The city's published records show little recorded distress here in the last three years. Less recorded distress than 60% of 25-99-unit residential buildings citywide. The citywide median for 25-99-unit residential buildings is 23.6 penalty
points per 10 units; this building carries 13.4. In ZIP 10029, 43% of residential buildings hold an A and
12% grade D or F.
How grades work
this building
A
B
C
Among 17,252 25-99-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
16 heat or hot-water complaints in the last three years (winter 2023–24: 8 · winter 2025–26: 6). Repeated winter clusters suggest a chronic heating problem.
8
’23–24
6
’25–26
No bedbug-infested units reported in the last three years of filings.
$14,675 in enforcement penalties imposed (ECB/OATH) in the last three years.
What 311 hears from this address
18 service requests in the last three years. Most common: HEAT/HOT WATER (8) · PLUMBING (4) · Lead (1) · Noise (1) · UNSANITARY CONDITION (1) · Street Light Condition (1).
Filed construction activity
$72,580 in permitted construction work filed since
2016 (2 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974 (2003)
Yes
Six or more residential units (45)
Yes
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. Buildings receiving 421-a or J-51 benefits are generally required to register their units as rent-stabilized for the duration of the benefit. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
BH 109 E 102 LLC
Head officer
GIL BOUSSIDAN
Managing agent
MARIN MANAGEMENT
Last registered
2025-09-17
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$5,844,000
$2,629,800
2026
$6,936,000
$3,121,200
2027
$6,115,000
$2,751,750
The city's market estimate has risen
5% between tax years 2025 and 2027.
Tax exemptions on the roll: 421A 25 YR NO CAP
Building systems
Energy grade (LL33)
C — ENERGY STAR score 63/100 (2022 disclosure cycle)
Heating fuel
NATURALGAS
Facade (Local Law 11)
SAFE (cycle 9)
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 4 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
103 St — 6 · 350 ft straight-line (about a 2-minute walk) · station accessibility: none
Bus
Nearest boarding stop: Lexington Av / E 104 St — M101 M102 M103 · 400 ft
Citi Bike
E 102 St & Park Ave · 350 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
18 311 service requests from this address in the last three years — 8 of them about heat or hot water.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $184,869 on
2022-03-23 (lender: Signature Bank). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2022-03-23
Mortgage $184,870 — from BH 109 E 102 LLC; MANHATTAN 102 LLC to SIGNATURE BANK
$184,870
2022-03-23
Agreement $9,750,000 — from MANHATTAN 102 LLC; BH 109 E 102 LLC to SIGNATURE BANK
$9,750,000
2022-03-23
AL&R $9,750,000 — from MANHATTAN 102 LLC; BH 109 E 102 LLC to SIGNATURE BANK
$9,750,000
2017-01-25
Agreement $10,600,000 — from MANHATTAN 102 LLC; BH 109 E 102 LLC to SANTANDER BANK, NA
$10,600,000
2017-01-25
Mortgage $2,983,072 — from MANHATTAN 102 LLC; BH 109 E 102 LLC to SANTANDER BANK, NA
$2,983,072
2017-01-25
Deed $14,700,000 — from EMPIRE HOLDINGS GROUP III, LLC to BH 109 E 102 LLC; MANHATTAN 102 LLC
$14,700,000
2017-01-19
Sold for $14,700,000
$14,700,000
$326,667
2014-03-31
Agreement $8,177,032 — from EMPIRE HOLDINGS GROUP III, LLC to JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO
$8,177,032
2014-03-31
Mortgage $72,968 — from EMPIRE HOLDINGS GROUP III, LLC to JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO
$72,968
2007-08-23
Agreement $9,000,000 — from EMPIRE HOLDINGS GROUP III, LLC to WASHINGTON MUTUAL BANK
$9,000,000
2007-08-23
Mortgage $1,175,129 — from EMPIRE HOLDINGS GROUP III, LLC to WASHINGTON MUTUAL BANK
$1,175,129
2005-07-14
Mortgage $3,700,000 — from EMPIRE HOLDINGS GROUP III, LLC to WASHINGTON MUTUAL BANK
$3,700,000
2005-07-14
Agreement $8,000,000 — from EMPIRE HOLDINGS GROUP III, LLC to WASHINGTON MUTUAL BANK
$8,000,000
2003-08-18
Mortgage $4,300,000 — from EMPIRE HOLDINGS GROUP III,LLC to WASHINGTON MUTUAL BANK, FA
