Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

137 North 10 Street · Brooklyn · BBL 3022970021 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

Where the penalty points come from

ComponentWhat it coversPoints
Housing codeHPD violations by class, complaints, emergency repairs, litigation, vacate orders, AEP13
Structural & safetyDOB violations, ECB/OATH violations by class0
PestsBedbug filings, failed rodent inspections, rodent 311s0
DisplacementMarshal evictions executed0
GRADE A

The city's published records show little recorded distress here in the last three years. Less recorded distress than 78% of 25-99-unit residential buildings citywide. The citywide median for 25-99-unit residential buildings is 23.6 penalty points per 10 units; this building carries 3.6. In ZIP 11249, 60% of residential buildings hold an A and 7% grade D or F. How grades work

this building
A
B
C

Among 17,252 25-99-unit residential buildings citywide · left is less recorded distress, right is more

Open with the city right now

Open HPD violations7 total — 1 class C (immediately hazardous), 3 class B, 3 class A. Oldest open since 2020-09-09.

status snapshot refreshed weekly from HPD records

Patterns

2 heat or hot-water complaints in the last three years (winter 2024–25: 2).

No bedbug-infested units reported in the last three years of filings.

What 311 hears from this address

24 service requests in the last three years. Most common: Noise (9) · Graffiti (8) · Abandoned Vehicle (1) · Damaged Tree (1) · Illegal Tree Damage (1) · General Construction/Plumbing (1).

Filed construction activity

$408,100 in permitted construction work filed since 2016 (8 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

Rent-stabilization signals

YesBuilt before 1974 (1910)
YesSix or more residential units (36)
No421-a / J-51 tax benefit on the current tax roll

2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit: request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).

Registered with HPD — the names behind the building

Registered owner(s)COMREF WILLIAMSBURG LOFTS, LLC
Head officerDMITRY TSVAYGOFT
Managing agentCANVAS PROPERTY GROUP
Last registered2025-12-02

as filed by the owner in the building's HPD registration

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$11,844,000 $5,329,800
2026$13,730,000 $6,178,500
2027$13,109,000 $5,899,050

The city's market estimate has risen 11% between tax years 2025 and 2027.

Building systems

Energy grade (LL33)F — did not submit required benchmarking data, posted at the entrance by law (2022 disclosure cycle)
Heating fuelNO2FUEL

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Hurricane evacuation zone 4 of 6 — zone 1 evacuates first.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

3 street-flooding or sewer-backup complaints at this address since 2012 (0 in the last three years).

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

SubwayBedford Av — L · 800 ft straight-line (about a 4-minute walk) · station accessibility: full
Nassau Av — G · 0.4 mi straight-line (about a 10-minute walk) · station accessibility: none
BusNearest boarding stop: Bedford Av / N 9 St — B62 · 300 ft
Citi BikeN 10 St & Berry St · 250 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: P.S. 017 Henry D. Woodworth. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

137 North 10 Street

Heat or hot waterHeat or hot water
Apartment maintenanceApartment maintenance
Bed bugsBed bugs
Residential pestsResidential pests
Rats or miceRats or mice
Anything elseAnything else

24 311 service requests from this address in the last three years — 1 of them about heat or hot water.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

The landlord's report card

Managed by CANVAS PROPERTY GROUP — 38 buildings, 1,059 units. Grades across the portfolio: A25 · B9 · C4. See the whole portfolio

BuildingBoroughUnitsGrade
220 East 22 Street MN122 A
47 East 34 Street MN110 A
152 4 Avenue BK95 A
210 East 22 Street MN88 A
59 East 3 Street MN79 A
85 Flatbush Avenue Exte BK64 A
20 Prince Street MN48 A
44 Berry Street BK42 A
185 South 4 Street BK42 B
137 North 10 Street BK36 A
335 Canal Street MN36 A
152 2 Avenue MN25 A
1381 Myrtle Avenue BK24 A
329 Union Street BK20 A
192 East 3 Street MN20 A
221 Mott Street MN18 B
402 East 12 Street MN16 B
42 Sidney Place BK14 A
39 East 1 Street MN13 A
420 West 51 Street MN12 B
89 7 Avenue BK12 A
552 Broome Street MN11 A
68 North 8 Street BK10 A
505 West 22 Street MN10 A
350 East 13 Street MN9 A
205 10 Avenue MN9 B
295 Degraw Street BK8 A
362 11 Street BK8 B
106 Bedford Avenue BK8 A
358 11 Street BK8 C
203 10 Avenue MN8 B
47 Clinton Street MN8 A
11 East 7 Street MN7 A
211 Johnson Avenue BK6 B
461 Lorimer Street BK5 C
123A 7 Avenue BK3 B
144 Duane Street MN3 C
384 South 2 Street BK2 C

Sales, deeds & mortgages

Most recent mortgage recorded against this lot: $2,000,000 on 2014-05-16 (lender: Ladder Capital Finance LLC). Face amount at recording — it may have since been paid down, refinanced or satisfied. View the recorded document.

DateRecordAmountPer res. unit
2023-02-02Deed $27,815,000 — from CLPF - PRINTHOUSE LOFTS, LLC to COMREF WILLIAMSBURG LOFTS LLC $27,815,000
2023-01-25Sold for $27,815,000 $27,815,000 $772,639
2014-12-09Deed $30,500,000 — from 139 NORTH 10TH PROPERTY LLC to CLPF-PRINTHOUSE LOFTS, LLC $30,500,000
2014-05-16SMTG $3,656,475 — from 139 NORTH 10TH PROPERTY LLC to LADDER CAPITAL FINANCE LLC $3,656,475
2014-05-16AL&R $13,725,794 — from 139 NORTH 10TH PROPERTY LLC to LADDER CAPITAL FINANCE LLC $13,725,794
2014-05-16Agreement $13,725,794 — from 139 NORTH 10TH PROPERTY LLC to LADDER CAPITAL FINANCE LLC $13,725,794
2014-05-16Mortgage $2,000,000 — from 139 NORTH 10TH PROPERTY LLC to LADDER CAPITAL FINANCE LLC $2,000,000
2014-05-16SMTG $1,897,731 — from 139 NORTH 10TH PROPERTY LLC to LADDER CAPITAL FINANCE LLC $1,897,731
2013-05-07Mortgage $1,075,794 — from 139 NORTH 10TH PROPERTY LLC to LADDER CAPITAL FINANCE I LLC $1,075,794
2013-05-07AL&R $11,725,794 — from 139 NORTH 10TH PROPERTY LLC to LADDER CAPITAL FINANCE I LLC $11,725,794
2013-05-07Mortgage $3,656,475 — from 139 NORTH 10TH PROPERTY LLC to LADDER CAPITAL FINANCE I LLC $3,656,475
2013-05-07AL&R $3,656,475 — from 139 NORTH 10TH PROPERTY LLC to LADDER CAPITAL FINANCE I LLC $3,656,475
2013-05-07Mortgage $1,897,731 — from 139 NORTH 10TH PROPERTY LLC to LADDER CAPITAL FINANCE I LLC $1,897,731
2013-05-07AL&R $1,897,731 — from 139 NORTH 10TH PROPERTY LLC to LADDER CAPITAL FINANCE I LLC $1,897,731
2013-05-07Deed $15,800,000 — from THE NORTH 10 PROJECT LLC to 139 NORTH 10TH PROPERTY LLC $15,800,000

