The city's published records show little recorded distress here in the last three years. Less recorded distress than 71% of 25-99-unit residential buildings citywide. The citywide median for 25-99-unit residential buildings is 23.6 penalty
points per 10 units; this building carries 6.2. In ZIP 10457, 34% of residential buildings hold an A and
24% grade D or F.
How grades work
this building
A
B
C
Among 17,252 25-99-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
7 heat or hot-water complaints in the last three years (winter 2023–24: 7).
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
52 service requests in the last three years. Most common: Noise (32) · Water System (8) · Illegal Parking (3) · HEAT/HOT WATER (3) · Lead (1) · Elevator (1).
Filed construction activity
$17,000 in permitted construction work filed since
2016 (5 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974 (2018)
Yes
Six or more residential units (42)
Yes
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. Buildings receiving 421-a or J-51 benefits are generally required to register their units as rent-stabilized for the duration of the benefit. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
240 E 178 DEVELOPMENT LLC
Head officer
MICHAEL S FRONING
Managing agent
SKF PROPERTY MGMT, LLC
Last registered
2025-08-25
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$5,666,000
$2,549,700
2026
$5,658,000
$2,546,100
2027
$4,916,000
$2,212,200
The city's market estimate has fallen
13% between tax years 2025 and 2027.
Tax exemptions on the roll: 421A 35YR WITH AFF HOUSING PCT
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Tremont Av — B D · 450 ft straight-line (about a 2-minute walk) · station accessibility: full Burnside Av — 4 · 0.3 mi straight-line (about an 8-minute walk) · station accessibility: none
Bus
Nearest boarding stop: East Tremont Av / Anthony Av — Bx36 · 400 ft
Citi Bike
Anthony Ave & E Tremont Ave · 450 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
52 311 service requests from this address in the last three years — 3 of them about heat or hot water.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $4,300,000 on
2019-08-09 (lender: Metropolitan Commercial Bank). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2019-08-09
AL&R $9,500,000 — from 240 E 178 ST DEVELOPMENT LLC to METROPOLITAN COMMERCIAL BANK
$9,500,000
2019-08-09
Agreement $9,500,000 — from 240 E 178 ST DEVELOPMENT LLC to METROPOLITAN COMMERCIAL BANK
$9,500,000
2019-08-09
Mortgage $4,300,000 — from 240 E 178 ST DEVELOPMENT LLC to METROPOLITAN COMMERCIAL BANK
$4,300,000
2018-08-08
Mortgage $3,219,657 — from 240 E 178 ST DEVELOPMENT LLC to POPULAR BANK
$3,219,657
2018-08-08
Mortgage $1,312,093 — from 240 E 178 ST DEVELOPMENT LLC to POPULAR BANK
$1,312,093
2018-08-08
Agreement $1,980,343 — from 240 E 178 ST DEVELOPMENT LLC to POPULAR BANK
$1,980,343
2018-08-08
AL&R $1,980,343 — from 240 E 178 ST DEVELOPMENT LLC to POPULAR BANK
$1,980,343
2018-08-08
AL&R $3,219,657 — from 240 E 178 ST DEVELOPMENT LLC to POPULAR BANK
$3,219,657
2016-02-24
Mortgage $668,250 — from 240 E 178 ST DEVELOPMENT LLC to BANCO POPULAR NORTH AMERICA
$668,250
2016-02-24
Deed $1,215,000 — from 240 E 178 STREET LLC to 240 E 178 ST DEVELOPMENT LLC
$1,215,000
2016-02-24
AL&R $668,250 — from 240 E 178 ST DEVELOPMENT LLC to BANCO POPULAR NORTH AMERICA
$668,250
2016-02-04
Sold for $1,215,000
$1,215,000
$28,929
2015-04-20
Deed $875,000 — from PEREZ, JR., WILFREDO to 240 E 178 STREET LLC
$875,000
2007-09-17
Mortgage $385,000 — from PEREZ JR., WILFREDO to WASHINGTON MUTUAL BANK, FA
$385,000
2000-06-20
Mortgage $32,607 — from PEREZ, WILFREDO JR. to TRAVELERS BANK & TRUST , FSB.
