The city's published records show little recorded distress here in the last three years. Less recorded distress than 100% of 1-5-unit residential buildings citywide. The citywide median for 1-5-unit residential buildings is 0 penalty
points per 10 units; this building carries 0. In ZIP 11249, 60% of residential buildings hold an A and
7% grade D or F.
How grades work
this building
A
C
Among 699,345 1-5-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
1 service requests in the last three years. Most common: Illegal Parking (1).
Filed construction activity
$561,500 in permitted construction work filed since
2016 (10 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974 (2016)
No
Six or more residential units (3)
No
421-a / J-51 tax benefit on the current tax roll
0 of 3 signals present. None of the common signals are present — stabilization is unlikely (though never impossible). The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
76 N 6 CONDO ASSOCIATION
Head officer
NORAAN SADIK
Managing agent
BROWNSTONE MANAGEMENT LLC
Last registered
2025-07-09
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$0
$0
2026
$985,000
$443,251
2027
$0
$0
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 3 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Bedford Av — L · 0.2 mi straight-line (about a 5-minute walk) · station accessibility: full Lorimer St — G L · 0.6 mi straight-line (about a 16-minute walk) · station accessibility: full
Bus
Nearest boarding stop: Wythe Av / N 6 St — B32 · 100 ft
Citi Bike
N 5 St & Wythe Ave · 200 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
1 311 service request from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
2024-12-11Permit Mechanical Systems — Permit Issued
2024-12-11Permit Boiler Equipment — Signed-off
2024-12-09Job filed: INSTALL REPLACEMENT BOILER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$5,000
2024-12-09Job filed: INSTALL REPLACEMENT BOILER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$5,000
2024-12-09Job filed: CONNECT REPLACEMENT GAS-FIRED BOILERS AND GAS-FIRED HOT WATER HEATER TO EXISTING GAS PIPING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$5,000
2024-12-09Job filed: INSTALL REPLACEMENT FRESH AIR AND EXHAUST VENTING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$5,000
2022-12-07Job filed: INTERIOR RENO OF EXISTING USE GROUP 6 RETAIL STORE (M) INCLUDING THE INSTALLATION OF NEW MILLWORK, SHELVING, WALL AND CEILING FINISHES THROUGHOUT AS I$250,000
2022-10-13Job filed: INSTALLATION OF NEW ILLUMINATED NON-FLASHING NON-ADVERTISING BUSINESS ACCESSORY SIGN AS INDICATED ON THE DRAWINGS FILED HEREIN.$1,500
2022-08-18Permit General Construction — Signed-off
2022-07-13Job filed: INTERIOR RENO OF EXISTING USE GROUP 6 RETAIL STORE (M) INCLUDING THE INSTALLATION OF NEW MILLWORK, SHELVING, WALL AND CEILING FINISHES THROUGHOUT AS I$250,000
2022-06-07Certificate of occupancy Final
2022-06-07Certificate of occupancy Final
2021
2021-08-24Mortgage $1,980,000 — from HASKINS, STEPHEN CALEB; SADIK, NORAAN YOUSRI to WELLS FARGO BANK, N.A.$1,980,000
2021-08-24PAT — from HASKINS, STEPHEN CALEB to EBER, SAMUEL
2021-08-24PAT — from SADIK, NORAAN YOUSRI to EBER, SAMUEL