$4,300,000
Ten-year activity
100500
2017
2018
2019
56
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
0
0
3
5
2
10
2018
0
2
11
0
6
19
2019
0
0
8
0
14
22
2020
0
1
54
0
1
56
2021
0
0
14
0
2
16
2022
0
1
4
4
2
11
2023
4
8
1
0
5
18
2024
0
0
15
4
3
22
2025
0
0
14
0
4
18
2026
0
0
10
0
1
11
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
HPD class C: HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3C, 3rd STORY, 2nd APARTMENT FR
2026-04-14
HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2026-04-09
311: Drinking — In Public
2026-03-12
311: Street Light Condition — Street Light Cycling
2026-02-26
311: UNSANITARY CONDITION — PESTS
2026-02-26
Tenant complaint: UNSANITARY CONDITION — PESTS
2026-02-09
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-09
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-12-10
Bedbug filing: 0 infested units
2025-12-10
311: HEAT/HOT WATER — ENTIRE BUILDING
2025-12-10
311: HEAT/HOT WATER — ENTIRE BUILDING
2025-12-10
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-12-10
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
The full timeline
2026
2026-07-03311: ELECTRIC — NO LIGHTING
2026-07-03Tenant complaint: ELECTRIC — NO LIGHTING
2026-04-14Rodent inspection: Passed
2026-04-14HPD class C: HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3C, 3rd STORY, 2nd APARTMENT FR
2026-04-14HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2026-04-09311: Drinking — In Public
2026-03-12311: Street Light Condition — Street Light Cycling
2024-09-11Mortgage assigned — from SIGNATURE BANK; SIGNATURE BRIDGE BANK; FEDERAL DEPOSIT INSURANCE CORPORATION to SIG RCRS A/B MF 2023 VENTURE LLC
2024-09-11Mortgage assigned — from SIGNATURE BANK; SIGNATURE BRIDGE BANK; FEDERAL DEPOSIT INSURANCE CORPORATION to SIG RCRS A/B MF 2023 VENTURE LLC
2024-09-11AALR — from SIGNATURE BANK; FEDERAL DEPOSIT INSURANCE CORPORATION; SIGNATURE BRIDGE BANK to SIG RCRS A/B MF 2023 VENTURE LLC
2024-09-11AALR — from SIGNATURE BANK; FEDERAL DEPOSIT INSURANCE CORPORATION; SIGNATURE BRIDGE BANK to SIG RCRS A/B MF 2023 VENTURE LLC
2024-08-06311: Lead — Lead Kit Request (Residential) (L10)
2024-04-08Rodent inspection: Passed
2024-02-14HPD class C: § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING KICK STAND AT VESTIBULE DOOR , 1st STORY
2024-01-26HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2024-01-26HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2024-01-25311: PLUMBING — WATER SUPPLY
2024-01-25Tenant complaint: PLUMBING — WATER SUPPLY
2024-01-23311: HEAT/HOT WATER — APARTMENT ONLY
2024-01-23Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2024-01-19311: HEAT/HOT WATER — ENTIRE BUILDING
2024-01-19Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2024-01-18311: HEAT/HOT WATER — ENTIRE BUILDING
2024-01-18311: HEAT/HOT WATER — ENTIRE BUILDING
2024-01-18Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2024-01-18Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2024-01-08Boiler inspection
2023
2023-12-29Facade (LL11) filing, cycle 9: SAFE
2023-12-05Bedbug filing: 0 infested units
2023-11-17Permit Sidewalk Shed — Permit Issued
2023-11-17Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE $5,000
2023-10-23ECB CLASS - 2 violation: FAILURE TO POST OR PROPERLY POST PERMITS FOR WORK AND EQUIPMENT AT PREMISES. NOTE: AT TIME OF INSPECTION I OBSERVED OOT RIGGERS IN$300
2023-10-23ECB CLASS - 2 violation: FAILURE TO POST OR DISTRIBUTE SAFE CONSTRUCTION BILL OF RIGHTS. NOTE: AT TIME OF INSPECTION I OBSERVED WORK WAS BEING PERFORMED UN$1,250
2023-10-23DOB complaint, category ?
2023-10-23ECB CLASS - 2 violation: FAILURE TO POST OR DISTRIBUTE TENANT PROTECTION PLAN. NOTE: AT TIME OF INSPECTION I OBSERVED WORK WAS BEING PERFORMED AT ROOF LOCA$3,125
2023-10-23DOB complaint, category ?
2023-10-23ECB CLASS - 1 violation: SIDEWALK SHED WHERE REQUIRED. NOTE: AT TIME OF INSPECTION OF A 7 STORY BLDG AT ROOF LEVEL APPROXIMATELY 70 FEET IN HEIGHT OBSERVED$10,000
2023-10-23DOB complaint, category ?
