A modest record — below the level that usually signals systemic problems. More recorded distress than 61% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty
points per 10 units; this building carries 27.2. In ZIP 11211, 58% of residential buildings hold an A and
7% grade D or F.
How grades work
this building
A
B
C
Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
100 heat or hot-water complaints in the last three years (winter 2024–25: 22 · winter 2025–26: 78). Repeated winter clusters suggest a chronic heating problem.
22
’24–25
78
’25–26
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
99 service requests in the last three years. Most common: HEAT/HOT WATER (50) · Noise (36) · Illegal Parking (3) · Illegal Fireworks (3) · SAFETY (2) · Elevator (2).
Filed construction activity
$790,146 in permitted construction work filed since
2016 (7 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1912)
Yes
Six or more residential units (21)
No
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
SUMET I ASSOCIATES, LP
Head officer
SCOTT JAFFEE
Managing agent
Metropolitan Realty Group, LLC
Last registered
2025-10-09
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$5,076,000
$2,284,200
2026
$5,447,000
$2,451,150
2027
$5,543,000
$2,494,350
The city's market estimate has risen
9% between tax years 2025 and 2027.
Tax exemptions on the roll: SHELTER RENT
Building systems
Heating fuel
NO2FUEL
Facade (Local Law 11)
SWARMP — "Safe With A Repair and Maintenance Program": known facade conditions that must be repaired (cycle 9)
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Marcy Av — J M Z · 0.3 mi straight-line (about a 7-minute walk) · station accessibility: full Bedford Av — L · 0.3 mi straight-line (about an 8-minute walk) · station accessibility: full
Bus
Nearest boarding stop: Roebling St / Grand St — Q59 · 300 ft
Citi Bike
Grand St & Havemeyer St · 400 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
99 311 service requests from this address in the last three years — 50 of them about heat or hot water.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $74,500,000 on
2021-03-30 (lender: Orix Real Estate Capital, LLC), covering 12 lots — the amount covers all of them. Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2021-03-30
Mortgage $74,500,000 — from SUMET I ASSOCIATES, L.P. to ORIX REAL ESTATE CAPITAL, LLC
$74,500,000
2015-12-31
Mortgage $25,634,659 — from SUMET I ASSOCIATES, L.P. to SIGNATURE BANK
$25,634,659
2015-12-31
Agreement $60,000,000 — from SUMET I ASSOCIATES, L.P. to SIGNATURE BANK
$60,000,000
2015-12-31
AL&R $60,000,000 — from SUMET I ASSOCIATES, L.P. to SIGNATURE BANK
$60,000,000
2012-01-19
Mortgage $36,515,700 — from SUMET I ASSOCIATES, L.P. to PRUDENTIAL HUNTOON PAIGE ASSOCIATES, LTD
$36,515,700
2008-03-26
Agreement $28,000,000 — from NEW YORK COMMUNITY BANK to SUMET I ASSOCIATES, L.P.
$28,000,000
2008-03-26
Mortgage $15,000,000 — from SUMET I ASSOCIATES, L.P. to NEW YORK COMMUNITY BANK
$15,000,000
2006-05-19
AL&R $13,000,000 — from NEW YORK COMMUNITY BANK to SUMET I ASSOCIATES, L.P.,
$13,000,000
2006-05-19
Mortgage $13,000,000 — from SUMET I ASSOCIATES, L.P., to NEW YORK COMMUNITY BANK
$13,000,000
Ten-year activity
100500
2017
2018
2019
2020
83
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
3
1
1
0
0
5
2018
2
5
1
0
2
10
2019
3
3
6
0
3
15
2020
3
5
9
0
2
19
2021
2
4
67
9
1
83
2022
0
1
28
0
1
30
2023
0
1
17
0
3
21
2024
0
0
26
3
2
31
2025
3
0
55
0
2
60
2026
6
2
74
0
1
83
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF
2026-08-05
Permit General Construction — Permit Issued
2026-08-03
Permit Suspended Scaffold — Permit Issued
2026-07-30
Job filed: PROPOSED EXTERIOR FACADE RESTORATION AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2026-07-25
311: Noise - Street/Sidewalk — Loud Music/Party
2026-07-25
311: Noise - Street/Sidewalk — Loud Music/Party
2026-07-25
311: Noise - Street/Sidewalk — Loud Music/Party
2026-07-24
311: Noise - Residential — Loud Music/Party
2026-07-24
311: Noise - Residential — Loud Music/Party
2026-07-24
Job filed: Installation of suspended scaffold for facade work or inspection.
