The city's published records show little recorded distress here in the last three years. Less recorded distress than 70% of 100+-unit residential buildings citywide. The citywide median for 100+-unit residential buildings is 3.7 penalty
points per 10 units; this building carries 1.3. In ZIP 10010, 74% of residential buildings hold an A and
5% grade D or F.
How grades work
this building
A
B
C
Among 4,677 100+-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
8 heat or hot-water complaints in the last three years (winter 2025–26: 8).
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
33 service requests in the last three years. Most common: Noise (11) · Missed Collection (4) · HEAT/HOT WATER (4) · Illegal Parking (2) · Sidewalk Condition (2) · UNSANITARY CONDITION (2).
Filed construction activity
$670,792 in permitted construction work filed since
2016 (24 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974 (1990)
Yes
Six or more residential units (166)
No
421-a / J-51 tax benefit on the current tax roll
1 of 3 signals present. Only a partial profile — stabilization is possible but less likely. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
ELEKTRA ACQUISITIONS LLC
Head officer
JASON W GREER
Managing agent
GREYSTAR
Last registered
2025-07-07
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$55,432,000
$24,944,400
2026
$63,263,000
$28,468,350
2027
$70,189,000
$31,585,050
The city's market estimate has risen
27% between tax years 2025 and 2027.
Building systems
Energy grade (LL33)
C — ENERGY STAR score 65/100 (2022 disclosure cycle)
Heating fuel
NATURALGAS
Facade (Local Law 11)
SAFE (cycle 10)
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 5 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
23 St-Baruch College — 6 · 850 ft straight-line (about a 4-minute walk) · station accessibility: full
Bus
Nearest boarding stop: E 23 St / 3 Av — M23-SBS · 200 ft · Select Bus Service
Citi Bike
Gramercy Park N & Gramercy Park E · 450 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
33 311 service requests from this address in the last three years — 4 of them about heat or hot water.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $3,000,000 on
2013-08-28 (lender: Hartford Life Insurance Company). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2013-08-28
Mortgage $3,000,000 — from ELEKTRA ACQUISITIONS, LLC to HARTFORD LIFE INSURANCE COMPANY
$3,000,000
2013-08-28
AL&R $73,000,000 — from ELEKTRA ACQUISITIONS, LLC to HARTFORD LIFE INSURANCE COMPANY
$73,000,000
2013-08-28
Agreement $73,000,000 — from ELEKTRA ACQUISITIONS, LLC to HARTFORD LIFE INSURANCE COMPANY
$73,000,000
2011-04-01
Deed $122,500,000 — from GRAMERCY 290, LLC to ELEKTRA ACQUISITIONS, LLC
$122,500,000
2011-04-01
Agreement $70,000,000 — from ELEKTRA ACQUISITIONS, LLC; GRAMERCY 290, LLC to NORTHWESTERN MUTUAL LIFE INSURANCE COMPA
$70,000,000
2008-01-16
ASPM $70,000,000 — from CITIGROUP GLOBAL MARKETS REALTY CORP., to THE NORTHWESTERN MUTUAL LIFE INSURANCE C
$70,000,000
2006-11-28
Deed $92,500,000 — from EAST 17TH STREET PROPERTIES, INC. to GRAMERCY 290 LLC
$92,500,000
2006-11-28
Mortgage $70,000,000 — from GRAMERCY 290 LLC to CITIGROUP GLOBAL MARKETS REALTY CORP.,
$70,000,000
2006-11-28
AL&R $70,000,000 — from CITIGROUP GLOBAL MARKETS REALTY CORP., to GRAMERCY 290 LLC
$70,000,000
1993-03-29
Mortgage $36,600,000 — from EAST 17TH ST PRPERTSINC to NYC HDC
$36,600,000
1989-06-29
Mortgage $1,200,000 — from MJM ASSOCIATES to MARINE MIDLAND BANKNA
$1,200,000
1989-06-29
Mortgage $17,619,169 — from MJM ASSOCIATES to MARINE MIDLAND BANKNA
$17,619,169
1987-06-10
Mortgage $1,250,000 — from MJM ASSOCIATES to MARINE MIDLAND BANKNA
$1,250,000
1987-06-10
Mortgage $414,600 — from MJM ASSOCIATES to MARINE MIDLAND BANKNA
$414,600
1986-12-01
Mortgage $312,210 — from MJM ASSOCIATES to 288-92 THIRD AVE ASSOC.
$312,210
Ten-year activity
50250
2017
2018
2019
2020
39
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
0
6
12
0
4
22
2018
11
0
6
0
4
21
2019
1
3
17
0
3
24
2020
0
3
13
0
2
18
2021
0
3
34
0
2
39
2022
2
6
9
0
2
19
2023
3
2
9
2
3
19
2024
13
2
16
0
2
33
2025
6
0
8
0
3
17
2026
14
0
20
0
2
36
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Air permit (CERTIFICATE TO OPERATE), fuel: NATURALGAS
2026-08-21
Facade (LL11) filing, cycle 10: SAFE
2026-08-05
Job filed: Furnish and Install (2) New Heat Pump Split Units without Ductwork thereby replacing existing unit serving 2 Retail Space on Ground Floor of the Build
2026-07-29
HPD class C: § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING KICK DOWN STOP AT VESTIBULE DOOR , 1st STORY
2026-07-29
HPD class C: § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING KICK DOWN DOOR STOP AT ENTRANCE DOOR TO BUILDING , 1st STORY
Job filed: APPLICATION FILED FOR STRUCTURAL ADDITIONS/MODIFICATIONS (SLAB INFILL) IN THE CELLAR AND ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH.
