The city's published records show little recorded distress here in the last three years. Less recorded distress than 64% of 100+-unit residential buildings citywide. The citywide median for 100+-unit residential buildings is 3.7 penalty
points per 10 units; this building carries 1.7. In ZIP 10001, 68% of residential buildings hold an A and
6% grade D or F.
How grades work
this building
A
B
C
Among 4,677 100+-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
2 heat or hot-water complaints in the last three years (winter 2023–24: 2).
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
60 service requests in the last three years. Most common: Noise (45) · Encampment (3) · Lead (2) · UNSANITARY CONDITION (2) · Sewer (2) · GENERAL (1).
Filed construction activity
$8,400,700 in permitted construction work filed since
2016 (51 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974 (2019)
Yes
Six or more residential units (112)
Yes
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. Buildings receiving 421-a or J-51 benefits are generally required to register their units as rent-stabilized for the duration of the benefit. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
225 West 28 STreet Property Owner LLC
Head officer
Gregory Taketa
Managing agent
Greystar
Last registered
2025-07-07
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$47,144,000
$21,214,800
2026
$50,121,000
$22,554,450
2027
$51,684,000
$23,257,800
The city's market estimate has risen
10% between tax years 2025 and 2027.
Tax exemptions on the roll: 421A 35YR WITH AFF HOUSING PCT
Building systems
Heating fuel
NATURALGAS
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 6 of 6 — zone 1 evacuates first.
In the city's stormwater flood map only under the extreme-storm
scenario (3.66 in/hr cloudburst with 2080 sea levels) — an Ida-scale event.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
28 St — 1 · 300 ft straight-line (about a 2-minute walk) · station accessibility: none 23 St — C E · 900 ft straight-line (about a 5-minute walk) · station accessibility: none
Bus
Nearest boarding stop: 7 Av / W 28 St — M7 M20 · 400 ft
Citi Bike
W 27 St & 7 Ave · 500 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
60 311 service requests from this address in the last three years — 1 of them about heat or hot water.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $106,100,000 on
2017-11-15 (lender: Daiwa House Texas INC.), covering 5 lots — the amount covers all of them. Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2024-07-22
Agreement $112,491,902 — from 225 WEST 28TH STREET PROPERTY OWNER LLC; 215 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.
$112,491,902
2024-02-23
Agreement $115,013,693 — from 215 WEST 28TH STREET PROPERTY OWNER LLC; 225 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.
$115,013,693
2023-08-30
Agreement $132,300,000 — from 225 WEST 28TH STREET PROPERTY OWNER LLC; 215 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.
$132,300,000
2023-05-24
Agreement $106,100,000 — from 215 WEST 28TH STREET PROPERTY OWNER LLC; 225 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC
$106,100,000
2022-11-10
Agreement $1,016,000 — from 215 WEST 28TH STREET PROPERTY OWNER LLC; 225 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.
$1,016,000
2022-11-09
Agreement $67,305,817 — from 225 WEST 28TH STREET PROPERTY OWNER LLC; 215 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.
$67,305,817
2022-10-17
Agreement $106,100,000 — from 225 WEST 28TH STREET PROPERTY OWNER LLC; 215 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.
$106,100,000
2022-09-23
Agreement $106,100,000 — from 215 WEST 28TH STREET PROPERTY OWNER LLC; 225 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.
$106,100,000
2022-09-20
Agreement $106,100,000 — from 215 WEST 28TH STREET PROPERTY OWNER LLC; 225 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.
$106,100,000
2022-09-20
Agreement $106,100,000 — from 215 WEST 28TH STREET PROPERTY OWNER LLC; 225 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.
$106,100,000
2022-09-20
Agreement $106,100,000 — from 215 WEST 28TH STREET PROPERTY OWNER LLC; 225 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.
$106,100,000
2022-09-20
Agreement $106,100,000 — from 225 WEST 28TH STREET PROPERTY OWNER LLC; 215 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.
$106,100,000
2022-09-20
Agreement $106,100,000 — from 215 WEST 28TH STREET PROPERTY OWNER LLC; 225 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.
$106,100,000
2022-09-06
Agreement $106,100,000 — from 225 WEST 28TH STREET PROPERTY OWNER LLC; 215 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.
$106,100,000
2022-08-31
Agreement $105,405,000 — from 215 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.
$105,405,000
Ten-year activity
100500
2017
2018
77
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
24
12
6
14
0
56
2018
12
27
15
4
0
58
2019
36
29
10
0
2
77
2020
17
26
3
1
1
48
2021
23
14
6
0
0
43
2022
14
3
12
26
0
55
2023
12
3
18
3
0
36
2024
17
1
36
4
0
58
2025
16
2
17
0
4
39
2026
10
12
14
0
2
38
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Permit Protection and Mechanical Methods — Signed-off
2026-03-30
Job filed: TEMPORARY WORK PLATFORMS AS PER DRAWINGS. WORK PLATFORMS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPL
2026-03-22
FDNY inspection (AGED_OUT)
2026-03-22
FDNY inspection (AGED_OUT)
2026-03-22
FDNY inspection (AGED_OUT)
2026-03-22
FDNY inspection (AGED_OUT)
2026-03-22
FDNY inspection (AGED_OUT)
2026-03-22
FDNY inspection (AGED_OUT)
2026-03-20
FDNY inspection (COM_OCPCY)
2026-03-20
FDNY inspection (COM_OCPCY)
2026-03-20
FDNY inspection (RISK)
2026-03-20
FDNY inspection (COM_OCPCY)
2026-03-20
FDNY inspection (COM_OCPCY)
2026-03-20
FDNY inspection (COM_OCPCY)
2026-03-20
311: Noise — Noise: Construction Equipment (NC1)
2026-03-12
Job filed: TEMPORARY SUSPENDED SCAFFOLD AS PER DRAWINGS DURING NB CONST FILED UNDER APPLICATION # 121191049. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NY
2026-03-12
Job filed: HEAVY DUTY SIDEWALK SHED DURING NB CONST FILED UNDER APPLICATION # 121191049. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE,
2026-02-27
Permit Suspended Scaffold — Signed-off
2026-02-19
Certificate of occupancy Renewal Without Change
2026-01-05
Permit NB — ISSUED
2025-12-11
Bedbug filing: 0 infested units
2025-12-10
Permit Suspended Scaffold — Signed-off
2025-12-09
Job filed: TEMPORARY SUSPENDED SCAFFOLD AS PER DRAWINGS DURING NB CONST FILED UNDER APPLICATION # 121191049. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NY
2025-12-08
Job filed: MECHANICAL SYSTEM WORK AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
2025-12-08
Certificate of occupancy Renewal Without Change
2025-11-24
Permit Sidewalk Shed — Signed-off
2025-11-21
Job filed: HEAVY DUTY SIDEWALK SHED DURING NB CONST FILED UNDER APPLICATION # 121191049. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE,
2025-11-14
DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
2025-11-14
DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
2026-03-31Permit Protection and Mechanical Methods — Signed-off
2026-03-30Job filed: TEMPORARY WORK PLATFORMS AS PER DRAWINGS. WORK PLATFORMS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPL$1,500
2026-03-22FDNY inspection (AGED_OUT)
2026-03-22FDNY inspection (AGED_OUT)
2026-03-22FDNY inspection (AGED_OUT)
2026-03-22FDNY inspection (AGED_OUT)
2026-03-22FDNY inspection (AGED_OUT)
2026-03-22FDNY inspection (AGED_OUT)
2026-03-20FDNY inspection (COM_OCPCY)
2026-03-20FDNY inspection (COM_OCPCY)
2026-03-20FDNY inspection (RISK)
2026-03-20FDNY inspection (COM_OCPCY)
2026-03-20FDNY inspection (COM_OCPCY)
2026-03-20FDNY inspection (COM_OCPCY)
2026-03-20311: Noise — Noise: Construction Equipment (NC1)
2026-03-12Job filed: TEMPORARY SUSPENDED SCAFFOLD AS PER DRAWINGS DURING NB CONST FILED UNDER APPLICATION # 121191049. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NY
2026-03-12Job filed: HEAVY DUTY SIDEWALK SHED DURING NB CONST FILED UNDER APPLICATION # 121191049. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, $2,000
2026-02-27Permit Suspended Scaffold — Signed-off
2026-02-19Certificate of occupancy Renewal Without Change
2026-01-05Permit NB — ISSUED
2025
