A meaningful record of code violations or complaints relative to its peers. More recorded distress than 90% of 1-5-unit residential buildings citywide. The citywide median for 1-5-unit residential buildings is 0 penalty
points per 10 units; this building carries 27.5. In ZIP 10003, 67% of residential buildings hold an A and
4% grade D or F.
How grades work
this building
A
C
Among 699,345 1-5-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
Open HPD violations
2 total — 1 class C (immediately hazardous), 0 class B, 1 class A. Oldest open since 2025-11-17.
status snapshot refreshed weekly from HPD records
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
3 service requests in the last three years. Most common: Homeless Person Assistance (1) · Water System (1) · Noise (1).
Filed construction activity
$496,500 in permitted construction work filed since
2016 (5 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1838)
No
Six or more residential units (4)
No
421-a / J-51 tax benefit on the current tax roll
1 of 3 signals present. Only a partial profile — stabilization is possible but less likely. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
7 EAST 9TH STREET APARTMENT CORP
Head officer
STEVEN BAKER
Managing agent
KAITO MANAGEMENT CORP
Last registered
2024-09-14
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$6,938,000
$3,122,100
2026
$7,401,000
$3,330,450
2027
$7,803,000
$3,511,350
The city's market estimate has risen
12% between tax years 2025 and 2027.
Building systems
Heating fuel
NATURALGAS
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 6 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
8 St-NYU — R W · 1,000 ft straight-line (about a 5-minute walk) · station accessibility: none W 4 St-Wash Sq — A B C D E F M · 0.2 mi straight-line (about a 6-minute walk) · station accessibility: full
Bus
Nearest boarding stop: E 9 St / University Pl — M8 · 200 ft
Citi Bike
E 10 St & 5 Ave · 200 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
3 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $261,319 on
2006-12-19 (lender: Flushing Savings Bank, FSB). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2025-01-22
AL&R $462,047 — from 7 EAST NINTH STREET APARTMENT CORP. to FLUSHING BANK
$462,047
2025-01-22
Agreement $462,047 — from 7 EAST NINTH STREET APARTMENT CORP. to FLUSHING BANK
$462,047
2024-03-13
RPTT&RET $1,485,000 — from SIEGEL, NOAH to DICKMAN, DREW
$1,485,000
2024-02-28
Sold for $1,485,000
$1,485,000
$371,250
2018-12-31
RPTT&RET $2,575,000 — from SARRIS, NICHOLAS C SR; SARRIS, NICHOLAS C JR. to DOUMET, MARK
$2,575,000
2018-12-27
Sold for $2,575,000
$2,575,000
$643,750
2018-07-02
RPTT&RET $7,950,000 — from GUTTMAN, KATHLEEN M; GUTTMAN, STEVEN J to DW BAY LLC
$7,950,000
2018-07-02
RPTT&RET $7,950,000 — from GUTTMAN, KATHLEEN M; GUTTMAN, STEVEN J to DW BAY LLC
$7,950,000
2018-05-22
Sold for $7,950,000
$7,950,000
$1,987,500
2015-08-25
RPTT&RET $2,350,000 — from SCHULMAN, JOSHUA to SKVORTSOVA, KSENIA
$2,350,000
2015-06-09
RPTT&RET $1,350,000 — from GANNATA, GARY to SIEGEL, NOAH
$1,350,000
2014-10-17
Agreement $584,044 — from 7 EAST NINTH STREET APARTMENT CORP to FLUSHING BANK
$584,044
2012-03-22
RPTT&RET $900,000 — from SHROFF, VIJAY to GUTTMAN, STEVEN J; GUTTMAN, KATHLEEN M
$900,000
2007-07-18
RPTT&RET $965,000 — from UNGARD, MICHAEL T to SHROFF, VIJAY
$965,000
2006-12-19
Mortgage $261,319 — from 7 EAST NINTH STREET APARTMENT CORP. to FLUSHING SAVINGS BANK, FSB