2021-08-24Deed $2,640,000 — from DANKYLE REALTY IV LLC to SADIK, NORAAN YOUSRI; HASKINS, STEPHEN CALEB$2,640,000
2021-08-24PAT — from SADIK, NORAAN YOUSRI; HASKINS, STEPHEN CALEB to BOARD OF MANAGERS OF THE 76 NORTH 6TH ST
2021-08-11Certificate of occupancy Renewal Without Change
2021-08-06Sold for $2,640,000$2,640,000
2021-08-03Mortgage satisfied — from DANKYLE REALTY IV LLC to ALPINE CAPITAL BANK
2021-08-03Deed $2,596,538 — from DANKYLE REALTY IV LLC to NISSAN, SIMON; EZRA, ALEXANDRA$2,596,538
2021-08-03PAT — from NISSAN, SIMON; EZRA, ALEXANDRA to BOARD OF MANAGERS OF 76 NORTH 6TH STREET
2021-08-03Mortgage satisfied — from DANKYLE REALTY IV LLC to ALPINE CAPITAL BANK
2021-08-03TL&R — from ALPINE CAPITAL BANK to DANKYLE REALTY IV LLC
2021-08-03Mortgage satisfied — from DANKYLE REALTY IV LLC to ALPINE CAPITAL BANK
2021-08-03TL&R — from ALPINE CAPITAL BANK to DANKYLE REALTY IV LLC
2021-08-03Mortgage satisfied — from DANKYLE REALTY IV LLC to ALPINE CAPITAL BANK
2021-08-03TL&R — from ALPINE CAPITAL BANK to DANKYLE REALTY IV LLC
2021-08-03TL&R — from ALPINE CAPITAL BANK to DANKYLE REALTY IV LLC
2021-07-28SUBM — from ALPINE CAPITAL BANK to DANKYLE REALTY IV LLC
2021-07-28SUBM — from ALPINE CAPITAL BANK to DANKYLE REALTY IV LLC
2021-07-28Deed $3,113,288 — from DANKYLE REALTY IV LLC to MARTINEY, MARIELLE; FOOTE, TYLER$3,113,288
2021-07-28Mortgage $2,440,000 — from MARTINEY, MARIELLE; FOOTE, TYLER to MERS$2,440,000
2021-07-28PAT — from FOOTE, TYLER; MARTINEY, MARIELLE to 76 NORTH 6TH STREET CONDOMINIUM BOARD OF
2021-07-28SUBM — from ALPINE CAPITAL BANK to DANKYLE REALTY IV LLC
2021-07-28SUBM — from ALPINE CAPITAL BANK to DANKYLE REALTY IV LLC
2021-07-27Sold for $2,596,538$2,596,538
2021-07-19Sold for $3,113,288$3,113,288
2021-06-17Certificate of occupancy Renewal With Change
2021-06-11CDEC — from DANKYLE REALTY IV LLC
2021-06-11MAPS — from 76 NORTH 6TH STREET CONDOMINIUM
2021-06-11MAPS — from 76 NORTH 6TH STREET CONDOMINIUM
2021-06-11MAPS — from 76 NORTH 6TH STREET CONDOMINIUM
2021-06-11CDEC — from DANKYLE REALTY IV LLC
2021-06-11MAPS — from 76 NORTH 6TH STREET CONDOMINIUM
2021-06-11CDEC — from DANKYLE REALTY IV LLC
2021-06-11CDEC — from DANKYLE REALTY IV LLC
2021-03-22Permit PL — ISSUED
2021-02-25FDNY inspection (STRUC_INT_6)
2021-01-21Job filed: THIS IS A NO WORK APPLICATION TO SUBDIVIDE TAX LOT 18 INTO FOUR (4) TAX LOTS, 1101-1104. NO WORK, AND NO CHANGE IN USE, ZONING OR EGRESS UNDER THIS AP
2021-01-21Job filed: THIS IS A NO WORK APPLICATION TO SUBDIVIDE TAX LOT 18 INTO FOUR (4) TAX LOTS, 1101-1104. NO WORK, AND NO CHANGE IN USE, ZONING OR EGRESS UNDER THIS AP
2021-01-21Job filed: THIS IS A NO WORK APPLICATION TO SUBDIVIDE TAX LOT 18 INTO FOUR (4) TAX LOTS, 1101-1104. NO WORK, AND NO CHANGE IN USE, ZONING OR EGRESS UNDER THIS AP
2019-06-13Job filed: INSTALLATION OF COMMERICAL BOILER AS PER PLANS. NO CHANGE OF USE, OCCUPANCY OR EGRESS.$30,000
2019-05-23FDNY inspection (CONSTR)
2019-05-07Job filed: CONDOMINIUM SUBDIVISION. CONDOMINIUM # 30.4671. ONE (1) RESIDENTIAL UNIT & ONE (1) COMMUNERCIAL UNIT - TAX LOTS 1101 AND 1102. NO WORK TO BE DONE
2019-05-07Job filed: CONDOMINIUM SUBDIVISION. CONDOMINIUM # 30.4671. ONE (1) RESIDENTIAL UNIT & ONE (1) COMMUNERCIAL UNIT - TAX LOTS 1101 AND 1102. NO WORK TO BE DONE
2019-04-18DOB complaint, category ?
