The city's published records show little recorded distress here in the last three years. Less recorded distress than 88% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty
points per 10 units; this building carries 0.9. In ZIP 10003, 67% of residential buildings hold an A and
4% grade D or F.
How grades work
this building
A
B
C
Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
6 service requests in the last three years. Most common: For Hire Vehicle Complaint (3) · Encampment (2) · Illegal Parking (1).
Filed construction activity
$4,491,600 in permitted construction work filed since
2016 (35 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1905)
Yes
Six or more residential units (11)
No
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
First Village Condominium
Head officer
CALEB CHAO
Managing agent
CORNERSTONE MGMT SYSTEMS INC.
Last registered
2025-09-29
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$475,599
$214,020
2026
$571,625
$257,231
2027
$549,171
$247,127
The city's market estimate has risen
15% between tax years 2025 and 2027.
Tax exemptions on the roll: NFP-CONTEMPLATED USE
For property tax, the Department of Finance values this condo
as if it were a rental building. Its 2023 estimate: gross income $1,288,679 a year
($45.40 per sq ft), operating expenses $438,264
($15.44 per sq ft), net operating income $850,415. These are the
city's estimates from comparable rentals, not the building's actual budget, rents or maintenance
charges.
Building systems
Heating fuel
NATURALGAS
Facade (Local Law 11)
SWARMP — "Safe With A Repair and Maintenance Program": known facade conditions that must be repaired (cycle 9)
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
2 street-flooding or sewer-backup complaints at this address since
2019 (0 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
3 Av — L · 650 ft straight-line (about a 3-minute walk) · station accessibility: none 14 St-Union Sq — 4 5 6 L N Q R W · 850 ft straight-line (about a 4-minute walk) · station accessibility: partial
Bus
Nearest boarding stop: 3 Av / E 11 St — M101 M102 M103 · 200 ft
Citi Bike
E 12 St & 3 Ave · 100 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)
Elementary: Elementary schools in this district are not zoned. Confirm with the DOE's school search.
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
6 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Mortgage $699,957 — from SCANLON, MICHAEL to JPMORGAN CHASE BANK, N.A.
$699,957
2026-06-09
Agreement $832,000 — from SCANLON, MICHAEL to JPMORGAN CHASE BANK, N.A.
$832,000
2025-06-03
Mortgage $985,000 — from SCANLON, MICHAEL to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; EAST COAST CAPITAL CORP
$985,000
2025-04-29
Mortgage $1,200,000 — from LEE, MICHELLE; LEE, EUGENE to MERS, INC.
$1,200,000
2025-04-29
Deed $2,175,000 — from SMITH, JEAN; NELSON, RODNIE ALLEN to LEE, EUGENE; LEE, MICHELLE
$2,175,000
2025-04-16
Sold for $2,175,000
$2,175,000
$197,727
2024-09-03
Deed $5,550,000 — from FRAWLEY, BRIAN T to WU, TIMOTHY; JUDGE, KATHRYN
$5,550,000
2024-09-03
Deed $5,550,000 — from FRAWLEY, BRIAN T to WU, TIMOTHY; JUDGE, KATHRYN
$5,550,000
2024-08-27
Sold for $5,550,000
$5,550,000
$504,545
2024-08-27
Sold for $5,550,000
$5,550,000
$504,545
2024-03-27
Deed $2,510,000 — from THE MICHAEL K. GANCAR TRUST DATED 10/05/; MICHAEL K. GANCAR, AS TRUSTEE to ERIC WORLEY, AS TRUSTEE; THE 2016 WORLEY FAMILY TRUST UTD 11/04/2; CARA WORLEY, AS TRUSTEE
$2,510,000
2024-03-20
Sold for $2,510,000
$2,510,000
$228,182
2023-06-21
Deed $2,300,000 — from FUCHS, MICHAEL to NELSON, PETER
$2,300,000
2023-06-21
Mortgage $1,840,000 — from NELSON, PETER to WELLS FARGO BANK, N.A.
$1,840,000
2023-06-14
Sold for $2,300,000
$2,300,000
$209,091
Ten-year activity
50250
2017
2018
2019
2020
2021
47
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
10
2
3
1
4
20
2018
2
1
3
12
3
21
2019
1
3
3
14
4
25
2020
6
0
1
0
4
11
2021
7
3
9
4
2
25
2022
17
6
8
12
4
47
2023
15
4
6
6
5
36
2024
1
0
3
9
3
16
2025
3
0
3
9
4
19
2026
11
4
2
4
3
24
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Job filed: Filing herewith to amend existing C of O to reflect religious establishment on 1st and cellar. Mechanical, structural, plumbing, and sprinkler work to
2026-09-01
Permit Sidewalk Shed — Permit Issued
2026-09-01
Permit Sidewalk Shed — Permit Issued
2026-08-13
Rodent inspection: Passed
2026-06-12
Permit Suspended Scaffold — Permit Issued
2026-06-11
Mortgage satisfied — from SCANLON, MICHAEL to JPMORGAN CHASE BANK; JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO
2026-06-11
Mortgage satisfied — from SCANLON, MICHAEL to JP MORGAN CHASE; MERRILL LYNCH CREDIT CORPORATION; JPMORGAN CHASE BANK, NATIONAL ASSOCIATI
2026-06-10
Permit Supported Scaffold — Permit Issued
2026-06-10
Permit Supported Scaffold — Permit Issued
2026-06-10
Permit Sidewalk Shed — Permit Issued
2026-06-10
Job filed: installation of pipe scaffolding. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
2026-06-10
Job filed: installation of sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
2026-06-09
Mortgage $699,957 — from SCANLON, MICHAEL to JPMORGAN CHASE BANK, N.A.
2026-06-09
Agreement $832,000 — from SCANLON, MICHAEL to JPMORGAN CHASE BANK, N.A.
2026-06-08
Boiler inspection
2026-06-03
Permit General Construction — Permit Issued
2026-06-03
Job filed: FACADE RESTORATION, INSPECTIONS
2026-05-17
311: Encampment — N/A
2026-04-09
FDNY inspection (CDA-90-DRILL)
2026-03-26
311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-03-25
FDNY inspection (ALT)
2026-03-24
FDNY inspection (AGED_OUT)
2026-03-11
FDNY inspection (RISK)
2026-02-19
Rodent inspection: Passed
2025-12-26
Deed — from SUI, ANNA to SUI-WONDERS, JEANNIE C
2025-12-23
Deed transfer (nominal price)
2025-12-23
Deed transfer (nominal price)
2025-12-04
Job filed: Scope of work includes mobilization, south and west facade repair, bricks replacement/crack repairs, remove and replace lintels & sills, recaulking, o
2025-12-03
Job filed: No Work
2025-12-02
Bedbug filing: 0 infested units
2025-12-02
Permit General Construction — Permit Issued
2025-11-26
311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-11-25
Boiler inspection
The full timeline
2026
2026-09-28Job filed: Filing herewith to amend existing C of O to reflect religious establishment on 1st and cellar. Mechanical, structural, plumbing, and sprinkler work to$629,640
2026-03-26311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-03-25FDNY inspection (ALT)
2026-03-24FDNY inspection (AGED_OUT)
2026-03-11FDNY inspection (RISK)
2026-02-19Rodent inspection: Passed
2025
2025-12-26Deed — from SUI, ANNA to SUI-WONDERS, JEANNIE C
2025-12-23Deed transfer (nominal price)
2025-12-23Deed transfer (nominal price)
2025-12-04Job filed: Scope of work includes mobilization, south and west facade repair, bricks replacement/crack repairs, remove and replace lintels & sills, recaulking, o$236,790
2025-12-03Job filed: No Work
2025-12-02Bedbug filing: 0 infested units
2025-12-02Permit General Construction — Permit Issued
2025-11-26311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-11-25Boiler inspection
2025-08-11Rodent inspection: Passed
2025-06-09Mortgage satisfied — from SCANLON, MICHAEL to UBS MORTGAGE LLC; WELLS FARGO BANK, N.A.
