A modest record — below the level that usually signals systemic problems. More recorded distress than 70% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty
points per 10 units; this building carries 45.8. In ZIP 10024, 70% of residential buildings hold an A and
2% grade D or F.
How grades work
this building
A
B
C
Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
Open HPD violations
3 total — 3 class C (immediately hazardous), 0 class B, 0 class A. Oldest open since 2024-09-17.
status snapshot refreshed weekly from HPD records
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
7 service requests in the last three years. Most common: Elevator (1) · Illegal Parking (1) · Lead (1) · Dirty Condition (1) · Indoor Air Quality (1) · DOOR/WINDOW (1).
Filed construction activity
$408,525 in permitted construction work filed since
2016 (9 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1910)
Yes
Six or more residential units (10)
No
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
TERRA ROSSA
Head officer
PAUL IRVINE
Managing agent
IRVINE REALTY GROUP, INC.
Last registered
2025-09-12
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$5,572,000
$2,507,400
2026
$4,720,000
$2,124,000
2027
$5,664,000
$2,548,800
The city's market estimate has risen
2% between tax years 2025 and 2027.
Building systems
Heating fuel
NATURALGAS
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
86 St — B C · 250 ft straight-line (about a 1-minute walk) · station accessibility: none
Bus
Nearest boarding stop: W 86 St / Central Pk West — M86-SBS · 150 ft · Select Bus Service
Citi Bike
Central Park W & W 85 St · 300 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
7 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $410,480 on
2002-06-17 (lender: Dime Savings Bank Ofnew York). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2016-04-25
Deed $12,000,000 — from 16 W 86TH ST LLC to TERRA ROSSA, LLC
$12,000,000
2016-03-15
Sold for $12,000,000
$12,000,000
$1,200,000
2011-10-18
Deed $7,200,000 — from NAVE, PATRICIA S; NAVE, GARY L to 16 WEST NY CORP
$7,200,000
2002-06-17
Mortgage $410,481 — from NAVE, GARY L.; NAV, PATRICIA S. to DIME SAVINGS BANK OFNEW YORK
$410,481
1997-06-20
Mortgage $900,000 — from NAVE, GARY L.; NAVE, PATRICIA S. to DIME SAVINGS BANK OFNEW YORK
$900,000
1997-06-20
Mortgage $140,715 — from NAVE, GARY L.; NAVE, PATRICIA S. to DIME SAVINGS BANK OFNEW YORK
$140,715
1997-06-18
Mortgage $900,000 — from NAVE, GARY L.; NAVE, PATRICIA S. to DIME SAVINGS BANK OFNEW YORK
$900,000
1997-06-18
Mortgage $209,164 — from NAVE, GARY L.; NAVE, PATRICIA S. to DIME SAVINGS BANK OFNEW YORK
$209,164
1994-07-21
Mortgage $70,000 — from NAVE, GARY L.; NAVE, PATRICIA S. to L.S.I. INVESTMENT CO.
$70,000
1990-10-22
Mortgage $200,000 — from BUSH, PATRICIA S NAVE; NAVE, GARY L to SZER, CHAIM
$200,000
1987-08-18
Mortgage $282,541 — from NAVE, PATRICIA S.; NAVE, GARY L. to GREATER NEW YORK SVGS BK
$282,541
1985-05-24
Mortgage $206,087 — from NAVE, GARY L.; NAVE, PATRICIA S. to SEAMEN'S BANK/SAVINGS
$206,087
1983-07-15
Mortgage $50,200 — from NAVE, PATRICIA S.; NAVE, GARY L.; BUSH, PATRICIA NAVENKA to COLLUMBIA SAVINGS F.A
$50,200
1983-04-05
Mortgage $75,611 — from BUSH, PATRICIA NAVE; NAVE, GARY L. to BANK OF BEVERLY HILLS
$75,611
Ten-year activity
50250
2017
2018
2019
24
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Health & systems
Total
2017
0
1
0
3
4
2018
0
0
3
2
5
2019
1
2
11
2
16
2020
8
2
12
2
24
2021
6
1
9
1
17
2022
0
0
4
2
6
2023
0
0
1
2
3
2024
0
1
12
3
16
2025
0
0
1
2
3
2026
2
1
5
1
9
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
HPD class C: HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FR
2026-05-29
311: UNSANITARY CONDITION — MOLD
2026-05-29
311: DOOR/WINDOW — WINDOW FRAME
2026-05-29
Tenant complaint: UNSANITARY CONDITION — MOLD
2026-05-29
Tenant complaint: DOOR/WINDOW — WINDOW FRAME
2026-03-18
Boiler inspection
2026-03-06
FDNY inspection (RISK)
2026-02-05
Permit General Construction — Permit Issued
2026-01-08
Job filed: Renovation to unit #3A including bath and kitchenette. Relocation of non-bearing partitions.