$261,319
Ten-year activity
20100
2017
2018
20
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
2
1
0
0
1
4
2018
1
1
2
5
2
11
2019
6
7
5
0
2
20
2020
0
1
3
0
1
5
2021
1
0
11
0
1
13
2022
0
0
2
0
3
5
2023
2
0
2
0
2
6
2024
3
0
4
2
2
11
2025
0
0
1
3
2
6
2026
0
0
1
0
2
3
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2026-01-05
Rodent inspection: Passed
2025-11-17
HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
The full timeline
2026
2026-05-29Boiler inspection
2026-04-29HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2026-01-05Rodent inspection: Passed
2025
2025-11-17HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2025-01-22TL&R — from 7 EAST NINTH STREET APARTMENT CORP. to FLUSHING BANK; FLUSHING SAVINGS BANK, FSB
2025-01-22AL&R $462,047 — from 7 EAST NINTH STREET APARTMENT CORP. to FLUSHING BANK$462,047
2025-01-22Agreement $462,047 — from 7 EAST NINTH STREET APARTMENT CORP. to FLUSHING BANK$462,047
2024
2024-12-25Bedbug filing: 0 infested units
2024-12-19311: Noise — Noise: Construction Before/After Hours (NM1)
2024-12-18311: Water System — Leak (Use Comments) (WA2)
2024-12-03Certificate of occupancy Final
2024-12-03Certificate of occupancy Final
2024-09-04Rodent inspection: Passed
2024-07-30311: Homeless Person Assistance
2024-07-29Permit PL — ISSUED
2024-05-13Boiler inspection
2024-03-13RPTT&RET $1,485,000 — from SIEGEL, NOAH to DICKMAN, DREW$1,485,000
2024-02-28Sold for $1,485,000$1,485,000
2023
2023-12-04Bedbug filing: 0 infested units
2023-11-17Permit General Construction — Signed-off
2023-10-30Job filed: PROPOSE MINOR PARTITION CHANGES AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE EGRESS OR OCCUPANCY.$2,000
2023-10-24HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2023-07-14Boiler inspection
2023-06-16Rodent inspection: Passed
2022
2022-12-15Boiler inspection
2022-12-14Bedbug filing: 0 infested units
2022-04-29Rodent inspection: Passed
2022-03-25Rodent inspection: Failed for Other Reason
2022-01-21311: Blocked Driveway — No Access
2021
2021-12-15Bedbug filing: 0 infested units
2021-11-18311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-11-15Boiler inspection
2021-10-18311: Dirty Condition — Trash
2021-10-14311: Encampment — N/A
2021-10-05311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-11-29311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-11-09Boiler inspection
2020-09-11DOB complaint, category ?
2020-09-10311: General Construction/Plumbing — Building Permit - None
2020-06-29311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019
2019-11-22311: Homeless Person Assistance — N/A
2019-11-08Boiler inspection
2019-10-30DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019-10-25HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2019-07-23ECB CLASS - 2 violation: AT TIME OF INSPECTION AS I WALKED THROUGH THE SITE AND THE BUILDING I NOTICED NO SCBR POSTED I SPOKE TO THE CONTRACTOR AND HE SAID$1,250
2019-07-23DOB complaint, category ?
2019-07-23ECB CLASS - 1 violation: ARRIVED AT 7 E 9 ST AND GAINED ACCESS TO #2 ON THE 1ST AND 2ND FLOOR WERE I SAW WALLS REMOVED ELECTRICAL WHIPS ALL OVER THE JOB RO
2019-07-23ECB CLASS - 2 violation: ARRIVED AT 7 E 9 ST GAINED ACCESS TO BUILDING WITH CONTRACTOR WHO STATED THAT THEY DID NOT GIVE BUILDING DEPARTMENT 72 HOUR NOTICE
2019-07-22DOB complaint, category ?
2019-06-20311: Building Marshals office — Illegal Activity
2019-06-20DOB complaint, category ?