2026-07-13
311: Noise - Residential — Loud Music/Party
2026-07-03
311: Elevator — Elevator - Single Device On Property/No Alternate Service
2026-07-03
DOB complaint, category ?
2026-06-19
311: Noise - Residential — Loud Music/Party
2026-06-16
311: Noise - Residential — Loud Music/Party
2026-06-16
311: Noise - Residential — Loud Music/Party
2026-06-08
311: Noise - Residential — Loud Music/Party
2026-06-07
311: Noise - Residential — Loud Music/Party
2026-05-08
311: Illegal Parking — Blocked Sidewalk
2026-03-30
Bedbug filing: 0 infested units
2026-03-14
311: Noise - Residential — Loud Music/Party
2026-03-13
311: Elevator — Elevator - Single Device On Property/No Alternate Service
2026-03-13
DOB complaint, category ?
2026-03-05
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-05
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-05
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-05
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-05
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-05
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-05
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-05
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-05
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-05
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-01
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-01
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-01
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-01
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-28
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-28
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-28
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-28
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-28
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-28
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-28
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-28
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-27
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-27
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-27
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-27
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-27
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-27
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-20
Boiler inspection
2026-02-20
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-20
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-20
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-20
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-19
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-19
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-19
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-19
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-11
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-11
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-11
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-11
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-11
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-11
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-30
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-30
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-29
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-29
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-08-14Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF$1,000
2026-08-05Permit General Construction — Permit Issued
2025-12-24Job filed: Installation of roof mounted solar panels. No change in use, egress, or occupancy$194,933
2025-12-01311: HEAT/HOT WATER — ENTIRE BUILDING
2025-12-01311: HEAT/HOT WATER — ENTIRE BUILDING
2025-12-01Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-12-01Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-11-27311: HEAT/HOT WATER — ENTIRE BUILDING
2025-11-27311: HEAT/HOT WATER — ENTIRE BUILDING
2025-11-27311: HEAT/HOT WATER — ENTIRE BUILDING
2025-11-27Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-11-27Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-11-27Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-11-20Elevator permit: Upgrade elevator braking system for existing Device #3P7365. As stated in the Device Job Description. All work to comply with ASME$8,869
2025-11-10311: HEAT/HOT WATER — ENTIRE BUILDING
2025-11-10Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-10-29311: HEAT/HOT WATER — ENTIRE BUILDING
2025-10-29Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-10-27311: HEAT/HOT WATER — APARTMENT ONLY
2025-10-27Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-10-25311: HEAT/HOT WATER — ENTIRE BUILDING
2025-10-25311: HEAT/HOT WATER — ENTIRE BUILDING
2025-10-25Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-10-25Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-10-21311: HEAT/HOT WATER — ENTIRE BUILDING
2025-10-21311: HEAT/HOT WATER — ENTIRE BUILDING
2025-10-21311: HEAT/HOT WATER — ENTIRE BUILDING
2025-10-21Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-10-21Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-10-21Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-10-21HPD class B: § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVI
2025-10-21HPD class B: § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN AC
2025-10-17311: HEAT/HOT WATER — ENTIRE BUILDING