2025-12-23
Bedbug filing: 0 infested units
The full timeline
2026
2026-06-02HPD class C: HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FR
2026-02-05Permit General Construction — Permit Issued
2026-01-08Job filed: Renovation to unit #3A including bath and kitchenette. Relocation of non-bearing partitions.$45,525
2025
2025-12-23Bedbug filing: 0 infested units
2025-10-02Rodent inspection: Passed
2025-04-10Boiler inspection
2024
2024-12-18Bedbug filing: 0 infested units
2024-09-24311: Indoor Air Quality — Dust from Construction
2024-09-17HPD class C: § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT UPPER AND LOWER SASH WINDOW IN THE 1st ROOM FROM EAST LOCATE
2024-09-17HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2024-09-17HPD class C: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD DECKING AND ASPHALT MATERIAL AT SOUTH ROOF EXTENSION A
2024-09-17HPD class C: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE 4th ROOM F
2024-09-17HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE 4th ROOM F
2024-09-17HPD class C: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND SOUTH WALL IN THE 1st ROOM
2024-01-25311: Elevator — Elevator - Single Device On Property/No Alternate Service
2024-01-25DOB complaint, category ?
2023
2023-12-27Bedbug filing: 0 infested units
2023-10-06Boiler inspection
2023-08-04Rodent inspection: Passed
2022
2022-12-12Bedbug filing: 0 infested units
2022-10-27Boiler inspection
2022-08-11311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-04-21Rodent inspection: Passed
2022-02-27311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2022-02-16HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021
2021-12-05311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-11-29311: Noise - Helicopter — Other
2021-11-23311: Missed Collection — Bulky Trash
2021-11-22311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-11-18311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-11-09Boiler inspection
2021-07-25311: Noise - Helicopter — Other
2021-06-21Job filed: Plumbing work to include Kitchen and Bathrooms as shown on drawing P-101 for combined apartment B and 1B. This filing is associated with job #12376500$19,500
2021-06-17DOB complaint, category ?
2021-06-15Permit Plumbing — Signed-off
2021-05-18Job filed: Plumbing work to include Kitchen and Bathrooms as shown on drawing P-101 for combined apartment B and 1B. This filing is associated with job #12376500$19,500
2021-01-22Job filed: Mechanical work for new AC system on Cellar level including 4 ton condenser unit and air handlers.$20,000
2021-01-22Job filed: Plumbing work to include Kitchen and Bathrooms as shown on drawing P-101 for combined apartment B and 1B. This filing is associated with job #12376500$19,500
2020
2020-12-01Boiler inspection
2020-11-30DOB complaint, category ?
2020-10-23311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-10-21Permit Mechanical Systems — Signed-off
2020-10-06Job filed: Mechanical work for new AC system on Cellar level including 4 ton condenser unit and air handlers.$20,000
2020-09-23Elevator permit: Filing this application to furnish and install a new software/hardware to existing controller to provide door lock monitoring. Al$7,000
2020-08-07Permit EW — ISSUED
2020-08-05DOB complaint, category ?
2020-07-30311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-07-27311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-06-29311: Street Condition — Defective Hardware
2020-06-19HPD class A: § 27-2005 ADM CODE REFIT WINDOW IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
2020-06-19HPD class A: § 27-2005 ADM CODE REFIT WINDOW IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
2020-02-04Job filed: Plumbing work to include Kitchen and Bathrooms as shown on drawing P-101 for combined apartment B and 1B. This filing is associated with job #12376500$19,500
2020-02-04Job filed: Structural Work for installation of New stair from First Floor to Cellar Floor. Included is structural shoring as required. No change to use, egress $25,000
2020-01-30311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-01-23Permit EW — ISSUED
2020-01-19311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-01-19311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-01-02311: Lead — Lead Kit Request (Residential) (L10)
2019
2019-12-20Bedbug filing: 0 infested units
2019-12-04ECB CLASS - 2 violation: 1/L/10 EMERGENCY STOP SWITCH BELL DOES NOT RING WHEN ACTIVATED DEFECTIVE REPAIR.$1,562
2019-11-14Job filed: COMBINATION OF CELLAR APT B WITH 1ST FLOOR APT 1B UNDER TPPN #3/97. PERFORM GENERAL CONSTRUCTION. PLUMBING WORK FOR NEW KITCHEN, PANTRY & BATHROOM$220,000
2019-10-14311: Elevator — Elevator - Single Device On Property/No Alternate Service
2019-10-14DOB complaint, category ?