2025-12-11Bedbug filing: 0 infested units
2025-12-10Permit Suspended Scaffold — Signed-off
2025-12-09Job filed: TEMPORARY SUSPENDED SCAFFOLD AS PER DRAWINGS DURING NB CONST FILED UNDER APPLICATION # 121191049. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NY
2025-12-08Job filed: MECHANICAL SYSTEM WORK AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$100,000
2025-12-08Certificate of occupancy Renewal Without Change
2025-11-24Permit Sidewalk Shed — Signed-off
2025-11-21Job filed: HEAVY DUTY SIDEWALK SHED DURING NB CONST FILED UNDER APPLICATION # 121191049. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, $2,000
2024-07-22Agreement $112,491,902 — from 225 WEST 28TH STREET PROPERTY OWNER LLC; 215 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.$112,491,902
2024-06-13Certificate of occupancy Renewal With Change
2024-06-04Permit Supported Scaffold — Signed-off
2024-06-04Job filed: Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress a$2,500
2024-02-23Agreement $115,013,693 — from 215 WEST 28TH STREET PROPERTY OWNER LLC; 225 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.$115,013,693
2024-02-08311: Noise — Noise: Construction Equipment (NC1)
2023-11-30311: Noise — Noise: Construction Before/After Hours (NM1)
2023-11-28311: Noise — Noise: Construction Before/After Hours (NM1)
2023-11-28311: Noise — Noise: Construction Before/After Hours (NM1)
2023-10-31Job filed: INSTALLATION OF MARQUEE (MARQUEE 3) AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION #: 121191049.$20,000
2023-10-31Job filed: INSTALLATION OF MARQUEE (MARQUEE 4) AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION #: 121191049.$20,000
2023-10-31Job filed: INSTALLATION OF MARQUE (MARQUEE 2) AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION #: 121191049.$20,000
2023-10-31Job filed: A3$20,000
2023-10-31Job filed: INSTALLATION OF MARQUEE (MARQUEE 1) AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION #: 121191049.$20,000
2023-10-23311: Noise — Noise: Construction Before/After Hours (NM1)
2023-09-15Permit NB — ISSUED
2023-09-11HPD class A: § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM
2023-09-11HPD class A: § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES
2023-08-30Agreement $132,300,000 — from 225 WEST 28TH STREET PROPERTY OWNER LLC; 215 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.$132,300,000
2023-07-11Permit NB — ISSUED
2023-07-03DOB complaint, category ?
2023-05-26Permit NB — ISSUED
2023-05-24Agreement $106,100,000 — from 215 WEST 28TH STREET PROPERTY OWNER LLC; 225 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC$106,100,000
2023-05-23Certificate of occupancy Renewal Without Change
2023-05-12DECL — from 225 WEST 28TH STREET PROPERTY OWNER LLC
2023-04-14311: Dirty Condition — Trash
2023-03-22Job filed: Plumbing work for the below grade portion as per the plans filed herewith. No change to use, egress or occupancy.$10,000
2023-03-15311: Noise — Noise: Construction Before/After Hours (NM1)
2023-03-14DOB complaint, category ?
2023-03-08HPD class A: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE UNEVEN WOOD FLOOR IN THE 1st ROOM FROM NORTH AT EAST LOCATE
2023-03-08HPD class A: § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE 1st ROOM FROM NORTH AT WEST L
2023-03-01Tenant complaint: WATER LEAK — DAMP SPOT
2022-11-27311: Water Quality — Taste/Odor, Musty/Stale (QA4)
2022-11-23Certificate of occupancy Renewal Without Change
2022-11-10Agreement $1,016,000 — from 215 WEST 28TH STREET PROPERTY OWNER LLC; 225 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.$1,016,000
2022-11-09Agreement $67,305,817 — from 225 WEST 28TH STREET PROPERTY OWNER LLC; 215 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.$67,305,817
2022-10-17Agreement $106,100,000 — from 225 WEST 28TH STREET PROPERTY OWNER LLC; 215 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.$106,100,000
2022-09-28Job filed: HAPPY HOUR EVENT FOR INVITED GUESTS ONLY, WITH FOOD AND BEVERAGE SERVED.
2022-09-23Agreement $106,100,000 — from 215 WEST 28TH STREET PROPERTY OWNER LLC; 225 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.$106,100,000
2022-09-20Agreement $106,100,000 — from 215 WEST 28TH STREET PROPERTY OWNER LLC; 225 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.$106,100,000
2022-09-20Agreement $106,100,000 — from 215 WEST 28TH STREET PROPERTY OWNER LLC; 225 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.$106,100,000
2022-09-20Agreement $106,100,000 — from 215 WEST 28TH STREET PROPERTY OWNER LLC; 225 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.$106,100,000
2022-09-20Agreement $106,100,000 — from 225 WEST 28TH STREET PROPERTY OWNER LLC; 215 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.$106,100,000
2022-09-20Agreement $106,100,000 — from 215 WEST 28TH STREET PROPERTY OWNER LLC; 225 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.$106,100,000
2022-09-15Permit Sprinklers — Signed-off
2022-09-13Permit Plumbing — Signed-off
2022-09-06Agreement $106,100,000 — from 225 WEST 28TH STREET PROPERTY OWNER LLC; 215 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.$106,100,000
2022-09-01Certificate of occupancy Renewal With Change
2022-08-31Agreement $105,405,000 — from 215 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.$105,405,000
2022-08-26SPRD $88,099,713 — from 225 WEST 28TH STREET PROPERTY OWNER LLC; 215 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.$88,099,713
2022-08-26SPRD $88,099,713 — from 225 WEST 28TH STREET PROPERTY OWNER LLC; 215 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.$88,099,713
2022-08-26SPRD $88,099,713 — from 225 WEST 28TH STREET PROPERTY OWNER LLC; 215 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.$88,099,713
2022-08-26SPRD $88,099,713 — from 225 WEST 28TH STREET PROPERTY OWNER LLC; 215 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.$88,099,713
2022-08-26Job filed: Happy Hour event for Maverick Chelsea
2022-08-25Agreement $89,127,746 — from 225 WEST 28TH STREET PROPERTY OWNER LLC; 215 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.$89,127,746
2022-08-23Agreement $106,100,000 — from 225 WEST 28TH STREET PROPERTY OWNER LLC; 215 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.$106,100,000
2022-08-23Agreement $106,100,000 — from 225 WEST 28TH STREET PROPERTY OWNER LLC; 215 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.$106,100,000
2022-08-23Agreement $106,100,000 — from 225 WEST 28TH STREET PROPERTY OWNER LLC; 215 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.$106,100,000
2022-08-23Agreement $106,100,000 — from 215 WEST 28TH STREET PROPERTY OWNER LLC; 225 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.$106,100,000
2022-08-23311: Noise — Noise: Construction Before/After Hours (NM1)
2022-08-18Agreement $94,725,952 — from 215 WEST 28TH STREET PROPERTY OWNER LLC; 225 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.$94,725,952
2022-08-18Agreement $94,725,952 — from 215 WEST 28TH STREET PROPERTY OWNER LLC; 225 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.$94,725,952
2022-08-18Agreement $94,725,952 — from 215 WEST 28TH STREET PROPERTY OWNER LLC; 225 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.$94,725,952
2022-08-09Job filed: Plumbing work for the below grade portion as per the plans filed herewith. No change to use, egress or occupancy.$10,000
2022-08-08Agreement $104,564,667 — from 215 WEST 28TH STREET PROPERTY OWNER LLC; 225 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.$104,564,667
2022-07-30311: Noise — Noise: Construction Before/After Hours (NM1)
2022-07-22Job filed: MODIFICATION OF SPRINKLER SYSTEM BELOW GRADE AS PER PLANS FILED HEREWITH.$14,700
2022-06-29Permit NB — ISSUED
2022-06-20FDNY inspection (CONSTR)
2022-06-20FDNY inspection (E-CIDS)
2022-06-08SAGE — from 215 WEST 28TH STREET PROPERTY OWNER LLC to 225 WEST 28TH STREET PROPERTY OWNER LLC
2022-06-07Certificate of occupancy Renewal With Change
2022-05-10Job filed: Book launch party
2022-04-13DECL — from 215 WEST 28TH STREET PROPERTY OWNER LLC; 225 WEST 28TH STREET PROPERTY OWNER LLC to 215 AND 225 W 28TH STREET HOMEOWNERS ASS
2022-03-25Certificate of occupancy Initial
2022-03-15311: General Construction/Plumbing — Site Conditions Endangering Workers
2022-03-15DOB complaint, category ?