$32,607
Ten-year activity
100500
2017
69
2018
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
7
7
7
0
3
24
2018
7
39
15
5
3
69
2019
4
8
19
8
2
41
2020
2
0
37
0
3
42
2021
0
0
63
0
4
67
2022
0
2
22
0
5
29
2023
0
10
23
0
7
40
2024
0
3
22
0
5
30
2025
0
1
6
0
4
11
2026
0
3
34
0
4
41
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2024-03-17Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2024-03-17Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2024-03-17Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2024-03-12HPD class A: § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 8D, 8th STORY, 2nd APARTMENT FROM WEST AT
2024-03-12HPD class A: § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WOOD DOOR FRAME IN THE BATHROOM LOCATED AT APT 8D, 8th STORY, 2nd APARTMEN
2024-03-12HPD class B: § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE LOCATED AT APT 8D, 8th STORY, 2nd APARTMENT FROM WEST
2024-03-12HPD class B: § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE LOCATED AT APT 8D, 8th STORY, 2nd APARTMENT FROM WEST AT NORTH
2024-03-10311: HEAT/HOT WATER — APARTMENT ONLY
2024-03-10Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2023-12-31311: Elevator — Elevator - Single Device On Property/No Alternate Service
2023-12-31DOB complaint, category ?
2023-12-27HPD class B: § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTELINE AT SINK IN THE KITCHENETTE LOCATED AT APT 2C, 2nd STORY, 1st APARTMEN
2023-12-27HPD class B: § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTE LINE AT SINK IN THE KITCHENETTE LOCATED AT APT 3B, 3rd STORY, 3rd APARTME
2023-12-12Bedbug filing: 0 infested units
2023-12-01DOB complaint, category ?
2023-11-13311: Lead — Lead Kit Request (Residential) (L10)
2023-10-04Rodent inspection: Passed
2023-09-11DOB complaint, category ?
2023-09-08ECB CLASS - 2 violation: ILLEGAL HARDWARE/SLIDING LATCH LOCK INSTALLED ON JANITOR CLOSET DOOR LOCATED AT CELLAR LEVEL., PROVIDE LEGAL HARDWARE
2023-04-10Rodent inspection: Failed for Rat Activity
2023-04-10ECB CLASS - 2 violation: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.OBSERVED ON 7TH FL GARBAGE CHUTE RM SPRINKLER HEAD OBSTRUCTED BY CEILING.AS $655
2023-04-10ECB CLASS - 2 violation: 3 400.8 (1) (2) (5) UNPERMITTED USE OF FLEXIBLE CARDS AS PERMANENT WIRING.OBSERVED IN ELEVATOR MOTOR RM & IN REAR YARD AT EXP #3 ($800
2022-11-03HPD class C: HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 7F, 7th STORY, 1st APARTMENT FR
2022-11-03HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2022-10-28HPD class B: § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING LOCATED AT APT 8D, 8th STORY, 2nd APARTMENT FROM EAST AT SOUTH
2022-10-28HPD class B: § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). LOCATED AT APT 8D, 8th STORY, 2nd APARTMENT FROM EAST AT SOUTH
2022-10-05Rodent inspection: Passed
2022-08-28311: Noise - Vehicle — Car/Truck Horn
2022-08-21311: Noise - Vehicle — Car/Truck Music
2022-07-24311: Water System — Fire Hydrant Emergency (FHE)
2022-07-24311: Water System — Fire Hydrant Emergency (FHE)
2022-02-01ECB CLASS - 2 violation: FLASHING USED TO CAP THE PARAPET WALL MISSING IN ONE SECTION ABOUT 6FT LETTING WATER INTO AREA, AND SCREWS MISSING HOLDING DOWN TH
2021
2021-12-13311: Noise — Noise: air condition/ventilation equipment (NV1)
2021-03-08HPD class A: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 4
2021-03-05Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2021-02-17HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INTERCOMMUNICATION SYSTEM, LOCATED AT APT 8D, 8th STORY, 2nd APARTMENT FROM EAST
2021-02-17HPD class A: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING, IN THE 1st ROOM FROM NORTH LOCATE
2020-04-08Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2020-03-07311: Water System — No Water (WNW)
2020-03-07311: HEAT/HOT WATER — ENTIRE BUILDING
2020-03-07311: PLUMBING — WATER SUPPLY
2020-03-07Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2020-03-07Tenant complaint: PLUMBING — WATER SUPPLY
2020-02-28Certificate of occupancy Final
2020-01-24Certificate of occupancy Temporary
2019
2019-12-01311: HEAT/HOT WATER — ENTIRE BUILDING
2019-12-01Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019-11-06311: HEAT/HOT WATER — ENTIRE BUILDING
2019-11-06Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019-11-03311: HEAT/HOT WATER — ENTIRE BUILDING
2019-11-03Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019-10-30DOB complaint, category ?
