The city's published records show little recorded distress here in the last three years. Less recorded distress than 72% of 25-99-unit residential buildings citywide. The citywide median for 25-99-unit residential buildings is 23.6 penalty
points per 10 units; this building carries 5.7. In ZIP 11212, 56% of residential buildings hold an A and
14% grade D or F.
How grades work
this building
A
B
C
Among 17,252 25-99-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
4 heat or hot-water complaints in the last three years (winter 2024–25: 1 · winter 2025–26: 3). Repeated winter clusters suggest a chronic heating problem.
1
’24–25
3
’25–26
No bedbug-infested units reported in the last three years of filings.
$3,750 in enforcement penalties imposed (ECB/OATH) in the last three years.
What 311 hears from this address
22 service requests in the last three years. Most common: General Construction/Plumbing (6) · Water System (2) · Sidewalk Condition (2) · Illegal Dumping (2) · Non (1) · For Hire Vehicle Complaint (1).
Filed construction activity
$599,735 in permitted construction work filed since
2016 (50 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974 (2023)
Yes
Six or more residential units (72)
No
421-a / J-51 tax benefit on the current tax roll
1 of 3 signals present. Only a partial profile — stabilization is possible but less likely. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
THE RISE OWNER LLLC
Head officer
TERRI BELKASMITCHEL
Managing agent
ELH MGMT.LLC
Last registered
2025-09-02
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$976,000
$439,200
2026
$12,673,000
$5,702,850
2027
$12,862,000
$5,787,900
The city's market estimate has risen
1218% between tax years 2025 and 2027.
Tax exemptions on the roll: 420C · DORMITORY AUTHORITY
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
1 street-flooding or sewer-backup complaints at this address since
2025 (1 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Sutter Av-Rutland Rd — 3 · 0.4 mi straight-line (about an 11-minute walk) · station accessibility: none
Bus
Nearest boarding stop: Pitkin Av / Strauss St — B12 B14 · 200 ft
Citi Bike
Pitkin Ave & Grafton St · 700 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)
Elementary: Elementary schools in this district are not zoned. Confirm with the DOE's school search.
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
22 311 service requests from this address in the last three years — 1 of them about heat or hot water.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $811,243 on
2025-11-05 (lender: Women's Prison Association And Home). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2025-11-05
Mortgage $811,243 — from THE RISE HOUSING DEVELOPMENT FUND CORPOR; THE RISE OWNER LLC to WOMEN'S PRISON ASSOCIATION AND HOME
$811,243
2025-11-05
Mortgage $13,873,336 — from THE RISE OWNER LLC; THE RISE HOUSING DEVELOPMENT FUND CORPOR to HOUSING TRUST FUND CORPORATION
$13,873,336
2025-11-05
AL&R $2,020,391 — from THE RISE OWNER LLC; THE RISE HOUSING DEVELOPMENT FUND CORPOR to THE COMMUNITY PRESERVATION CORPORATION
$2,020,391
2025-11-05
Mortgage $2,020,391 — from THE RISE OWNER LLC; THE RISE HOUSING DEVELOPMENT FUND CORPOR to THE COMMUNITY PRESERVATION CORPORATION
$2,020,391
2022-10-17
Mortgage $279,680 — from THE RISE HOUSING DEVELOPMENT FUND CORPOR; THE RISE OWNER LLC to BROWNSVILLE PARTNERSHIP, INC.
$279,680
2022-10-17
Mortgage $850,000 — from THE RISE HOUSING DEVELOPMENT FUND CORPOR; THE RISE OWNER LLC to BROWNSVILLE PARTNERSHIP, INC.
$850,000
2022-10-17
Mortgage $811,243 — from THE RISE OWNER LLC; THE RISE HOUSING DEVELOPMENT FUND CORPOR to THE RISE XENOLITH CCA LLC
$811,243
2022-10-17
Mortgage $10,000,000 — from THE RISE HOUSING DEVELOPMENT FUND CORPOR; THE RISE OWNER LLC to NEW YORK STATE HOMELESS HOUSING AND ASSI
$10,000,000
2022-10-17
AL&R $5,740,815 — from THE RISE OWNER LLC to TD BANK, N.A.
$5,740,815
2022-10-17
Mortgage $5,740,815 — from THE RISE HOUSING DEVELOPMENT FUND CORPOR; THE RISE OWNER LLC to TD BANK, N.A.
$5,740,815
2022-10-17
AL&R $25,410,964 — from THE RISE OWNER LLC to TD BANK, N.A.