2025-06-09311: Encampment — N/A
2025-06-03Mortgage $985,000 — from SCANLON, MICHAEL to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; EAST COAST CAPITAL CORP$985,000
2025-04-29Mortgage $1,200,000 — from LEE, MICHELLE; LEE, EUGENE to MERS, INC.$1,200,000
2025-04-29PAT — from LEE, MICHELLE; LEE, EUGENE to FIRST VILLAGE CONDOMINIUM
2025-04-29Deed $2,175,000 — from SMITH, JEAN; NELSON, RODNIE ALLEN to LEE, EUGENE; LEE, MICHELLE$2,175,000
2025-04-16Sold for $2,175,000$2,175,000
2025-02-10Rodent inspection: Passed
2025-01-29Boiler inspection
2024
2024-12-23Job filed: Filing herewith to amend existing C of O to reflect religious establishment on 1st and cellar. Mechanical, structural, plumbing, and sprinkler work to$629,640
2024-12-17Boiler inspection — defects found
2024-12-03Bedbug filing: 0 infested units
2024-09-03Deed $5,550,000 — from FRAWLEY, BRIAN T to WU, TIMOTHY; JUDGE, KATHRYN$5,550,000
2024-09-03Deed $5,550,000 — from FRAWLEY, BRIAN T to WU, TIMOTHY; JUDGE, KATHRYN$5,550,000
2024-09-03PAT — from JUDGE, KATHRYN; WU, TIMOTHY to BOARD OF MANAGERS OF FIRST VILLAGE CONDO
2024-09-03PAT — from JUDGE, KATHRYN; WU, TIMOTHY to BOARD OF MANAGERS OF FIRST VILLAGE CONDO
2024-08-27Sold for $5,550,000$5,550,000
2024-08-27Sold for $5,550,000$5,550,000
2024-08-09Rodent inspection: Passed
2024-04-02Bedbug filing: 0 infested units
2024-04-01HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2024-03-27PAT — from CARA WORLEY, AS TRUSTEE; THE 2016 WORLEY FAMILY TRUST; ERIC WORLEY, AS TRUSTEE to BOARD OF MGRS OF THE FIRST VILLAGE CONDO
2024-03-27Deed $2,510,000 — from THE MICHAEL K. GANCAR TRUST DATED 10/05/; MICHAEL K. GANCAR, AS TRUSTEE to ERIC WORLEY, AS TRUSTEE; THE 2016 WORLEY FAMILY TRUST UTD 11/04/2; CARA WORLEY, AS TRUSTEE$2,510,000
2024-03-20Sold for $2,510,000$2,510,000
2024-02-12Rodent inspection: Passed
2023
2023-11-14311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-11-14311: Illegal Parking — Blocked Bike Lane
2023-10-26Permit Sprinklers — Signed-off
2023-10-26Permit Plumbing — Signed-off
2023-10-25Boiler inspection
2023-09-14Job filed: Install HVAC Units indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application.$150,000
2023-09-08Boiler inspection — defects found
2023-08-14Rodent inspection: Passed
2023-08-14DOB complaint, category ?
2023-08-10Permit PL — ISSUED
2023-08-03DOB complaint, category ?
2023-07-27311: Noise — Noise: Construction Equipment (NC1)
2023-07-25Mortgage satisfied — from FUCHS, MICHAEL to DEUTSCHE BANK TRUST COMPANY AMERICAS
2023-07-25Mortgage satisfied — from FUCHS, MICHAEL to DEUTSCHE BANK TRUST COMPANY AMERICAS
2023-07-25DOB complaint, category ?
2023-07-06Permit General Construction — Signed-off
2023-06-26Job filed: Structural work to provide framing and elevator pit for the proposed elevator from cellar to 1st floor.$25,000
2023-06-21PAT — from NELSON, PETER to THE BOARD OF MANAGERS OF THE CONDOMINIUM
2023-06-21Deed $2,300,000 — from FUCHS, MICHAEL to NELSON, PETER$2,300,000
2023-06-21Mortgage $1,840,000 — from NELSON, PETER to WELLS FARGO BANK, N.A.$1,840,000
2023-06-16Job filed: Remove stair and seal opening in ceiling installed under alt # 102862813. No change in use, occupancy or egress.$20,000
2023-06-14Sold for $2,300,000$2,300,000
2023-05-30Job filed: No Work
2023-05-22Job filed: Filing herewith to amend existing C of O to reflect religious establishment on 1st and cellar. Mechanical, structural, plumbing, and sprinkler work to$629,640
2023-05-19Facade (LL11) filing, cycle 9: SWARMP
2023-05-10Job filed: THIS APPLICATION IS BEING FILED FOR MECHANICAL WORK WORK ONLY TO INSTALL (1) ELECTRIC OUTDOOR CONDENSING UNIT & (1) INDOOR WALL MOUNTED AIR CONDITIONE$18,000
2023-04-19311: Noise — Noise: Construction Equipment (NC1)
2023-04-11Permit Sprinklers — Signed-off
2023-04-11Permit Plumbing — Signed-off
2023-03-29Permit General Construction — Permit Issued
2023-03-29Permit Structural — Signed-off
2023-03-29Permit Mechanical Systems — Signed-off
2023-03-16Bedbug filing: 0 infested units
2023-03-15HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2023-02-06Rodent inspection: Passed
2022
2022-12-09ECB CLASS - 2 violation: FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURT$1,250
2022-12-01311: Noise — Noise: Construction Equipment (NC1)
2022-12-01311: Noise — Noise: Construction Equipment (NC1)
2022-11-09Elevator permit: Installation of One (1) New MRL Lula Elevator as per code.$68,000
2022-11-02HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2022-10-17311: Plumbing — Gas Hook-Up/Piping - Illegal Or Defective
2022-10-17DOB complaint, category ?
2022-10-11Permit Sprinklers — Signed-off
2022-10-11Permit Plumbing — Signed-off
2022-10-05Permit Plumbing — Signed-off
2022-10-05Permit Sprinklers — Signed-off
2022-09-26311: Real Time Enforcement — Work Without A Permit - Occupied Multiple Dwelling
2022-09-26DOB complaint, category ?
2022-09-23311: Real Time Enforcement — Work Without A Permit - Occupied Multiple Dwelling
2022-09-23DOB complaint, category ?
2022-09-15Permit General Construction — Permit Issued
2022-09-13Permit Structural — Signed-off
2022-09-13Permit Mechanical Systems — Signed-off
2022-09-09Boiler inspection — defects found
2022-08-23Job filed: Structural work to provide framing and elevator pit for the proposed elevator from cellar to 1st floor.$25,000
2022-08-05Rodent inspection: Passed
2022-07-11Deed $4,725,000 — from FUCHS, MICHAEL to EFSTATHIOU, LEONIDAS JR.; WONG, YI CHEN$4,725,000
2022-07-11Mortgage $3,307,500 — from WONG, YI CHEN; EFSTATHIOU, LEONIDAS JR. to WELLS FARGO BANK NA$3,307,500
2022-07-11PREL — from DEUTSCHE BANK TRUST COMPANY AMERICAS to FUCHS, MICHAEL; FUCHS, MICHAEL J
2022-07-11PAT — from WONG, YI CHEN; EFSTATHIOU, LEONIDAS JR. to FIRST VILLAGE CONDOMINIUM
2022-06-28Sold for $4,725,000$4,725,000
2022-05-31DOB violation EGRADE: FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2022-05-23Job filed: Install HVAC Units indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application.$150,000
2022-05-09Job filed: No Work
2022-05-03Job filed: Structural work to provide framing and elevator pit for the proposed elevator from cellar to 1st floor.$25,000
2022-04-29Job filed: Relocate and install plumbing fixtures and sprinklers at Cellar and 1st floor indicated on drawings filed herewith. No change in Use Egress or occupa$64,700
2022-04-13Job filed: Relocate and install plumbing fixtures and sprinklers at Cellar and 1st floor indicated on drawings filed herewith. No change in Use Egress or occupa$64,700
2022-04-10Job filed: Replacement of existing Air-cooled Chiller for Air Conditioning System on Building Roof on existing dunnage.$33,000
2022-03-24Job filed: Structural work to provide framing and elevator pit for the proposed elevator from cellar to 1st floor.$25,000
2022-03-23Job filed: Install HVAC Units indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application.$150,000
2022-03-15Job filed: Filing herewith to amend existing C of O to reflect religious establishment on 1st and cellar. Mechanical, structural, plumbing, and sprinkler work to$629,640
2022-02-24Rodent inspection: Passed
2022-02-22DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
2022-02-16Bedbug filing: 0 infested units
2022-02-15HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2022-01-10PAT — from MANHATTAN CHRISTIAN GATHERING, INC. to BOARD OF MANAGERS
2022-01-10Deed $5,192,400 — from 130 EAST REALTY LLC to MANHATTAN CHRISTIAN GATHERING, INC.$5,192,400
2022-01-10Agreement $3,500,000 — from MANHATTAN CHRISTAIN GATHERING, INC. to FOUNDATION CAPITAL RESOURCES, INC.$3,500,000
2022-01-10AL&R $3,500,000 — from MANHATTAN CHRISTAIN GATHERING, INC. to FOUNDATION CAPITAL RESOURCES, INC.$3,500,000
2022-01-10TL&R — from SIGNATURE BANK to 130 EAST REALTY LLC
2022-01-10Mortgage assigned — from SIGNATURE BANK to FOUNDATION CAPITAL RESOURCES INC.