2022-02-23311: Street Condition — Pothole
2022-01-13Permit EQ — ISSUED
2022-01-13Permit NB — ISSUED
2021
2021-11-11311: Noise - Helicopter — Other
2021-11-06311: Noise — Noise: Construction Before/After Hours (NM1)
2021-09-10FDNY inspection (CONSTR)
2021-09-07Permit NB — ISSUED
2021-09-02FDNY inspection (CONSTR)
2021-09-02Permit NB — ISSUED
2021-08-30FDNY inspection (CONSTR)
2021-08-27FDNY inspection (OTHER)
2021-08-02Permit Supported Scaffold — Signed-off
2021-08-02Job filed: INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEM FOR NEW BUILDING AS PER PLANS FILED HEREWITH. IN CONJUNCTION WITH NB# 121191049.$2,000
2021-07-16311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2021-07-16DOB complaint, category ?
2021-06-08Job filed: INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEM FOR NEW BUILDING AS PER PLANS FILED HEREWITH. IN CONJUNCTION WITH NB# 121191049.$2,000
2021-06-07311: General Construction/Plumbing — Working Contrary To Stop Work Order
2021-06-07DOB complaint, category ?
2021-06-01ECB CLASS - 1 violation: 2841811-EXPIRATION OF REGETRATION(GC)NOTE:AT TIME OF INSPECTION OF AN ACTIVE JOBSITE,UPON REVIEWING BIS/DOB NOW OBSERVED GC REGIST
2021-06-01DOB complaint, category ?
2021-05-28Job filed: INSTALLATION OF BOILERS AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION 121185813.$50,000
2021-05-18Permit Sidewalk Shed — Signed-off
2021-05-18Job filed: INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.$1,000
2021-05-05Permit NB — ISSUED
2021-04-21Permit Standpipe — Signed-off
2021-04-21Permit Standpipe — Signed-off
2021-04-21Permit Sprinklers — Signed-off
2021-04-08Permit EQ — ISSUED
2021-04-07311: Noise - Helicopter — Other
2021-04-01Job filed: HEREWITH FILING TENANT PROTECTION PLAN IN CONJUNCTION WITH NEW BUILDING APPLICATION 121191049$1,000
2021-04-01Job filed: HEREWITH FILING TENANT PROTECTION PLAN IN CONJUNCTION WITH NEW BUILDING APPLICATION 121191049$1,000
2021-04-01Job filed: HEREWITH FILING TENANT PROTECTION PLAN IN CONJUNCTION WITH NEW BUILDING APPLICATION 121191049$1,000
2021-01-29ECB CLASS - 1 violation: BC3303.4.5.1 STORAGE OF MATERIALS&EQUIPMENT OPEN&EXPOSED AREA NOTE:@TIME OF COMP INSPECTION @NEW 20STYBLDG ACTIVE JOBSITE.IT WAS R$625
2021-01-29Job filed: Construction of support scaffold for construction of New building under job # 121191049$100,000
2021-01-29DOB complaint, category ?
2021-01-14FDNY inspection (CDA-90-DRILL)
2021-01-12Permit EQ — ISSUED
2021-01-06FDNY inspection (CDA-90-DRILL)
2021-01-04FDNY inspection (CDA-90-DRILL)
2020
2020-12-18Permit Supported Scaffold — Signed-off
2020-12-11Job filed: HEREWITH FILING TENANT PROTECTION PLAN IN CONJUNCTION WITH NEW BUILDING APPLICATION 121185813$1,000
2020-11-25DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2020-11-25DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2020-11-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2020-10-17CORRD — from 213-227 WEST 28TH STREET LLC to 225 WEST 28TH STREET PROPERTY OWNER LLC
2020-10-02Permit Supported Scaffold — Signed-off
2020-09-28ECB CLASS - 2 violation: BC3314.4.3.2/FAILED TO PROVIDE INSTALLATION INSPECTION REPORT FOR SUSPENDED SCAFFOLD.AT TIME OF INSPECTION IN RESPONSE TO COMPLAIN
2020-09-26311: General Construction/Plumbing — Site Conditions Endangering Workers
2020-09-26DOB complaint, category ?
2020-09-18Job filed: Construction of support scaffold for construction of New building under job # 121191049$100,000
2020-08-27ECB CLASS - 1 violation: TOWER CRANE USER MIDWEST STEEL FAILED TO HAVE CERTIFIED RIGGERS ON SITE WHILE USING TOWER CRANE TO HOIST PRECAST CURTAIN WALL PANE
2020-08-27ECB CLASS - 1 violation: LIFT DIRECTOR THOMAS WILSON FAILED TO VERIFIED THE CERIFICATIONS OF HIS RIGGING CREW THEIR RIGGING CERTIFICATIONS WERE EXPIRED IN
2020-08-27DOB complaint, category ?
2020-08-10Elevator permit: FURNISH AND INSTALL GEARLESS PASSENGER CAR. ALL WORK TO COMPLY WITH ASME A17.1-2000/03, CHAPTER 30 OF 2014 BC, APPENDIX K AND K3. $1,200,000
2020-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2020-07-06DOB complaint, category ?
2020-06-17DOB complaint, category ?
2020-06-15DOB complaint, category ?
2020-06-13ECB CLASS - 1 violation: 3301.6 FAIL TO PROVIDE APPROVE DESIGN DRAWINGS FOR PLATFORMS @TIME OF INSPECTION ON AN ACTIVE 20 STY NB CONST SITE NOTICE ON THE 1$2,500
2020-05-18Permit Sidewalk Shed — Signed-off
2020-05-18Job filed: INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.$1,000
2020-05-09Permit Sprinklers — Signed-off
2020-05-09Permit Standpipe — Signed-off
2020-05-06Permit NB — ISSUED
2020-05-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2020-04-23311: COVID-19 Non-essential Construction — Construction
2020-04-23DOB complaint, category ?