$25,410,964
2022-10-17
Mortgage $25,410,964 — from THE RISE OWNER LLC; THE RISE HOUSING DEVELOPMENT FUND CORPOR to TD BANK, N.A.
$25,410,964
2021-03-31
Agreement $118,764,750 — from ROCKREAL CORPORATION; BROOKDALE FAMILY CARE CENTERS, INC.; URBAN STRATEGIES/BROOKDALE FAMI to ATLANTIC AVENUE HEALTHCARE PROPERTY HOLD; DORMITORY AUTHORITY OF THE STATE O
$118,764,750
2007-04-13
SPRD $122,475,000 — from INTERFAITH MEDICAL CENTER to DORMITORY AUTHORITY OF THE STATE OF NEW
$122,475,000
1998-05-05
Mortgage $148,500,000 — from INTERFAITH MEDICAL CENTER to DORMITORY AUTHORITYOF THE STATE OF NEW Y
$148,500,000
Ten-year activity
100500
2017
2018
2019
2020
2021
2022
66
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
0
0
1
0
0
1
2018
0
0
2
1
0
3
2019
0
1
2
0
0
3
2020
2
0
2
1
0
5
2021
9
0
0
1
0
10
2022
32
3
2
18
0
55
2023
41
14
9
0
2
66
2024
29
14
4
0
0
47
2025
2
2
19
15
0
38
2026
0
2
9
0
0
11
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
AALR — from THE COMMUNITY PRESERVATION CORPORATION to PENY & CO., L.L.C.
2025-11-12
Mortgage assigned — from THE COMMUNITY PRESERVATION CORPORATION to PENY & CO., L.L.C.
2025-11-05
Agreement — from NEW YORK STATE HOMELESS HOUSING ASSISTAN; HOUSING TRUST FUND CORPORATION; THE COMMUNITY PR to THE WOMEN'S PRISON ASSOCIATION AND HOME; BROWNSVILLE PARTNERSHIP, INC.; HSBC BANK USA, NA
2025-11-05
Mortgage assigned — from WOMEN'S PRISON ASSOCIATION AND HOME to HSBC BANK USA, NATIONAL ASSOCIATION
2025-11-05
Mortgage $811,243 — from THE RISE HOUSING DEVELOPMENT FUND CORPOR; THE RISE OWNER LLC to WOMEN'S PRISON ASSOCIATION AND HOME
2025-11-05
Mortgage $13,873,336 — from THE RISE OWNER LLC; THE RISE HOUSING DEVELOPMENT FUND CORPOR to HOUSING TRUST FUND CORPORATION
2025-11-05
AL&R $2,020,391 — from THE RISE OWNER LLC; THE RISE HOUSING DEVELOPMENT FUND CORPOR to THE COMMUNITY PRESERVATION CORPORATION
2025-11-05
Mortgage $2,020,391 — from THE RISE OWNER LLC; THE RISE HOUSING DEVELOPMENT FUND CORPOR to THE COMMUNITY PRESERVATION CORPORATION
2025-11-05
Agreement — from HOUSING TRUST FUND CORPORATION to THE RISE HOUSING DEVELOPMENT FUND CORPOR; THE RISE OWNER LLC
2025-11-05
Agreement — from NYS DIVISION OF HOUSING AND COMMUNITY RE to THE RISE OWNER LLC; THE RISE HOUSING DEVELOPMENT FUND CORPOR
2025-11-05
TL&R — from THE RISE OWNER LLC to TD BANK, N.A.
2025-11-05
TL&R — from THE RISE OWNER LLC to TD BANK, N.A.
2025-11-05
Mortgage satisfied — from THE RISE HOUSING DEVELOPMENT FUND CORPOR; THE RISE OWNER LLC to TD BANK, N.A.
2025-11-05
Mortgage satisfied — from THE RISE HOUSING DEVELOPMENT FUND CORPOR; THE RISE OWNER LLC to TD BANK, N.A.
2025-11-05
Mortgage satisfied — from THE RISE HOUSING DEVELOPMENT FUND CORPOR; THE RISE OWNER LLC to THE RISE XENOLITH CCA LLC
2025-11-03
311: Sewer — Street Flooding (SJ)
The full timeline
2026
2026-08-27311: Elevator — Elevator - Multiple Devices On Property
2025-11-12AALR — from THE COMMUNITY PRESERVATION CORPORATION to PENY & CO., L.L.C.