Ten-year activity

50250
2017
2018
2019
2020
38
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
20177220011
201801110012
2019023005
202005280033
202103350038
202203130117
20230472013
20247290119
202501140015
2026007007
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 9 records

DateRecord
2026-10-03311: Noise - Residential — Loud Talking
2026-07-29311: Graffiti — Graffiti
2026-07-04311: Noise - Residential — Loud Music/Party
2026-07-03311: Noise - Residential — Loud Music/Party
2026-05-05HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2026-04-18311: Noise - Residential — Loud Music/Party
2026-04-18311: Noise - Residential — Loud Music/Party
2025-11-20HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2025-11-08311: Graffiti — Graffiti

The full timeline

2026
2026-10-03311: Noise - Residential — Loud Talking
2026-07-29311: Graffiti — Graffiti
2026-07-04311: Noise - Residential — Loud Music/Party
2026-07-03311: Noise - Residential — Loud Music/Party
2026-05-05HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2026-04-18311: Noise - Residential — Loud Music/Party
2026-04-18311: Noise - Residential — Loud Music/Party
2025
2025-11-20HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2025-11-08311: Graffiti — Graffiti
2025-07-26311: Noise - Residential — Banging/Pounding
2025-07-11311: Graffiti — Graffiti
2025-06-10HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2025-05-17311: Lead — Lead Kit Request (Residential) (L10)
2025-05-17311: Noise - Residential — Loud Music/Party
2025-05-16311: Noise - Residential — Loud Music/Party
2025-05-16311: Noise - Residential — Loud Music/Party
2025-05-04311: Graffiti — Graffiti
2025-04-17311: Graffiti — Graffiti
2025-03-26FDNY inspection (RISK)
2025-02-11311: HEAT/HOT WATER — ENTIRE BUILDING
2025-02-11Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-01-13311: Unleashed Dog — Unleashed Dog in Public
2024
2024-12-30311: Graffiti — Graffiti
2024-11-29HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2024-11-17311: Graffiti — Graffiti
2024-11-01Air permit (BOILER REGISTRATION II), fuel: ?
2024-09-27311: General Construction/Plumbing — Adjacent Buildings Not Protected
2024-09-27DOB complaint, category ?
2024-09-10311: Illegal Tree Damage — Trunk Damaged
2024-07-16Permit Supported Scaffold — Signed-off
2024-07-16Permit Sidewalk Shed — Signed-off
2024-07-12311: Damaged Tree — Branch or Limb Has Fallen Down
2024-07-11Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED and pipe scaffolding AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ALL WORK TO COMPLY WITH CHAPTER 33
2024-06-28Permit General Construction — Signed-off
2024-06-24311: Graffiti — Graffiti
2024-04-11HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2024-04-01311: Abandoned Vehicle — With License Plate
2024-03-25DOB complaint, category ?
2024-02-27Job filed: THE PROPOSED WORK FILED UNDER THIS APPL. IS FOR CUT & POINT MORTAR JOINTS; CUT & SEAL SILL BED JOINTS; REPAIR STEP CRACKS; APPLY CEMENT COATING AND MI$81,550
2024-02-09Permit General Construction — Signed-off
2024-01-02Job filed: THE PROPOSED WORK FILED UNDER THIS APPL. IS FOR CUT & POINT MORTAR JOINTS; CUT & SEAL SILL BED JOINTS; REPAIR STEP CRACKS; APPLY CEMENT COATING AND MI$81,550
2023
2023-11-22HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2023-11-21FDNY inspection (RISK)
2023-11-15FDNY inspection (RISK)
2023-10-13311: Noise - Residential — Loud Music/Party
2023-10-13311: Noise - Residential — Loud Music/Party
2023-08-18311: Sewer — Sewer Backup (Use Comments) (SA)
2023-07-06FDNY inspection (RISK)
2023-05-23311: Noise - Residential — Loud Television
2023-02-02Deed $27,815,000 — from CLPF - PRINTHOUSE LOFTS, LLC to COMREF WILLIAMSBURG LOFTS LLC$27,815,000
2023-01-25Sold for $27,815,000$27,815,000
2023-01-17FDNY inspection (RISK)
2023-01-11Bedbug filing: 0 infested units
2023-01-11Bedbug filing: 0 infested units
2022
2022-12-01DOB violation EGRADE: FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2022-11-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2022-08-12311: Blocked Driveway — No Access
2022-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2022-06-30Elevator permit: All work to comply with ASME A17.3 of 2002, as modified by Chapter K3 of 2014 NYC BC Appendix K section 3.10.12. Claddagh controll$3,800
2022-04-26311: Missed Collection — Recycling - Paper/Metal/Glass/Rigid Plastic
2022-03-25311: Blocked Driveway — No Access
2022-03-01HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2022-03-01HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2022-02-24311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2022-02-23311: Blocked Driveway — No Access
2022-01-07311: WATER LEAK — SLOW LEAK
2022-01-07311: SAFETY — SMOKE DETECTOR
2022-01-07311: UNSANITARY CONDITION — MOLD
2022-01-07Tenant complaint: UNSANITARY CONDITION — MOLD
2022-01-07Tenant complaint: WATER LEAK — SLOW LEAK
2022-01-07Tenant complaint: SAFETY — SMOKE DETECTOR
2021
