A modest record — below the level that usually signals systemic problems. More recorded distress than 82% of 1-5-unit residential buildings citywide. The citywide median for 1-5-unit residential buildings is 0 penalty
points per 10 units; this building carries 7.5. In ZIP 10013, 70% of residential buildings hold an A and
5% grade D or F.
How grades work
this building
A
C
Among 699,345 1-5-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
$2,400 in enforcement penalties imposed (ECB/OATH) in the last three years.
What 311 hears from this address
2 service requests in the last three years. Most common: Noise (1) · General Construction/Plumbing (1).
Filed construction activity
$367,500 in permitted construction work filed since
2016 (5 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1867)
No
Six or more residential units (4)
No
421-a / J-51 tax benefit on the current tax roll
1 of 3 signals present. Only a partial profile — stabilization is possible but less likely. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
112 FRANKLIN CONDOMINIUM
Head officer
DIVYA RASHAD
Managing agent
THE ANDREWS ORGANIZATION
Last registered
2025-09-12
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$1,961,277
$882,575
2026
$2,354,000
$1,059,300
2027
$0
$0
The city's market estimate has fallen
100% between tax years 2025 and 2027.
Building systems
Heating fuel
NATURALGAS
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 2 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Franklin St — 1 · 250 ft straight-line (about a 1-minute walk) · station accessibility: none Canal St — A C E · 450 ft straight-line (about a 2-minute walk) · station accessibility: none
Bus
Nearest boarding stop: 6 Av / White St — M55 · 300 ft
Citi Bike
Franklin St & W Broadway · 250 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
2 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Job filed: FRAMING FOR THE PERGOLA ON THE ROOF TERRACE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
2026-04-09
Permit Sidewalk Shed — Permit Issued
2026-04-06
Mortgage $100,000 — from 112 FRANKLIN CORP. to NATIONAL CONSUMER COOPERATIVE BANK
2026-04-06
Mortgage assigned — from NATIONAL CONSUMER COOPERATIVE BANK to NATIONAL COOPERATIVE BANK, N.A.
2026-04-06
AL&R $100,000 — from 112 FRANKLIN CORP. to NATIONAL CONSUMER COOPERATIVE BANK
2026-04-06
Mortgage satisfied — from 112 FRANKLIN CORP. to NATIONAL COOPERATIVE BANK, N.A.
2026-04-06
TL&R — from NATIONAL COOPERATIVE BANK, N.A.
2026-04-06
Mortgage satisfied — from 112 FRANKLIN CORP. to NATIONAL COOPERATIVE BANK, N.A.
2026-04-06
TL&R — from NATIONAL COOPERATIVE BANK, N.A.
2026-04-06
Mortgage satisfied — from 112 FRANKLIN CORP. to NATIONAL COOPERATIVE BANK, N.A
2026-04-06
TL&R — from 112 FRANKLIN CORP. to NATIONAL COOPERATIVE BANK, N.A
2026-04-06
AALR — from NATIONAL CONSUMER COOPERATIVE BANK to NATIONAL COOPERATIVE BANK, N.A.
2026-04-06
Mortgage $595,000 — from 112 FRANKLIN CORP. to NATIONAL CONSUMER COOPERATIVE BANK
2026-04-06
AL&R $595,000 — from 112 FRANKLIN CORP. to NATIONAL CONSUMER COOPERATIVE BANK
2026-04-06
Mortgage assigned — from NATIONAL CONSUMER COOPERATIVE BANK to NATIONAL COOPERATIVE BANK, N.A.
2026-04-06
AALR — from NATIONAL CONSUMER COOPERATIVE BANK to NATIONAL COOPERATIVE BANK, N.A.
2026-02-25
ECB CLASS - 2 violation: AT TIME OF INSPECTION (4:30 AM) I OBSERVED A SIDEWALK SHED ERECTED AT EXPOSURE# 1 WITHOUT THE REQUIRED LIGHTS ON AT THE UNDERSIDE
2026-02-09
Permit Sidewalk Shed — Permit Issued
2026-01-31
311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2026-01-31
DOB complaint, category ?