2019-10-25311: HEAT/HOT WATER — ENTIRE BUILDING
2019-10-25Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019-10-22Certificate of occupancy Temporary
2019-10-04Rodent inspection: Passed
2019-10-02FDNY inspection (CONSTR)
2019-09-11SAGE — from 240 E 178 ST DEVELOPMENT LLC
2019-08-09Mortgage assigned — from POPULAR BANK to METROPOLITAN COMMERCIAL BANK
2019-08-09AL&R $9,500,000 — from 240 E 178 ST DEVELOPMENT LLC to METROPOLITAN COMMERCIAL BANK$9,500,000
2019-08-09TL&R — from POPULAR BANK to 240 E 178 ST DEVELOPMENT LLC
2019-08-09Agreement $9,500,000 — from 240 E 178 ST DEVELOPMENT LLC to METROPOLITAN COMMERCIAL BANK$9,500,000
2019-08-09Mortgage $4,300,000 — from 240 E 178 ST DEVELOPMENT LLC to METROPOLITAN COMMERCIAL BANK$4,300,000
2019-08-09Mortgage assigned — from POPULAR BANK to METROPOLITAN COMMERCIAL BANK
2019-08-09TL&R — from POPULAR BANK to 240 E 178 ST DEVELOPMENT LLC
2019-07-25FDNY inspection (CONSTR)
2019-07-18Certificate of occupancy Temporary
2019-07-15311: Noise - Vehicle — Car/Truck Music
2019-07-04311: Illegal Fireworks — N/A
2019-07-02311: Water System — Hydrant Leaking (WC1)
2019-07-02311: Water System — Hydrant Defective (WC2)
2019-07-02311: New Tree Request — For One Address
2019-06-29311: Street Condition — Cave-in
2019-06-07FDNY inspection (CONSTR)
2019-05-16311: Water System — Hydrant Running (WC3)
2019-04-22FDNY inspection (CONSTR)
2019-04-08Rodent inspection: Passed
2019-03-22311: Sidewalk Condition — Blocked - Construction
2019-03-11311: Noise — Noise: Construction Before/After Hours (NM1)
2019-03-05FDNY inspection (CONSTR)
2019-02-18311: Noise — Noise: Construction Before/After Hours (NM1)
2019-02-12311: Noise — Noise: Construction Before/After Hours (NM1)
2019-02-08Permit Supported Scaffold — Signed-off
2019-02-07Job filed: INSTALLATION OF A TEMPORARY SCAFFOLD @ ELEVATOR SHAFT AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOL$5,000
2019-01-14FDNY inspection (CONSTR)
2019-01-11FDNY inspection (CONSTR)
2018
2018-12-29ECB CLASS - 2 violation: BC3307.2.1/OBSTRUCTION OF STREETS FAILURE TO COMPLY WITH DOT REGULATION AT THE TIME OF INSPECTION OF A 8 STORY NB AT 7TH FLLOR,I O$1,250
2018-12-26Permit Sidewalk Shed — Signed-off
2018-12-17311: Construction Safety Enforcement — Best - Low-Rise Tracking Complaint
2018-12-17Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHAL$5,000
2018-12-17DOB complaint, category ?
