Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

54 East 11 Street · Manhattan · BBL 1005620011 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

Where the penalty points come from

ComponentWhat it coversPoints
Housing codeHPD violations by class, complaints, emergency repairs, litigation, vacate orders, AEP0
Structural & safetyDOB violations, ECB/OATH violations by class0
PestsBedbug filings, failed rodent inspections, rodent 311s0
DisplacementMarshal evictions executed0
GRADE A

The city's published records show little recorded distress here in the last three years. Less recorded distress than 100% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty points per 10 units; this building carries 0. In ZIP 10003, 67% of residential buildings hold an A and 4% grade D or F. How grades work

this building
A
B
C

Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more

Open with the city right now

Open HPD violations1 total — 0 class C (immediately hazardous), 0 class B, 1 class A. Oldest open since 1982-10-13.

status snapshot refreshed weekly from HPD records

Patterns

No heat or hot-water complaints in the last three years.

No bedbug-infested units reported in the last three years of filings.

What 311 hears from this address

7 service requests in the last three years. Most common: Missed Collection (3) · Illegal Parking (2) · Street Condition (1) · Derelict Vehicles (1).

Filed construction activity

$4,311,160 in permitted construction work filed since 2016 (21 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

Rent-stabilization signals

YesBuilt before 1974 (1902)
YesSix or more residential units (10)
No421-a / J-51 tax benefit on the current tax roll

2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit: request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).

Registered with HPD — the names behind the building

Registered owner(s)ATHENIUM HOUSE CORP
Head officerDIVYA RASHAD
Managing agentTHE ANDREWS ORGANIZATION
Last registered2025-09-12

as filed by the owner in the building's HPD registration

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$6,555,000 $2,949,750
2026$6,850,000 $3,082,500
2027$6,608,000 $2,973,600

The city's market estimate has risen 1% between tax years 2025 and 2027.

For property tax, the Department of Finance values this co-op as if it were a rental building. Its 2022 estimate: gross income $1,123,332 a year ($45.15 per sq ft), operating expenses $341,105 ($13.71 per sq ft), net operating income $782,227. These are the city's estimates from comparable rentals, not the building's actual budget, rents or maintenance charges.

Building systems

Heating fuelNO2FUEL
Facade (Local Law 11)SAFE (cycle 9)

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Not in a hurricane evacuation zone.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

No street-flooding or sewer-backup complaints on record at this address.

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

Subway8 St-NYU — R W · 750 ft straight-line (about a 4-minute walk) · station accessibility: none
14 St-Union Sq — 4 5 6 L N Q R W · 850 ft straight-line (about a 4-minute walk) · station accessibility: partial
BusNearest boarding stop: E 9 St / Broadway — M8 · 500 ft
Citi BikeE 11 St & Broadway · 350 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: P.S. 041 Greenwich Village
Middle: M.S. 297. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

54 East 11 Street

Heat or hot waterHeat or hot water
Apartment maintenanceApartment maintenance
Bed bugsBed bugs
Residential pestsResidential pests
Rats or miceRats or mice
Anything elseAnything else

7 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

The landlord's report card

Managed by THE ANDREWS ORGANIZATION — 235 buildings, 3,789 units. Grades across the portfolio: A194 · B31 · C6 · D2. See the whole portfolio

BuildingBoroughUnitsGrade
60 Gramercy Park North MN149 B
321 East 54 Street MN102 A
421 East 13 Street MN96 A
130 Clinton Street BK89 A
25 Minetta Lane MN65 A
221 East 18 Street BK60 A
74 West 68 Street MN58 A
135 West 79 Street MN53 A
807 Riverside Drive MN53 B
345 West 88 Street MN52 A
125 West 21 Street MN52 A
43 East 10 Street MN51 A
33 Cooper Street MN42 A
157 Chambers Street MN38 A
482 Hudson Street MN36 A
179 Ludlow Street MN36 A
101 Thompson Street MN36 A
189 Avenue C MN35 A
447 West 45 Street MN34 A
7 Hubert Street MN34 A
56 East 87 Street MN33 A
79 Laight Street MN33 A
439 East 88 Street MN32 A
28 Laight Street MN31 A
19 West Houston Street MN31 A
320 West 96 Street MN31 D
372 15 Street BK30 A
433 West Street MN30 A
525 West 22 Street MN30 A
166 Duane Street MN30 A
285 Lafayette Street MN30 A
255 West 95 Street MN30 A
326 West 83 Street MN29 A
93 Greene Street MN29 A
65 Nassau Street MN28 A
124 Hudson Street MN27 A
75 Grand Street MN26 A
10 East 12 Street MN26 B
169 West 12 Street MN25 A
220 West 111 Street MN25 A
220 West Broadway MN24 A
38 Warren Street MN24 A
118 West 112 Street MN24 A
124 East 91 Street MN24 A
161 Hudson Street MN24 A
31 North Moore Street MN23 A
40 Prince Street MN23 A
394 Lincoln Place BK23 A
126 West 22 Street MN22 A
342 West 85 Street MN22 A
684 Broadway MN22 A
331 West 14 Street MN21 A
137 West 142 Street MN21 A
225 East 4 Street MN21 A
689 Vanderbilt Avenue BK21 A
40 West 17 Street MN21 A
124 West 24 Street MN20 A
250 Manhattan Avenue MN20 A
926 2 Avenue MN20 A
479 Greenwich Street MN19 A

showing 60 of 235 buildings

Sales, deeds & mortgages

Most recent mortgage recorded against this lot: $379,895 on 2021-11-15 (lender: Investors Bank). Face amount at recording — it may have since been paid down, refinanced or satisfied. View the recorded document.