2019-06-04Permit PL — ISSUED
2019-05-21Permit EW — ISSUED
2019-05-21Permit EW — ISSUED
2019-03-14Rodent inspection: Passed
2019-03-11311: Other Enforcement — E3B Sidewalk Obstruction
2019-01-29Bedbug filing: 0 infested units
2019-01-23Job filed: MECHANICAL AND PLUMBING MODIFICATIONS IN CONJUNCTION WITH APARTMENT #2 ON THE 1ST & 2ND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$146,000
2019-01-23Job filed: MECHANICAL AND PLUMBING MODIFICATIONS IN CONJUNCTION WITH APARTMENT #2 ON THE 1ST & 2ND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$146,000
2019-01-23Job filed: RENOVATION OF EXISTING APARTMENT #2 ON THE 1ST & 2ND FLOOR. WORK INCLUDES GENERAL CONSTRUCTION, REMOVAL AND INSTALLATION OF INTERIOR NON-LOAD BEAR$175,000
2018
2018-12-31RPTT&RET $2,575,000 — from SARRIS, NICHOLAS C SR; SARRIS, NICHOLAS C JR. to DOUMET, MARK$2,575,000
2018-12-27Sold for $2,575,000$2,575,000
2018-12-17Permit PL — ISSUED
2018-10-05HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2018-07-16311: Non-Emergency Police Matter — Other (complaint details)
2018-07-02RPTT&RET $7,950,000 — from GUTTMAN, KATHLEEN M; GUTTMAN, STEVEN J to DW BAY LLC$7,950,000
2018-07-02RPTT&RET $7,950,000 — from GUTTMAN, KATHLEEN M; GUTTMAN, STEVEN J to DW BAY LLC$7,950,000
2018-06-06Rodent inspection: Passed
2018-05-22Sold for $7,950,000$7,950,000
2018-04-11Boiler inspection
2018-04-06DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
2017
2017-08-21Permit EW — ISSUED
2017-08-16Job filed: INSTALL NEW CHIMNEY LINER PER PLANS. FILED IN CONJUNCTION WITH LAA 122580448 FOR REPLACEMENT BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$27,500
2017-08-15Rodent inspection: Passed
2017-02-24DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
2016
2016-11-22Rodent inspection: Passed
2016-10-24HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2016-09-21DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2016-06-27ECB CLASS - 1 violation: 50. BURNHAM P810 GAS FIRED HYDRUNIC BOILER HAS BO PROPER PERMIT. ACQUIRE PROPER PERMITS & SUBMIT C OF C.$8,000
2016-06-27ECB CLASS - 2 violation: 36,15,38,4A,50A,50B. (50) WRONG FLUE PIPE GAUGE, B265 28-303.7 FAILURE TO FILE A COMPLETE BOILER INSP AS PER DOB RECORDS. B254 (36$5,000
2015
2015-10-13Rodent inspection: Passed
2015-10-01DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
2015-09-16Rodent inspection: Failed for Rat Activity
2015-08-25RPTT&RET $2,350,000 — from SCHULMAN, JOSHUA to SKVORTSOVA, KSENIA$2,350,000
2015-06-09RPTT&RET $1,350,000 — from GANNATA, GARY to SIEGEL, NOAH$1,350,000
2015-03-03DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
2014
2014-10-17Agreement $584,044 — from 7 EAST NINTH STREET APARTMENT CORP to FLUSHING BANK$584,044
2014-05-15DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
2013
2013-03-01DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
2012
2012-07-11Permit PL — ISSUED
2012-05-30Permit EW — ISSUED
2012-04-02Rodent inspection: Passed
2012-03-22RPTT&RET $900,000 — from SHROFF, VIJAY to GUTTMAN, STEVEN J; GUTTMAN, KATHLEEN M$900,000
2012-03-20Job filed: COMBINE APARTMENTS 2F AND 2R PER TPPN#3/1997; CAP/REOMVE KITCHEN FIXTURES FROM APT 2F; REMOVE AND INSTALL INTERIOR NON-BEARING PARTITIONS, CABINETRY, $119,800
2011
2011-12-13DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
2011-02-24Rodent inspection: Passed
2010
2010-02-22Rodent inspection: Passed
2009
2009-10-09CORR — from ALAN PRESSMAN INCORPORATED to CENTRAL FEDERAL SAVINGS & LOAN ASSOCIATI
2009-10-09CORR — from ELLENBERG, SHEPARD to PRESSMAN, DR. ALAN H
2009-10-09CORR — from PRESSMAN, DR. ALAN H to ELLENBERG, SHEPARD
2009-10-09CORR — from ALAN PRESSMAN INCORPORATED to CENTRAL FEDERAL SAVING & LOAN ASSOCIATIO
2009-10-09CORR — from PRESSMAN, DR. ALAN H to ALAN PRESSMAN INCORPORATED
2009-10-09DEED COR — from ALAN PRESSMAN INCORPORATED to PRESSMAN, DR. ALAN H
2009-01-01DOB violation LL6291:
2007
2007-09-23DOB complaint, category ?