2022-01-10Mortgage $122,770 — from MANHATTAN CHRISTAIN GATHERING, INC. to FOUNDATION CAPITAL RESOURCES, INC.$122,770
2021
2021-11-30Sold for $5,192,400$5,192,400
2021-10-26311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-09-22Permit Sidewalk Shed — Signed-off
2021-09-15Permit Supported Scaffold — Signed-off
2021-09-11311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2021-09-11311: Illegal Parking — Blocked Bike Lane
2021-09-09311: Non-Emergency Police Matter — Other (complaint details)
2021-09-09311: Homeless Person Assistance
2021-08-16Rodent inspection: Passed
2021-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2021-08-02Permit Sidewalk Shed — Signed-off
2021-07-29Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF$1,000
2021-07-26Permit Supported Scaffold — Signed-off
2021-07-26Job filed: INSTALLATION OF TEMPORARY 104' HIGH PIPE SCAFFOLD AT VARIOUS LEVELS FOR FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAF$1,000
2021-06-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2021-05-20Agreement $3,700,000 — from 130 EAST REALTY LLC to SIGNATURE BANK$3,700,000
2021-05-20TOLCC — from 130 EAST 12TH STREET LLC to FIRST VILLAGE CONDOMINIUM
2021-05-20TOLCC — from 130 EAST 12TH STREET LLC to FIRST VILLAGE CONDOMINIUM
2021-05-01311: Illegal Parking — Blocked Bike Lane
2021-05-01311: Illegal Parking — Blocked Bike Lane
2021-04-01HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021-04-01HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2021-03-19Permit EW — ISSUED
2021-02-16Boiler inspection — defects found
2021-01-22FDNY inspection (STRUC_INT_6)
2020
2020-12-03Permit EW — ISSUED
2020-10-14Elevator permit: Modernize elevator, as per "Device Job Description". All work to comply with ASME A17.1-2000/03, Chapter 30 of 2014 BC, Appendix K$181,550
2020-06-24Permit EW — ISSUED
2020-05-12Elevator permit: Modernize elevator, as per "Device Job Description". All work to comply with ASME A17.1-2000/03, Chapter 30 of 2014 BC, Appendix K$181,550
2020-03-27Boiler inspection — defects found
2020-03-23Permit Sidewalk Shed — Signed-off
2020-03-18Permit Supported Scaffold — Signed-off
2020-03-18Job filed: INSTALLATION OF PIPE SCAFFOLD IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.$1,000
2020-03-18Job filed: INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.$1,000
2020-03-16311: Illegal Parking — Blocked Bike Lane
2020-02-11Rodent inspection: Failed for Other Reason
2019
2019-12-11RPTT&RET $1,150,000 — from JAC REALTY HOLDINGS LLC; EMP CAPITAL LLC to A&D FAMILY ASSOCIATES LLC$1,150,000
2019-12-09LOCC — from 130 EAST REALTY LLC to BOARD OF MANAGERS OF FIRST VILLAGE CONDO
2019-12-03Sold for $1,150,000$1,150,000
2019-11-13SAGE — from 130E12TH LLC to ZABARKES, ROCHELLE; WELLER, DAVID
2019-11-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2019-10-25HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2019-09-05Boiler inspection
2019-09-05Job filed: FACADE REPAIRS- WORK TO INCLUDE SELECTIVE BRICK REPLACEMENT, MASONRY REPOINTING, BUILDING CORNER REBUILD ,WINDOW REPLACEMENT AND STUCCO REMOVAL. NO CH$63,350
2019-08-06Rodent inspection: Passed
2019-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2019-08-01LOCC — from 130 EAST REALTY LLC to BOARD OF MANAGERS OF FIRST VILLAGE CONDO
2019-06-14Deed $2,200,000 — from HANSON, JOSEPH J to 130E12TH LLC$2,200,000
2019-06-14PAT — from 130E12TH LLC to THE FIRST VILLAGE CONDOMINIUM
2019-05-15Sold for $2,200,000$2,200,000
2019-05-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2019-03-14Rodent inspection: Passed
2019-03-08PAT — from FISHER, ANDREW J to STODDARD, BENJAMIN P
2019-03-08Deed $2,400,000 — from FISHER, ANDREW J to MICHAEL K. GANCAR, AS TRUSTEE; MICHAEL K. GANCAR TRUST DATED OCTOBER 5,$2,400,000
2019-03-08PAT — from MICHAEL K. GANCAR, AS TRUSTEE to FIRST VILLAGE CONDOMINIUM
2019-02-25Mortgage satisfied — from FISHER, ANDREW J to RIDGEWOOD SAVINGS BANK
2019-02-15Rodent inspection: Failed for Rat Activity
2019-02-13Mortgage satisfied — from FISHER, ANDREW J to JPMORGAN CHASE BANK NA
2019-01-29Sold for $2,400,000$2,400,000
2018
2018-10-02311: Noise — Noise: Alarms (NR3)
2018-09-16311: Noise — Noise: Alarms (NR3)
2018-09-07FDNY inspection (RISK)
2018-08-16Rodent inspection: Passed
2018-07-26311: New Tree Request — For One Address
2018-07-17ADEC — from FIRST VILLAGE CONDOMINIUM
2018-07-17ADEC — from FIRST VILLAGE CONDOMINIUM
2018-07-17ADEC — from FIRST VILLAGE CONDOMINIUM
2018-07-17ADEC — from FIRST VILLAGE CONDOMINIUM
2018-07-17ADEC — from FIRST VILLAGE CONDOMINIUM
2018-07-17ADEC — from FIRST VILLAGE CONDOMINIUM
2018-07-17ADEC — from FIRST VILLAGE CONDOMINIUM
2018-07-17ADEC — from FIRST VILLAGE CONDOMINIUM
2018-07-17ADEC — from FIRST VILLAGE CONDOMINIUM
2018-07-17ADEC — from FIRST VILLAGE CONDOMINIUM
2018-07-17ADEC — from FIRST VILLAGE CONDOMINIUM
2018-07-17ADEC — from FIRST VILLAGE CONDOMINIUM
2018-05-24Boiler inspection
2018-02-07Permit PL — ISSUED
2018-02-01Rodent inspection: Passed
2018-01-17Job filed: IN CONJUNCTION WITH GAS SHUTDOWN BY CON EDISON. EXISTING (8) GAS STOVES, EXISTING (10) BOILERS, AND (9) HOT WATER HEATERS TO BE TURNED ON AS PER PLANS$20,000
2017
2017-12-22Permit EW — ISSUED
2017-12-22Permit EW — ISSUED
2017-12-12311: HEAT/HOT WATER — ENTIRE BUILDING
2017-12-12Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2017-11-27Rodent inspection: Passed
2017-11-15Mortgage satisfied — from STEINBERG, STEVEN to JPMORGAN CHASE BANK, N.A.