2025-10-17Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-06-13Permit Solar — Signed-off
2025-06-06Job filed: Installation of roof mounted solar panels. No change in use, egress, or occupancy$194,933
2025-03-21311: HEAT/HOT WATER — ENTIRE BUILDING
2025-03-21311: HEAT/HOT WATER — ENTIRE BUILDING
2025-03-21Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-03-21Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-03-20311: HEAT/HOT WATER — ENTIRE BUILDING
2025-03-20Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-03-16311: HEAT/HOT WATER — ENTIRE BUILDING
2025-03-16Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-03-14311: HEAT/HOT WATER — ENTIRE BUILDING
2025-03-14Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-03-07311: HEAT/HOT WATER — ENTIRE BUILDING
2025-03-07Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-02-19311: SAFETY — FIRE ESCAPE
2025-02-19311: HEAT/HOT WATER — ENTIRE BUILDING
2025-02-19Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2023-07-12Elevator permit: Renovation for device # 3P7365 of existing elevator cab with new car operating panel 8.7.2.27. Reline Cab 8.7.2.14. No charge in w$36,900
2022-01-31Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2022-01-21311: HEAT/HOT WATER — ENTIRE BUILDING
2022-01-21Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2022-01-16311: HEAT/HOT WATER — ENTIRE BUILDING
2022-01-16Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2022-01-03311: HEAT/HOT WATER — ENTIRE BUILDING
2022-01-03Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2021
2021-11-29HPD class A: § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGE
2021-11-29HPD class A: § 27-2005 ADM CODE REFIT 1ST DOOR AT WEST IN THE 1st ROOM FROM EAST LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
2021-11-29HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE SPRING BALANCE AT 3RD WINDOW AT NORTH LOWER SASH IN THE 4th ROOM FROM EAST LOCATE
2021-11-29HPD class A: § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISS
2021-11-29HPD class A: § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES
2021-11-29HPD class A: § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON
2021-11-29HPD class A: § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM
2021-11-29HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION SYSTEM IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 1st A
2021-11-29HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE SPRING BALANCE AT 1ST WINDOW AT NORTH LOWER SASH IN THE KITCHEN LOCATED AT APT 3B
2021-11-29HPD class A: § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND
2021-11-27311: HEAT/HOT WATER — APARTMENT ONLY
2021-11-27311: DOOR/WINDOW — WINDOW FRAME
2021-11-27Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2021-11-19Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2021-11-18HPD class A: § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGE
2021-11-18HPD class A: § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES
2021-11-18HPD class A: § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND
2021-11-18HPD class A: § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX AT P
2021-11-18HPD class A: § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPE
2021-11-18HPD class A: § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM
2021-11-18HPD class C: § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO H
2021-11-18HPD class A: § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON
2021-11-15311: HEAT/HOT WATER — ENTIRE BUILDING
2021-11-15Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2021-11-07311: HEAT/HOT WATER — ENTIRE BUILDING
2021-11-07Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2021-04-13HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021-03-30Mortgage $74,500,000 — from SUMET I ASSOCIATES, L.P. to ORIX REAL ESTATE CAPITAL, LLC$74,500,000
2021-03-30SAGE — from SUMET I ASSOCIATES, L.P. to CITY OF NEW YORK
2021-03-30SAGE — from UNITED STATES OF AMERICA, SECRETARY OF H to SUMET I ASSOCIATES, L.P.
2021-03-30SAGE — from SUMET I ASSOCIATES, L.P. to CITY OF NEW YORK
2021-03-30SAGE — from SUMET I ASSOCIATES, L.P. to UNITED STATES DEPT OF HOUSING AND URBAN
2021-03-30Mortgage satisfied — from SUMET I ASSOCIATES, L.P. to SIGNATURE BANK
2021-03-30TL&R — from SIGNATURE BANK to SUMET I ASSOCIATES, L.P.
2021-03-30TERA — from THE CITY OF NEW YORK to SUMET I ASSOCIATES, L.P.
2021-03-30TERA — from THE CITY OF NEW YORK to SUMET I ASSOCIATES, L.P.
2021-03-17DOB complaint, category ?
2021-03-15DOB violation E:
2021-03-08Boiler inspection
2021-03-05Permit General Construction — Signed-off
2021-02-17Job filed: Replace finishes in bathrooms and kitchens including new floors and cabinets in units 1A, 2A, 2B, 2C, 2D, 3,A ,3B, 3C, 3D, 4A, 4B, 4C, 4D, 5A, 5B,5C, $189,000
2020-09-08ECB CLASS - 2 violation: SINGLE WALL BOILER FLUE OUTSIDE BOILER ROOM TO THE CHIMNEY IS NOT SHIELDED FROM TOUCH-GAS PIOLIT IS NOT HARD PIPED TO REGULATOR-SA$312
2020-01-24Job filed: BATHROOM RENOVATION, NON-LOAD BEARING PARTITION REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$6,000
2019-10-10ECB CLASS - 2 violation: BC105.8.2/TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT.NOTEAT THE TIME OF INSPECTION,I OBSERVED A SIDEWALK SHED EXPOSUR
2019-10-09311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2019-10-09DOB complaint, category ?