2026-04-24
Job filed: APPLICATION FILED FOR SPRINKLER ADDITIONS/MODIFICATIONS ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
2026-04-22
311: HEAT/HOT WATER — APARTMENT ONLY
2026-04-22
Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-03-28
Job filed: APPLICATION FILED FOR PLUMBING ADDITIONS/MODIFICATIONS ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
2026-03-28
Job filed: APPLICATION FILED FOR MECHANICAL ADDITIONS/MODIFICATIONS ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
2026-03-27
Job filed: APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHAN
2026-02-07
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-07
311: HEAT/HOT WATER — APARTMENT ONLY
2026-02-07
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-07
Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-01-12
311: Air Quality — Air: Odor/Fumes, Vehicle Idling (AD3)
2026-01-12
HPD class A: § 27-2042 ADM CODE PROVIDE A MIRROR IN SELF-SERVICE ELEVATOR ARRANGED SO AS TO ENABLE A PERSON ENTERING, TO VIEW INSIDE OF ELEVATOR NUMBER 1
2026-01-10
311: HEAT/HOT WATER — APARTMENT ONLY
2026-01-10
Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-12-19
311: Missed Collection — Compost
2025-12-08
Bedbug filing: 0 infested units
The full timeline
2026
2026-10-09Permit Mechanical Systems — Permit Issued
2026-09-02Air permit (CERTIFICATE TO OPERATE), fuel: NATURALGAS
2026-08-21Facade (LL11) filing, cycle 10: SAFE
2026-08-05Job filed: Furnish and Install (2) New Heat Pump Split Units without Ductwork thereby replacing existing unit serving 2 Retail Space on Ground Floor of the Build$30,000
2026-07-29HPD class C: § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING KICK DOWN STOP AT VESTIBULE DOOR , 1st STORY
2026-07-29HPD class C: § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING KICK DOWN DOOR STOP AT ENTRANCE DOOR TO BUILDING , 1st STORY
2026-05-13Permit General Construction — Permit Issued
2026-05-13Permit Mechanical Systems — Permit Issued
2026-05-13Permit Plumbing — Permit Issued
2026-05-13Permit Plumbing — Permit Issued
2026-05-05Job filed: APPLICATION FILED FOR STRUCTURAL ADDITIONS/MODIFICATIONS (SLAB INFILL) IN THE CELLAR AND ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH.$20,000
2026-04-24Job filed: APPLICATION FILED FOR SPRINKLER ADDITIONS/MODIFICATIONS ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$14,000
2026-04-22311: HEAT/HOT WATER — APARTMENT ONLY
2026-04-22Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-03-28Job filed: APPLICATION FILED FOR PLUMBING ADDITIONS/MODIFICATIONS ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$33,500
2026-03-28Job filed: APPLICATION FILED FOR MECHANICAL ADDITIONS/MODIFICATIONS ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$25,000
2026-03-27Job filed: APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHAN$92,755
2026-02-07311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-07311: HEAT/HOT WATER — APARTMENT ONLY
2026-02-07Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-07Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-01-12311: Air Quality — Air: Odor/Fumes, Vehicle Idling (AD3)
2026-01-12HPD class A: § 27-2042 ADM CODE PROVIDE A MIRROR IN SELF-SERVICE ELEVATOR ARRANGED SO AS TO ENABLE A PERSON ENTERING, TO VIEW INSIDE OF ELEVATOR NUMBER 1
2026-01-10311: HEAT/HOT WATER — APARTMENT ONLY
2026-01-10Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-07-03Job filed: PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCC$1,000
2025-05-22Boiler inspection
2025-05-22Boiler inspection
2025-04-24Rodent inspection: Passed
2025-03-28311: Missed Collection — Recycling - Paper
2025-03-18311: Noise — Noise: Construction Equipment (NC1)
2025-02-21Permit General Construction — Signed-off
2025-02-07311: Noise — Noise: Construction Equipment (NC1)
2025-01-29Job filed: Amendment for New Suspended Scaffold for new faade work.
2024
2024-12-26311: Noise — Noise: Construction Equipment (NC1)
2024-12-20311: Real Time Enforcement — Work Without A Permit - Occupied Multiple Dwelling
2024-12-20DOB complaint, category ?