2025-11-12Mortgage assigned — from THE COMMUNITY PRESERVATION CORPORATION to PENY & CO., L.L.C.
2025-11-05Agreement — from NEW YORK STATE HOMELESS HOUSING ASSISTAN; HOUSING TRUST FUND CORPORATION; THE COMMUNITY PR to THE WOMEN'S PRISON ASSOCIATION AND HOME; BROWNSVILLE PARTNERSHIP, INC.; HSBC BANK USA, NA
2025-11-05Mortgage assigned — from WOMEN'S PRISON ASSOCIATION AND HOME to HSBC BANK USA, NATIONAL ASSOCIATION
2025-11-05Mortgage $811,243 — from THE RISE HOUSING DEVELOPMENT FUND CORPOR; THE RISE OWNER LLC to WOMEN'S PRISON ASSOCIATION AND HOME$811,243
2025-11-05Mortgage $13,873,336 — from THE RISE OWNER LLC; THE RISE HOUSING DEVELOPMENT FUND CORPOR to HOUSING TRUST FUND CORPORATION$13,873,336
2025-11-05AL&R $2,020,391 — from THE RISE OWNER LLC; THE RISE HOUSING DEVELOPMENT FUND CORPOR to THE COMMUNITY PRESERVATION CORPORATION$2,020,391
2025-11-05Mortgage $2,020,391 — from THE RISE OWNER LLC; THE RISE HOUSING DEVELOPMENT FUND CORPOR to THE COMMUNITY PRESERVATION CORPORATION$2,020,391
2025-11-05Agreement — from HOUSING TRUST FUND CORPORATION to THE RISE HOUSING DEVELOPMENT FUND CORPOR; THE RISE OWNER LLC
2025-11-05Agreement — from NYS DIVISION OF HOUSING AND COMMUNITY RE to THE RISE OWNER LLC; THE RISE HOUSING DEVELOPMENT FUND CORPOR
2025-11-05TL&R — from THE RISE OWNER LLC to TD BANK, N.A.
2025-11-05TL&R — from THE RISE OWNER LLC to TD BANK, N.A.
2025-11-05Mortgage satisfied — from THE RISE HOUSING DEVELOPMENT FUND CORPOR; THE RISE OWNER LLC to TD BANK, N.A.
2025-11-05Mortgage satisfied — from THE RISE HOUSING DEVELOPMENT FUND CORPOR; THE RISE OWNER LLC to TD BANK, N.A.
2025-11-05Mortgage satisfied — from THE RISE HOUSING DEVELOPMENT FUND CORPOR; THE RISE OWNER LLC to THE RISE XENOLITH CCA LLC
2025-11-03311: Sewer — Street Flooding (SJ)
2025-10-14HPD class A: § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM
2025-10-14HPD class C: § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO H
2025-10-14HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 402, 4th STORY, 6th APARTMENT FROM NOR
2025-10-14HPD class A: §27-2045(B)(5) HMC, § 12-06, 12-10 RCNY POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY COMMISS
2025-10-14HPD class A: §27-2045(B)(5) HMC, § 12-01 RCNY POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE
2025-10-14HPD class A: § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND
2025-10-14HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR AT BOILER ROOM
2025-10-14HPD class A: § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES
2025-10-14HPD class A: § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGE
2025-10-13311: HEAT/HOT WATER — APARTMENT ONLY
2025-10-13Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-06-13HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2025-05-30311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2025-03-28Certificate of occupancy Final
2025-02-27FDNY inspection (CDA-90-DRILL)
2025-02-20311: Non-Residential Heat — Inadequate or No Heat
2025-02-04Certificate of occupancy Renewal Without Change
2024
2024-11-08Certificate of occupancy Initial
2024-11-04Permit Curb Cut — Signed-off
2024-08-22Job filed: MECHANICAL IN CONJUCTION WITH NEW BUILDING JOB NO # 321599150$5,000
2024-08-08311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2024-08-08DOB complaint, category ?
2024-08-06311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2024-07-25Permit Sprinklers — Signed-off
2024-07-25Permit Standpipe — Signed-off
2024-07-21FDNY inspection (CDA-90-DRILL)
2024-07-12Job filed: MECHANICAL IN CONJUCTION WITH NEW BUILDING JOB NO # 321599150$5,000
2024-07-11Permit Sprinklers — Signed-off
2024-07-11Permit Standpipe — Signed-off
2024-07-03Permit Protection and Mechanical Methods — Signed-off
2024-06-14Job filed: SPRINKLER/STANDPIPE IN CONJUNCTION WITH NEW BUILDING JOB NO # 321599150$5,000
2024-06-10Job filed: MECHANICAL IN CONJUCTION WITH NEW BUILDING JOB NO # 321599150$5,000
2024-06-08DOB complaint, category ?