2021-11-28311: Blocked Driveway — No Access
2021-11-24311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-10-28FDNY inspection (RISK)
2021-10-19311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-09-06311: HEAT/HOT WATER — ENTIRE BUILDING
2021-09-06311: PLUMBING — WATER SUPPLY
2021-09-06Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2021-09-06Tenant complaint: PLUMBING — WATER SUPPLY
2021-09-05311: Water System — Excessive Water In Basement (WEFB)
2021-09-04311: Sewer — Sewer Backup (Use Comments) (SA)
2021-09-04311: WATER LEAK — HEAVY FLOW
2021-09-04311: UNSANITARY CONDITION — SEWAGE
2021-09-04Tenant complaint: UNSANITARY CONDITION — SEWAGE
2021-09-04Tenant complaint: WATER LEAK — HEAVY FLOW
2021-08-30311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-08-28311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-08-13311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-07-11311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-06-19311: Noise - Residential — Loud Music/Party
2021-05-31311: Blocked Driveway — Partial Access
2021-04-29DOB violation EGRADE: FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2021-04-15Bedbug filing: 0 infested units
2021-04-12HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021-03-19HPD class C: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING IN THE 3rd ROOM FROM NOR
2021-03-19HPD class B: § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 5C, 5th STORY, 1s
2021-03-19HPD class B: § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AT PUBLIC HALL, 5th STORY
2021-03-19HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 5th STOR
2021-03-19HPD class A: § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 5th STORY
2021-03-19HPD class C: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING IN THE 3rd ROOM FROM NOR
2021-03-16311: WATER LEAK — SLOW LEAK
2021-03-16Tenant complaint: WATER LEAK — SLOW LEAK
2021-03-02HPD class A: § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR AT PUBLIC HALL, 1st STORY
2021-03-02HPD class B: § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS AT PUBLIC HALL, 1st STORY
2021-02-19DOB violation E:
2021-02-14311: WATER LEAK — SLOW LEAK
2021-02-14Tenant complaint: WATER LEAK — SLOW LEAK
2021-02-03311: WATER LEAK — SLOW LEAK
2021-02-03Tenant complaint: WATER LEAK — SLOW LEAK
2020
2020-10-24311: Blocked Driveway — No Access
2020-10-14311: Blocked Driveway — No Access
2020-10-06311: Blocked Driveway — No Access
2020-09-20311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-09-09HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING, WEST AND NORTH WALLS IN THE 3r
2020-09-09HPD class C: § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF AN UNACCEPTABLE ELECTROMAGNETIC LOCKING DEVICE INSTALL AT THE BUILDING E
2020-09-09HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st BATHROOM FROM EAST L
2020-09-09HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH AT E
2020-09-09HPD class B: § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 4B, 4th STORY, 3r
2020-09-09HPD class B: § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE CEILING IN THE 1st BATHROOM FROM EAST LOCATED AT APT 4B, 4th STORY, 3rd AP
2020-09-09HPD class B: § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 4B, 4th STORY, 3
2020-09-09HPD class B: § 27-2005 ADM CODE PROVIDE SECURITY IN THE EVENT OF A POWER OUTAGE BY MEANS OF AN ACCEPTABLE MECHANICAL HEAVY DUTY LOCK AND LATCH SET AT THE
2020-09-09HPD class C: HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 3rd APARTMENT FR
2020-09-04311: UNSANITARY CONDITION — MOLD
2020-09-04311: WATER LEAK — SLOW LEAK
2020-09-04311: HEAT/HOT WATER — APARTMENT ONLY
2020-09-04311: PAINT/PLASTER — WALL
2020-09-04311: PAINT/PLASTER — CEILING
2020-09-04Tenant complaint: PAINT/PLASTER — CEILING
2020-09-04Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2020-09-04Tenant complaint: WATER LEAK — SLOW LEAK
2020-09-04Tenant complaint: UNSANITARY CONDITION — MOLD
2020-09-04Tenant complaint: PAINT/PLASTER — WALL
2020-08-27311: Noise - Residential — Loud Music/Party
2020-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2020-06-03311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-05-28311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-05-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2020-04-13311: Elevator — Elevator - Single Device On Property/No Alternate Service
2020-04-13DOB complaint, category ?
2020-02-26FDNY inspection (RISK)
2020-02-12DOB violation E:
2020-01-25311: Blocked Driveway — No Access
2019
2019-10-19311: Noise - Residential — Loud Music/Party
2019-05-20DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2019-05-19311: Noise - Residential — Loud Music/Party
2019-03-31311: Noise - Residential — Loud Music/Party
2019-03-05ECB CLASS - 2 violation: 02X10; 14M07. 02X10-REPAIR EMERGENCY PHONE; 14M07-PROVIDE CAR MIRROR$655
2018
2018-06-20311: Graffiti — Graffiti
2018-06-05311: Noise — Noise: Construction Before/After Hours (NM1)