2019-02-07DOB violation E:
2018
2018-12-03Permit EQ — ISSUED
2018-11-30FDNY inspection (CONSTR)
2018-09-21FDNY inspection (CONSTR)
2018-09-20FDNY inspection (CONSTR)
2018-08-09FDNY inspection (CONSTR)
2018-08-09FDNY inspection (CONSTR)
2018-08-07Permit PL — ISSUED
2018-07-10Elevator permit: Furnish and install OH traction elevator under ASME A1-2003 Modified by 2008 BC, Chapter 30 and appendix K. Inspections to be comp$200,000
2018-07-06FDNY inspection (CONSTR)
2018-07-03Permit NB — ISSUED
2018-06-09DOB complaint, category ?
2018-05-31Permit EQ — ISSUED
2018-05-30FDNY inspection (CONSTR)
2018-05-14DOB complaint, category ?
2018-04-27Job filed: INSTALLATION OF PIPE SCAFFOLD & NEEDLE BEAM AS PER PLANS. ALL WORK SHALL BE ACCORDING TO CHAPTER #33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, $5,000
2018-03-27FDNY inspection (CONSTR)
2018-03-26Permit Supported Scaffold — Signed-off
2018-02-26FDNY inspection (CONSTR)
2018-02-26Permit Supported Scaffold — Signed-off
2018-02-26Job filed: INSTALLATION OF PIPE SCAFFOLD & NEEDLE BEAM AS PER PLANS. ALL WORK SHALL BE ACCORDING TO CHAPTER #33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, $5,000
2018-02-06DOB complaint, category ?
2018-01-23FDNY inspection (CONSTR)
2017
2017-12-04Permit EQ — ISSUED
2017-11-30FDNY inspection (CONSTR)
2017-11-02DOB complaint, category ?
2017-10-25FDNY inspection (CONSTR)
2017-09-26FDNY inspection (CONSTR)
2017-08-30FDNY inspection (SPECIAL-OTH)
2017-08-28FDNY inspection (CONSTR)
2017-07-27FDNY inspection (CONSTR)
2017-07-11FDNY inspection (CONSTR)
2017-06-28Permit NB — ISSUED
2017-06-28Permit FO — ISSUED
2017-06-28Permit FO — ISSUED
2017-06-23Permit NB — RE-ISSUED
2017-06-23Permit NB — RE-ISSUED
2017-06-07Permit EQ — ISSUED
2017-06-01FDNY inspection (CONSTR)
2017-05-30Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO US
2017-05-30Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO US
2017-05-22ECB CLASS - 2 violation: FAILURE TO PROVIDE APPROVED CONSTRUCTIONDOCS AT JOBSITE.AT TIME OF INSPECTION NO PLANS ON SITE.REM:PROVIDE PLANS.$250
2017-05-20DOB complaint, category ?
2017-04-18FDNY inspection (CONSTR)
2017-04-18FDNY inspection (STRUC_INT)
2017-03-08DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2017-03-08DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2017-02-27Permit EQ — ISSUED
2017-02-14FDNY inspection (CONSTR)
2017-01-25Permit PL — ISSUED
2016
2016-12-28DOB complaint, category ?
2016-12-14FDNY inspection (CONSTR)
2016-12-13DOB complaint, category ?
2016-12-12DOB complaint, category ?
2016-12-12ECB CLASS - 1 violation: SEC: BC3309.16. MONITORING PLAN. NOTE: @ TIME OF INSP OF A 4 STORY BLDG @ FOUNDATION & PARTIAL EXCAVATED PHASE, CONSTRUCTION WORK
2016-12-12ECB CLASS - 1 violation: SEC: BC 3301.2. FAILURE TO MAINTAIN ADEQUATE MEANS OF EGRESS. NOTE: @ TIME OF INSP OF A 4 STORY BLDG @ FOUNDATION & EXCAVATED PHAS$1,600
2016-12-12ECB CLASS - 1 violation: CONSTRUCTION SUPERINTENDENT FAIL TO PERFORM DUTIES PER RULE. THE FOLLOWING HAZARDOUS CONDITIONS WERE OBSERVED & STOP WORK ORDER WA$1,600
2016-12-12ECB CLASS - 1 violation: PROTECTION OF SIDES OF EXCAVATION. NOTE: @ TIME OF INSP OF A 4 STORY BLDG @ FOUNDATION & PARTIAL EXCAVATED PHASE, CONSTRUCTION WOR$2,400
2016-12-12ECB CLASS - 1 violation: DESIGNATION OF CONSTRUCTION SUPERINTENDENT. NOTE: @ TIME OF INSP OF A 4 STORY MIXED USE BLDG (COMMERCIAL/RESIDENTIAL) @ FOUNDATION$1,600
2016-12-12ECB CLASS - 1 violation: LOGS. NOTE: @ TIME OF INSP OF A 4 STORY MIXED USE BLDG (COMMERCIAL/RESIDENTIAL) @ FOUNDATION & PARTIAL EXCAVATED PHASE. UPON REQUE$400
2016-11-04FDNY inspection (CONSTR)
2016-09-29FDNY inspection (CONSTR)
2016-07-13FDNY inspection (CONSTR)
2016-07-05Permit FO — ISSUED
2016-07-05Permit NB — ISSUED
2016-07-05Permit FO — ISSUED
2016-05-05DOB complaint, category ?