2024-06-05ECB CLASS - 2 violation: 3307.2FAILURE TO COMPLY WITH DOT REQUIREMENTS AT TIME OF INSPECTION OF AN ACTIVE JOB SITE WITH ACTIVE DOT PERMITS OBSERVED STORAGE$625
2024-06-04DOB complaint, category ?
2024-06-04Permit Sidewalk Shed — Signed-off
2024-06-04Permit Protection and Mechanical Methods — Signed-off
2024-05-21Permit Supported Scaffold — Signed-off
2024-05-13Job filed: SPRINKLER/STANDPIPE IN CONJUNCTION WITH NEW BUILDING JOB NO # 321599150$5,000
2024-05-13Job filed: Plumbing IN CONJUNCTION WITH NEW BUILDING JOB NO # 321599150$5,000
2024-04-10FDNY inspection (CDA-90-DRILL)
2024-04-01311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2024-04-01DOB complaint, category ?
2024-03-13Permit Sidewalk Shed — Signed-off
2024-03-11311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2024-03-11DOB complaint, category ?
2024-03-08Permit Foundation — Signed-off
2024-02-22Permit Protection and Mechanical Methods — Signed-off
2024-02-16Permit Standpipe — Signed-off
2024-02-16Permit Sprinklers — Signed-off
2024-02-16Permit Plumbing — Signed-off
2024-02-08Job filed: PROPOSED FO FILING IN CONJUNCTION WITH NB#321599150$5,000
2024-02-08Job filed: PROPOSED EA FILING IN CONJUNCTION WITH NB#321599150$5,000
2024-02-08Job filed: PROPOSED SUPPORT OF EXCAVATION IN CONJUNCTION TO NB# 321599150$5,000
2024-02-08Job filed: Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, eg$7,500
2024-02-08Job filed: STRUCTURAL APPLICATION IN CONJUNCTION WITH NB JOB NUMBER # 321599150$5,000
2024-02-08Permit Sidewalk Shed — Signed-off
2024-01-30DOB complaint, category ?
2024-01-30ECB CLASS - 2 violation: (BC 3307.6.3 AREA TO BE PROTECTED). OBSERVED NO OHP FOR THE ENTRANCE AT CORNER OF EXP#2&3 WHILE FACADE IS NOT COMPLETED AND BUILDI$2,500
2024-01-23Job filed: Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress a$80,000
2024-01-19ECB CLASS - 2 violation: SUPPORTED PIPE SCAFFOLD AT EXP#1 NOT AS PER DRAWINGS, SCAFFOLD START FROM GROUND THEN JUMP WITH ONE SCAFFOLD LEG ON TOP OF EXISTIN$625
2024-01-18DOB complaint, category ?
2024-01-10DOB complaint, category ?
2024-01-10ECB CLASS - 2 violation: DURING MY INSPECTION OF A NEW 7 STORY BUILDING, CONSTRUCTION IN PROGRESS, BUILDING TOPPED OFF, I OBSERVED A MASON'S SUSPENDED SCAF
2023
2023-12-19311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2023-12-19311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2023-12-19DOB complaint, category ?
2023-12-18Permit Standpipe — Signed-off
2023-12-18Permit Sprinklers — Signed-off
2023-12-15FDNY inspection (CDA-90-DRILL)
2023-11-21Permit NB — RE-ISSUED
2023-11-20311: Water System — Hydrant Defective (WC2)
2023-11-17Permit Mechanical Systems — Signed-off
2023-11-17Permit Structural — Permit Issued
2023-11-17Permit Earth Work — Signed-off
2023-11-15311: Water System — Hydrant Defective (WC2)
2023-11-13Permit Support of Excavation — Signed-off
2023-11-09Job filed: Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress a$80,000
2023-11-06Permit EW — ISSUED
2023-11-02Job filed: INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY$118,238
2023-10-19311: Sidewalk Condition — Blocked - Construction
2023-09-28Elevator permit: Furnish and install Two (2) new MRL elevators as per attached drawing. Plan # N1CD60 (Elev1) and N1CD59 (Elev2) - subsequent fili$531,000
2023-09-06Permit Construction Fence — Signed-off
2023-08-19FDNY inspection (CDA-90-DRILL)
2023-08-05311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2023-08-05DOB complaint, category ?
