57,548
2027
$130,308
$58,639
The city's market estimate has risen
9% between tax years 2025 and 2027.
Tax exemptions on the roll: 421A 15 YR NO CAP
For property tax, the Department of Finance values this condo
as if it were a rental building. Its 2023 estimate: gross income $239,161 a year
($33.59 per sq ft), operating expenses $105,234
($14.78 per sq ft), net operating income $133,927. These are the
city's estimates from comparable rentals, not the building's actual budget, rents or maintenance
charges.
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Flushing-Main St — 7 · 0.3 mi straight-line (about an 8-minute walk) · station accessibility: full
Bus
Nearest boarding stop: Main St / Maple Av — Q20 · 650 ft
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
10 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
2016-06-29PAT — from KAN, NANCY T to SHU YEN CONDOMINIUM
2016-06-29Deed $565,000 — from DENISE LLC to KAN, NANCY T$565,000
2016-06-07Deed — from DENISE LLC to DENISE LLC
2016-06-07Deed — from DENISE LLC to DENISE LLC
2016-06-07Deed — from DENISE LLC to DENISE LLC
2016-05-26Sold for $565,000$565,000
2016-05-23Deed $408,000 — from DENISE LLC to DONG, FENGFANG; LI, JIAN$408,000
2016-05-23Mortgage $200,000 — from DONG, FENGFANG; LI, JIAN to METRO CITY BANK$200,000
2016-05-23PAT — from LI, JIAN; DONG, FENGFANG to MEMBERS OF THE BOARD OF MANAGERS OF SHU
2016-05-20Deed transfer (nominal price)
2016-05-20Deed transfer (nominal price)
2016-05-20Deed transfer (nominal price)
2016-05-17Deed $415,000 — from DENISE LLC to ZHANG, JIN R$415,000
2016-05-17PAT — from ZHANG, JIN R to SHU YEN CONDOMINIUM
2016-05-12PAT — from FUZHOU XIAJIANG ASSOCIATION OF NY, INC. to FUZHOU XIAJIANG ASSOCIATION OF NY, INC.
2016-05-12Deed $550,000 — from DENISE LLC to FUZHOU XIAJIANG ASSOCIATION OF NY, INC.$550,000
2016-05-10Sold for $408,000$408,000
2016-05-06Deed $385,000 — from DENISE LLC to WANG, XIAO-FEN; WANG, WAYNE TSU TING$385,000
2016-05-06PAT — from WANG, XIAO-FEN; WANG, WAYNE TSU TING to SHU YEN CONDOMINIUM
2016-05-02Sold for $415,000$415,000
2016-04-25Sold for $385,000$385,000
2016-04-25Sold for $550,000$550,000
2015
2015-10-20HPD class I: SECTION27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE ?27-2097 AND IS THER
2015-09-16FDNY inspection (ANNUL-K-12)
2015-07-17FDNY inspection (SPECIAL-OTH)
2015-07-17311: Animal Abuse — Neglected
2015-05-27FDNY inspection (ANNUL-K-12)
2014
2014-11-23311: HEAT/HOT WATER — ENTIRE BUILDING
2014-11-23Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2014-11-19311: HEAT/HOT WATER — ENTIRE BUILDING
2014-11-19Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2014-10-20FDNY inspection (RISK)
2014-09-19DTL — from THE BANK OF NEW YORK MELLON
2014-09-19DTL — from BANK OF NEW YORK MELLON
2014-03-27311: Investigations and Discipline (IAD) — Complaince Inspection
2014-03-12ECB CLASS - 2 violation: WORK W/O A PERMIT.NOTED: PREMIS IS 5-STORY APARTMENT AT EXPOUSRE 2 ANDEXPOSURE 4. TOTAL 12 WINDOWS WERE INSTALLED BY REMOVAL GLASS$800
2014-02-10311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2013
2013-09-12TLS — from CITY OF NEW YORK to BANK OF NEW YORK
2012
2012-08-20TLS — from CITY OF NEW YORK to BANK OF NEW YORK
2012-07-05LOCC — from HUANG, XIAO FENG to BOARD OF MANAGERS OF SHU YEN CONDOMINIUM
2012-07-05LOCC — from HUANG, YI TAO to BOARD OF MANAGERS OF SHU YEN CONDOMINIUM
2011