2026-01-05
Bedbug filing: 0 infested units
The full timeline
2026
2026-05-15Boiler inspection
2026-04-27Job filed: FRAMING FOR THE PERGOLA ON THE ROOF TERRACE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$50,000
2026-04-09Permit Sidewalk Shed — Permit Issued
2026-04-06Mortgage $100,000 — from 112 FRANKLIN CORP. to NATIONAL CONSUMER COOPERATIVE BANK$100,000
2026-04-06Mortgage assigned — from NATIONAL CONSUMER COOPERATIVE BANK to NATIONAL COOPERATIVE BANK, N.A.
2026-04-06AL&R $100,000 — from 112 FRANKLIN CORP. to NATIONAL CONSUMER COOPERATIVE BANK$100,000
2026-04-06Mortgage satisfied — from 112 FRANKLIN CORP. to NATIONAL COOPERATIVE BANK, N.A.
2026-04-06TL&R — from NATIONAL COOPERATIVE BANK, N.A.
2026-04-06Mortgage satisfied — from 112 FRANKLIN CORP. to NATIONAL COOPERATIVE BANK, N.A.
2026-04-06TL&R — from NATIONAL COOPERATIVE BANK, N.A.
2026-04-06Mortgage satisfied — from 112 FRANKLIN CORP. to NATIONAL COOPERATIVE BANK, N.A
2026-04-06TL&R — from 112 FRANKLIN CORP. to NATIONAL COOPERATIVE BANK, N.A
2026-04-06AALR — from NATIONAL CONSUMER COOPERATIVE BANK to NATIONAL COOPERATIVE BANK, N.A.
2026-04-06Mortgage $595,000 — from 112 FRANKLIN CORP. to NATIONAL CONSUMER COOPERATIVE BANK$595,000
2026-04-06AL&R $595,000 — from 112 FRANKLIN CORP. to NATIONAL CONSUMER COOPERATIVE BANK$595,000
2026-04-06Mortgage assigned — from NATIONAL CONSUMER COOPERATIVE BANK to NATIONAL COOPERATIVE BANK, N.A.
2026-04-06AALR — from NATIONAL CONSUMER COOPERATIVE BANK to NATIONAL COOPERATIVE BANK, N.A.
2026-02-25ECB CLASS - 2 violation: AT TIME OF INSPECTION (4:30 AM) I OBSERVED A SIDEWALK SHED ERECTED AT EXPOSURE# 1 WITHOUT THE REQUIRED LIGHTS ON AT THE UNDERSIDE $2,400
2026-02-09Permit Sidewalk Shed — Permit Issued
2026-01-31311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2026-01-31DOB complaint, category ?
2026-01-05Bedbug filing: 0 infested units
2025
2025-10-16DOB complaint, category ?
2025-10-08DOB complaint, category ?
2025-09-29Permit General Construction — Permit Issued
2025-09-02Job filed: REMOVAL OF RAISED SKYLIGHT, REPLACEMENT OF EXISTING ROOF TERRACE INCLUDING FENCES, PAVING AND PERGOLA AND ADDITION OF OUTDOOR KITCHEN. AS PER PLANS F$120,000
2025-01-21Permit General Construction — Permit Issued
2024
2024-12-31Job filed: Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, eg$2,500
2024-12-31Permit Sidewalk Shed — Permit Issued
2024-12-06Bedbug filing: 0 infested units
2024-11-18Asbestos abatement: Removal — Setanta Inc.
2024-11-18Asbestos abatement: Removal — Setanta Inc.