DateRecordAmountPer res. unit
2023-05-10RPTT&RET $4,730,000 — from TAMARKIN, CARY to WICK, WALTER D; HEDLEY WICK, LISA A $4,730,000
2023-04-28Sold for $4,730,000 $4,730,000 $473,000
2021-11-15Agreement $2,000,000 — from ATHENIUM HOUSE CORP. to INVESTORS BANK $2,000,000
2021-11-15AL&R $2,000,000 — from ATHENIUM HOUSE CORP. to INVESTORS BANK $2,000,000
2021-11-15Mortgage $379,896 — from ATHENIUM HOUSE CORP. to INVESTORS BANK $379,896
2021-10-08RPTT&RET $4,999,899 — from ODEGAARD, SIRI S; SIMONS, AARON W to SUBRAMANIAN, SAVITA; SPEHAR, EDWARD $4,999,899
2021-09-23Sold for $4,999,899 $4,999,899 $499,990
2017-10-05RPTT&RET $3,980,000 — from ARNDT, PATRICIA J; ARNDT, CHRISTOPHER F to MIRCHANDANI, DOLLY; ULICH, OLIVER $3,980,000
2017-09-06Sold for $3,980,000 $3,980,000 $398,000
2017-08-18AL&R $250,000 — from ATHENIUM HOUSE CORP. to NATIONAL CONSUMER COOPERATIVE BANK $250,000
2017-08-18Mortgage $250,000 — from ATHENIUM HOUSE CORP. to NATIONAL CONSUMER COOPERATIVE BANK $250,000
2017-08-18AL&R $850,000 — from ATHENIUM HOUSE CORP. to NATIONAL CONSUMER COOPERATIVE BANK $850,000
2017-08-18Mortgage $850,000 — from ATHENIUM HOUSE CORP. to NATIONAL CONSUMER COOPERATIVE BANK $850,000
2016-03-25RPTT&RET $3,500,000 — from NOTE, MARIE VAN to KULINA, FRANCES TYLER; KULINA, CHRISTOPHER E $3,500,000
2016-01-28Sold for $3,500,000 $3,500,000 $350,000

Ten-year activity

50250
42
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
20171501412142
201816160326
20197050214
2020002024
202101815226
2022201025
20235042314
2024007029
2025013037
2026000000
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 4 records

DateRecord
2025-12-30Rodent inspection: Passed
2025-12-09Bedbug filing: 0 infested units
2025-12-02311: Missed Collection — Compost
2025-12-02311: Missed Collection — Compost