2018-12-17DOB violation C:
2018-12-17ECB CLASS - 1 violation: WORK WITHOUT A PERMIT. AT THE TIME OF MY INSPECTION 8 STORY NB CONSTRUCTION WORK IN PROGRESS.OBSERVED SWS PLACED AT EXP 1 UPON REQ$1,250
2018-12-11Permit EQ — ISSUED
2018-12-06Permit Supported Scaffold — Signed-off
2018-12-05FDNY inspection (CONSTR)
2018-12-04Job filed: INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH $5,000
2018-12-01311: Construction Safety Enforcement — Best - Low-Rise Tracking Complaint
2018-12-01DOB complaint, category ?
2018-11-30ECB CLASS - 1 violation: BC33014.2 FAILURE TO INSTITUTE SAFETY MEASURES. AT THE TIME OF MY INSPECTION OF AN 8 STORY NB, I OBSERVED A WORKER USING A GRINDER$10,000
2018-11-30ECB CLASS - 1 violation: PERMIT-SCAFFOLD. AT THE TIME OF INSPECTION OF 8 STORY NB AT 8TH FL, I OBSERVED A SUPPORTED SCAFFOLD IN THE ELEVATOR SHAFT FROM THE$5,000
2018-11-29FDNY inspection (OTHER)
2018-11-17ECB CLASS - 1 violation: GUARD RAILS.ACTIVE CONSTRUCTION SITE, OBSERVED RAILS IN PLACE BUT RAILS WERE INADEQUATE,CONSISTING OF RAILS BEING PLACED @ INCORRE$5,000
2018-11-17ECB CLASS - 2 violation: BC 3309.1 ADJ PROPERTY PROTECTION OBSERVED ACTIVE SITE NB 8 STYS CURRENTLY @ ROOF LVL END 1 1/2 STY ABOVE ADJACENT PROPERTIES @ EX$1,250
2018-11-17ECB CLASS - 2 violation: BC 3301.2 FALL PROTECTION.OBSERVED @ ROOF LVL NO GAURD RAILS,JUST A CAZ IN PLACE, UPON REQUEST FOR SAFETY HARNESS FIRE OFF/FIRE PR$1,250
2018-11-09FDNY inspection (CONSTR)
2018-10-31311: General Construction/Plumbing — Adjacent Buildings Not Protected
2018-10-31DOB complaint, category ?
2018-10-25Elevator permit: Furnish and install one new overhead traction passenger elevator to comply with ASME A17.1/2000 with supplements A17.1a-2002 and $219,000
2018-10-18311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2018-10-18311: Street Condition — Blocked - Construction
2018-10-18311: Emergency Response Team (ERT) — After Hours Work - Illegal
2018-10-18DOB complaint, category ?
2018-10-18DOB complaint, category ?
2018-10-17Rodent inspection: Passed
2018-10-10FDNY inspection (CONSTR)
2018-09-22311: Noise — Noise: Construction Equipment (NC1)
2018-09-19FDNY inspection (STRUC_INT_3)
2018-09-17311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2018-09-17DOB complaint, category ?