2007-09-17Permit EQ — ISSUED
2007-09-11Permit EQ — ISSUED
2007-09-10Job filed: PROPOSED INSTALLATION OF 25 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. SIDEWALK SHED SHALL COMPLY WITH LL 33/91 & TPPN 9/1999.
2007-09-10Job filed: PROPOSED INSTALLATION OF 25 FEET X 40 FEET HIGH PIPE SCAFFOLD. SCAFFOLD TO ORIGINATE FROM SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER T
2007-07-18RPTT&RET $965,000 — from UNGARD, MICHAEL T to SHROFF, VIJAY$965,000
2006
2006-12-19Mortgage $261,319 — from 7 EAST NINTH STREET APARTMENT CORP. to FLUSHING SAVINGS BANK, FSB$261,319
2006-12-19M&CON $670,000 — from 7 EAST NINTH STREET APARTMENT CORP. to FLUSHING SAVINGS BANK, FSB$670,000
2006-07-25DOB complaint, category ?
2006-03-08Permit PL — ISSUED
2006-01-06DOB violation LL6291:
2006-01-05Permit EW — ISSUED
2005
2005-12-30Permit EW — ISSUED
2005-10-17Permit EW — ISSUED
2005-07-08ECB Non-Hazardous violation: WORK WITHOUT PERMIT,WORK NOTED:ENTRIE GUT RENOVATION IN PROGRESS WALL CEILINGS WINDOWS (REAR).LOCATION OF WORK 4TH FL AT ROOF LEVE$250
2005-06-29DOB complaint, category ?
2005-06-08Job filed: Proposed to remove existing walls as shown on plans. No change in use, egress or occupancy$5,000
2005-06-01RPTT&RET $4,100,000 — from BAUER, III , JOHN L to GUTTMAN, KATHLEEN M; GUTTMAN, STEVEN J$4,100,000
2005-02-22Job filed: PROPOSE TO PERFORM INTERIOR RENOVATIONS OF 4TH FLOOR APT AND INSTALL ROOF DECK AS SHOWN ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$28,000
2005-01-31DOB violation LL6291:
2005-01-12RPTT $710,000 — from HUDSON, CHQANDLER to UNGARD, MICHAEL TODD$710,000
2004
2004-12-30RPTT&RET $947,469 — from 7 EAST NINTH STREET ASSOCIATES to SARRIS, SR., NICHOLAS C; SARRIS, JR., NICHOLAS C$947,469
2004-09-02AL&R — from FLUSHING SAVINGS BANK, FSB to 7 EAST NINTH STREET APARTMENT CORP.
2004-09-02Agreement $420,000 — from FLUSHING SAVINGS BANK, FSB to 7 EAST NINTH STREET APARTMENT CORP.$420,000
2004-09-02TL&R — from FANNIE MAE to 7 EAST NINTH STREET APARTMENT CORP.