The full timeline

2025
2025-12-30Rodent inspection: Passed
2025-12-09Bedbug filing: 0 infested units
2025-12-02311: Missed Collection — Compost
2025-12-02311: Missed Collection — Compost
2025-09-29Boiler inspection
2025-09-03FDNY inspection (RISK)
2025-06-27Air permit (REGISTRATION), fuel: NO2FUEL
2024
2024-12-26Bedbug filing: 0 infested units
2024-12-04311: Illegal Parking — Paper License Plates
2024-11-14311: Derelict Vehicles — Derelict Vehicles
2024-11-09311: Missed Collection — Trash
2024-11-07311: Illegal Parking — License Plate Obscured
2024-09-03Rodent inspection: Passed
2024-08-16Boiler inspection
2024-05-21311: Street Condition — Cave-in
2024-01-16Bedbug filing: 0 infested units
2023
2023-10-30Facade (LL11) filing, cycle 9: SAFE
2023-08-09Permit General Construction — Signed-off
2023-08-08311: Missed Collection — Recycling - Paper
2023-07-13Permit Sidewalk Shed — Signed-off
2023-07-13Permit Supported Scaffold — Signed-off
2023-07-12Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
2023-07-11311: Missed Collection — Recycling - Metal/Glass/Rigid Plastic
2023-06-20Rodent inspection: Passed
2023-05-20311: Missed Collection — Recycling - Metal/Glass/Rigid Plastic
2023-05-10RPTT&RET $4,730,000 — from TAMARKIN, CARY to WICK, WALTER D; HEDLEY WICK, LISA A$4,730,000
2023-04-28Sold for $4,730,000$4,730,000
2023-04-26Job filed: MISCELLANEOUS STONE, BRICK , AND STUCCO REPAIRS. RAILING MODIFICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$43,400
2023-04-25Boiler inspection
2023-01-10Bedbug filing: 0 infested units
2022
2022-11-03311: Missed Collection — Trash
2022-07-06Boiler inspection
2022-05-17Permit Structural — Signed-off
2022-03-25Rodent inspection: Passed
2022-01-14Job filed: Filing for Partial Sidewalk Vault Replacement; no change to use, egress or occupancy.$100,000
2021
2021-12-28311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-12-22Bedbug filing: 0 infested units
2021-11-16Mortgage satisfied — from ATHENIUM HOUSE CORP. to APPLE BANK FOR SAVINGS
2021-11-16TL&R — from NATIONAL COOPERATIVE BANK, N.A. to NATIONAL CONSUMER COOPERATIVE BANK; ATHENIUM HOUSE CORP.
2021-11-16Mortgage satisfied — from ATHENIUM HOUSE CORP. to NATIONAL COOPERATIVE BANK, N.A.
2021-11-16TL&R — from APPLE BANK FOR SAVINGS to ATHENIUM HOUSE CORP.; NATIONAL CONSUMER COOPERATIVE BANK
2021-11-16TL&R — from FANNIE MAE to ATHENIUM HOUSE CORP; NATIONAL CONSUMER COOPERATIVE BANK
2021-11-16TL&R — from NATIONAL COOPERATIVE BANK, N.A. to ATHENIUM HOUSE CORP.
2021-11-15Agreement $2,000,000 — from ATHENIUM HOUSE CORP. to INVESTORS BANK$2,000,000
2021-11-15Mortgage assigned — from FANNIE MAE to INVESTORS BANK
2021-11-15Mortgage assigned — from NATIONAL COOPERATIVE BANK, N.A. to INVESTORS BANK
2021-11-15AL&R $2,000,000 — from ATHENIUM HOUSE CORP. to INVESTORS BANK$2,000,000
2021-11-15Mortgage $379,896 — from ATHENIUM HOUSE CORP. to INVESTORS BANK$379,896
2021-10-25311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-10-21Boiler inspection
2021-10-08RPTT&RET $4,999,899 — from ODEGAARD, SIRI S; SIMONS, AARON W to SUBRAMANIAN, SAVITA; SPEHAR, EDWARD$4,999,899
2021-09-30311: Green Taxi Report — Driver Report - Non Passenger
2021-09-23Sold for $4,999,899$4,999,899
2021-08-31311: Missed Collection (All Materials) — 1 Missed Collection
2021-07-31311: Missed Collection (All Materials) — 1 Missed Collection
2021-07-14311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-05-06DOB violation E:
2021-04-14Elevator permit: Provide New Door Lock Monitoring System per Section 3.10.12 of Chapter K3 of Appendix K of the New York City Building Code. All wo$6,250
2021-02-22RPTT&RET — from ULICH, OLIVER; MIRCHANDANI, DOLLY to MIRCHANDANI, DOLLY
2021-02-05Deed transfer (nominal price)
2021-01-05Bedbug filing: 0 infested units
2020
2020-12-18Boiler inspection
2020-09-22311: Missed Collection (All Materials) — 1RB Missed Recycling - M/G/Pl
2020-05-20Boiler inspection — defects found
2020-01-30Bedbug filing: 0 infested units
2019
2019-12-23Permit Mechanical Systems — Signed-off
2019-10-31Permit Mechanical Systems — Signed-off
2019-10-21311: Noise — Noise: Construction Before/After Hours (NM1)
2019-10-07Boiler inspection
2019-10-02311: Noise - Vehicle — Car/Truck Music
2019-10-02311: Noise - Vehicle — Car/Truck Horn
2019-08-13Permit EW — ISSUED
2019-08-12Job filed: INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$48,000
2019-08-12Job filed: INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$48,000
2019-07-24Permit Mechanical Systems — Signed-off
2019-07-24Job filed: INSTALL NEW CHIMNEY LINER ON FLOORS 010 THROUGH ROOF TO SERVE ADJACENT BUILDING, 56 EAST 11TH STREET. FILED IN CONJUNCTION WITH DOB JOB No. 140850201.$25,500
2019-06-24311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-03-07Rodent inspection: Passed