2023-07-21FDNY inspection (CONSTR)
2023-07-19ECB CLASS - 2 violation: ON EXPOSURE #4 IN THE 1ST FLOOR BETWEEN NEW BUILDING AND ADJACENT BUILDING EXTERIOR WALLS OUTBOARD INSULATION WERE INSTALLED RIGID
2023-07-19Permit NB — ISSUED
2023-07-18Permit NB — ISSUED
2023-07-13311: Blocked Driveway — No Access
2023-07-05Job filed: TEMPORARY ROOF PROTECTION AT ADJACENT PROPERTY DURING NB CONST, FILED SEP. ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, O$3,000
2023-07-05Permit Protection and Mechanical Methods — Signed-off
2023-06-27Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY$15,000
2023-06-26DOB complaint, category ?
2023-06-26ECB CLASS - 2 violation: OBSERVED RAMP OVER OPENING USED BY WORKERS AT CELLAR LEVEL. UPON REQUEST FOR DESIGN DRAWINGS FOR RAMP, NONE WERE PROVIDED OR AVAIL
2023-06-26ECB CLASS - 1 violation: GATE INSTALLED NOT AS PER CODE. OBSERVED GATE AT EXP#2 INSTALLED NOT AS PER CODE. GATE AT EXP#2 SWINGS OUT INTO AREA ACCESSIBLE TO$6,250
2023-06-08Job filed: TEMPORARY OVERHEAD PROTECTION AT ADJACENT PROPERTY (1358 EAST NEW YORK AVE) DURING NB CONST, FILED SEP. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 O$2,997
2023-06-08Permit Protection and Mechanical Methods — Signed-off
2023-06-08Permit Protection and Mechanical Methods — Signed-off
2023-06-06Job filed: Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress a$80,000
2023-06-06Job filed: Easy Scale Multipoint Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy.$1,000
2023-06-06Permit Supported Scaffold — Signed-off
2023-05-30Elevator permit: Installation of a Single 6000 LB Capacity Personnel/Material Hoist during NB Construction, filed separately. Installations and Te$10,000
2023-05-23Job filed: SINGLE 6000 # CAPACITY PERSONNEL/MATERIAL HOIST DURING NB CONST, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY $10,000
2023-05-23Permit Protection and Mechanical Methods — Signed-off
2023-05-01Job filed: APPLICATION FOR THE INSTALLATION OF CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$1,000
2023-04-19DOB complaint, category ?
2023-03-13Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY$15,000
2023-03-13Permit Sidewalk Shed — Signed-off
2023-03-10Permit Foundation — Signed-off
2023-03-01Job filed: PROPOSED EA FILING IN CONJUNCTION WITH NB#321599150$5,000
2023-03-01Job filed: PROPOSED SUPPORT OF EXCAVATION IN CONJUNCTION TO NB# 321599150$5,000
2023-03-01Job filed: PROPOSED FO FILING IN CONJUNCTION WITH NB#321599150$5,000
2023-02-28Permit Plumbing — Signed-off
2023-02-24Permit Standpipe — Signed-off
2023-02-24Permit Sprinklers — Signed-off
2023-02-09Permit NB — ISSUED
2023-02-06DOB complaint, category ?