2017-10-10Permit PL — ISSUED
2017-10-03Permit EW — ISSUED
2017-10-03Permit EW — ISSUED
2017-09-25311: Lead — Lead Kit Request (Residential) (L10)
2017-08-17Job filed: RENOVATION OF APARTMENT 5B ON THE 5TH FLOOR. ARCHITECTURAL AND PLUMBING WORK. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$328,000
2017-08-17Job filed: MECHANICAL WORK FILED IN CONJUNCTION WITH RENOVATION OF APARTMENT 5B ON THE 5TH FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$10,000
2017-08-09Boiler inspection
2017-08-09Boiler inspection
2017-08-04Job filed: A2$50,000
2017-08-04Job filed: FILING FOR FACADE REPAIRS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$50,000
2017-06-29DOB violation E:
2017-06-20Permit EW — ISSUED
2017-01-04Rodent inspection: Passed
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2016
2016-11-30Facade (LL11) filing, cycle 8: SWARMP
2016-09-21DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2016-09-15Permit EW — ISSUED
2016-08-25Permit PL — ISSUED
2016-08-23Permit EW — ISSUED
2016-08-23Permit EW — ISSUED
2016-08-23Job filed: INSTALLATION OF MANUAL & AUTOMATIC SMOKE SPRINKLER FIRE ALARM SYSTEM COMMERCIAL SPACE ON CELLAR AND FIRST FLOOR. FIRE ALARM WORK. NO CHANGE TO USE$27,000
2016-08-23Job filed: INSTALLATION OF MANUAL & AUTOMATIC SMOKE SPRINKLER FIRE ALARM SYSTEM COMMERCIAL SPACE ON CELLAR AND FIRST FLOOR. FIRE ALARM WORK. NO CHANGE TO USE$27,000
2016-07-05Job filed: STRUCTURAL WORK FILED IN CONJUNCTION WITH THE RENOVATION TO EXISTING COMMERCIAL SPACE ON CELLAR AND FIRST FLOOR. NO CHANGES TO USE, OCCUPANCY, OR EGRE$25,000
2016-07-05Job filed: RENOVATION TO EXISTING COMMERCIAL SPACE ON CELLAR AND FIRST FLOOR. ARCHITECTURAL WORK. NO CHANGES TO USE, OCCUPANCY, OR EGRESS.$200,000
2016-07-05Job filed: A2$95,000
2016-06-30ECB CLASS - 1 violation: FAILURE TO PROVIDE SAFETY MEASURES SUCH AS SIDEWALK SHED FENCE ETC TO PROTECT PUBLIC FROM UNSAFE CONDITIONS AS PER 1RCNY 103-04 &
2016-05-26Job filed: RENOVATE TWO BATHROOMS AND CREATE NEW POWDER ROOM IN APARTMENT #6B ON THE 6TH FLOOR. WORK INCLUDES NEW PARTITIONS, NEW PLUMBING FIXTURES, NEW DOORS A$61,000
2016-05-23Mortgage satisfied — from MARGOLIS, CORY to STATEN ISLAND SAVINGS BANK; CITIBANK, N.A.
2016-05-23Mortgage satisfied — from MARGOLIS, CORY to STATEN ISLAND SAVINGS BANK; CITIBANK, N.A.
2016-05-12Rodent inspection: Passed
2016-05-10DOB violation E:
2016-03-25Mortgage satisfied — from FRAWLEY, BRIAN T to CITIMORTGAGE, INC
2016-03-25Mortgage satisfied — from FRAWLEY, BRIAN T to CITIMORTGAGE, INC
2016-03-22Mortgage satisfied — from GRAMERCY GRACE ASSOCIATES to JPMORGAN CHASE BANK NA
2016-03-09PAT — from 130 EAST REALTY LLC to THE FIRST VILLAGE CONDOMINIUM
2016-03-09AL&R $3,700,000 — from 130 EAST REALTY LLC to SIGNATURE BANK$3,700,000
2016-03-09Mortgage $3,700,000 — from 130 EAST REALTY LLC to SIGNATURE BANK$3,700,000
2016-03-09Deed $5,000,000 — from GRAMERCY GRACE ASSOCIATES to 130 EAST REALTY LLC$5,000,000
2016-02-23Sold for $5,000,000$5,000,000
2015
2015-12-23Permit EW — ISSUED
2015-07-06Permit AL — ISSUED
2015-05-20Job filed: REMOVAL OF EXISTING TELECOMMUNICATIONS CABINETS, RELATED DUNNAGE, AND RELATED ANTENNAS ON ROOF. ALL WORK IN COMPLIANCE WITH TPPN 5/98. NO CHANGE TO $20,000
2015-04-21Rodent inspection: Passed
2015-03-27311: Street Condition — Pothole
2014
2014-05-29311: Graffiti — Graffiti
2014-03-21Rodent inspection: Passed
2014-03-17Permit EW — ISSUED
2014-03-07Permit EW — ISSUED
2014-03-03Job filed: INSTALLATION OF NEW HVAC UNITS AND DUCTWORK IN APT 2A AND ROOF. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$85,000
2014-02-13Job filed: LEGALIZE FUEL OIL TANK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2013
2013-12-16Permit EW — ISSUED
2013-11-12Permit PL — ISSUED
2013-09-26Permit EW — ISSUED
2013-09-25Job filed: REMOVAL OF NONLOAD BEARING PARTITIONS ,KITCHEN AND BATHROOM.THE INSTALLATION OF NEW NON LOAD BEARING PARTITIONS, THE RELOCATION OF KITCHEN AND ONE BAT$282,500
2013-09-25Job filed: REMOVAL OF NONLOAD BEARING PARTITIONS ,KITCHEN AND BATHROOM.THE INSTALLATION OF NEW NON LOAD BEARING PARTITIONS, THE RELOCATION OF KITCHEN AND ONE BAT$282,500
2013-09-17DOB violation E:
2013-08-06Mortgage satisfied — from AUSPITZ, JACK C; AUSPITZ, MARION A; AUSPITZ, FLORENCE JESSICA; AUSPITZ, F JESSICA to MERRILL LYNCH CREDIT CORPORATION; BANK OF AMERICA NATIONAL ASSOCIATION; PHH MORTGAGE CORP
2013-07-09RPTT $1,810,281 — from METROPCS COMMUNICATIONS, INC.; METROPCS COMMUNICATIONS, INC to T-MOBILE HOLDING GMBH; T-MOBILE HOLDING GMBH$1,810,281
2013-04-02Rodent inspection: Passed
2012
2012-11-07ECB CLASS - 2 violation: 16R09,45M13,68B07,100D06. 16R- TOP FLR LANDING DOES NOT PROVIDE ZERO CLEARANCE VESTIBULE- PROVIDE ZERO CLEARANCE AT THE TOP FLR L$250
2012-06-05Rodent inspection: Passed
2012-05-11Mortgage assigned — from CITIMORTGAGE, INC to CITIBANK, N.A.
2012-05-11Agreement $562,809 — from FRAWLEY, BRIAN T to CITIBANK, N.A.$562,809
2012-05-11SUBM — from CITIMORTGAGE, INC to CITIBANK, N.A.
2012-05-11Agreement $562,809 — from FRAWLEY, BRIAN T to CITIBANK, N.A.$562,809
2012-05-11SUBM — from CITIMORTGAGE, INC to CITIBANK, N.A.
2012-05-11Mortgage assigned — from CITIMORTGAGE, INC to CITIBANK, N.A.