2019-08-27Boiler inspection
2019-07-19311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-05-21Rodent inspection: Passed
2019-04-01HPD class A: § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX SIGN
2019-04-01HPD class A: § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES
2019-04-01HPD class A: § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGE
2019-02-10311: HEAT/HOT WATER — ENTIRE BUILDING
2019-02-10311: DOOR/WINDOW — DOOR
2019-02-10Tenant complaint: DOOR/WINDOW — DOOR
2019-02-10Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2012-12-09311: Noise — Noise: Construction Before/After Hours (NM1)
2012-12-08311: Noise — Noise: Construction Before/After Hours (NM1)
2012-09-06311: Asbestos — N/A
2012-08-31311: Asbestos — Asbestos Complaint (B1)
2012-08-31DOB complaint, category ?
2012-08-30311: Asbestos — Asbestos Complaint (B1)
2012-08-04311: Emergency Response Team (ERT) — After Hours Work - Illegal
2012-08-04DOB complaint, category ?
2012-07-25DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2012-07-25DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2012-07-25DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2012-07-11DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2012-06-14DOB complaint, category ?
2012-06-06311: Special Projects Inspection Team (SPIT) — Illegal Hotel Rooms In Residential Building
2012-06-06DOB complaint, category ?
2012-06-02311: Emergency Response Team (ERT) — After Hours Work - Illegal
2012-06-02DOB complaint, category ?
2012-06-01DOB complaint, category ?
2012-05-17311: Special Projects Inspection Team (SPIT) — Illegal Hotel Rooms In Residential Building
2012-05-07311: Special Projects Inspection Team (SPIT) — Illegal Hotel Rooms In Residential Building
2012-05-07DOB complaint, category ?
2012-05-03311: Special Projects Inspection Team (SPIT) — Illegal Hotel Rooms In Residential Building
2012-05-03DOB complaint, category ?
2012-04-24311: Special Projects Inspection Team (SPIT) — Illegal Hotel Rooms In Residential Building
2012-04-24311: Special Projects Inspection Team (SPIT) — Illegal Hotel Rooms In Residential Building
2012-04-24DOB complaint, category ?
2012-04-24DOB complaint, category ?
2012-04-19ECB CLASS - 1 violation: 907.2.8.:FAILURE TO PROVIDE FIRE ALARM SYSTEM. NOTED:APT 4B OCCUPIED AS A TRANSIENT USE WITHOUT PROVIDING FIRE ALARM SYSTEM. REM:D$1,600
2012-04-19ECB CLASS - 2 violation: ILLEGAL USE IN RESIDENTIAL DISTRICT. ILLEGAL USE NOTED:APT 4B OCCUPIEDAS A TRANSIENT USE IN R10A GENERAL RESIDENCE DISTRICT. REM:D$800
2012-04-19ECB CLASS - 1 violation: 28-1004.1:FAILURE TO PROVIDE REQUIRED MEANS OF EGRESS FROM ROOM ON SPACE NOTED:APT #4B OCCUPIED AS A TRANSIENT USE WITHOUT PROVIDI$1,600
2012-04-19ECB CLASS - 1 violation: 903.2.7:FAILURE TO PROVIDE AN AUTOMATIC SPRINKLER SYSTEM. NOTED:APT 4BOCCUPIED AS A TRANSIENT USE WITHOUT PROVIDING AN AUTOMATIC S$1,600
2012-04-19ECB CLASS - 1 violation: OCCUPANCY CONTRARY TO THAT ALLOWED BY C/O#64150. ILLEGAL OCCUPANCY NOTED:APT 4B OCCUPIED AS A TRANSIENT USE. REM:DISCONTINUE ILLEG$2,400
2012-03-21DOB violation E:
2012-03-20Rodent inspection: Passed
2012-02-14311: HEATING — HEAT
2012-02-14Tenant complaint: HEATING — HEAT RELATED
2012-01-30TL&R — from JPMORGAN CHASE BANK, N.A.
2012-01-30Mortgage satisfied — from BUSH, PATRICIA S; NAVE, GARY L to JPMORGAN CHASE BANK, N.A.