2019-01-17Bedbug filing: 0 infested units
2018
2018-11-05Permit EW — ISSUED
2018-08-29Facade (LL11) filing, cycle 8: SAFE
2018-06-11Rodent inspection: Passed
2018-05-24Permit PL — ISSUED
2018-05-23Boiler inspection
2018-05-07Permit EW — ISSUED
2018-04-18Permit EW — ISSUED
2018-04-18Permit EW — ISSUED
2018-04-18Permit PL — ISSUED
2018-04-06FDNY inspection (STRUC_INT_3)
2018-04-03Permit Sidewalk Shed — Permit Issued
2018-03-28311: Homeless Encampment — N/A
2018-03-14Permit EW — ISSUED
2018-03-12Permit EW — ISSUED
2018-03-12Permit EW — ISSUED
2018-03-09Permit EW — ISSUED
2018-03-07Job filed: MINOR ALTERATIONS TO 8TH FLOOR APARTMENT AS PER PLANS SUBMITTED HEREWITH. ARCHITECTURAL, PLUMBING, ELECTRICAL, MECHANICAL, AND SPRINKLER WORK ONLY. NO$377,320
2018-03-01Job filed: MINOR ALTERATIONS TO 8TH FLOOR APARTMENT AS PER PLANS SUBMITTED HEREWITH. ARCHITECTURAL, PLUMBING, ELECTRICAL, MECHANICAL, AND SPRINKLER WORK ONLY. NO$377,320
2018-03-01Job filed: MINOR ALTERATIONS TO 8TH FLOOR APARTMENT AS PER PLANS SUBMITTED HEREWITH. ARCHITECTURAL, PLUMBING, ELECTRICAL, MECHANICAL, AND SPRINKLER WORK ONLY. NO$377,320
2018-02-08Job filed: MODIFICATIONS AND ADDITIONS TO AN EXISTING APPROVED FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY UND$6,000
2018-02-08Job filed: MODIFICATIONS AND ADDITIONS TO AN EXISTING APPROVED FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY UND$6,000
2018-01-28311: Homeless Encampment — N/A
2018-01-23311: Homeless Person Assistance — N/A
2018-01-22311: Homeless Encampment — N/A
2018-01-18311: Request Xmas Tree Collection — C1 Request Xmas Trees Collection
2018-01-17311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2017
2017-12-28Permit EQ — ISSUED
2017-12-19311: Homeless Encampment — N/A
2017-12-06311: Homeless Encampment — N/A
2017-12-06311: Homeless Encampment — N/A
2017-12-05311: Homeless Encampment — N/A
2017-12-05Permit Sidewalk Shed — Permit Issued
2017-12-03311: Homeless Encampment — N/A
2017-12-03311: Homeless Person Assistance — N/A
2017-12-03311: Homeless Encampment — N/A
2017-12-01Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2017-11-26311: Homeless Encampment — N/A
2017-11-24311: Homeless Encampment — N/A
2017-11-24311: Homeless Encampment — N/A
2017-11-21311: Homeless Encampment — N/A
2017-11-18311: Homeless Encampment — N/A
2017-10-05RPTT&RET $3,980,000 — from ARNDT, PATRICIA J; ARNDT, CHRISTOPHER F to MIRCHANDANI, DOLLY; ULICH, OLIVER$3,980,000
2017-10-03Permit EW — ISSUED
2017-10-03Permit EW — ISSUED
2017-09-29SUBM — from FANNIE MAE to NATIONAL COOPERATIVE BANK, N.A.; ATHENIUM HOUSE CORP.
2017-09-29SUBM — from FANNIE MAE to ATHENIUM HOUSE CORP.; NATIONAL COOPERATIVE BANK, N.A.
2017-09-13Permit EW — ISSUED
2017-09-12Permit EW — ISSUED
2017-09-12Permit PL — ISSUED
2017-09-12Permit EW — ISSUED
2017-09-07311: Missed Collection (All Materials) — 1 Missed Collection
2017-09-06Sold for $3,980,000$3,980,000
2017-08-18AALR — from NATIONAL CONSUMER COOPERATIVE BANK to NATIONAL COOPERATIVE BANK, N.A.
2017-08-18Mortgage assigned — from NATIONAL CONSUMER COOPERATIVE BANK to NATIONAL COOPERATIVE BANK, N.A.
2017-08-18AL&R $250,000 — from ATHENIUM HOUSE CORP. to NATIONAL CONSUMER COOPERATIVE BANK$250,000
2017-08-18Mortgage $250,000 — from ATHENIUM HOUSE CORP. to NATIONAL CONSUMER COOPERATIVE BANK$250,000
2017-08-18AALR — from NATIONAL CONSUMER COOPERATIVE BANK to NATIONAL COOPERATIVE BANK, N.A.
2017-08-18Mortgage assigned — from NATIONAL CONSUMER COOPERATIVE BANK to NATIONAL COOPERATIVE BANK, N.A.
2017-08-18AL&R $850,000 — from ATHENIUM HOUSE CORP. to NATIONAL CONSUMER COOPERATIVE BANK$850,000
2017-08-18Mortgage $850,000 — from ATHENIUM HOUSE CORP. to NATIONAL CONSUMER COOPERATIVE BANK$850,000
2017-08-15311: Missed Collection (All Materials) — 1RB Missed Recycling - M/G/Pl
2017-08-11Rodent inspection: Passed
2017-05-17Permit PL — ISSUED
2017-04-04Permit EW — ISSUED
2017-03-08Permit EW — ISSUED
2017-01-04Permit EW — ISSUED
2017-01-04Permit EW — ISSUED
2017-01-04Permit EW — ISSUED
2016
2016-12-30Permit PL — ISSUED
2016-12-30Permit EW — ISSUED
2016-12-28Permit EQ — ISSUED
2016-12-22Job filed: INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCU
2016-12-22Job filed: INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCU
2016-12-13Rodent inspection: Passed
2016-12-12Job filed: FILING FOR THE REMOVAL OF WATER TANKS AND TANK FILL PUMP. INSTALLATION OF NEW WATER SERVICE, BACKFLOW PREVENTER, FIRE PUMP, DOMESTIC WATER PRESSURE BO$180,000
2016-11-22Permit EQ — ISSUED
2016-11-21Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2016-11-21Job filed: REPLACE GAS PIPING FROM ENTRY IN CELLAR POINT TO ELEVENTH FLOOR. PATCH FLOORS AND CEILINGS AS NECESSARY FOR INSTALLATION OF RISERS.$53,000
2016-07-14Permit EW — ISSUED