2024-07-29Job filed: Sidewalk and vault framing and bulkhead framing as per plans filed herewith. No change to use, egress or occupancy.$75,000
2024-06-05Job filed: REPAIR OF EXISTING CELLAR VAULT, INCLUDING REPLACEMENT OF CONCRETE SIDEWALK, REPLACEMENT OF ELEVATOR BULKHEAD AT ROOF LEVEL AS PER PLANS FILED HEREWIT$120,000
2021-04-19311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-04-19311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-03-18DOB violation E:
2021-01-06Bedbug filing: 0 infested units
2020
2020-12-15Elevator permit: Furnish and install modifications to the existing controller that will enable the controller to comply with the NYC Appendix K Sec$7,000
2020-10-15Boiler inspection — defects found
2020-08-12Permit EW — ISSUED
2020-07-15DOB violation E:
2020-07-14RPTT&RET $4,050,000 — from UCHITEL, DIEGO to LARSEN, THOMAS$4,050,000
2020-06-30Sold for $4,050,000$4,050,000
2020-02-20Bedbug filing: 0 infested units
2020-02-20Bedbug filing: 0 infested units
2019
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-08-26RPTT&RET $3,010,000 — from HARDWICK, GARY; HARDWICK, TANA to CORWIN, DANIEL G$3,010,000
2010-06-29RPTT&RET $1,900,000 — from RADJOJCIC MATIKIEWICZ, NATASHA; WEAVER, ALISON to BACK, TEKLA; MONTAGU, JONATHAN$1,900,000
2010-01-20Rodent inspection: Passed
2009
2009-09-22Permit PL — ISSUED
2009-05-28Permit EW — ISSUED
2009-05-27Permit EW — ISSUED
2009-05-27Permit EW — ISSUED
2009-01-26Permit EW — ISSUED
2008
2008-10-20DOB violation E:
2008-07-18Permit EW — ISSUED
2008-07-10Permit PL — ISSUED
2008-05-22Permit EW — ISSUED
2008-05-22Permit EW — ISSUED
2008-03-21DOB violation LL1081:
2008-03-19Job filed: INSTALLING PARTIAL FLOOR AND NEW CONVINIENCE STAIR FROM CELLAR TO 1ST FLOOR AS SHOWN ON PLANS. NO CHANGE OF USE,EGRESS OR OCCUPANCY.$10,000
2008-03-19Job filed: INSTALLING PARTIAL FLOOR AND NEW CONVINIENCE STAIR FROM CELLAR TO 1ST FLOOR AS SHOWN ON PLANS. NO CHANGE OF USE,EGRESS OR OCCUPANCY.$10,000
2008-03-19Job filed: INSTALLING MECHANICAL, PLUMBING SYSTEMS AND RELOCATING SPRINKER HEADS AS SHOWN ON PLANS. NO CHANGE OF USE,EGRESS OR OCCUPANCY.$105,000
2008-03-19Job filed: DEMOLITION AND INSTALLATON OF INTERIOR PARTITIONS AS SHOW ON PLANS. NO CANGE OF USE,EGRESS OR OPPPANCY.$50,000
2008-01-22DOB violation E:
2007
2007-07-09Permit PL — ISSUED
2007-07-09Permit EW — ISSUED
2007-07-09Permit EW — ISSUED
2007-07-09Permit EW — ISSUED
2007-05-22RPTT $2,212,500 — from SACKS, GLEN S to MATIKIEWICZ, NATASHA; WEAVER, ALISON M$2,212,500
2007-04-02DOB violation LL1081:
2007-02-20DOB violation E:
2007-02-20DOB violation E:
2007-01-19DOB violation LL6291:
2007-01-12ECB Hazardous violation: NOTE: THE PRIMARY EGRESS STAIRS LEADING FROM 1ST FL TO CELLAR IS LOCKED OCCUPANT ON 1ST FL CONDO/ CORP INSTALLED LOCKING DEVICES O$400
2007-01-02DOB complaint, category ?
2006
2006-12-21Job filed: Install new Structural Steel and Parapet wall as per plans filed herewith. No change to use, egress, or occupancy$20,000
2006-12-21Job filed: A2$20,000
2006-12-21Job filed: Install new Roof Top mounted HVAC units AS PER PLANS filed herewith. No change to use, egress or, occupancy.$40,000
2006-12-21Job filed: A2$20,000
2006-12-11Job filed: Renovate existing 5th floor and create new Roof Deck to be used in conjunction with Loft dwelling below as per plans filed herewith. No change to use,$40,000
2006-11-24DOB complaint, category ?