2012-05-11PAT — from FRAWLEY, BRIAN T to HIRSCH, ALISON R
2012-05-11PAT — from FRAWLEY, BRIAN T to HIRSCH, ALISON R
2012-02-16Facade (LL11) filing, cycle 7: SAFE
2012-02-08DOB violation E:
2011
2011-12-05SUBM — from JPMORGAN CHASE BANK, N.A. to RIDGEWOOD SAVINGS BANK
2011-12-05Agreement $975,000 — from FISHER, ANDREW J to RIDGEWOOD SAVINGS BANK$975,000
2011-12-05Mortgage $18,757 — from FISHER, ANDREW J to RIDGEWOOD SAVINGS BANK$18,757
2011-12-05Mortgage assigned — from JPMORGAN CHASE BANK, N.A. to RIDGEWOOD SAVINGS BANK
2011-05-09Rodent inspection: Passed
2010
2010-10-12Permit AL — ISSUED
2010-07-28Job filed: INSTALL CABINET ON EXISTING ROOFTOP DUNNAGE IN CONFORMANCE WITH TPPN# 5/98. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$20,000
2010-07-28Job filed: INSTALL CABINET ON EXISTING ROOFTOP DUNNAGE IN CONFORMANCE WITH TPPN# 5/98. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$20,000
2010-04-08Rodent inspection: Passed
2010-04-08Permit EW — ISSUED
2010-03-18Permit EQ — ISSUED
2010-03-17Permit EQ — ISSUED
2010-03-17Job filed: ERECT PIPE SCAFFOLD AS PER PLAN AT 130 EAST 12 STREET. DURING REMEDIAL REPAIR, WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE,
2010-03-17Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED A TOTAL OF 168 L.F. AS PER PLAN AT 130 EAST 12 STREET. DURING REMEDIAL REPAIR, WORK SHALL COMPLY WITH 2008 BU
2010-02-22311: Graffiti — Graffiti
2010-01-20Mortgage satisfied — from AUSPITZ, MARION A; AUSPITZ, JACK C; FLORENCE JESSICA AUSPITZ to CITIMORTGAGE, INC.; APPLE BANK FOR SAVINGS; CITIBANK, N.A.; PHH MORTGAGE CORPORATION; MERR
2009
2009-10-23PAT — from FUCHS, MICHAEL to MEISEL, ELLIOTT; ALDRIDGE, CHRISTOPHER S
2009-10-23Agreement $5,525,000 — from FUCHS, MICHAEL J; FUCHS, MICHAEL to DEUTSCHE BANK TRUST COMPANY AMERICAS$5,525,000
2009-10-23Mortgage $525,000 — from FUCHS, MICHAEL J; FUCHS, MICHAEL to DEUTSCHE BANK TRUST COMPANY AMERICAS$525,000
2009-10-23Mortgage $525,000 — from FUCHS, MICHAEL J; FUCHS, MICHAEL to DEUTSCHE BANK TRUST COMPANY AMERICAS$525,000
2009-10-23Mortgage assigned — from CITIMORTGAGE, INC. to DEUTSCHE BANK TRUST COMPANY AMERICAS
2009-10-23PAT — from FUCHS, MICHAEL to MEISEL, ELLIOTT; ALDRIDGE, CHRISTOPHER S
2009-10-23Mortgage assigned — from CITIMORTGAGE, INC. to DEUTSCHE BANK TRUST COMPANY AMERICAS
2009-10-23Agreement $5,525,000 — from FUCHS, MICHAEL J; FUCHS, MICHAEL to DEUTSCHE BANK TRUST COMPANY AMERICAS$5,525,000
2009-06-01Job filed: REPAIRS AT EXTERIOR MASONRY WALLS AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$9,200
2009-05-06Permit PL — ISSUED
2009-01-16Permit AL — ISSUED
2008
2008-12-22Job filed: INSTALLING TELECOMMUNICATIONS CABINETS RELATED DUNNAGE AND RELATED ANTENNAS ON ROOF IN CONFORMANCE WTIH TPPN#5/98. CHANGE IN USE, EGRESS OR OCCUPANCY.$110,000
2008-12-22Job filed: INSTALLING TELECOMMUNICATIONS CABINETS RELATED DUNNAGE AND RELATED ANTENNAS ON ROOF IN CONFORMANCE WTIH TPPN#5/98. CHANGE IN USE, EGRESS OR OCCUPANCY.$110,000
2008-01-09Mortgage $100,000 — from SCANLON, MICHAEL to JP MORGAN CHASE BANK NA$100,000
2008-01-09Agreement $350,000 — from SCANLON, MICHAEL to JP MORGAN CHASE BANK NA$350,000
2007
2007-11-13DOB violation E:
2007-11-13DOB complaint, category ?
2007-09-24Permit EW — ISSUED
2007-09-24Permit EW — ISSUED
2007-08-30Job filed: Demolition of interior non-loadbearing partitions; construction of new partitions; replacement of gas Hot Water Heater; reconnection of HWH exhaust; n$15,000
2007-08-23Mortgage $201,000 — from GRAMERCY GRACE ASSOCIATES to JPMORGAN CHASE BANK, N. A.$201,000
2007-07-25Mortgage satisfied — from SUI, ANNA to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2007-06-27Mortgage satisfied — from BERGER, JUDITH M; BERGER, MARTIN S to ASTORIA FEDERAL SAVINGS AND LOAN ASSOCIA
2007-03-08CORRD — from BERGER, MARTIN S; BERGER, JUDITH M to TRUSTEES OF THE BERGER NEW YORK REAL EST; MARTIN S. BERGER; JUDITH M. BERGER
2007-03-08Deed $1,465,000 — from TRUSTEES OF THE BERGER NEW YORK REAL EST; JUDITH M. BERGER; MARTIN S. BERGER to FISHER, ANDREW J$1,465,000
2007-03-08Mortgage $1,025,500 — from FISHER, ANDREW J to JPMORGAN CHASE BANK, N.A.$1,025,500
2007-03-08Mortgage $293,000 — from FISHER, ANDREW J to JPMORGAN CHASE BANK, N.A.; C/O CHASE HOME FINANCE LLC$293,000
2007-03-08PAT — from FISHER, ANDREW J to THE CONDOMINIUM BOARD OF
2007-03-08DOB violation E:
2007-02-13Mortgage satisfied — from MANSON, CYNTHIA; MANSON, MARK to CITIBANK, N.A.
2007-01-31Facade (LL11) filing, cycle 6: SWARMP
2006
2006-10-18M&CON $250,000 — from SCANLON, MICHAEL; SCANLON, MICHAEL to JPMORGAN CHASE BANK, NA$250,000
2006-10-17Mortgage satisfied — from TAL, YUVAL; DEMNGE, ISABELLE to WASHINGTON MUTUAL BANK, FA
2006-09-18PAT — from HANSON, JOSEPH J to BD OF MGRS OF THE UNION TERRACE CONDOMIN
2006-09-18Deed $1,675,000 — from TAL, YUVAL; DEMENGE, ISABELLE to HANSON, JOSEPH J$1,675,000
2006-08-17Mortgage satisfied — from SCANLON, MICHAEL B; SCANLON, MARY RIFINO to CONNORS, KEVIN
2006-07-31CORRD — from RIFINO, MARY to SCANLON, MICHAEL
2006-07-06PAT — from FUCHS, MICHAEL J to MEISEL, ELLIOTT; ALDRIDGE, CHRISTOPHER S
2006-07-06Agreement $5,000,000 — from FUCHS, MICHAEL J to CITIMORTGAGE, INC.$5,000,000
2006-07-06Agreement $5,000,000 — from FUCHS, MICHAEL J to CITIMORTGAGE, INC.$5,000,000
2006-07-06Mortgage $1,500,024 — from FUCHS, MICHAEL J to CITIMORTGAGE, INC.$1,500,024
2006-07-06Mortgage assigned — from INDEPENDENCE COMMUNITY BANK to CITIMORTGAGE, INC.,
2006-07-06PAT — from FUCHS, MICHAEL J to MEISEL, ELLIOTT; ALDRIDGE, CHRISTOPHER S
2006-07-06Mortgage $1,500,024 — from FUCHS, MICHAEL J to CITIMORTGAGE, INC.$1,500,024
2006-06-08Mortgage satisfied — from FUCHS, MICHAEL to INDEPENDENCE COMMUNITY BANK
2006-02-13Mortgage assigned — from UBS MORTGAGE LLC to WELLS FARGO BANK, N.A.
2006-02-13Mortgage $980,000 — from SCANLON, MICHAEL to UBS MORTGAGE LLC$980,000
2005
2005-12-02Mortgage satisfied — from SCANLON, MICHAEL to JPMORGAN CHASE BANK, N.A.