2011
2011-10-19Rodent inspection: Passed
2011-10-18Deed $7,200,000 — from NAVE, PATRICIA S; NAVE, GARY L to 16 WEST NY CORP$7,200,000
2005-11-30City emergency repair (OMO): public area: sheetrock ceiling under skylight in public hall approx. 10 sq. ft. , scrape, plaster and paint entire ceili$725
2005-11-15HPD class C: SECTION 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNE
2005-11-15HPD class A: SECTION 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER O
2005-11-15HPD class C: SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AT PUBLIC HALL, 5th STORY
2005-11-15HPD class A: SECTION 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMEN
2005-11-15HPD class A: SECTION 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A C
2003-12-08PREL — from NAVE, GARY L to THE DIME SAVINGS BANK OF NEW YORK , FSB
2003-10-30ECB Non-Hazardous violation: 8V1,31H11,1R11,16B1,16T15,85BB5,86BB5,51BB12,63U15,84M7,33O2,38O2,66O267O2,68O2,71O2.31-REPLACE GUIDE SHOES TOP AND BOTTOM. 1-REPL$2,500
2003-10-22DOB violation E:
2003-03-21DOB violation LL1081:
2002
2002-11-08DOB violation E:
2002-11-08DOB violation E:
2002-06-17Agreement — from NAVE, PATRICIA S.; NAVE, GARY L. to DIME SAVINGS BANK OFNEW YORK
2002-06-17Mortgage $410,481 — from NAVE, GARY L.; NAV, PATRICIA S. to DIME SAVINGS BANK OFNEW YORK$410,481
2002-06-17REL — from DIME SAVINGS BANK OFNEW YORK to NAVE, PATRICIA S.; NAVE, GARY L.
2002-06-17SAGE — from DIME SAVINGS BANK OFNEW YORK
1998-07-16HPD class B: SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AT KITCHEN 4 STY NORTH APT 4
1998-01-06DOB violation LL1081:
1997
1997-09-16DOB violation LL6291:
1997-06-20Mortgage $900,000 — from NAVE, GARY L.; NAVE, PATRICIA S. to DIME SAVINGS BANK OFNEW YORK$900,000
1997-06-20Mortgage satisfied — from NAVE, GARY L.; BUSH, PATRICIA S. NAVE to SZER, CHAIM
1997-06-20Mortgage assigned — from NAVE, GRAY L.; NAVE, PATRICIA S. to DIME SAVINGS BANK OFNEW YORK
1997-06-20SAGE — from GREATER NEW YORK SAVINGS BANK
1997-06-20Mortgage assigned — from KISSELOFF, SAMUEL J.; L.S.I. INVESTMENT CO. to DIME SAVINGS BANK OFNEW YORK
1997-06-20Mortgage assigned — from GREATER NEW YORK SAVINGS BANK to DIME SAVINGS BANK OFNEW YORK
1997-06-20Mortgage $140,715 — from NAVE, GARY L.; NAVE, PATRICIA S. to DIME SAVINGS BANK OFNEW YORK$140,715
1997-06-18Mortgage $900,000 — from NAVE, GARY L.; NAVE, PATRICIA S. to DIME SAVINGS BANK OFNEW YORK$900,000
1997-06-18Mortgage assigned — from NAVE, GARY L.; NAVE, PATRICIA S. to DIME SAVINGS BANK OFNEW YORK
1997-06-18Mortgage $209,164 — from NAVE, GARY L.; NAVE, PATRICIA S. to DIME SAVINGS BANK OFNEW YORK$209,164
1997-06-18PAT — from NAVE, PATRICIA S. to NAVE, GARY L.
1997-02-10DOB violation LL6291:
1997-01-13DOB violation LL1081:
1997-01-13DOB violation LL1081:
1996
1996-06-11DOB violation E:
1996-03-08DOB violation LL1081:
1995
1995-10-23DOB complaint, category ?
1995-08-29DOB violation LL6291:
1995-04-17DOB violation LL1081:
1995-04-06DOB complaint, category ?
1995-04-04DOB complaint, category ?
1995-04-04DOB complaint, category ?
1995-04-03DOB complaint, category ?
1994
1994-10-21DOB complaint, category ?