2020-04-21ECB CLASS - 2 violation: 3301.2 GUARDRAILS.AT TIME OF INSP I OBSERVED INADEQUATE GUARDRAILS AT THE GARBAGE,DUCT SHAFT FROM FLOOR 4-12.I OBSERVED NETTING W/$625
2020-04-13DOB complaint, category ?
2020-04-06311: COVID-19 Non-essential Construction — Construction
2020-04-06DOB complaint, category ?
2020-03-31Job filed: INSTALLATION OF BOILERS AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION 121185813.$50,000
2020-03-30ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMEDNMENTS.NOTE:AT THE TIME OF MY INSPECTION,I OBSERVED O$625
2020-03-30DOB complaint, category ?
2020-03-20Permit EQ — ISSUED
2020-03-12FDNY inspection (CDA-90-DRILL)
2020-03-12Permit PL — ISSUED
2020-03-09ECB CLASS - 2 violation: AT THE TIME OF ECC INSPECTION, THERE WERE NO DOB APPROVED/AMENDED PLANS ON SITE. PLEASE GO TO HTTPS://WWW1.NYC.GOV/SITE/BUILDINGS/$625
2020-03-02ECB CLASS - 1 violation: AT TIME OF INSPECTION, IT WAS DISCOVERED THAT TOWER CRANE CD4910 CN 121418 WAS INSTALLED CONTRARY TO APPROVED CN PLANS. #10 TOWER $625
2020-03-02ECB CLASS - 1 violation: AT TIME OF INSPECTION, IT WAS DISCOVERED THAT TOWER CRANE CD4910 CN 121418 WAS INSTALLED CONTRARY TO APPROVED CN PLANS. #10 TOWER $2,500
2020-03-02DOB complaint, category ?
2020-02-14Permit NB — ISSUED
2020-01-10Permit NB — ISSUED
2020-01-09Permit EQ — ISSUED
2020-01-09Permit FO — ISSUED
2020-01-08Permit FO — ISSUED
2020-01-08DOB complaint, category ?
2019
2019-12-05Permit NB — ISSUED
2019-11-21Elevator permit: FURNISH AND INSTALL GEARLESS PASSENGER CAR. ALL WORK TO COMPLY WITH ASME A17.1-2000/03, CHAPTER 30 OF 2014 BC, APPENDIX K AND K3. $1,200,000
2019-11-19Job filed: INSTALLATION OF MARQUEE (MARQUEE 4) AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 121191049.$20,000
2019-11-19Job filed: INSTALLATION OF MARQUEE (MARQUEE 4) AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 121191049.$20,000
2019-11-19Job filed: INSTALLATION OF MARQUEE (MARQUEE 4) AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 121191049.$20,000
2019-11-16311: General Construction/Plumbing — Working Contrary To Stop Work Order
2019-11-16311: General Construction/Plumbing — Debris - Excessive
2019-11-16DOB complaint, category ?
2019-11-16DOB complaint, category ?
2019-11-14Job filed: INSTALLATION OF MARQUEE (MARQUEE 3) AS PER PLANS FILED HEREWITH. ALL RELATED S T & PL WORK TO BE FILED SEPARATELY UNDER NB APPLICATION 121191049$20,000
2019-11-14Job filed: INSTALLATION OF MARQUEE (MARQUEE 2) AS PER PLANS FILED HEREWITH. ALL RELATED S T & PL WORK TO BE FILED SEPARATELY UNDER NB APPLICATION 121191049$20,000
2019-11-14Job filed: INSTALLATION OF MARQUEE (MARQUEE 1) AS PER PLANS FILED HEREWITH. ALL RELATED S T & PL WORK TO BE FILED SEPARATELY UNDER NB APPLICATION 121191049$20,000
2019-11-14Job filed: INSTALLATION OF MARQUEE (MARQUEE 3) AS PER PLANS FILED HEREWITH. ALL RELATED S T & PL WORK TO BE FILED SEPARATELY UNDER NB APPLICATION 121191049$20,000
2019-11-14DOB complaint, category ?
2019-11-14DOB complaint, category ?
2019-11-14DOB complaint, category ?
2019-11-13ECB CLASS - 2 violation: FAILURE TO MAINTAIN/DISPLAY DOCUMENTS REQUIRED BY CHAPTER 33-DEMETRINGPLAN. AT THE TIME OF MY INSPECTION IT WAS OBSERVED AN ACTIVE$625
2019-11-13ECB CLASS - 1 violation: SEC. 28-105.12.8 WORK IS NOT ACCORDANCE W/SITE SAFETY PLAN. AT THE TIME OF MY INSPECTION IT WAS OBSERVED AN ACTIVE CONSTRUCTION SI$625
2019-11-13Job filed: INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEM FOR NEW BUILDING AS PER PLANS FILED HEREWITH. IN CONJUNCTION WITH NB# 121191049.$2,000
2019-11-06ECB CLASS - 2 violation: PROJECT INFORMATION PANEL/SIDEWALK SHED PARAPET PANEL CONSTRUCTION SIGN NOT PROVIDED OR NOT IN COMPLIANCE WITH SECTION.AT TIME OF
2019-11-06Permit EQ — ISSUED
2019-11-05FDNY inspection (CDA-90-DRILL)
2019-11-05Job filed: USE OF TEMPORARY OUTRIGGER PLATFORM CONSTRUCTION EQUIPMENT AT PER PLANS FILED HEREWITH. THIS APPLICATION IS FILED IN CONJUNCTION WITH NB-121191049.
2019-10-17ECB CLASS - 1 violation: INADEQUATE SAFETY MEASURES.NOTE AT TIME OF INSPECTION I OBSERVED HOIST CAR IN USE BY ROBERT GROVA NOT AUTHORIZED BY REPUBLIC SCAFF$2,500
2019-10-17DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019-10-17DOB complaint, category ?
2019-10-16ECB CLASS - 2 violation: 3310.4 PARTIAL STOP WORK ORDER EXPOSURE #3 15' FROM EDGE OF BUILDING.NOTE AT TIME OF INSPECTION I OBSERVED OVERHEAD PROTECTIONON S
2019-10-14Job filed: USE OF TEMPORARY CONCRETE PLACING BOOM CONSTRUCTION EQUIPMENT AT PER PLANS FILED HEREWITH. THIS APPLICATION IS FILED IN CONJUNCTION WITH NB-121191049.
2019-10-07Elevator permit: INSTALLATION OF DUAL TEMPORARY PERSONNEL MATERIAL CARS AS PER PLANS IN CONJUNCTION WITH INSTALLATION AND TESTS AS PER ANSI A10.4-1$20,000
2019-09-27Permit EQ — ISSUED
2019-09-26Permit Standpipe — Signed-off
2019-09-26Job filed: INSTALLATION OF DUAL TEMPORARY PERSONNEL/MATERIAL HOIST FOR WORKER ACCESS DURING CONSTRUCTION. DUAL TEMPORARY PERSONNEL/MATERIAL HOIST COMPLIES WITH C
2019-09-26Job filed: INSTALLATION OF DUAL TEMPORARY PERSONNEL/MATERIAL HOIST FOR WORKER ACCESS DURING CONSTRUCTION. DUAL TEMPORARY PERSONNEL/MATERIAL HOIST COMPLIES WITH C
2019-09-24Job filed: INSTALLATION OF TEMPORARY STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. IN CONJUNCTION WITH NB# 121191049$20,000
2019-09-20311: Homeless Encampment — N/A
2019-08-22Permit NB — ISSUED
2019-08-20Permit EQ — ISSUED
2019-08-19Job filed: USE OF TEMPORARY SPYDER W295 MINI CRANE CONSTRUCTION EQUIPMENT AS PER PLANS FILED HEREWITH. THIS APPLICATION IS FILED IN CONJUNCTION WITH NB-121191049
2019-08-17FDNY inspection (CDA-90-DRILL)
2019-07-23Job filed: BOILER WORK FOR NEW BUILDING. FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION 121191049.$100,000
2019-07-18Permit EQ — ISSUED
2019-07-15311: General Construction/Plumbing — Working Contrary To Stop Work Order
2019-07-15DOB complaint, category ?