2016-06-27Job filed: 11 FLOOR ROOF FRAMING UPGRADE,11 FLOOR WINDOW ENLARGEMENT, CMU REPAIRS,CLADDING REPAIRS AS PER PLANS FILED.NO_CHANGE IN USE EGRESS OR OCCUPANCY.$120,500
2016-06-27Job filed: 11 FLOOR ROOF FRAMING UPGRADE,11 FLOOR WINDOW ENLARGEMENT, CMU REPAIRS,CLADDING REPAIRS AS PER PLANS FILED.NO_CHANGE IN USE EGRESS OR OCCUPANCY.$120,500
2016-06-20Job filed: INTERIOR RENOVATION OF APARTMENT PH ON THE 11TH FLOOR. ARCHITECTURAL WORK. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$725,000
2016-06-20Job filed: PLUMBING, MECHANICAL AND SPRINKLER WORK FILED IN CONJUNCTION WITH INTERIOR RENOVATION OF APARTMENT PH ON THE 11TH FLOOR AND ROOF. NO CHANGE IN USE, OC$161,500
2016-06-20Job filed: STRUCTURAL WORK FILED IN CONJUNCTION WITH INTERIOR RENOVATION OF APARTMENT PH ON THE 11TH FLOOR AND ROOF. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$20,000
2016-06-20Job filed: INTERIOR RENOVATION OF APARTMENT PH ON THE 11TH FLOOR. ARCHITECTURAL WORK. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$725,000
2016-06-20Job filed: STRUCTURAL WORK FILED IN CONJUNCTION WITH INTERIOR RENOVATION OF APARTMENT PH ON THE 11TH FLOOR AND ROOF. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$20,000
2016-06-20Job filed: INTERIOR RENOVATION OF APARTMENT PH ON THE 11TH FLOOR. ARCHITECTURAL WORK. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$725,000
2016-06-11311: Homeless Person Assistance — N/A
2016-05-27311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2016-05-27DOB complaint, category ?
2016-03-25RPTT&RET $3,500,000 — from NOTE, MARIE VAN to KULINA, FRANCES TYLER; KULINA, CHRISTOPHER E$3,500,000
2016-03-16Permit PL — ISSUED
2016-03-01Permit EW — ISSUED
2016-02-29Job filed: INTERIOR RENOVATION OF APARTMENT PH ON THE 11TH FLOOR. ARCHITECTURAL WORK. NO CHANGE IN USE, OCCUPANCY, OR EGRESS$51,800
2016-01-28Sold for $3,500,000$3,500,000
2016-01-20Permit EW — ISSUED
2016-01-20Permit EW — ISSUED
2015
2015-12-25311: Noise - Residential — Banging/Pounding
2015-10-13Job filed: INTERIOR RENOVATION APARTMENT 3 ON THE 3RD FLOOR. ARCHITECTURAL AND MECHANICAL WORK. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$115,800
2015-10-13Job filed: INTERIOR RENOVATION OF APARTMENT 3 ON THE 3RD FLOOR. PLUMBING AND SPRINKLER WORK. NO CHANGE IN USE, OCCUPANCY OR EGRESS$70,000
2015-09-30Permit EW — ISSUED
2015-09-23Job filed: INTERIOR DEMOLITION & INSTALLATION OF PARTITIONS IN APARTMENT 3 ON THE THIRD FLOOR. ARCHITECTURAL AND PLUMBING WORK. NO CHANGE IN USE, OCCUPANCY O$30,600
2015-08-03RPTT&RET $4,200,000 — from DEVI, GAYATRI; DEVI-CHOU, VIRGINIA to ZUMMO, PAUL A$4,200,000
2015-06-12RPTT&RET $4,011,479 — from MURRAY, CARTER; MURRAY, CARMEN to ODEGAARD, SIRI S; SIMONS, AARON W$4,011,479
2015-05-27Permit PL — ISSUED
2015-04-15RPTT&RET $4,300,000 — from PARK, JOON YONG to CONSTANTINO, JEFFREY; CONSTANTINO, DANIELA$4,300,000
2015-02-15FDNY inspection (RISK)
2015-02-15311: Homeless Encampment — N/A
2014
2014-12-29Permit EQ — ISSUED
2014-12-29Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE NO CHAN
2014-11-12Permit EW — ISSUED
2014-11-12Permit EW — ISSUED
2014-11-12Job filed: INTERIOR RENOVATION TO EXISTING 7TH FLOOR APARTMENT. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$127,500
2014-10-29Job filed: INTERIOR RENOVATION TO EXISTING 7TH FLOOR APARTMENT. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$127,500
2014-08-09311: Dead Tree — Dead/Dying Tree
2014-05-15DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
2014-05-08Permit EW — ISSUED
2014-05-08Permit PL — ISSUED
2014-04-09DOB violation E:
2014-03-06Rodent inspection: Passed
2013
2013-12-02RPTT&RET $3,787,000 — from DEANER-MALVANIA, JANICE; MALVANIA, NIK to TAMARKIN, CARY$3,787,000
2013-10-03DOB violation E:
2013-04-19Job filed: INSTALLATION OF AN AUTOMATIC SMOKE/HEAT DETECTION & SPRINKLER FIRE ALARM SYSTEM AS PER FDNY TECHNOLOGY MANAGEMENT LETTER (FPI # 1202132B, DATED 9-$9,000
2013-04-19Job filed: INSTALLATION OF AN AUTOMATIC SMOKE/HEAT DETECTION & SPRINKLER FIRE ALARM SYSTEM AS PER FDNY TECHNOLOGY MANAGEMENT LETTER (FPI # 1202132B, DATED 9-$9,000
2012
2012-10-15Permit EW — ISSUED
2012-10-15Permit EW — ISSUED
2012-09-04311: Homeless Encampment — N/A
2012-09-03311: Illegal Parking — Blocked Sidewalk
2012-09-02311: Illegal Parking — Blocked Sidewalk
2012-08-06311: Homeless Encampment — N/A
2012-08-06311: Dirty Conditions — E11 Litter Surveillance
2012-07-25Permit EW — ISSUED
2012-07-25Permit PL — ISSUED
2012-07-16311: Homeless Encampment — N/A
2012-06-28Permit EW — ISSUED
2012-06-28Permit EW — ISSUED
2012-06-05311: Missed Collection (All Materials) — 1RG Missed Recycling Paper
2012-05-22Facade (LL11) filing, cycle 7: SAFE
2012-04-16Job filed: MINOR PARTITION WORK ON 5TH FLOOR. NO CHANGE IN EGRESS, USE OR OCCUPANCY INVOLVED UNDER THIS APPLICATION.$142,500