2005-10-31Mortgage satisfied — from SCANLON, MICHAEL B to MERRILL LYNCH CREDIT CORPORATION
2005-10-21Permit EW — ISSUED
2005-09-22Job filed: REPLACEMENT AC CHILLER ON ROOF$30,000
2005-08-02Mortgage satisfied — from BENEDETTO, RENE; BENEDETTO, MICHAEL to EAB MORTGAGE COMPANY, INC
2005-07-18Mortgage $250,000 — from SCANLON, MICHAEL to JP MORGAN CHASE BANK, N.A.$250,000
2005-02-25DOB violation E:
2004
2004-11-01PAT — from BENEDETTO, RENE to KISHNER, ESQ., BRYAN W; GREENSPAN, ESQ., JUSTIN; WELLMAN, ESQ., AMI; ALMAZAN, ESQ., TRACY
2004-11-01PAT — from SUI, ANNA to SUI, ROBERT
2004-11-01Deed $1,400,000 — from BENEDETTO, MICHAEL; BENEDETTO, RENE to SUI, ANNA$1,400,000
2004-11-01PAT — from THE BOARD OF FIRST VILLAGE CONDOMINIUM to SUI, ANNA
2004-11-01Mortgage $910,000 — from SUI, ANNA to MERS$910,000
2004-11-01PAT — from BENEDETTO, MICHAEL to GREENSPAN, ESQ., JUSTIN; WELLMAN, ESQ., AMI; ALMAZAN, ESQ, TRACY; KISHNER, ESQ., BRYAN W
2004-08-25Deed $2,095,000 — from MARGOLIS, CORY$2,095,000
2004-08-25Agreement — from FRAWLEY, BRIAN T to CITIMORTGAGE INC
2004-08-25PAT — from FRAWLEY, BRIAN T to BOARD OF THE FIRST VILLAGE CONDOMINIUM
2004-08-25Deed $2,095,000 — from MARGOLIS, CORY$2,095,000
2004-08-25Mortgage assigned — from WASHINGTON MUTUAL BANK, F.A. to CITIMORTGAGE, INC.
2004-08-25PAT — from FRAWLEY, BRIAN T to BOARD OF THE FIRST VILLAGE CONDOMINIUM
2004-08-25Mortgage assigned — from WASHINGTON MUTUAL BANK, F.A. to CITIMORTGAGE, INC.
2004-08-25Agreement — from FRAWLEY, BRIAN T to CITIMORTGAGE INC
2004-08-25Mortgage $400,000 — from FRAWLEY, BRIAN T to CITIMORTGAGE, INC.$400,000
2004-08-25Mortgage $400,000 — from FRAWLEY, BRIAN T to CITIMORTGAGE, INC.$400,000
2004-05-18Mortgage satisfied — from SCANLON, MICHAEL to MERRILL LYNCH CREDIT CORPORATION
2004-03-03Agreement $470,000 — from JPMORGAN CHASE BANK to SCANLON, MICHAEL$470,000
2004-03-03Mortgage $125,000 — from SCANLON, MICHAEL to JPMORGAN CHASE BANK$125,000
2004-03-03Mortgage $183,282 — from SCANLON, MICHAEL to JPMORGAN CHASE BANK$183,282
2004-03-03Mortgage assigned — from CENDANT MORTGAGE CORPORATION ATTNY IN FA to JPMORGAN CHASE BANK
2004-02-10Mortgage satisfied — from FUCHS, MICHAEL to CITIBANK, N.A.
2004-02-03Agreement $900,000 — from TAL, YUVAL; DEMENGE, ISABELLE to NORTHFORK BANK$900,000
2004-02-03Mortgage $5,018 — from DEMENGE, ISABELLE; TAL, YUVAL to NORTHFORK BANK$5,018
2004-02-03Mortgage assigned — from WASHINGTON MUTUAL BANK, F.A. to NORTHFORK BANK
2003
2003-09-11Agreement $298,000 — from AUSPITZ, MARION A; AUSPITZ, JACK C; F. JESSICA AUSPITZ AKA FLORENCE JESSICA to MERRILL LYNCH CREDIT CORPORATION$298,000
2003-09-11Mortgage $235,000 — from F. JESSICA AUSPITZ AKA FLORENCE JESSICA ; AUSPITZ, MARION A; AUSPITZ, JACK C to MERRILL LYNCH CREDIT CORPORATION$235,000
2003-09-08Agreement $159,000 — from MARGOLIS, CORY to WASHINGTON MUTUAL BANK, FA$159,000
2003-09-08Mortgage $438,326 — from MARGOLIS, CORY to WASHINGTON MUTUAL BANK, FA$438,326
2003-07-28Mortgage $6,913 — from AUSPITZ, JACK C; AUSPITZ, FLORENCE JESSICA; AUSPITZ, AKA F. JESSICA; AUSPITZ, MARION A to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; MERRILL LYNCH CREDIT CORPORATION$6,913
2003-07-28Mortgage assigned — from APPLE BANK FOR SAVINGS to MERRILL LYNCH CREDIT CORPORATION
2003-07-28PAT — from AUSPITZ, AKA FLORENCE JESSICA; AUSPITZ, F. JESSICA to AUSPITZ, JACK C
2003-07-28PAT — from AUSPITZ, MARION A to AUSPITZ, JACK C
2003-05-08Mortgage satisfied — from MARGOLIS, CORY to SI BANK & TRUST F/K/A STATEN ISLAND SAVI
2003-05-08Mortgage satisfied — from MARGOLIS, CORY to SI BANK & TRUST F/K/A STATEN ISLAND SAVI
2002
2002-12-20Mortgage satisfied — from MARGOLIS, CORY to CENTERBANK MORTGAGECOMPANY
2002-11-29Agreement — from FUCHS, MICHAEL to INDEPENDENCE COMMUNITY BANK
2002-11-29PAT — from FUCHS, MICHAEL to ALDRIDGE, CHRISTIPHER S.; MEISEL, ELLIOTT
2002-11-29Mortgage assigned — from CITIMORTGAGE, INC. to INDEPENDENCE COMMUNITY BANK
2002-11-29Agreement — from FUCHS, MICHAEL to INDEPENDENCE COMMUNITY BANK
2002-11-29Mortgage assigned — from CITIMORTGAGE, INC. to INDEPENDENCE COMMUNITY BANK
2002-10-09Deed — from BERGER, JUDITH; BERGER, MARTIN to BERGER NEW YORK REALESTATE TRUST
2002-09-24PAT — from DEMENGE, ISABELLE; TAL, YUVAL to FIRST VILLAGE CONDOMINIUM
2002-09-24Mortgage $900,000 — from TAL, YUVAL; DEMENGE, ISABELLE to WASHINGTON MUTUAL BANK, FA$900,000
2002-09-24Deed — from BOULUKOS, NICHOLAS; PEZZIMENTI, MARY; BOULUKOS, MARY GAILP. to EMENGE, ISABELLE; TAL, YUVALD
2002-07-15Mortgage $3,500,000 — from FUCHS, MICHAEL to CITIBANK, NA$3,500,000
2002-07-15Mortgage $500,000 — from FUCHS, MICHAEL to CITIBANK, NA$500,000
2002-07-15PAT — from FUCHS, MICHAEL J. to MEISEL, ELLIOTT
2002-07-02Mortgage $9,749 — from BENEDETTO, RENE; BENEDETTO, MICHAEL to CITIBANK, NA$9,749
2002-07-02Agreement — from BENEDETTO, RENE; BENEDETTO, MICHAEL to CITIBANK, NA
2002-07-02Mortgage assigned — from CITIMORTGAGE, INC. to CITIBANK, NA
2002-02-11Agreement — from MARGOLIS, CORY to WASHINGTON MUTUAL BANK, FA
2002-02-11Agreement — from MARGOLIS, CORY to WASHINGTON MUTUAL BANK, FA
2001
2001-12-21Mortgage satisfied — from NELSON, JEAN SMITH; NELSON, RODNIE ALLEN to SECURITY PACIFIC MORTGAGE CORPORATION
2001-10-18PAT — from AUSPITZ, MARION A. to AUSPITZ, JACK C.
2001-10-18Mortgage $1,675 — from AUSPITZ, JACK C.; AUSPITZ, MARION A.; AUSPITZ, F. JESSICA$1,675
2001-10-18Agreement — from AUSPITZ, F. JESSICA; AUSPITZ, MARION A.; AUSPITZ, JACK C. to APPLE BANK FOR SAVINGS
2001-10-18Mortgage assigned — from CITIBANK, NA to APPLE BANK FOR SAVINGS
2001-10-18PAT — from AUSPITZ, F. JESSICA to AUSPITZ, JACK C.