2019-07-11DOB complaint, category ?
2019-07-10Permit FO — ISSUED
2019-07-10Permit NB — ISSUED
2019-07-10Permit EQ — ISSUED
2019-07-09ECB CLASS - 2 violation: FAILURE TO PROVIDE ADEQUATE HOUSEKEEPING(STANDING WATER).@TIME OF INSPI OBSERVED @A FOUNDATION SITE OF A PROPOSED 20 STORY PITS TH$625
2019-07-09ECB CLASS - 1 violation: FAILURE TO PROVIDE ADEQUATE HOUSEKEEPING @TIME OF INSP I OBSERVED INADEQUATE HOUSEKEEPING @SUB CELLAR 3.THERE IS A SECTION OF CONS
2019-05-21Permit NB — ISSUED
2019-05-20Permit EQ — ISSUED
2019-05-17FDNY inspection (CDA-90-DRILL)
2019-05-15Permit PL — ISSUED
2019-05-15Job filed: INSTALLATION AND USE OF STAIR TOWER AS PER PLANS SUBMITTED.STAIR TOWER SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES
2019-04-17ECB CLASS - 1 violation: FAILURE TO HAVE SITE SAFETY MANAGER PRESENT AS REQUIRED AT TIME OF INSPECTION OBSERVED IN LOG BOOK THAT SSM NAMED ON PW1 HAS NOT B
2019-04-17ECB CLASS - 1 violation: SEC. 3307.1 PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECS AT TIME OF INSPECTION OBSERVED YODOCK BARRIERS IN PLACE NOT FILLED W/WA$2,400
2019-04-15DOB complaint, category ?
2019-04-13ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTIES AFFECTED BY CONSTRUCTION OPERATIONS.IN RESPONSE TO THE ABOVE MENTIONED COMPLIANT O
2019-04-03311: Water System — Hydrant Leaking (WC1)
2019-03-28311: Water System — Hydrant Running (WC3)
2019-03-27DOB complaint, category ?
2019-03-18311: Investigations and Discipline (IAD) — Investigative Inspection
2019-03-18DOB complaint, category ?
2019-03-01Permit EQ — ISSUED
2019-02-25311: Noise — Noise: Construction Before/After Hours (NM1)
2019-02-15FDNY inspection (CDA-90-DRILL)
2019-02-07Permit NB — ISSUED
2019-02-03311: Water System — Hydrant Running Full (WA4)
2019-01-29Permit FO — ISSUED
2019-01-29Permit FO — ISSUED
2019-01-09DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019-01-09DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2018
2018-11-14Permit EQ — ISSUED
2018-11-13311: Noise — Noise: Construction Before/After Hours (NM1)
2018-11-10Job filed: INSTALLATION AND USE OF AN EQUIPMENT PLATFORM AS PER PLANS SUBMITTED.EQUIPMENT PLATFORM SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APP
2018-11-08311: Water System — Hydrant Defective (WC2)
2018-10-29311: General Construction/Plumbing — Adjacent Buildings Not Protected
2018-10-29DOB complaint, category ?
2018-10-25FDNY inspection (CDA-90-DRILL)
2018-10-24Permit FO — ISSUED
2018-10-24Permit FO — ISSUED
2018-10-19311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2018-10-19311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2018-10-19DOB complaint, category ?
2018-10-19DOB complaint, category ?
2018-10-17SMIS — from 213-227 WEST 28 TH STREET LLC
2018-10-17SMIS — from 213-227 WEST 28TH ST LLC
2018-10-17311: Homeless Encampment — N/A
2018-10-15311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-10-15ECB CLASS - 1 violation: BC3301.2 FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION OPERATION. AT TIME OF INSPECTION RESPONDING TO ACC$2,530
2018-10-15DOB complaint, category ?
2018-10-13311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-10-13DOB complaint, category ?
2018-10-08311: General Construction/Plumbing — Excavation Undermining Adjacent Building
2018-10-08DOB complaint, category ?
2018-10-02ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSON AND PROPERTIES AT THE TIME OF MY INSPECTION AN ACTIVE JOBSITE,OBSERVED NO CRACKS AND VIBRATIONS,MO
2018-10-01311: General Construction/Plumbing — Adjacent Buildings Not Protected
2018-10-01DOB complaint, category ?
2018-07-27FDNY inspection (CDA-90-DRILL)
2018-07-26Permit FO — ISSUED
2018-07-26Permit FO — ISSUED
2018-07-25Permit EQ — ISSUED
2018-07-24Permit EQ — ISSUED
2018-07-10311: Borough Office — Construction Enforcement Work Order (DOB)
2018-07-10DOB complaint, category ?
2018-05-30DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2018-05-30DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2018-05-30DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2018-05-30DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2018-05-30DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2018-05-08Job filed: INSTALLATION OF TEMPORARY STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. IN CONJUNCTION WITH NB# 121191049$50,000
2018-05-08Job filed: INSTALLATION OF TEMPORARY STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. IN CONJUNCTION WITH NB# 121191049$50,000
2018-05-02FDNY inspection (CDA-90-DRILL)
2018-04-13311: General Construction/Plumbing — Working Contrary To Stop Work Order
2018-04-13DOB complaint, category ?
2018-04-12Agreement — from 225 WEST 28TH STREET PROPERTY OWNER, LLC to THE CITY OF NEW YORK
2018-04-12Agreement — from DAIWA HOUSE TEXAS INC. to THE CITY OF NEW YORK
2018-03-08311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-03-08ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATION.@ TIME OF INSPECTION OBSERVED AN CONSTRUCTION SITE
2018-03-08DOB complaint, category ?
2018-03-05Permit EQ — ISSUED
2018-02-26ECB CLASS - 2 violation: BC3309.4 FAILURE TO PERFORM INSPECTION AND DOCUMENT CONDITIONS OF EXISTING STRUCTURES ADJOINING AN EXCAVATION IN A PRE CONSTRUCTIO
2018-02-26ECB CLASS - 1 violation: FAILURE TO NOTIFY THE DEPARTMENT PRIOR TO COMMENCEMENT OF EARTHWORK. AT THE TIME OF INSPECTION, IT WAS OBSERVED AN ACTIVE CONSTRUC
2018-02-26ECB CLASS - 1 violation: BC3309.1 FAILURE TO PROTECT OR ADEQUATELY PROTECT ADJOINING PROPERTIES DURING CONSTRUCTION OR DEMOLITION OPERATION. AT THE TIME OF$1,600
2018-02-26ECB CLASS - 1 violation: SITE SAFETY MANAGER FAILED TO IMMEDIATELY NOTIFY THE DEPARTMENT OF CONDITIONS AS REQUIRED. AT THE TIME OF INSPECTION IT WAS OBSERV
2018-02-26ECB CLASS - 1 violation: FAILURE TO PROMPTLY NOTIFY THE DEPARTMENT OF AN ACCIDENT OR DAMAGE TO ADJOINING PROPERTY AT CONSTRUCTION/DEMOLITION SITE. AT THE T$2,500
2018-02-23311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2018-02-23DOB complaint, category ?