2023-10-17Permit General Construction — Signed-off
2023-10-13Rodent inspection: Passed
2023-07-05Rodent inspection: Passed
2023-04-24Job filed: REPAIR / REPLACE DECORATIVE STONES, REPAIR / REPLACE LOUVER, REPAIR / REPLACE WINDOWSILLS,REMOVED CRACKED BRICK AND OLD MORTAR AND REPLACE WITH NEW BR$67,580
2023-04-14Rodent inspection: Passed
2023-02-22DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
2020-10-07311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-08-31311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-07-24HPD class C: HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6E, 6th STORY, 2nd APARTMENT FR
2020-06-23HPD class C: HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6E, 6th STORY, 2nd APARTMENT FR
2020-06-17HPD class C: HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6E, 6th STORY, 4th APARTMENT FR
2020-06-17HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 2nd ROOM FROM NORTH LOCATED
2020-06-17HPD class B: § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 6E, 6th STORY, 4th APARTM
2020-05-10Tenant complaint: WATER LEAK — HEAVY FLOW
2020-05-03HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM EAST LOCA
2020-05-03HPD class B: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING. IN THE 2nd ROOM FROM EAST LOCATED AT APT
2020-05-01311: WATER LEAK — HEAVY FLOW
2020-05-01Tenant complaint: WATER LEAK — HEAVY FLOW
2020-04-29311: WATER LEAK — HEAVY FLOW
2020-04-29Tenant complaint: WATER LEAK — HEAVY FLOW
2020-04-22311: WATER LEAK — HEAVY FLOW
2020-04-22Tenant complaint: WATER LEAK — HEAVY FLOW
2020-04-13311: Water Quality — Cloudy Or Milky Water (QB1)
2020-04-13311: WATER LEAK — SLOW LEAK
2020-04-13Tenant complaint: WATER LEAK — SLOW LEAK
2020-03-08311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-02-29311: Elevator — Elevator - Single Device On Property/No Alternate Service
2020-02-03HPD class A: § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND NORTH WALL IN THE 1st ROOM FROM NORTH L
2020-02-03HPD class A: § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT
2020-01-23Tenant complaint: PAINT/PLASTER — WALL
2020-01-23Tenant complaint: DOOR/WINDOW — DOOR
2020-01-23Tenant complaint: PAINT/PLASTER — WALL
2020-01-23Tenant complaint: PAINT/PLASTER — WALL
2020-01-21HPD litigation: Tenant Action
2019
2019-12-12Bedbug filing: 0 infested units
2019-10-09Boiler inspection
2019-10-05Rodent inspection: Bait applied
2019-10-04Elevator permit: MODIFICATION TO EXISTING CONTROLLER TO INSTALL DOOR POSITION MONITORING SYSTEM (DPM) AS PER REQUIREMENTS OF ASME A 17.3 OF 2002, A$14,230
2019-09-28Rodent inspection: Bait applied
2019-09-14Rodent inspection: Bait applied
2019-09-08Rodent inspection: Bait applied
2019-08-31Rodent inspection: Bait applied
2019-08-09Rodent inspection: Bait applied
2019-07-24Rodent inspection: Bait applied
2019-07-23311: Water System — Hydrant Running (WC3)
2018-10-15ECB CLASS - 2 violation: FAILURE TO SUBMIT A REQUIRED CYCLE 8B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQU
2018-10-06311: Lead — Lead Kit Request (Residential) (L10)
2018-07-31DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
2018-04-22311: Noise - Residential — Loud Talking
2018-04-16311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2018-03-06311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2018-02-13Rodent inspection: Passed
2018-02-11311: Noise - Residential — Loud Talking
2018-02-11311: Noise - Residential — Loud Talking
2018-01-28311: Noise - Residential — Loud Talking
2018-01-21311: Noise - Residential — Loud Talking
2018-01-21311: Noise - Residential — Loud Talking
2018-01-02311: Lead — Lead Kit Request (Residential) (L10)
2017
2017-12-28Boiler inspection
2017-10-30311: Water System — NO WATER - WNW
2017-09-25311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2017-09-18Eviction executed (1C)
2017-05-12Rodent inspection: Passed
2017-01-25Agreement $10,600,000 — from MANHATTAN 102 LLC; BH 109 E 102 LLC to SANTANDER BANK, NA$10,600,000
2017-01-25Mortgage $2,983,072 — from MANHATTAN 102 LLC; BH 109 E 102 LLC to SANTANDER BANK, NA$2,983,072
2017-01-25Mortgage assigned — from JPMORGAN CHASE BANK, NA to SANTANDER BANK, NA
2017-01-25Deed $14,700,000 — from EMPIRE HOLDINGS GROUP III, LLC to BH 109 E 102 LLC; MANHATTAN 102 LLC$14,700,000
2014-04-24311: Construction Safety Enforcement — SST Tracking Complaint
2014-04-24DOB complaint, category ?