2018-08-29311: Sustainability Enforcement — Sustainability Enforcement Work Order
2018-08-08Mortgage $3,219,657 — from 240 E 178 ST DEVELOPMENT LLC to POPULAR BANK$3,219,657
2018-08-08Mortgage $1,312,093 — from 240 E 178 ST DEVELOPMENT LLC to POPULAR BANK$1,312,093
2018-08-08Agreement $1,980,343 — from 240 E 178 ST DEVELOPMENT LLC to POPULAR BANK$1,980,343
2018-08-08AL&R $1,980,343 — from 240 E 178 ST DEVELOPMENT LLC to POPULAR BANK$1,980,343
2018-08-08AL&R $3,219,657 — from 240 E 178 ST DEVELOPMENT LLC to POPULAR BANK$3,219,657
2018-08-06FDNY inspection (CONSTR)
2018-08-02ECB CLASS - 1 violation: 3301.6.1.NO DESIGN DRAWING.AT THE TIME OF MY INSPECTION OF A 8 STORY NEW BUILDING AT 1ST FLOOR LEVEL UNDER CONSTRUCTION.SOME WORKE$2,500
2018-07-20Permit PL — ISSUED
2018-07-19FDNY inspection (CONSTR)
2018-07-18FDNY inspection (CONSTR)
2018-07-17Permit NB — ISSUED
2018-07-16311: Water System — Hydrant Running Full (WA4)
2018-06-15311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-06-15DOB complaint, category ?
2018-06-11FDNY inspection (CONSTR)
2018-05-23FDNY inspection (CONSTR)
2018-04-23FDNY inspection (CONSTR)
2018-04-23FDNY inspection (CONSTR)
2018-04-13311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2018-04-13DOB complaint, category ?
2018-04-10Rodent inspection: Passed
2018-03-23FDNY inspection (CONSTR)
2018-03-14FDNY inspection (CONSTR)
2018-02-12FDNY inspection (CONSTR)
2018-01-29311: Construction Safety Enforcement — Excavation Tracking Complaint
2018-01-29DOB complaint, category ?
2018-01-26311: Construction Safety Enforcement — Best - DM Tracking Complaint
2018-01-26DOB complaint, category ?
2018-01-26ECB CLASS - 1 violation: BC3309.6 AND BC 1814.3 FAILURE TO MONITOR ADJOINING STRUCTURES FOR MOVEMENT IN ALL DIRECTIONS DURING EXCAVATION-RELATED ACTIVIT$400
2018-01-26ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED PLANS. AT TIME OF INSPECTION, NOTED AT EXPO 1/2 OF JOBSITE. SITE EXCAVATED APPROX 14' BELOW GRAD$1,000
2018-01-09FDNY inspection (CONSTR)
2017
2017-12-06Permit EQ — ISSUED
2017-12-06Permit NB — ISSUED
2017-11-15DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2017-11-03Rodent inspection: Passed
2017-10-06311: BEST/Site Safety — Demolition Notification Received
2017-10-06DOB complaint, category ?
2017-10-06DOB complaint, category ?
2017-09-23311: Construction Safety Enforcement — Best - DM Tracking Complaint
2017-08-03311: Construction Safety Enforcement — Best - DM Tracking Complaint
2017-08-03DOB complaint, category ?