2018-02-14Permit EQ — ISSUED
2018-01-08311: Water System — Hydrant Defective (WC2)
2017
2017-11-21Job filed: FIRE PROTECTION PLAN IN CONJUNCTION WITH NB #121191049 AS PER THE PLANS FILED HEREWITH.$1,000
2017-11-21Job filed: FIRE PROTECTION PLAN IN CONJUNCTION WITH NB #121191049 AS PER THE PLANS FILED HEREWITH.$1,000
2017-11-15Deed — from 213-227 WEST 28TH STREET LLC to 225 WEST 28TH STREET PROPERTY OWNER LLC
2017-11-15Agreement $132,300,000 — from 215 WEST 28TH STREET PROPERTY OWNER LLC; 225 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.$132,300,000
2017-11-15Mortgage $106,100,000 — from 215 WEST 28TH STREET PROPERTY OWNER LLC; 225 WEST 28TH STREET PROPERTY OWNER LLC to DAIWA HOUSE TEXAS INC.$106,100,000
2017-11-14FDNY inspection (CONSTR)
2017-11-14311: General Construction/Plumbing — Excavation Undermining Adjacent Building
2017-11-14DOB complaint, category ?
2017-11-06FDNY inspection (CONSTR)
2017-11-06HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2017-10-30Deed transfer (nominal price)
2017-10-30Permit FO — ISSUED
2017-10-30Permit FO — ISSUED
2017-10-27Permit EQ — ISSUED
2017-10-13Permit DM — ISSUED
2017-09-21Job filed: FIRE PROTECTION PLAN IN CONJUNCTION WITH NB #121191049 AS PER THE PLANS FILED HEREWITH.$1,000
2017-09-21Job filed: SUBSEQUENT APPLICATION FOR FOUNDATION WORK AS PER PLANS FILED HEREWITH.
2017-09-21Job filed: SUBSEQUENT APPLICATION FOR FOUNDATION WORK AS PER PLANS FILED HEREWITH.
2017-09-21Job filed: SUBSEQUENT APPLICATION FOR FOUNDATION WORK AS PER PLANS FILED HEREWITH.
2017-09-05FDNY inspection (RISK)
2017-08-25CERT — from CHICAGO TITLE INSURANCE COMPANY
2017-08-25ZONE — from 213-227 WEST 28TH STREET LLC
2017-08-25ZONE — from 213-227 WEST 28TH STREET LLC
2017-08-23DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2017-08-02Permit EQ — ISSUED
2017-07-21Permit EQ — ISSUED
2017-07-10311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2017-07-10DOB complaint, category ?
2017-06-02311: General Construction/Plumbing — Working Contrary To Stop Work Order
2017-06-02DOB complaint, category ?
2017-05-31ECB CLASS - 1 violation: 3301.02DESIGNATION OF CONSTRUCTION SUPERINTENDENT.NOTE:AT THE TIME OF MY INSPECTION OF A 2 STORY DEMOLITION OPERATION DOWN TO 2ND $1,600
2017-05-31ECB CLASS - 2 violation: CONSTRUCTION SUPERINTENDENT FAIL TO PERFORM DUTIES PER RULE THE FOLLOWING HAZARDOUS CONDITIONS WERE OBSERVED AND STOP WORK ORDER W$2,500
2017-05-31ECB CLASS - 2 violation: FAILURE TO INSTITUTE AND MAINTAIN SAFETY MEASURES & TEMPORARY CONSTRUCTING EQUIPMENT.NOTE:AT THE TIME OF MY INSPECTION OF A 2 STO$5,000
2017-05-17311: General Construction/Plumbing — Debris - Excessive
2017-05-17DOB complaint, category ?
2017-04-19311: BEST/Site Safety — Demolition Notification Received
2017-04-19DOB complaint, category ?
2017-04-13Permit DM — ISSUED
2017-04-13Permit EQ — ISSUED
2017-04-12CERT — from WORLD WIDE TRANSFER, INC
2017-04-12ZONE — from 213-227 WEST 28TH STREET LLC; 215 WEST 28TH STREET PROPERTY OWNERLLC/E
2017-04-12SMIS — from 213-227 WEST 28TH STREET LLC; 215 WEST 28TH STREET PROPERTY OWNERLLC/E
2017-04-12SMIS — from 215-219 WEST 28TH STREET 2 LLC/DAVID SPE
2017-04-06PAT — from MINTZ, RONNY to BESEN, MICHAEL
2017-03-30Job filed: INSTALLATION OF MANUAL & AUTOMATIC SMOKE/HEAT/CO DETECTION & SPRINKLER FIRE ALARM SYSTEM WITH VOICE COMMUNICATION SYSTEM AND PURGE SYSTEM. ARC$100,000
2017-03-17Job filed: INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEM FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 121191049.$1,423,200
2017-03-17Job filed: BPP FILED IN CONJUNCTION WITH NB #121191049 AS PER PLANS FILED HEREWITH.
2017-03-17Job filed: INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEM FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 121191049.$1,423,200
2017-03-17Job filed: BPP FILED IN CONJUNCTION WITH NB #121191049 AS PER PLANS FILED HEREWITH.
2017-03-16Permit EQ — ISSUED
2017-03-16Job filed: INSTALLATION OF A FENCE AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. FENCE TO BE PLACED ON THE ROADWAY. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FE
2017-03-16Job filed: INSTALLATION OF A FENCE AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. FENCE TO BE PLACED ON THE ROADWAY. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FE
2017-01-30Agreement $42,000,000 — from 213-227 WEST 28TH STREET LLC to DAIWA HOUSE TEXAS INC.$42,000,000
2017-01-30Agreement $28,800,000 — from 213-227 WEST 28TH STREET LLC to DAIWA HOUSE TEXAS INC.$28,800,000
2017-01-17Job filed: DM
2017-01-05Job filed: INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEM FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 121191049.$1,423,200
2016
2016-12-11Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2016-10-26HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2016-09-28Job filed: INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEM FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 121191049.$1,423,200
2016-09-28Job filed: INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEM FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 121191049.$1,423,200
2016-09-20Job filed: SUBSEQUENT APPLICATION FOR STRUCTURAL WORK AS PER PLANS FILED HEREWITH.
2016-09-20Job filed: SUBSQUENT FILING FOR MECHANICAL AND PLUMBING AND BOILER WORK FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION AS PER PLANS FILED HEREWITH.