2006-11-09DOB complaint, category ?
2006-11-03DOB complaint, category ?
2006-11-03DOB complaint, category ?
2006-10-30DOB complaint, category ?
2006-10-30Permit PL — ISSUED
2006-10-30Permit EW — ISSUED
2006-10-26DOB complaint, category ?
2006-10-23Job filed: REPLACE GAS BOILER (NYC BOILER NO. 44699-01). NO CHANGE IN EGRESS, OCCUPANCY OR USE UNDER THIS APPLICATION.$14,000
2006-06-06ECB Hazardous violation: WORK W/O PERMIT.WORK NOTEF:AT 1ST FL PREMISES 1.RELOCATED (STAIR FROM MESANINE TO 1ST FL) FROM WEST WALL TO EAST WALL REMOVED STAI$800
2006-05-22DOB complaint, category ?
2006-01-06DOB violation LL6291:
2005
2005-11-22Permit EW — ISSUED
2005-08-18PAT — from GRIBBLE, GLENN E to THE BOARD OF MANAGERS OF THE 112 CONDOMI
2005-08-18Deed $2,300,000 — from SHEN, MICHAEL; SHEN, TAMMY to GRIBBLE, GLENN E$2,300,000
2005-08-18Mortgage $1,475,000 — from GRIBBLE, GLENN E to EMIGRANT MORTGAGE COMPANY, INC.$1,475,000
2005-08-18Mortgage assigned — from EMIGRANT MORTGAGE COMPANY, INC. to EMIGRANT SAVINGS BANK
2005-06-17Permit EW — ISSUED
2005-06-17Permit EW — ISSUED
2005-03-25Permit AL — RE-ISSUED
2005-03-23Job filed: INSTALL SPRINKLER SYSTEM AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$7,000
2005-03-21Permit PL — ISSUED
2005-03-08Job filed: Installation of three new lot line windows to an existing apartment. No change of use ,egress or occupancy under this application.$6,500
2005-01-31Permit EQ — ISSUED
2004
2004-10-29Permit AL — ISSUED
2004-10-25Permit EQ — ISSUED
2004-10-22Job filed: Install heavy duty sidewalk shed a total of 25 ft long at 112 Franklin Street - during remedial repairs. Work shall comply with LL33/91. No change in
2004-10-19Permit PL — ISSUED
2004-10-18Permit EW — ISSUED
2004-09-14Job filed: Install rooftop mounted HVAC units and new plumbing fixtures per plan.
2004-09-14Job filed: Renovate existing 5th floor and create new roof deck to be used in conjunction with loft dwelling below.$120,000
2004-09-14Job filed: Renovate existing 5th floor and create new roof deck to be used in conjunction with loft dwelling below.$120,000
2004-09-14Job filed: Install rooftop mounted HVAC units and new plumbing fixtures per plan.
2004-09-14Job filed: Install new structural steel and papapet wall per plan.
2004-08-17Job filed: Demolish non-bearing partitions and remove all plumbing fixtures on the 5th floor per plan. There will be no change in use, egress or occupancy under $23,000
2004-08-17Job filed: Demolish non-bearing partitions and remove all plumbing fixtures on the 5th floor per plan. There will be no change in use, egress or occupancy under $23,000
2004-03-23Mortgage assigned — from LONGA, LOUISE; MONGELLI, NORMA; LONGA, THOMAS to THE DIME SAVINGS BANK OF WILLIAMSBURGH
2004-03-23Mortgage $188,119 — from 112 FRANKLIN CORP. to THE DIME SAVINGS BANK OF WILLIAMSBURGH$188,119
2004-03-23Agreement $450,000 — from THE DIME SAVINGS BANK OF WILLIAMSBURGH to 112 FRANKLIN CORP.$450,000
2004-03-23Mortgage $100,000 — from 112 FRANKLIN CORP. to THE DIME SAVINGS BANK OF WILLIAMSBURGH$100,000
2002
2002-12-23ECB Non-Hazardous violation: 59M07. 59M07 - PROVIDE NYC DEVICE # TAGS ON CONTROL BOARD AND MACHINE - MAIN LINE.