2018-03-08HPD litigation: Heat and Hot Water
2018-02-02DOB violation E:
2018-01-10HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR
2018-01-10HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST WALL IN THE 2nd ROOM FROM EAST LOCATE
2018-01-10HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING THROUGHOUT IN THE ENTIRE APARTMENT
2018-01-10HPD class B: § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM EAS
2018-01-10HPD class B: § 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW A
2018-01-10HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM EAST
2018-01-06311: HEAT/HOT WATER — APARTMENT ONLY
2018-01-06Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2017
2017-07-19Job filed: HEREWITH FILE STRUCTURAL PLANS FOR THE IMPROVEMENTS TO THE EXISTING ROOF TERRACE TO SUPPORT A PERGOLA AND KITCHEN (PERGOLA AND KITCHEN BY OTHERS). NO$12,000
2017-07-19Job filed: HEREWITH FILE STRUCTURAL PLANS FOR THE IMPROVEMENTS TO THE EXISTING ROOF TERRACE TO SUPPORT A PERGOLA AND KITCHEN (PERGOLA AND KITCHEN BY OTHERS). NO$12,000
2017-05-19Permit EW — ISSUED
2017-05-03311: Noise — Noise, Barking Dog (NR5)
2017-04-28Job filed: HEREWITH FILE PLANS FOR PLUMBING WORK ON DOC 02, FILED IN CONJUNCTION WITH DOC 01 FILED FOR GENERAL CONSTRUCTION. NO CHANGE TO USE, EGRESS OR OCCUPAN$7,000
2017-04-28Job filed: HEREWITH FILE PLANS FOR PLUMBING WORK ON DOC 02, FILED IN CONJUNCTION WITH DOC 01 FILED FOR GENERAL CONSTRUCTION. NO CHANGE TO USE, EGRESS OR OCCUPAN$7,000
2017-04-28Job filed: HEREWITH FILE PLANS FOR ROOF TERRACE NEW GRILLING AREA, NEW SEATING AREA, NEW PERGOLA AREA, NEW LOUNGE SEATING AREA, NEW FIRE PIT AREA. SUBSEQUENT DO$200,000
2017-04-28Job filed: HEREWITH FILE PLANS FOR PLUMBING WORK ON DOC 02, FILED IN CONJUNCTION WITH DOC 01 FILED FOR GENERAL CONSTRUCTION. NO CHANGE TO USE, EGRESS OR OCCUPAN$7,000
2017-02-24DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
2017-01-31311: Water System — Dirty Water (WE)
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2016
2016-10-04311: Missed Collection (All Materials) — 1RB Missed Recycling - M/G/Pl
2016-10-04311: Missed Collection (All Materials) — 1 Missed Collection
2016-06-21311: Noise - Residential — Loud Music/Party
2016-06-20311: Noise - Residential — Loud Music/Party
2016-05-21311: Sidewalk Condition — Broken Sidewalk
2016-03-24311: Blocked Driveway — No Access
2016-03-10311: Graffiti — Graffiti
2016-02-01DOB violation E:
2015
2015-10-11311: Noise - Residential — Loud Music/Party
2015-10-01DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
2015-08-19FDNY inspection (OTHER)
2015-07-09Tenant complaint: PAINT/PLASTER — CEILING
2015-07-09Tenant complaint: PAINT/PLASTER — CEILING
2015-06-02FDNY inspection (RISK)
2015-04-30311: Graffiti — Graffiti
2015-04-23FDNY inspection (ALT)
2015-04-14311: Missed Collection (All Materials) — 2 Bulk-Missed Collection
2015-04-14311: Missed Collection (All Materials) — 1RB Missed Recycling - M/G/Pl
2015-03-12HPD class B: SECTION 27-2005 ADM CODE REPLACE WITH NEW THE MISSING DOOR AT EAST COURT YARD
2015-03-12HPD class A: SECTION 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF T
2015-03-12HPD class A: SECTION 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES,
2015-03-12HPD class A: SECTION 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER O
2015-03-12HPD class A: SECTION 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMEN
2015-03-12HPD class A: SECTION 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BO
2015-03-12HPD class A: SECTION 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A C
2015-03-09Certificate of occupancy Final
2015-03-03DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
2015-02-27HPD class I: SECTION27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE ?27-2097 AND IS THER
2015-02-19311: Indoor Air Quality — Dust from Construction
2015-02-19311: DOOR/WINDOW — DOOR
2015-02-19311: DOOR/WINDOW — DOOR
2015-02-19311: DOOR/WINDOW — DOOR
2015-02-19Tenant complaint: DOOR/WINDOW — DOOR
2015-02-19Tenant complaint: DOOR/WINDOW — DOOR
2015-02-19Tenant complaint: DOOR/WINDOW — DOOR
2015-02-05HPD litigation: Tenant Action
2015-01-21HPD class A: SECTION 27-2005 ADM CODE REPLACE WITH NEW THE MISSING HINGES ON CABINET DOORS ON WEST WALL IN THE KITCHEN LOCATED AT APT GF, 1st APARTMENT F
2015-01-21HPD class A: SECTION 27-2005 ADM CODE REPLACE WITH NEW THE MISSING SEALANT AT GAPS IN CEILING TO PREVENT DRAFT AND DUST IN THE 1st ROOM FROM NORTH AT EAS
2015-01-21HPD class A: SECTION 27-2005 ADM CODE REPLACE WITH NEW THE MISSING SEALANT AT GAPS IN CEILING TO PREVENT DRAFT AND DUST IN THE 2nd ROOM FROM NORTH AT EAS
2015-01-21Certificate of occupancy Temporary
2015-01-16Tenant complaint: GENERAL — VENTILATION SYSTEM
2015-01-16Tenant complaint: GENERAL — CABINET
2015-01-15HPD litigation: Tenant Action
2014
2014-12-16FDNY inspection (ALT)
2014-12-09TL&R — from LADDER CAPITAL FINANCE LLC
2014-12-09TL&R — from LADDER CAPITAL FINANCE LLC