2019-06-03Elevator permit: A software upgrade to the existing controller to comply with door lock monitoring system as per ASME A17.3 of 2002 as modified by $16,972
2019-05-30311: Derelict Vehicle — With License Plate
2019-04-24311: Borough Office — Construction Enforcement Work Order (DOB)
2019-04-24DOB complaint, category ?
2019-02-26Permit EW — ISSUED
2019-01-22Bedbug filing: 0 infested units
2019-01-14Permit EW — ISSUED
2019-01-11Boiler inspection — defects found
2018
2018-12-28Rodent inspection: Passed
2018-12-21ECB CLASS - 2 violation: FAILURE TO PROVIDE SIDEWALK SHED PARAPET SIGN AS REQUIRED.NOTE:AT TIME OF INSPECTION I OBSERVED SIDEWALK SHED ON SITE WITHOUT A SI
2018-10-15ECB CLASS - 2 violation: FAILURE TO SUBMIT A REQUIRED CYCLE 8B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALLS & APPURTENANCES REQU
2018-07-31DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
2018-07-19Permit EW — ISSUED
2018-06-11Permit EQ — ISSUED
2018-05-24ECB CLASS - 2 violation: 67X10.52M07.40R09.61T07.67X10.REPAIR EMERGENCY PHONE.52H07.MISSING SHACKIE SPIN OUT DEVICE ON CARSIDE.40R09 REMOVE NOT ELEVATOR RE
2017-07-19Job filed: FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$79,100
2017-06-16Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED APPROXIMATELY 225' LONG AS PER PLANS DURING FACADE REPAIRS.NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK
2016-11-15HPD class I: SECTION27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE ?27-2097 AND IS THER
2016-09-07DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2016-08-11ECB CLASS - 2 violation: FAILURE TO SUBMIT ACCEPTABLE 7TH ROUND REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALLS & APPURTENANCES REQU
2016-05-02REL — from SECRETARY OF HOUSING AND URBAN DEVELOPME to SUMET I ASSOCIATES, L.P.
2016-04-11ECB CLASS - 1 violation: FAILURE TO MAINTAIN BUILDING WALLS & APPURTENANCES.NOTED AT TIME OF INSPECTION,A SECTION OF PARAPET(ABOUT 20FT)FROM SOUTHWEST CORN$1,000
2016-04-11ECB CLASS - 2 violation: FAILURE TO MAINTAIN BUILDING WALLS & APPURTENANCES-NOTED(I)AT EXPOSURES 1-SPALLED DECORATIVE STONE AT PARAPET AT NORTH SECTION.(II$500
2015
2015-12-31TERA — from CITY OF NEW YORK to SUMET I ASSOCIATES, L.P.
2015-12-31Mortgage assigned — from PRUDENTIAL HUNTOON PAIGE ASSOCIATES, LTD; PRUDENTIAL HUNTOON PAIGE ASSOCIATES, LLC to SIGNATURE BANK
2015-12-31Mortgage $25,634,659 — from SUMET I ASSOCIATES, L.P. to SIGNATURE BANK$25,634,659
2015-12-31Agreement $60,000,000 — from SUMET I ASSOCIATES, L.P. to SIGNATURE BANK$60,000,000
2015-12-31AL&R $60,000,000 — from SUMET I ASSOCIATES, L.P. to SIGNATURE BANK$60,000,000
2015-12-31Agreement — from SUMET I ASSOCIATES, L.P. to THE CITY OF NEW YORK
2015-12-31Agreement — from SUMET I ASSOCIATES, L.P. to SECRETARY OF HOUSING AND URGAN DEVELOPME
2015-12-26DOB complaint, category ?
2015-11-19DOB complaint, category ?