2023-02-06DOB violation C: THE BOROUGH COMMISSION HAS ORDERED ALL WORK STOP UNDER APPLICATION # 321599150 IMMEDIATELY THE CONSTRUCTION SUPERINTENDENT OF REC
2023-02-06DOB violation C: THE BOROUGH COMMISSION HAS ORDERED ALL WORK STOP UNDER APPLICATION # 321599150 IMMEDIATELY THE CONSTRUCTION SUPERINTENDENT OF REC
2023-01-31Job filed: STRUCTURAL APPLICATION IN CONJUNCTION WITH NB JOB NUMBER # 321599150$5,000
2023-01-31Job filed: PROPOSED EA FILING IN CONJUNCTION WITH NB#321599150$5,000
2023-01-31Job filed: Plumbing IN CONJUNCTION WITH NEW BUILDING JOB NO # 321599150$5,000
2023-01-31Job filed: PROPOSED FO FILING IN CONJUNCTION WITH NB#321599150$5,000
2023-01-31Job filed: PROPOSED SUPPORT OF EXCAVATION IN CONJUNCTION TO NB# 321599150$5,000
2022
2022-12-09FDNY inspection (CONSTR)
2022-12-08Job filed: SPRINKLER/STANDPIPE IN CONJUNCTION WITH NEW BUILDING JOB NO # 321599150$5,000
2022-11-29Permit Structural — Permit Issued
2022-11-29Permit Foundation — Signed-off
2022-11-29Permit Earth Work — Signed-off
2022-11-29Permit Mechanical Systems — Signed-off
2022-11-23Permit NB — ISSUED
2022-11-09Permit NB — ISSUED
2022-11-07Permit Support of Excavation — Signed-off
2022-11-07Permit Structural — Permit Issued
2022-11-07Permit Foundation — Signed-off
2022-11-03Permit Earth Work — Signed-off
2022-10-31Permit Mechanical Systems — Signed-off
2022-10-20Job filed: PROPOSED SUPPORT OF EXCAVATION IN CONJUNCTION TO NB# 321599150$5,000
2022-10-17SAGE — from TD BANK, N.A.; NYS HOMELESS HOUSING AND ASSISTANCE CORP to THE RISE OWNER LLC; THE RISE HOUSING DEVELOPMENT FUND CORPOR
2022-10-17Mortgage $279,680 — from THE RISE HOUSING DEVELOPMENT FUND CORPOR; THE RISE OWNER LLC to BROWNSVILLE PARTNERSHIP, INC.$279,680
2022-10-17Mortgage $850,000 — from THE RISE HOUSING DEVELOPMENT FUND CORPOR; THE RISE OWNER LLC to BROWNSVILLE PARTNERSHIP, INC.$850,000
2022-10-17Mortgage $811,243 — from THE RISE OWNER LLC; THE RISE HOUSING DEVELOPMENT FUND CORPOR to THE RISE XENOLITH CCA LLC$811,243
2022-10-17Mortgage $10,000,000 — from THE RISE HOUSING DEVELOPMENT FUND CORPOR; THE RISE OWNER LLC to NEW YORK STATE HOMELESS HOUSING AND ASSI$10,000,000
2022-10-17AL&R $5,740,815 — from THE RISE OWNER LLC to TD BANK, N.A.$5,740,815
2022-10-17Mortgage $5,740,815 — from THE RISE HOUSING DEVELOPMENT FUND CORPOR; THE RISE OWNER LLC to TD BANK, N.A.$5,740,815
2022-10-17AL&R $25,410,964 — from THE RISE OWNER LLC to TD BANK, N.A.$25,410,964
2022-10-17Mortgage $25,410,964 — from THE RISE OWNER LLC; THE RISE HOUSING DEVELOPMENT FUND CORPOR to TD BANK, N.A.$25,410,964
2022-10-17Agreement — from NYS DIVISION OF HOUSING AND COMMUNITY RE to THE RISE HOUSING DEVELOPMENT FUND CORPOR; THE RISE OWNER LLC
2022-10-17Agreement — from THE RISE HOUSING DEVELOPMENT FUND CORPOR to THE RISE OWNER LLC
2022-10-17Deed — from ATLANTIC AVENUE HEALTHCARE PROPERTY HOLD to THE RISE HOUSING DEVELOPMENT FUND CORPOR
2022-10-17Agreement — from THE RISE HOUSING DEVELOPMENT FUND CORPOR; THE RISE OWNER LLC to TRACEY, LLOYD
2022-10-17Agreement — from ATLANTIC AVENUE HEALTHCARE PROPERTY HOLD to BROOKDALE HOSPITAL MEDICAL CENTER
2022-10-17PREL — from DORMITORY AUTHORITY OF THE STATE OF NEW to ATLANTIC AVENUE HEALTHCARE PROPERTY HOLD
2022-10-14Permit DM — ISSUED
2022-10-07DOB complaint, category ?
2022-10-06311: Sidewalk Condition — Blocked - Construction
2022-10-05311: General Construction/Plumbing — Fence - None/Inadequate
2022-10-05DOB complaint, category ?