2012-04-16Job filed: PLUMBING, SPRINKLER AND MECHANICAL WORK ON 5TH FLOOR. NO CHANGE IN EGRESS, USE OR OCCUPANCY INVOLVED UNDER THIS APPLICATION$92,500
2012-03-19Rodent inspection: Passed
2011
2011-12-28RPTT&RET $2,205,000 — from MALHOTRA, CARMEN; MALHOTRA, GAURAY to MURRAY, CARTER; MURRAY, CARMEN$2,205,000
2011-06-24RPTT&RET $1,925,000 — from ROBERT L. STEIN, AS EXECUTOR; ESTATE OF SARA M. DOWNES to PARK, JOON YONG$1,925,000
2011-02-17Rodent inspection: Passed
2010
2010-08-24ECB CLASS - 3 violation: 40S10,40B07.(40S10)PATCH ALL HOLES IN MACHINE ROOM.(40B07)PROVIDE MACHINE ROOM VENTILATION.
2010-07-22Permit PL — ISSUED
2010-07-19Permit EW — ISSUED
2010-07-16Permit EW — ISSUED
2010-07-15Job filed: PROPOSE TO CONSTRUCT NON-LOAD BEARING PARTITIONS, DOORS AND FINISHES; GENERAL PLUMBING AND MECHANICAL MODIFICATIONS AS PER PLANS FILED. THERE IS NO C$225,000
2010-07-14Permit PL — ISSUED
2010-06-08RPTT&RET $1,700,000 — from THE MILTON KATZ RESIDENCE TRUST to DEVI, GAYARI; DEVI-CHOU, YASMINE$1,700,000
2010-05-25Permit EW — ISSUED
2010-05-25Job filed: APPLICATION FILED FOR THE REMOVAL OF PARTITIONS AND PLUMBING FIXTURES AS PER DRAWINGS FILED HEREWITH. APPLICATION FOR NEW PARTITION LAYOUT AND PLUMBIN$14,000
2010-04-14DOB violation E:
2010-02-09Rodent inspection: Passed
2010-02-04Mortgage assigned — from NATIONAL CONSUMER COOPERATIVE BANK to APPLE BANK FOR SAVINGS
2010-02-04AALR — from NATIONAL CONSUMER COOPERATIVE BANK to APPLE BANK FOR SAVINGS
2009
2009-05-12DOB violation E:
2009-04-09Permit EW — ISSUED
2009-03-30Permit PL — ISSUED
2009-03-10Permit EW — ISSUED
2009-03-03Permit EQ — ISSUED
2008
2008-12-22Permit EQ — ISSUED
2008-11-07DOB complaint, category ?
2008-11-06DOB violation E:
2008-10-16ECB CLASS - 1 violation: MATERIAL AND DEBRIS SHALL NOT BE STORED ON SIDEWALK SHED. NOTED: SUPPORTED APPRX 100FT HIGH ON SHED. THERE IS EXCESSIVE MATERIAL A$1,600
2008-10-16ECB CLASS - 1 violation: MODIFIED SUPPORTED SCAFFOLD W/O A SCAFFOLD CERTIFICATE OF COMPLETION. REMEDY: DISCONTINUE ACTIVITY & OBTAIN A SUPPORTED CERTIFICAT$2,400
2008-10-16ECB CLASS - 1 violation: USE OF SUPPORTED SCAFFOLD W/O A SCAFFOLD USER CERTIFICATE. REMEDY: DISCONTINUE ACTIVITY OR OBTAIN A SUPPORTED SCAFFOLD USER CERTIF$1,600
2008-10-16ECB CLASS - 2 violation: FAILURE TO PROVIDE APPROVED/ACCEPTED PLANS AT JOB SITE AT TIME OF INSPECTION. NOTED: NO PLANS AVAILABLE FOR INSPECTION FOR SUPPORT$500
2008-06-24Permit EW — ISSUED
2008-06-17Job filed: STRUCTURAL STEEL REPAIRS, BRICK REPLACEMENT,REPOINTING, COATING AND CONCRETE PATCHING AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$39,500
2008-05-10ECB Hazardous violation: 27-1021(B)(7)(A) FOR ALL BLDGS 100FT OR MORE IN HEIGHT THE SHED SHALL EXTEND 20FT BEYOND THE STRUCTURES. REMEDY: PROVIDE ADEQUATE $2,000
2008-05-08DOB complaint, category ?
2008-03-24DOB complaint, category ?
2008-01-07Permit EQ — ISSUED
2008-01-02Permit EQ — ISSUED
2007
2007-12-27Facade (LL11) filing, cycle 6: SWARMP
2007-11-30DOB violation LL1198:
2007-11-26DOB violation E:
2007-10-15Permit EQ — ISSUED
2007-10-12Job filed: ERECT PIPE SCAFFOLD 25 L.F. x 100' H. AT 54 EAST 11 STREET. DURING REMEDIAL REPAIRS .WORK SHALL COMPLY WITH LL33/98. NO CHANGE IN USE, EGRESS OR OCCU
2007-10-12Job filed: ERECT PIPE SCAFFOLD 25 L.F. x 100' H. AT 54 EAST 11 STREET. DURING REMEDIAL REPAIRS .WORK SHALL COMPLY WITH LL33/98. NO CHANGE IN USE, EGRESS OR OCCU
2007-09-28Permit EQ — ISSUED
2007-09-27Job filed: INSTALL HEAVY DUTY SIDEWALK SHED A TOTOAL OF 65DT LONG ATR 54 EAST 11 ST REET. DURING REMEDIAL REPAIRS. WORK SHALL COMPLY WITH LL33/91. NO CHANGE IN U
2007-07-06Mortgage assigned — from NCB, FSB to FANNIE MAE
2007-07-06AALR — from NCB, FSB to FANNIE MAE
2007-06-26Permit PL — ISSUED
2007-06-15Permit EW — ISSUED
2007-06-14ECB Non-Hazardous violation: 25D06,11B07,36P16,39P16,85P16,86P16.11-PROVIDE ACCESS TO FLOORS.85-PROVIDE ACCESS TO GOVERNOR-TO CHECK(5)YEAR & (2)YEAR TAGS.$180
2007-05-21Permit PL — ISSUED
2007-04-02Permit EW — ISSUED
2007-03-27Job filed: TO REMOVE AND RELOCATE EXISTING KITCHEN AND LAUNDRY ROOM AND THE CREATION OF A TWO FIXTURE POWDER ROOM. REMOVAL OF EXISTING WALLS TO ALLOW FOR NEW LA$55,000
2007-03-09Permit AL — ISSUED
2007-02-07TL&R — from ATHENIUM HOUSE CORP. to NORTH FORK BANK
2007-02-07Mortgage satisfied — from ATHENIUM HOUSE CORP. to NORTH FORK BANK
2007-01-29AL&R — from NATIONAL CONSUMER COOPERATIVE BANK to ATHENIUM HOUSE CORP
2007-01-29Mortgage $1,100,000 — from ATHENIUM HOUSE CORP to NATIONAL CONSUMER COOPERATIVE BANK$1,100,000
2007-01-29Mortgage assigned — from NATIONAL CONSUMER COOPERATIVE BANK to NCB, FSB
2007-01-29AALR — from NCB, FSB to NATIONAL CONSUMER COOPERATIVE BANK
2007-01-29Mortgage $500,000 — from ATHENIUM HOUSE CORP to NATIONAL CONSUMER COOPERATIVE BANK$500,000