2014-04-24ECB CLASS - 1 violation: PARTIAL STOP WORK ORDER ISSUED @ 109 EAST 102 ST FOR VIOLATION OF(1RCNY9-03)LICENSED RIGGER FAILED TO ENSURE SCAFFOLD WORKER MET M$1,600
2014-04-24ECB CLASS - 1 violation: 3314.10.9,PARTIAL STOP WORK ORDER ISSUED @ 109 EAST 102ND ST FOR VIOLATION OF(BC3314.10.9)TIEBACK LOCATION.TIEBACKS SHALL BE INSTA$1,600
2014-03-31Agreement $8,177,032 — from EMPIRE HOLDINGS GROUP III, LLC to JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO$8,177,032
2014-03-31Mortgage $72,968 — from EMPIRE HOLDINGS GROUP III, LLC to JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO$72,968
2014-03-31Mortgage assigned — from FEDERAL DEPOSIT INSURANCE CORPORATION to JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO
2013
2013-12-30Permit EW — ISSUED
2013-12-10Permit EQ — ISSUED
2013-12-10Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2013-12-02Rodent inspection: Passed
2013-11-05DOB violation E:
2013-10-22Job filed: FACADE RESTORATION INCLUDING BRICK REPLACEMENT,REPLACE DECORATIVE PRECAST STONE, LINTEL REPLACEMENT & PRECAST SILLS AS PER PLANS FILED. NO CHANGE$27,820
2012
2012-10-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2011 INSPECTION/TEST
2012-08-13Facade (LL11) filing, cycle 7: SAFE
2012-05-04Rodent inspection: Passed
2011
2011-08-25DOB violation E:
2011-05-19Rodent inspection: Passed
2010
2010-10-22DOB violation E:
2010-04-26Rodent inspection: Passed
2010-04-08DOB violation E:
2010-01-09HPD class B: § 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNS
2009
2009-05-12Tenant complaint: HEATING — HEAT RELATED
2009-05-11Tenant complaint: HEATING — HEAT RELATED
2008
2008-06-05DOB violation E:
2007
2007-08-23Agreement $9,000,000 — from EMPIRE HOLDINGS GROUP III, LLC to WASHINGTON MUTUAL BANK$9,000,000
2007-08-23Mortgage $1,175,129 — from EMPIRE HOLDINGS GROUP III, LLC to WASHINGTON MUTUAL BANK$1,175,129
2007-01-22DOB violation E:
2007-01-19DOB violation LL6291:
2007-01-19DOB violation LL6291:
2007-01-19DOB violation LL6291:
2007-01-19DOB violation LL6291:
2007-01-19DOB violation LL6291:
2007-01-19DOB violation LL6291:
2006
2006-05-01ZONE — from FIDELITY NATIONAL TITLE
2005
2005-10-01DOB violation LL1081:
2005-07-14Mortgage $3,700,000 — from EMPIRE HOLDINGS GROUP III, LLC to WASHINGTON MUTUAL BANK$3,700,000
2005-07-14Agreement $8,000,000 — from EMPIRE HOLDINGS GROUP III, LLC to WASHINGTON MUTUAL BANK$8,000,000
2005-05-13Permit EW — ISSUED
2005-05-13Permit PL — ISSUED
2005-05-13Permit EW — ISSUED
2005-02-01Permit NB — ISSUED
2005-02-01Permit EQ — ISSUED
2005-01-10Permit EQ — ISSUED
2004
2004-10-19Permit NB — ISSUED
2004-10-15Permit EQ — ISSUED
2004-05-17Permit EW — ISSUED
2004-05-17Permit PL — ISSUED
2004-05-10Permit EW — ISSUED
2004-02-23Permit NB — ISSUED
2004-02-20Permit EQ — ISSUED
2004-02-03Permit EQ — ISSUED
2004-02-03Permit EQ — ISSUED
2004-02-02Job filed: Install heavy duty sidewalk shed a total of 50 ft long at 107 East 102 St, - during remedial repairs. Work shall comply with LL33/91. No change in u
2004-02-02Job filed: Install heavy duty sidewalk shed a total of 50 ft long at 107 East 102 St, - during remedial repairs. Work shall comply with LL33/91. No change in u
2004-01-23ECB Hazardous violation: FAILURE TO SAFEGUARD PUBLIC AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS NOTED: 7 STY MASONARY BLDG UNDER CONST. NOTED: UNSAFE$1,000
2004-01-23DOB complaint, category ?
