The city's published records show little recorded distress here in the last three years. Less recorded distress than 64% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty
points per 10 units; this building carries 8.5. In ZIP 10029, 43% of residential buildings hold an A and
12% grade D or F.
How grades work
this building
A
B
C
Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
Open HPD violations
1 total — 0 class C (immediately hazardous), 1 class B, 0 class A. Oldest open since 2000-04-06.
status snapshot refreshed weekly from HPD records
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
8 service requests in the last three years. Most common: Noise (4) · Water System (1) · Lead (1) · Street Condition (1) · Rodent (1).
Filed construction activity
$30,000 in permitted construction work filed since
2016 (1 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1910)
Yes
Six or more residential units (10)
No
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
BALDWIN CONDOMINIUM CORP
Head officer
JILL JONES
Managing agent
HARLEM PROPERTY MANAGEMENT
Last registered
2025-12-05
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$0
$0
2026
$307,557
$138,400
2027
$225,438
$101,447
Building systems
Heating fuel
NATURALGAS
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
103 St — 6 · 500 ft straight-line (about a 2-minute walk) · station accessibility: none
Bus
Nearest boarding stop: Lexington Av / E 100 St — M101 M102 M103 · 500 ft
Citi Bike
E 102 St & Park Ave · 400 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
8 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2025-11-14
DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
2025-10-25
311: Noise — Noise: Construction Before/After Hours (NM1)
The full timeline
2026
2026-09-17Rodent inspection: Passed
2026-03-07Rodent inspection: Passed
2026-02-13311: Rodent — Rat Sighting
2026-01-29Bedbug filing: 0 infested units
2025
2025-11-17HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2025-10-25311: Noise — Noise: Construction Before/After Hours (NM1)
2025-10-01Mortgage satisfied — from REID, BHANWATTIE to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; CITIBANK
2025-09-22Permit General Construction — Signed-off
2025-09-16311: Street Condition — Dumpster - Construction Waste
2025-09-08Rodent inspection: Passed
2025-08-15Job filed: APPLICATION BEING FILED TO REPAIR BUILDING'S FACADE.$30,000
2025-03-11Rodent inspection: Passed
2025-01-29Deed — from CONTICELLI, ROBERT G II; CONTICELLI, ROBERT; GOLDSTEIN, INNA to INNA GOLDSTEIN, TRUSTEE; INNA GOLDSTEIN REVOCABLE TRUST; ROBERT G. CONTICELLI II REVOCABLE
2024
2024-12-18Deed transfer (nominal price)
2024-12-17Bedbug filing: 0 infested units
2024-11-22Deed — from HAI, LEE LILAC; BARAM, YAM to HAI, LEE LILAC
2024-11-11Deed transfer (nominal price)
2024-09-13Rodent inspection: Passed
2024-07-26311: Lead — Lead Kit Request (Residential) (L10)
2023-11-15HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2023-09-21Rodent inspection: Passed
2023-09-06Mortgage satisfied — from GAVRILESCU, CRISTIANDORIN to CITIBANK NA; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2023-08-23PAT — from BARAM, YAM to GOLDBLUM, AARON
2023-08-23PAT — from HAI, LEE LILAC to THE BOARD OF MANAGERS OF THE BALDWIN CON
2023-08-23PAT — from HAI, LEE LILAC to GOLDBLUM, AARON
2023-08-23PAT — from BARAM, YAM to THE BOARD OF MANAGERS OF THE BALDWIN CON
2023-08-23Deed $607,300 — from GAVRILESCU, CRISTIAN DORIN to HAI, LEE LILAC; BARAM, YAM$607,300
2023-08-23PAT — from GAVRILESCU, CRISTIAN DORIN to CHAN, KAIKO
2022-05-05Mortgage satisfied — from PERRY, MICHELLE; PERRY, TIMON to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; P.O. BOX 2026, FLINT, MI 48501-2026
2022-04-19Mortgage $720,000 — from KERSTEN, AARON; JONES, JILL to MERS$720,000
2022-04-19Deed $900,000 — from PERRY, TIMON; PERRY, MICHELLE to JONES, JILL; KERSTEN, AARON$900,000
2022-03-31Sold for $900,000$900,000
2022-02-02311: HEAT/HOT WATER — ENTIRE BUILDING
2022-02-02Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2021
2021-12-08Bedbug filing: 0 infested units
2021-09-15Mortgage $382,000 — from SETHI, KAMALA to CONTINENTAL MORTGAGE BANKERS INC. DBA FI; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$382,000
2021-09-15SUBM — from MUNICIPAL CREDIT UNION to CONTINENTAL MORTGAGE BANKERS INC. DBA FI
2021-06-16Mortgage satisfied — from SETHI, KAMALA to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; FRANKLIN FIRST FINANCIAL, LTD
2021-06-02Bedbug filing: 0 infested units
2021-04-01HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021-02-11Agreement $392,000 — from EMPALMADO, ALVIN SAMODIO; STALLINGS, DOUGLAS to CITIBANK, N.A.$392,000
2021-02-11Mortgage $25,671 — from EMPALMADO, ALVIN SAMODIO; STALLINGS, DOUGLAS to CITIBANK, N.A.$25,671
2021-02-11Mortgage assigned — from MERS to CITIBANK, N.A.