2007-01-29AL&R — from ATHENIUM HOUSE CORP to NATIONAL CONSUMER COOPERATIVE BANK
2007-01-02DOB violation E:
2006
2006-10-27Permit EQ — ISSUED
2006-10-03Job filed: INSTALL FENCE APPLICATION IN CONJUNCTION WITH APPLICATION 104509097. NO CHANGE IN USE EGRESS OR OCUPANCY
2006-10-03Job filed: INSTALL FENCE APPLICATION IN CONJUNCTION WITH APPLICATION 104509097. NO CHANGE IN USE EGRESS OR OCUPANCY
2006-08-02Job filed: INSTALL NEW STORE FRONT AS PER PLANS FILED. NO CHANGE IN USE EGREE OR OCCUPANCY$13,000
2006-08-02Job filed: INSTALL NEW STORE FRONT AS PER PLANS FILED. NO CHANGE IN USE EGREE OR OCCUPANCY$13,000
2006-06-27Permit PL — ISSUED
2006-06-27Permit PL — ISSUED
2006-06-06RPTT&RET $2,000,000 — from MOREA, BARBARA; MOREA, DOUGLAS to MAHOLTRA, GAURAY; MAHOLTRA, CARMEN-NEDDA$2,000,000
2006-05-02Permit EW — ISSUED
2006-04-13Job filed: RONOVATE APARTMENT ON 8TH FLOOR, ADD ONE TV/DEN AREA, NO CHANGE IN USE, EGRESS, OCCUPANCY OR BULK IS INVOLVED.$10,000
2006-04-13Job filed: RONOVATE APARTMENT ON 8TH FLOOR, ADD ONE TV/DEN AREA, NO CHANGE IN USE, EGRESS, OCCUPANCY OR BULK IS INVOLVED.$10,000
2006-03-02Permit EW — ISSUED
2006-03-02Permit EW — ISSUED
2006-01-11Job filed: Remove and relocate sprinklers in apartment on 7th floor. No change to use, egress or occupancy.$10,000
2006-01-11Job filed: Renovate apartment on 7th floor. Work to include general construction, plumbing and mechanicals. No change to use, egress or occupancy.$55,000
2005
2005-12-02DOB violation E:
2005-10-01DOB violation LL1081:
2005-08-16RPTT&RET $2,250,000 — from JACOBS, SEYMOUR to MALVANIA, NIK; DEANER-MALVANIA, JANICE$2,250,000
2005-02-28DOB violation E:
2005-01-31DOB violation LL6291:
2005-01-10Agreement $675,000 — from ATHENIUM HOUSE CORP to NORTH FORK BANK$675,000
2005-01-10Mortgage $260,217 — from ATHENIUM HOUSE CORP to NORTH FORK BANK$260,217
2005-01-10AL&R — from NORTH FORK BANK to ATHENIUM HOUSE CORP
2004
2004-04-15DOB complaint, category ?
2004-04-04DOB complaint, category ?
2004-02-13DOB violation LL6291:
2003
2003-12-26ECB Non-Hazardous violation: FAILURE TO SUBMIT A FIFTH ROUND TECHNICAL REPORT PERIODIC INSPECTION OR EXTERIOR WALLS AND APPURTENANCES AS REQUIRED BY LOCAL LAW $350
2003-05-09Permit EQ — ISSUED
2003-05-01DOB complaint, category ?
2003-03-06Permit EQ — ISSUED
2003-03-06Permit EQ — ISSUED
2002
2002-12-27Permit EW — ISSUED
2002-11-21Job filed: Restoration of bulding facade; cut and point mortar joints, partial brick replacement and window lintel replacement.$125,000
2002-09-13Permit EQ — ISSUED
2002-09-13Permit EQ — ISSUED
2002-09-06Job filed: We shall install 65 linear ft of heavy duty sidewalk shed in front of 54 East 11 Street. This shall be used for exterior facade restoration. There w
2002-09-06Job filed: We shall install 30 linear ft of pipe scaffolding in front of 54 East 11 Street. This shall be used for exterior facade restoration. There will be
2002-09-06Job filed: We shall install 65 linear ft of heavy duty sidewalk shed in front of 54 East 11 Street. This shall be used for exterior facade restoration. There w
2002-08-08DOB violation L1198:
2002-06-24Mortgage assigned — from ATHENIUM HOUSE CORP. to NORTH FORK BANK
2002-06-24Agreement — from ATHENIUM HOUSE CORP. to NORTH FORK BANK
2002-06-24Mortgage $169,584 — from ATHENIUM HOUSE CORP. to NORTH FORK BANK$169,584
2002-06-04Permit EW — ISSUED
2002-05-22DOB violation E:
2002-03-26DOB violation LL6291:
2002-02-21Job filed: SIDEWALK VAULT RESTORATION.$13,000
2002-02-21Job filed: SIDEWALK VAULT RESTORATION.$13,000
2001
2001-06-04DOB violation E: 1P3104
2001-03-30Permit EW — ISSUED
2001-03-30Permit EW — ISSUED
2001-02-14Job filed: INTERIOR DEMOLITION, INSTALLATION OF NEW PARTITIONS, STEEL DUNNAGE WITH NEW AC UNIT. nO cHANGE IN USE EGRESS OCCUPANCY$10,000
2001-01-29ECB Non-Hazardous violation: WORK WITHOUT A PERMIT:1FL COMMERCIAL SPACE HAS ERECTED NUMEROUS SUBDIVIDING WALLS CONSISTING OF SHEET ROCK AND STUDS.INSTALLATION $500
2001-01-29DOB violation C:
2001-01-26DOB complaint, category ?
1998
1998-07-21ECB Non-Hazardous violation: 33P17,22D06,35P17,31D06,. 33P17-,.-PROVIDE ACCESS TO OVER HEAD FOR PROPER INSECTION. 22D PROPERLY SECURE EMERGENCY HATCH. 35P-
1997
1997-09-16DOB violation LL6291:
1997-02-10DOB violation LL6291:
1994
1994-09-27Agreement — from ATHENIUM HOUSE CORP to BAYSIDE FEDERAL SAVINGS BANK
1994-06-23Mortgage assigned — from ATHENIUM HOUSE CORP. to BAYSIDE FEDERAL SAVINGS BANK
1994-06-23Agreement — from ATHENIUM HOUSE CORP. to BAYSIDE FEDERAL SAVINGS BANK
1994-03-18DOB violation LL6291:
1993
1993-09-21DOB violation E:
1993-03-18DOB violation LL6291:
1992
1992-07-01DOB violation LL1080:
1992-03-27DOB violation E:
1992-02-27ECB Non-Hazardous violation: 37G
1991