2016-09-20Job filed: SUBSEQUENT FILING FOR SOE WORK AS PER PLANS FILED HEREWITH
2016-09-09M&CON $42,000,000 — from 213-227 WEST 28TH STREET LLC to DAIWA HOUSE TEXAS INC$42,000,000
2016-09-09Deed $30,000,000 — from MBK I PROPERTY I LLC; MINTZ, JULIE; XENOPOULOS, ALEX; P2016 LLC; PEREVOSKI, ERNEST; NEWBUR to 213-227 WEST 28TH STREET LLC$30,000,000
2016-09-09PAT — from MINTZ, JULIE to BESEN, MICHAEL
2016-09-09PAT — from XENOPOULOS, ALEX to BESEN, MICHAEL
2016-09-09Mortgage $1,796,369 — from MINTZ, RONNY; P. XENOPOULOS REALTY, LLC; MBK 28 LLC; MBK 1 PROPERTY 1 LLC; P.O. M. REALTY to SANTANDER BANK, N.A.$1,796,369
2016-09-09Mortgage $1,796,369 — from 213-227 WEST 28TH STREET LLC to DAIWA HOUSE TEXAS INC$1,796,369
2016-09-09Mortgage assigned — from SANTANDER BANK, N.A. to DAIWA HOUSE TEXAS INC
2016-09-09PAT — from PEREVOSKI, ERNEST to BESEN, MICHAEL
2016-09-09Agreement $1,796,369 — from NEWBURGER MBK, LLC; MINTZ, RONNY; MBK GROUP, LLC; J & S 49 PRINCE LLC; CONCORD MANAGEMENT to SANTANDER BANK, N.A.$1,796,369
2016-09-09PAT — from DEMARCO, RAYMOND to BESEN, MICHAEL
2016-09-08Job filed: NB
2016-09-08Job filed: NB
2016-08-15Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCU
2016-08-11Permit EQ — ISSUED
2016-08-11Permit EQ — ISSUED
2016-08-11Job filed: INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCU
2016-08-10Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCU
2016-08-10Job filed: INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCU
2016-08-10Job filed: INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCU
2016-08-10Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCU
2016-08-10Job filed: INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCU
2016-08-09Sold for $30,000,000$30,000,000
2016-08-08HPD class C: § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING TWO LOCKABLE SLIDE BOLTS AT BULKHEAD DOOR TO ROOF
2016-08-08HPD class A: § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGE
2016-08-08HPD class A: § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT EAST AND WEST WALLS AT BULKHEAD
2016-08-08HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT PLASTER AT EAST AND WEST WALLS AT BULKHEAD
2016-08-08HPD class A: § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON
2016-07-12Deed — from MBK GROUP, LLC to DEMARCO, RAYMOND; P XENOPOULOS REALTY LLC; NEWBURGER MBK, LLC; MINTZ, RONNY; MBK I PROPERT
2016-03-30311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2016-03-30ECB CLASS - 2 violation: FAILURE TO MAINTAIN BUILDING WALLS NOTED AT 2ND FLR LEVEL ABOVE WINDOWS LINTELS DEFETIVE AND DETERIORATED MASONRY MORTAR HAS SEPAR$1,250
2016-03-30DOB complaint, category ?
2016-03-07Job filed: DM
2016-02-25Job filed: INTERIOR RENOVATION TO ALL EXISTING DWELLING UNITS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$126,000
2016-02-14Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2016-01-07Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2012-04-05311: Water Conservation — Illegal Use Of A Hydrant (CIN)
2012-01-14311: Graffiti — Graffiti
2011
2011-09-26TL&R — from JPMORGAN CHASE BANK, N.A. to J&J 161 8TH AVE. LLC; 434 WEST 38TH STREET LLC; J&S 49 PRINCE LLC; 336 WEST 17TH STREET LL
2011-09-26TL&R — from JPMORGAN CHASE BANK, N.A. to J&J 161 8TH AVE. LLC; J&S 49 PRINCE LLC; MBK GROUP, LLC; CONCORD MANAGEMENT 211 W 21ST LLC
2011-09-26Agreement $18,000,000 — from J&J 161 8TH AVE. LLC; MBK GROUP, LLC; 434 WEST 38TH STREET LLC; 336 WEST 17TH STREET LLC; to SOVEREIGN BANK$18,000,000
2011-09-26Mortgage $2,308,568 — from 336 WEST 17TH STREET LLC; MBK GROUP, LLC; CONCORD MANAGEMENT 211 W 21ST LLC; 434 WEST 38TH to SOVEREIGN BANK$2,308,568
2011-09-26Mortgage assigned — from JPMORGAN CHASE BANK, N.A. to SOVEREIGN BANK
2011-09-26Mortgage assigned — from CITIBANK, N.A. to JPMORGAN CHASE BANK, N.A.
2011-09-26Mortgage assigned — from JPMORGAN CHASE BANK, N.A. to SOVEREIGN BANK
2011-09-26Mortgage assigned — from CITIBANK, N.A. to JPMORGAN CHASE BANK, N.A.
2011-07-14Tenant complaint: PLUMBING — WATER SUPPLY
2011-07-14Tenant complaint: PLUMBING — WATER SUPPLY
2011-07-14Tenant complaint: PLUMBING — WATER SUPPLY
2011-07-14Tenant complaint: PLUMBING — WATER SUPPLY
2011-07-14Tenant complaint: PLUMBING — WATER SUPPLY
2011-07-13Rodent inspection: Passed
2011-07-13Rodent inspection: Passed
2011-07-13Rodent inspection: Passed
2011-04-19Permit AL — ISSUED
2011-04-08Permit EW — ISSUED
2011-04-01Mortgage assigned — from CITIBANK N.A., A NATIONAL BANKING ASSOCI to JPMORGAN CHASE BANK, N.A.
2011-03-11Job filed: INSTALL OF STOREFRONT AWNING "BANANA LEAF" SRI LANKAN & SOUTH ASIAN CUISINE .$2,241
2011-03-11Job filed: INSTALL OF STOREFRONT AWNING 'BANANA LEAF' SRI LANKAN & SOUTH ASIAN CUISINE .$2,241
2011-02-28AALR — from CITIBANK N.A., A NATIONAL BANKING ASSOCI to JPMORGAN CHASE BANK, N.A.
2011-02-25Permit PL — ISSUED
2011-02-16Permit EW — ISSUED
2011-02-10Job filed: FILING FOR KITCHEN FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH JOB#120579212, AS SHOWN ON PLAN. COOKING EQUIPMENT, COOKING EXHAUST SYSTEM, AND FIRE S$3,000
2011-02-10Job filed: FILING FOR KITCHEN FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH JOB#120579212, AS SHOWN ON PLAN. COOKING EQUIPMENT, COOKING EXHAUST SYSTEM, AND FIRE S$3,000
2011-01-14Permit EW — ISSUED
2011-01-14Job filed: INTERIOR RENOVATION WORK ON EXISTING STORE ON FIRST FLOOR SUCH AS INSTALL NEW KITCHEN FIXTURES, ADA TOILET AND COSMETIC WORKS. NO CHANGE IN USE, EGRES$19,990
2011-01-14Job filed: INTERIOR RENOVATION WORK ON EXISTING STORE ON FIRST FLOOR SUCH AS INSTALL NEW KITCHEN FIXTURES, ADA TOILET AND COSMETIC WORKS. NO CHANGE IN USE, EGRES$19,990
2011-01-07Tenant complaint: HEATING — HEAT RELATED
2010
2010-11-26311: Graffiti — Graffiti
2010-07-29Rodent inspection: Passed
2010-07-28Rodent inspection: Passed
2010-07-28Rodent inspection: Passed
2010-07-23311: Street Condition — Pothole
2010-07-20311: Street Condition — Pothole
2010-05-17311: Graffiti — Graffiti
2010-05-12311: Graffiti — Graffiti
2010-05-08311: Noise - Vehicle — Car/Truck Music
2009
2009-08-14Tenant complaint: HEATING — HEAT RELATED
2008
2008-04-18AL&R $4,000,000 — from MBK GROUP, LLC to CITIBANK, N.A.$4,000,000
2008-04-18Mortgage $4,000,000 — from MBK GROUP, LLC to CITIBANK, N.A.$4,000,000
2008-04-18Agreement $13,000,000 — from 336 WEST 17TH STREET LLC; J&J 161 8TH AVE. LLC; CONCORD MANAGEMENT 211 W 21ST LLC; 434 WES to CITIBANK, N.A.$13,000,000
2008-04-18ASPM $13,000,000 — from 434 WEST 38TH STREET LLC; 336 WEST 17TH STREET LLC to CITIBANK, N.A.$13,000,000
2008-04-14Tenant complaint: HEATING — HEAT RELATED
2007
2007-11-02Tenant complaint: HEATING — HEAT RELATED
2007-03-06Tenant complaint: HEATING — HEAT RELATED
2007-03-06Tenant complaint: HEATING — HEAT RELATED
2007-01-17Tenant complaint: HEATING — HEAT RELATED
2007-01-03Permit EW — ISSUED
2006
2006-12-22Job filed: Install kitchen fire suppression system, as shown on plan. No change in use, occupancy, or egress.$3,000
2006-04-11Job filed: REPLACEMENT OF PARAPET AT ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$30,000
2006-02-24DOB complaint, category ?