2020
2020-12-23311: Water Quality — Taste/Odor, Musty/Stale (QA4)
2020-10-15Mortgage $215,000 — from SETHI, KAMALA to MUNICIPAL CREDIT UNION$215,000
2020-05-28Mortgage assigned — from CITIBANK, NA.; MERS to MERS; HSBC BANK USA NA
2020-05-28Mortgage $108,032 — from PERRY, TIMON; PERRY, MICHELLE to MERS; HSBC BANK USA NA$108,032
2020-05-28Agreement $499,000 — from PERRY, TIMON; PERRY, MICHELLE to HSBC BANK USA NA; MERS$499,000
2019
2019-06-19Rodent inspection: Passed
2018
2018-11-28Rodent inspection: Passed
2018-03-02Mortgage satisfied — from PENZINI NYC, LLC to NYDBC LOCAL DEVELOPMENT CORPORATION
2018-02-13Rodent inspection: Passed
2017
2017-06-27PAT — from GOLDSTEIN, INNA; CONTICELLI, ROBERT to BOARD OF MANAGERS OF THE BALDWIN CONDOMI
2017-06-27Mortgage $880,000 — from GOLDSTEIN, INNA; CONTICELLI, ROBERT to WELLS FARGO BANK N.A.$880,000
2017-06-27Deed $1,100,000 — from PENZINI NYC, LLC to GOLDSTEIN, INNA; CONTICELLI, ROBERT$1,100,000
2017-06-22Sold for $1,100,000$1,100,000
2017-05-12Rodent inspection: Passed
2017-02-14Mortgage $88,000 — from PENZINI NYC LLC to NYBDC LOCAL DEVELOPMENT CORPORATION$88,000
2016
2016-10-25HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2016-08-23Rodent inspection: Passed
2016-07-13FDNY inspection (RISK)
2016-03-24311: Lead — Lead Kit Request (Residential) (L10)
2015
2015-12-08Rodent inspection: Passed
2015-08-18311: Water System — Hydrant Running Full (WA4)
2015-07-22Mortgage satisfied — from STIVALETTA, JANE to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; CITIBANK, N.A.
2015-06-25Deed $535,000 — from STIVALETTA, JANE$535,000
2015-06-25PAT — from JASLEEN, LLC to BOARD OF MANAGERS
2015-06-25PAT — from STIVALETTA, JANE to WHELAN, AMI; PALEY, MARC; LUFTIG, ANDREW; SPALLINO, DANIELLE; NATI, DANIELLE; BLASS, JONAT
2015-04-28Deed $485,000 — from HAZANOV, NATALIE; VAYSBURD, IGOR; NOV, NATASHA to BESSER, ARIE$485,000
2015-04-28PAT — from BESSER, ARIE to KRINSKY, SCOTT ESQ
2015-04-28PAT — from HAZANOV, NATALIE to NOV, NATASHA
2015-04-28PAT — from BESSER, ARIE to THE BALDWIN CONDOMINIUM
2013-09-26ECB CLASS - 2 violation: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: FAILURE TO COMPLY WITH LAW FOR DRAINAGE SYSTEM PER PC 702.1,27-911 FOUND TH$500
2013-08-15311: Water System — Hydrant Leaking (WC1)
2013-02-27DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2013-02-27DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2013-01-09Mortgage assigned — from HUDSON CITY SAVINGS BANK to MERS
2013-01-09Agreement $400,000 — from GUNS, KRIS; VAN LAER, CORA to MERS$400,000
2012