2011-10-13PREL — from CATHAY BANK to SANFORD GROUP 168, LLC
2011-03-09Tenant complaint: HEATING — HEAT RELATED
2011-02-09TL&R — from DENISE, LLC to CATHAY BANK
2011-02-09Mortgage satisfied — from DENISE, LLC to CATHAY BANK
2011-02-09TL&R — from DENISE, LLC to CATHAY BANK
2011-02-09Mortgage satisfied — from DENISE, LLC to CATHAY BANK
2011-02-09Mortgage satisfied — from DENISE, LLC to CATHAY BANK
2011-02-09TL&R — from DENISE, LLC to CATHAY BANK
2011-02-09Mortgage satisfied — from DENISE, LLC to CATHAY BANK
2011-02-09TL&R — from DENISE, LLC to CATHAY BANK
2011-02-09TL&R — from DENISE, LLC to CATHAY BANK
2011-02-09Mortgage satisfied — from DENISE, LLC to CATHAY BANK
2011-02-09Mortgage satisfied — from DENISE, LLC to CATHAY BANK
2011-02-09TL&R — from DENISE, LLC to CATHAY BANK
2011-02-09Mortgage satisfied — from DENISE, LLC to CATHAY BANK
2011-02-09TL&R — from DENISE, LLC to CATHAY BANK
2011-02-09Mortgage satisfied — from DENISE, LLC to CATHAY BANK
2011-02-09TL&R — from DENISE, LLC to CATHAY BANK
2011-02-09Mortgage satisfied — from DENISE, LLC to CATHAY BANK
2011-02-09TL&R — from DENISE, LLC to CATHAY BANK
2011-02-09TL&R — from DENISE, LLC to CATHAY BANK
2010
2010-12-02Mortgage satisfied — from DENISE, LLC to CATHAY BANK
2010-12-02TL&R — from CATHAY BANK to DENISE, LLC
2010-11-04PAT — from YOU, LI ZHU to SHU YEN CONDOMINIUM BOARD OF MANAGERS
2010-11-04Mortgage $180,000 — from YOU, LI ZHU to CATHAY BANK$180,000
2010-11-04Deed $385,320 — from DENISE LLC to YOU, LI ZHU$385,320
2010-06-10PREL — from CATHAY BANK to DENISE LLC
2010-06-10PREL — from CATHAY BANK to DENISE LLC
2010-06-10PREL — from CATHAY BANK to DENISE LLC
2010-06-10PREL — from CATHAY BANK to DENISE LLC
2010-06-10PREL — from CATHAY BANK to DENISE LLC
2010-06-10PREL — from CATHAY BANK to DENISE LLC
2010-05-11Deed $375,180 — from DENISE LLC to HUANG, YI TAO$375,180
2010-05-11PAT — from HUANG, YI TAO to BOARD OF MANAGERS OF SHU YEN CONDOMINIUM
2010-05-03PAT — from HUANG, XIAO FENG to BOARD OF MANAGERS OF SHU YEN CONDOMINIUM
2010-05-03Deed $385,320 — from DENISE LLC to HUANG, XIAO FENG$385,320
2010-03-09MAPS — from SHU YEN CONDOMINIUM
2010-03-09CDEC — from DENISE LLC
2010-03-09CDEC — from DENISE LLC
2010-03-09MAPS — from SHU YEN CONDOMINIUM
2010-03-09CDEC — from DENISE LLC
2010-03-09MAPS — from SHU YEN CONDOMINIUM
2010-03-09MAPS — from SHU YEN CONDOMINIUM
2010-03-09CDEC — from DENISE LLC
2010-03-09MAPS — from SHU YEN CONDOMINIUM
2010-03-09CDEC — from DENISE LLC
2010-03-09MAPS — from SHU YEN CONDOMINIUM
2010-03-09CDEC — from DENISE LLC
2010-03-09CDEC — from DENISE LLC
2010-03-09MAPS — from SHU YEN CONDOMINIUM
2010-03-09CDEC — from DENISE LLC
2010-03-09MAPS — from SHU YEN CONDOMINIUM
2010-03-09MAPS — from SHU YEN CONDOMINIUM
2010-03-09CDEC — from DENISE LLC
2010-03-09MAPS — from SHU YEN CONDOMINIUM
2010-03-09CDEC — from DENISE LLC
2010-03-09MAPS — from SHU YEN CONDOMINIUM
2010-03-09CDEC — from DENISE LLC
2009
2009-06-29Job filed: INSTALLATION OF NEW CODED INTERIOR FIRE ALARM SYSTEM IN ACCORDANCE WITH NYC BUILDING CODE 27-968(A)(6) AND PLANS ATTACHED. NO CHANGE IN USE, OCCUPANCY$30,000
2009-06-29Job filed: INSTALLATION OF NEW CODED INTERIOR FIRE ALARM SYSTEM IN ACCORDANCE WITH NYC BUILDING CODE 27-968(A)(6) AND PLANS ATTACHED. NO CHANGE IN USE, OCCUPANCY$30,000
2009-03-20Job filed: TO FILE FOR CONDO TAX LOT SUB- DIVISION; 2 MEDICAL OFFICE, 1 DAYCARE 8 RESIDENTIAL UNITS; TENTATIVE TAX LOT FROM 1001 TO 1011.