2022-10-05Job filed: APPLICATION FOR THE INSTALLATION OF CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$1,000
2022-10-05Permit Construction Fence — Signed-off
2022-10-01Job filed: INSTALLATION OF CONSTRUCTION FENCE IN ASSOCIATION WITH FULL BUILDING DEMOLITION UNDER SEPARATE DOB JOB NUMBER. THERE IS NO CHANGE TO USE, EGRESS, OCCU$5,000
2022-09-30Deed transfer (nominal price)
2022-08-29Job filed: INSTALLATION OF CONSTRUCTION FENCE IN ASSOCIATION WITH FULL BUILDING DEMOLITION UNDER SEPARATE DOB JOB NUMBER. THERE IS NO CHANGE TO USE, EGRESS, OCCU$5,000
2022-08-15Permit DM — ISSUED
2022-08-05Job filed: PROPOSED 15' CURB CUT$5,000
2022-07-22Job filed: MECHANICAL IN CONJUCTION WITH NEW BUILDING JOB NO # 321599150$5,000
2022-07-22Job filed: PROPOSED SUPPORT OF EXCAVATION IN CONJUNCTION TO NB# 321599150$5,000
2022-07-22Job filed: SPRINKLER/STANDPIPE IN CONJUNCTION WITH NEW BUILDING JOB NO # 321599150$5,000
2022-07-22Job filed: Plumbing IN CONJUNCTION WITH NEW BUILDING JOB NO # 321599150$5,000
2022-06-08ZONE — from ATLANTIC AVENUE HEALTHCARE PROPERTY HOLD
2022-06-08CERT — from FEDERATED NATIONAL LAND
2022-05-11Job filed: INSTALLATION OF CONSTRUCTION FENCE IN ASSOCIATION WITH FULL BUILDING DEMOLITION UNDER SEPARATE DOB JOB NUMBER. THERE IS NO CHANGE TO USE, EGRESS, OCCU$5,000
2022-03-15Permit Construction Fence — Signed-off
2022-03-14Job filed: MECHANICAL EQUIPMENT USE IN ASSOCIATION WITH FULL BUILDING DEMOLITION UNDER SEPARATE DOB JOB NUMBER. THERE IS NO CHANGE TO USE, EGRESS, OCCUPANCY, OR $5,000
2022-03-11Job filed: INSTALLATION OF CONSTRUCTION FENCE IN ASSOCIATION WITH FULL BUILDING DEMOLITION UNDER SEPARATE DOB JOB NUMBER. THERE IS NO CHANGE TO USE, EGRESS, OCCU$5,000
2022-03-02Job filed: WORK INCLUDES THE DEMOLITION OF THE EXISTING ONE-STORY MASONRY BUILDING USING MECHANICAL MEANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
2022-03-02Job filed: WORK INCLUDES THE DEMOLITION OF THE EXISTING ONE-STORY MASONRY BUILDING USING MECHANICAL MEANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
2022-03-02Job filed: WORK INCLUDES THE DEMOLITION OF THE EXISTING ONE-STORY MASONRY BUILDING USING MECHANICAL MEANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
2022-01-18Job filed: PROPOSED EA FILING IN CONJUNCTION WITH NB#321599150$5,000
2021
2021-07-02Job filed: SPRINKLER/STANDPIPE IN CONJUNCTION WITH NEW BUILDING JOB NO # 321599150$5,000
2021-03-31Agreement $118,764,750 — from ROCKREAL CORPORATION; BROOKDALE FAMILY CARE CENTERS, INC.; URBAN STRATEGIES/BROOKDALE FAMI to ATLANTIC AVENUE HEALTHCARE PROPERTY HOLD; DORMITORY AUTHORITY OF THE STATE O$118,764,750
2021-02-10Job filed: PROPOSED SUPPORT OF EXCAVATION IN CONJUNCTION TO NB# 321599150$5,000
2021-02-10Job filed: PROPOSED FO FILING IN CONJUNCTION WITH NB#321599150$5,000
2021-01-26Job filed: BUILDERS PAVEMENT PLAN (255.00 FEET STREET FRONTAGE) IN CONJUNCTION WITH NB#321599150
2021-01-26Job filed: BUILDERS PAVEMENT PLAN (255.00 FEET STREET FRONTAGE) IN CONJUNCTION WITH NB#321599150
2021-01-26Job filed: BUILDERS PAVEMENT PLAN (255.00 FEET STREET FRONTAGE) IN CONJUNCTION WITH NB#321599150
2021-01-25Job filed: STRUCTURAL APPLICATION IN CONJUNCTION WITH NB JOB NUMBER # 321599150$5,000