2024-12-19311: Noise — Noise: Construction Equipment (NC1)
2024-12-19311: Noise — Noise: Construction Equipment (NC1)
2024-12-18Bedbug filing: 0 infested units
2024-11-25311: Noise — Noise: Construction Equipment (NC1)
2024-11-18311: Consumer Complaint — Other Store (Non-Food)
2024-10-28Job filed: EXISTING COMMERCIAL SPACE, INTERIOR RENOVATION MODIFY PARTITION FOR PROPOSED AT FIRST FLOOR SPACE; INSTALL MECHANICAL WORK FOR THE VENTILATION SYSTEM $69,740
2024-09-11Permit General Construction — Signed-off
2024-09-05Permit Sidewalk Shed — Signed-off
2024-09-04Job filed: INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANC$5,000
2024-08-29Permit Suspended Scaffold — Signed-off
2024-08-26Permit Mechanical Systems — Signed-off
2024-08-23311: Noise — Noise: Construction Equipment (NC1)
2024-08-22311: Noise — Noise: Jack Hammering (NC2)
2024-08-07Job filed: Amendment for New Suspended Scaffold for new faade work.
2024-07-26311: Noise — Noise: Construction Equipment (NC1)
2024-07-17311: Food Establishment — Handwashing
2024-06-03Permit Plumbing — Signed-off
2024-05-15Job filed: EXISTING COMMERCIAL SPACE, MECHANICAL SYSTEM OBTAIN MECHANICAL PERMIT FOR THE INSTALL VENTILATION SYSTEM WORKS.$21,216
2024-05-12311: Homeless Person Assistance
2024-05-08Permit General Construction — Signed-off
2024-05-07Job filed: EXISTING COMMERCIAL SPACE, PLUMBING SYSTEM IN CONJUNCTION WITH JOB # M01042714, OBTAIN PLUMBING PERMIT FOR THE INSTALL PLUMBING FIXTURES WORKS.$36,500
2024-05-03DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2024-04-30Job filed: EXISTING COMMERCIAL SPACE, INTERIOR RENOVATION MODIFY PARTITION FOR PROPOSED AT FIRST FLOOR SPACE; INSTALL MECHANICAL WORK FOR THE VENTILATION SYSTEM $69,740
2024-03-13Job filed: Exterior facade restoration and repairs work as necessary. No change in use, occupancy or egress proposed under this application.$34,717
2022-09-14Permit General Construction — Signed-off
2022-09-04311: Abandoned Vehicle — With License Plate
2022-08-25Job filed: Propose interior demo work at existing retail space on ground level. Removal of non load bearing partitions and related finishes all as per plans here$30,000
2021-03-02311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2021-01-23Bedbug filing: 0 infested units
2021-01-18311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020
2020-12-17311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-12-04Bedbug filing: 0 infested units
2020-12-04Bedbug filing: 0 infested units
2020-11-09Bedbug filing: 0 infested units
2020-10-26311: HEAT/HOT WATER — ENTIRE BUILDING
2020-10-26Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2020-06-28311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-06-23311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-03-09311: Broken Parking Meter — Timer Defect - Fast/Fail
2020-03-04311: Broken Parking Meter — Timer Defect - Fast/Fail
2020-02-28311: Broken Parking Meter — No Receipt
2020-02-26DOB violation E:
2020-02-26DOB violation E:
2020-02-26DOB violation E:
2020-02-10Boiler inspection
2020-02-10Boiler inspection
2020-01-27Bedbug filing: 0 infested units
2020-01-11311: Noise — Noise: Construction Equipment (NC1)
2019
2019-11-29311: Broken Parking Meter — Coin or Card Did Not Register
2019-11-26311: HEAT/HOT WATER — ENTIRE BUILDING
2019-11-26311: HEAT/HOT WATER — ENTIRE BUILDING
2019-11-26Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019-11-26Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019-11-25311: HEAT/HOT WATER — ENTIRE BUILDING
2019-11-25Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019-11-22311: HEAT/HOT WATER — ENTIRE BUILDING
2019-11-22Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019-11-14Permit EW — ISSUED
2019-10-06311: Abandoned Vehicle — With License Plate
2019-10-03311: Broken Parking Meter — No Receipt
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-07-17311: Homeless Person Assistance — N/A
2019-07-02Elevator permit: A software upgrade to the existing controller to comply with door lock monitoring system as per ASME A17.3 of 2002 as modified by $15,663
2018-10-05HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2018-10-01Permit EW — ISSUED
2018-10-01Permit EW — ISSUED
2018-09-12Job filed: SUBSEQUENT MECHANICAL WORK AS SHOWN HEREWITH. NO CHANGE TO EGRESS, OCCUPANCY OR USE.$2,500