2016-05-04ECB CLASS - 2 violation: FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. AT TIME OF INSPECTION IT WAS OBSERVED THAT THERE
2016-04-26FDNY inspection (CONSTR)
2016-03-03Permit EQ — ISSUED
2016-02-08FDNY inspection (CONSTR)
2015
2015-12-01FDNY inspection (CONSTR)
2015-10-27FDNY inspection (CONSTR)
2015-09-25FDNY inspection (CONSTR)
2015-09-21Permit EW — ISSUED
2015-09-17Job filed: SHORING OF NEIGHBORING BUILDING. NO CHANGE OF USE, OCCUPANCY OR EGRESS.$60,000
2015-09-14Job filed: SHORING OF NEIGHBORING BUILDING. NO CHANGE OF USE, OCCUPANCY OR EGRESS.$60,000
2015-08-20FDNY inspection (OTHER)
2015-07-07Permit NB — ISSUED
2015-07-07Permit FO — ISSUED
2015-07-07Permit FO — ISSUED
2015-04-16Permit NB — ISSUED
2015-04-14Permit FO — ISSUED
2015-04-14Permit FO — ISSUED
2015-04-09Permit EQ — ISSUED
2015-01-30Job filed: SHORING OF NEIGHBORING BUILDING. NO CHANGE OF USE, OCCUPANCY OR EGRESS.$60,000
2015-01-30Job filed: UNDERPINNING OF NEIGHBORING BUILDING LOCATED AT 80 N.6TH STREET. NO CHANGE OF USE, OCCUPANCY OR EGRESS.$85,000
2015-01-30Job filed: UNDERPINNING OF NEIGHBORING BUILDING LOCATED AT 80 N.6TH STREET. NO CHANGE OF USE, OCCUPANCY OR EGRESS.$85,000
2015-01-25Job filed: SHORING OF NEIGHBORING BUILDING. NO CHANGE OF USE, OCCUPANCY OR EGRESS.$60,000
2015-01-14Job filed: UNDERPINNING OF NEIGHBORING BUILDING LOCATED AT 80 N.6TH STREET. NO CHANGE OF USE, OCCUPANCY OR EGRESS.$100,000
2015-01-14Job filed: UNDERPINNING OF NEIGHBORING BUILDING LOCATED AT 80 N.6TH STREET. NO CHANGE OF USE, OCCUPANCY OR EGRESS.$85,000
2014
2014-08-05Permit NB — ISSUED
2014-07-15Permit FO — ISSUED
2014-07-15Permit FO — ISSUED
2014-04-17Permit FO — ISSUED
2014-04-17Permit FO — ISSUED
2014-04-17Permit EQ — ISSUED
2014-02-18Permit EQ — ISSUED
2014-02-14Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2012
2012-03-27DOB complaint, category ?
2012-03-27Permit EQ — ISSUED
2012-03-27Permit DM — ISSUED
2012-01-25Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS AP
2012-01-25Job filed: INSTALLATION OF 35 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED DURING BUILDING DEMOLITION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY
2012-01-25Permit EQ — ISSUED
2012-01-25Permit EQ — ISSUED
2012-01-25Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS AP
2012-01-10Permit EQ — ISSUED
2012-01-10Permit DM — ISSUED
2012-01-09Job filed: NEW BUILDING
2011
2011-10-14Job filed: FULL DEMOLITON OF THREE STORY STRUCTURE, USING MECHANICAL MEANS.
2011-10-14Job filed: FULL DEMOLITON OF THREE STORY STRUCTURE, USING MECHANICAL MEANS.
2010-09-21Job filed: INSTALLATION OF AN AUTOMATIC SMOKE AND SPRINKLER FIRE ALARM SYSTEM INCONJUNCTION WITH NB FILING. ALL FEES PAID UNDER NB APPLICATION. NO CHANGE TO US$100