2001-07-10Mortgage satisfied — from ALAM, AKBAR to CHEMICAL BANK
2001-01-26Permit EW — ISSUED
2001-01-22Mortgage $322,579 — from MARGOLIS, CORY to WASHINGTON MUTUAL BANK, FA$322,579
2001-01-22Mortgage assigned — from SI BANK & TRUST to WASHINGTON MUTUAL BANK, FA
2001-01-22Mortgage $322,579 — from MARGOLIS, CORY to WASHINGTON MUTUAL BANK, FA$322,579
2001-01-22Mortgage assigned — from SI BANK & TRUST to WASHINGTON MUTUAL BANK, FA
2000
2000-08-21Permit EW — ISSUED
2000-04-06Mortgage satisfied — from KRAMARSKY, STEPHEN MORTIMER to CHEMICAL BANK
2000-03-20Deed — from KRAMARSKY, STEPHEN MORTIMER to BENEDETTO, MICHAEL; BENEDETTO, RENE
2000-03-17Mortgage $690,000 — from BENEDETTO, RENE; BENEDETTO, MICHAEL to EAB MORTGAGE COMPANY, INC.$690,000
2000-03-17PAT — from BENEDETTO, MICHAEL; BENEDETTO, RENE to FIRST VILLAGE CONDOMINIUM
1999
1999-10-15Deed — from ALAM, AKBAR to FUCHS, MICHAEL
1999-10-15WSAT — from ALAM, AKBAR to CHEMICAL BANK
1999-10-15PAT — from FUCHS, MICHAEL to ALDRIGE, CHRISTOPHERS. ESQ.; MEISEL, ELLIOTT ESQ.
1999-10-15PAT — from FUCHS, MICHAEL to FIRST VILLAGE CONDOMINIUM
1999-07-13Deed — from SCANLON, MICHAEL B.; SCANLON, MICHAEL; RIFINO-SCANLON, MARY to SCANLON, MICHAEL
1999-04-29Permit EW — ISSUED
1999-04-05Permit EW — ISSUED
1999-04-05Permit EW — ISSUED
1999-03-11ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL. DEFECT IS: ON EAST FACADE,ABOVE 6TH FLOOR WINDOWS, BETWEEN 1ST & 2ND SET OF WINDOWS OF
1999-02-03Permit EQ — ISSUED
1998
1998-11-12ECB Hazardous violation: FAILURE TO FILE AN AMENDED ROUNG FOUR REPORT ACCEPTABLE TO THIS DEPARTMENT PIRSUANT TO RULE R.C.N.Y. 32-03B(5), INDICATING C$1,000
1998-10-28Mortgage $20,000 — from SCANLON, MICHAEL B. to MERRILL LYNCH CREDITCORPORATION$20,000
1998-09-28ECB Hazardous violation: FAILURE TO FILE AN AMENDED ROUND 4 REPORT ACCEPTABLE TO THIS DEPT PURSUANT TO RULE RCNY 32-03B(5), INDICATING CORRECTIO OF HAZ$400
1998-08-19Mortgage satisfied — from SCANLON, MICHAEL; SCANLON, MARY to GREATER NE WYORK SAVINGS BANK
1998-08-07Mortgage satisfied — from SCANLON, MICHAEL; SCANLON, MARY to ANCHOR SAVINGS BANK
1998-07-22Mortgage $167,000 — from SCANLON, MICHAEL to MERRILL LYNCH CREDITCORPORATION$167,000
1998-07-22Deed — from SCANLON, MICHAEL; RIFINO-SCANLON, MARY; SCANLON, MARY to SCANLON, MICHAEL
1998-07-22Mortgage $300,000 — from SCANLON, MICHAEL to MERRILL LYNCH CREDITCORPORATION$300,000
1998-07-13DOB violation LL10/80:
1998-05-21ECB Hazardous violation: FAILURE TO SUBMIT A 4TH ROUND TECHNICAL REPORT: PERIODIC INSPECTION OFEXTERIOR WALLS & APPURTENANCES AS REQUIRED BY LL 10 OF 1980 $400
1998-02-18Deed — from MANSON, MARK; MANSON, CYNTHIA to BOULUKOS, NICHOLAS; PEZZIMENTI, MARY
1998-02-18Mortgage $70,222 — from BOULUKOS, NICHOLAS; PEZZIMENTI, MARY to CITIBANK, NA$70,222
1998-02-18PAT — from PEZZIMENI, MARY G.; BOUTLUKOS, NICHOLASG. to FIRST VILLAGE CONDOMINIUM
1998-02-18Agreement — from PEZZIMENTI, MARY; BOULUKOS, NICHOLAS to CITIBANK, NA
1998-01-23Mortgage satisfied — from KREBS, HOPE; KINSER, KIM to CHEMICAL BANK
1998-01-21Permit PL — ISSUED
1997
1997-12-18Mortgage $3,090 — from AUSPITZ, MARION A.; AUSPITZ, JACK C.; AUSPITZ, FLORENCE JESSICA; AUSPITZ, F. JESSICA to CITIBANK, NA$3,090
1997-12-18Mortgage assigned — from CHASE MANHATTAN BANK to CITIBANK, NA
1997-12-18Agreement — from AUSPITZ, MARION A.; AUSPITZ, JACK C.; AUSPITZ, FLORENCE JESSICA; AUSPITZ, F. JESSICA to CITIBANK, NA
1997-12-18PAT — from AUSPITZ, MARION A. to AUSPITZ, JACK C.
1997-12-18PAT — from AUSPITZ, F. JESSICA; AUSPITZ, FLORENCE JESSICA to AUSPITZ, JACK C.
1997-12-02Permit AL — ISSUED
1997-08-06Mortgage $700,000 — from MARGOLIS, CORY to STATEN ISLAND SAVINGS BANK$700,000
1997-08-06PAT — from MARGOLIS, CORY to FIRST VILLAGE CONDOMINIUM
1997-08-06PAT — from KREBS, HOPE to KINSER, KIM
1997-08-06Mortgage $373,057 — from MARGOLIS, CORY to STATEN ISLAND SAVINGS BANK$373,057
1997-08-06Mortgage $373,057 — from MARGOLIS, CORY to STATEN ISLAND SAVINGS BANK$373,057
1997-08-06Deed — from KREBS, HOPE; KINSER, KIM to MARGOLIS, CORY
1997-08-06Mortgage $700,000 — from MARGOLIS, CORY to STATEN ISLAND SAVINGS BANK$700,000
1997-07-01DOB violation LL1080:
1997-03-21Mortgage assigned — from GRAMERCY-GRACE ASSOCIATES to CHASE MANHATTAN BANK
1997-03-21Agreement — from GRAMERCY-GRACE ASSOCIATES to CHASE MANHATTAN BANK
1997-03-21Agreement — from GRAMERCY-GRACE ASSOCIATES to STEINBERG, STEVEN
1997-03-21Mortgage satisfied — from STEINBERG, STEVEN to FIRST VILLAGE REALTYASSOCIATES
1997-03-21Mortgage $174,982 — from GRAMERCY-GRACE ASSOCIATES to CHASE MANHATTAN BANK$174,982
1996
1996-09-23Mortgage satisfied — from ESPTEIN, NMURRAY S.; ESPTEIN, AMY B. to HOME SAVINGS OF AMERICA
1996-08-29Mortgage satisfied — from MARGOLIS, CORY to DIME SAVINGS BANK OFNEW YORK
1996-07-31Deed — from EPSTEIN, AMY B.; EPSTEIN, MURRAY S. to BERGER, MARTIN S.; BERGER, JUDITH M.
1996-07-31PAT — from BERGER, MARTIN S. to BERGER, JUDITH M.
1996-07-31PAT — from BERGER, MARTIN; BERGER, JUDITH to FIRST VILLAGE CONDOMINIUM
1996-07-31Mortgage $372,000 — from BERGER, MARTIN S.; BERGER, JUDITH M. to ASTORIA FEDERAL SAVINGS AND LOAN ASSOCIA$372,000
1996-06-19Mortgage $330,000 — from MARGOLIS, CORY to STATEN ISLAND SAVINGS BANK$330,000
1994
1994-11-23Permit EW — ISSUED
1994-06-01PAT — from KROMARSKY, STEPHEN MORTIMER to FIRST VILLAGE CONDO
1994-06-01Mortgage $200,000 — from KRAMARSKY, SJTEPHENMORTIMER to CHEMICAL BANK$200,000
1994-06-01Mortgage assigned — from HOME SAVINGS OF AMERICA to BANKERS TRUST COMPANY
1993
1993-10-14ECB Non-Hazardous violation: 73T. PERFORM THE 5YR. TEST DATE AND TAG THE GOVERNOR AND FILE ELEV.3 FORM WITH THIS DEPT.