2015-11-02ECB CLASS - 2 violation: FAIL TO FILE AN ACCEPTABLE TECH REPORT IN COMPLIANCE W/CODE PROVISIONS:NOV #36019813L PERIODIC INSPECTION OF EXTERIOR WALLS & APPU
2015-10-05TL&R — from SUMET I ASSOCIATES, L.P. to NEW YORK COMMUNITY BANK
2015-10-05Mortgage satisfied — from SUMET I ASSOCIATES, L.P. to NEW YORK COMMUNITY BANK
2014
2014-09-19ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE CYCLE 7 TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS &
2014-01-26FDNY inspection (RISK)
2012
2012-01-19Agreement — from SUMET I ASSOCIATES, L.P. to CITY OF NEW YORK DEPARTMENT OF HOUSING
2012-01-19Agreement — from SUMET I ASSOCIATES, L.P. to UNITED STATES DEPARTMENT OF HOUSING AND
2012-01-19Mortgage $36,515,700 — from SUMET I ASSOCIATES, L.P. to PRUDENTIAL HUNTOON PAIGE ASSOCIATES, LTD$36,515,700
2010
2010-10-14Permit AL — ISSUED
2010-10-13Permit EQ — ISSUED
2010-10-07Job filed: INSTALLATION OF HEAVYDUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY
2010-10-07Job filed: FACADE REPAIR AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED FILED FOR SEPARATE APPLICATION.$15,000
2009
2009-12-31DOB violation LBLVIO:
2009-07-16Job filed: REPLACE GAS BURNER WITH GAS/OIL BURNER ON NYC BOILER NO. MD68164-01 AND REACTIVATE 5000 GALLON FUEL OIL TANK.$3,000
2009-01-01DOB violation LL6291:
2008
2008-03-26Agreement $28,000,000 — from NEW YORK COMMUNITY BANK to SUMET I ASSOCIATES, L.P.$28,000,000
2008-03-26Mortgage $15,000,000 — from SUMET I ASSOCIATES, L.P. to NEW YORK COMMUNITY BANK$15,000,000
2008-03-26Agreement — from SUMET I ASSOCIATES, L.P. to CITY OF NEW YORK
2008-01-03DOB violation LL6291:
2007
2007-02-15Facade (LL11) filing, cycle 6: SWARMP
2007-01-19DOB violation LL6291:
2006
2006-05-19AL&R $13,000,000 — from NEW YORK COMMUNITY BANK to SUMET I ASSOCIATES, L.P.,$13,000,000
2006-05-19Mortgage $13,000,000 — from SUMET I ASSOCIATES, L.P., to NEW YORK COMMUNITY BANK$13,000,000
2006-01-06DOB violation LL6291:
2005
2005-10-20Job filed: REPLACE OIL BURNER WITH GAS BURNERINSTALL NEW GAS LINE AND METER NO CHANGE IN USE EGRESS OR OCCUPANCY$15,000
2005-02-01Mortgage assigned — from FIRST WINCONSIN TRUST COMPANY; U.S BANK, N.A, AS TRUSTEE to SECRETARY OF HUD, OF WAHINGTON ,D.C
2005-01-31DOB violation LL6291:
2004
2004-02-13DOB violation LL6291:
2003
2003-03-19DOB violation LL6291:
2002
2002-03-26DOB violation LL6291:
2001
2001-02-27DOB violation LL6291:
2000
2000-02-07DOB violation LL6291:
1999
1999-03-16DOB violation LL6291:
1997
1997-02-10DOB violation LL6291:
1995
1995-08-29DOB violation LL6291:
1989
1989-12-06PAT — from CORDANO, THEODORE J to SPANAKOS, GEORGE M
1989-08-07Mortgage assigned — from BOWERY SAVINGS BANK to FIRST WISCONSIN TRUST CO
1981
1981-03-02Mortgage assigned — from CITIBANK N A; CITI BANK N A to THE BOWERY SAVINGS BANK; BOWERY SAVINGS BANK
1981-02-17CERT — from SUMET I ASSOC; DEPARTMENT OF HOUSING PRESERVATION AND D; CERTIFICATE OF COMPLETION OF IMPR
1980
1980-12-11SAGE — from SUMET I ASSOCIATES; CITIBANK NA
1980-12-11Mortgage — from SUMET I ASSOCIATES to CITIBANK NA
1978
1978-10-17SAGE — from NY TELEPHONE CO; NEW YORK TELEPHONE CO; METROPOLITAN REHABILITATION CORP; METROPOLITAN REH
1978-04-20SAGE — from SECY OF HOUSING & URBAN DVLPT; SUMET I ASSOCIATES
1978-04-20SAGE — from CITY OF NEW YORK; SUMET I ASSOCIATES; THE CITY OF NEW YORK
1978-04-18Mortgage — from SUMET I ASSOCIATES to CITIBANK NA
1978-04-18Deed — from GOLDSMITH FRANCES D; DAVIS HAROLD; DAVIS MORTON J; RODGERS SYLVIA D; DAVIS HEROME G to SUMET I ASSOCIATES