2018-09-12Job filed: SUBSEQUENT MECHANICAL WORK AS SHOWN HEREWITH. NO CHANGE TO EGRESS, OCCUPANCY OR USE.$2,500
2018-09-11Job filed: INTERIOR RENOVATION OF EXISTING ACCESSORY TENANT'S EXERCISE ROOM AS SHOWN HEREWITH. NO CHANGE TO EGRESS, OCCUPANCY OR USE.$75,000
2018-09-11Job filed: ADDITION AND MODIFICATION TO EXISTING SPRINKLER SYSTEM. NO CHANGE TO EGRESS, OCCUPANCY OR USE.$14,800
2018-06-29311: Missed Collection (All Materials) — 1RG Missed Recycling Paper
2018-06-19Boiler inspection
2018-06-19Boiler inspection
2018-03-15Permit Sign — Signed-off
2018-03-15Permit Sign — Signed-off
2018-03-13Job filed: INSTALL NON-ILLUMINATED SIGN ON WALL (JANOVIC-BENJAMIN MOORE)$3,770
2018-03-12Job filed: INSTALL ILLUMINATED SIGN ON WALL (JANOVIC-BENJAMIN MOORE)$3,042
2015-10-04Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2015-09-04Job filed: FACADE REPAIR INCLUDING MASONRY POINTING, MISC BRICK REPLACEMENT, LINTEL REPLACEMENT AND CONCRETE EYEBROW REPAIR AS PER PLANS FILED. NO CHANGE IN USE$18,300
2015-09-04Job filed: FACADE REPAIR INCLUDING MASONRY POINTING, MISC BRICK REPLACEMENT, LINTEL REPLACEMENT AND CONCRETE EYEBROW REPAIR AS PER PLANS FILED. NO CHANGE IN USE$18,300
2015-08-20311: Broken Muni Meter — Out of Order
2015-05-31311: For Hire Vehicle Complaint — Driver Complaint
2015-04-29311: Noise - Helicopter — Other
2015-04-11311: Street Condition — Blocked - Construction
2015-02-25311: Noise — Noise: Construction Before/After Hours (NM1)
2015-01-21DOB violation E:
2015-01-21DOB violation E:
2015-01-21DOB violation E:
2014
2014-12-30Permit AL — ISSUED
2014-11-24Job filed: INSTALLING TELECOMMUNICATIONS CABINET ON PLATFORM WITH RELATED ANTENNAS ON THE ROOF.ALL IN CONFORMANCE WITH TPPN# 5/98.NO CHANGE IN USE,EGRESS OR OCCU$10,500
2011-12-13DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
2011-08-11Rodent inspection: Passed
2011-07-20DOB violation E:
2011-07-20DOB violation E:
2011-05-17311: Hazardous Materials — Oil Spill On Street, Large (HQL)
2011-04-08Permit EW — ISSUED
2011-04-06Job filed: LINTEL AND BRICK REPLACEMENT AS PER PLAN AT 290 3RD AVENUE. DURING REMEDIAL REPAIRS, NO CHANGE IN USE, EGRESS OR OCCUPANCY.$17,500
2011-04-06Job filed: LINTEL AND BRICK REPLACEMENT AS PER PLAN AT 290 3RD AVENUE. DURING REMEDIAL REPAIRS, NO CHANGE IN USE, EGRESS OR OCCUPANCY.$17,500
2011-04-01Deed $122,500,000 — from GRAMERCY 290, LLC to ELEKTRA ACQUISITIONS, LLC$122,500,000
2011-04-01Agreement $70,000,000 — from ELEKTRA ACQUISITIONS, LLC; GRAMERCY 290, LLC to NORTHWESTERN MUTUAL LIFE INSURANCE COMPA$70,000,000
2011-03-31Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED A TOTAL OF APPROXIMATELY 75 L.F. AS PER PLAN AT 290 3 AVENUE. DURING REMEDIAL REPAIRS. WORK SHALL COMPLY WITH
2011-03-31Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED A TOTAL OF APPROXIMATELY 75 L.F. AS PER PLAN AT 290 3 AVENUE. DURING REMEDIAL REPAIRS. WORK SHALL COMPLY WITH
2011-03-31Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED A TOTAL OF APPROXIMATELY 75 L.F. AS PER PLAN AT 290 3 AVENUE. DURING REMEDIAL REPAIRS. WORK SHALL COMPLY WITH
2011-03-31Permit EQ — ISSUED
2010
2010-12-20311: Taxi Complaint — Driver Complaint
2010-12-15311: Street Condition — Pothole
2010-10-13ECB CLASS - 2 violation: 100R09,60M07,47M07,98BB05,39O02,72M07. 100R- REMOVE ILLEGAL LIGHTING IN MACHINE ROOM. 60M- PROVIDE PROPER LIGHTING IN MACHINE ROO$500
2010-10-13ECB CLASS - 2 violation: 100R09,60M07,42M07,98BB05,100R09,39R09,72M07. 100R- REMOVE ILLEGAL LIGHTING IN MACHINE ROOM. 60M- PROVIDE PROPER LIGHTING. 42M- PR$500
2010-10-08DOB violation VCAT1:
2010-08-16Rodent inspection: Passed
2010-03-25311: Street Condition — Line/Marking - Faded
2010-02-21311: Noise — Noise: Construction Equipment (NC1)
2010-01-27ECB CLASS - 2 violation: FAILURE TO FILE AN ARCHITECT / ENGINEER REPORT CERTIFYING EXIT / DIRECTIONAL SIGNS ARE CONNECTED TO EMERGENCY POWER SOURCE / STORA
2009
2009-12-31DOB violation LBLVIO:
2009-09-02DOB violation E:
2009-09-02DOB violation E:
2009-09-02DOB violation E:
2009-01-16Permit EQ — ISSUED
2009-01-09Job filed: ERECT PIPE SCAFFOLD AS PER PLAN AT 290 3 AVENUE. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2009-01-01DOB violation LL6291:
2008
2008-10-15Facade (LL11) filing, cycle 6: SAFE
2008-08-13DOB violation E:
2008-08-13DOB violation E:
2008-06-11Permit EW — ISSUED
2008-06-11Permit EW — ISSUED
2008-06-11Permit EW — ISSUED
2008-05-20DOB complaint, category ?