1993-09-27Permit PL — ISSUED
1993-09-15Permit EW — ISSUED
1993-09-14Mortgage assigned — from APPLE BANK FOR SAVINGS to BANK AMERICA NATL TRT CO
1993-09-14Mortgage satisfied — from BRESSMAN, CONSTANCEM.; BRESSMAN, BRIAN to CONTINENTAL BANK
1993-08-26Agreement — from MANSON, MARK; MANSON, CYNTHIA to CITIBANK, N.A.
1993-08-26Mortgage $6,177 — from MANSON, MARK; MANSON, CYNTHIA to CITIBANK, N.A.$6,177
1993-08-26Mortgage assigned — from SECURITY PACIFIC NATETC to CITIBANK, N.A.
1993-05-10PAT — from KRAMARSKY, STEVEN M. to FIRST VILLAGE CD BD/MNGR
1993-05-10Deed — from PINTCHIK, MICHAEL to KRAMARSKY, STEPHEN M.
1993-05-10PAT — from PINTCHIK, MICHAEL to STOLLOW, AURY BENNETT
1993-04-29SMIS — from PINTCHIK, MICHAEL to CHEMICAL BANK
1993-01-27Mortgage assigned — from APPLE BANK FOR SAVINGS to BANK AMERICA NATL ETC
1993-01-15Mortgage $292,500 — from KINSER, KIM; KREBS, HOPE to CHEMICAL BANK$292,500
1993-01-15PAT — from KREBS, HOPE; KINSER, KIM to FIRST VILLAGE CONDOB/MN
1993-01-15Deed — from BRESSMAN, CONSTANCEM.; BRESSMAN, BRIAN to KREBS, HOPE; KINSER, KIM
1993-01-15PAT — from BRESSMAN, BRIAN M. to BRESSMAN, CONSTANCE
1992
1992-12-09Mortgage assigned — from DIME SAVINGS BANK/NY to CENTERBANK MORTGAGECO
1992-09-29Mortgage assigned — from GREATER NEW YORK SVBK to EMC MORTGAGE CORP
1992-09-25Mortgage assigned — from EMC MORTGAGE CORP to PREMIUM FEDERAL SVGSBK
1992-07-23Permit AL — ISSUED
1992-06-18Mortgage $10,173 — from MARGOLIS, CORY to CENTERBANK MORTGAGECO$10,173
1992-05-29Mortgage assigned — from FIRST FED S&L ASSN ROCHE to CHEMICAL BANK
1992-05-29Agreement — from AUSPITZ, MARION A.; AUSPITZ, F. JESSICA; AUSPITZ, JACK C.; AUSPITZ, FLORENCE J.AKA to CHEMICAL BANK
1992-05-29PAT — from AUSPITZ, F. JESSICA; AUSPITZ, FLORENCE J.AKA to AUSPITZ, JACK C.
1992-05-29PAT — from AUSPITZ, MARION A. to AUSPITZ, JACK C.
1990
1990-05-02Mortgage $93,000 — from SCANLON, MARY; SCANLON, MICHAEL to ANCHOR SAVINGS BANKFSB$93,000
1990-04-26PAT — from CONNORS, KEVIN P to MARGOLIS, JEFFREY A.
1990-04-26Deed — from CONNORS, KEVIN to SCANLON, MARY RIFINO; SCANLON, MICHAEL
1990-04-26Mortgage $300,000 — from SCANLON, MARY RIFINO; SCANLON, MICHAEL B to CONNORS, KEVIN$300,000
1990-01-24Mortgage assigned — from CITICORP MTGE INC to BOSTON SAFE DEP & TRCO
1990-01-24Mortgage $9,748 — from FUCHS, MICHAEL to BOSTON SAFE DEP & TRCO$9,748
1990-01-24Agreement — from BOSTON SAFE DEP & TRCO to FUCHS, MICHAEL
1990-01-19Mortgage $250,450 — from SCANLON, MICHAEL; SCANLON, MARY to GREATER NEW YORK SAVG BK$250,450
1990-01-10Mortgage satisfied — from BRIZEL, MICHAEL ALAN; BRIZEL, AMY FREY to INDEPENDENCE SVGS BANK
1989
1989-11-16SMIS — from MARGOLIA, CORY to DIME SAVINGS BK
1989-11-15PAT — from AUSPITZ, JACK C.; AUSPITZ, MARION A.; AUSPITZ, F.JESSICA to FIRST VILLAGE CD B/MGRS
1989-11-15Mortgage $360,000 — from AUSPITZ, MARION A.; AUSPITZ, F. JESSICAAKA; AUSPITZ, JACK C.; AUSPITZ, FLORENCE JESSIE to FIRST FEDERAL SVGS ETAL$360,000
1989-11-15Deed — from BRIZEL, AMY FREY; BRIZEL, MICHAEL ALAN to AUSPITZ, MARION A; AUSPITZ, JACK C.; ASUPITZ,FLORENCE J.AKA; AUSPITZ, F. JESSICA
1989-11-15PAT — from AUSPITZ,FLORENCE JESSICA to GOLUB, KENNETH
1989-11-15PAT — from AUSPITZ, MARION A. to GOLUB, KENNETH
1989-11-15PAT — from AUSPITZ, JACK to GOLUB, KENNETH
1989-07-17Agreement — from BRESSMAN, BRAIN; BRESSMAN, CONSTANCEM to APPLE BANK FOR SAVINGS
1989-07-17Mortgage assigned — from CONTINENTAL BANK to APPLE BANK FOR SAVINGS
1989-07-17Mortgage $32,788 — from BRESSMAN, BRIAN; BRESSMAN, CONSTANCEM to APPLE BANK SAVINGS$32,788
1989-04-06Mortgage assigned — from CHEMICAL ACCEPT CORP to UNITED STATES TRS CON Y
1989-04-06Mortgage assigned — from CHEMICAL BANK to CHEMICAL ACCEPT CORP
1988
1988-12-02Mortgage satisfied — from MAYER, MICHAEL to DIME SVGS BANK N.Y.,FSB
1988-11-09SMIS — from ALAM, AKBAR to CHEMICAL BANK
1988-11-07SMIS — from MANSON, CYNTHIA; MANSON, MARK to CITIBANK, N.A.
1988-10-27PAT — from EPSTEIN, MURRAY S; EPSTEIN, AMY B to FIRST VILLAGE CD BD/MGRS
1988-10-27Mortgage $425,000 — from EPSTEIN, AMY B to HOME SVGS OF AMERICA$425,000
1988-10-27Deed — from MAYER, MICHAEL to EPSTEIN, MURRAY S; EPSTEIN, AMY B
1988-10-05Mortgage $300,000 — from MARGOLIS, CORY to DIME SVGS BK NY$300,000
1988-08-09Mortgage assigned — from CHEMICAL BANK to CHEMICAL ACCPTNCE CP
1988-08-09Mortgage assigned — from CHEMICAL ACCPTNCE CORP to U S TRUST COMPANY
1988-07-20Mortgage $340,000 — from ALAM, AKBAR to CHEMICAL BANK$340,000
1988-06-27PAT — from ALAM, AKBAR to FIRST VILL CD BD/MGRS
1988-06-27Deed — from FIRST VILLAGE RLTY ASC to ALAM, AKBAR
1988-06-27SAGE — from CHASE MANHATTAN BANKNA
1988-06-20Mortgage $1,100,000 — from FUCHS, MICHAEL to CITIBANK N A$1,100,000
1988-05-16Mortgage $272,000 — from PINTCHIK, MICHAEL to CHEMCIAL BANK$272,000
1988-04-12Mortgage $272,000 — from PINTCHIK, MICHAEL to CHEMICAL BANK$272,000