2002-09-30DOB violation E: 1P7373
2002-08-27Mortgage satisfied — from CAUDWELL, CHRISTOPHER R. to FLEET NATIONAL BANK
2002-08-20DOB complaint, category ?
2002-07-11Permit PL — RE-ISSUED
2002-05-24Permit AL — ISSUED
2002-04-04EASE — from SHEN, MICHAEL; SHEN, TAMMY to 112 FRANKLIN CORP.
2002-04-04EASE — from SHEN, MICHAEL; SHEN, TAMMY to 112 FRANKLIN CORP.
2002-04-01ECB Non-Hazardous violation: 38/ 49A/ 49A REPLACE THE SAFTEY VALUE WITH A SIDE OPENING A SME APPROVED SAFTEY VALUE
2002-03-06Mortgage satisfied — from CAUDWELL, CHRISTOPHER R. to STAMFORD FEDERAL SAVINGS BANK
2002-02-07Deed — from CAUDWELL, CHRISTOPHER R. to SHEN, MICHAEL; SHEN, TAMMY
2002-02-07PAT — from SHEN, MICHAEL; SHEN, TAMMY to 112 CONDOMINIUM
2001
2001-06-05Permit PL — ISSUED
2000
2000-01-13Mortgage $249,000 — from CAUDWELL, CHRISTOPHER R. to FLEET BANK, NATIONALASSOCIATION$249,000
1999
1999-11-16Permit EW — ISSUED
1999-11-16Permit EW — ISSUED
1999-08-24Permit PL — ISSUED
1999-08-06Permit EW — ISSUED
1999-08-06Permit EW — ISSUED
1999-05-14Permit AL — ISSUED
1999-01-08DOB violation E: 1P7373
1998
1998-10-16Permit PL — ISSUED
1998-09-08Permit EW — ISSUED
1998-09-08Permit EW — ISSUED
1998-03-26DOB complaint, category ?
1998-02-19Deed — from MONGELLI, MICHELE ESTATE OF; LONGA, LOUISE ADELECO-EXECUTOR; LONGA, THOMAS CO-EXECUTOR; MO to 112 FRANKLIN CORP.
1998-02-19Deed — from MONGELLI, MICHELE ESTATE OF; LONGA, LOUISE ADELECO-EXECUTOR; LONGA, THOMAS CO-EXECUTOR; MO to 112 FRANKLIN CORP.
1998-01-23Deed — from FRANKLIN FURNACE ARCHIVE, INC. to CAUDWELL, CHRISTOPHER R.
1998-01-23Mortgage $325,000 — from CAUDWELL, CHRISTOPHER R. to STAMFORD FEDERAL SAVINGS BANK$325,000
1998-01-23PAT — from CAUDWELL, CHRISTOPHER to 112 CONDOMINIUM
1998-01-23REL — from MONGELLI, MICHELLE ESTATE OF; LONGA, LOUISE CO-EXECUTOR; LONGA, THOMAS CO-EXECUTOR; MONGEL to FRANKLIN FURNACE ARCHIVE, INC.
1991-01-28ECB Hazardous violation: FAILURE TO FILE A REPORT OF COMPLIANCE WITH LOCAL LAW 16/84 CERTIFYINGTO THE INSTALLATION OF REQUIRED FIRE PROTECTION SYSTEMS. RE
1990
1990-05-04DOB violation E:
1989
1989-09-27DOB violation E: (74)PATCH ALL HOLES IN HOISTWAY (75)REMOVE ALL INFLAMMABLE MATERIAL IN HALLWAY
1988
1988-10-17DOB violation E: (51) REMOVE LOCKS FROM HOISTWAY DOORS