2003
2003-11-21ECB Hazardous violation: FAILURE TO MAINTAIN NOTED DEFECT EXCESSIVE CEMENTATIONS DEBRIS W LOOSE MORTER ACCUMULATED ON ADJACENT BLDG COPING AIR SHAFT BLDG W$800
2003-11-21DOB complaint, category ?
2003-10-01Permit NB — ISSUED
2003-09-15ECB Hazardous violation: QUESTIONABLE CONSTRUCTION. AT TIME OF INSPECTION MEN WERE WORKING LAYING BRICK AND INSTALL STEEL ON 7TH FLOOR BUILDING UP TO 7TH F$500
2003-09-08ECB Hazardous violation: FAILURE TO PROTECT ADJOINING ROOF; AT TIME OF INSP. AT ABOVE ADDRESS, BLOCK WORK WAS BEING DONE ON THE 6TH FLOOR AND THERE WAS NO $500
2003-09-08ECB Hazardous violation: NO GUARD RAILS. UPON INSPECTION AT THE ABOVE PROPERTY NB UP TO 6TH FLOOR AND THERE IS NO GUARD RAIL AT WINDOW OPENINGS ON 2,3,4 AN$1,000
2003-09-08ECB Hazardous violation: NO HANDRAILS. UPON INSPECTION AT THE ABOVE PROPERTY NB UP TO 6TH FLOOR AND THERE IS NO HANDRAIL ON STAIRWELL 3,4,5 & 6TH FLOO. REM$1,250
2003-08-18Mortgage $4,300,000 — from EMPIRE HOLDINGS GROUP III,LLC to WASHINGTON MUTUAL BANK, FA$4,300,000
2003-06-22DOB complaint, category ?
2003-05-05Permit EW — ISSUED
2003-05-05Permit EW — ISSUED
2003-04-23Permit PL — ISSUED
2003-02-12Permit NB — ISSUED
2003-02-11Permit EQ — ISSUED
2002
2002-10-22Permit NB — ISSUED
2002-10-22Permit EQ — ISSUED
2002-10-10Job filed: FILING BUILDERS PAVING PLAN FOR 75'-0" OF NEW SIDEWALK WITH NB# 103084421.
2002-10-09Job filed: NB
2002-10-08Job filed: Filing for sprinkler and standpipe in conjunction with new building.$100,000
2002-10-08Job filed: Filing for sprinkler and standpipe in conjunction with new building.$100,000
2002-10-07Job filed: Filing fire protection plan in conjunction with new Building 103084421$100
2002-10-07Job filed: Filing fire protection plan in conjunction with new Building 103084421$100
2002-06-21Job filed: FILING FOR STRUCTURAL WORK FOR NEW FILING.
2002-01-30Job filed: NB
2001
2001-11-28PAT — from ERMOGENOUS, ELENA to TURKISH, WILLIAM J.ESQ.
2001-11-28Deed — from CITY OF NEW YORK to EMPIRE HOLDINGS GROUP III LLC
1978
1978-05-25Deed — from COMMISSIONER OF FINANCE NY; COMMISSIONER OF FINANCE NY to CITY OF NEW YORK; CITY OF NEW YORK
1978-05-25Deed — from COMMISSIONER OF FINANCE NY; COMMISSIONER OF FINANCE NY to CITY OF NEW YORK; CITY OF NEW YORK
1976
1976-11-30Deed — from BLEEKS, GILBERT to VELEZ, CARLOS
1972
1972-10-25Deed — from 109 E 102 CORP to BLEEKS, GILBERT
1970
1970-09-21Mortgage assigned — from LOPAL INVESTORS INC to WALOWITZ, SAM
1970-05-22Deed — from BLEEKS, GILBERT to 109 E 102 CORP
1970-04-24PAT — from WALOWITZ, SAM AKA; WALOWITZ, SAMUEL AKA; WALLACE, SAMUEL to WALLACE, IRA M
1970-04-24Mortgage — from BLEEKS, GILBERT to LOPAL INVESTORS INC
1970-04-24Mortgage assigned — from WASHINGTON HGHTS ETAL to WALLACE, IRA M
1970-04-24Deed — from LOPAL INVESTORS INC to BLEEKS, GILBERT
1967
1967-02-06Deed — from WALOWITZ, SAM to SOPAL INVESTORS INC
1967-01-17Deed — from GERWIN, ARTHUR REF; 107 E 102 REALTY CORP; 109 E 102 REALTY CORP; FARDELLA BUILDERS INC; 1 to WALOWITZ, SAM