2014-12-09TL&R — from LADDER CAPITAL FINANCE LLC
2014-12-09Mortgage satisfied — from 139 NORTH 10TH PROPERTY LLC to LADDER CAPITAL FINANCE I LLC
2014-12-09Mortgage satisfied — from THE NORTH 10 PROJECT LLC to LADDER CAPITAL FINANCE LLC
2014-12-09EASE — from 139 NORTH 10TH PROPERTY LLC to CLPF-PRINTHOUSE LOFTS, LLC
2014-12-09Deed $30,500,000 — from 139 NORTH 10TH PROPERTY LLC to CLPF-PRINTHOUSE LOFTS, LLC$30,500,000
2014-12-09Mortgage satisfied — from 139 NORTH 10TH PROPERTY LLC to LADDER CAPITAL FINANCE I LLC
2014-12-03311: FLOORING/STAIRS — FLOOR
2014-12-03311: PLUMBING — BASIN/SINK
2014-12-03311: GENERAL — VENTILATION SYSTEM
2014-12-03Tenant complaint: GENERAL — VENTILATION SYSTEM
2014-12-03Tenant complaint: FLOORING/STAIRS — FLOOR
2014-12-03Tenant complaint: PLUMBING — BASIN/SINK
2014-11-25FDNY inspection (ALT)
2014-11-25311: Missed Collection (All Materials) — 1RG Missed Recycling Paper
2014-11-18311: Missed Collection (All Materials) — 1 Missed Collection
2014-11-16311: Noise — Noise: Construction Before/After Hours (NM1)
2014-11-06FDNY inspection (ALT)
2014-11-04311: Missed Collection (All Materials) — 1RG Missed Recycling Paper
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-23Certificate of occupancy Temporary
2014-10-21FDNY inspection (ALT)
2014-10-15Permit EW — ISSUED
2014-10-07311: Missed Collection (All Materials) — 1R Missed Recycling-All Materials
2014-09-25311: Missed Collection (All Materials) — 1 Missed Collection
2014-09-11311: New Tree Request — For One Address
2014-08-27FDNY inspection (CDA-90-DRILL)
2014-08-20Certificate of occupancy Temporary
2014-08-05Permit PL — ISSUED
2014-06-03311: General Construction/Plumbing — Excavation Undermining Adjacent Building
2014-06-03DOB complaint, category ?
2014-06-02DOB complaint, category ?
2014-05-26311: Noise — Noise: Construction Equipment (NC1)
2014-05-20FDNY inspection (CDA-90-DRILL)
2014-05-20FDNY inspection (SPECIAL-OTH)
2014-05-16SMTG $3,656,475 — from 139 NORTH 10TH PROPERTY LLC to LADDER CAPITAL FINANCE LLC$3,656,475
2014-05-16AL&R $13,725,794 — from 139 NORTH 10TH PROPERTY LLC to LADDER CAPITAL FINANCE LLC$13,725,794
2014-05-16Agreement $13,725,794 — from 139 NORTH 10TH PROPERTY LLC to LADDER CAPITAL FINANCE LLC$13,725,794
2014-05-16Mortgage $2,000,000 — from 139 NORTH 10TH PROPERTY LLC to LADDER CAPITAL FINANCE LLC$2,000,000
2014-05-16EASE — from 125 NORTH 10TH STREET CONDOMINIUM to 139 NORTH 10TH PROPERTY LLC
2014-05-16SMTG $1,897,731 — from 139 NORTH 10TH PROPERTY LLC to LADDER CAPITAL FINANCE LLC$1,897,731
2014-05-15DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
2014-05-14Job filed: AUTOMATIC SMOKE/ HEAT DETECTION // SPRINKLER ALARM SYSTEM$25,000
2014-04-25311: Noise — Noise: Construction Before/After Hours (NM1)
2014-04-24311: Noise — Noise: Construction Before/After Hours (NM1)
2014-04-14311: Noise — Noise: Construction Before/After Hours (NM1)
2014-04-03311: Dirty Conditions — E3 Dirty Sidewalk
2014-04-03311: Street Condition — Blocked - Construction
2014-04-03DOB complaint, category ?
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-21311: Emergency Response Team (ERT) — After Hours Work - Illegal
2014-03-21DOB complaint, category ?
2014-02-06Permit EQ — ISSUED
2014-02-06Permit AL — ISSUED
2014-02-06Permit EQ — ISSUED
2014-01-30FDNY inspection (ALT)
2014-01-22311: Noise — Noise: Construction Before/After Hours (NM1)
2013
2013-12-31FDNY inspection (ALT)
2013-12-18FDNY inspection (ALT)
2013-11-07Permit EW — ISSUED
2013-10-30311: Noise — Noise: Jack Hammering (NC2)
2013-10-24FDNY inspection (ALT)
2013-10-09FDNY inspection (ALT)
2013-09-23AALR — from LADDER CAPITAL FINANCE I LLC to LADDER CAPITAL FINANCE LLC
2013-09-23Mortgage assigned — from LADDER CAPITAL FINANCE I LLC to LADDER CAPITAL FINANCE LLC
2013-09-23AALR — from LADDER CAPITAL FINANCE I LLC to LADDER CAPITAL FINANCE LLC
2013-09-23Mortgage assigned — from LADDER CAPITAL FINANCE I LLC to LADDER CAPITAL FINANCE LLC
2013-09-23AALR — from LADDER CAPITAL FINANCE I LLC to LADDER CAPITAL FINANCE LLC
2013-09-23Mortgage assigned — from LADDER CAPITAL FINANCE I LLC to LADDER CAPITAL FINANCE LLC
2013-09-17FDNY inspection (ALT)
2013-09-05FDNY inspection (ALT)
2013-07-31FDNY inspection (ALT)
2013-07-16Permit EQ — ISSUED
2013-07-16Permit PL — ISSUED
2013-07-15ECB CLASS - 2 violation: SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS. NOTED: SHED NOT ILLUMINATED @ TIME OF INSPECTION. RMDY: CONFORM TO SHED CODE SPEC$2,400
2013-07-11Permit EQ — ISSUED
2013-07-10311: Emergency Response Team (ERT) — After Hours Work - Illegal
2013-07-10DOB complaint, category ?
2013-07-10Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
2013-07-03FDNY inspection (CDA-90-DRILL)
2013-07-01Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
2013-07-01Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
2013-05-08Permit EQ — ISSUED
2013-05-08Permit AL — ISSUED
2013-05-07Mortgage $1,075,794 — from 139 NORTH 10TH PROPERTY LLC to LADDER CAPITAL FINANCE I LLC$1,075,794