1994-07-21Mortgage $70,000 — from NAVE, GARY L.; NAVE, PATRICIA S. to L.S.I. INVESTMENT CO.$70,000
1994-05-31DOB violation LL1081:
1994-03-18DOB violation LL6291:
1994-03-08DOB violation E:
1993
1993-06-28DOB violation LL1081: 2
1993-03-31DOB violation E:
1993-03-18DOB violation LL6291:
1992
1992-04-07DOB violation LL1081: 2
1991
1991-04-25DOB violation LL1081: 1
1990
1990-10-22Mortgage $200,000 — from BUSH, PATRICIA S NAVE; NAVE, GARY L to SZER, CHAIM$200,000
1990-10-22PAT — from NAVE, PATRICIA S to NAVE, GARY L
1990-09-27DOB violation E:
1990-06-29DOB violation LL1081: 1
1990-05-29SAGE — from LANDMARKS PRSVN COMMSN
1989
1989-04-10HPD class C: SECTION 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM CELLAR DOOR LOCKED.
1987
1987-08-18Mortgage assigned — from SEAMEN'S BK FOR SVGS to GREATER NEW YORK SVGBK
1987-08-18Mortgage assigned — from NAVE, GARY L; NAVE, PATRICIA S to GREATER NEW YORK SVGS BK
1987-08-18Mortgage $282,541 — from NAVE, PATRICIA S.; NAVE, GARY L. to GREATER NEW YORK SVGS BK$282,541
1987-08-18SAGE — from SEAMEN'S BANK SVGS
1985
1985-05-24Mortgage assigned — from NAVE, GARY L.; NAVE, PATRICIA S to SEAMEN'S BANK/SAVINGS
1985-05-24Mortgage $206,087 — from NAVE, GARY L.; NAVE, PATRICIA S. to SEAMEN'S BANK/SAVINGS$206,087
1985-05-24Mortgage assigned — from COLUMBIA FEDL SAVINGS BK to SEAMEN'S BANK/SAVINGS
1983
1983-07-15Mortgage $50,200 — from NAVE, PATRICIA S.; NAVE, GARY L.; BUSH, PATRICIA NAVENKA to COLLUMBIA SAVINGS F.A$50,200
1983-07-15Mortgage assigned — from BANK/BEVERLY HILLS to COLUMBIA SAVINGS F.A.
1983-04-05Mortgage $75,611 — from BUSH, PATRICIA NAVE; NAVE, GARY L. to BANK OF BEVERLY HILLS$75,611
1983-04-05Mortgage satisfied — from NAVE, GARY Z. & ANO to MARSH, GREGORY S.
1983-04-05Mortgage satisfied — from NAVE, GARY Z. & ANO to MARSH, GREGORY S.
1983-04-05Mortgage satisfied — from DANON, JOSEPH; GOLDWEP REALTY CORP. to MINISTESRS/MISSONRSETC.; WOODSIDE SV & LN ASSOC.
1983-04-05Mortgage assigned — from C.H.F. ASSOCIATES to BANK OF BEVERLY HILLS
1983-03-08Mortgage assigned — from ASTORIA FED SV&LN ASSOC. to CHF ASSOCIATES
1981
1981-12-15Agreement — from NAVE, GARY L; NAVE, PATRICIA to C H F ASSOCIATES
1981-07-20Agreement — from C H F ASSOCIATES to NAVE, PATRICIA; NAVE, GARY L
1979
1979-11-13Mortgage assigned — from MARSH, GREGORY S to C H F ASSOCIATES
1979-11-13SMIS — from NAVE, GARY L; NAVE, PATRICIA S to MARSH, GREGORY S
1979-11-13Mortgage — from NAVE, PATRICIA S; NAVE, GARY L to C H F ASSOCIATES
1979-11-13Deed — from C H F ASSOCIATES to NAVE, GARYL; NAVE, PATRICIA S
1972
1972-12-19Mortgage assigned — from MINISTERS & MSSNRS ETAL to WOODSIDE S/LA
1972-12-11Deed — from GOLDWEP REALTY CORP to C H F ASSOCIATES
1972-12-11Mortgage — from GOLDWEP REALTY CORP to WOODSIDE S/LA
1972-12-11Deed — from C H F ASSOCIATES to GOLDWEP REALTY CORP
1969
1969-07-17Deed — from CHF AASSOCIATES to CHF ASSOCIATES
1969-03-21Deed — from JERUSALAM EDUCATIONAL TR; DARON JOSEPH TR to CHF ASSOCIATES
1966
1966-02-23Deed — from DANON JOSEPH to JERUSALEM EDUC.TRUST; DANON JOSEPH-TR
1966-01-17Deed — from DANON, JOSEPH to JERUSALEM EDCTNL TRUST; DANON, JOSEPH TR