2005
2005-12-28AL&R $13,000,000 — from CITIBANK, N.A to MBK GROUP, LLC; J&J 161 8TH AVE. LLC; CONCORD MANAGEMENT 211 W 21ST LLC; J&S 49 PRINCE LLC$13,000,000
2005-12-28Deed — from RUBELL, MARILYN; SIDNEY RUBELL, AS TRUSTEE FOR; THE SIDNEY RUBELL FAMILY REVOCABLE TRUST to CONCORD MANAGEMENT 211 W. 21ST LLC
2005-12-28Mortgage $13,000,000 — from CONCORD MANAGEMENT 211 W 21ST LLC; J&J 161 8TH AVE. LLC; J&S 49 PRINCE LLC; MBK GROUP, LLC to CITIBANK, N.A$13,000,000
2005-12-28Deed — from P. XENOPOULOS REALTY, LLC; KB EQUITIES LLC; MHK GROUP, LLC to MBK GROUP, LLC
2005-12-15Tenant complaint: HEATING — HEAT RELATED
2005-04-01Deed $11,000,000 — from SPERBER, MICHAEL F; SPERBER, A/K/A SHARON; HARRIS, SHARON L to KB EQUITIES LLC; P. XENOPOULOS REALTY, LLC; MHK GROUP, LLC$11,000,000
2005-03-07Job filed: REPLACE LOW PRESSURE GAS FIRED ATMOSPHER IC BOILER WITH BOILER AND GAS B RNER. REPLACE EXISTING GAS METER AND PIP ING. NO CHANGE IN USE, EGRESS OR OCC$28,000
2005-02-24Tenant complaint: HEATING — HEAT RELATED
2005-02-24Tenant complaint: HEATING — HEAT RELATED
2005-02-24Tenant complaint: HEATING — HEAT RELATED
2005-02-24Tenant complaint: HEATING — HEAT RELATED
2005-02-24Tenant complaint: HEATING — HEAT RELATED
2005-02-24Tenant complaint: GENERAL — COOKING GAS
2005-02-24Tenant complaint: HEATING — HEAT RELATED
2005-02-24Tenant complaint: GENERAL — COOKING GAS
2005-02-24Tenant complaint: HEATING — HEAT RELATED
2005-02-23Tenant complaint: HEATING — HEAT RELATED
2005-02-23Tenant complaint: GENERAL — COOKING GAS
2005-02-23Tenant complaint: HEATING — HEAT RELATED
2005-02-14Tenant complaint: GENERAL — COOKING GAS
2005-02-01Tenant complaint: APPLIANCE — ELECTRIC/GAS RANGE
2003-02-12DEEDO $35,625 — from SPERBER, JOSEPH to SPERBER, MICHAEL$35,625
2003-02-12DEEDO $35,625 — from SPERBER, JOSEPH to HARRIS, SHARON$35,625
2002
2002-09-12Deed — from SPERBER, JOSEPH E. to HARRIS, SHARON L.
2002-09-12Deed — from SPERBER, JOSEPH E. to SPERBER, MICHAEL F.
2001
2001-02-28ECB Non-Hazardous violation: FAILURE TO MAINTAIN;DEFECT ARE EXTERRIOR WALL (BRICKWORK)AT WEST LEVATION-MORTAR JOINST MISSING IN VARIOUR LOCATION;REMEDY: REPAIR$350
2000
2000-12-28Deed — from RUBELL, SIDNEY AS TRUSTEE; RUBELL, SIDNEY FAMILY REVOCABLE LIVING T to GORLECHEN, ELAINE M.; RUBELL, MARILYN
1999
1999-10-13Deed — from SPERBER, JOSEPH E. to SPERBER, MICHAEL F.
1999-10-13Deed — from SPERBER, JOSEPH E. to HARRIS, SHARON L.
1999-05-14ECB Non-Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL. NOTED AT WEST ELEVATION: MORTAR CRACKED AND SPALLING FROM 3RD STORY TO ROOF. AT EAST $800
1998
1998-04-14ECB Hazardous violation: FAILURE TO MAINTAIN BLDG. LINTELS ARE CORRODED AT 2ND STORY FRONT. MASONRY BRICKWORK IS CRACKED & OUT OF BOND A FRONT FACADE. $800
1998-04-14ECB Hazardous violation: FAILURE TO MAINTAIN BLDG. MASONRY BRICKWORK IS CRACKED, OUT OF BOND &DEFECTIVE AT WEST SIDE, FROM 2ND STORY TO ROOF & AT EAST SID$2,500
1998-04-14DOB complaint, category ?
1997
1997-05-30Permit EW — ISSUED
1997-05-30Permit EW — ISSUED
1997-03-21Deed — from SPERBER, JOSEPH E. to HARRIS, SHARON L.
1997-03-21Deed — from SPERBER, JOSEPH E. to SPERBER, MICHAEL F.
1996
1996-08-01Deed — from RUBELL, SIDNEY to GORLECHEN, ELAINE M.; SIDNEY RUBELL FAMILYREVOCABLE LIVING TRU; RUBELL, SIDNEY; RUBELL, MA
1996-08-01Deed — from SIDNEY RUBELL FAMILTY REVOCABLE LIVING T; RUBELL, SIDNEY TRUSTEE to CONCORD MANAGEMENT CO.
1996-08-01Deed — from RUBELL, MARILYN to CONCORD MANAGEMENT CO.
1996-08-01Deed — from CONCORD MANAGEMENT CO. to RUBELL, SIDNEY; SPERBER, JOSEPH E.
1996-08-01Deed — from GORLECHEN, ELAINE M. to CONCORD MANAGEMENT CO.
1994
1994-08-19Deed — from RUBELL, SIDNEY; SIDNEY RUBELL FAMILYREVOCABLE LIVING TRU to RUBELL, SIDNEY; GORLECHEN, ELAINE M.; RUBELL, MARILYN; SIDNEY RUBELL FAMILYREVOCABLE LIVIN
1993
1993-09-29ECB Non-Hazardous violation: WORK WITHOUT PERMIT PARTITIONS HAVE BEEN REMOVED NEW ELECTRICAL LINES FIXTURES AND SWITCH AND NO PERMITS. REMEDY:STOP ALL WORK. PR$350
1993-06-29Deed — from CONCORD MANAGEMENT CO; RUBELL, SIDNEY to RUBELL, SIDNEY TRTEE; SIDNEY RUBELL FAMILYETC
1989
1989-05-19Mortgage satisfied — from CONCORD MGMNT CO to BOLDER SPRTZR MFG COINC
1986
1986-09-29Mortgage assigned — from ZIMMERMAN, ABRAHAM LWT; MANUFACTURERS HAN TRCO to AKRON INVESTMENTS
1974
1974-05-21Mortgage assigned — from BOLDER-SPRITZER MFGCO to ZIMMERMAN, ABE
1974-05-13Mortgage — from CONCORD MANAGEMENT CO to BOLDER-SPRITZER MFGCO
1972
1972-07-13Agreement — from EMMONS REALTY CO INC to BRINKERHOFF, MARY DEAN W; WESTON, CHARLES DIMICK; GRIMLEY, MARION E
1967
1967-08-31Agreement — from EMMONS REALTY CO INC to GRIMLEY, MARION E; WESTON, CHARLES D; BRINKERHOFF, MARY D