2013-05-07AL&R $11,725,794 — from 139 NORTH 10TH PROPERTY LLC to LADDER CAPITAL FINANCE I LLC$11,725,794
2013-05-07Mortgage $3,656,475 — from 139 NORTH 10TH PROPERTY LLC to LADDER CAPITAL FINANCE I LLC$3,656,475
2013-05-07AL&R $3,656,475 — from 139 NORTH 10TH PROPERTY LLC to LADDER CAPITAL FINANCE I LLC$3,656,475
2013-05-07Mortgage $1,897,731 — from 139 NORTH 10TH PROPERTY LLC to LADDER CAPITAL FINANCE I LLC$1,897,731
2013-05-07AL&R $1,897,731 — from 139 NORTH 10TH PROPERTY LLC to LADDER CAPITAL FINANCE I LLC$1,897,731
2013-05-07TL&R — from HRC FUND V REIT LLC to THE NORTH 10 PROJECT LLC
2013-05-07TL&R — from HRC FUND V REIT LLC to THE NORTH 10 PROJECT LLC
2013-05-07Mortgage assigned — from HRC FUND V REIT LLC to LADDER CAPITAL FINANCE I LLC
2013-05-07Mortgage assigned — from HRC FUND V REIT LLC to LADDER CAPITAL FINANCE I LLC
2013-05-07Mortgage assigned — from HRC FUND V REIT LLC to LADDER CAPITAL FINANCE I LLC
2013-05-07Deed $15,800,000 — from THE NORTH 10 PROJECT LLC to 139 NORTH 10TH PROPERTY LLC$15,800,000
2013-05-07EASE $90,000 — from 125 NORTH 10TH STREET CONDOMINIUM to THE NORTH 10 PROJECT LLC$90,000
2013-05-07Agreement $11,725,794 — from 139 NORTH 10TH PROPERTY LLC to LADDER CAPITAL FINANCE I LLC$11,725,794
2013-03-07311: General Construction/Plumbing — Adjacent Buildings Not Protected
2013-03-07DOB complaint, category ?
2013-03-01DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
2013-02-07311: Noise — Noise: Construction Before/After Hours (NM1)
2013-01-13311: Emergency Response Team (ERT) — After Hours Work - Illegal
2013-01-13DOB complaint, category ?
2012
2012-10-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2011 INSPECTION/TEST
2012-09-18311: General Construction/Plumbing — Site Conditions Endangering Workers
2012-09-18DOB complaint, category ?
2012-08-31311: Water System — Excessive Water In Basement (WEFB)
2012-08-31311: Sewer — Catch Basin Clogged/Flooding (Use Comments) (SC)
2012-08-09311: Water System — Excessive Water In Basement (WEFB)
2012-07-30Permit EW — ISSUED
2012-07-25311: Dirty Conditions — E3A Dirty Area/Alleyway
2012-07-18Permit EQ — ISSUED
2012-07-17311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2012-07-17Permit AL — ISSUED
2012-07-13Mortgage $4,254,050 — from THE NORTH 10 PROJECT LLC to HRC FUND V REIT LLC$4,254,050
2012-07-13AL&R $1,745,950 — from THE NORTH 10 PROJECT LLC to HRC FUND V REIT LLC$1,745,950
2012-07-13Mortgage $1,745,950 — from THE NORTH 10 PROJECT LLC to HRC FUND V REIT LLC$1,745,950
2012-07-13AL&R $4,254,050 — from THE NORTH 10 PROJECT LLC to HRC FUND V REIT LLC$4,254,050
2012-07-05311: General Construction/Plumbing — Adjacent Buildings Not Protected
2012-07-05DOB complaint, category ?
2012-07-05DOB violation C:
2012-07-02DOB violation E:
2012-05-29Job filed: REMOVE SPRINKLER SYTEM AND REPLACE WITH NEW SPRINKLER SYSTEM, MECHANICAL IN CONJUNCTION WITH ALT 1 JOB # 320422823$265,000
2012-05-29Job filed: REMOVE SPRINKLER SYTEM AND REPLACE WITH NEW SPRINKLER SYSTEM, MECHANICAL IN CONJUNCTION WITH ALT 1 JOB # 320422823$265,000
2012-05-21Permit EQ — ISSUED
2012-05-21Permit AL — ISSUED
2012-05-21Permit EQ — ISSUED
2012-05-18Permit EW — ISSUED
2012-05-16311: General Construction/Plumbing — Failure To Maintain
2012-05-16311: Forensic Engineering — Building Under Structural Monitoring
2012-05-16DOB complaint, category ?
2012-05-16DOB complaint, category ?
2012-05-14Permit EQ — ISSUED
2012-05-09Job filed: INSTALLATION OF 85 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY
2012-05-01CERT — from LANDMARK ABSTRACT AGENCY, LLC
2012-05-01ZONE — from THE NORTH 10 PROJECT, LLC
2012-04-19Job filed: STRUCTURE AND FOUNDATION IN CONJUNCTION WITH ALT ONE
2012-04-19Job filed: STRUCTURE AND FOUNDATION IN CONJUNCTION WITH ALT ONE
2012-04-04Job filed: BNP12-113,75'FRONTAGE,ALT 1 320422823
2012-04-04Job filed: BNP12-113,75'FRONTAGE,ALT 1 320422823
2012-04-04Job filed: BNP12-113,75'FRONTAGE,ALT 1 320422823
2012-03-29Job filed: PLUMBING FILED IN CONJUNCTION WITH ALT 1 320422823
2012-02-09Job filed: INTERIOR DEMOLILITION, INTERIOR RENOVATION THROUGHOUT BUILDING AS PER PLANS.$225,000
2012-02-06Job filed: SHED FILED IN CONJUNCTION WITH ALT ONE
2012-02-06Job filed: A1$1,972,000
2012-01-24311: Dirty Conditions — E3 Dirty Sidewalk
2011
2011-12-07Mortgage $4,650,000 — from THE NORTH 10 PROJECT LLC to HRC FUND V REIT LLC$4,650,000
2011-10-18311: Graffiti — Graffiti
2011-10-05DOB complaint, category ?
2011-09-17ECB CLASS - 1 violation: FIALURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN NOV#34716625P ISUED ON 10/06/2008.REMEDY:COMPLY W/THE COMM'S ORDER.
2011-09-02TL&R — from SANJER RAZ, LLC to FLUSHING SAVINGS BANK, FSB
2011-09-02Mortgage satisfied — from SANJER RAZ, LLC to FLUSHING SAVINGS BANK, FSB
2011-08-25DOB complaint, category ?
2011-08-19Deed $6,100,000 — from SANJER RAZ LLC to THE NORTH 10 PROJECT, LLC$6,100,000
2011-07-30ECB CLASS - 1 violation: FAILURE TO COMPLY W/ THE COMMS ORDER CONTAINED IN NOV#34716625P ISSUEDON 10/06/08 REM; COMPLY W/ THE COMMS ORDER