2004-09-02Mortgage assigned — from FANNIE MAE to FLUSHING SAVINGS BANK, FSB
2004-09-02Mortgage $93,980 — from 7 EAST NINTH STREET APARTMENT CORP. to FLUSHING SAVINGS BANK, FSB$93,980
2004-02-13DOB violation LL6291:
1999
1999-04-14Mortgage assigned — from NATIONAL CONSUMER COOPERATIVE BANK to FEDERAL NATIONAL MORTGAGE ASSOCIATION
1999-04-14Mortgage assigned — from NATIONAL CONSUMER COOPERATIVE BANK to FEDERAL NATIONAL MORTGAGE ASSOCIATION
1999-03-16DOB violation LL6291:
1998
1998-10-09Permit AL — ISSUED
1998-04-30Permit AL — ISSUED
1998-04-03Permit PL — ISSUED
1998-03-25DECL — from 7 EAST 9TH STREET APARTMENT CORP.
1997
1997-08-07Mortgage assigned — from NCB MORTGAGE CORPORATION to NATIONAL CONSUMER COOPERATIVE BANK
1997-08-07Agreement — from 7 EAST NINTH STREETAPARTMENT CORP. to NCB MORTGAGE CORPORATION
1997-08-07Mortgage assigned — from 7 EAST NINTH STREETAPARTMENT CORP. to NCB MORTGAGE CORPORATION
1997-08-07Mortgage assigned — from NINTH STREET MORTGAGE ASSOCIATES to NCB MORTGAGE CORPORATION
1997-08-07Mortgage assigned — from NCB MORTGAGE CORPORATION to NATIONAL CONSUMER COOPERATIVE BANK
1997-08-07Mortgage $25,000 — from 7 EAST NINTH STREETAPARTMENT CORP. to NCB MORTGAGE CORPORATION$25,000
1996
1996-12-11Permit EW — ISSUED
1996-02-13Agreement — from EAST NINTH STREET APARTMENT CORP. to NINTH STREET MORTGAGE ASSOCIATES
1996-01-31Mortgage satisfied — from 7 EAST NINTH STREETASSOCIATES to EMIGRANT SAVINGS BANK
1996-01-31SAGE — from EMIGRANT SAVINGS BANK
1990
1990-02-26DOB complaint, category ?
1989
1989-12-26DOB complaint, category ?
1989-11-09DOB complaint, category ?
1988
1988-10-14Agreement — from 7 EAST NINTH ST APTCORP to NINTH ST MTGE ASSOCS
1988-10-14Deed — from 7 EAST NINTH ST ASC to 7 EAST NINTH ST APTCORP
1988-10-14Mortgage $325,000 — from 7 EAST NINTH ST APTCP to NINTH ST MTGE ASSOCS$325,000
1988-10-14Mortgage assigned — from FORMAN, SCOTT JASON; JASON, SCOTT AKA; FORMAN, GLEN ADAM to NINTH STREET MTGE ASC
1988-10-14CERT — from NINTH ST MTGE ASSOCS
1988-10-06HPD class A: § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM
1988-10-06HPD class A: § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF WOOD STRIPS EXPOSED IN BRICKWALL FROM BASEMENT TO 1 STY PUBLIC HALL STAIRW
1988-10-06HPD class B: § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE BALLUSTRADE FROM 1 STY PUBLIC HALL STAIR.
1988-10-06HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WOOD TREAD 2 FROM 2 STY PUBLIC HALL STAIR.
1988-10-06HPD class A: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WALL WEST 4 STY PUBLIC HALL.
1987
1987-08-18Mortgage assigned — from FORMAN, JEROME to FORMAN, GLENN ADAM TR; FORMAN, SCOTT JASONTR
1987-03-16HPD class A: D26-10.01 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE THE SASH WINDOWS 1ST STY APT 1 FL THROUGHOUT. , SECTION '' ''
1987-03-16HPD class B: D26-20.08 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR WHICH IS MISSING AT 1ST STY APT 1 FL. , SECTION '' ''
1986
1986-02-20HPD class B: D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AT BATHROOM AT WATER PIPE 2 STY FR
1986-02-20HPD class B: D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING CABINET AT KITCHEN 2 STY FRONT APT
1986-02-20HPD class B: D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING FRONT ROOM 2 STY FRONT APT.