2009-01-01DOB violation LL6291:
2008
2008-10-18DOB complaint, category ?
2008-10-18DOB violation C:
2008-08-20ECB CLASS - 1 violation: FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION NO HANDRAILS ON STAIRWELL THROUGHOUT EVIDENT. NB$1,000
2008-08-20DOB complaint, category ?
2008-08-20ECB CLASS - 2 violation: JOBSITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION. AT FRONT 8'HIGH WOOD CONSTRUCTION FENCE IN PLACE WITH OUT SWING GATE AND NAI
2008-08-20ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVEDAMENDMENTS. NON CONFORMING WORK NOTED: AT CELLAR L SHAPED GA
2008-08-20ECB CLASS - 2 violation: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. AT FRONT DEBRIS EVIDENT IN EXCESS OF APPROX 10 CUBIC YARDS INC
2008-04-28Permit EW — ISSUED
2007
2007-12-28DOB complaint, category ?
2007-12-10DOB complaint, category ?
2007-12-01DOB complaint, category ?
2007-12-01DOB complaint, category ?
2007-12-01DOB violation C:
2007-11-17DOB complaint, category ?
2007-11-17DOB complaint, category ?
2007-11-17DOB complaint, category ?
2007-11-17ECB Non-Hazardous violation: WORK W/O A PERMIT. WORK NOTED.@ CELLAR INSTALLING UNDERGROUND PIPING ALSO BLOCK WORK ON THE 4TH FLR LEVEL. WORK IN PROGRESS W/ EXP
2007-11-12DOB violation C: WORK W/OUT PERMIT
2007-11-12ECB Non-Hazardous violation: WORK W/O A PERMIT EXPIRED PERMIT 40187393Z FOR NEW 5 STORY BLDG EXPIRED 11/9/07 POSTED ON FENCE. REMEDY: RENEW PERMIT 40187393Z BE
2007-11-10DOB complaint, category ?
2007-10-16Job filed: To install sprinkler system in conjunction with application #401873932$1,000
2007-07-30Job filed: SPRINKLER IN CONJUNCTION WITH APPLICATION NB #401873932$1,000
2006
2006-09-27DOB complaint, category ?
2006-08-11DOB complaint, category ?
2006-08-01DOB violation C:
2006-07-31DOB complaint, category ?
2006-07-29DOB complaint, category ?
2006-07-29DOB violation C:
2006-07-24ECB Hazardous violation: FAILURE TO PROTECT ADJOINING STRUCTURES DURING EXCAVATION OPERATIONS NB IS IN PROGRESS W/FOUNDATION & EXCAVATION UPTO 10' DEEP ON $1,000
2006-07-24ECB Non-Hazardous violation: FAILURE TO COMPLY W/STOP WORK ORDER NB IS IN PROGRESS W/FOUNDATION & EXCAVATION UPTO 9'-10'DEEP.STOP WORK ORDER WAS ISSUED ON 7/20$500
2006-07-24ECB Hazardous violation: FAILURE TO PROVIDE APPROVED PLAN AT SITE DURING INSPECTION NB IS IN PROGRESS W/FOUNDATION & EXCAVATION UP TO 10' DEEP NO APPROVED
2006-07-20ECB Hazardous violation: FAILURE TO SAFEGUARD PUBLIC & PROPERTY AFFECTED BY CONST OPERATION NB IS IN PROGRESS WITH 8'-9' DEEP EXCAVATION @ SITE & WITH FORM$1,000
2006-07-20ECB Hazardous violation: FAILURE TO PROVIDE PROTECTION @ SIDES OF EXCAVTION NB IS IN PROGRESS WITH 8'-9' DEEP FOUNDATION & EXCAVTION NO ADEQAUTE PROTECTION$1,000
2006-07-20ECB Hazardous violation: FAIURE TO POST CONTRACTORS SIGN @ SITE NB IS IN PROGRESS WITH EXCAVATION & FOUNDATION WORKS NO CONTRACTORS SIGN & CONSTRUCTION COM
2006-04-26Permit AL — ISSUED
2005
2005-07-06Job filed: To install shorring for new building application# 401873932. No change to use, occupancy and egress.$10,000
2005-06-21Job filed: To install shorring for new building application# 401873932. No change to use, occupancy and egress.$10,000
2004
2004-08-05ECB Non-Hazardous violation: FAILURE TO POST PERMIT FOR WORK AT PREMISES.NOTED:ERECTED CONSTRUCTION FENCE APPROX. 8' HT WOOD TYPE UNDER JOB#401857923 & NO PERM
2004-06-30Job filed: To install sprinkler system in conjunction with application#:401873932$100
2004-06-25Job filed: BPP PAVING PLAN FILED IN CONJUCTION WITH APPLICATION #401873932 LINEAR T: 25'