2011-07-03311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2011-07-01311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2011-07-01311: Dirty Conditions — E3 Dirty Sidewalk
2011-06-29DOB complaint, category ?
2011-06-23ECB CLASS - 1 violation: FAILURE TO COMPLY W/COMM'S ORDER TO CORRECT VIO #34716625P. REMEDY: COMPLY W/COMM'S ORDER & OBTAIN PERMIT.$6,000
2011-04-22DOB complaint, category ?
2011-04-11311: Graffiti — Graffiti
2011-04-05ECB CLASS - 1 violation: UNLAWFUL ACTS. FAILURE TO COMPLY W/AN ORDER OF COMMISSIONER. RESPONDENT FAILED TO CORRECT VIOLATING CONDITIONS CITED IN THE PRIOR $12,000
2011-03-15DOB complaint, category ?
2011-03-09DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2011-02-12ECB CLASS - 1 violation: FAILURE TO COMPLY W/AN ORDER OF THE COMMISSIONER. RESPONDENT FAILED TOCORRECT THE VIO CONDITIONS CITED IN NOV 34716625P. (PARTITIO$24,000
2011-01-12DOB complaint, category ?
2010
2010-12-17ECB CLASS - 1 violation: FAILURE TO CORRECT CONDITIONS CITED IN NOV #34716625P FOR WORK DONE W/O A PERMIT/INSTALLED. REMEDY: CORRECT CONDITIONS CITED.$6,000
2010-12-16ECB CLASS - 1 violation: FAILURE TO CORRECT CONDITIONS CITED IN NOV 34780807L FOR WORK DONE W/OA PERMIT. (CONVERTED SPACES TO CLASS 'A' APTS ETC). REMEDY: $6,000
2010-12-15DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2010-11-18DOB violation E:
2010-10-30311: Blocked Driveway — No Access
2010-10-19311: General Construction/Plumbing — Building Permit - None
2010-10-19DOB complaint, category ?
2010-09-18ECB CLASS - 1 violation: UNLAWFUL ACTS FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER NOTE:RESPONDENT FAILED TO CORRECT THE VIOLATING CONDITION CITED $6,000
2010-08-11DOB complaint, category ?
2010-07-10311: Forensic Engineering — Building Under Structural Monitoring
2010-07-07311: General Construction/Plumbing — Failure To Maintain
2010-07-07DOB complaint, category ?
2010-05-29ECB CLASS - 1 violation: UNLAWFUL ACTS. FAILURE TO COMPLY W/AN ORDER OF THE COMMISSIONER. NOTE:RESPONDENT FAILED TO CORRECT THE VIOLATING CONDITION CITED I$24,000
2010-05-20ECB CLASS - 1 violation: UNLAWFUL ACTS. FAILURE TO COMPLY W/AN ORDER OF THE COMMISSIONER. NOTE:RESPONDENT FAILED TO CORRECT THE VIOLATING CONDITION CITED I$24,000
2010-04-27311: Street Condition — Pothole
2010-03-09311: General Construction/Plumbing — Failure To Maintain
2010-03-09311: General Construction/Plumbing — Building Permit - None
2010-03-09DOB complaint, category ?
2010-03-09DOB complaint, category ?
2010-01-30ECB CLASS - 1 violation: UNLAWFUL ACTS.FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER.NOTE:RESP FAILED TO CORRECT THE VIOLATING CONDITIONS NOTED IN NO$2,400
2010-01-30ECB CLASS - 1 violation: FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES NOTE:SEVERE STRESS CRACKS OBSERVED ON THE FRT FACADE,EXTENDING BTWN THE WINDOW L$2,500
2009
2009-12-10DOB complaint, category ?
2009-12-10DOB complaint, category ?
2009-12-10DOB complaint, category ?
2009-12-07DOB complaint, category ?
2009-11-21ECB CLASS - 1 violation: FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES. NOTE: CRACKS OBSERVEDRUNNING UNDER WINDOW SILLS AND OVER LINTELS OF ALL WINDOWS O$2,500
2009-11-21ECB CLASS - 1 violation: UNLAWFUL ACTS FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER RESPONDENT FAILED TO CORRECT THE CONDITION CITIED IN NOV#34716625P I$800
2009-11-21ECB CLASS - 2 violation: FAILURE TO COMPLY WITH THE COMMISSIONER ORDER TO FILE A CERTIFICATE OFCORRECTION WITH THE DEPT OF BLDG'S NOTE RESPONDENT FAILED TO$800
2009-11-20ECB CLASS - 2 violation: FAIL TO COMPLY W/AN ORDER OF THE COMM TO FILE A COFC W/THE DOB NOTE:RESP FAILED TO COMPLY W/THE COMM ORDER TO CORRECT THE VIOLATIN$4,000
2009-09-12ECB CLASS - 2 violation: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS. RESPONDENT FAILED
2009-09-12ECB CLASS - 1 violation: FAILURE TO MAINTAIN BUILDING WALLS OR APPURTENANCES. NOTE: SEVERE STRESS CRACKS OBSERVED ON FRONT FACADE,EXTENDING BETWEEN THE WIN$1,000
2009-09-12ECB CLASS - 2 violation: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS. RESPONDENT FAILED
2009-09-12ECB CLASS - 1 violation: UNLAWFUL ACTS: FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER TO OBTAIN A PERMIT PER VIOLATION #34716625P. ERECTED PARTITIONS
2009-07-16DOB complaint, category ?
2009-07-11ECB CLASS - 1 violation: FAILURE TO COMPLY W/ THE COMMISSIONERS ORDER TO OBTAIN A PERMIT PER VIOLATION #34739766K. INTERIOR SHEETROCK PARTITIONS ERECTED TH
2009-07-11ECB CLASS - 1 violation: FAILURE TO MAINTAIN BLDG WALL OR APPURTENANCES NOTE: CRACKS OBSERVED RUNNING UNDER THE WINDOW SILLS AND OVER THE LINTELS OF ALL OF$2,400
2009-05-14DOB complaint, category ?
2009-04-25ECB CLASS - 1 violation: FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES.NOTE:SEVERE STRESS CRACKS OBSERVED THROUGHOUT THE FRONT BRICK WALL OF THE BLDG A
2009-04-25ECB CLASS - 1 violation: SEC. 28-201.1. FAILURE TO COMPLY W/AN ORDER OF THE COMMISSIONER TO OBTAIN A PERMIT PER VIOLATION #34716625P. ERECTED PARTITIONS AN$8,000