2012-12-10Mortgage satisfied — from IGLESIA PRESBITERIANA DEL ESTE to PONCE DE LEON FEDERAL BANK
2012-12-10PAT — from NOV, NATASHA; HAZANOV, NATALIE; VAYSBURD, IGOR to BD MGRS THE BALDWIN CONDO
2012-12-10Deed — from 101 CONDO, LLC to HAZANOV, NATALIE; VAYSBURD, IGOR; NOV, NATASHA
2012-12-10PAT — from HAZANOV, NATALIE to JERRO, BONNIE
2012-12-10311: General Construction/Plumbing — Adjacent Buildings Not Protected
2012-12-08ECB CLASS - 1 violation: B154,51,50A,B,C,D,D. 50A- BOILER CARBON MONOXIDE 250 PPM AND CLIMBING.50B- FRESH AIR INTAKE TO CLOSE TO CHIMNEY CLEAN OUT DOOR, FU$1,000
2012-12-08ECB CLASS - 1 violation: B154,51,50A,B. 50A- REMOVE DIRECT VENT PIPING FROM FRESH AIR INTAKE HAZARDOUS. 50B- THIS DEVICE CANNOT BE RESTORED TO SERVICE UNTI$1,000
2012-11-13RPTT&RET $417,000 — from 101 CONDO, LLC to HAZANOV, NATALIE; VAYSBURD, IGOR; NOV, NATASHA$417,000
2012-08-16Mortgage satisfied — from 101 CONDO LLC to IGLESIA PRESBITERIANA DEL ESTE
2012-08-16PREL — from SARATOGA SPRINGS PROPERTIES LLC to 101 CONDO LLC
2012-08-16Mortgage satisfied — from 101 CONDO LLC to IGLESIA PRESBITERIANA DEL ESTE
2012-08-16Mortgage satisfied — from 101 CONDO LLC to IGLESIA PRESBITERIANA DEL ESTE
2012-07-26Mortgage $497,250 — from SETHI, KAMALA to MERS$497,250
2012-07-26Deed $585,000 — from 101 CONDO LLC to SETHI, KAMALA$585,000
2012-07-26PAT — from SETHI, KAMALA to B/O/M OF THE BALDWIN CONDOMINIUM
2012-07-18PAT — from DORIN GAVRILESCU, CRISTIAN to BOARD OF MANAGERS
2012-07-18Deed $415,000 — from 101 CONDO LLC to GAVRILESCU, CRISTIAN DORIN$415,000
2012-07-18Mortgage $332,000 — from DORIN GAVRILESCU, CRISTIAN to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; CITIBANK, NA$332,000
2012-07-03Mortgage $200,000 — from REID, BHANWATTIE to MERS$200,000
2012-07-03Deed $388,362 — from 101 CONDO, LLC to REID, BHANWATTIE$388,362
2012-07-03PAT — from REID, BHANWATTIE to THE BALDWIN CONDOMINIUM BOARD OF MANAGER
2012-06-27PREL — from IGLESIA PRESBITERIANA DEL ESTE to 101 CONDO LLC
2012-06-27PREL — from SARATOGA PROPERTIES LLC to 101 CONDO LLC
2012-06-27Mortgage $329,600 — from STIVALETTA, JANE to MERS$329,600
2012-06-27PAT — from STIVALETTA, JANE to THE BALDWIN CONDOMINIUM
2012-06-27Deed $417,768 — from 101 CONDO LLC to STIVALETTA, JANE$417,768
2012-06-26Mortgage $464,000 — from GUNS, KRIS; VAN LAER, CORA to HUDSON CITY SAVINGS BANK$464,000
2012-06-26PAT — from GUNS, KRIS; VAN LAER, CORA to THE BOARD MANAGERS OF THE BALDWIN CONDOM
2012-06-26PREL — from 101 CONDO, LLC to IGLESIA PRESBITERIANA DEL ESTE
2012-06-26PAT — from LAER, CORA VAN to ALLEN SCHIFINO, ESQ.