2017-08-03ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. AT TIME OF DEMO SIGN OFF INSPECTION NOTED AT EX$10,000
2017-07-26311: Blocked Driveway — No Access
2017-05-09Rodent inspection: Failed for Other Reason
2017-05-08Permit DM — ISSUED
2017-05-04Permit DM — ISSUED
2017-04-21Permit DM — ISSUED
2017-04-21Permit DM — ISSUED
2017-03-23Rodent inspection: Failed for Other Reason
2017-03-16311: Illegal Parking — Blocked Hydrant
2017-03-09Permit EQ — ISSUED
2017-01-24311: Blocked Driveway — Partial Access
2016
2016-10-24Rodent inspection: Passed
2016-07-27Job filed: FULL DEMOLITION OF A 1-CAR GARAGE FILE IN CONJUNCTION WITH 220482877
2016-07-27Job filed: FULL DEMOLITION OF A 1-CAR GARAGE FILE IN CONJUNCTION WITH 220482877
2016-05-05CERT — from 240 E 178 DEVELOPMENT LLC; BANCO POPULAR NORTH AMERICA
2016-05-05ZONE — from 240 E 178 DEVELOPMENT LLC
2016-05-03Rodent inspection: Passed
2016-04-15Job filed: FULL DEMOLITION OF A 2 STORY FRAME HOUSE WITH BASEMENT FILE IN CONJUNCTION WITH 220482886
2016-04-15Job filed: FULL DEMOLITION OF A 1-CAR GARAGE FILE IN CONJUNCTION WITH 220482877
2016-03-31Job filed: INSTALL AUTOMATIC SMOKE, HEAT DETECTION & SPRINKLER FIRE ALARM SYSTEM PER NYCBC SECTION 907.2.9 AND PER THE PLANS FILED HEREWITH. THERE IS NO CHAN$1,000
2016-03-31Job filed: BUILDERS PAVEMENT PLAN FILED IN CONJUNCTION WITH NEW BUILDING DOB# 220482868
2016-03-31Job filed: INSTALL AUTOMATIC SMOKE, HEAT DETECTION & SPRINKLER FIRE ALARM SYSTEM PER NYCBC SECTION 907.2.9 AND PER THE PLANS FILED HEREWITH. THERE IS NO CHAN$1,000
2016-02-24Mortgage $668,250 — from 240 E 178 ST DEVELOPMENT LLC to BANCO POPULAR NORTH AMERICA$668,250
2016-02-24Deed $1,215,000 — from 240 E 178 STREET LLC to 240 E 178 ST DEVELOPMENT LLC$1,215,000
2016-02-24AL&R $668,250 — from 240 E 178 ST DEVELOPMENT LLC to BANCO POPULAR NORTH AMERICA$668,250
2016-02-17Job filed: CONSTRUCT NEW APARTMENT BUILDING_WITH COMMUMITY FACILITY ON FIRST FLOOR PAA SUBMITED TO AMEND SCHEDULE B.
2016-02-04Sold for $1,215,000$1,215,000
2016-01-20311: Graffiti — Graffiti
2015
2015-08-06Rodent inspection: Passed
2015-05-18Mortgage satisfied — from JR., WILFREDO P to NATIONSTAR MORTGAGE LLC
2015-04-24Mortgage assigned — from JPMORGAN CHASE BANK, N.A. to NATIONSTAR MORTGAGE, LLC
2015-04-20Deed $875,000 — from PEREZ, JR., WILFREDO to 240 E 178 STREET LLC$875,000
2015-03-10311: Water System — Hydrant Defective (WC2)
2015-02-26Rodent inspection: Passed
2015-02-23Mortgage assigned — from JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO; WASHINGTON MUTUAL BANK, FA; WASHINGTON MUTUAL BA to JPMORGAN CHASE BANK, N.A.
2014
2014-11-30311: Blocked Driveway — No Access
2014-11-30311: Blocked Driveway — No Access
2014-08-19311: Water System — Hydrant Knocked Over/Missing (WC)
2014-08-10311: Water System — Hydrant Knocked Over/Missing (WC)
2014-08-07Rodent inspection: Passed
2014-05-20311: Blocked Driveway — Partial Access
2014-05-20311: Blocked Driveway — No Access
2014-03-17Rodent inspection: Passed
2013
2013-10-08Permit AL — ISSUED
2013-08-08Rodent inspection: Passed
2013-08-05311: Blocked Driveway — Partial Access
2013-08-03311: Blocked Driveway — Partial Access
2013-06-21311: Water System — Hydrant Locking Device Request (Use Comments) (WC5)
2013-06-21311: Water System — Hydrant Running Full (WA4)
2013-04-22Job filed: APPLICATION BEING FILED TO CONVERT ONE FAMILY BUILDING TO TWO FAMILY, NEW KITCHEN AND MINOR PARTITION ON SECOND FLOOR. NEW PARTITION ON ATTIC FLOOR AN$30,000
2013-04-18311: GENERAL CONSTRUCTION — VENTILATION SYSTEM