2009-01-12DOB complaint, category ?
2009-01-08DOB complaint, category ?
2009-01-06ECB CLASS - 1 violation: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER NO FIRE STOPPINGPER BC712.3 27-345 NOTE BUILDING ILLEGALLY CONVERTED FROM MA$1,000
2009-01-06DOB violation P:
2009-01-06DOB violation C: DISCONTINUE ILLEGAL USE AND/OR AMEND THE CERTIFICATE OF OCCUPANCY
2009-01-06ECB CLASS - 3 violation: OCCUPANCY CONTRARY TO THAT ALLOWED BY BUILDING DEPARTMENT RECORDS. NOTE: BUILDING;S RECORDS INDICATE PREMISES TO BE MANUFACTURING
2009-01-06ECB CLASS - 1 violation: WORK W/O A PERMIT.UPON INSPECTION OF THE BLDG AT 139 NORTH 10ST.I OBSERVED NEW GAS PIPING & WATER LINES TO APT ON EACH OF THE 5FL.
2009-01-06ECB CLASS - 2 violation: MAINTAIN OR PERMIT CONVERSION OF INDUSTRIAL/MANUFACTURING BUILDING TO RESIDENTIAL USE W/O BEING PERMITTED OR OBTAIN C OF O IN CODE$2,400
2009-01-06ECB CLASS - 1 violation: GAS BEING SUPPLIED TO BLDG W/O INSPECTION & CERTIFICATION BY THIS DEPT.UPON INSPECTION I OBSERVED GAS PIPING BEING SUPPLIED TO ALL$1,600
2009-01-06ECB CLASS - 1 violation: WORK W/O A PERMIT. NOTE: FULL HEIGHT INTERIOR SHEETROCK PARTITION WALLS ERECTED THROUGHOUT TO ILLEGALLY CONVERT MANUFACTURING BUIL
2009-01-06ECB CLASS - 1 violation: NO SPRINKLER ALARM IN ACCORDANCE W/RS17:UPON INSPECTION OF SPRINKLER SYSTEM I FOUND THAT THE ALARM BELL ON THE 1FL WAS MADE INOPER$1,600
2009-01-06ECB CLASS - 1 violation: GAS VENT REDUCED OR UNDERSIZED.ON THE 2FL I FOUND A GAS WATER HEATER W/3INCH FLUE PUSHED INSIDE A 4INCH FLUE VENT TO THE OUTSIDE.T$1,600
2008
2008-12-24DOB complaint, category ?
2008-10-23DOB complaint, category ?
2008-10-16DOB complaint, category ?
2008-10-16DOB complaint, category ?
2008-10-16ECB CLASS - 1 violation: CONSTRUCTION WORK W/O A PERMIT IN MANUFACTURING DISTRICT FOR RESIDENTIAL USE NOTED AT 1ST FL OF BLDGERECTED PARTITIONS & INSTALL W$2,400
2008-10-16ECB CLASS - 1 violation: 16B10.16J10.32H10.34Q7.35Q7.38I10.39P16.42R7.42Q7.41T7.58Y10.59Y11.60X10.61X10.64M7.70P16.60D6.34M7.100B7.97O2.C.U.16B10 REPAIR HO$1,000
2008-10-16ECB CLASS - 1 violation: WORK W/O PERMIT OBSERVED HOT WATER HEATER AT 1ST FL APT HOOK-UP WITH A GAS FILTER HOSE (ILLEGAL) MUST BE HARD PIPED GAS METER SHUT
2008-10-16ECB CLASS - 2 violation: B254,32A,42,34B,36,50A,50B,50C,50D,50E,50F,50G,50H,50I,50J. 50A REMOVEFLAMMABLE MATERIAL FROM BOILER ROOM 50B OIL BURNER MOUNTED P$500
2008-10-16ECB CLASS - 3 violation: OCCUPANCY CONTRARY TO THAT ALLOWED BY BLDG DEPT RECORDS NOTE DEPT OF RECORDS INDICATES PREMISES TO BE MANUFACTORING AND INDUSTRIAL$400
2008-10-16ECB CLASS - 2 violation: MAONTAIN OR PERMIT CONVERSION OF INDUSTRIAL MANUFACTURING BLDG TO RESIDENTIAL USE W/O BEING PERMITTED OR OBTAINING COFO IN CODE CO$2,400
2007
2007-07-03DOB complaint, category ?
2006
2006-07-03Mortgage $475,180 — from SANJER RAZ, LLC to FLUSHING SAVINGS BANK, FSB$475,180
2006-07-03AL&R $850,000 — from FLUSHING SAVINGS BANK, FSB to SANJER RAZ, LLC$850,000
2006-07-03Agreement $850,000 — from SANJER RAZ, LLC to FLUSHING SAVINGS BANK, FSB$850,000
2006-03-06DOB violation E:
2005
2005-02-13Tenant complaint: HEATING — HEAT RELATED
2002
2002-04-02DOB violation E:
2001
2001-08-29Job filed: CONVERSION OF MANUFACTURING BUILDINGS TO LOFT DWELLINGS.$118,000
2001-08-29Job filed: CONVERSION OF MANUFACTURING BUILDINGS TO LOFT DWELLINGS.$118,000
2001-08-29Job filed: CONVERSION OF MANUFACTURING BUILDINGS TO LOFT DWELLINGS.$118,000
2001-04-17ECB Hazardous violation: EXIT PASSAGEWAY CORRIDOR TOTALLY OBSTRUCTED.NOTE:AT CELLAR LEVEL SOUTH EXIT DOOR IS OBSTRUCTED BY VARIED DEBRIS AND EQUIPMENT FROM$480
2001-04-17ECB Non-Hazardous violation: ALTERED BILUILIG OCCUPIED W/O A VALID C OF O.CERTIFICATE OF OCCUPANCY APPROVALS #17937 FOR REPLACEMENT HAS BEEN EXTENDED TO CREATE$350
2001-04-17ECB Non-Hazardous violation: ILLEGAL USE IN A MANUFACTOR DISTRICT:NOTE:AT 1ST AND 5TH FLOORS FULL HEIGT WALLS ERECTED CREATING TEN CLASS "A" WITH A KITCHEN,AND$480
2001-04-17DOB violation C: HAZARDOUS
2001-04-17ECB Hazardous violation: WORK WITHOUT A PERMIT-HAZARDOUS NOTE:AT 1ST THROUGH 5TH FLOOR CREATED 10 ILLEGAL CLASS "A" APT, WITH A BEDROOM, 2 PEICE BATHROOM, $800
2001-04-17DOB violation C: HAZARDOUS
2001-04-17DOB violation Z: HAZARDOUS
2001-04-17DOB violation C: WORK WITHOUT A PERMIT. HAZARDOUS WORK NOTED: AT 1ST THRU 5TH FLOOR 10 ILLEGAL CLASS "A" APTS WITH A BEDROOM, 3PC BATHROOM, LIVI
2001-02-14DOB complaint, category ?
1999
1999-12-30Mortgage $450,000 — from SANJER RAZ LLC to FLUSHING SAVINGS BANK FSB$450,000
1999-05-21DOB violation E: 3P4212
1996
1996-11-22Deed — from POLIACOFF, ABRAHAM/EXECS OF; MAISLEN, SANDRA P; POLIACOFF, JEROME to SANJER RAZ, LLC
1995
1995-08-29DOB violation LL6291:
1992
1992-01-30DOB complaint, category ?
1992-01-29DOB complaint, category ?
1991
1991-05-24Air permit (CERTIFICATE TO OPERATE), fuel: NO2FUEL
1991-02-27DOB violation E:

Support this site Back to the building page