2008-05-19ECB Hazardous violation: WORKERS NOT ATTACHED TO LIFE LINE. FAILURE TO USE HARNESS WHILE WORKING ON 2 POINT SUSPENDED SCAFFOLD. WORKERS ON SCAFFOLD W/O A C$2,000
2008-05-14Job filed: MODIFY EXISTING SPRINKLER SYSTEM AS PER PLANS FILED$10,750
2008-04-01Job filed: PROPOSED INSTALLATION OF SPRINKLER ALARM SYSTEM WITH SMOKE DETECTION, FAN SHUT DOWN AND CENTRAL OFFICE CONNECTION. THERE IS NO CHANGE IN USE, AGRES$40,000
2008-04-01Permit PL — ISSUED
2008-03-31DOB violation LL2604E:
2008-03-24Permit EW — ISSUED
2008-02-28Permit EW — ISSUED
2008-02-28Permit EW — ISSUED
2008-02-28Permit EW — ISSUED
2008-02-27Permit EW — ISSUED
2008-02-25Job filed: UNDERPINNING OF INTERIOR WALL IN BSMT.IN CONJUNCTION WITH ALT 2 JOB 104919625. ALL WORK AS SHOWN ON PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$10,000
2008-02-05ECB Non-Hazardous violation: INSTALLED EQUIPMENT DOES NOT MATCH APPROVED PLANS/DRAWINGS. WORK CONTRARY TO DEPARTMENT OF BUILDINGS APPROVED PLANS AND APPLICATIO$500
2008-01-16Mortgage assigned — from CITIGROUP GLOBAL MARKETS REALTY CORP., to THE NORTHWESTERN MUTUAL LIFE INSURANCE C
2008-01-16ASPM $70,000,000 — from CITIGROUP GLOBAL MARKETS REALTY CORP., to THE NORTHWESTERN MUTUAL LIFE INSURANCE C$70,000,000
2008-01-16AALR — from CITIGROUP GLOBAL MARKETS REALTY CORP., to THE NORTHWESTERN MUTUAL LIFE INSURANCE C
2008-01-03DOB violation LL6291:
2008-01-02DOB complaint, category ?
2007
2007-12-20Permit EQ — ISSUED
2007-12-10DOB violation E:
2007-12-10DOB violation E:
2007-10-10Permit EW — ISSUED
2007-10-09Job filed: STRUCTURAL MODIFICATION FOR NEW ELEVATORSHAFT AS PER PLANS FILED$50,000
2007-10-09Job filed: MODIFOCATION TO SPRINKLER SYSTEM AS PERPLANS FILED NO CHANGES$16,000
2007-10-09Job filed: REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS AND RELATED FINI SHES NEW ELEVATOR SHAFT CELLAR TO LOBBYREPLACE ENTRANCE DOORS NEW ROOF DECK A$100,000
2007-10-09Job filed: MODIFICATIONS TO MCNANICAL SYSTEM ANDPLUMBING CHANGES AS PER PLANS$60,000
2007-10-09Job filed: MODIFICATIONS TO MCNANICAL SYSTEM ANDPLUMBING CHANGES AS PER PLANS$60,000
2007-09-28DOB complaint, category ?
2007-08-21Job filed: Facade Repairs as per plans submitted herewith. No change to use, occupancy group or egress.$75,000
2007-07-13Permit EW — ISSUED
2007-07-11Job filed: Remove and replace all plumbing fixtures on floors 2nd thru 30th, lower penthouse & upper penthouse as shown on drawings filed herewith. No change$135,000
2007-07-09Job filed: Remove and replace all finishes and fixtures on floors 2nd thru 30th, lower penthouse & upper penthouse as shown on drawings filed herewith. No ch$450,000
2007-06-25DOB violation L1198:
2007-04-30DOB complaint, category ?
2007-04-25DOB complaint, category ?
2007-04-09Permit EQ — ISSUED
2007-04-05Job filed: INSTALL HEAVY DUTY SIDEWALK SHED A TOTAL OF 133LF AT 290 3RD AVENUE. WORK TO COMPLY WITH LL33/91. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2007-04-05Job filed: INSTALL HEAVY DUTY SIDEWALK SHED A TOTAL OF 133LF AT 290 3RD AVENUE. WORK TO COMPLY WITH LL33/91. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2007-02-21Facade (LL11) filing, cycle 6: SAFE
2007-01-19DOB violation LL6291:
2007-01-15DOB violation E:
2007-01-15DOB violation E:
2006
2006-11-28Mortgage satisfied — from EAST 17TH STREET PROPERTIES, INC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2006-11-28Mortgage assigned — from THE BANK OF NEW YORK MERGER TO IBJ SCHRO; COMMERCE BANK, N.A. to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2006-11-28Deed $92,500,000 — from EAST 17TH STREET PROPERTIES, INC. to GRAMERCY 290 LLC$92,500,000
2006-11-28TERA — from NEW YORK CITY HOUSING DEVELOPMENT CORPOR to 17TH STREET PROPERTIES, INC.,
2006-11-28TERA — from COMMERCE BANK, N.A. to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2006-11-28TL&R — from COMMERCE BANK, N.A.