2021-01-25Job filed: Plumbing IN CONJUNCTION WITH NEW BUILDING JOB NO # 321599150$5,000
2021-01-22Job filed: MECHANICAL IN CONJUCTION WITH NEW BUILDING JOB NO # 321599150$5,000
2020
2020-12-07311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2020-12-02Job filed: NB
2020-12-02Job filed: NB
2020-09-18DTL — from THE BANK OF NEW YORK MELLON
2020-04-02311: Animal-Abuse — Tortured
2019
2019-12-15311: Root/Sewer/Sidewalk Condition — Trees and Sidewalks Program
2019-05-03311: Street Condition — Pothole
2019-05-02FDNY inspection (RISK)
2018
2018-08-23TLS — from CITY OF NEW YORK to BANK OF NEW YORK
2014-09-30Mortgage satisfied — from INTERFAITH MEDICAL CENTER to DORMITORY AUTHORITY OF THE STATE OF NEW
2014-09-19Deed — from INTERFAITH MEDICAL CENTER, INC. to ATLANTIC AVENUE HEALTHCARE PROPERTY HOLD
2014-09-19Deed — from INTERFAITH MEDICAL CENTER, INC. to ATLANTIC AVENUE HEALTHCARE PROPERTY HOLD
2014-09-19MLEA — from ATLANTIC AVENUE HEALTHCARE PROPERTY HOLD to INTERFAITH MEDICAL CENTER
2014-03-04311: Street Condition — Pothole
2007
2007-04-13SPRD $122,475,000 — from INTERFAITH MEDICAL CENTER to DORMITORY AUTHORITY OF THE STATE OF NEW $122,475,000
2002
2002-03-01Permit AL — ISSUED
2001
2001-10-12Job filed: HEREBY FILING FOR NEW 27 FT INCLUDING TW O 1'-6' SPLAYS) CURB CUT CURB CUT IS LOCATED 85 FT. WEST OF THE INTERS ECTION FORMED BY EAST NEW YORK AVENUE
2001-10-12Job filed: HEREBY FILING FOR NEW 27 FT INCLUDING TW O 1'-6" SPLAYS) CURB CUT CURB CUT IS LOCATED 85 FT. WEST OF THE INTERS ECTION FORMED BY EAST NEW YORK AVENUE
2001-05-07Job filed: HEREWITH FILING FOR THE INSTALLATION OF A NEW FIRE ALARM SYSTEM IN CONJU NCTION WITH NB#300807116.NO CHANGE IN US E,EGRESS OR OCCUPANCY.$15,000
2001-05-07Job filed: HEREWITH FILING FOR THE INSTALLATION OF A NEW FIRE ALARM SYSTEM IN CONJU NCTION WITH NB#300807116.NO CHANGE IN US E,EGRESS OR OCCUPANCY.$15,000
2001-03-23Permit EQ — ISSUED
2001-03-23Permit NB — ISSUED
2000
2000-03-16Permit PL — ISSUED
2000-03-16Permit PL — ISSUED
2000-02-15Permit EQ — ISSUED
2000-02-15Permit NB — ISSUED
2000-01-28Job filed: Herewith filing for temporary construction fence No change in use, egress or occupancy
2000-01-28Job filed: Herewith filing for temporary construction fence No change in use, egress or occupancy
2000-01-28Job filed: Herewith filing for temporary construction fence No change in use, egress or occupancy
1998
1998-05-05Mortgage $148,500,000 — from INTERFAITH MEDICAL CENTER to DORMITORY AUTHORITYOF THE STATE OF NEW Y$148,500,000
1996
1996-03-11Deed — from PITKIN ASSOCIATES; DUSHEY, JACK to INTERFAITH MEDICAL CTR
1987
1987-11-10Deed — from SMITH, GEORGE T to PITKIN ASSOCIATES
1982
1982-03-11Deed — from NEW YORK, CITY OF to SMITH, GEORGE T.
1975
1975-06-19Deed — from FINANCE ADMINISTRATORS OF THE CITY OF NE; FINANCEADMIN CITY OF NY; FINANCE ADMIN OF CITY O to THE CITY O FNEW YORK; CITY OF NEW YORK; THE CITY OF NE WYORK; CITY OF NEW YORK; THE CITY
1974
1974-02-01Deed — from ZWEIBEL JULIUS to SEAM RLTY CORP
1969
1969-12-24Deed — from CIRCLE CIRCUIT INC to ZWEIBEL JULIUS
1969-12-24Mortgage assigned — from WALSH JOHN J to BROCK HARRY
1969-12-24Mortgage assigned — from BROCK HARRY to ZWEIBEL JULIUS
1969-12-24Mortgage — from ZWEIBEL JULIUS to CIRCLE CIRCUIT INC