1991-07-22ECB Non-Hazardous violation: 35P,15#,22D,15 REMOVE ALL ILLEGAL LOCKS 35 PROVIDE ACCESS TO MACHINE ROOM AND OVERHEAD SO A COMPLETE INSPECTION CAN BE MADE BY THI$150
1988
1988-11-14DOB violation E: 3)PROVIDE VISON PANEL GRILL IN THE BASEMENT 15)SECURE TOP EXIT COVER 19)REPAIR OR RENEW THE SLACK CABLE SWITCH 51)PROPERLY
1988-11-14DOB violation E: (03) PROVIDE VISION PANEL GRILL IN THE BASEMENT (15) SECURE TOP EXIT COVER
1988-01-21Agreement — from ATHENIUM HOUSE CORP to BAYSIDE FED S&L ASSN
1988-01-21Mortgage $232,794 — from ATHENIUM HOUSE CORP to BAYSIDE FED S&L ASSN$232,794
1988-01-21Mortgage assigned — from LINCOLN SAVINGS BANK to BAYSIDE FED S&L ASSN
1982
1982-10-13HPD class A: D26-10.01 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CEILING CELLAR AT REAR SOUTH WEST.
1982-10-13HPD class A: D26-11.01, 11.03, 11.05 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE CELLAR AT FRONT EAST
1982-10-13HPD class A: D26-12.03 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT SOFFITS OF FIRE STAIRS ALL
1982-10-13HPD class A: D26-10.01 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WALLS 9TH AND 10TH STYS PUBLIC HALL AT FIRE STAIRS.
1982-10-13HPD class A: D26-11.03 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE ALL STYS PUBLIC HALL AT FIRE STAIRS.
1982-10-13HPD class A: D26-10.01 ADM CODE REPLACE WITH NEW THE MISSING ELECTRICAL BOX COVER 2ND 3RD 4TH 5TH AND 8TH STYS PUBLIC HALL AT FIRE STAIRS.
1982-10-13HPD class A: D26-10.01 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF EXPOSED WIRING 8TH STY AND BULKHEAD LANDING PUBLIC HALL.
1982-10-13HPD class A: § 178, 217 M/D LAW PROVIDE FIXED VENTILATION OF AT LEAST 40 SQ.IN. DIRECTLY OVER STAIRWELL ROOF AT BULKHEAD.
1982-10-13HPD class A: D26-41.15 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND
1982-10-13HPD class A: § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM
1982-01-20HPD class A: D26-20.08,20.09 ADM CODE FILE CERTIFICATION OF SATISFACTORY INSTALLATION OF SMOKE DETECTING DEVICE IN ACCORDANCE WITH H.P.D. RULES AND REGUL
1979
1979-05-07MISC — from HUDSON CITY SAVINGSINST
1979-05-07MISC — from HUDSON CITY SAVINGSINST
1979-04-12MISC — from BRAUNSCHWEIGER, FREDRCK
1979-04-12MISC — from ROSS, PHILIP; ROSS, ANITA
1979-04-12MISC — from BRAUNSCHWEIGER, FREDRCK
1979-04-12MISC — from SILVER, SARAH
1979-04-12MISC — from BECKER, MITCHELL
1979-04-12MISC — from BERRY, HERBERT
1979-04-12MISC — from KAUFMAN, ABE; KAUFMAN, KATE
1979-04-12MISC — from BOGART, BURTON
1979-04-12MISC — from COLLIUS, KENNETH
1979-04-12MISC — from GALBUSERA, BLANCHE
1979-04-12MISC — from JENNY, THERESA
1979-04-12MISC — from BOGART, BURTON
1979-04-12MISC — from BRAUNSCHWEIGER, HORTENSE
1979-04-12MISC — from NACKMAN, RONALD; NACKMAN, PHYLLIS
1979-04-12MISC — from CATAPANO, JOSEPHINE
1979-04-10Mortgage — from ATHENIUM HOUSE CORP to LINCOLN SAVINGS BANK
1978
1978-06-09LEAS — from ATHENIUM HOUSE CORP to HER SHOE OUTLET INC
1977
1977-10-14EASE — from CORBO COMPANY to ATHENIUM HOUSE CORP
1977-10-14Agreement — from CORBO COMPANY; ATHENIUM HOUSE CORP to LINCOLN SAVINGS BANK
1974
1974-10-25Agreement — from ATHENIUM HOUSE CORP to BERGER, DAVID
1974-06-17Deed — from HALCYON HOUSE INC to ATHENIUM HOUSE CORP
1974-06-17Mortgage — from WINTOR REALTY CORP to ROSS, ANITA ET AL; ROSS, PHILLIP; BOGART, BURTON; BRAUNSCHWEIGER, HORTENSE
1974-06-17Deed — from WINTOR REALTY CORP to HALCYON HOUSE CORP
1974-06-17Mortgage — from WINTOR REALTY CORP to KENNARD, MARCELLA
1974-06-17Mortgage — from WINTOR REALTY CORP to GALBUERA, BLANCHE
1974-06-17Mortgage — from WINTOR REALTY CORP to KAUFMAN, KATE; BRAUNSCHWEIGER, HORTENSE; BOGART, BURTON; CATAPANO, JOSEPHINE; BERRY, HERBE
1974-06-17Deed — from ELEVENTH ST ASSOCIATES to WINTOR REALTY CORP
1974-06-17Deed — from WINTOR REALTY CORP to ELEVENTH STREET ASSOC
1970
1970-12-17Agreement — from WINTOR REALTY CORP to CORLAN COMMERCIAL CORP
1970-03-06Agreement — from GILBERT, MAY to COUNCIL COMMERCE CORP
1970-03-06Mortgage assigned — from MILLER, ROBERT G; ACME FACTORS DBA to COUNCIL COMMERCE CORP
1970-03-06Mortgage — from WINTOR REALTY CORP to COUNCIL COMMERCE CORP
1969
1969-07-01Mortgage — from WINTOR REALTY CORP to MILLER, ROBERT G
1969-07-01Agreement — from MILLER, ROBERT G to WINTOR REALTY CORP
1969-07-01Mortgage assigned — from CORLAN COMMERCIAL CORP to ACME FACTORS; MILLER, ROBERT G DBA
1966
1966-08-24Mortgage — from WINTON REALTY CORP to CARLAN COMMERCIAL CORP
1966-08-03Deed — from ELEVENTH ST ASSOCIATES to WINTOR REALTY CORP
1966-08-01Mortgage assigned — from R & V MILLER INC to SACKMAN GILLILAND CORP
1966-07-29Mortgage assigned — from SACKMAN GILLAND CORP to HUDSON CITY SVNGS INSTS
1966-07-29Mortgage — from WINTOR REALTY CORP to SACKMAN GILLAND CORP
1966-07-29SAGE — from BERGER, DAVID; SACKMAN GILLILAND CORP

Support this site Back to the building page