2006-11-28Mortgage $70,000,000 — from GRAMERCY 290 LLC to CITIGROUP GLOBAL MARKETS REALTY CORP.,$70,000,000
2006-11-28AL&R $70,000,000 — from CITIGROUP GLOBAL MARKETS REALTY CORP., to GRAMERCY 290 LLC$70,000,000
2006-11-28TL&R — from COMMERCE BANK, N.A.
2006-01-06DOB violation LL6291:
2005
2005-04-12DOB violation E:
2005-04-12DOB violation E:
2005-01-31DOB violation LL6291:
2004
2004-02-13DOB violation LL6291:
2003
2003-12-11DOB complaint, category ?
2003-12-05Job filed: Erect 50LF Sidewalk Shed . Heavy duty shed to be installed @ 300psf. to perform facade repair. There will be no change to egress, use or occupancy.
2003-12-05Job filed: Erect 50LF Sidewalk Shed . Heavy duty shed to be installed @ 300psf. to perform facade repair. There will be no change to egress, use or occupancy.
2003-12-04ECB Non-Hazardous violation: FAILURE TO OBTAIN A PERMIT FOR SIDEWALK SHED NOTED:SIDEWALK SHED ERECTED IN FRONT OF BLDG APPROX 10FT HIGH 90FT LONG.REMEDY:OBTAIN$2,500
2003-12-04DOB complaint, category ?
2003-12-04DOB complaint, category ?
2003-08-11AALR — from JP MORGAN CHASE BANK to COMMERCE BANK, N.A.
2003-08-11AALR — from JP MORGAN CHASE BANK to COMMERCE BANK, N.A.
2003-08-11Agreement — from JP MORGAN CHASE BANK to COMMERCE BANK, N.A.
2003-08-11Mortgage assigned — from JP MORGAN CHASE BANK to COMMERCE BANK, N.A.
1997-01-13ECB Non-Hazardous violation: INSTALLATION OF AN AIR CONDITIONIING CARRIER UNIT AT 2ND FLOOR ROOF BEHIND 290 3 AVENUE WITHOUT FIRST OBTAINING AN EQUIPMENT USE$600
1997-01-07DOB complaint, category ?
1996
1996-02-07Permit EW — ISSUED
1994
1994-03-18DOB violation LL6291:
1994-03-18DOB violation LL6291:
1993
1993-09-09DOB complaint, category ?
1993-04-21Agreement — from NYC HOUSING DVLPMNTCORP; EAST 17TH ST PRPTS INC to BETH ISRAEL MED CENTER
1993-04-21Agreement — from NYC HOUSING DVLP CORP; EAST 17 ST PRPTS INC to BETH ISRAEL MED CENTER
1993-03-29Mortgage assigned — from BETH ISRAEL MEDICALCNTR to NYC HDC
1993-03-29Mortgage assigned — from EAST 17TH ST PRPTS INC to NYC HDC
1993-03-29Mortgage assigned — from NYC HDC; EAST 17TH ST PRPTS INC to CHEMICAL BANK; IBJ SCHRODER BK & TRCO
1993-03-29Agreement — from EAST 17TH ST PRPTS INC; NYC HDC to BETH ISRAEL MEDICALCNTR
1993-03-29Mortgage assigned — from NYC HDC to IBJ SCHRODER BK & TRCO; CHEMICAL BANK
1993-03-29Agreement — from NYC HDC; EAST 17TH ST PROPRTSINC to BETH ISRAEL MEDICALCNTR
1993-03-29Mortgage $36,600,000 — from EAST 17TH ST PRPERTSINC to NYC HDC$36,600,000
1993-03-18DOB violation LL6291:
1993-03-18DOB violation LL6291:
1993-01-11Mortgage satisfied — from 288-92 THIRD AVE ASOC to HARLEM SAVINGS BANK
1992
1992-12-15Mortgage satisfied — from MJM ASSOCIATES to MARINE MIDLAND BANK,NA
1992-12-15Mortgage satisfied — from MJM ASSOCIATES to MARINER MIDLAND BANK, NA
1992-12-04Mortgage satisfied — from MJM ASSOCIATES to MARINE MIDLAND BANK
1992-12-04Mortgage satisfied — from MJM ASSOOCIATES to MARINE MIDLAND BANK,N.A
1992-11-30DECL — from MJM ASSOCIATES
1992-11-30Deed — from MJM ASSOCIATES to EAST 17TH ST PRPTS,INC
1992-11-30Agreement — from GUSTAVUS ADOLPHUS ETC to MJM ASSOCIATES
1992-07-07SAGE — from MJM ASSOCIATES
1992-02-24DOB violation ES:
1992-02-19DOB complaint, category ?
1991
1991-08-02MISC — from MJM ASSOCIATES
1991-07-19ECB Hazardous violation: FAILURE TO PROVIDE GUARD & TOE BOARD ON SCAFFOLD, IN THAT THE POLE SCAFFOLD 40 FEET ABOVE THE 2 FLR. SET BACK HAD NO GUARDRAIL
1991-05-07DOB complaint, category ?