1986-01-22HPD class B: D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALL CLOSET 2ND STY NORTH APT 2R. , SECTIO
1985
1985-07-09Mortgage $325,000 — from 7 E. NINTH ST. ASSOC. to EMIGRANT SAVINGS BANK$325,000
1985-07-09Mortgage $355,000 — from 7 E. NINTH ST. ASSOC. to FORMAN, JEROME$355,000
1985-07-09Deed — from FORMAN, JEROME G. to 7 E NINTH ST ASSOCIATES
1985-07-09Mortgage satisfied — from PRESSMAN, ALAN H to ELLENBERG, SHEPARD
1985-07-09Mortgage satisfied — from PRESSMAN, ALAN H to CHEMICAL BANK
1985-07-09Mortgage satisfied — from ALAN PRESSMAN INCORP. to CENTRAL FD SVGS LN ETC
1985-07-09Mortgage satisfied — from FORMAN, JEROME G. to PRESSMAN, ALAN H
1985-07-09Mortgage assigned — from 7 E. NINTH ST ASSOCIATES to EMIGRANT SAVINGS BANK
1985-04-30HPD class B: D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALL 5 STY APT KITCHEN AT WEST.
1985-04-30HPD class B: D26-15.01 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES 5 STY APT 5 KITCHEN. LOCATED AT APT 5
1985-04-30HPD class A: D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALL 5 STY APT 5 FRONT ROOM AT WEST. LOCAT
1981
1981-11-05Agreement — from ALLEGRO FILM PRODUCTIONS to FORMAN, JEROME G
1981-08-12Mortgage assigned — from PRESSMAN, ALAN H to ALLEGRO FILM PRODUCTIONS
1981-04-21Deed — from PRESSMAN, ALAN H DR to FORMAN, JEROME G
1981-04-21MISC — from CENTRAL FDL S/L NASSAU
1981-04-21Agreement — from FORMAN, JEROME G; PRESSMAN, ALAN H DR to CHEMICAL BANK
1981-04-21Mortgage assigned — from CENTRAL FDL S/L NASSAU to PRESSMAN, ALAN
1981-04-21Mortgage — from FORMAN, JEROME G to PRESSMEN, ALAN H
1980
1980-01-25Mortgage — from PRESSMAN, ALAN H DR to CHEMICAL BANK
1978
1978-01-03Mortgage assigned — from ALAN PRESSMAN INC to CENTRAL FEDL S/LA NASSAU
1978-01-03Mortgage — from PRESSMAN, ALAN H DR to ELLENBERG, SHEPARD
1978-01-03Deed — from ELLENBERG, SHEPARD to PRESSMAN, ALAN
1978-01-03Deed — from ALAN PRESSMAN INC to PRESSMAN, ALAN H DR
1978-01-03Mortgage — from ALAN PRESSMAN INC to CENTRAL FEDL S/LA NASSAU
1978-01-03Deed — from PRESSMAN, ALAN H DR to ALAN PRESSMAN INC
1977
1977-06-01Mortgage assigned — from BLOOMGARDEN, NANCY L to DEJUR, MARION
1977-05-02Mortgage assigned — from SEIDEL, MARGARET to BLOOMGARDEN, NANCY L
1969
1969-06-27Mortgage — from J S M REALTY CORP to MIRELLE ASSOCIATES
1969-06-27Deed — from MIRELLE ASSOCIATES to J S M REALTY CORP
1969-06-27Deed — from J S M REALTY CORP to ELLENBERG, SHEPARD
1969-04-29MISC — from GREENWICH VLLG HSTRCDST
1967
1967-04-04Deed — from MAC HARG, DONALD E; INTERNATIONAL CREDITCO to SEIDEL, MARGARET
1967-04-04Deed — from SEIDEL, MARGARET to B J ANDREWS ASSOCIATES
1967-04-04Mortgage — from B J ANDREWS ASSOCIATES to SEIDEL, MARGARET
1967-04-04Deed — from B J ANDREWS ASSOCIATES to MIRELLE ASSOCIATES