2012-06-26PREL — from 101 CONDO, LLC to SARATOGA PROPERTIES LLC
2012-06-26Deed $580,000 — from 101 CONDO LLC to VAN LAER, CORA; GUNS, KRIS$580,000
2012-06-20REL — from 101 CONDO LLC
2012-06-20REL — from 101 CONDO LLC
2012-06-19PREL — from 101 CONDO LLC to IGLESIA PRESBITERIANA DEL ESTE
2012-06-19PREL — from 101 CONDO LLC to SARATOGA PROPERTIES LLC
2012-06-08Deed $560,038 — from 101 CONDO, LLC to PERRY, TIMON; PERRY, MICHELLE$560,038
2012-06-08Mortgage $495,000 — from PERRY, TIMON; PERRY, MICHELLE to MERS$495,000
2012-06-08PAT — from PERRY, MICHELLE; PERRY, TIMON to THE BOARD MANAGERS OF THE BALDWIN CONDOM
2012-06-07Deed $580,000 — from 101 CONDO, LLC to PENZINI NYC, LLC$580,000
2012-06-07PAT — from PENZINI NYC LLC to THE BALDWIN CONDOMINIUM
2012-06-07REL — from SARATOGA PROPERTIES LLC to 101 CONDO LLC
2012-05-30PREL — from SARATOGA PROPERTIES LLC to 101 CONDO LLC
2012-05-30PREL — from IGLESIA PRESBITERIANA DEL ESTATE; EAST PRESBYTERIAN CHURCH to 101 CONDO LLC
2012-05-30Deed $590,585 — from 101 CONDO, LLC to EMPALMADO, ALVIN SAMODIO; STALLINGS, DOUGLAS$590,585
2012-05-30PAT — from EMPALMADO, ALVIN SAMODIO; STALLINGS, DOUGLAS to THE BOARD OF MANAGERS OF THE BALDWIN CON
2012-05-30Mortgage $521,000 — from STALLINGS, DOUGLAS; EMPALMADO, ALVIN SAMODIO to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; CITIMORTGAGE, INC.$521,000
2012-05-09PAT — from THE BALDWIN CONDOMINIUM to TREATISE LIVING, LLC
2012-05-09REL — from 101 CONDO LLC to IGLESIA PRESBITERIANA DEL ESTE
2012-05-09Deed $440,000 — from 101 CONDO, LLC to TREATISE LIVING, LLC$440,000
2012-05-09REL — from 101 CONDO LLC to IGLESIA PRESBITERIANA DEL ESTE
2012-05-09REL — from 101 CONDO LLC to SARATOGA PROPERTIES LLC
2012-05-07Rodent inspection: Passed
2012-03-29CDEC — from THE BALDWIN CONDOMINIUM
2012-03-29CDEC — from THE BALDWIN CONDOMINIUM
2012-03-29MAPS — from THE BALDWIN CONDOMINIUM
2012-03-29MAPS — from THE BALDWIN CONDOMINIUM
2012-03-29MAPS — from THE BALDWIN CONDOMINIUM
2012-03-29MAPS — from THE BALDWIN CONDOMINIUM
2012-03-29CDEC — from THE BALDWIN CONDOMINIUM
2012-03-29CDEC — from THE BALDWIN CONDOMINIUM
2012-03-29CDEC — from THE BALDWIN CONDOMINIUM
2012-03-29CDEC — from THE BALDWIN CONDOMINIUM
2012-03-29MAPS — from THE BALDWIN CONDOMINIUM
2012-03-29MAPS — from THE BALDWIN CONDOMINIUM
2012-03-29CDEC — from THE BALDWIN CONDOMINIUM
2012-03-29MAPS — from THE BALDWIN CONDOMINIUM
2012-03-29MAPS — from THE BALDWIN CONDOMINIUM
2012-03-29CDEC — from THE BALDWIN CONDOMINIUM
2012-03-29CDEC — from THE BALDWIN CONDOMINIUM
2012-03-29MAPS — from THE BALDWIN CONDOMINIUM
2012-03-29MAPS — from THE BALDWIN CONDOMINIUM
2012-03-29CDEC — from THE BALDWIN CONDOMINIUM
2012-02-03Job filed: INSTALL NEW BOILER. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.$5,000
2012-01-27Job filed: ALL LOCATION OF TEN (10) CONDOMINIUM LOT NUMBERS TO TEN (10) CONDOMINIUM UNITS
2011
2011-05-24Rodent inspection: Passed
2010
2010-04-26Rodent inspection: Passed
2007
2007-07-16Job filed: Modifications to the existing plumbing and mechanical systems and new sprinkler system as per plans submitted herewith. No change to use, occupancy gr$60,000
2007-01-31Job filed: Installation of additional structural support to existinf residential building as per plans submitted herewith. No Change to Use, Occupancy Group, or $30,000
2006
2006-12-21Job filed: Installation of new partitions, doors, and finish ceiling as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.$110,000
2002
2002-11-26Job filed: INSTALLATION OF INTERIOR PARTITIONS, DOO RS AND FINISH CEILINGS. INSTALL TION OF NEW STEAM PIPING AND RADIATIOR ( CONNECTED TO EXISTING BOILER). INSTA$80,000
2002-10-28Job filed: Removal of interior, non-load bearing paRTITIONS. RE- FRAME ROOF AND INSTALLATION OF NEW ROOFING SYSTEM. NO CHANGE TO USE , OCCUPANCY AND/OR EGRESS$40,000
2002-10-21Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK BRID GE 26'DURING FACADE REPAIR NO C ANGE IN EGRESS USE OR OCCUPANCY HEAVY DU TY SHED=300 PSF LIVE LOAD SHED TO C
2000
2000-04-06HPD class B: SECTION 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FRO