1991-01-14ECB Hazardous violation: FAILURE TO SAFEGUARD PUBLIC AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. RAYING CONCRETE BLOCK AT ENTIRE FRONT OF BUILDING A$345
1990
1990-12-07EASE — from GUSTAVUS ADOLPHUS ETC to MJM ASSOCIATES
1990-12-03ECB Hazardous violation: UNSAFE STORAGE OF MATERIALS AT EDGE OF BUILDING-BRICK,BLOCK,MORTAR HASBEEN LEFT ON EDGE OF BUILDING (WITHIN 10') ON 26TH FLOOR ALL$345
1990-12-03ECB Hazardous violation: FAILURE TO DO ADEQUATE HOUSEKEEPING IN THAT MASONRY DEBRIS (BLOCK,BRICK,MORTAR)HAS BEEN LEFT ON THE 26TH FLOOR UNCONTAINED. THIS D$345
1990-12-03ECB Hazardous violation: VERTICAL NETTING NOT PROVIDED-(INADEQUATE)IN THAT 2ND CDABLE AT 42" ISMISSING AND NETTING IS LOOSE AND ABLE TO BLOW IN THE WIND-2N$2,155
1990-11-27ECB Hazardous violation: WORK CONTRARY TO APPROVED DEPARTMENT OR BUILDINGS PLANS AND APPLICATIONS. USING A PERSONEL HOIST CAR ROOF AS SUPPORT FOR ONE END O$345
1990-11-20ECB Non-Hazardous violation: VERTICAL SAFETY NETTING NOT PROVIDED, AT THE FOLLOWING LOCATIONS & FLOORS: - (1) 9 FL (NORTHEAST) 9FL. (SOUTHWEST). (2) ) SOUTH& 1$2,155
1990-09-28Permit EQ — ISSUED
1990-09-27ECB Hazardous violation: FAILURE TO PROVIDE WARNING SIGNS. AT VEHICLE ENTRANCE ON 3 AVENUE TRACTOR TRAILER LOADED WITH DRYWALL BACKED ACROSS SIDEWALK.
1990-09-27ECB Hazardous violation: NO FLAGPERSON. TRACTOR TRAILER LOADED WIHT DRYWALL WAS BACKING INTO JOBSITE CROSSING SIDWALK.. NO FLAGPERSON WAS PRESENT ON EITH
1990-09-10Permit EQ — ISSUED
1990-09-04ECB Hazardous violation: FAILURE TO DO ADEQUATE HOUSEKEEPING ON THE 26, 23,22 AND 18 FLOORS ON THESE ENTIRE FLOOR THER ARE PIECES OF WOOD CONCRETE DROPPING$860
1990-09-04ECB Hazardous violation: OPENING HOLES NOT COVERED ON THE 28TH 27TH 26TH 21 20TH 19TH 17 16TH AND 14 AT VARIOUS LOCATIONS ON THESE ENTIRE FLOORS THERE ARE $2,155
1990-09-04ECB Hazardous violation: UNSAFE STORAGE OF MATERIALS AT EDGE OF BUILDING ON THE 29TH FLOOR ON THE EAST SIDE 4 DOOR FRAMES 3' AT EDGE AND 27TH & 25TH FLOOR $860
1990-09-04ECB Hazardous violation: NO TOE BOARDS AT STAIR OPENING ON THE EAST SIDE ON FLOORS 29,28,27 24,22 AND 21 REMEDY PROVIDE AND INSTALL TOEBOARDS AT STAIR OPEN
1990-08-10ECB Hazardous violation: NO FLAGPERSON WHILE LIFTING A BLUE DEBRIS BOX FROM THE 25TH FLOOR DOWN TO THE STREET ON EAST SIE OF SITE AND NOT STOPPING PEDESTRI$575
1990-08-10ECB Hazardous violation: FAILURE TO PROVIDE WARNING SINGS INTHE HOISTING AREA ON THE EAST SIDE OF THE SITE ALONG THIRD AVE. REMEDY PROVIDE SIMAGE IN AREAS $345
1990-08-01ECB Hazardous violation: VERTICAL SAFETY NETTING NOT PROVIDED, IN THAT THE VERTICAL NETS ON FLOORS (AT PERIMETERS) 10TH THROUGH 15 ON THE NORTH, EAST AN$860
1990-08-01ECB Hazardous violation: NO TOE BOARDS AT THE PERIMETERS OF FLOORS 10 THROUGH 15 ON THE NORTH, EAST AND SOUTH SIDES. REMEDY: PROVIDE AND INSTALL TOE BOARDS$860
1990-07-31Permit EQ — ISSUED
1990-07-25ECB Non-Hazardous violation: NO PERMIT FOR MATERIAL HOIST. ERECTTION OF TONER TOWER FOR MATERIAL HOIST, HAS BEEN ERECTED TO THE 10 FL LOCATED IN REAR OF 292 $345
1990-06-28ECB Hazardous violation: HORIZONTIAL SAFETY NETTING NOT PROVIDED ON THE PERIMETAER AS REQUIRED BY LOCAL LAW 61/87 NO HORIZONTIAL SAFETY NETTING PROVIDED ON$345
1990-05-10Permit EQ — ISSUED
1990-05-01Permit EQ — ISSUED
1990-04-09DOB complaint, category ?
1990-03-07DOB complaint, category ?
1990-02-06ECB Hazardous violation: SITE SAFETY. APPROVED PLANS NOT AVAIALBLE FOR INSPECTION. REMEDY: HAVE APPROVED PLANS AVAILABLE FOR INSPECTION AT SIT$150
1990-02-06ECB Hazardous violation: NO SITE SAFETY LOG AS PER REGULATION EFFECTIVE 11/1/86 REMEDY: MAINTAIN SITE SAFETY LOG AS PER REGULATION.$300
1990-02-06ECB Hazardous violation: FAILURE TO HAVE SITE SAFETY MANAGER PRESENT AS REQUIRED. REMEDY: STOP ALL WORK EXCEPT PROTECTION OF EXCAVTION AND HA$1,500
1990-02-06ECB Hazardous violation: FAILURE TO PROVIDE APPROVED PLANS AT PREMISES AT TIME OF INSPECTION FOR NEW BLDG. FAILURE TO FILE 10F PRIOR TO START OF UNCONTR$300
1989
1989-12-29ECB Hazardous violation: FAILURE TO SAFELY REMOVE DEMOKLITIN DEBRIS FROM UPPER FLOORS(NOTED: THROWING DEMOLITION DEBRIS ROOF 4TH FLOOR LEVEL TO GROUND LE$500
1989-12-15Deed — from 288-92 THIRD AVE ASSOC to MJM ASSOCIATES
1989-12-12DOB violation C:
1989-12-12DOB violation CS:
1989-12-12ECB Non-Hazardous violation: WORK WITHOUT A PERMIT. REMEDY: OBTAIN A PERMIT.$250
1989-12-07SAGE — from MJM ASSOCIATES; LA MARCA, JOSEPH
1989-12-07Agreement — from LA MARCA, JOSEPH to MJM ASSOCIATES
1989-12-07SAGE — from MERRILL LYNCH EQUTYETC
1989-12-07SAGE — from MARINE MIDLAND BANKN A
1989-12-07SAGE — from M J M ASSOCIATES
1989-12-07CERT — from COMMONWEALTH LD TTLEINS
1989-10-04Mortgage assigned — from 288-92 THIRD AVE ASSOC to MARINE MIDLAND BANKN.A.
1989-06-29Mortgage $1,200,000 — from MJM ASSOCIATES to MARINE MIDLAND BANKNA$1,200,000
1989-06-29Agreement — from MARINE MIDLAND BANKN A to MJM ASSOCIATES
1989-06-29Mortgage $17,619,169 — from MJM ASSOCIATES to MARINE MIDLAND BANKNA$17,619,169
1989-06-29Agreement — from MARINE MIDLAND BANKN A to MJM ASSOCIATES
1989-06-08SAGE — from COMMONWEALTH LND/TIT/INS
1989-04-17VAC — from COMMISSIONER OF FINANCE to CITY OF THE NEW YORK
1988
1988-10-06Deed — from COMMISSIONER OF FINANCE to CITY OF NEW YORK
1987
1987-06-10SAGE — from 288-92 THIRD AVE ASSOC
1987-06-10Mortgage $1,250,000 — from MJM ASSOCIATES to MARINE MIDLAND BANKNA$1,250,000
1987-06-10SAGE — from MJM ASSOCIATES; GUSTAVUS ADOLPHUS ETAL
1987-06-10Mortgage $414,600 — from MJM ASSOCIATES to MARINE MIDLAND BANKNA$414,600
1987-06-10SAGE — from MARINE MIDLAND BANKNA
1987-06-10EASE — from GUSTAVUS ADOLPHUS ETAL to MJM ASSOCIATES
1987-06-10Agreement — from 288-92 THIRD AVE ASSOC to MARINE MIDLAND BANKNA
1987-06-10SAGE — from MJM ASSOCIATES
1986
1986-12-01Mortgage $312,210 — from MJM ASSOCIATES to 288-92 THIRD AVE ASSOC.$312,210
1986-12-01Agreement — from 288-92 THIRD AVE ASSOC to MJM ASSOCIATES
1986-12-01Mortgage assigned — from APPLE BANK FOR SAVINGS to 288-92 THIRD AVE ASSOC
1986-12-01Deed — from 288-92 THIRD AVE ASSOC to MJM ASSOCIATES
1979
1979-08-17Deed — from I T S 135 EAST 45 STCRP to 288-92 THIRD AVE ASSOCTS
1979-08-17Mortgage assigned — from 288-92 THIRD AVE ASSCTES to HARLEM SAVINGS BANK
1979-08-17Mortgage — from 288-92 THIRD AVE ASSCTES to HARLEM SAVING BANK
1977
1977-04-04Deed — from PLIMACK, BEE TR; KRAMER, NORMAN DECDTR; KRAMER, MILTON TR to J J S 135 EAST 45 STCRP
1972
1972-07-20Deed — from KRAMER, JANE DECD EX to PLIMACH, BEE TR; KRAMER, MILTON TR; KRAMER, JANE DECD EX
1971
1971-06-29Mortgage assigned — from EMPIRE SAVINGS BANK to DINNERSTEIN, DOROTHY
1966
1966-02-15Agreement — from KRAMER, JANE to EMPIRE CITY SAVINGSBANK